Certificate of Substantial Completion Project: Correct Life Safety Violations, Renovate East Wing, DOS 84490010, Government House, St. Augustine, FL |
|
Series Title: |
Historic St. Augustine: Permits, State Inspections, City Forms, HARB |
|
Physical Description: |
Maintenance record |
|
Language: |
English |
|
Publication Date: |
1988 |
|
Physical Location: |
Box: | 8 | Divider: | DOS 8449-A, Govt. House 87-88 | Folder: | Permits, State Inspections, City Forms, HARB |
|
Subjects |
|
Subject: |
Saint Augustine (Fla.) 48 King Street (Saint Augustine, Fla.) Government House (Saint Augustine, Fla.) |
|
Spatial Coverage: |
North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 48 King Street |
|
Coordinates: |
29.892465 x -81.313142 |
Record Information |
|
Bibliographic ID: |
UF00095503 |
|
Volume ID: |
VID00034 |
|
Source Institution: |
University of Florida |
|
Holding Location: |
University of Florida |
|
Rights Management: |
All rights reserved by the source institution and holding location. |
|
CERIIIICAt: O1-
SUBSTANTIAL
COMPLETION
AIA DOCUMENT G704
LJIAlllUULIUl LU.
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
PROJECT: Correct Life Safety Violations,
(name, address) Renovate East Wing, DOS 84490010
Government House, St. Augustine, FL
TO (Owner):
FState of Florida Department of -
General Services
Room 512, Larson Building
Tallahassee, FL 32399-0973
L O
DATE OF ISSUANCE: 5-/S -Y
ARCHITECT: Shepard Associates Architects &
Planners Inc.
ARCHITECT'S PROJECT NUMBER: 8801
CONTRACTOR: Len Weeks Construction Co.
CONTRACT FOR. (Project)
CONTRACT DATE:
7-26 8#
PROJECT OR DESIGNATED PORTION SHALL INCLUDE: Project, complete except mechanical
and electrical under separate contracts.
The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial
Completion of the Project or portion thereof designated above is hereby established as 1,i. 6
which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below.
DEFINITION OF DATE OF SUBSTANTIAL COMPLETION
The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when
construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the
Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Architect, is
attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all
Work' in accordance with the Contract Documents. The date of commencement of warranties for items on the attached list will
be the date of final payment unless otherwise agreed to in writing.
Shepard Associates Architects &
Planners Inc.
ARCHITECT
BY Herschel E. Shepard FAIA
days
The Contractor will complete or correct the Work on the list of items attached hereto within thirty (30)
from the above Date of Substantial Completion.
Len Weeks Construction Co.
CONTRACTOR
BY Len Weeks
The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof
at (time) on (date).
State of Florida Department of- .-
General Services 6-
OWNER 1T-1Davi Scott, HSAPB Res/Const DirDATE
The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work
and insurance shall be as follows:
(Note-Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage; Contractor
shall Lecure consent of surely company, ii any.)
The Owner assumes responsibility effective the date of Substantial Completion.
AIA DOCUMENT C704 CERTIFICATE OF SUBSTANTIAL COMPLETION APRIL 1978 EDITION AIA*
) 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006
DATE
G704 1978
DATE
CERTIFY ICAt O1
SUBSTANTIAL
COMPLETION
AIA DOCUMENT G704
Ull l IUUluI(J tU:
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
PROJECT: Correct Life Safety Violations,
(name, address) Renovate East Wing, DOS 8449001C
Government House, St. Augustine, FL
TO (Owner):
FState of Florida Department of
General Services
Room 512, Larson Building
Tallahassee, FL 32399-0973
L
DATE OF ISSUANCE: 5 /4'
ARCHITECT: Shepard Associates Architects &
) Planners Inc.
ARCHITECT'S PROJECT NUMBER: 8801
CONTRACTOR: Len Weeks Construction Co.
CONTRACT FOR. (Project)
I CONTRACT DATE:
7-26-.
PROJECT OR DESIGNATED PORTION SHALL INCLUDE: Project, complete except mechanical
and electrical under separate contracts.
The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial
Completion of the Project or portion thereof designated above is hereby established as 6.,- 8
which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below.
DEFINITION OF DATE OF SUBSTANTIAL COMPLETION
The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when
construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the
Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Architect, is
attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all
Work' in accordance with the Contract Documents. The date of commencement of warranties for items on the attached list will
be the date of final payment unless otherwise agreed to in writing.
Shepard Associates Architects &
Planners Inc.
ARCHITECT
BY Herschel E. Siepard FAIA
days
The Contractor will complete or correct the Work on the list of items attached hereto within thirty (30)
from the above Date of Substantial Completion.
Len Weeks Construction Co. AL eJ
CONTRACTOR BY Len Weeks DA
The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof
at (time) on (date).
State of Florida Department of
General Services, / n
OWNER Y- avi Scott, HSAPB Res/Const Dir DATE
The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work
and insurance shall be as follows:
(Note-Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage; Contractor
shall curee consent of surety company, ii any.)
The Owner assumes responsibility effective the date of Substantial Completion.
AIA DOCUMENT G704 CERTIFICATE OF SUBSTANTIAL COMPLETION APRIL 1978 EDITION AIAe
U 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006
DATE
G704 1978