PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE
SAN AGUSTIN ANTIQUO FOUNDATION
JULY 5, 1988
1. PRELIMINARY RESEARCH ALLOWANCES
1. Historic/ Architectural Research
A. Staff labor
2. Archeological Research
A. Staff labor
3. Paint analysis, $75 first,$50 each after
4. Record architectural details
2. SITE WORK
1. Landscape rear garden (historic)
A. Staff labor
2. Remove second story 1949 partitions
A. Staff labor
3. Remove second, story floor, 1949 addition
A. Staff labor
4. Remove building in rear yard
A. Staff labor
3.& 4. CONCRETE AND MASONRY
1. Grind and repair tabby floor.
200 hrs.
150 hrs.
$575
1, 000
3,500
100 hrs.
40 hrs.
40 hrs.
45 hrs.
1,800
5. METALS
1. Remove later iron grates on windows
A. Staff labor
15 hrs.
6. ROUGH AND FINISH CARPENTRY
1. Rebuild roof rafters, replace inappropriate later
material with accurate reproductions $4,300
2. Remove shingles and replace with hand split
shakes. 11 squares at $127 each. Material cost 1,397
3. Labor to re-roof and correct later overhang &
front facade work. 4,100
4. Re-build rear room and stairs 5,400
7. DOORS AND WINDOWS
1. Replace front windows, first story 3,600
2. Repair, restore second story windows 2,000
8. FINISHES
1. Repair or replaster interior 2,600
2. Repair plaster on front exterior ,-- 1,000
3. Paint exterior Materials 200
A. Staff labor 90 hrs.
4. Paint interior Materials 350
A. Staff labor 175 hrs.
8. FINISHES, CONT.
5. Repair, restore, or replace interior details.
Remove later inappropriate additions. Materials $2,000
A. Staff labor 220 hrs.
9. MECHANICAL
1. Remove existing plumbing $900
10. ELECTRICAL
1. Remove and reconfigure electrical service 1,200
2. Rewire electrical 1,000
11. CONTINGENCY COSTS (10%)
3,
TOTAL CONSTRUCTION COSTS **&-,4 404
NOTE: This estimate represents the minimum restoration costs for
the Paredes/Dodge House. If special load testing analyses are
required an additional $3,000 would be spent.
This estimate also includes a minimum of 1,100 Staff hours and
that figure could double depending upon unexpected expenses.
'I,
PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE
SAN AGUSTIN ANTIQUO FOUNDATION
JULY 5, 1988
1. BASE BID, ALTERNATES, ALLOWANCES
ALLOWANCES:
1. Historic/ Architectural Research Staff
Paint analysis, $75 first,$50 each after
Record architectural details
S Archeological Research Staff
BASE BID/ ALTERNATES
1. Contingency Costs 10% of total costs
2. SITE WORK
1. Landscape rear garden (historic)
A. Staff labor
2. Remove second story 1949 partitions
A. Staff labor
3. Remove second. story floor, 1949 addition
A. Staff labor
4. Remove building in rear yard
A. Staff labor
3.& 4. CONCRETE AND MASONRY
1. Grind and repair tabby floor.
200 hrs.
$575
1,000
150 hrs.
3,962
3,500
100 hrs.
40 hrs.
40 hrs.
45 hrs.
1,800
5. METALS
1. Remove later iron grates on windows
A. Staff labor
6. ROUGH AND FINISH CARPENTRY
1. Rebuild roof rafters, replace inappropriate
-material with accurate reproductions
2. Remove shingles and replace with hand split
shakes. 11 squares at $127 each. Material cost
3. Labor to re-roof and correct later overhang
front facade work.
4. Re-build rear room and stairs
later
$4,300
1,397
4,100
5,400
7. NOT USED
8. DOORS AND WINDOWS
1. Replace front windows, first story
2. Repair, restore second story windows
9. FINISHES
1. Repair or replaster interior
2. Repair plaster on front exterior
3. Paint exterior Materials
A. Staff labor
4. Paint interior Materials
A. Staff labor
3,600
2,000
2,600
1,000
200
90 hrs.
350
175 hrs.
15 hrs.
9. FINISHES, CONT.
5. Repair, restore, or replace interior details.
Remove later inappropriate additions. Materials $2,000
A. Staff labor 220 hrs.
10-14. NOT USED
15. MECHANICAL
1. Remove existing plumbing $900
16. ELECTRICAL
1. Remove and reconfigure electrical service 1,200
2. Rewire electrical 1,000
TOTAL CONSTRUCTION COSTS $40,884
NOTE: This estimate represents the minimum restoration costs for
the Paredes/Dodge House. If special load-testing analyses are
LAoGO b& IA *;rr*
required adan additional $3,000. If 4-.h._rn t r-chitet' 1 ira l o
This estimate also includes a, minimum of 1,100 Staff hours and
that figure could doubled ) #ur *o O4d-- S
|