Title: Water Requirements Based on Process Flow Sheets, Dated 10/31/75
CITATION THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/WL00004102/00001
 Material Information
Title: Water Requirements Based on Process Flow Sheets, Dated 10/31/75
Physical Description: Book
Language: English
 Subjects
Spatial Coverage: North America -- United States of America -- Florida
 Notes
Abstract: Jake Varn Collection - Water Requirements Based on Process Flow Sheets, Dated 10/31/75 (JDV Box 54)
General Note: Box 17, Folder 3 ( WaterTransbasin Transfers - 1970s ), Item 3
Funding: Digitized by the Legal Technology Institute in the Levin College of Law at the University of Florida.
 Record Information
Bibliographic ID: WL00004102
Volume ID: VID00001
Source Institution: Levin College of Law, University of Florida
Holding Location: Levin College of Law, University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text



/1


M' :"


Pr "f /


WATER REQUIREMENTS BASED ON
PROCESS FLOW SHEETS

7TA ?d /A-- .


GRACE

Hooker's
Prairie


AGRICO

Fort
Green


7c<- At- / 7p--
/9-z rA e- 7


BEKER


M'TX TPH
PEBBLE TPH
CAR PRODUCT TPH
F.A. CONC. TPH
A. CONO. TPH
dIELL WATER GPM
J'ELL WATER GPD
TOTAL PEBBLE PRODUCT, TPH
O7TAL CONC. PRODUCT, TPH
TOTAL PLANT PRODUCT, TPH
RATIO PEBBLE/CONC.
WELL WATER REQUIRED:
GPM/T MTX
GPM/T FAC
GPM/T AC
RATIO FAC/AC


PRODUCT:


% PEBBLE
% CONC.


RECLAIM GPM MINE &
PLANT WATER REQUIRED
WELL + RECLAIM WATER
GPM TOTAL WATER/TPH MTX
3PM TOTAL WATER/TPH PRODUCT


1,588
250
46
280
147
6,988
10,062,720
296
147
443
2.01/1


4.40
24.96
47.54
1.90/1


66.8%
33.2%


60,449
67,437'
42.47
152.23


2,430
361
129
508
382
9,535**
13,730,400
490
382
872
1.28/1


3.92
18.77
24.96
1.33/1


56.2%
43.8%


104,125
113,660
46.77
130.34


* Plant pebble product.--Not necessarily marketable pebble.
** Includes pump seal water.


2,200
109

401
321
6,940
9,993,600
109
321
430
0.34/1

3.15
17.30
21.62
1.25/1

25.3%
74.7%


90,770
97,710
44.41
227.23



Z4- tf cl'-,


2,505
150*

641
501
o10,321
14,862,240
150
501
651
0.30/1
4.12
16.10
20.60
1.28/1

23.0%
77.0%


88,177
98,498
39.32
151.30


S24 1, P,.


PPCo

DPG
Red
Book


iPaj -*t" N
/=&.*.'








WATER FLOW DIAGRAM
MISSISSIPPI CHEMICAL CORPORATION
AVERAGE DAILY FLOWS IN GPM
---- I 15..8 12 ------------


PRODUCTION USE OF WATER


A detailed flow sheet shows the sources and distribution of water in gpm. Water for use
at the plant is pumped from the well fields at an average flow of 7,974 gpm. In addition,
95,000 gpm of recirculated process water from the waste pebble, the sand tailings, the waste
clays, and the product itself, is piped to the mine and to the plant. Water from Brushy
Creek Storage Basin amounts to 3,812 gpm and is piped to the mining area.


The water balance diagram is the product of detailed planning for the water needs of this
operation. It represents the combination of knowledge regarding process requirements,
ore characteristics, water sources, and a thoughtful management plan.




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs