Title: Letter Re: Tampa Bypass Canal (C-135) and Harney Canal (C-136)
CITATION THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/WL00001664/00001
 Material Information
Title: Letter Re: Tampa Bypass Canal (C-135) and Harney Canal (C-136)
Physical Description: Book
Language: English
 Subjects
Spatial Coverage: North America -- United States of America -- Florida
 Notes
Abstract: Letter Re: Tampa Bypass Canal (C-135) and Harney Canal (C-136), August 26, 1974
General Note: Box 9, Folder 2 ( SF-Tampa Baypass Canal - 1976-1997 ), Item 48
Funding: Digitized by the Legal Technology Institute in the Levin College of Law at the University of Florida.
 Record Information
Bibliographic ID: WL00001664
Volume ID: VID00001
Source Institution: Levin College of Law, University of Florida
Holding Location: Levin College of Law, University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text
r.. ... .. .. "- - .




DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT. CORPS OF ENGINEERS
P,- 0. BOX 4970
JACKSONVILLE. FLORIDA 32201


SAJBP 26 August 1974



Mr. Robert Watson
Southwest Florida Water Management District -
P. 0. Box 457 -
Brooksville, Florida 33512

Re: Tampa Bypass Canal (C-135)
- -..-...-...... .. .. ...... ~ ._ and Harney Canal (C-136)
Dear Mr. Watson:

We are proceeding with preparation of plans and specifications for
Canal 135, Sec. 3B, 4A, Canal 136, and Structure 162. If funding
permits and all rights-of-way and easementshave been furnished, we
will advertise this work on 15 November 1974. It is our intent to
execute this work in two construction contracts. One will include
Structure 162 and that part of Canal 135, Sec. 3B,between Buffalo Ave.
and Interstate 4. The other contract will include the remainder of
Canal 135, 3B, Canal 135, 4A, and Canal 136. A plug will be left in
Canal 136 for the U. S. 301 Bridge and another from a point east of
Structure 161 to the west right-of-way of Harney Road.

In accordance with previous understandings among SWFWMD, SCL RR,
an the Corps, we are planning to place approximately 1.1 million
cus yards of material on railroad property within Disposal Area "T".
O We.will place debris from the clearing and grubbing operation on
UL SWERMD property (Riga Tract) and cover it with three feet of fill.
> Up bo but no more than 1 million cubic yards of canal-excavation will
L. be placed, in .isposal Area "V" (Ryal Tract)'.

Lj Approximately 1.6 million cubic yards from Canal 135, Sec. 3B, north
iC of -T4 will be placed in Disposal Area "B" (Lovelace Property).
Excavation from Canal 135, Sec. 4A will be placed within the
right-of-way adjacent to this reach of the canal. Excavation from
Canal 136 will be placed in disposal areas continuous and adjacent
to canal right-of-way.

If there is any reason why the above-stated plans cannot be carried
out, this office should be advised immediately.












26 August 1974


SAJBP
Mr. Robert Watson


Plans and specifications for both contracts will be issued for 30-day
review on 15 October 1974. So that the review plans and specifications
will accurately show the right-of-way, haul routes, and easements, and
properly reflect all agreements, certified land maps, documents, and
agreements must be furnished by 15 September 1974.

Lerely yours, -




Chief, Engineering Division
Chief, Engineering Division


Copy furnished:
Mr. Charles H. Miller, SWFWMD


- S.

9


b~ ii


1




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs