Title: Memorandum: Tampa Bypass Canal Operational Levels
CITATION THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/WL00001642/00001
 Material Information
Title: Memorandum: Tampa Bypass Canal Operational Levels
Physical Description: Book
Language: English
 Subjects
Spatial Coverage: North America -- United States of America -- Florida
 Notes
Abstract: Memorandum: Tampa Bypass Canal Operational Levels, April 30, 1981
General Note: Box 9, Folder 2 ( SF-Tampa Baypass Canal - 1976-1997 ), Item 26
Funding: Digitized by the Legal Technology Institute in the Levin College of Law at the University of Florida.
 Record Information
Bibliographic ID: WL00001642
Volume ID: VID00001
Source Institution: Levin College of Law, University of Florida
Holding Location: Levin College of Law, University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text

cL^


Southwest Florida
Water MWanagenment District

5060 U.S. HIGHWAY 41, SOUTH BROOKSVILLE, FLORIDA 33512
1961 a PHONE (904) 796-7211

4GMETBRUCE A. SAMSON, Chairman, Tampa B. T. LONGINO, Sarasota JIM KIMBROUGH, Brooksville
Win. 0. STUBBS. JR~ Vice Chairman Dlade City, CLI1FF STEPHENS Clawae ARCHU UtPDlIE JR Lae Wal


., ,
JAMES CAMPBELL, Secretary, Plant City
RONALD B. LAMBERT, Treasurer, Wauchula


DON CRANE, St. Petersburg


April 30, 1981



MEMORANDUM


TO: L. M. Blain, General Counsel

FROM: TF. Sietman, Chief, Project Development Section

RE: Tampa Bypass Canal Operational Levels


Attached is written confirmation of the information given by telephone
to your office in response to your request. If you require any additional
information, we will provide it.


WFS:cca


cc: D.
C.
W.
F.


Feaster, Executive Director
Miller, Director, Resource Development Division
Allee, Program Coordinator, Executive Department
Lopes, Project Engineer, Project Development Section


Attachment: Design Water Levels at Control Structures TBC System


DONALD R. FEASTER, Executive Director










TAMPA BYPASS CANAL SYSTEM

DESIGN WATER LEVELS(1) AT CONTROL STRUCTURES


UPSTREAM LEVELS


NORMAL


24.1(3)
20.4
14.2(4)



19.5 to
22.0(5)



14.2(4)


10.0


DOWNSTREAM LEVELS


FLOOD(2)


35.8
29.0
22.2


21.3


14.5


11.2


NORMAL


20.4
14.2(4)
14.2(4)


14.2(4)


10.0


FLOOD(2)


29.1
22.4
15.8


15.9


11.9


Tidal


Feet above mean sea level (NGVD)
Flood = Design water surface during flood conditions
Level fluctuates with ground water levels and surface inflow
Level controlled by S-162
Level fluctuates with Hillsborough River levels


CHM:cca
4-30-81


STRUCTURE


S-159 --


Upper
Middle
Lower


S-161 --



S-162 --



S-160 --




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs