Approaches for Construction and Demolition Waste Management in Hong Kong

Permanent Link: http://ufdc.ufl.edu/UFE0041272/00001

Material Information

Title: Approaches for Construction and Demolition Waste Management in Hong Kong
Physical Description: 1 online resource (89 p.)
Language: english
Creator: Eramela, Wing
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2009

Subjects

Subjects / Keywords: construction, demolition, hongkong, land, landfill, reclamation, recycle, reuse, waste
Building Construction -- Dissertations, Academic -- UF
Genre: Building Construction thesis, M.S.B.C.
bibliography   ( marcgt )
theses   ( marcgt )
government publication (state, provincial, terriorial, dependent)   ( marcgt )
born-digital   ( sobekcm )
Electronic Thesis or Dissertation

Notes

Abstract: This research is aiming at providing an overview of the current situations of construction and demolition waste management practice in Hong Kong and formulating strategies on waste minimization. The proposed thesis would provide useful and constructive information for the local and foreign construction companies and help them to achieve better planning and organizing in the waste management process in order to achieve sustainable development. The research has found out which kinds of waste were commonly reused or recycled and the views of industrial participants towards different waste management strategies, while the limitations in reusing or recycling the waste of various categories were discovered by interviewing. Strategies which had already been adopted by the leading construction companies in Hong Kong have been discussed in the case study. This research has also provided recommendations to different parties involved in the construction projects, including the government, developers, designers and contractors.
General Note: In the series University of Florida Digital Collections.
General Note: Includes vita.
Bibliography: Includes bibliographical references.
Source of Description: Description based on online resource; title from PDF title page.
Source of Description: This bibliographic record is available under the Creative Commons CC0 public domain dedication. The University of Florida Libraries, as creator of this bibliographic record, has waived all rights to it worldwide under copyright law, including all related and neighboring rights, to the extent allowed by law.
Statement of Responsibility: by Wing Eramela.
Thesis: Thesis (M.S.B.C.)--University of Florida, 2009.
Local: Adviser: Chini, Abdol R.
Local: Co-adviser: Ries, Robert J.

Record Information

Source Institution: UFRGP
Rights Management: Applicable rights reserved.
Classification: lcc - LD1780 2009
System ID: UFE0041272:00001

Permanent Link: http://ufdc.ufl.edu/UFE0041272/00001

Material Information

Title: Approaches for Construction and Demolition Waste Management in Hong Kong
Physical Description: 1 online resource (89 p.)
Language: english
Creator: Eramela, Wing
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2009

Subjects

Subjects / Keywords: construction, demolition, hongkong, land, landfill, reclamation, recycle, reuse, waste
Building Construction -- Dissertations, Academic -- UF
Genre: Building Construction thesis, M.S.B.C.
bibliography   ( marcgt )
theses   ( marcgt )
government publication (state, provincial, terriorial, dependent)   ( marcgt )
born-digital   ( sobekcm )
Electronic Thesis or Dissertation

Notes

Abstract: This research is aiming at providing an overview of the current situations of construction and demolition waste management practice in Hong Kong and formulating strategies on waste minimization. The proposed thesis would provide useful and constructive information for the local and foreign construction companies and help them to achieve better planning and organizing in the waste management process in order to achieve sustainable development. The research has found out which kinds of waste were commonly reused or recycled and the views of industrial participants towards different waste management strategies, while the limitations in reusing or recycling the waste of various categories were discovered by interviewing. Strategies which had already been adopted by the leading construction companies in Hong Kong have been discussed in the case study. This research has also provided recommendations to different parties involved in the construction projects, including the government, developers, designers and contractors.
General Note: In the series University of Florida Digital Collections.
General Note: Includes vita.
Bibliography: Includes bibliographical references.
Source of Description: Description based on online resource; title from PDF title page.
Source of Description: This bibliographic record is available under the Creative Commons CC0 public domain dedication. The University of Florida Libraries, as creator of this bibliographic record, has waived all rights to it worldwide under copyright law, including all related and neighboring rights, to the extent allowed by law.
Statement of Responsibility: by Wing Eramela.
Thesis: Thesis (M.S.B.C.)--University of Florida, 2009.
Local: Adviser: Chini, Abdol R.
Local: Co-adviser: Ries, Robert J.

Record Information

Source Institution: UFRGP
Rights Management: Applicable rights reserved.
Classification: lcc - LD1780 2009
System ID: UFE0041272:00001


This item has the following downloads:


Full Text

PAGE 1

1 APPROACHES FOR CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT IN HONG KONG By WING YI JOSEFINA ERAMELA A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DE GREE OF MASTER OF SCIENCE IN BUI L DING CONSTRUCTION UNIVERSITY OF FLORIDA 2009

PAGE 2

2 2009 W ing Yi Josefina Eramela

PAGE 3

3 T o M y P arents

PAGE 4

4 ACKNOWLEDGMENTS Firstly, I would like to express my sincere appreciation to my chairman Dr. Ab dol Chini, f or his patient guidance and continuous support throughout this research Secondly, I would also like to thank my co chair, Dr. Robert Ries and my committee member, Dr. James Sullivan, for their valuable suggestions. Thirdly, I would like to sh ow my acknowledgment to numerous experts and professionals for responding my surveys and granting me interviews. Last but not least I would like to express the deepest thanks to my family and friends. Their encouragement is vital for my research during th e progress.

PAGE 5

5 TABLE OF CONTENTS page ACKNOWLEDGMENTS ................................ ................................ ................................ .. 4 LIST OF TABLES ................................ ................................ ................................ ............ 8 LIST OF FIGURES ................................ ................................ ................................ .......... 9 ABSTRACT ................................ ................................ ................................ ................... 11 CHAPTER 1 INTRODUCTION ................................ ................................ ................................ .... 12 Background of the R esearch ................................ ................................ .................. 12 Objectives of the R esearch ................................ ................................ ..................... 13 Structure of the R esearch ................................ ................................ ....................... 13 2 LIT ERATURE REVIEW ................................ ................................ .......................... 15 Definitions ................................ ................................ ................................ ............... 15 Classification of Construction and Demolition Waste ................................ .............. 15 Reasons for Minimizing Construction and Demolition Waste ................................ .. 16 Composition of the Construction and Demolition Waste in Hong Kong .................. 17 Causes of Construction and Demolition Waste during Construction Phase ............ 18 Waste Minimization Strategies ................................ ................................ ................ 18 Government Incentives for Construction and Demolition Waste Management in Hong Kong ................................ ................................ ................................ ........... 20 Construction Waste Disposal Charging Scheme ................................ .............. 20 Performance Assessment Scoring System (PASS) ................................ ......... 22 Environmental M anagement P lan ................................ ................................ .... 22 Existing Facilities for Construction a nd Demolition Waste in Hong Kong ................ 23 Landfills ................................ ................................ ................................ ............ 23 Public F ill R eception F acilities ................................ ................................ .......... 23 Sorting F acilities ................................ ................................ ............................... 23 Outlying Islands Transfer Facilities ................................ ................................ ... 24 Limitations in Practicing Waste Management in Hong Kong ................................ ... 24 Contractual R equirements ................................ ................................ ................ 24 Considerable T ime and C ost ................................ ................................ ............ 25 Little A ttention from the S enior M anagement ................................ ................... 25 Labor Cost ................................ ................................ ................................ ........ 25 Use of Heavy Equipment and Plant ................................ ................................ .. 25 Successful Strategies of C&D Waste Management Adopted in Other Countries .... 25 Australia ................................ ................................ ................................ ........... 25 Mature recycling and recovering industry ................................ .................. 26 Reuse of concrete ................................ ................................ ...................... 26

PAGE 6

6 The Netherlands ................................ ................................ ............................... 26 Landfill Ban ................................ ................................ ................................ 26 Provincial Environmental Ordinances ................................ ........................ 27 Building Materials Decree ................................ ................................ .......... 27 Norway ................................ ................................ ................................ ............. 27 NORSAS ................................ ................................ ................................ .... 27 EcoBuild ................................ ................................ ................................ ..... 28 The Norwegian Concrete Association ................................ ........................ 28 USA ................................ ................................ ................................ .................. 28 Other Strategies Suggested by Other Researchers ................................ ................ 29 Dimensional S tandardization ................................ ................................ ............ 29 Minimizing the N eed for T emporary W orks ................................ ...................... 29 Avoid L ate D esign M odifications ................................ ................................ ...... 30 Setting R ecycling B oxes ................................ ................................ ................... 30 Waste Sorting out in Early Stage ................................ ................................ ..... 30 Sub R esponsibilities ................................ ................................ ..... 31 Regular S ite I nspection and R eview of the WMP P eriodically .......................... 31 3 METHO DOLOGY ................................ ................................ ................................ ... 39 Surveying ................................ ................................ ................................ ................ 39 Interviewing ................................ ................................ ................................ ............. 41 Case Study ................................ ................................ ................................ ............. 41 4 RESULTS ................................ ................................ ................................ ............... 43 Reusing ................................ ................................ ................................ ................... 43 Overview ................................ ................................ ................................ .......... 43 Metal ................................ ................................ ................................ .......... 43 Concrete ................................ ................................ ................................ .... 44 Glass and tiles ................................ ................................ ........................... 44 Wood ................................ ................................ ................................ ......... 44 Rocks, r ubbles and s and ................................ ................................ ............ 45 Wires ................................ ................................ ................................ .......... 45 Plastics ................................ ................................ ................................ ...... 45 Toilet cups ................................ ................................ ................................ .. 46 Bamboo ................................ ................................ ................................ ...... 46 Reasons for Not Reusing the Waste Materials ................................ ................. 46 High recovery cost ................................ ................................ ..................... 47 Lack of space for storage ................................ ................................ ........... 47 Lacks of spe cial contractors in the market ................................ ................. 47 Recycling ................................ ................................ ................................ ................ 48 Overview ................................ ................................ ................................ .......... 48 Metal ................................ ................................ ................................ .......... 48 Rocks, r ubbles, s and, s oils and g lass ................................ ........................ 49 Wood and b amboo ................................ ................................ ..................... 49 Wires ................................ ................................ ................................ .......... 49

PAGE 7

7 Plastics ................................ ................................ ................................ ...... 49 Papers ................................ ................................ ................................ ....... 50 Reasons for N ot R ecycling the W as te M aterials ................................ .............. 50 Tight s chedule ................................ ................................ ............................ 50 Lack of d emand for r ecyclable m aterials in the m arket .............................. 51 Lack of s pace for s orting ................................ ................................ ............ 51 Waste Management Planning ................................ ................................ ................. 51 Opinions Towards Possible Strategies ................................ ................................ ... 51 Case Study ................................ ................................ ................................ ............. 52 Company Background ................................ ................................ ...................... 52 Contract sum of the project ................................ ................................ ........ 53 Project description ................................ ................................ ..................... 53 Planning for C onstruction and D emolition W aste M anagement ....................... 53 Arrangement for Construction and Demolition Waste Disposal ........................ 54 Procedures in Sorting Different Kinds of Waste ................................ ............... 54 Concrete Recycling ................................ ................................ .......................... 56 Other Strategies Adopted to Reduce the Amount of Waste to be Disposed ..... 56 Use of metal falsework and me tal formwork ................................ .............. 56 Use of p recast e lements ................................ ................................ ............ 56 Placing r ecycling b oxes in p rominent l ocations ................................ .......... 57 5 RECOMMENDATIONS ................................ ................................ ........................... 76 For Government ................................ ................................ ................................ ...... 76 Legislations ................................ ................................ ................................ ...... 76 Government Incentives ................................ ................................ ..................... 76 Subsidies for the Refurbishing/recycling Industries ................................ .......... 77 For Developers ................................ ................................ ................................ ....... 77 Contract C lauses ................................ ................................ .............................. 77 Adoption of Performance Assessment System ................................ ................ 77 For Desig ners ................................ ................................ ................................ ......... 78 Consideration in Designs ................................ ................................ .................. 78 Using R ecyclable or R ecycled M aterials ................................ .......................... 78 For Contractors ................................ ................................ ................................ ....... 79 6 CONCLUSIONS ................................ ................................ ................................ ..... 80 APPENDIX SAMPLE OF THE SURVEY ................................ ................................ .......................... 83 LIST OF REFERENCES ................................ ................................ ............................... 86 BIOGRAPHICAL SKETCH ................................ ................................ ............................ 89

PAGE 8

8 LIST OF TABLES Table page 2 1 T he construction and demolition waste received at landfills in different regions ................................ ................................ ................................ ................ 17 2 2 Charges for different construction waste under the Construction Waste Disposal Charging Scheme ................................ ................................ ................ 21 2 3 The daily C&D waste disposal at landfills and public filling areas in 2005 and 2006 ................................ ................................ ................................ ................... 21 2 4 The amount of waste received in different facilities in 2006 ............................... 24 4 1 Mean, mode, median and standard deviation of the reuse rate of various waste materials among the companies which have reused the materials .......... 46 4 2 Means, modes, medians and standard deviations of the recycle rate of various waste materials among the companies which have recycled the materials ................................ ................................ ................................ ............. 50

PAGE 9

9 LIST OF FIGURES Figure page 2 1 A pie chart showing the composition of solid waste received in landfills in 2006 ................................ ................................ ................................ ................... 32 2 2 A pie chart s howing the percentage the construction and demolition waste from different kinds of construction and demolition activities .............................. 33 2 3 A pie chart showing the ratio of construction and demolition waste from private projects to public projects ................................ ................................ ....... 34 2 4 A bar chart showing the composition of construction and demolition waste received in the public landfills and filling areas from differen t kinds of activities ................................ ................................ ................................ .............. 35 2 5 Waste management hierarchy ................................ ................................ ............ 36 2 6 A line chart showing the quantity of C&D waste received in both l andfills and public filling area from 1991 to 2006 ................................ ................................ ... 36 2 7 A schematic flow diagram of a sorting site ................................ ......................... 37 2 8 A map showing the lo cation of the facilities for construction and demolition waste in Hong Kong ................................ ................................ ........................... 38 2 9 Concrete recycling plant in Brisbane, Australia ................................ .................. 38 3 1 A pie chart showing the percentage of the types of work being performed by the respondents ................................ ................................ ................................ .. 42 4 1 A bar chart showing the mean percentage of companies which have reused different ki nds of materials ................................ ................................ .................. 57 4 2 A bar chart showing the scores of the reasons for not reusing the waste materials ................................ ................................ ................................ ............. 58 4 3 A bar chart sh owing the mean percentage of companies which have recycled different kinds of materials ................................ ................................ ... 59 4 4 A bar chart showing the scores of the reasons for not recycling the waste materials ................................ ................................ ................................ ............. 60 4 5 A pie chart showing the ratio of the companies having and not having waste management planning ................................ ................................ ........................ 61 4 6 A bar chart showing the scores of the possible strategies ................................ .. 62

PAGE 10

10 4 7 Layout Plan of Block 3 ................................ ................................ ........................ 63 4 8 Layout Plan of Block 4 ................................ ................................ ........................ 64 4 9 Layout Plan of Block 12 ................................ ................................ ...................... 65 4 10 The refuse chute ................................ ................................ ................................ 66 4 11 Schedule for disposal of different kinds of C&D materials ................................ .. 67 4 12 Refuse collection point at ground level ................................ .............................. 68 4 13 Container used to store reusable or recyclable non in ert materials .................... 69 4 14 Concrete piled up for sorting ................................ ................................ ............... 70 4 15 Wire net used to screen out the large pieces of concrete ................................ ... 71 4 16 Metal scaffolding mounted on the faade ................................ ........................... 72 4 17 Aluminum formworks for suspended slab ................................ ........................... 73 4 18 Prefabricated facade system ................................ ................................ .............. 74 4 19 Recycling boxes for collecting different kinds of waste materials ....................... 75

PAGE 11

11 Abstract of Thesis Prese nted to the Graduate School of the University of Florida in Partial Fulfillment of the Requirements fo r the Degree of Master of Science in Building Construction APPROACHES FOR CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT IN HONG KONG By Wi ng Yi Josefina Eramela December 2009 Chair: Abdol Chini Cochair: Robert Ries Major: Building Construction This research is aiming at providing an overview of the current situations of construction and demolition waste management practice in Hong Kong an d formulating strategies on waste minimization. The proposed thesis would provide useful and constructive information for the local and foreign construction companies and help them to achieve better planning and organizing in the waste management process i n order to achieve sustainable development. T he research has f ound out which kinds of waste were commonly reused or recycled and the views of industrial participants towards different waste management strategies, while the limitations in reusing or recycli ng the waste of various categories were discovered by interviewing. Strategies which had already been adopted by the leading construction companies in Hong Kong have been discussed in the case study. This research has also provided recommendations to diffe rent parties involved in the construction projects includ ing the government, developers, designers and contractors.

PAGE 12

12 CHAPTER 1 INTRODUCTION Background of the R esearch Hong Kong has become an international metropolis from a small fishing port in just seve ral decades. Now, Hong Kong is one of the most densely populated cities in the world with an overall density of approximately 6,300 people per square kilometer. The city's population increased sharply since the late 1980s, and reaching 7 million in 2007.Th e population in Hong Kong, however, is continuing to grow due to the influx of annual 45,000 immigrants from the mainland China. In order to cope with this huge population, redevelopment of old urban districts is imperative and inevitable. Due to the rapid redevelopment programs throughout the past decades, vast amount of construction and demolition waste is being generated every year because of poor waste material control on the construction or demolition sites. The problem of construction and demolition w astage is not only an isolated issue on construction sites, but it also caused environmental problems. In 2006, Hong Kong generated approximately 17,000 tons of solid waste each day, which is up 30% from 10 years ago. Hong Kong is mainly relying on sanita ry landfills and reclamation site for solid waste disposal. This seems to be a cost effective method in short term, but it is not efficacious for long team since land is very scarce and precious in Hong Kong (Mill et al. 1999). Construction and demolitio n waste accounted for 27% of all solid waste disposed of at landfills in 2006 (EDP 2007). Despite the fact that reusing, recycling and reducing waste have been encouraged by the Hong Kong government, disposal in landfills is still the most common method us ed in the construction industry for the disposal of

PAGE 13

13 construction and demolition waste (Hao et al. 2008). Hong Kong is running out of landfill sites for disposal of construction and demolition waste. Thus, construction and demolition waste control is imperi ous to the sustainable development of the city. Indeed, many materials from construction and demolition can be reused, conserved, and recycled. The amount of waste required to be disposed would be greatly reduced if there is a better construction and demol ition waste management system on construction sites. Objectives of the R esearch The proposed thesis is aiming at providing an overview of the current situations of construction and demolition waste management practice in Hong Kong and formulating innovati ve strategies on construction and demolition waste minimization. The proposed thesis would provide useful and constructive information for the local and foreign construction companies and help them to achieve better planning and organizing in the waste man agement process in order to achieve sustainable development. Structure of the R esearch This research provides an overview of the current situation of the construction and demolition waste management in Hong Kong by gathering information and opinions from t he construction industry. Recommendations and comments on formulating new strategies in waste management are then provided. This research also discusses the constraints and incentives in implementing the new strategies. Chapter 2 provides an overview of th e current situations and practice on construction waste management in Hong Kong. It also provides a summary of the Hong Kong statutory requirements on construction waste management in different scale of

PAGE 14

14 construction projects and the strategies in waste man agement which have been adopted by other countries. Chapter 3 describes the methodology adopted in the research. Chapter 4 summaries the results of the research. It includes the constraints in implementing waste reduction strategies and the views of the in dustry participants towards the strategies which could be adopted in Hong Kong. It also describes the good strategies which had already been adopted by some of the leading construction companies in Hong Kong. Chapter 5 discusses the strategies which are applicable in Hong Kong and provides recommendations on implementing such strategies. Chapter 6 provides a conclusion of the research.

PAGE 15

15 CHAPTER 2 LITERATURE REVIEW Definitions The following are the definitions of the key words used in this research. C ONS TRUCTION AND D EMOLITION W ASTE Waste arising from any land excavation or formation, civil or building construction, roadwork, building renovation or demolition activities. It includes various types of building waste, rubble, earth, concrete, timber and mix ed site clearance materials (E PD 2007, p.7). L AND R ECLAMATION L and reclamation involves modifying wetlands or waterways to convert them into usable land, usually for the purpose of development (Smith 2009) R ECYCLING Recycling includes collecting recycla ble materials that would otherwise be considered waste, sorting and processing recyclables into raw materials such as fibers, manufacturing raw materials into new products, and purchasing recycled products (USEPA 2009) R EUSE Reuse involves putting an ite m to another use after its original function has been fulfilled. The products are used a number of times before they are discarded (GRC 2004) Classification of Co nstruction and Demolition Waste Construction and demolition waste are normally sor ted into two main portions: 1) inert; 2) non inert (Johnston and Mincks 1995). 1) Inert waste includes rocks, rubble, concrete, cement, asphalt, rubbles, bricks, tiles, stones, soil, sand and asphalt. This kind of waste is suitable for land reclamation. So me of this kind of waste can also be used in recycling. 2) Non inert waste is around 20% of the total construction and demolition waste (GovHK N.D). It includes wood, timber, paper, metal, bamboo, trees, glass, plastics, junk, organism and fixtures. This kind of waste is not suitable for land reclamation (EPD 2009 a ), since it will decompose slowly underground by bacterial actions and sink gradually S uch land reclamation projects are commonly aiming at creating new land for

PAGE 16

16 buildings or other structures. I f the building structures were built on top of the land with substantial non insert materials, it would cause seriously structural problems. Reasons for Minimizing Construction and Demolition Waste The construction industry consumes large quantities of na tural resources and generates a huge amount of construction and demolition waste. This problem is not an isolated issue in construction industries (Cheung et al. 1993). Hong Kong is one of the most densely populated cities among the world and filled with m any high rise residential and commercial buildings. Construction and demolition (C&D) wastes are bulky in size and use up a huge amount of space if they are disposed of at landfills (Poon et al. 2003). Although the rate of construction and demolition waste received at landfills per capita per day in Hong Kong is relatively low when compared with other regions (refer to Table 2 1), it is imperative to reduce the amount of wastes to be disposed at the landfills. The land supply for landfills and building site s is very s carce Most of the land in Hong Kong is undulating and not suitable for landfills and buildings. Approximately 27% of the public landfill capacity in Hong Kong was used for handling with the construction and demolition waste in 2006 (refer to F igure 2 1) (EPD 2007). If this problem continues, the landfills in Hong Kong will be filled up in 5 to 9 years (Poon 2007). Reducing and recycling construction wastes are therefore a key element of sustainability in future development. The building industr y consumes a considerable amount of resources. Those resources include valuable natural assets like timber and metal. Indeed, There is a large portion of the materials being wasted because of poor material control on building sites (Poon et al. 2003).If th e life cycle of the material, from extraction from the nature to its end fate, is closely examined, many resources can be conserved.

PAGE 17

17 Table 2 1 T he construction and demolition waste received at landfills in different regions CITY C&D WASTE RECEIVED ANNUA LLY (tons) POPULATION YEAR PER CAPITA PER DAY (KG) New York 9,000,000 18,756,000 1998 1.19 Chicago 1,484,610 2,853,000 2007 1.29 Singapore 922,000 4,990,000 2001 0.46 Hong Kong 1,505,625 6,800,000 2006 0.55 Composition of the Construction and Demolit ion Waste in Hong Kong The composition of construction and demolition waste is variable. It depends on the types of construction activities taken (Li 2002). The breakdown of the volume of construction and demolition waste received in the public landfills a nd filling areas are shown in following figures (refers to Figure 2 2 to 2 4). From Figure 2 2, it was found that over 85% of construction and demolition waste came from renovations and construction works (Li 2002). The renovation works are ususally condu cted by small contractors employed by individual households. This kind of waste is difficult to be sorted, since the waste is usually broken into very fine pieces and mixed together. This reduces the possibility of recycling or reusing this kind of waste. Thus, the waste is inevitably disposed to the landfills. Figure 2 3 shows that near 80% of construction and demolition waste came from private projects. This suggests that private residential and commercial projects are dominant in the construction industr y. From Figure 2 4, it shows that concrete was the most commonly found construction and demolition waste among all other categories. This is because most of the buildings in Hong Kong are commonly made up of reinforced concrete in both building structures and envelopes.

PAGE 18

18 Causes of Construction and Demolition Waste during Construction Phase Summarizing the results from different researchers, the causes of construction and demolition waste generated during the construction phase are listed as following: Desi gn changes and design errors would result in dismantling of the work which have already installed. (Faniran and Caban 1998) There is a lack of standard guidance for setting up proper waste management procedures on site (Shen et al. 2004). There is a lack o procedures (Shen et al. 2004). Since concrete is the main material used in building the structures and envelopes extensive use of formwork is required. However, timber formwork usually can be used for one to two times only. Timber formwork comprises 30% of all waste during the construction phase excluding the site formation and demolition works (Poon et al. 2003). Three to five percents of the material was wasted due to excessive material ord ering during the construction phase excluding the site formation and demolition works (Poon et al. 2003). Works have to be redone due to poor concrete placement quality and poor workmanship (Poon et al. 2003) Wet trades include brick/block walling, plaste ring, floor screeds, internal and external finishing. The wet trades of finishing work such as screeding, plastering and tiling were identified as the second major waste. It counts for 20% of all waste during the construction phase excluding the site form ation and demolition works (Poon et al. 2003). Loss during loading and unloading, damaged bricks due to over stacking in the storage area and poor products of layering were the possible causes of wastes (Poon et al. 2003). Waste Minimization Strategies Gen erally, the strategies of waste management includes the following (Kibert and Chini 2000): Avoid Reuse

PAGE 19

19 Recycle Compost Burn Dispose at landfills However, composting construction and demolition waste would require extensive use of land. Since the land supp ly in Hong Kong is too scarce, it is not feasible in Hong Kong. Burning waste would induce the emission of toxic gases and many kinds of construction and demolition waste are not flammable. Thus, t his research would focus on the remaining three ways for mi nimization of construction and demolition waste T hey are: 1) avoiding waste; 2) re using materials; and 3) recycling waste. Avoiding waste refers to any practice that avoids or minimizes waste at source. Re using and recycling waste refers to the re using and recycling of waste materials, and thus, reducing the volume of waste needed to be disposed to the landfills (Ferguson et al. 1995). It is recommended that minimization of waste at source should be given the highest priority (Crittenden and Kolaczkow ski 1995), because it is always more efficient to minimize the generation of waste at source than to develop ways for treating or handling the waste. Although Re using and recycling allow waste materials to be put into a beneficial use, reusing and recycl ing do not completely avoid the waste generation (Faniran and Caban 1998). Reusing and recycling can only reduce the quantity of waste to be eventually disposed to the landfill sites. Since reusing requires less energy and processes in dealing with the was te than recycling, reusing should be put in higher hierarchy than recycling (Crittenden and Kolaczkowski 1995). The hierarchy of the three means of minimization of construction and demolition waste should be: 1) avoiding

PAGE 20

20 waste; 2) reusing waste; 3) recycli ng waste; 4) disposing waste. Figure 2 5 shows the priority of the options for waste minimizing. Many studies have found that technology, work process and practice have a huge contribution in generating C&D waste. However, human behavior also has an impor tant role in waste causation and minimization in construction industry (Teo and Loosemore 2001). Thus, apart from improving the current practices and technologies, effective education of the workforce, comprehensive audit procedures and legislations could result in improvement in waste minimization performance (Dainty and Brooke 2004). Government Incentives for Construction and Demolition Waste Management in Hong Kong Construction W aste D isposal C harging S cheme The Hong Kong government introduced the Constr uction Waste Disposal Charging Scheme in December 2005. The scheme is a waste reduction measure based on the polluter pays principle (EPD 2007). The Polluter pays principle is now used in international environmental law. It refers that the polluting partie s are made liable to pay for the damages they cause to the natural environment. The objective of this principle is to shift the responsibility of processing or dealing the C&D waste from governments to the parties who produces such waste (Verma N.D.). This charging scheme is not only intended to provide an economic incentive for contractors and developers to reduce waste but also to encourage reuse and recycling of waste material thereby slowing down the depletion of limited landfill and public filling capa cities (Hao et al. 2008). The scheme mainly comprises the following features (EPD 2007): To accept various types of construction waste at different charge rates as T able 2 2

PAGE 21

21 To mandate the waste producers, i.e. construction contractors, to open billing ac count with the government for the construction works and pay the waste disposal charges Table 2 2 Charges for different construction waste under the Construction Waste Disposal Charging Scheme (Source: EDP 2007) *Notes: The exchange rate of HK$ to US$ approximately equals at 7.80 to 1 Effecti veness of the Construction Waste Disposal Charging Schem e There was about 60% waste reduction in landfills, about 23% in public fills, and about 65% in total waste between 2005 and 2006 (Hao et al. 2008). Table 2 3 shows the daily C&D waste disposal at lan dfills and public filling areas in 2005 and 2006 and Figure 2 6 shows the trend of total waste sent to landfills and public fills from 1991 to 2006. The annual C&D waste disposal has dropped from 21,450,000 tones in 2005 to 8,561,200 tones in 2006 after th e implementation of the Construction Waste Disposal Charging Scheme (refer to Figure 2 6). These data proved that the implementation of the Construction Waste Disposal Charging Scheme has been launched very successfully. Table 2 3 The daily C&D waste dis posal at landfills and public filling areas in 2005 and 2006. (Source: Hao et al. 2008) Designated Waste Disposal Facilities Type of construction waste accepted Charge per tone Landfills Containing not more than 50% by weight of inert construction waste HK$125 Sorting facilities Containing more than 50% by weight of inert construction waste HK$100 Public fill recepti on facilities Consisting entirely of inert construction waste HK$27 Outlying Islands Transfer Facilities Containing any percentage of inert construction waste HK$125

PAGE 22

22 Performance Assessment Scoring System (PASS) In Hong Kong, near half of the residential projects are developed by the Housing Authority. Thus, the government is the biggest residential developer in Hong Kong. In 2000, the Housing Authority established the PASS assessment system to evaluate the performance of the contractors undertaking the public residential construction works and the quality of work done by the contr actors. The results of the assessment would be used as a basis in selecting contractors in future procurement (HKHA 2009). The assessment system comprises the following areas: Works Assessment, including Structural Works Assessment Architectural Works Asse ssment General Assessment, including Management Input Assessment Program and Progress Assessment Environmental and Other Obligations Assessment Safety Assessment Architectural Works (Final) Assessment Maintenance Period Assessment Under the Environmental and Other Obligations Assessment, it requires the contractors to submit a waste management plan to the Housing Department, take up the waste management responsibilities, dispose and monitor construction waste. It also encourages the contractors to sort and segregate construction and demolition waste generated in their construction site for reuse and recycling. T his PASS system is still only used in public residential projects. Environmental M anagement P lan The Hong Kong Government introduced a new requireme nt in December 2005 requiring contractors of all public works contracts to prepare and implement an Environmental Management Plan (EMP). Arrangement for and conducting on site

PAGE 23

23 sorting of construction waste are mandatory under the relevant contractual provi sions and payment items (EPD 2007). These efforts also contributed to the reduction of construction waste disposed of at the waste disposal facilities. Existing Facilities for Construction and Demolition Waste in Hong Kong Landfills Mixed construction wast e containing not more than 50% by weight of inert construction waste can be disposed of at the landfills (EDP 2009). Public F ill R eception F acilities Public fill reception facilities comprise public filling areas, filling barging points, fill stockpiling a reas, fill banks and C&D material recycling facility (EPD 2009 b ). Such facilities are set up for development projects which accept public fills for reclamation purpose. In order to reduce the loading in the public landfill, the Hong Kong government has lau nched several land reclamation programs which utilize a large quantity of fill material (Poon 1997). The current policy specifies that insert materials (e.g. rock, rubbles, bricks, stones, concrete, sand and so on) not larger than 250mm in size and free fr om decomposable contaminants are acceptable in the public fill reception facilities. Sorting F acilities Construction waste containing more than 50% by weight of mixed inert waste can be delivered to the sorting facilities. This helps the contractors, espe cially for those undertaking small scale works and not having enough space and resources, to carry out on site sorting (EPD 2009 b ). Simple plants consisted of horizontal impact crushers with magnetic separators and static grizzly screens were set up in tho se sorting sites. The layout of such sorting sites is shown in Figure 2 7.

PAGE 24

24 Outlying I slands T ransfer F acilities Waste contains any percentage of inert materials can be sent to the outlying islands transfer facilities. Those facilities are to provide marine access for refuse transfer vessels to transfer the waste out of Hong Kong (see figure 2.8). Table 2 4 The amount of waste received in different facilities in 2006 ( Source: EPD 200 7 ) Facilities Average daily waste intake (tpd) Outlying Islands Transfer F acilities 205 Landfills 15,039 Public fill reception facilities 25,759 notes: the data in this table include all kinds of solid waste. Limitations in Practicing Waste Management in Hong Kong Contractual R equirements Some contracts may require the con tractors to use virgin materials in construction. virgin rock and sand in construction work (Poon,1997). This limits the possibility of using recycled or reused material i n construction. Lack of W illingness for the P ublic to A ccept S econd H and Materials People may prefer to use new materials or products in their new or newly renovated properties rather than use second hand materials. This causes limited demand for the recyc led or recovered products in the market (Poon 2007)

PAGE 25

25 Considerable T ime and C ost The requirements of considerable time and cost in improving environmental performance discourages the owners, developers, contractors and architects to deliver sustainable c onstruction (Shen et al. 1992 ; Mills et al., 1999 ). Little A ttention f rom the S enior M anagement Waste management has been receiving less attention from senior management within organizations. More concern is given to the cost for implementing waste manage ment, functionality of the finished products, and whether it is delivered on time and up to the standard (Wong and Yip 2004) than the possible benefits that the organization can gain from the implementation of waste management (Shen and Tam 2002). Labor C o st Labor is generally more expensive than the building materials cost. Thus, contractors would rather allow considerable amount of material loss or wastage on site rather than put more human resources in implementing waste management strategies or educatin g the workers to minimize waste and loss (poon et al 2004). Use of Heavy Equipment and P lant The prevalence of small and medium construction enterprises inhibits the industry from investing heavily in the purchase of waste recycling plant and equipment (W ong and Yip 2004). Successful Strategies of C&D Waste Management Adopted in Other Countries Australia In Australia, around 50% to 80% of materials are recovered or reused during the demolition process. The majority of those materials are reused without any form of

PAGE 26

26 reprocessing. In addition, up to 80% of concrete is processed to recover the aggregates for reuse in construction (Crowther 2000). Mature r ecycling and r ecovering i ndustry There is a well developed market for reused doors, windows, floorboards, w all lining boards, framing, and the like. Those recovered or recycled materials would be used in residential restoration, renovation and in new housing construction. Reuse of concrete 70 80% of demolished concrete was recovered for reuse as aggregates. Th e majority of the concrete was used for in constructing road bases (Crowther 2000). The concrete rubble was transported further to the crushing plant than if it had been transported to a landfill site. The salvaged concrete is broken up by using machinery concrete could be sold as aggregates for $15 per ton. This provided an effective incentive for the contractors and developers to practice the recycling strategies. Fig ure 2 9 shows a typical concrete recycle plant used in Australia. The Netherlands Legislation and regulations were set to ensure that over 80% of construction and demolition waste is either reused or recycled. The main three legislative policies include La ndfill Ban, Provincial Environmental Ordinances, and the Building Materials Decree (Dijk et al. 2000). Landfill Ban This policy was launched on April 1st 1997. It prohibits the landfill operators to accept any reusable or burnable construction and demoliti on waste. All construction and demolition waste must be sent to the sorting plant before delivery to the landfills. The

PAGE 27

27 main objective of this policy is to encourage the construction participants to conduct separation of construction and demolition waste i nto component streams. Provincial Environmental Ordinances The twelve Provinces in the Netherlands regulate the disposal of commercial wastes through the Provincial Environmental Ordinances. These Ordinances require waste collection and processing compani es to submit quarterly reports to the Province on the waste volumes which they have received. The Provinces can obtain more information about the composition of the waste and monitor the disposal and processing. Building Materials Decree The Decree was int roduced to regulate the use of building materials, so as to protect the soil and surface water while ensuring the greatest possibility of reusing the materials. Certain kinds of building materials must not be mixed with the soil on the site. Those material s must be able to be removed when the structure is demolished. Norway 25% to 50% of the construction and demolition waste is either recycled or reused in recent years. There are several significant private and public initiatives to promote C&D waste minimi zation (Myhre 2000). The examples of such initiatives are as following: NORSAS NORSAS is a government organization which aims at promoting waste reduction and recycling. NORSAS also acts as a national register on all waste handling companies. Those compani es have to annually report the volume, types, origins, transport and handling methods of waste to NORSAS.

PAGE 28

28 EcoBuild EcoBuild is a program financed by both government and private sectors. This program is directed by a board of representatives from the buil ding and real property trade. The aim of this program is to establish a commercial market system for recycling waste, so that the construction and demolition waste would be reduced by more than 70%. The Norwegian Concrete Association The Norwegian Concret e Association has developed national guidelines for classification of the use of recycled aggregate in the production of new concrete. This made recycling of concrete become more practical. USA USA has adopted LEED standard for many years. LEED provides de sign and construction guidance for developing green and high efficient buildings. In recent years, the number of certified buildings has almost doubled each year (Kibert 2008). Since the buildings with LEED certifications usually have superior performance in minimizing resource consumption, reducing operating costs and achieving healthy indoor environment, those buildings would achieve higher market values than the conventional buildings. LEED The Leadership in Energy and Environmental Design (LEED) Green Building Rating System encourages the adoption of sustainable green building and development practices (USGBC 2008). This rating system awards Platinum, Gold, Silver, or Certified rating based on how successful the buildings have addressed the identified criteria

PAGE 29

29 (Kibert 2009). LEED can be applied to any building types and any life cycle phases. The key areas of the LEED system are listed as following: Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environmental Qual ity Locations & Linkages Awareness & Education Innovation in Design Regional Priority Under the category of Materials & Resources, credits would be granted to the selection of sustainably grown, harvested, produced and transported products and materials It promotes reuse and recycling of construction and demolition waste and encourages the use of recycled products in the building design. It also takes into account the reduction of waste during the construction (USBGC 2008). Other Strategies Suggested by Other Researchers Dimensional S tandardization 10% of construction waste is generated from the cutting of building materials during the construction process (Poon 2007). The designers should consider dimensions of the building elements to match with the m aterial size standards during the designing phase. Cutting wastes can then be significantly reduced. Minimizing the N eed for T emporary W orks Timber boards used in formwork were the most significant waste type requiring disposal followed by waste derived f rom wet trades. Waste generation could be significantly reduced by the use of prefabricated elements and metal system formworks. (Poon et al. 2004). Prefabricated concrete elements are usually produced in factories

PAGE 30

30 and are transported to construction sites By using mass mechanical production, better quality and finishes can be achieved. This could also contribute to cost savings (Poon 2007). Avoid L ate D esign M odifications Late design modifications generally result in demolishing the already built componen ts and redoing of works. Therefore design modifications, if necessary, should be considered early in the design process, and late changes should be avoided. Also, by providing more detailed designs, waste reduction during construction could be achieved by avoiding abortive works and excessive redoing of works (Poon 2007). Setting R ecycling B oxes Placing boxes for collecting recyclable wastes at proper locations would increase the efficiency of collecting and delivering wastes. The allocation of these boxes can also promote environmental awareness among all working staff on site (Shen et al. 2004). Waste S orting out in E arly S tage The willingness to separate different kind of construction and demolition waste is the key to many waste reduction policies. Unlik e other industries, construction and demolition works generate waste on specific schedule (i.e. during different phases of the progress). This makes separation of the waste easier than in other industries, like manufacturing or chemical industries (Johnsto n and Mincks 1995). Planning for sorting is very important. Planning allows reusable waste materials to be sorted out as soon as they are generated and delivered to designated locations. The sorting out at the point of waste generation is easier to do than that at later stages (Shen et al. 2004). Such practice can also avoid the increase of waste volume when the project proceeds. Earlier waste sorting out can avoid the possibility that the usable and recyclable waste

PAGE 31

31 materials are mixed with other debris. F or the current practice in Hong Kong, waste sorting is uncommon and only a few kinds of reusable wastes are collected at a Sub R esponsibilities Requiring the sub contractors to be responsible for purchasing of their mate rials and disposing of their wastes provides a dual incentive to keep the wastage to minimum. Contractors may also impose a limit on the amount of waste on the sub contracts. The contracts may include penalty clauses if the amount of waste exceeds the limi t and bonus clauses if the subcontractors are able to control the amount waste in a certain level. (poon et al. 2004) Regular S ite I nspection and R eview of the WMP P eriodically Site inspection should be carried out on a regular basis. The inspection should include the issue regarding reduction of construction waste and environmental protection. Since different contractors use different self monitoring system, it is difficult for the Housing Authority or Environmental Protection Department to evaluate their effectiveness. The owners or developers should provide a detailed checklist for the periodically to identify the need of amendments (Poon et al. 2004).

PAGE 32

32 *Notes: Municipal solid waste includes domestic waste, commercial waste and industrial waste. It does not include construction waste and chemical waste. Special waste is the waste that requires special disposal arrangement. That includes animal carcasses, asbestos, chemical waste, clinical waste, condemned goods and etc. Figure 2 1 A pie chart showing the composition of solid wast e received in landfills in 2006 (source: EPD 2007)

PAGE 33

33 *Notes: The calculation of the percentage of waste is based on volu me The c onstruction works in this set of data also included the waste generated during site formation dismantling of the existing structures on the construction site and the construction phase Figure 2 2 A pie chart showing th e percentage the construction and demolition waste from different kinds of constru ction and demolition activities (Adopted from: Li 2002)

PAGE 34

34 *Notes: The calculation of the percentage of waste is based on volume Figure 2 3 A pie chart showing the ratio of construction and demolition waste from priv ate projects to public projects (Adopted from: Li 2002)

PAGE 35

35 *Notes: The calculation of the percentage of waste is based on volume The c onstruction works in this set of data also inclu ded the waste generated during site formation dismantling of the existing structures on the construction site and the construction phase Figure 2 4 A bar chart showing the composition of construction and demolition waste receiv ed in the public landfills and filling areas fro m different kinds of activities (Adopted from: Li 2002)

PAGE 36

36 Figure 2 5 Waste management hierarchy (adopted from: Faniran and Caban 1998) Figure 2 6 A line chart showing the quantity of C&D waste received in both landfills and public filling area from 1991 to 2006 (Source: Hao et al. 2008) 1. Avoid 2. Re use 3. Recycle 4. Disposal Priority of the means for waste minimizing

PAGE 37

37 Figure 2 7 A schematic flow diagram of a sorting site (Source: P oon 1997)

PAGE 38

38 Figure 2 8 A map showing the location of the facilities for construction and demolition waste in Hong Kong (Source: Hong Kong G o vernment N.D. ) Figure 2 9 Concrete recycling plant in Brisb ane, Australia (source: Crowther 2000)

PAGE 39

39 CHAPTER 3 METHODOLOGY This chapter is to describe the methodology used in this research. The steps taken to form a logical flow of the research were as follows: A literature search was performed on material related t o current practices in Hong Kong and in other counties. The data needed for the analysis was identified. The sources of data were identified. Survey questions were designed to collect the necessary data. Identify what kind of information is needed from int erviews. The results from the survey content from interviews and case studies were administered. Assess the limitations of waste management in Hong Kong and potential means for improvement current practices. Thus, the data of this research came from three sources: Surveying the target group by questionnaire Interviewing with management staff of selected construction companies in Hong Kong Case study Surveying The aims of this survey are to find out which kinds of waste are commonly reused or recycled and the views of industrial participants towards different waste management strategies. 352 sets of questionnaire (Appendix 1) were sent via email and fax to the members of the Hong Kong Construction Association and the management teams of construction projec ts with high demand for construction and demolition waste management during the period of September 15 to 25, 2009. Such construction projects included redevelopment projects, residential housing complexes, civil engineering

PAGE 40

40 projects, and high rise commerc ial buildings. The respondents were consultants, engineers, project managers and environmental, health and safety officers for the selected projects. By the date of September 29, 2009, 35 completed questionnaires were received from the respondents. The ove rall response rate of this survey was 9.94%. The percentage of the types of works being performed by the respondents are shown in Figure 3 1. The questionnaire comprises seven questions: Question 1: to find out which kinds of waste materials have been re used Question 2: to find out the main reasons for not reusing the waste materials Question 3: to find out which kinds of waste materials have been recycled Question 4: to find out the main reasons for not recycling the waste materials Question 5: to find o ut if the responding companies have a plan designated for construction waste management Question 6: to find out the views of industrial participants towards different waste management strategies Question 7: an open question asking for other possible strate gies to improve the current situation Upon receiving the completed questionnaires, the data were inputted into a spreadsheet for further analysis. For Question 1, 3, and 5, descriptive statistics were used to describe the current situation. For Question 2, 4, 6, the respondents were asked to rank the options from 1 to 8 (1 to 9 for Question 6). Rank 1 represents the most possible option while rank 8 (or 9) represents the least possible option. Then a scoring system was applied to the rankings. 8 points (or 9 points for Question 6) would be

PAGE 41

41 assigned to the option with rank 1; 7 points would be given to the option with rank 2, and so on. The scores of each option would be summed up for analysis. Interviewing The main purpose was to find out the limitations in reusing or recycling the waste of various categories. Two interviews were conducted on September 30, 2009 and October 1, 2009. One of the interviewees was an environmental engineer while the other on was an environmental, health and safety officer. Each of the interviews lasted for approximately twenty minutes and was conducted on via telephone conversations. The interview was conducted in Cantonese, since Cantonese is the primary language in Hong Kong. After each interview, contents were summarized into te xt for further analysis. Case S tudy The purpose of the case study is to investigate the strategies which had already been adopted in dealing with different kinds of waste by the leading construction companies in Hong Kong. The information of the case stud y is based on a site visit conducted on August 4, 2009 in Hong Kong.

PAGE 42

42 Figure 3 1 A pie chart showing the percentage of the types of work being performed by the respondents

PAGE 43

43 CHAPTER 4 RESULTS This chapter summarizes the results of the research. The results are based on the survey and follow up interviews. This chapter outlines the constraints in implementing waste reduction strategies and the views of the industry participants towards the strategies which could be adopted in Hong Kong. It also describes the good strategies which had already been adopted by the leading construction companies in Hong Kong in the case study section. Reusing Overview Figure 4 1 shows the percentage of companies which have reused different kin ds of materials and Table 4 1 shows the mean, mode, median and standard deviation of the reuse rate of various waste materials among the companies which have reused the materials From Figure 4 1, the responding companies would mainly reuse metal, wood, paper and bamboo. The percentages of companies which have reused those kinds of materials are 7 4%, 74 %, 54 % and 60 % respectively. T he analysis below is based on the data from the survey and the follow up interviews. Metal According to the interviewees, me tal price has been appreciated for more than thirty percents during the past decade. The engineer would firstly inspect the condition of the metal. If the metal elements were suitable for the new construction work, those elements would usually be reused. T he most common metal elements which had been reused included the following items:

PAGE 44

44 Metal formworks Steel columns Steel piles Metal Pipes (e.g. cast iron, copper) Metal railings Metal doors However, in some cases, the condition of the metal elements might not be suitable in the new construction works. For instance, the metals were rusted due to aging of the elements and the dimensions of the existing materials did not suit the new works. Concrete Reusing the existing concrete elements in the new building s tructures is not common in Hong Kong. The main reason is that the existing elements do not dimensionally match with the new building designs. In addition, due to the aging of the concrete, it may not be able to support the structures and the loading of the new buildings. Glass and tiles These kinds of materials were fragile and easily be broken during demolition. In addition, the recovering cost was expensive. Thus, those kinds of materials would usually be disposed rather than be reused. Wood The most c ommon wood elements which had been reused included the following items: Timber formwork Wood floor Wood door

PAGE 45

45 Due to the prevalence of in situ reinforced concrete in buildings, extensive use of formwork is needed. Most of the timber formwork would be used more than one times. However, it depends on the workmanship and the formwork stripping process. Some high quality wood floor and door would also be recovered and reused. Rocks, r ubbles and s and These materials could be used in sub bases of piling stru ctures or ground slabs and backfilling. However, this would require extra labor hours and extensive space for sorting, screening, jack hammering and storing the aggregates. In most of the cases, it requires engineers to inspect if the rocks, rubbles and sa nd were free from contaminations for the purpose of using them as backfilling. Some builders would prefer to use imported materials for backfilling, in order to save time. Wires Due to aging of the wires, the wires in the existing building may not be safe and suitable to be reused in the new construction work. According to the interviewees, the cost of recovering the wires would not be much cheaper than buying new ones. Thus, most of the builders would prefer to dispose the wires rather than recover them. Plastics Most of the builders would reuse the plastic tools, like buckets, during the construction. However, the builder usually would not reuse the plastics from the existing structures, since the cost of virgin materials was low when compared with the c ost of recovery.

PAGE 46

46 Toilet cups Many owners would not accept imported second hand toilet cups in their properties, since they considered such toilet cups were unhygienic. Furthermore, according to the interviewees, the recovery cost of toilet cups was high. Paper, Cloth and Textile Paper includes packaging waste, office paper, cardboard and newspaper. Cloth and textile includes carpets, towels, wiping cloth and canvas. Some of these materials might be contaminated during the construction and demolition or be wetted due to exposure to the weather. These materials would not be suitable for reuse in such situations. Bamboo Bamboo is widely used as scaffolding in Hong Kong, due to its stiffness, low cost and flexibility. Most of the bamboo would be used more than once. However, bamboo would become brittle as exposed to the weather. It then would not be suitable to be reused again. Table 4 1 M ean, mode, median and standard deviation of the reuse rate of various waste materials among the companies which have r eused the materials Metal Concrete Glass/ Tiles Wood Rock/ Rubble Wires Plastic Sand/ Soil Toilet Cups Paper Cloth/ Textile Bamboo Mean 33% 12% 0% 39% 15% 27% 19% 15% 16% 41% 26% 62% Mode 30% 10% 0% 30% 10% 10% 10% 10% 20% 30% 10% 70% Median 30% 10% 0% 35% 14% 20% 15% 10% 18% 30% 20% 60% S.D. 27% 8% 0% 21% 9% 23% 12% 12% 5% 27% 22% 19% Reasons for Not Reusing the Waste Materials The mains reasons which made the responding companies not reusing the waste materials are: (see Figure 4 2) High recovery cost of the waste materials Lack of space for storage

PAGE 47

47 Lacks of special contractors to recover the waste materials in the market The scores of the three reasons are 210, 174 and 168 respectively. High recovery cost High recovery cost would be the main bar rier for the construction companies to reuse the waste materials. The cost of recovery also includes the transportation cost from the site to the companies for refurbishing or recovering of the waste. When the cost of recovery is high or even similar when compared with cost of buying new materials, the construction companies would prefer to use new materials, since the construction companies could save labor efforts, time and space in sorting and storing the reusable materials. Lack of space for storage Wh en the reusable materials were dismantled, they might not be installed to the new works until the project is nearly finished. For instance, the electricity wires are dismantled from the old building and it would not be installed until the building structur e is completed. The building services works are usually conducted in the late stages of the overall progress. Thus, it requires the construction companies to store the waste materials from the very beginning to the late stage of the project. Since the site areas of the construction projects in Hong Kong are very limited, the builders might not be able to store the materials in such case. Such materials have to be disposed. Lacks of special contractors in the market The recovering market is very immature. T he builders are always not able to find special contractors to recover the waste materials in the market, even though there are suitable materials for reuse.

PAGE 48

48 Recycling Overview T he analysis below is based on the data from the survey and the follow up inte rviews. Figure 4 3 shows the percentage of companies which have recycled different kinds of materials and Table 4 2 shows the mean, mode, median and standard deviation of the re cycle rate of various waste materials among the companies which have recycled t he materials From Figure 4 2, the responding companies would mainly recycle metal, and paper. The percentages of companies which have recycled such materials are 97% and 74 % respectively. Metal The recycling value of metal is highest among all other cat egories of waste. According to the interviewees, steel and iron could be sold at HK$900 to HK$2000 per ton (the linked exchange rate of US$1 to HK$1 is 1:7.8), depending on the condition and purity of the materials. Copper and aluminum are even more valuab le. They could be sold at around HK$15000 and HK$8000 per ton respectively. Thus, the recycling rate of metal was the highest among different kinds of materials. The most common metal elements which had been recycled included the following items: Aluminum windows frames Aluminum or stainless steel sinks Metal Pipes (e.g. copper pipes or cast iron) Steel columns Steel reinforcement bars Concrete The most common ways of reusing concrete were to break the concrete elements into fine pieces and then reuse t hem as aggregates in sub bases of piling structures or

PAGE 49

49 ground slabs and backfilling. However, this would require extra labor hours and extensive space for sorting, screening, jack hammering and storing the aggregates. The small scale construction company w ould tend not to reuse concrete as they could not afford extra time, cost and machinery in breaking the concrete. Rocks, r ubbles, s and, s oils and g lass Those kinds of materials could be recycled as aggregates for road bases, paving blocks and concrete. Ho wever, this kind of recycling technology was not well developed in Hong Kong. Thus, recycling such materials was still not prevalent in Hong Kong. Wood and b amboo Wood and bamboo could be recycled into various products, for example, paper, landscaping pr oducts, fertilizers, furniture, flooring, and pet littering products and so on. However, the recycling value received by the builders was low. In most of the cases, such recycling value could not even cover the transportation cost from the site to the recy cling companies. In addition, waste wood materials were usually bulky in size. This increased the handling cost and transportation cost. Wires Wires could be recycled by separating the wrapping plastic and the copper wires. However, this required extensiv e manpower and the quantity was usually small. So, many construction companies would not consider recycling the wires. Plastics Plastic wastes were usually mixed with different plastic materials (e.g. nylon, polystyrene and PVC). It is difficult to identif y different kinds of plastic materials simply by visual observations. This would reduce the possibility of recycling the plastic wastes

PAGE 50

50 and the recycling value. Plastic wastes also required extensive space for temporary storage. As a result, most of the pl astic wastes are sent to landfills. Papers According to the interviewees, papers could be sold at HK$700 1000 per ton. Most of the paper waste would be recycled, except for those which have been contaminated with other substances, like greasy and chemicals Table 4 2 Means, modes, medians and standard deviations of the re cycle rate of various waste materials among the companies which have recycled the materials Reasons for N ot R e cycling the W as te M aterials The mains reasons which made the responding companies not re cycling the waste materials are (see Figure 4 4): Tight schedule Lack of demand in the market Lack of space for sorting The scores of the three reasons are 218, 192 and 190 respectiv ely. Tight s chedule The land prices in Hong Kong are very expensive. The owners of the construction project would often squeeze the construction time, so that they get the return from their investment (e.g. rental income, profit from selling the properties ) and pay back the loans earlier. Therefore, the project schedules are tight. Most of the construction companies were not able to afford extra time and man hours in sorting and storing the recyclable Metal Concrete Glass/ Tiles Wood Rock/ Rubble Wires Plastic Sand/ Soil Toilet Cups Paper Cloth / Textile Bamboo Mean 67% 6% 15% 18% 8% 16% 12% 11% 8% 57% 6% 25% Mode 90% 5% 20%,25% 10% 5% 10% 10% 5% 10% 60% 5% 25% Median 70% 5% 20% 10% 5% 10% 10% 5% 8% 60% 5% 25% S.D. 24% 5% 13% 17% 7% 14% 8% 14% 3% 26% 5% 20%

PAGE 51

51 materials. They would rather allocate budget and resourc es in the real progress of the projects. Lack of d emand for r ecyclable m aterials in the m arket The recovering market was very immature. The construction companies were not able to find recycling companies to recover the waste materials in the market, even thought there are suitable materials for recycle. Lack of s pace for s orting Retrieving recyclable materials requires extensive space for sorting. The site areas of the projects in Hong Kong are very limited, due to the high land prices. The construction co mpany might not be able to allocate sorting area for retrieving recyclable materials. Such materials have to be disposed in such cases. Waste Management Planning 94% of the responding companies did not have a formal plan which is designated for constructio n and demolition waste management in their construction sites (see Figure 4 5). The current legislations did not mandate the construction companies to have such plans before the commencement of the works. Indeed, such planning is critical to the success of waste management. It specifies the goals of the waste management and the strategies and procedures in dealing with the construction and demolition waste materials. The subcontractors and the foremen could then have a comprehensive guideline to follow. Opi nions Towards Possible Strategies The responding companies had favorable opinions towards the following options (refer to Figure 4 6):

PAGE 52

52 Legislations to mandate contractors a minimum percentage of C&D waste reuse and/or recycling in any construction projects Government provides incentives to the contractors or developers with high percentage of C&D waste reuse/recycle (e.g. allows higher gross floor area to site area ratio, lower the tax rates, etc.) Government subsidies the C&D waste reuse/recycling indus tries Include a clause in the contract requiring a C&D waste management plan for both private and public projects The scores of the above four options are 265, 242, 232 and 209 respectively. Case Study The purpose of the case study is to investigate the s trategies which had already been adopted in dealing with different kinds of waste by the leading construction companies in Hong Kong. This reveals what the industrial participants could do based on current technology and resource constraints Company Backg round The Company and its subsidiaries are engaged in the business of civil engineering, building construction, alternation and addition works, renovations, fitting out, building repair and maintenance, property investment, construction management, develop approximately HK$1,000 million. It is included in the List of HKSAR Approved General Building Contractors, List of Building Contractors for Housing Authority and List of HKSAR Approved Contra ctors for Public Works (Group C) of Categories of Buildings, Roads and Drainage, Site Formation and Water Works. The company has established an environmental management system and was certified to ISO 14001:2004 Environment Management System Standard by H ong Kong

PAGE 53

53 Quality Assurance Agency. It has also attained several awards related to the aspects of environmental protection in recent years. Contract s um of the project Approximately HK$ 100 million (the linked exchange rate of US$ to HK$ is 1:7.8) Project d escription The project mainly included the following components: One 35 storey non standard domestic block (Block 3), which is approximately 63m x 45m overall on plan and approximately 98m high from ground floor to main roof level; One 41 storey non stand ard domestic block (Block 4), which is approximately 47m x 45m overall on plan and approximately 114m high from ground floor to main roof level; One 41 storey non standard domestic block (Block 12), which is approximately 69m x 36m overall on plan and appr oximately 114m high from ground floor to main roof level; One single storey Integrated Children and Youth Services Centre at the ground floor of Block 3 including construction of footings, piling and pile caps; Site formation works including one approxima tely 130m (length) x 13m (height); Site formation works including a series of approximately 104m (length) x 4.2m (height) retaining wall. Significant rock excavation in connection with construction of base slab of the retaining wall and mass concrete fill underneath the base slab of the retaining wall. Planning for C onstruction and D emolition W aste M anagement The company has established a plan for construction and demolition waste management. The purpose of the plan was to provide details of the means and m easures for reducing the environmental impact of the construction waste generated throughout the execution of the work. It also provided a comprehensive guideline for their subcontractors and employees to follow. The plan included the following items:

PAGE 54

54 Goal s Organization structure for waste management Types and quantities of wastes would be generated during the execution of the work Timing of waste arising Procedures of handling different kinds of waste Layout plan for on site waste sorting Areas for was te storage Monitoring and auditing program Arrangement for Construction and Demolition Waste Disposal All construction and demolition (C&D) waste would be sorted to: Non inert portion (Landfill s ) Inert C&D waste(Public Fill s ) Chemical Waste Recyclable ma terials e.g. metal All C&D materials arising from or in connection with the construction and demolition work would be sorted on site and be separated into different categories for disposal at landfills, public filling areas, or reuse and recycling as appr opriate. It would be conducted immediately at designated points or at the source on each floor to avoid loss or leakage during handling (Refer to Figure 4 7, 4 8 and 4 9). Procedures in Sorting Different Kinds of Waste Foremen of each block would ensure a ll the C&D materials generated from the buildings was sorted at source as the following procedures: C&D materials would be separated manually into general C&D waste and inert waste and then stored temporarily at the designated locations on each floor. Diff erent kinds of C&D materials (i.e. general C&D waste and inert waste etc.) would be placed separately next to the refuse chute at each floor (see Figure 4 10).

PAGE 55

55 To avoid contamination, different kinds of C&D materials would be disposed separately via the re fuse chute to the refuse collection point at ground level. The schedule is shown as following (Refer to Figure 4 11). For every Monday, Wednesday and Friday: Only inert portion (i.e. concrete, bricks, sand and soil) would be disposed thru the refuse chute to the refuse collection point. For every Tuesday, Thursday and Saturday: Only bamboo, plastics, timber and general C&D waste would be disposed thru the refuse chute to the refuse collection point. The waste collected on the refuse collection point at grou nd level would be removed promptly so that different kind of wastes would not be mixed together (See Figure 4 12). Some C&D waste (e.g. pipe duct), due to its sizes or dimensions, is not suitable for dumping thru the refuse chute. Workers would collect and transfer this special waste manually to the refuse collection points at ground level for collection. To avoid spillage and contamination, Chemical waste would be collected separately and transferred manually to the designated chemical waste storage facili ties on site. The chemical waste would be collected by the licensed collector for proper disposal. Useful materials such as reusable timber, rubble and steel/metal would be separated for reuse. Where it is no longer reusable, steel and metal items will be sent as scrap for recycling. Reusable or recyclable materials would be sorted from the waste manually and stored separately in the designated container to avoid contamination (See Figure 4 13).

PAGE 56

56 Concrete Recycling The existing old structures of site were se veral ten story high buildings which were made up by reinforced concrete. In order to reduce the amount of inert materials sent to the public filling areas and landfills, the company has recycled a large quantity of concrete from demolition. The concrete was firstly broken by a jack hammer. The steel bars inside the concrete were picked out manually. The concrete was then piled up in a designated area to ensure it would not be contaminated by other materials (see Figure 4 14). The broken concrete was mainl y used as aggregates in the sub bases of the piling system (e.g. pile cap and ground beam) and the ground slab. The size of aggregates should not exceed certain dimensions according to the specification. Wire nets were used to screen out the large pieces o f concrete (see Figure 4 15). Through this strategy, over 70% of the concrete from demolition were recycled. Other Strategies Adopted to Reduce the Amount of Waste to be Disposed Use of metal falsework and metal formwork The metal system falsework and met al formwork can be reused more than hundred times. They can also be recycled at the end of the lifecycle. This can reduce the amount of bamboo and timber waste disposed at the landfills and public filling areas (see Figure 4 16, 4 17 and 4 18). Use of p rec ast e lements Waste generation can be significantly reduced by the use of prefabricated elements. Prefabricated concrete elements were produced in factories and transported to construction sites. By using mass mechanical production, better quality and finis hes could be achieved. In this project, massive prefabricated faade system was adopted.

PAGE 57

57 The window frames have already installed inside the prefabricated faade system (see Figure 4 18). Placing r ecycling b oxes in p rominent l ocations Placing recycling bo xes for collecting recyclable wastes at proper locations would increase the efficiency of collecting and delivering wastes. This could also promote environmental awareness among all working staff on site. Yellow boxes were used for collecting aluminum ma terials; Blue boxes were used for collecting paper waste; and brown boxes were used for collecting plastic bottles (see Figure 4 19). Figure 4 1 A bar chart showing the mean percentage of companies which have reused different kinds of materials

PAGE 58

58 Figure 4 2 A bar chart showing the scores of the reasons for not reusing the waste materials

PAGE 59

59 Figure 4 3 A bar chart showing the mean percentage of companies which have recycled different kinds of materials

PAGE 60

60 Figure 4 4 A bar chart showing the scores of the reasons for not recycling the waste materials

PAGE 61

61 Figure 4 5 A pie chart showing the ratio of the companies having and not having waste management planning

PAGE 62

62 Notes: A. Legislations to mandate contractors a minimum percentage of C&D waste reuse and/or recycling in any construction projects. B. Government subsidies the C&D waste reuse/recycling industries C. Government promotes the development of C&D waste reuse/recycling technologies (e.g. converting reinforced concrete waste into recycled steel and recycled ag gregates) D. Government provides incentives to the contractors or developers with high percentage of C&D waste reuse/recycle (e.g. allows higher gross floor area to site area ratio, lower the tax rates, etc.) E. Legislations to mandate the contractors to submit C&D waste management plan before the commencement of the works F. Include a clause in the contract requiring a C&D waste management plan for both private and public projects G. Provide guidelines and standard for C&D waste reuse and recycling H. Increase the fees for disposal of C&D waste in landfill areas I. The design professionals should plan for demolition in the design phase. Figure 4 6 A bar chart showing the scores of the possible strategies

PAGE 63

63 Figure 4 7 Layout Plan of Block 3

PAGE 64

64 Figure 4 8 Layout Plan of Block 4

PAGE 65

65 Figure 4 9 Layout Plan of Block 12

PAGE 66

66 Figure 4 10 The refuse chute

PAGE 67

67 Figure 4 11 Schedule for disposal of different kinds of C&D materials

PAGE 68

68 Figure 4 12 Refuse collection point at ground level

PAGE 69

69 Figure 4 13 Container used to store reusable or recyclable non inert materials

PAGE 70

70 Figure 4 14 Concrete piled up for sorting

PAGE 71

71 Figure 4 15 Wire net used to screen out the large pieces of concrete

PAGE 72

72 Figure 4 16 Metal scaffolding mounted on the faade

PAGE 73

73 Figure 4 17 Aluminum formworks for suspended s lab

PAGE 74

74 Figure 4 18 Prefabricated facade system

PAGE 75

75 Figure 4 19 Recycling boxes for collecting different kinds of waste materials

PAGE 76

76 CHAPTER 5 RECOMMENDATIONS Based on the findings of this research, recommendations on implementing construction and demolition waste management strategies were provided. For Government Legislations T he government could mandate contractors to reuse and/or recycle a minimum percentage of construction and demolition waste in any construction projects T his would make the contractors implement construction and demolition waste management in a certain level in order to achieve the legislati ve requirements. H owever, this approach would only be practicable if there is a sound industry for recovering and recycling. T he development of s uch industry is still very immature. T hus, to ensure the feasibility, the government should set a relatively low rate in the first several years (i.e. five percents), and then increase the minimum percentage by ten percents for every five years. T his would allow enough time to the industrial participants for accommodating such policy. Government Incentives Government could provide different incentives in order to encourage the construction participants in implementing construction and waste management syst em. T he developers or owners are interested in generating more rental income or profit in selling the properties. T hus, allowing the developers to develop the projects with higher gross floor area ratio would be an effective incentive. As for the contract ors, they are interested in reducing the construction costs and generate higher profit margin on the construction projects. P ossible incentives would be

PAGE 77

77 allowing a lower tax rate or a lower charge on using the public filling areas if they can meet certain requirements on waste management. S ubsidies for the R e furbishing /recycling I ndustries T he development of such industr ies is still immature. T he recovering or recycling companies are only interested at the waste with high recycling value, like aluminum ste el and copper. T he main difficulty for such companies is finding a suitable location for sorting and handling the waste. The refurbishing and recycling processes require the use of excessive space. H owever, the land cost in Hong Kong is generally high. T hu s, apart from monetary subsidies, the government could lease out some land to the recovering or recycling companies with rental lower than current market price. S uch location should be connected with waste and electricity supplies and easily accessed from the sources of waste. For Developers Contract C lauses T he developers could i nclude a clause in the contract requiring the contractors to implement construction and demolition waste management for both private and public projects The contracts may also in clude a penalty clause if the amount of waste exceeds the limit and a bonus clause if the contractors are able to control the amount waste in a certain level. Adoption of Performance Assessment System The developers, especially for those with large market shares, should adopt an assessment system to evaluate the performance of the contractors the quality of the work and effectiveness in implementing construction and demolition waste management

PAGE 78

78 system S u ch system would then provide a basis to evaluat e the overall performance of the contractor for selecting contractors in future procurement As for the developers with relatively low market shares, their projects may just be in one off nature. O nce their projects have completed, they could submit the result of the assessment to a pool. E very developer in the industry could be assessable to such pool to examine the past performance of the contractors. T his would provide incentives for the contractors to implementing construction and demolition waste management system, since the contractors are interested in maintaining their goodwill with in the industry. For D esigners C o nsideration in Designs T he designers should consider waste reduction in the design phases. T his could be achieve d by matching the building ele ments with the standard dimensions of the building materials and using prefabricated elements to reduce the needs of temporary structures. Using R ecyclable or R ecycled M aterials If possible, the designers should use recyclable or recycled materials in t he designs. Example of this would be the specifications requiring the contractors to use concrete from demolition as the aggregates in road base s or sub bases in piling system. T his would not only achieve sustainable development, but also increase the dema nd of recycled products in the market. T his would help the development of the refurbishing and recycling industries.

PAGE 79

79 For C ontractors Planning for Construction and Demolition Waste Management The contractors should develop a plan for construction and demoli tion waste management before the commencement of the work. The purpose of the plan is to provide details of the means and measures for reducing the environmental impact of the construction waste generated throughout the execution of the work. T he company s hould also ensure there are enough resources in implementation the measures. S uch resources include money, manpower, and space in sorting and storing the waste. T he plan would provide a comprehensive guideline for the subcontractors and employees to follow S uch plan should consist of the following items: Goals and objectives of the waste management system Organization structure for waste management Types and quantities of wastes would be generated during the execution of the work Timing of waste arising Procedures of handling different kinds of waste Layout plan for o n site waste sorting Areas for waste storage Monitoring and auditing program

PAGE 80

80 CHAPTER 6 CONCLUSIONS This research is aiming at providing an overview of the current situations of construction and demolition waste management practice in Hong Kong and formulating strategies on waste minimization. The building industry consumes a considerable amount of resources. Those resources include valuable natural assets like timber and metal. Indeed, a la rge portion of the materials being wasted is due to poor material control on the building sites. Construction and demolition wastes are bulky in size and use up a large proportion of capacity if they are disposed of at landfills. Approximately 27% of the p ublic landfill capacity in Hong Kong was used for handling with the construction and demolition waste in 2006. If this problem continues, the landfills in Hong Kong will be filled up in 5 to 9 years. Reducing and recycling construction wastes are therefore a key element of sustainability in future development. Construction and demolition waste are normally sorted into two main portions: inert and non inert. The strategies discussed in this research are mainly focused on avoiding waste, reusing materials and recycling waste. Near 80% of construction and demolition waste came from private projects and concrete was the most commonly found construction and demolition waste among all other categories. This is because most of the buildings in Hong Kong are commonl y made up of reinforced concrete in both building structures and envelopes. The research has described the current facilities for waste management in Hong Kong and the limitations in implementing construction and demolition waste management. The research has also discussed the strategies adopted in other

PAGE 81

81 countries and other possible measures suggested by other researchers. The data of this research came from three sources: surveying the target group by questionnaire; interviewing with management staff of s elected construction companies in Hong Kong; and a case study. The aims of the survey are to find out which kinds of waste are commonly reused or recycled and the views of industrial participants towards different waste management strategies, while the lim itations in reusing or recycling the waste of various categories were discovered by interviewing. Strategies which had already been adopted in dealing with different kinds of waste by one of the leading construction companies in Hong Kong have been discuss ed in the case study. The responding companies mainly reused metal, wood, wires, paper and bamboo in their sites. The mains reasons which made the responding companies not reusing the waste materials are the high recovery cost, lack of space for storage an d lacks of special contractors to recover the waste materials in the market. The research also found that the construction companies were only interested at recycling the material with high value, like metal and paper. Most of responding companies did not have a plan designated for construction and demolition waste management. This would indeed be the biggest barrier in implementing the construction and demolition waste management in Hong Kong. This research has provided several recommendations to different parties involved in the construction projects. Those parties include the government, developers, designers and contractors. Further studies Further studies could focus on the technical aspects in recycling concrete, minimum percentage of waste materials c ould be recycled and/or recovered in different

PAGE 82

82 kinds of construction, and ways in helping the development of the recycling and refurbishing industries in Hong Kong.

PAGE 83

83 APPENDIX A SAMPLE OF THE SURVEY Dear Sir or Madam, I am a Master Degree student in Univ ersity of Florida (USA). I am now working on a thesis related to construction and demolition waste management in Hong Kong. This questionnaire has been developed to determine the state of reuse and recycling of construction materials in Hong Kong. I would appreciate if you complete the survey and email/fax it to eramela@ufl.edu or ( 852 )3106 8655 by 2 1 ST September 2009. The results of the survey along with their analysis and conclusions will be provided to you upon com pletion of the study. Definitions: Reuse material being utilized in its original state more than once. Recycle process used materials into new products to prevent waste of potentially useful materials Construction and Demolition (C&D) W aste Waste aris ing from any land excavation or formation, civil or building construction, roadwork, building renovation or demolition activities. / eramela@ufl.edu ( 852 )3106 8655 Please circle/highlight the appropriate answers. 1. Which of the following materials have been reused in your construction projects? (You may choose more than one option) Please also provide a rough percentage (%) of waste that was reused f or each kind of material. ( )? ?( ) Metal ___% Concrete ___% Glass/Tile s / ___% Wood (timber /plywood) ___% Rock/Rubble ___% Wires ___% Plastic ___% Sand/Soil / ___% Toilet Cups ___% Paper ___% Cloth/Textile ___% Bamboo ___% Others(please specify:_______________________) :___________________ ___% 2. Rank the following reasons (from 1 to 8) fo r not reusing construction materials. (1 8)

PAGE 84

84 Costs for recovery ____ Contract requirements ____ Lack of suitable materials ____ Lack of specialty contractors for salvaging materials for reuse / ____ Lacks of space for sorting ____ Lacks of space for storage ____ Tight Schedule ____ Lacks of standard for reuse ____ Others (please specify:_______________________) :_____ ____________________ 3. Which of the following materials have been recycled in your construction projects? Please also provide a rough percentage (%) of waste that is recycled for each material (You may choose more than one option) ( ) Metal ___% Concrete ___% Glass/Tile s / ___% Wood (timber /plywood) ___% Rock/Rubble ___% Wires ___% Plastic ___% Sand/Soil / ___% Toilet Cups ___% Paper ___% Cloth/Textile ___% Bamboo ___% Others (please specify:_______________________) :___________________ ___% 4. Rank the following reasons (from 1 to 8) for not recycling construction materials. 1 8 Lack of standard for recycling _____ Lack of suitable materials ____ Lack of demand of rec ycled products _____ Lack of space for sorting ____ Lack of space for storage _____ Tight Schedule _____ Costs for transportation _____ Extra labor cost _____ Others (please specify:_______________________) : _____ 5. Does your company have any C&D waste management plan for construction projects? A. Yes (Would you please provide us a copy of the plan ) B. No 6. Rank the following recommendations (from 1 to 8) to promote reuse and recycling of C&D waste materials in Hong Kong? ( 1 9 ) A. Legislati ons to mandate contractors a minimum percentage of C&D waste reuse and/or recycling in any construction projects

PAGE 85

85 ____ B. Government subsidies the C&D waste reuse/recycling industries ____ C. Gov ernment promotes the development of C&D waste reuse/recycling technologies (e.g. converting reinforced concrete waste into recycled steel and recycled aggregates) ( ) ____ D. Government provides incenti ves to the contractors or developers with high percentage of C&D waste reuse/recycle (e.g. allows higher gross floor area to site area ratio, lower the tax rates, etc.) ( ) ____ E. Legislations to ma ndate the contractors to submit C&D waste management plan before the commencement of the works ____ F. Include a clause in the contract requiring a C&D waste management plan for both private and public projects ____ G. Provide guidelines and standard for C&D waste reuse and recycling ____ H. Increase the fees for disposal of C&D waste in landfill areas ____ I. The design professionals should plan for demolition in the de sign phase. ( ) ____ 7. Please provide other recommendations for increasing reuse and recycling of construction materials in Hong Kong. __________________________________________________________ ____________ ____ _______________________________________________________ ___________________ Please e mail/fax your responses to: Josefina Eramela ( eramela@ufl.edu)/ ( 852 )3106 8655 eramela@ufl.edu ( 852 )31 06 8655 Thank you very much for your responses. B est Regards, Wing Yi Josefina Eramela

PAGE 86

86 LIST OF REFERENCES Cheung C.M., Wong K.W., Fan C.N. and Poon, C.S. (1993) Reduction of c onstruction w aste: f inal r eport, Hong Kong Polytechnic University a nd Hong Kong Construction Association Hong Kong. successful J ournal of Constr uction Manage ment and Econ omics 15(1), 49 58. Crittenden, B., and Kolaczkowski, S (1995). Waste m anagement a p ractical g uide London: Institution of Civil Engineers Crowther, P. (2000). Building d econstruction in Australia : o verview of d econstruction in s elected c ountries. CIB Publication Repor t: 252 Dainty, A and Brooke R. (2004). Towards i mproved c onstruction w aste m inimization: a n eed for i mproved s upply c hain i ntegration. Structural Survey 2004 22 ( 1 ), 20 30 Dijk, K., Boedinato, P., Dorsthoorst, B. and Kowalczyk, A. (2000). e art of deconstruction in the Netherlands: o verview of d econstruction in s elected c ountries. CIB Publication Report: 252 Environment Protection Department (2007). Monitoring s olid w aste in H ong Kong Environmental Infrastructure Division, Hong Kong Environmental Protection Department (2009 a ). Construction w aste m anagement. < http://www.epd.gov.hk/epd/misc/cdm/management_intro.htm > (August 21, 2009) Environmental Protection Dep artment (2009 b ) < http://www.epd.gov.hk/epd/misc/cdm/introduction.htm > (September 24, 2009) Faniran, O.O., and Caban, G. (1998). Minimizing w ast e on c onstruction p roject s ites Engineering, Construction and Architectural Management 5 ( 2 ) 182 188 Ferguson, J., Kermode, N., Nash, C.L., Sketch, W., and Huxford, R. (1995) Managing and m inimizing c onstruction w ast e, Institution of Civil Engineers L ondon Geo environment Research Centre (2004) Waste r e use. < http://grc.engineering.cf.ac.uk/lrn/resources/waste/management/re use/index.php > (October 24, 2 009) Hao, J.L., Hills, M.J. and Tam, V.W.Y.(2008). The e ffectiveness of Hong Kong's c onstruction w aste d isposal c harging s cheme. Waste Management & Research 26 ( 6 ) 553 558

PAGE 87

87 Hong Kong Government (N.D.) Construction w aste. < http://www.gov.hk/en/residents/environment/waste/constructionwaste.htm > (August 21, 2009) Hong Kong Housing Authority (2003) Performance a ssessment: b uilding PASS. < http://www.housingauthority.gov.hk/en/businesspartners/buildingpass/ > (August 21, 2009) Johnston, H. and Mincks, W. R. (1995) Cost effective waste minimization for construction managers Cost Engineering 37 (1), 31 39 Kibert, C. J.and Chini, A. R. (2000) Overview of d econstruction in s elected c ountries CIB Publication Report: 252 Li, W. (2002). Composition a nalysis of c onstruction and d emolition Waste in c onstruction i nd ustry in Hong Kong The Hong Kong Polytechnic University Hong Kong effective waste management ineering 41(3), 35 43. Myhre, L. (2000) State of Deconstruction in Norway : Over view of Deconstruction in Selected Countries. CIB Publication Report: 252 Petts, J. ( 1995 ) of community involvement and consensus J ournal of Environ mental Plan ning Manage men t 38(4), 519 536. Poon, C.S., Yu, A.T.W., and Jaillon, L.(2003). Reducing b uilding w aste at c onstruction s ites in Hong Kong. Construction Management and Economics 2004 ( 22 ) 461 470 Poon, C S Yu, A Wong, S W and Cheung, E (2004) Management o f construction waste in public housing projects in Hong Kong Construction Management and Economics 22 ( 7 ) 675 689 Poon, C.S. (2007) Reducing c onstruction w aste. Waste Managemet 2007( 27 ), 1715 1716 Shen, L.Y., Bao, Q. and Yip, S.L. (1992) Construc tion and E nvironment A M anagement M atrix Chartered Builder, Hong Kong. Shen, L. Y., and Tam, W. Y. Vivian ( 2002 ) Int ernational J ournal of Proj ect Manage ment 20(7), 535 543.

PAGE 88

88 Shen L. Y.; Tam V., Tam C.M. ; and Drew D. (2004). Mapping a pproach for e xamining w aste m anagement on c onstruction s ites. Journal of Construction of Construction Engineering and Management 130(4) 472 481 Smith, S.E. (2009) What is l and r eclamation? < http ://www.wisegeek.com/what is land reclamation.htm > (October 24, 2009) Teo, M. and Loosemore, M. (2001). A t heory of w aste b ehavior in the c onstruction i ndustry. Co nstruction Management and Economics 19 ( 7 ) 741 7 51 U.S. Environment Protection Agency (2009). Recycling. < http://www.epa.gov/osw/conserve/rrr/recycle.htm > (October 24, 2009) U S Green Building Council (2008) LEED: LEED r ating s ystem. < http://www.usgbc.org/DisplayPage.aspx?CategoryID=19 > (August 21, 2009) Verma, M. (N.D.) Polluter pays principle. < http://hubpages.com/hub/Polluter pays principle > (August 10, 2009) Wong, E.O. W. and Yip, R. C. P. (2004) Promoting sustainable construction waste management in Hong Kong Construction Management and Ec onomics 22 ( 6 ) 563 566

PAGE 89

89 BIOGRAPHICAL SKETCH Wing Yi Josefina Eramela was born in Hong Kong. After graduating from the Hong Kong Polytechnic Univer sity with a Bachelor of Science (Hons) in Surveying, she decided pursue a higher education in America. Wing Y i graduated with a Master of Science in Building Construction in University of F l orida in December 2009 and intends to be an estimator in the construction industry.