Developing a Scorecard to Evaluate the Use of Personal Fall Arrest Systems

Permanent Link: http://ufdc.ufl.edu/UFE0021347/00001

Material Information

Title: Developing a Scorecard to Evaluate the Use of Personal Fall Arrest Systems
Physical Description: 1 online resource (184 p.)
Language: english
Creator: Harris, Matthew Albert
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2007

Subjects

Subjects / Keywords: absorber, analysis, anchor, anchorage, architect, architecture, arrest, body, bodybelt, bollard, bridge, builder, building, carabiner, carpenter, checklist, civil, connector, construction, constructor, continuous, contracting, contractor, coordination, d, davit, distance, elevation, engineer, engineering, environment, equipment, erection, erector, evaluation, fall, falls, fatalities, fatality, harness, hazard, health, ibeam, impact, improvement, indicator, industrial, injury, intolerance, ironworker, ladder, lagging, lanyard, leading, leg, lifeline, maintenance, management, metric, occupational, off, orthostatic, osha, parapet, personal, pfas, plan, project, protective, rate, recordable, rescue, rigging, ring, risk, roof, roofer, roofing, safety, scaffold, scorecard, shock, site, slips, snaphook, steel, structure, superintendent, suspension, system, telecommunication, tie, tower, training, trauma, trips, truss, twin, user, webbing
Design, Construction, and Planning -- Dissertations, Academic -- UF
Genre: Design, Construction, and Planning thesis, Ph.D.
bibliography   ( marcgt )
theses   ( marcgt )
government publication (state, provincial, terriorial, dependent)   ( marcgt )
born-digital   ( sobekcm )
Electronic Thesis or Dissertation

Notes

Abstract: The structural erection of buildings, bridges, and other structures is associated with a high frequency of serious fall injuries and fatalities. Routine maintenance activities such as roofing replacement are also associated with high rates of occupational fall injuries. Falls from elevation is the leading category of serious injury and fatalities in the construction industry. Annually, more than 1000 construction worker fatalities (15% attributable to falls from elevation) occur in the United States. The Occupational Safety and Health Administration (OSHA) Construction Standard, Subpart M, Fall Protection, contains requirements for employers to insure the health and safety of their employees that are exposed to fall injury hazards. Any employee working at a height of six feet or more above the walking surface is required to have fall protection. The requirements for fall protection may be satisfied by passive systems, such as 40 inch-height guardrails, or by the use of active systems. The typical equipment of an active system consists of a safety harness and lifeline assembly known as a personal fall arrest system (PFAS). By receiving the proper training and equipment, workers exposed to fall hazards may use PFASs to significantly reduce their risk of fall injury. A complete PFAS is typically defined as a full body harness (similar to a parachute harness), a lanyard to connect the harness and anchorage, and an anchorage (a heavy-duty steel alloy ring solidly connected to the structure). This study investigated the implementation of fall protection practices and policies, specifically PFASs as used in large construction companies. A scorecard was developed to assist employers in effectively evaluating the safety performance of fall protection and PFASs at either the individual project or companywide level.
General Note: In the series University of Florida Digital Collections.
General Note: Includes vita.
Bibliography: Includes bibliographical references.
Source of Description: Description based on online resource; title from PDF title page.
Source of Description: This bibliographic record is available under the Creative Commons CC0 public domain dedication. The University of Florida Libraries, as creator of this bibliographic record, has waived all rights to it worldwide under copyright law, including all related and neighboring rights, to the extent allowed by law.
Statement of Responsibility: by Matthew Albert Harris.
Thesis: Thesis (Ph.D.)--University of Florida, 2007.
Local: Adviser: Hinze, Jimmie W.

Record Information

Source Institution: UFRGP
Rights Management: Applicable rights reserved.
Classification: lcc - LD1780 2007
System ID: UFE0021347:00001

Permanent Link: http://ufdc.ufl.edu/UFE0021347/00001

Material Information

Title: Developing a Scorecard to Evaluate the Use of Personal Fall Arrest Systems
Physical Description: 1 online resource (184 p.)
Language: english
Creator: Harris, Matthew Albert
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2007

Subjects

Subjects / Keywords: absorber, analysis, anchor, anchorage, architect, architecture, arrest, body, bodybelt, bollard, bridge, builder, building, carabiner, carpenter, checklist, civil, connector, construction, constructor, continuous, contracting, contractor, coordination, d, davit, distance, elevation, engineer, engineering, environment, equipment, erection, erector, evaluation, fall, falls, fatalities, fatality, harness, hazard, health, ibeam, impact, improvement, indicator, industrial, injury, intolerance, ironworker, ladder, lagging, lanyard, leading, leg, lifeline, maintenance, management, metric, occupational, off, orthostatic, osha, parapet, personal, pfas, plan, project, protective, rate, recordable, rescue, rigging, ring, risk, roof, roofer, roofing, safety, scaffold, scorecard, shock, site, slips, snaphook, steel, structure, superintendent, suspension, system, telecommunication, tie, tower, training, trauma, trips, truss, twin, user, webbing
Design, Construction, and Planning -- Dissertations, Academic -- UF
Genre: Design, Construction, and Planning thesis, Ph.D.
bibliography   ( marcgt )
theses   ( marcgt )
government publication (state, provincial, terriorial, dependent)   ( marcgt )
born-digital   ( sobekcm )
Electronic Thesis or Dissertation

Notes

Abstract: The structural erection of buildings, bridges, and other structures is associated with a high frequency of serious fall injuries and fatalities. Routine maintenance activities such as roofing replacement are also associated with high rates of occupational fall injuries. Falls from elevation is the leading category of serious injury and fatalities in the construction industry. Annually, more than 1000 construction worker fatalities (15% attributable to falls from elevation) occur in the United States. The Occupational Safety and Health Administration (OSHA) Construction Standard, Subpart M, Fall Protection, contains requirements for employers to insure the health and safety of their employees that are exposed to fall injury hazards. Any employee working at a height of six feet or more above the walking surface is required to have fall protection. The requirements for fall protection may be satisfied by passive systems, such as 40 inch-height guardrails, or by the use of active systems. The typical equipment of an active system consists of a safety harness and lifeline assembly known as a personal fall arrest system (PFAS). By receiving the proper training and equipment, workers exposed to fall hazards may use PFASs to significantly reduce their risk of fall injury. A complete PFAS is typically defined as a full body harness (similar to a parachute harness), a lanyard to connect the harness and anchorage, and an anchorage (a heavy-duty steel alloy ring solidly connected to the structure). This study investigated the implementation of fall protection practices and policies, specifically PFASs as used in large construction companies. A scorecard was developed to assist employers in effectively evaluating the safety performance of fall protection and PFASs at either the individual project or companywide level.
General Note: In the series University of Florida Digital Collections.
General Note: Includes vita.
Bibliography: Includes bibliographical references.
Source of Description: Description based on online resource; title from PDF title page.
Source of Description: This bibliographic record is available under the Creative Commons CC0 public domain dedication. The University of Florida Libraries, as creator of this bibliographic record, has waived all rights to it worldwide under copyright law, including all related and neighboring rights, to the extent allowed by law.
Statement of Responsibility: by Matthew Albert Harris.
Thesis: Thesis (Ph.D.)--University of Florida, 2007.
Local: Adviser: Hinze, Jimmie W.

Record Information

Source Institution: UFRGP
Rights Management: Applicable rights reserved.
Classification: lcc - LD1780 2007
System ID: UFE0021347:00001


This item has the following downloads:


Full Text
xml version 1.0 encoding UTF-8
REPORT xmlns http:www.fcla.edudlsmddaitss xmlns:xsi http:www.w3.org2001XMLSchema-instance xsi:schemaLocation http:www.fcla.edudlsmddaitssdaitssReport.xsd
INGEST IEID E20101115_AAAABM INGEST_TIME 2010-11-15T09:03:30Z PACKAGE UFE0021347_00001
AGREEMENT_INFO ACCOUNT UF PROJECT UFDC
FILES
FILE SIZE 58980 DFID F20101115_AAAOMJ ORIGIN DEPOSITOR PATH harris_m_Page_081.pro GLOBAL false PRESERVATION BIT MESSAGE_DIGEST ALGORITHM MD5
81bde891ceff9741e8e443e391a1ed8f
SHA-1
8d65c0d6bf95df03833ed500e532a3a5b86ee6eb
50751 F20101115_AAAOLV harris_m_Page_067.pro
c547011404b47990786de1146ba045b9
44e8f86153cafaab242a5364e3bc061e063826e4
57847 F20101115_AAAOMK harris_m_Page_082.pro
99a42ad651af8a0189ce1b3ce86a4af2
f3149e20651f62e3f028ce0b863d45296c30e88a
60433 F20101115_AAAOLW harris_m_Page_068.pro
7748db8d3d5cc4967b664a180f7c0bb7
c795093a5f6ac3d4963c1e02e6e4cf52fefb19c0
55751 F20101115_AAAONA harris_m_Page_099.pro
762793b0802eb71a27608b789b2023ba
353c7a3f807ba60734c6e45885fc84086d30fd12
50762 F20101115_AAAOML harris_m_Page_083.pro
f2a0f511ba7d38679c2219397387c478
809ab45c63033bc43999c3f948bce0303bbfd757
51869 F20101115_AAAOLX harris_m_Page_069.pro
aa7e5e06a4efd47b7ca67d812ec8d310
014304963d6225b7f5f84c1130808c9937b96301
50544 F20101115_AAAONB harris_m_Page_100.pro
807ddb322013bd549a1c76712e491f4f
23078bcb9e51723b86d5ec762254bb628b4151ba
54904 F20101115_AAAOMM harris_m_Page_084.pro
635efb5e52219bf58ee8605110b29a07
e49cfb39e98fb470f00fd187c44d7df6028ec5c1
5514 F20101115_AAAOLY harris_m_Page_070.pro
af029d58625d76803051a53998bd5da8
05a03630a54eaf9dc9655b27b72e42376722845b
55948 F20101115_AAAONC harris_m_Page_101.pro
9f2df39d260dc8beb19a8a3130df0085
aa827f3cc9743f974153505cf1fea86aede34811
49266 F20101115_AAAOMN harris_m_Page_085.pro
2fed28c85cff3bd1aa97ac0a355bdb5b
326c7941dbeadc1894600c9ab65420e3585ac370
4687 F20101115_AAAOLZ harris_m_Page_071.pro
54c5d6b1fae5c18cd1e30189367dc089
b8b489fb0b7ab3e1512053c927136ee556b53268
51506 F20101115_AAAOND harris_m_Page_102.pro
cb9c547fe94d0d19ba00852fd4c6dc30
30739d2f84f44d6729d6d7cf98d60adddbbaf2bc
42576 F20101115_AAAOMO harris_m_Page_086.pro
f8597486ca34c7a16a04bf14eb11e1f5
12c7107496cca35d15cac9a3876962e82ae493b9
53334 F20101115_AAAONE harris_m_Page_103.pro
33dd2f6e74f665911df0495e3b6d74f4
f3c99578f37ec1364f6941781b718dedcf9dde89
54633 F20101115_AAAOMP harris_m_Page_087.pro
ce22750ed095cfaf84434e896c7a5198
ea45444ffdc97695d86af9e01d6371ecd4fa43cc
49097 F20101115_AAAONF harris_m_Page_104.pro
f1ebb5465c187253428dd9371c46a9dd
1ab9dc598ff7a15411626ff5c8e03a794e55cefb
77193 F20101115_AAAOMQ harris_m_Page_088.pro
6737d832718d5b4c4252cab4a5cdbf32
f5b40b4a2b82f900cb401529eabb328b4394cc29
52199 F20101115_AAAONG harris_m_Page_105.pro
a307731a292ae34843f5310105582e00
3cb890e3fe3a8f87bd01427a3255abc69c33828f
53545 F20101115_AAAOMR harris_m_Page_089.pro
7937a24e7e0e588202d2daa2f2a1e594
fb229e6825ef1f3a70cd458605f76d31472a8952
54708 F20101115_AAAOMS harris_m_Page_090.pro
2cf38404b50b17eb59cdbc7fdb2a29e1
19dce93cc44d553b4caeea648a476f065d630bbf
53080 F20101115_AAAONH harris_m_Page_106.pro
85be926cbbd4ec84f984aeb58c7d80f3
5be7f2aa154737cd3d5781a6f98c3bb75452e637
51223 F20101115_AAAOMT harris_m_Page_091.pro
a3fbbe28365c9b082cae4734a11a7a4d
92d4df0bad1829369bdcf292934bf0461261afaf
49824 F20101115_AAAONI harris_m_Page_107.pro
76870c48f6e7f8509ef816158e133ef1
0c7b6108aa6a34737255913872afbe213a659a30
52326 F20101115_AAAOMU harris_m_Page_092.pro
9dcc8d496ee52a80a0311de096c25dcd
6e6f48e1f83812f0a5b09342d03fd5d7e60ec016
4173 F20101115_AAAONJ harris_m_Page_108.pro
15ee7e01ef735852786f844e12d648a7
c49ed785f1b74026a73a4f5a26c25fd23710760e
53189 F20101115_AAAOMV harris_m_Page_093.pro
ea04f0fc8dfea6483558d92e77fec276
f72c402ec2b9df5d0b2ef0be44af5f0cae408034
7339 F20101115_AAAONK harris_m_Page_109.pro
bf2474c434c302f0c79911172b76c1ad
31a2cbb2c659be72d3a15ab23fd11abfb3240163
49425 F20101115_AAAOMW harris_m_Page_095.pro
440e3919a5af5cbca2e529f65d7cbf3d
3e0632ae0153d5644a9307630872e9be723c8b22
5965 F20101115_AAAONL harris_m_Page_110.pro
da891c4f557b628f8d7c7168c5490425
066b3536136bceff0278a4b9a236791ff9900014
52935 F20101115_AAAOMX harris_m_Page_096.pro
5dd170e0270ee5c91ffd995dd2eca376
aa5396f5c9ad36bdf5d9353e32749e0ad7472658
64916 F20101115_AAAOOA harris_m_Page_127.pro
9f2c39688ae8477f26030fba2c594591
20d3a5500ac29b2bb2f256a163b8bfa0dcb8e515
7755 F20101115_AAAONM harris_m_Page_111.pro
7eece0f11de5446f8b8c15d5a1a3a956
7633f47ebc03e4afc45a719d548b4bada02557b5
53047 F20101115_AAAOMY harris_m_Page_097.pro
8c2a2f05a98064f8ec081bc9cf29bc64
ec7df1dcd1b7a79f6a32781e1fcc527cc3ca5153
65849 F20101115_AAAOOB harris_m_Page_128.pro
dafcdf3b92d05afd7c1873238ca6db30
69be58dd14b1f98e20ad2b5ba699d9e57e632956
6707 F20101115_AAAONN harris_m_Page_112.pro
5ddfd204f23dbeadcb281796f2287443
089e0e611d06c714569752cda7c11839ff1e9173
52067 F20101115_AAAOMZ harris_m_Page_098.pro
8df481405173be196631bfeb2ebd3b81
7158b57e0ae867569ac9b2a391ad8d531a4f3bb0
415 F20101115_AAANLA harris_m_Page_118.txt
11f13a574ca153230f5d129cf3e63620
b9e1079d3d7d182141ff0b14808daa3640ac3c1e
65303 F20101115_AAAOOC harris_m_Page_129.pro
e45e3779e351efdb933c68caa22cc622
1dab1666aed08ac9845a4a8c99202744e43dd4ea
12827 F20101115_AAAONO harris_m_Page_113.pro
a87ff8142a0c0cb2cf8fc119a112f7e1
efc42d572ac78ef7ff4c6954a51d5f8149edcb61
2054 F20101115_AAANLB harris_m_Page_015.txt
878464904584c150ffaf75beb64cf645
262af0187cfb95e4234a901fd69c7b625695f8a6
51295 F20101115_AAAOOD harris_m_Page_130.pro
3edc4c9dfcb9bc07ca223a7a5e7324cb
8f5f5df4f645f32083aa1590eef6f6fe14c59759
1053954 F20101115_AAANLC harris_m_Page_061.tif
8d34f534d69e6db42f70e545151d0a7b
2ea4135a6509df8b6c84edf0a01f18d1e9c473ad
51443 F20101115_AAAOOE harris_m_Page_131.pro
8929766de600d5abff284de90bb26874
57d830137c54d15f95b9807767336c805d27a4ba
12381 F20101115_AAAONP harris_m_Page_114.pro
270ee0d4d89a2baefc7d5d531ad93e7d
bb0c62606da83148a47c5ad8b4c13bf128a33dbc
6581 F20101115_AAANLD harris_m_Page_009thm.jpg
c2725a26e1edcbcfaaad7e46e803446a
6a7cba99cbeb3de3e661bd06b4f708426889cabf
52548 F20101115_AAAOOF harris_m_Page_133.pro
3fd7feac4cf2c2f5b3238108123a3d15
9b6a762ffd866a3b1216a4a6b346d28ea7433f6c
7460 F20101115_AAAONQ harris_m_Page_115.pro
b6cac01813726887dc36c24ac3bce9c1
29ecd60ea571e0157fd2e3df35f7589f902f9f79
45735 F20101115_AAANLE harris_m_Page_035.pro
93230800e0d70d41b5cac10e8bc594b6
632b2513e3f645fea49c40322418f4057950637a
56485 F20101115_AAAOOG harris_m_Page_134.pro
db48e2013c74e6b78fe6e07405021172
3672e837fc232c822107d60915cba4a9b6da4468
38271 F20101115_AAAONR harris_m_Page_116.pro
6acf5707da90132858bb408434c2c485
5fa98f77bed5ee846b5328e8e119e3a7116e8c25
F20101115_AAANLF harris_m_Page_054.tif
44f3d2e488d5c554290cea7c3aa0b148
01e3ccb324acb0fe243e1f85e26b85898c2dbd23
56172 F20101115_AAAOOH harris_m_Page_135.pro
b48a0f625d8741e6068b68b91ccdc91e
10e2515b5a7b583f65722b43e3196c2274ebd757
6306 F20101115_AAAONS harris_m_Page_117.pro
260ee525f4d82ce03372571c3908b192
b490da669d18fac052a07ee562f596af4345d79c
6497 F20101115_AAAONT harris_m_Page_118.pro
39ddc7d26236743abf1d1970a37457a2
225a4efcbe782c9cab95ea87ba2947355d7f52ad
75932 F20101115_AAANLG harris_m_Page_177.pro
0f973ed855349c7ba6c28f5e54f068c2
884dbf86c56126c9a00c4294c7caf84454e8620b
56427 F20101115_AAAOOI harris_m_Page_136.pro
51886b320fdf84153e48d9e3633e428d
8de514cbb659634143d6d51177c40a0613e18a52
4318 F20101115_AAAONU harris_m_Page_119.pro
4e4f902dd17108e66c2172a92a580c3d
b120bcc44e864ecf41680f3ee3752a2e5e3e96ac
24743 F20101115_AAANLH harris_m_Page_102.QC.jpg
a30feec2c78d545521ae14d7f5378fb7
4987c68dea0d4253dd4a1c74d7e9bc5e4acbcc3b
53775 F20101115_AAAOOJ harris_m_Page_137.pro
65fdf1b2f031f362e6918b1032b39c52
8a2e3c01f69951cbd28ac9c159ba58a9fabbdcd7
12533 F20101115_AAAONV harris_m_Page_120.pro
30986f88ca7b488cd3d020618163a9c2
9b23824959d30ce62d12db98c7d848f4b7385188
2048 F20101115_AAANLI harris_m_Page_126.txt
8e3b2017bf9de721d827b4eb8e2822b5
585a8cc3911d69772a1e9a85650dca577e8135b5
50073 F20101115_AAAOOK harris_m_Page_138.pro
6fb9951f6e0d8c2f6f9143298fe5cc0b
985943cede4d0f67d689088ea4643c029dd1df83
5515 F20101115_AAAONW harris_m_Page_121.pro
fcbb57e681159e821162b0dae8314c86
af3dbfb596e9e014525c366f14f98d26beece5a7
40535 F20101115_AAAOPA harris_m_Page_155.pro
f2e6602502945d116288596927b770ba
964ffeb30901a51fe60f5980338c10b98f38a82f
18789 F20101115_AAANLJ harris_m_Page_022.QC.jpg
b37a33f23f23cf10f34dcd0b0a5ae087
e36543026ce0f0bc58f847ddf28c6b6b3d6c7f53
51969 F20101115_AAAOOL harris_m_Page_139.pro
a3eb34be2324bdfec136176dc457c1b9
5a98395fe659ab678177d99df3be1b84ffc95e82
62423 F20101115_AAAONX harris_m_Page_123.pro
28ca31452786dab12375de84c93b67e1
170c466591d7728002177493529dfe7377a8d602
47020 F20101115_AAAOPB harris_m_Page_156.pro
99850721d4c2b05ff0efae79693ccaea
dcb71c0622225ba09031d7ace63fc7e745982168
54041 F20101115_AAANLK harris_m_Page_179.pro
95e081748027559b4a6b829cb03e9ce5
96e4d28f60b7feca627be9b649571d4e05e2e617
56021 F20101115_AAAOOM harris_m_Page_140.pro
fe3a5000b9abbb8066ffd4123a0d3161
a9b1dc546140660715b58d0e629d508e266a89cc
53347 F20101115_AAAONY harris_m_Page_125.pro
556c261f4e488d8aa8f80e234ed2fdad
a65d2be58d5a29981bafa1067c7ac890785a6fa4
F20101115_AAANMA harris_m_Page_091.tif
a7951a2a3754071565044712d76c6f56
1b60cb52a46aaaecc1516db193ff56e208c7b1f7
49313 F20101115_AAAOPC harris_m_Page_157.pro
ac99865731cf3a0ac7125e2899807a32
b79a4e9b6941c44b99151d76aa584851fb488542
2160 F20101115_AAANLL harris_m_Page_147.txt
0c7dafe05ccf6236749cc43124253f75
a2bd4c0decf0cc84f4fde57bd65db7c223ea1b81
36958 F20101115_AAAOON harris_m_Page_141.pro
79c8eab4bb6b20a6baf5ad205c4ae24d
6ce46154341678dc6a86d7142160b70ab5c280bf
49531 F20101115_AAAONZ harris_m_Page_126.pro
db2688e55fda962de0ed034989901e37
ed7ec2739ec58e4bd20313121d353228413d3add
69943 F20101115_AAANMB harris_m_Page_085.jpg
55752c932ae441b900c78d07ef101555
62318d4ac348d8f410a21abf5cf0b12c58c7ea94
F20101115_AAAOPD harris_m_Page_158.pro
b8952ed2ef0050f42464db3177a79ceb
d0210b8db7ea133f8d3ff8c4581e5c3064dd01fc
F20101115_AAANLM harris_m_Page_024.tif
8f73c50934fc8bbc189ae0e3a53f41f6
fecb3164dd4311efe9e3945af0d0bd94edc7be06
52535 F20101115_AAAOOO harris_m_Page_143.pro
43cffb007fbbc3d6aed3d6438fda2eed
db8c9d1571e3d31080e8098eb93506b897ef219a
52629 F20101115_AAANMC harris_m_Page_020.pro
cb4f0b9e289c4f241faeec7f63fbce2d
c18dbf0db9e24de79d6e2e599835e413751b84e6
40798 F20101115_AAAOPE harris_m_Page_159.pro
c4b7c67b06787f14be3d2815a381955d
b4590628e4ad21cb82df040571dc4dc630180299
29388 F20101115_AAANLN harris_m_Page_163.pro
0b340f2eb374c02e5309f30675d8dbe9
defb4ddc3c29570bae76a5165c9ad226edb64a0c
45340 F20101115_AAAOOP harris_m_Page_144.pro
6e957e4a162e45e1efa24cd44ab67486
a6396ed02a96c0a66bdf0984f6290f34f71ee25c
4656 F20101115_AAANMD harris_m_Page_108.QC.jpg
ba921add820faa10ba481cb726934ed3
3acb2520e848a89a081ec4f9658c8e6a5f642e55
41559 F20101115_AAAOPF harris_m_Page_160.pro
19bf198265e8baf430eac116fde3b6a3
e9fba0f598d74c6eb3daf11fc5f5ea39ca16143b
13554 F20101115_AAANLO harris_m_Page_108.jpg
f42df4fc461bc62f425b5bbcbf08b344
27228a131ead7ff895afc0b91a17b80330ff3705
48809 F20101115_AAAOOQ harris_m_Page_145.pro
f6068a652c46135879aae01849a62bfb
9528253a711209b29f029c2620dbfa91f2627c26
43162 F20101115_AAAOPG harris_m_Page_161.pro
64656370fec61d4381b413ba0a936895
c6895f0befb258d549f125d06ca198589b3f9513
254140 F20101115_AAANME harris_m_Page_110.jp2
0f10fdec2368bb4ed84b6786e1c94aa5
4548d223e46c088eee2f800b9199649a84382401
127113 F20101115_AAANLP harris_m_Page_031.jp2
6a633a25994ff7e3599ebd9b5febba1a
27bd5978f20f6886537621ed8da503fea36e98a9
48234 F20101115_AAAOOR harris_m_Page_146.pro
06c135058147d29b7dedd683c9a8d3f8
9d5e0c00dbad1afb2028dc4c030b17f5af8f2567
46292 F20101115_AAAOPH harris_m_Page_162.pro
ab38976c446873051e805fa2303b9192
3087ae6f8c031f41e0e04c125c03881b5e510f49
3918 F20101115_AAANMF harris_m_Page_003.QC.jpg
1dc5e4bd922550896b3d20888215ef80
6e6ca6fbfcd62677f7b7801f93bcb497917938a6
120638 F20101115_AAANLQ harris_m_Page_135.jp2
81fe2ad63b0a4fad9c99d292bb999b04
d1305b68c652ffabece9a6f675490537e5c18dfa
54227 F20101115_AAAOOS harris_m_Page_147.pro
a39af0c9ff690fc9be0003346ddef1ac
93a1994bae80f5e91ce7f1c2adf995effd441588
69893 F20101115_AAAOPI harris_m_Page_164.pro
7bca8accf1ad7f6a51c4eea59ed62f88
c115f83b1c3fc8b9f97847275232b7bafddadd8e
6732 F20101115_AAANMG harris_m_Page_001.pro
b76f492508891772b64e8e00998bf314
767f6f2bde09246dfb78041fa9ef11311fe6b519
100768 F20101115_AAANLR harris_m_Page_035.jp2
736a3d2fb60fe411d5e35b48187f35d6
cb680d8b9797ff6ebf5861ba8b4ed88afd36ff72
58152 F20101115_AAAOOT harris_m_Page_148.pro
044fe70f685397de89404940d7003a73
65cbcfcf8c0cae1983f86feaebc716a8adca8878
7008 F20101115_AAANLS harris_m_Page_084thm.jpg
9bcd6afec51a7d759e0fd5a786c60138
a2b74492af0b468544fad97e1e6fcbba6d8c5172
33894 F20101115_AAAOOU harris_m_Page_149.pro
f07e09248434c1ed15f99cec78dba4e2
9a9286aed1af5ad0efa7eb5ed891988f8398dae9
64090 F20101115_AAAOPJ harris_m_Page_166.pro
e7cc372469b6029d9a914d7f64e4f567
229dea0cf80a8d1f5557a253002add9f9f4eee25
105811 F20101115_AAANMH harris_m_Page_157.jp2
fcca9ac97a7cf443918e82d76c4ec19e
bfeaa8e6628fa9b9c18e4765e51aed099dc4460b
1051976 F20101115_AAANLT harris_m_Page_056.jp2
0fb184ed85e029a5eec84efeb1f84b3d
d7aa1f6f805f0031de8fb6faf269938b148d4331
16129 F20101115_AAAOOV harris_m_Page_150.pro
600c641de8e2f4bafd973fd64c1e70d8
ba19e51d2a6d9f6b310e9adcefabb6d8c28ad377
86062 F20101115_AAAOPK harris_m_Page_167.pro
a0c07d1d6e43535c13c1667f06954a2f
0fa5b62228ee26db3d2a16a8ad5b10f9b14cf6b5
2077 F20101115_AAANMI harris_m_Page_054.txt
0e460bf36760c40b29c4e4363dbdd1b6
59c52b5b64e00459d69d8e175babfdbd1a228818
3974 F20101115_AAANLU harris_m_Page_064thm.jpg
9313dfc8ca70e81fda4e42e772ad8178
05e7e41729195691ff98760e8e8bf1232eeab31a
54596 F20101115_AAAOOW harris_m_Page_151.pro
a50082b4acf115a0c846af23edca2379
1d3e164a32d58d4bc0069413614a76d99374818c
191 F20101115_AAAOQA harris_m_Page_003.txt
9d41abcf74edc7b3665717c1d27834fb
5f1a8d4d28aaf6bd9fcbbf88e3836821cab534f6
64119 F20101115_AAAOPL harris_m_Page_168.pro
09046cdc148f4fb8ed6c8affd71ef2c5
979de35e204011f798809c99bacd7fafedd7c218
F20101115_AAANMJ harris_m_Page_133.tif
d3808bf5a17d2eec2f359262651f82e0
18361b9d09553e88b83eb8d62b8347a14dcc3c33
25271604 F20101115_AAANLV harris_m_Page_008.tif
5ca30bd88dcb7161bf0a9fbc6d8170dd
44f76c7cb5b611831157dc935d999ca0b81e7980
47324 F20101115_AAAOOX harris_m_Page_152.pro
dd9a25468c9e182fd5603c1ec2883fa3
7759e3597746300397215171c92d970f2a5daf40
2327 F20101115_AAAOQB harris_m_Page_004.txt
f400b598cb1d36f684bff289b551b0a8
ba612bf661251b1dced872bac05c5385295ef1f5
18571 F20101115_AAAOPM harris_m_Page_169.pro
8ced24722db2246e832360c4c4c2a396
3dd142cccb7e9456b45033fc28c3dec98ffb9675
171 F20101115_AAANMK harris_m_Page_108.txt
ef7e0037264e41a51cdb896964050945
c392b3751abd9426597628dcb5d16f1efd8339ee
67220 F20101115_AAANLW harris_m_Page_035.jpg
fc1f14aebc93f0ab8ad160c29f569e56
272d9591eba78faadccea7e65d704c3a0442852d
55151 F20101115_AAAOOY harris_m_Page_153.pro
9d7b46a70589e149de8f2ab791e39cee
c1f5b92f27fb31aff93464dccccdc4c87e0246b1
1011 F20101115_AAAOQC harris_m_Page_005.txt
de7786b0682c6ddbdcb958248540c25a
eec5b93b1ea71b9786a983e1b19db6b81e04f11b
63691 F20101115_AAAOPN harris_m_Page_170.pro
4597e9dad559182a01a88bb1484a7bd4
b38a15e0ee1ae76fb02ede93ed110283483d52dc
22326 F20101115_AAANML harris_m_Page_157.QC.jpg
1745fc9facafe5250407e2ef98b1bfa6
e58470b0eed7bd87b9193b9eb11a271d8979bcbd
46403 F20101115_AAANLX harris_m_Page_049.jpg
e2f82347a62092aefaa99366043915ee
6fb30e267d2c37cec144f6073002eefe4fd1f00e
22948 F20101115_AAAOOZ harris_m_Page_154.pro
b4adcc2a1d319c3c8e24db648641923b
c6cde22eedeb365c0e80f81af85dbf506205250a
6648 F20101115_AAANNA harris_m_Page_095thm.jpg
a312d3355fd9f87829ca1cb47c8d249d
05fbcb4ad18d551d228e167b62037808e2b74123
3321 F20101115_AAAOQD harris_m_Page_006.txt
ef8d3edd186c74916eea0b6583bbe94f
e42860db113c26951475032cf87990363be0c762
89661 F20101115_AAAOPO harris_m_Page_172.pro
c5dddc4bc40adfeb63bc1af5e5906892
cb64117e37758c2d01270613fe590ca1da8133e5
18581 F20101115_AAANMM harris_m_Page_019.QC.jpg
44b50f320116322ff9b8c6bebdbf0ed5
c3045c488f415806ac4249abffc59204409f383e
23929 F20101115_AAANLY harris_m_Page_004.QC.jpg
94a80003f84a4a3d4a2e8bdcc8a5e639
1a3c93eeeedb69cca95da4ce992ef4ebd91c9566
25315 F20101115_AAANNB harris_m_Page_015.QC.jpg
acce764fcd68ff2649f6de17a7025f73
1e57f159cd2bf2c9fee89bb3e752c5ee2fb55ee9
3594 F20101115_AAAOQE harris_m_Page_007.txt
6cdd132ffeaa543bde25b9d45f53b5bd
b44f1658adba1611abb14559a3333b080499ab0f
65588 F20101115_AAAOPP harris_m_Page_173.pro
f7ce895dc9263b62df1eddaa2ed5eb2d
9593cca454e02b26308cdeaa07e764b70c3fbb10
58509 F20101115_AAANMN harris_m_Page_019.jpg
8966220b8d0ddff6080db1a432275533
c80818b66d6a36c71725f0fe0f25e755bb205fe5
1854 F20101115_AAANLZ harris_m_Page_050.txt
de72e35281c7fa38de19c5c18b8de03b
f2f6bc51f1474650b1aaae6d5587a06c67b96d08
2924 F20101115_AAANNC harris_m_Page_109thm.jpg
d05e4151a10c75c59d216b4e042e5134
f67e630a44a66b2781e52e3fe690ef87200ae452
1570 F20101115_AAAOQF harris_m_Page_008.txt
35542fb5af03091126d1146a54f22dda
fc48c3ce5404c5145c5fb613ecc3a4f35fc54a1a
89150 F20101115_AAAOPQ harris_m_Page_174.pro
a4672896aba3ce96953c57227725375a
ee1f391644bce8dad9e95fc2c16c950d0be5702d
F20101115_AAANMO harris_m_Page_023.tif
a78d76e52213f175b73637cb4963a686
be85848f856d3e98ff8e3d6f2cf98b44e1f828db
285356 F20101115_AAANND harris_m_Page_071.jp2
f7bff86fbb66c4380c4d0ba81d619996
b2ceba8640e001103f432af5b101fa87c33614d1
2604 F20101115_AAAOQG harris_m_Page_009.txt
a0bf98cbd17b15efee70c90c3238cc86
3612670024b364ffcce469b35250e5dc6881a33f
75485 F20101115_AAAOPR harris_m_Page_175.pro
4f18bf7101fc4e713f34981b589723cf
34c6c499b3668debe58b6e806529e13a7d7d5da3
81929 F20101115_AAANMP harris_m_Page_127.jpg
c3bdd42308a31eb5f78e30e01fe7bc59
92ebe8eb4d3754d90b95fce14dea33aea9edba54
54738 F20101115_AAANNE harris_m_Page_032.pro
c08d2cf8c7942b8c9f7bba901182a26d
fe581292fa5dc01b23444b7555d5cb7937d96480
2504 F20101115_AAAOQH harris_m_Page_010.txt
b77ceda7d9e74298058a609a85eb9892
5abbefeba76f54dd7b9ed2c4d2aa04f9c601f5a8
81566 F20101115_AAAOPS harris_m_Page_176.pro
b3e6eb4986c433a622737808c423777d
218744e1bfc0843d3aa68c8676837f84cf5d7ec2
75902 F20101115_AAANMQ harris_m_Page_137.jpg
83d030522152a5a5fe83824f3abdb332
0d66496949ea02a4f18489e6539bce1a691247f4
6295 F20101115_AAANNF harris_m_Page_067thm.jpg
29a36a6b21fe65d78c6caa5b5bbdca9b
7e20f2147cbc88933030457701407dc2b7325799
1796 F20101115_AAAOQI harris_m_Page_011.txt
c3f48ad6e0613f6e3ae8af7944bf92a1
9f43fefc1d0f598c19a0baa05353cb0fb3a1e3ea
47005 F20101115_AAAOPT harris_m_Page_178.pro
8d59891400e769ef1ebfa1b06f515819
4038b5a34a761e0e28589e409932259d9a59a0b3
F20101115_AAANMR harris_m_Page_084.tif
7529557d9643a35fab1226ddc320c59b
351a42d1d2d498d5ffc3582043d414710873c459
116702 F20101115_AAANNG harris_m_Page_103.jp2
18ace3f3ceea353a44d827c7f8ffdced
dcbff81836e20808ee3e7f99a6b8edacf785fc9f
340 F20101115_AAAOQJ harris_m_Page_013.txt
9399134d905a9ac315234cf7dbbb038d
9e575170e1bdd334205b6a571b7b4d36615fd78a
58777 F20101115_AAAOPU harris_m_Page_180.pro
1094bdb60cf0b943c7cb872e1773f542
4b0689e024b876f7814679d270f8bda3d0603eae
18946 F20101115_AAANMS harris_m_Page_159.QC.jpg
9fac87c28effb730ac4202c95a47dbe0
f780d1b902663c070de31611efed422af30e7be3
F20101115_AAANNH harris_m_Page_082.tif
c9e98c79f1e0eb1ff57e5f5574c50df9
970664e8d42954d07bcae874a508cb7b47116c63
60932 F20101115_AAAOPV harris_m_Page_181.pro
770953d172b6937f51847929968e40fc
e6626e862808fbabaed4e6e7fa866a7dc0356bc0
26461 F20101115_AAANMT harris_m_Page_134.QC.jpg
03ec7e9ed5c642925ff55bd55ee845a7
d6c46d917dd83feff62ac09b1315eff0aeac7586
1770 F20101115_AAAOQK harris_m_Page_014.txt
906b8759cc2446b6b0c8aa988b94d4b7
4e3f32866c433a0f3c0de2d0a932724386ee619d
58061 F20101115_AAAOPW harris_m_Page_182.pro
2b385002a61631c00843fb55cd5bf2e3
ecd44dc8462d4c1914e189d87cfcf3cbb9413b48
43077 F20101115_AAANMU harris_m_Page_065.pro
f834abba7fdad903e9b5a60a1cc02c77
2195335091fc72f37ebb37e537ea8076300fe088
61016 F20101115_AAANNI harris_m_Page_155.jpg
9da18a838fb12d626c51568849ddd442
e46d06d0c5aba447d27b27feae1e42669cfbe0da
2042 F20101115_AAAORA harris_m_Page_033.txt
163fc9e803252bc10d7a488e60ffdad6
780e56a2a4e348f9d828cc2d18c9433143849383
2317 F20101115_AAAOQL harris_m_Page_016.txt
402bffb0e469ca3a8aa26ad9f5402f60
da4131b109946a968c2325d2e2d6b6af8696c646
35203 F20101115_AAAOPX harris_m_Page_184.pro
a0e97fa0e5e4ff18f80f7c740bc8c234
f60d5ea5c134033c31d68ed8766ecc4666abb795
22820 F20101115_AAANMV harris_m_Page_046.QC.jpg
d0e30e3f4401a7a3afc2e81e11c5c946
73b24ea80e74584139a8c952eb08ac25ed1d87e8
52322 F20101115_AAANNJ harris_m_Page_094.pro
69b2db87dd4be897fbeb40282270335d
e5a6290794c8bb0f6b041c3c8496fec189fa1839
2019 F20101115_AAAORB harris_m_Page_034.txt
9b8112bdaca691d97ce214302c925dce
80a91d2aba08ee35add00a49b672dad928335f93
1066 F20101115_AAAOQM harris_m_Page_017.txt
a2bb88b706d943fbf507f4d326a59cff
0ec8d91f94d0641a96a0bc99979231c16b0a4a53
405 F20101115_AAAOPY harris_m_Page_001.txt
08a2067bd5bab078b51d3a8853a283cd
a523ca5740dc8efb5ab06e1414b2a5f20f707af7
F20101115_AAANMW harris_m_Page_107.tif
b7217813e92527b1cd251ce3e9cebdd4
9028e41ec2c2d896f225138dad351c1d8fed5fe2
44240 F20101115_AAANNK harris_m_Page_011.pro
137434d263b5c171c40741c81265c6c0
24fdb4c393d1cf29fef28e64c755981767fd14cd
1802 F20101115_AAAORC harris_m_Page_035.txt
48c31fefa1e69248c37f38aeeff9c95c
a893c826c8e16b303f6a49403b532410b62ec55c
2094 F20101115_AAAOQN harris_m_Page_020.txt
ebb10031aea83485ff279cf011239516
c3e231b9dcd542ae6590e70af556c12f0c683af5
97 F20101115_AAAOPZ harris_m_Page_002.txt
c7a31c94532927cc66c6dcdec1c039ce
6878477a20896c05cd4fffeb55cbe61be862f1ef
19159 F20101115_AAANMX harris_m_Page_160.QC.jpg
9d048e2ed3d339778c801092c25ed048
f5dc34bb6f4d1455acfc747b27482850590ef6de
2175 F20101115_AAANOA harris_m_Page_018.txt
5d12ad40bc2a8db1fe71915d27e905c5
5527c975471e1a018ff17c0d36600b3bbedcb835
2056 F20101115_AAANNL harris_m_Page_091.txt
aac04275fa5645e72a6eae50aaf9210d
a7fc3d0d7dfd72dcdf037cd40ae688019a7e710a
2102 F20101115_AAAORD harris_m_Page_036.txt
cf634e60aa73447ef7f29df8aa6cd9fb
1fcef1d5d0e01ca5e35277175898975e0cc02d56
1524 F20101115_AAAOQO harris_m_Page_021.txt
d73613c1a9c3e7ce57f6b4208c87acd7
1f2c52b3e6a118e6a4f9a8dad5a78033308732c4
76294 F20101115_AAANMY harris_m_Page_175.jpg
97c453fcfb2b14f8017dd8ac68336410
540a97517bae60567e2c081ae26dc7412035dafa
19571 F20101115_AAANOB harris_m_Page_183.pro
767314ad444b0ad0eab418c602a76cec
8210765c214309093b235b61932b304e5157bcb8
1535 F20101115_AAANNM harris_m_Page_019.txt
072b092d33ca1179597d8987140cefb3
93a4c4dfb7695ca3f702c9d4fbacb56db5561c32
2285 F20101115_AAAORE harris_m_Page_038.txt
86f4f7d51049119841d5452f5f6c6eee
2dc547fc8d7e3ae0d5a681120c4c36f7fc42c149
1710 F20101115_AAAOQP harris_m_Page_022.txt
749064143e25436c6f8e4f0fe1e489f8
adc20af22b96d3a28ec92f88413d5319e3dda885
23497 F20101115_AAANMZ harris_m_Page_053.QC.jpg
37af670de70adc10fe85c9dd69c3d8bc
8d495b16f71ebeeaad5b295455730dbd52aca265
127038 F20101115_AAANOC harris_m_Page_068.jp2
f81f13ef09b6799c0b3b66dacaa80599
58e8cbb038784394f7bb73341b95c610bc9888b0
109602 F20101115_AAANNN harris_m_Page_079.jp2
b00e050ef580ce588e18e96ae00a6150
ee78a7e454ab16870a62dfeccda639baacb65fb4
1551 F20101115_AAAORF harris_m_Page_039.txt
2b4e68bd38a39d75b5ea9b11ae8ecc46
69eea4b868ab954838e72c6580f05d5123652dca
2334 F20101115_AAAOQQ harris_m_Page_023.txt
b68d8e0a999a0ef2a1b62c20882277c1
16ba8439fcc61de3e6d9fda4beb50b42eb2bbfd6
F20101115_AAANOD harris_m_Page_066.tif
2e6e56a317b8888421cae23c7bea2149
3513c4368ef1dc84f4debbc7916a7ac945a562a0
30660 F20101115_AAANNO harris_m_Page_124.pro
f1dae3a19264fbcbd9c684752c0d783e
593325a15daf02d68ddf11c598d018698e6066ba
1871 F20101115_AAAORG harris_m_Page_040.txt
786e222f4ddd9f21d512c2ea003e31cb
e96c2ace1c2438712cad67f82d73b67018d87f59
2187 F20101115_AAAOQR harris_m_Page_024.txt
3a8e077606b129f9f33b469d0b9af0f2
6881310eed700fae9f8cfb8d6ad03720d7926c87
7438 F20101115_AAANOE harris_m_Page_057thm.jpg
8690d945949273a4ed15ed6a65c98830
2e4419f74e8d9d3b4adbb4e12873d47b5157074f
5787 F20101115_AAANNP harris_m_Page_086thm.jpg
8fba9b2ef4757b943d26b198300d5bbd
7ef91cadc6a1ae20bd7cae3f3df78cdd0b978444
1956 F20101115_AAAORH harris_m_Page_041.txt
c3f14f2f41d19999a2b0f32f9928585c
60219e651e2c33859f708ca6a74d7c0beaa2132c
889 F20101115_AAAOQS harris_m_Page_025.txt
8ac03c3bdfaf331d12d516a49d2f7950
79c86593846758b3537407ce0e9f71a27e19b3d9
3667 F20101115_AAANOF harris_m_Page_132thm.jpg
2e1ee3cf15a3e2ef7693131058303755
6472096c3c82c14fda604393b299d37b30152cc9
5227 F20101115_AAANNQ harris_m_Page_161thm.jpg
65d05d9d970d41ff1a37851e46e59a7d
7ce57883901f2afc860914f2242f937ebfc18660
1669 F20101115_AAAORI harris_m_Page_042.txt
3825b6e58faf5241ef7311864706a13a
6afaa4c7bea20e8a127d8508b1d3f3307a4d7e45
1025 F20101115_AAAOQT harris_m_Page_026.txt
6001d1f7f5a9ac2c0d73a791532cd585
a7b9f22f1e2f78c2ff7e6b824c70371e4b6be7ae
33687 F20101115_AAANOG harris_m_Page_019.pro
0a7035ff830d8ad12f89aac49934f751
0b2c5fec195ba44822bca08f4c1be3d409411630
62814 F20101115_AAANNR harris_m_Page_064.jp2
2d50827e2a8d729885b00a4dbac09004
16ae5f6520993e3768e21eadd40f8f7b58ec3db1
2113 F20101115_AAAORJ harris_m_Page_043.txt
52c798ff295f5d85cf4c29d9e10eba33
34eea293b5122a8382cc1701e979afe7a3eaf09e
2066 F20101115_AAAOQU harris_m_Page_027.txt
7b7037649ffc04fa1e09ff742ac56be6
bacdbadcd152432e4eec925b7b0f0267f6823f50
71023 F20101115_AAANOH harris_m_Page_046.jpg
35bbdcc784086446be67bc742b0b4936
02c84d362d2d30e9fc85a9d37e5d9c5b208dfb07
88526 F20101115_AAANNS harris_m_Page_172.jpg
2ef479525dc3d70f721f7dc7eb0ccb45
c942c36d5e8c07143e77c1b8cba3d0f30dc8bb1d
2443 F20101115_AAAORK harris_m_Page_044.txt
6cc511b32781a2064926acb0023ddcc3
21897bc5a63d4dd35ae1b5c2c69227e8761f475f
961 F20101115_AAAOQV harris_m_Page_028.txt
5b46df574e9adc215aef3177dc7bc3c7
692952f6845245b0c2d7c039476a3efb21e21416
2690 F20101115_AAANOI harris_m_Page_037.txt
2395d9ff67d64d192577316947f9d9a3
31226166d8db1e069fe9c59c2b758e7506b32d3c
2218 F20101115_AAANNT harris_m_Page_012.txt
9cbd6eeed9d22413c95d63e67bf6a165
ff1be71c6440ef6b465cf1c8fbd6ee2a96d520e8
2059 F20101115_AAAOQW harris_m_Page_029.txt
81ceefd14e3f504a0a3905b7ba168b37
8ed9e2006e77e888f08a4dc369f94c5257816e08
F20101115_AAANNU harris_m_Page_106.tif
4776e3064ccba1947e7ff7bf2882f4f9
84e64538887b51827cea2e7bf41975d3e0966cea
1814 F20101115_AAAOSA harris_m_Page_065.txt
139bd12dcd1eec78a6a5c55785b9b8aa
09ed98340fba4b4caf52778f3f0481330f12879c
2176 F20101115_AAAORL harris_m_Page_045.txt
f640f6f74a573d7bae10057b2b74d938
5d81c3c93c24f8156fef9c8534974a62e8af2379
2189 F20101115_AAAOQX harris_m_Page_030.txt
2f50dac40c540317bab361036985e880
8eca055538cd5b3ff7f784a725830342fca27395
653 F20101115_AAANOJ harris_m_Page_113.txt
968e5c13530e60f37a603ccaaa570413
80f1b6baedab08271b5bb73d6fe5145a60baab91
73299 F20101115_AAANNV harris_m_Page_094.jpg
f5427f8bee73329ab8c1526044cc918b
df8af70f8d3be7c88011b2f12ceb9eeb8426a265
1986 F20101115_AAAOSB harris_m_Page_066.txt
15e4cf3ce1558eea21a181ab7d975de9
fdc319b7d0912d21fa2950b1934ed1207c200368
1978 F20101115_AAAORM harris_m_Page_046.txt
cc260fc04a2cca638ba112d18f7d148c
c42c650e9effd7eff88ecf8fe366a60b563b4c7d
2336 F20101115_AAAOQY harris_m_Page_031.txt
aa0eab57364def95f938542676cbaee6
410bf59acbc7c4fd601678ad67147e3f6e9fccf2
72118 F20101115_AAANOK harris_m_Page_069.jpg
78f6e720b77b6ff93a5e86e593fec342
ee3871bf8a39b619cf6f268551349e197d789efe
3852 F20101115_AAANNW harris_m_Page_114thm.jpg
3f7ebc1aacfe55e03031272dba79b3ed
532a9e2a41593c4af05d8dc7dee617474c8f0ec8
2064 F20101115_AAAOSC harris_m_Page_067.txt
a3fb939bdb007f35c1883d469839cc73
07eca0f7dcc0172d6310296ed2491d7cd9ee3195
2012 F20101115_AAAORN harris_m_Page_047.txt
8f8366c446ead7b00564829f9f0e23ba
83b3c2adb0bef7089bbde18c3fd1dfa2f47dc11c
2156 F20101115_AAAOQZ harris_m_Page_032.txt
8eef37d7cf790ff36973e2fa1ce1cff1
52d52932d484412b5b45041c4b89b44ccebd2263
31978 F20101115_AAANPA harris_m_Page_114.jpg
289425b099a402cedbd4b955e515c0e3
92f83870fcef13a7fe6725a3eb71b72990fc1b34
2033 F20101115_AAANOL harris_m_Page_048.txt
6945ef963698b39893d6ca0064e14abd
ba714bc4d763a43db29a036b05c1c0269e6c3e0e
70401 F20101115_AAANNX harris_m_Page_165.pro
20fd84a5e05264423429c3a03b8f12e9
50eaacef258fe2d1f3032c000dbe2b27e844e47d
2408 F20101115_AAAOSD harris_m_Page_068.txt
de83d0055a94276fe69b197e2a653514
79cfc0f943d0256a47f1e66a16907ea1f275b74b
1178 F20101115_AAAORO harris_m_Page_049.txt
3dc54aa271cc14ebb89dac88fd9a8cb0
d80fcfdf0f0698e5cf5cef54b5adbb31a88a05f4
7542 F20101115_AAANPB harris_m_Page_110.QC.jpg
863e711b9397fc24e1a6ed7ca1861a10
80a6fcb8497569efbd48373be0c46c4881966b8b
52949 F20101115_AAANOM harris_m_Page_055.pro
686a3dd1a1778610574342d48a90c87b
bdfe9743551d69d004c9378e3b9284fdddc530fe
5982 F20101115_AAANNY harris_m_Page_054thm.jpg
df5bbb08884ac6163212257737ddbcd4
addafbb25e5a160f9d4cd8083813987f67c0381a
2071 F20101115_AAAOSE harris_m_Page_069.txt
209f590b98a42a87a95bfb97e6261a65
0f8e250413e554a89d812e1ed8c7e7c28be7c40d
2025 F20101115_AAAORP harris_m_Page_051.txt
9c7faa651751d104a0bcadcd07616088
b27fc78cff4cdf892cc51d0a25ebfdb997a1ce81
5117 F20101115_AAANON harris_m_Page_164thm.jpg
3d4ceca6cf5b357509bcef8a6377f870
925c52693b7334bbe1e1b1e78115f8cde153f6b6
3427 F20101115_AAANNZ harris_m_Page_167.txt
f2690caea16397d685064d79bd3f62bf
c79cc6e9fb14d0421b892f23820f228e722ccac3
74497 F20101115_AAANPC harris_m_Page_036.jpg
52640a86bdb9f5a6389be41443f10f1c
0dddf0c19bf5f31e6e7ea802a7592984a379758c
225 F20101115_AAAOSF harris_m_Page_070.txt
4a77f89cf38b283c69553a3acf159943
8c57bc2bdb5c58bcdf25c45472dc2cbe558e27e3
2275 F20101115_AAAORQ harris_m_Page_052.txt
26c8cbc7b3d41617b353d7cdee53991c
cd3115a7069a98776a29f86c76649d0c13185180
58284 F20101115_AAANOO harris_m_Page_031.pro
17ad8cb339185fd381b0d5f6ec31bd1c
c73e10cf35d607ada323468f6fbbcad7bfe92744
80455 F20101115_AAANPD harris_m_Page_004.jpg
65ee5207acbd430044f2e2ce81c11b67
d673057de8e41c3a785cd8c1d625e2daed6df717
F20101115_AAAOSG harris_m_Page_071.txt
da52f41d459ffa61c4409c37f89f64d0
bd48605c9f3b4c061fa4f1ca1a62a9d7b7d9e79f
2089 F20101115_AAAORR harris_m_Page_055.txt
1e4d5e580c4d8381441e9ad938b98d08
e4bb0d2111803093a95cc87407d46c421eaa647e
64683 F20101115_AAANOP harris_m_Page_050.jpg
14925396a2ef6ff261ee6d88e532c6be
843393f96d7f933632c0d75f3b198cff731701bf
F20101115_AAANPE harris_m_Page_165.tif
06e04fc85aaee2aa8f8719cd368ba07f
cf75326197cbd9f5c46dc924bd98aa36b221ddc9
251 F20101115_AAAOSH harris_m_Page_073.txt
afce65172ef59a5e346d013960fd3dc7
052352d935d1206b88d928d012f7e1a880bd92f3
3006 F20101115_AAAORS harris_m_Page_057.txt
177bfcb562d4f52f01194884f3bc2979
fa31411ea2295615e0557f64387aa926f3c7e09c
F20101115_AAANOQ harris_m_Page_041.tif
e85ef555eee8a4cb74a8115f17cf4dc7
d16bec0d1d01352d42bfcf632bb6585529dc3f9a
48335 F20101115_AAANPF harris_m_Page_142.pro
9a4d71468a654e5c0201e9399e08fc7a
70553d740ed9b8d291751c1918fce6c50bd594b1
376 F20101115_AAAOSI harris_m_Page_074.txt
590f00cd2a8bd466500fb676935c8eca
9bb9e41229df45ed180c41ede57289c0424593a5
F20101115_AAAORT harris_m_Page_058.txt
ce13d29bba67ff028741d9a5140579ef
da188ac17ac58f965ee0c9a5858d55ede18b889a
F20101115_AAANOR harris_m_Page_055.tif
7ea2505b295466946ca24e2c9a4baf3f
ce8c585ea4f3dedff38ed18e0d8a1a3ded4b6353
2819 F20101115_AAANPG harris_m_Page_165.txt
07007692875e4c023484bad619de2552
826f8e89d862dc152bcc5ac346f5d0efe5168e72
187 F20101115_AAAOSJ harris_m_Page_075.txt
4aa5ef9b63ae1701d9a8bb997d4eee36
b2b774c85c15ad7e7654efcbca1d32855048da1a
2093 F20101115_AAAORU harris_m_Page_059.txt
4428bb544e437bb99cf1f068d51154bc
7b4dcddc0122bfc729236f5146c8f6cdcfe8646b
6652 F20101115_AAANOS harris_m_Page_138thm.jpg
0122c25bbde038e0b71634820fe9e7a0
3cb4a9993685781722718be1e420279887f7b5ab
2075 F20101115_AAANPH harris_m_Page_143.txt
ef5f1c71d8eebae9722ae488f16f9044
297a9f4dafa856fda92f689200514582d584ba71
421 F20101115_AAAOSK harris_m_Page_076.txt
558214f93b266599de8ac9229e133168
190b75a2dbb2bd1e2fe0fe69682c341bdc115b23
F20101115_AAAORV harris_m_Page_060.txt
73e91a636b53ccabbff2daacb6d667ed
8cd786184b4618fd625fbcea438edcdbe7bab49f
58535 F20101115_AAANOT harris_m_Page_122.pro
9194f3e2cd71f4e2ea0018a1d3d6e340
617a0c38b689d47f5024a0e8600d0bb99f78f479
7042 F20101115_AAANPI harris_m_Page_135thm.jpg
f56302195011a6fe0099308e2fce8af1
bdd35bd57b55105966974ac651c6ca69c5bc58b9
144 F20101115_AAAOSL harris_m_Page_077.txt
977c357a1b14a3bde8e00bac294dd24e
bb8d42be9b9ed2f4aaef207a00dd6e679e3221a5
2190 F20101115_AAAORW harris_m_Page_061.txt
a75970a84473fbec4276a41558d93440
4db40c76f16fa4c076c9f10bc334ab3f30b41fce
56007 F20101115_AAANOU harris_m_Page_021.jpg
65618abfac1f10d1cb3dd5f9a6e2ac91
d7118b340d68a0d4dc37ca77a90eea1eeeb329a6
5384 F20101115_AAANPJ harris_m_Page_070.QC.jpg
56fc244020231f15f0fbdfdfaba694b7
829239fbce1f1c3fed901f8e7d1c8c92b0622ee6
2101 F20101115_AAAOTA harris_m_Page_093.txt
26c43d033fa58c38f86b8b89ad5b9a27
313aa84fbe6beacef5ba7459811b9cb069e32ab1
2100 F20101115_AAAORX harris_m_Page_062.txt
bd28de114287d7d5e11ed11598576d4d
91c7de96a226312ba4b0d1a004d0cc0fc11dda76
F20101115_AAANOV harris_m_Page_120.tif
8c89734b22afe41659367cfb12604e73
0212ddca2fcb97e900ee825d2c05431f90655d10
2051 F20101115_AAAOTB harris_m_Page_094.txt
4c2b9a993cad6ae8302e50a9fffa11af
a7df4e4bca959991894c2de0aad3a973f0a5e628
2326 F20101115_AAAOSM harris_m_Page_078.txt
4d02104ad72a710670de4132575143fa
e9b9a5408606a5ad1c24915025f8005145ada551
2081 F20101115_AAAORY harris_m_Page_063.txt
dc16790655b6e24e042bf45e89b11927
7c696c590a1173a45bef8769c834e8f0c9e4f51f
6841 F20101115_AAANOW harris_m_Page_024thm.jpg
0056bfd54f9eb875362c37c0925924ec
52c84d05866bb0fbe0c5dafe11297ab7600c6773
19701 F20101115_AAANPK harris_m_Page_156.QC.jpg
de296a4eec3df037865aa90999944cd1
51249fca98be1a1a4d1b474601d28b8c550f7429
1945 F20101115_AAAOTC harris_m_Page_095.txt
3064631c73c9e20ac4f3839c1f3681f8
ef8a3fe97c9fd319cce381c35398167ba88de602
2014 F20101115_AAAOSN harris_m_Page_079.txt
add6755381dd5414911e7da04bbadda6
2369710aa2b4121fe6baa4774b3c9435d6d93dba
1146 F20101115_AAAORZ harris_m_Page_064.txt
16bd9b548e0aee73d1df03d84e1781d4
5f476da69549688ed86053e7dcc1bd84b6145991
74411 F20101115_AAANOX harris_m_Page_098.jpg
180145c325cfb0b583d145dd3f9611a4
450867545465b4c7597b0234901e35b03e6ef8dc
82161 F20101115_AAANQA harris_m_Page_176.jpg
538ed05944cf79a16bbd1a587068a9bd
368ed7545cf44f621fed23ed31f9864d91b47d4e
318 F20101115_AAANPL harris_m_Page_072.txt
c7697bd6269fd97dd4bd4619b80dfaae
868ad39c006381beb5eac10e31947e77a0efaed7
F20101115_AAAOTD harris_m_Page_096.txt
240b2dafafbd462c2926b1fc05a9ad41
764115275885a30ccdecc849e7649f856faf724b
2111 F20101115_AAAOSO harris_m_Page_080.txt
2d26bf4db130ae5451af92f240ee50f7
65801a6289bd1e80b45abaf46c28fcd543f4204c
6338 F20101115_AAANOY harris_m_Page_085thm.jpg
0ffec341a0df457a634512d6c12559ed
fe76c3fb915f75fddd566ad46840dbf8ca0d0c9b
5450 F20101115_AAANQB harris_m_Page_167thm.jpg
4d5a8ae2373a91a6d416d41ff2fe22d8
deb8d8a2cc2e5d799f37c5e51d6f5eca03303b99
23968 F20101115_AAANPM harris_m_Page_089.QC.jpg
d5dc93f20379454a56fc1e260bee4fa3
be77446fb715ff7ddec21b34cd4f986a593b1806
2084 F20101115_AAAOTE harris_m_Page_097.txt
b3eaacc9bd791d8e8e3eb43bd8f6ddfe
b84cca86b35f88043d138bc3431dc218a8fa815a
2360 F20101115_AAAOSP harris_m_Page_081.txt
ea869d35b6162e15973ed24a0605c2b0
a3dfee8a3ccd5bfb23d003ddf82033412a1c363b
67001 F20101115_AAANOZ harris_m_Page_037.pro
f75453adaaa039160cc19dba0c858932
275f0b94eae519234696bebdae679043a8ca4e74
2132 F20101115_AAANQC harris_m_Page_053.txt
738fe0f50018badd7b84e6f88c7cce05
6cd5cd8ae206601a29f5b9fd412b1e7bbb3ac9eb
11625 F20101115_AAANPN harris_m_Page_076.QC.jpg
189d5fc88ccb4168927b4f032284317c
8f4877e221227fc694de147c49bd9ba495035add
2068 F20101115_AAAOTF harris_m_Page_098.txt
6cb10174445c58e6345a99f9896fc232
e8107c1e62286429e77e31ba5397733e589e4518
2288 F20101115_AAAOSQ harris_m_Page_082.txt
c7469dba8895908099294f9733269dbf
7f2b9275ce5d6e6ec27f41475bf94c3822627716
50115 F20101115_AAANQD harris_m_Page_012.pro
7f6a3e28257aecc36bf74ed1c4b1ce6a
517259a5ea70997f4b0b5a659826ee999334f823
7002 F20101115_AAANPO harris_m_Page_103thm.jpg
92c5a47ee5785dbf0225f1c830b31257
d6815507e3526bdd0467f8240b7374152955fc22
2191 F20101115_AAAOTG harris_m_Page_099.txt
6b69720c10626320a3527b9c48dbd832
be6e7740920113d383c05a0174b1f83a7c4b98b3
2007 F20101115_AAAOSR harris_m_Page_083.txt
4401b3073993fae420a36a79fcb5c5c3
2ce8fca42b40aea6c401627b9f57f6a97b002066
25221 F20101115_AAANQE harris_m_Page_043.QC.jpg
5c064a418534a3b411eb6bba6de8ee09
48a5f663f7d014353c2c947b19ce34519739bfdb
84155 F20101115_AAANPP harris_m_Page_055.jpg
7b7522bed464740173d939b00d85c686
be912f69e3187d216408385729ccb5dbb41c30b0
F20101115_AAAOTH harris_m_Page_100.txt
3008b16b19af0130b131c9f64df4a757
e39587490b064d899b8e766974a290d8dd827664
2165 F20101115_AAAOSS harris_m_Page_084.txt
34d216ef17059403634d968a6138687e
f9627ad5b81e6ef82a47f244df8d077c5f48b073
109079 F20101115_AAANQF harris_m_Page_085.jp2
377e62861edf71c58c57518695399372
e5b1db09479c1c224a657232c8b2773481ccef0c
25682 F20101115_AAANPQ harris_m_Page_132.pro
87b5708ea1870b2ad3b52522c4ffd70a
694cfc466479b677107359fcc9428d30d2b79d56
2196 F20101115_AAAOTI harris_m_Page_101.txt
00ae71f4d33cf5696bbb91a9614315fa
b529eda4f84b60fc3c6219528d5af5fcedbd8ba5
1942 F20101115_AAAOST harris_m_Page_085.txt
85226d38e714d07c09bb4cccea410b65
964c95650e03067198f2b599b657808f69f3c4c7
1051958 F20101115_AAANQG harris_m_Page_006.jp2
6b6b201d467b4a21c316a62418cb982f
1e4bd0378d862940c235b4b20e9f96f2ae80b4b8
6765 F20101115_AAANPR harris_m_Page_027thm.jpg
4558e4dabcc0b0d207ecb5d178504733
e89bbcf1cfb9e013d2aef8060349cf574261b14c
F20101115_AAAOTJ harris_m_Page_102.txt
c59a46d91b097711a19153e82c2df257
0a6785e0595c660cd60021dee0ce52ea65129378
1725 F20101115_AAAOSU harris_m_Page_086.txt
0f892019461532a5f519e41a79413e76
ab4dc5dba05f42b6dc2837593fbb410f9e4cf05b
5463 F20101115_AAANQH harris_m_Page_116thm.jpg
d8d18980e2e4df5a2a4fac225e9beb1e
adbc160f5ee5110b82374deebc5a0349432ff544
106414 F20101115_AAANPS harris_m_Page_146.jp2
6ff661614515b9321773c0b2a4cc8f7e
e54bd5f0fbacadd2a27ca79b395bd38f019e8c95
2107 F20101115_AAAOTK harris_m_Page_103.txt
39f3b3553b09110f18fb6ae6fadc2752
97854787c682566f23923923a772b1dcfe3c2987
2174 F20101115_AAAOSV harris_m_Page_087.txt
39759bd176bae8d5598ce53bc1522bc2
0235c80b4bbbbed095fee2a923ab7a686db27465
78952 F20101115_AAANQI harris_m_Page_099.jpg
0e39441d323783e846dc921b97991f35
f09357e15bd29abdf2f44b943414c782410ec377
F20101115_AAANPT harris_m_Page_038.tif
8c23876f58b4f2147d0b1c4eb92ef667
843c7f713a2961145b432e1eecba03e15d6665e6
1943 F20101115_AAAOTL harris_m_Page_104.txt
05fd1914442f7ab66f2e5e601eff6983
d8c0647f6840abacb623fed7d862948775d8b20c
3083 F20101115_AAAOSW harris_m_Page_088.txt
5eddcbc7c5fdc7c197edbbadea977a34
eb2c006a82267ade9138fa26f7db54be0ab65025
124553 F20101115_AAANQJ harris_m_Page_082.jp2
7fe3f2dde93669b87eb832deca091af4
eec02f9330c69ddd4bc8a9014db01263b8f93452
6593 F20101115_AAANPU harris_m_Page_079thm.jpg
eb9d5e568d145cea335c56cc41e4fbe3
210c7006bb7297d75331bb28b6eca3fd4e82465a
2426 F20101115_AAAOUA harris_m_Page_122.txt
13ad7737ef1460876cbb5a70f17c7c5d
da2428d2ad56c0196bae1752f1d6a47f43d85da5
2096 F20101115_AAAOTM harris_m_Page_105.txt
fb237b8a638784707c7c1d7ed28fee87
0251dde1161885ba469da0473a6effb1728d4cd4
2120 F20101115_AAAOSX harris_m_Page_089.txt
bed1301ef2fed04303c6b525c89b3a23
b4eeafd86efd651197aabb6c37c1a8876ded4f71
2198 F20101115_AAANQK harris_m_Page_125.txt
b152da49e2ce868d561f69ba2c48b0c7
e971b85e5a4446a48005465ae78250fdc456e6ab
35547 F20101115_AAANPV harris_m_Page_183.jpg
453d07d370e53642948404b0cb496868
30a3b5d4bc4189a5769c115b3bfb0db2432ba88b
2577 F20101115_AAAOUB harris_m_Page_123.txt
4498a0cc326196c61fe7cee5553758fd
0bed15f47934e2b06f9a50c2573ca6e7ea5daa6d
2194 F20101115_AAAOSY harris_m_Page_090.txt
8a9fa5c599d8244c578a808b3bb35a56
9b3c81564f11e438661f78cc13a72b381c570f7c
73635 F20101115_AAANPW harris_m_Page_059.jpg
0d1e3e356a4777520a2cd268d0fb98de
ad8d9ef90aeab40abac8e905f01a15a1dadac91f
1251 F20101115_AAAOUC harris_m_Page_124.txt
b70f353af845ae1bf507b715d8df2d67
7a22d57fce954e9042bac4edbc4a891409b388f3
2105 F20101115_AAAOTN harris_m_Page_106.txt
05534510b52dfc9d5606940fd2f257ae
6382c8233283ea3b32b122c83a5c3803bf941c99
F20101115_AAAOSZ harris_m_Page_092.txt
9d1eb895683f06534a713190cd192c12
097fcfcc38ec67a77750fbcfa49b1ab228dda65c
62271 F20101115_AAANRA harris_m_Page_011.jpg
0943e5d1b5f81adf320c8b90dbece1aa
a48e8906696b4ef1a1040180323d8f0e45707c32
4929 F20101115_AAANQL harris_m_Page_160thm.jpg
ccc45c4f549e72c7451d453cfb775562
e9c53e3a8b28b2e9c8434d2468c1418386b9e197
24577 F20101115_AAANPX harris_m_Page_059.QC.jpg
d1311161d741429a839e43ac43540597
6114f3d4c469360f24b57294e9ffc668dcfcc9b4
2740 F20101115_AAAOUD harris_m_Page_127.txt
a0896c176c6204dbe4c1235283141a17
03f2e5a3a465a47bd3e309c20ad2c47b2cc465e9
F20101115_AAAOTO harris_m_Page_107.txt
a68793269bd782e676ed84c6f5dd0f28
0aee8a1bfc5e6eca1f0c6e138d20d3876204f95f
74256 F20101115_AAANRB harris_m_Page_012.jpg
454e498222f20c41dbe5e2be894f15a5
51432cf545f0b20a7987d6d4e4e029b729a9f291
1932 F20101115_AAANQM harris_m_Page_056.txt
f080c1470931bff438f42fea40f19278
d8d0d2357f8a2538e8b2894a5bedd489d8579632
79807 F20101115_AAANPY harris_m_Page_171.pro
2997f9872e5c7b16f0e86a3127ccf034
99d4e4eda41ac04649d247f748ee77c803bb6954
2772 F20101115_AAAOUE harris_m_Page_128.txt
94279896cbaea8eab5a6a352e0033950
3efe734d2de0b56abae1614f145da74170ef1d43
440 F20101115_AAAOTP harris_m_Page_109.txt
26e70f9d4d3563f4af8593b12c3ad1e1
436f8eec0c76a248cbd164e3d59d64e4cd0330c7
19220 F20101115_AAANRC harris_m_Page_013.jpg
42fd4c3714497d2195552d107d387ea2
abfc9679a9aeaed5b04f1a8c45d6bdc067d76773
52868 F20101115_AAANQN harris_m_Page_059.pro
bceb144b9b90704c3c9c695788a0ec70
b50d2cdda2031ca682b2c5c6b5f74584a67a5382
5948 F20101115_AAANPZ harris_m_Page_174thm.jpg
5f44674026546dd961a6cd0eea0ec723
4ba7f7848eecbd79d01c8014aac18f54ed409ec7
2714 F20101115_AAAOUF harris_m_Page_129.txt
d01dcf5ab5a59cdae158c6f18cdb10f5
2c77c5f6262074358288b38e991a8fa34ce89016
359 F20101115_AAAOTQ harris_m_Page_110.txt
2c010fa030c0e7dfc0b81f83ed9bbe8d
4de611fc84cf842177c32d9ca638ef848458b724
63220 F20101115_AAANRD harris_m_Page_014.jpg
7cf0808a24c3bb8463cae939926affb1
9268ab76ebcec502b7468e6234570639361e2b7d
274117 F20101115_AAANQO UFE0021347_00001.xml FULL
cedb192439be3d17e97088d720564eec
bc8d8ea17560d283e387f27496e6853f293850d5
24492 F20101115_AAAPAA harris_m_Page_056.QC.jpg
b7713f4f1a70095d05400e0b0f1230cf
5112e4db06aacc0bbc003a09f9a5358d1d4ac95a
2079 F20101115_AAAOUG harris_m_Page_130.txt
e091bb653aa880c0589e4af39bf99306
2ef7c7b3775cdb86e29d3751f4f8644a467d6a5b
527 F20101115_AAAOTR harris_m_Page_111.txt
8d5342e84226120eb537fc506bc2bcfd
c54be21894b2395cbf70a88da60831adcc62b7c8
80392 F20101115_AAANRE harris_m_Page_015.jpg
3eb8faa688cc8f4b2b6db5daa6411e65
6df9a9f5e0a33a1f35c54993353b9a22c0567ba2
7177 F20101115_AAAPAB harris_m_Page_056thm.jpg
1aaaa9d5ede6381bc523708d7a0ffb2d
11a9d2d00b42aeb9437c337f1567b205298abf63
2027 F20101115_AAAOUH harris_m_Page_131.txt
92b17fde3635603e3345c6b733868649
9ad250d83c3dfd965f3d95716fb87e3ea7fefe7e
310 F20101115_AAAOTS harris_m_Page_112.txt
e4a1a545cf441da9ee9845d6cdecc73d
07496e58a15624ad36d0bce8837bcdd5be07a2a9
81101 F20101115_AAANRF harris_m_Page_016.jpg
1ab63d9303e3a35203c647a36e616f10
4df0ddfe7b503bd0e8373e430a8a80f1c04d0f95
28982 F20101115_AAAPAC harris_m_Page_057.QC.jpg
a17201cd32d8b419e92f6f119d1e68cd
656b7a7b7ba7aa05027cbaa2b05516ae7e55ef6d
1236 F20101115_AAAOUI harris_m_Page_132.txt
77363a0385983fc64dccda6f2f0ba1ad
8f1beed46b2c388ed28b2b91231bd2e9942ff2b1
628 F20101115_AAAOTT harris_m_Page_114.txt
4bc31600d96b786b67a70b09a2d15379
068ea02d5365f0754698d754fbe19b7d9d489734
52007 F20101115_AAANRG harris_m_Page_017.jpg
e361eae7bc3f01c6999400062ced5aee
fc29c33cfd9a84cbe67f6144edb66d37402564b6
20705 F20101115_AAANQR harris_m_Page_001.jpg
5042b0ebf4831da11bd3b0cf76d31a86
49662dd52f8cc9437e7c2697c6c375b3354f4fbb
24694 F20101115_AAAPAD harris_m_Page_058.QC.jpg
22e3a8f5c57801ddc455eaf60c81d444
bd06bafd9367425a69193f6c815130d025908121
2155 F20101115_AAAOUJ harris_m_Page_133.txt
a0e178479318b6c1367ee69ccfebc659
2d19dcfaec3972159178d20d57135f1d16eb55d1
394 F20101115_AAAOTU harris_m_Page_115.txt
f59ab4ae2b527289fa84e15fe6b0cc5e
3185215a689a8ef43acad0b5da923d67bdf035df
76538 F20101115_AAANRH harris_m_Page_018.jpg
7dcd502423392ab3b81f766be335ad39
870e9256d02f3986a636535e2131479b9ad0e1cf
9882 F20101115_AAANQS harris_m_Page_002.jpg
2c22ab38fe4323c92ebf20ce07a06121
a93d41b735c342e1b0cc138c33d97c41f1ebc8b6
6619 F20101115_AAAPAE harris_m_Page_058thm.jpg
2673c4edf5c8de47ec5c9cd13d7639a0
c43ad95d383d03f7efbf9fe3b39c1d0ef8567729
2247 F20101115_AAAOUK harris_m_Page_134.txt
39e5a964bcb29a34a325a37b33091a0d
e556c33d36a7167e937ca0bd9bd5836f53610c39
1701 F20101115_AAAOTV harris_m_Page_116.txt
09a6ba13ccc9db66da6c28b09bbde455
997b1847a690b40ec3c718d1895443e65b34fe49
76351 F20101115_AAANRI harris_m_Page_020.jpg
042831c0cff96589f4a1e4e7ce390c6b
06c51fb4f82c08cba5ccd99a258d9f4c40172744
12055 F20101115_AAANQT harris_m_Page_003.jpg
04cd4e0453a942eca7f9f48589195f05
4bfbeb87e1f71b1e28375a30db72610114c61218
6940 F20101115_AAAPAF harris_m_Page_059thm.jpg
6e8faac9672161f49164a37bad02cada
223bfe2409bd258df275fc82da7b03b4fda0f0c9
2254 F20101115_AAAOUL harris_m_Page_135.txt
56f2e89119f85978cca6b2dbc5625f05
f52ed4ff85aa2d9c5975a2bab4e8743101cd6ab8
386 F20101115_AAAOTW harris_m_Page_117.txt
6db4d16e7dad3127f5fe4fe91d7e6114
b036a0f78d9436cd3473b7eeea0b816a2381408d
59540 F20101115_AAANRJ harris_m_Page_022.jpg
7554971cbb9f510accf337732d1b267a
6702436a585301d933caa627aa36165563a5b2e7
41654 F20101115_AAANQU harris_m_Page_005.jpg
5b1d57e14ebe776d62f88a6f2afe2c86
be0c6b521b622e9a4447a31c3094d197f5bd0671
24346 F20101115_AAAPAG harris_m_Page_060.QC.jpg
4c2b750cf3e44eda9187e6076e6fb852
e54559c3e25ba5a9e8756855455037edcc107f43
1930 F20101115_AAAOVA harris_m_Page_152.txt
9dc4ca37d6f10a6998c4f15f8a13b5b3
a452826ec7a797fe6e17eb02d20ae78b82b41f2d
2221 F20101115_AAAOUM harris_m_Page_136.txt
cd2524db060680bfcda672306ce0a2d7
118a2e290f59f3ee376a1a722ff495958eb8fc29
293 F20101115_AAAOTX harris_m_Page_119.txt
5593aa5610e627ceec343e0bde423d3a
a66e0deccf956ac2b1911707c4518875bd0f89b7
77762 F20101115_AAANRK harris_m_Page_023.jpg
6ba6202aaa04389ce7765f1872747bf9
d672b1729275252357da66e632620f7e8f1f9ace
84715 F20101115_AAANQV harris_m_Page_006.jpg
1e6829f9d8c7f5c7cfed6b2dcec455fc
6aa2dc5194e315bd9835caee06d4042a58f3abaf
6424 F20101115_AAAPAH harris_m_Page_060thm.jpg
c1e7fea2e863854b99973274d28dc657
894b111141b5dbe11eae6231d4ef5773fc1f2f14
2220 F20101115_AAAOVB harris_m_Page_153.txt
ac2d539f418f2eb628b1fd5162ebf35e
12bfdc27ee3c71de6ae9177ecb29d438629f17ed
F20101115_AAAOUN harris_m_Page_137.txt
db4e82b6b36b346bdd87f1381c974a26
cbc4e54a8e2684a856d4d139574d62806304116e
679 F20101115_AAAOTY harris_m_Page_120.txt
5de0af0dd56ec82c9fb6b821d8fd1cd2
0dd4bfa193e07ad2762548fa1349f6bae2386490
76582 F20101115_AAANRL harris_m_Page_024.jpg
314c803591f42a2243eef5c8993e9d8e
d0924faf6f09d60adb2eb9c9d55d2877974aba86
105720 F20101115_AAANQW harris_m_Page_007.jpg
7cb3eef9ef47ad2a865a84d5c75bd7b6
5cd6f4a0d69437a6126bc434f763863636ed522e
25786 F20101115_AAAPAI harris_m_Page_061.QC.jpg
04842c7801387bd6ba8aadf7a674e595
6b5d69c6e6c1bc16df7bb86cc2e5e96744e56411
924 F20101115_AAAOVC harris_m_Page_154.txt
722a92715b85ca5572bcfd49851c4d99
5a7398715b5fa8991910343a9f5bb168e3f584d9
267 F20101115_AAAOTZ harris_m_Page_121.txt
21c55b23c5be5412e8feca9d9f3b6337
66c14eecff5e544fa67be9e22d4b29aa12b97edc
53735 F20101115_AAANQX harris_m_Page_008.jpg
25d83ebcd0aaf730c877fc1feeac0407
4021af0f3e17443911c14fbb508c320fa3a9445d
70410 F20101115_AAANSA harris_m_Page_041.jpg
736c7f0e2872ba6d01e45b76fd521eb9
bd4f33b1d4cafc7f1e49fdc275e80c3e0db7679b
6938 F20101115_AAAPAJ harris_m_Page_061thm.jpg
9597b5b6baf03ff2ab6c22e9ae5810d2
fdb7159268900aff7e6a61a56bf0586c157d92af
1864 F20101115_AAAOVD harris_m_Page_155.txt
fd59acf8729bf0343824c8e81c595e28
84474a9bb589b6df86c2f055660399fe0fdfdead
2015 F20101115_AAAOUO harris_m_Page_138.txt
f821a35904c59ddb6e9b2de6173b7dea
544f03f99bb21d853b121ef69d9373f97952e1e1
41586 F20101115_AAANRM harris_m_Page_025.jpg
c56e474181b540955b27ab694657e44f
ede8e5b29d09647c3fae79ce0cee4de775a45adc
86607 F20101115_AAANQY harris_m_Page_009.jpg
5be70f1d14844243ab4f021d20891283
eb67aaff84d23de94992dba70168ba37efe18244
49477 F20101115_AAANSB harris_m_Page_042.jpg
3397adfd0526ae9719af1e089d22c0fe
47cbfc6470b021a377042499a147d63fd52caaac
24288 F20101115_AAAPAK harris_m_Page_062.QC.jpg
46f8b9357c4d63fa1af60e0c2d0f03b6
15e2d120cede5e81b7960a226f2f1864f821e137
2022 F20101115_AAAOVE harris_m_Page_156.txt
d531f0bf79b3b08ea26f1e215e33d5e8
3539d052c7136b808ddc9f2ac9611f8f5eb3de09
F20101115_AAAOUP harris_m_Page_139.txt
90d8208a2218cbbd0f36ffd976f991bd
9922bccf836a533968ba74a7a4ac0fc716197a9f
50409 F20101115_AAANRN harris_m_Page_026.jpg
43ff7d208b73b7a076da7fbe2d8be686
e2ab95039b351ff1ffddbd1bf21eb888efa29fe1
80350 F20101115_AAANQZ harris_m_Page_010.jpg
9c88c695ba7045777b189c840a6bdd85
5b3b487396625f91583fc8feb04afb18f72b4e22
76597 F20101115_AAANSC harris_m_Page_043.jpg
4b07755d819fd10816c919508c6fb0a0
74a41a632ebec0b94e5f60e787ac9bab1346292a
6542 F20101115_AAAPAL harris_m_Page_062thm.jpg
48c8dc5d0fbfd152daae993111697af7
dd1181fd5b4c512d7e1e3b56cc07a1d03ec8ea42
2082 F20101115_AAAOVF harris_m_Page_157.txt
0d5fc87c5392c5c396d03d9b533404dd
44ab28c92f6cbd52c19f6466efcfa37885543b55
2242 F20101115_AAAOUQ harris_m_Page_140.txt
91b8e5ec03f210de3300031795138920
14258e2306fe7be12964d8d6276b2d7b88abf95f
73700 F20101115_AAANRO harris_m_Page_027.jpg
4503211121e13c75dfb92b186f608e1e
c9fb65965adbb35444b09e57792e5af2b5c14a47
84546 F20101115_AAANSD harris_m_Page_044.jpg
0640a12b299020caf2b3bfb9c70949a8
98e0d545be496ffb066a3efa1118d753ac319823
3228 F20101115_AAAPBA harris_m_Page_071thm.jpg
def294396cfe09d3302478a3c52ef534
28c5ae78755cf96d08b35ba677084659c6562449
24035 F20101115_AAAPAM harris_m_Page_063.QC.jpg
b87f9ffa4425de53fb396382a5a77186
3bf594d056ce9dd528e0eab29e76a96129e510c1
2136 F20101115_AAAOVG harris_m_Page_158.txt
0c0ccf8d87721d5dded803d6131ac450
020b6cbe6c82a8e42d3d028854db7eda33efb179
1472 F20101115_AAAOUR harris_m_Page_141.txt
64eed7ae9913c76984bf5aec6aa32afe
f24d575c3a67c68cf6a621b604ac1e83e15c813c
51637 F20101115_AAANRP harris_m_Page_028.jpg
7b0e49bc9b1f3e71b0f0dbfbfca15f8a
d4d9b3089a5bf753631c6af0155cb3fdbcb844bf
78906 F20101115_AAANSE harris_m_Page_045.jpg
381ff24c956ebdad671d5437886addb0
ba2c99b7159cb2684e6543114558be548d2bc0c2
8410 F20101115_AAAPBB harris_m_Page_072.QC.jpg
90ebfc5bacad3e24b17b340db1b0b639
a8ef2317ea8bbbb4abc6b3f9be08d9f052f6ad7e
6600 F20101115_AAAPAN harris_m_Page_063thm.jpg
d506a8e54b302de699ba9e44c8105496
6d218df923c4cef6d4c6e08d7b1d930c85c017d3
1775 F20101115_AAAOVH harris_m_Page_159.txt
a1756e418db26ec045d61f413e39d00c
3fff798ceafa40afb209047bbcbad29bf4fdaca7
1996 F20101115_AAAOUS harris_m_Page_142.txt
7d3d1907a79b5c986668b55ca327e999
7fa82eb0a87b9cf32184642b5b5d6d54dca27651
73247 F20101115_AAANRQ harris_m_Page_029.jpg
93c1eef6793892ee28d80094307c26fd
33ddc45517c028abe3fd23f8d1f11b97b8f3c89e
72439 F20101115_AAANSF harris_m_Page_047.jpg
ad484b20be64f7bf763f88f7044cbeeb
2d75ab6f2436c5fc2c92066dd4eec0222726941a
3108 F20101115_AAAPBC harris_m_Page_072thm.jpg
593d00303845e86a996a88ada8ea7dae
6b5859669e575ab9dd5bb75a992e25319b12e539
14035 F20101115_AAAPAO harris_m_Page_064.QC.jpg
a3a57f2aa6d919f8ba4a8f8de72ae394
5b0e0124ee3bed2bfe96faf195508a204c4dbee0
1700 F20101115_AAAOVI harris_m_Page_160.txt
852aba17a904a2aca9d0662abc3f5718
f1d730637cfc7db4285bd483fb1395a2937b2ffe
1823 F20101115_AAAOUT harris_m_Page_144.txt
a3340d288a18bbf0fa29e8ab9297808c
40e55ad583e1d5363ba54062856075ff1996c2e3
78151 F20101115_AAANRR harris_m_Page_030.jpg
980baa3bd94725af42faa3d81d03df93
60b93fc22d4bfa07f4ce827f68a8a4f6a9b8c467
72200 F20101115_AAANSG harris_m_Page_048.jpg
74d4ea1f8eae0a8dbf5fe9c11f70d145
55563cdeed774079a687316e18d28d925333070c
11571 F20101115_AAAPBD harris_m_Page_073.QC.jpg
9e78eb5846c240d2b12a1882885f7ad4
52b6108b5225bbc305544b174c931c280ec77e40
20335 F20101115_AAAPAP harris_m_Page_065.QC.jpg
8e65f16dbc1bcb0c9ccaf94197e14674
88aba95449e226c0716359fe081f1ccde99b0128
1783 F20101115_AAAOVJ harris_m_Page_161.txt
bf898cf61da14e52ed9bf91019571373
ce18cefcda264a36bfa93838619645e233e289e2
1939 F20101115_AAAOUU harris_m_Page_145.txt
4e8a7dc7f7707932451ad583b87eff14
05dc1c3e0203ee6453c5f7b4b2f8480a6b131e92
82574 F20101115_AAANRS harris_m_Page_031.jpg
c0d2b7a8cd6bc9ea39472e8cc02728b6
7bb2d655f5e11e31e5aa8d54e4165b6d241fb14e
72500 F20101115_AAANSH harris_m_Page_051.jpg
29f29d3daccf16d1e6dceda3229aa99f
4448ae1a28c6d4304124ab9b017fe3c76c1e6cbb
4051 F20101115_AAAPBE harris_m_Page_073thm.jpg
d156d924629c15f8dacbf5942a33fe4b
9b120a9027e22cd099abc902eb9ecbbe76afc985
5777 F20101115_AAAPAQ harris_m_Page_065thm.jpg
a1898d6301a90306b50e298a60b39019
4322c93ace4da509f1b4fe2d54b7b8a5a52ff3c8
1907 F20101115_AAAOVK harris_m_Page_162.txt
97c0b6251697dcb8fbac5f4bc1da2461
67ab078790a91c569ac5cda6543e1c8d0d6eff66
1964 F20101115_AAAOUV harris_m_Page_146.txt
633465f53d82c84b55b2d59306c99a72
cdde0165387d97ddf59ba8f6b37042c4e7de62ce
77462 F20101115_AAANRT harris_m_Page_032.jpg
77771335ccae6d744f71210874016506
142ced39338e7044981b19fe945bb8a3670ea5da
80985 F20101115_AAANSI harris_m_Page_052.jpg
a8aab7632708dbb61d3c023fd5936cf8
a76e36f873074b4ebad990a6cc11cb959462e7de
11011 F20101115_AAAPBF harris_m_Page_074.QC.jpg
39d09dded4a2f4856f4ebba38fbd09e5
5c3da928b5e5604382825b13053f6bf40bb6ecc4
23115 F20101115_AAAPAR harris_m_Page_066.QC.jpg
a24c5392aa7a3b56ebf4b01570ca6bd0
9a09eaab1ccf14c82b486c815226673e84b05bfe
1189 F20101115_AAAOVL harris_m_Page_163.txt
5376b978da4a8365de12d60aed9f41e5
171353f6a44b3d028e94300b87936bee76426f5a
2310 F20101115_AAAOUW harris_m_Page_148.txt
ee057070e79d923189803535b2765607
e6a766f6c6e316e3caae4909e7915c98481f7d75
67200 F20101115_AAANRU harris_m_Page_033.jpg
d1e94826125b0cc48ded6806b6d8f09a
4a05d0d856ed61d307c2eca38fa1c1667bdd9773
75056 F20101115_AAANSJ harris_m_Page_053.jpg
af5250996779d12914164ca6c3c3b45a
830c12bc1bae125bb65cb7f797a91c931f4726f7
4058 F20101115_AAAPBG harris_m_Page_074thm.jpg
02a79a2e8dba741af55960f14888e120
da19e644695613c1237305a85909824999e1d912
6429 F20101115_AAAPAS harris_m_Page_066thm.jpg
5cfc189fb499cbec628abc1ac6b23e4e
2f13f76ab9059e6587aad475b683c04351f3c9b7
2366 F20101115_AAAOWA harris_m_Page_180.txt
6188a75cd595f34daf1657dc3572b68d
e7645d61f6372ba7657bef39e5b767a58c0caf1e
2857 F20101115_AAAOVM harris_m_Page_164.txt
28f2b13b70d71a659ac862570d987808
12ae161d86bfaae9c1cc6bb6e08a2444ca9b9353
1392 F20101115_AAAOUX harris_m_Page_149.txt
c5e0b32f5687b45d1a3785e4f8cdf8a8
399b867426c766d6b6c850dbf118c5775b3638fb
75493 F20101115_AAANRV harris_m_Page_034.jpg
838dc49faa7bb95f5b65e95da1c88c83
060dc79e55cb4edde3593e6e2fa090fe6081cdbb
67658 F20101115_AAANSK harris_m_Page_054.jpg
869caa36b00698199b8cd07c6caed0f8
b3d309c1e5d13aefad526ad1030ac801ebb0c555
9942 F20101115_AAAPBH harris_m_Page_075.QC.jpg
ee32522defa684ce12ae8d1962c2b39f
61ead73c3f3a1ee2a2c1acf564c97096a5c77089
22099 F20101115_AAAPAT harris_m_Page_067.QC.jpg
797dd40073abb71d9b69920cb1182327
69460c3d7f1f56251ff9f2ba5248ffc937a6d0a6
2452 F20101115_AAAOWB harris_m_Page_181.txt
a2062c4458e3fa0cdf4c0e21f4890eaa
d3580ee3a5da319f93b6deb83da4c8b37f9144ef
2596 F20101115_AAAOVN harris_m_Page_166.txt
5e094a5b51ecfe892b8c79d7a48df3b4
4962606cb092fd51eb2592163203132b0f0491c7
709 F20101115_AAAOUY harris_m_Page_150.txt
90daaadcb01e73aa81a84a51edc70964
4449cb3af568321b0283d845a49dc28f628c9b73
90726 F20101115_AAANRW harris_m_Page_037.jpg
688f46545e329c01dcfb41b85d6503d1
dce771fc40cf667a14c62181bc479878a4b1c047
76168 F20101115_AAANSL harris_m_Page_056.jpg
3cb3dcf8ff9540647ff7bbaa59a2dedf
e747d27cf6f18c924bd7989c79a45ea466228e0e
3430 F20101115_AAAPBI harris_m_Page_075thm.jpg
2661055f96303b8e9332c567d6ff38b3
04e21aabd15656c2a6bde90a9dcf82d8ec81f2d0
26165 F20101115_AAAPAU harris_m_Page_068.QC.jpg
0d2d7ead5b7c7227dba26bbb4448aa0d
522a750135879dac7b11417ce6e31b73b79ad014
2341 F20101115_AAAOWC harris_m_Page_182.txt
512983cb5be45d5979cfcf2b77189fd8
ca4d7a582187018ab24096f2baede98c2ef2b2bc
2603 F20101115_AAAOVO harris_m_Page_168.txt
3505ff64008984410dcb817d7cb96218
8fd10a0db6e9e6dff866e38eb34d7d7adbfebd32
2296 F20101115_AAAOUZ harris_m_Page_151.txt
c74a41125eb05c538706e1e162a474c5
972fcfd64b5ea7d4889b95797dd92cf3ea516543
78360 F20101115_AAANRX harris_m_Page_038.jpg
82088a98867d07d2a85a621b8bf57189
b4c6e4a68c6040333b7307d839bf0e1201f28d47
34322 F20101115_AAANTA harris_m_Page_073.jpg
6427f415b97948a1d99d43ff8f137ca8
91db277fe44e4d5deb1224445858db8e56cf4082
99318 F20101115_AAANSM harris_m_Page_057.jpg
96f34a0fc3f27529b04d600c13fdca9a
6335035b760474194f38f50bf736f3bbc029579a
4155 F20101115_AAAPBJ harris_m_Page_076thm.jpg
eba6f43b302d26a9e18483e319f5aeed
f342c710657986e0efdc2c0a8d7e8f77b7c1dc81
7054 F20101115_AAAPAV harris_m_Page_068thm.jpg
da8d507fd662af8a4b0bf213ded8e590
ef29b52eb532a104af6886f76d4aec22a8d9e099
806 F20101115_AAAOWD harris_m_Page_183.txt
7a6a9275c46424bb940c96382f1934c1
dcb49e773e94eb61f384743afb400929cb290143
69144 F20101115_AAANRY harris_m_Page_039.jpg
887823c9fe4f3cbe6a3afa4b8c49cd1c
9473007449bebcfbaba5751bffb95ada690d175b
34501 F20101115_AAANTB harris_m_Page_074.jpg
ca413fdf26ceba21b04a9912d5b19a13
ee301054b5b639cd42364f9c47d048335116484c
10488 F20101115_AAAPBK harris_m_Page_077.QC.jpg
cc5023b1643e1313c070ef30babc97a6
a24cc689463ce7fee4e8a9575679e86890a4ef17
23000 F20101115_AAAPAW harris_m_Page_069.QC.jpg
4a96b19f57e21974016b60574322526a
3f8b784cb8062d568f4e998153b513f286c0bac4
1434 F20101115_AAAOWE harris_m_Page_184.txt
1bb8d2b7f92692bf3f56d4025c499d97
f4150e360267a31b20af57164e0aedb9ec4dbfcf
787 F20101115_AAAOVP harris_m_Page_169.txt
42b4f1adc7dbe1c0c9e2883ece7a26c6
89403ed640e5788eeea5b72500259bf9a9ad1f5a
68240 F20101115_AAANRZ harris_m_Page_040.jpg
ee6b7a2621f31b3b6262c9b30bc2cd4c
57a6ebf6d8a76058f36449c3a7959fdae6c82c51
29282 F20101115_AAANTC harris_m_Page_075.jpg
9f3358f40e10767fe2c064374df2c353
e7abe203ade2fb60fa225c6f9f8f9890803f2cfb
72443 F20101115_AAANSN harris_m_Page_058.jpg
589d0eb8bff66624dff46e5a7c581ae6
3d0e35ea8118f2049bb213522eb8b84fad99dcef
3697 F20101115_AAAPBL harris_m_Page_077thm.jpg
58e69fe759b8f183c3359751550b581c
c6d5493e940ba96ab276d06bb261774829fe47e0
6319 F20101115_AAAPAX harris_m_Page_069thm.jpg
357176590addcc4a919e4d964e28c691
96ce0b0c3e305f6626ed3e90148355da29794ba7
2205 F20101115_AAAOWF harris_m_Page_001thm.jpg
eb8634a228818002119887ff29fa2ef2
13b5b1db3a91c15e6431b1d5067ad6ea8a7e6b56
2655 F20101115_AAAOVQ harris_m_Page_170.txt
605ed48e2bd4b24ba58009b7d77934ac
d0cc125b2c3540e2b51142acc141f2dc777b2ab6
34961 F20101115_AAANTD harris_m_Page_076.jpg
acf4700d148c8bbec0b772f7622c62cb
291a147ab91314f73f65b0d1bc33f88892f49237
73767 F20101115_AAANSO harris_m_Page_060.jpg
02e7954358dff150af4d3b03437462f7
802748dbfc2a557368fe34e31edcf4d9f2249d8b
25253 F20101115_AAAPCA harris_m_Page_087.QC.jpg
2d60fb5ba216d170bdef6d69a4fbae83
a5fec67cf215f92daa45b3c6a1e2282871de2b1d
23468 F20101115_AAAPBM harris_m_Page_078.QC.jpg
ec2ceabda9c18b8337372345ad9a0384
a00a38b379e95b5118421f0efb46499b578e64f3
1867 F20101115_AAAPAY harris_m_Page_070thm.jpg
44597033df8da2957340502701fffd1a
9fa0fd261f95a623ad74547f4faf6628b92925a5
1578890 F20101115_AAAOWG harris_m.pdf
f82d3de8c4b6579043abb40692b91479
b89be83962758c231db84acceaa24ca614852813
3141 F20101115_AAAOVR harris_m_Page_171.txt
2240b676d2a10699e3eecbb5c15b4298
d8d81987f9c45bf60188d036464c603402e93595
31596 F20101115_AAANTE harris_m_Page_077.jpg
ff0fcd048c25e1f258c975ee791bd702
8677288528084679b9bf941822fbe5e181d759da
77704 F20101115_AAANSP harris_m_Page_061.jpg
6d29bb9abb7a828d16b5153f2cf58132
1d2418a56775310a5bdea9e4717f4b2bd6ccab6f
6865 F20101115_AAAPCB harris_m_Page_087thm.jpg
84c549aed088f96b00ae8832e04b58c6
c63068d63e79d67623b6a7fc2be1c3032527b6c1
6290 F20101115_AAAPBN harris_m_Page_078thm.jpg
3d0d5bfe9a29a67c72d6fc497e873b05
2e16855d6b4bf9e5dd6100c1c03e81f9d0469dc0
6622 F20101115_AAAOWH harris_m_Page_001.QC.jpg
e9bf51972cf704a998953da2b02903c9
7c2ec77c1bf3733f99f3768a58b836c335f88292
3590 F20101115_AAAOVS harris_m_Page_172.txt
6cece5ed6ea20c99ed5c07745b6e04c4
90c7a0876e92f35da4a7e8fc2b0c190c4d4e6b01
80006 F20101115_AAANTF harris_m_Page_078.jpg
5fcef7d005045f800e5734c3c5b8d686
701d37cf9e8c41f7ff54dfd4e8fbc3b55b9797fc
73664 F20101115_AAANSQ harris_m_Page_062.jpg
fe331ed12018d451efcbb90436c4e3f5
4b1a20c113c4b0dcd2391b409fdf2702a7480472
29193 F20101115_AAAPCC harris_m_Page_088.QC.jpg
3ba1d273bb132ce45a8913e091e4e44b
d1b4e4ce231b38ec44a989e0885edf41131af408
22833 F20101115_AAAPBO harris_m_Page_079.QC.jpg
766b1974c0c277b3099fb033763c2da1
655f7a1891672c64ea690b47a78729ea0b26042a
7735 F20101115_AAAPAZ harris_m_Page_071.QC.jpg
d7e58873610f0ffd261cf9b41b67ac05
35406e066c9c33ec9c45ffaa220093ba52504e74
3085 F20101115_AAAOWI harris_m_Page_002.QC.jpg
da7a2eaf2fdb30e95f66b4c7c2afb93d
0852b4580bfa49ee7685e86b754fae004ff357b8
2668 F20101115_AAAOVT harris_m_Page_173.txt
7980cd9e34f58457dab4417c317ba5e7
2a14e06145654621f08123ba80ecc641b0a38b44
72206 F20101115_AAANTG harris_m_Page_079.jpg
ab7f4418cac125a2a05d4cb5f5e40f4f
a6bfe0de7a6e4319a403ea95278bb401c4f68668
74465 F20101115_AAANSR harris_m_Page_063.jpg
c55f96daa0440bca9df9c57c099264ea
511d262a0d10befb44e0b5c70f648182e78dfed4
7362 F20101115_AAAPCD harris_m_Page_088thm.jpg
d543b77812da5b38eb1e83ebe367bd66
52b53353acc3cab7998609c29dffc9aae44cb0b9
25204 F20101115_AAAPBP harris_m_Page_080.QC.jpg
f84b51b7c5ed4c69b8b97dcc56f52fe2
d72d352594ebbfb7cc7b295a03deb0e068af8f12
1399 F20101115_AAAOWJ harris_m_Page_002thm.jpg
8d2000480a8e0c889e07191876cd6d18
8539bb655be07b1d21c7e9f2d6cf61f4d9d7173f
3564 F20101115_AAAOVU harris_m_Page_174.txt
29e801dfd3db17f767af6ddde9292579
df95e93c8d52628132f26fe088b1d11af1efc6a4
76405 F20101115_AAANTH harris_m_Page_080.jpg
8b05e28cc786247254dfdc542f1a6294
ea6069fd4ede1d96d5e8663e4418512268724e08
44301 F20101115_AAANSS harris_m_Page_064.jpg
d262a185b54c0b991219fb8a155d5eb7
353b53615baeb4123827d708a5ecc092e0a46fc6
6405 F20101115_AAAPCE harris_m_Page_089thm.jpg
a75ce3583e100abd893c54d6618fd6bc
d410d00f79337a308dd621d7c93026fb97498e28
6731 F20101115_AAAPBQ harris_m_Page_080thm.jpg
466590d9b2d23a18f0e0b5f98a157797
8c30cd66b8b9b67b27b9bbd96f614b7240f2f03a
1494 F20101115_AAAOWK harris_m_Page_003thm.jpg
f6a761632149eef6e097e4202aab8010
91983aaba7806331f06c9228917869f2f6e07194
3031 F20101115_AAAOVV harris_m_Page_175.txt
6e71762405aea7ea4e41166914228a9f
ef0ea44159f3a19dea363e8d9487d05b091548bc
82610 F20101115_AAANTI harris_m_Page_081.jpg
06ab9edd68578a47a90f27540af2e4b1
88d3ceb66e62fd1a57afb27fc340a5e736d9d0ba
63233 F20101115_AAANST harris_m_Page_065.jpg
8f7d22b133c568c94f72027e93295f7a
991e8d2e4f0f2a68a50a190afac5db8a98e5efd9
25216 F20101115_AAAPCF harris_m_Page_090.QC.jpg
e36d892f4e4ceb8e867c0d89bdf024d5
8a7f83bb4da6a2bdcc160eecc09dba27ab07d0c1
25442 F20101115_AAAPBR harris_m_Page_081.QC.jpg
9b53d3f52147db8846ddf50df0fe0e8c
476c73f2503dd0217ac41e1d777041035465daeb
6878 F20101115_AAAOWL harris_m_Page_004thm.jpg
1b7726bf5c99973ac7a8cdf8691116cd
5308af76f0ac2b2cd6015b69a3082f41977efbcd
3303 F20101115_AAAOVW harris_m_Page_176.txt
af9c3cd14885bc817d58b46fd24d164a
e89c27426fbb62fd8ae7af90d4a570271dbf6a8c
80606 F20101115_AAANTJ harris_m_Page_082.jpg
81a505d8df96eecb0027c2f8406733ab
0ccf8106e89a89ce79e7882f417ea1ea513a7c95
70209 F20101115_AAANSU harris_m_Page_066.jpg
e46457dc4417090e6cf901a7c5ced65d
0d2c11dc7aa4516def0d4a2513b36baf80ae9165
6574 F20101115_AAAPCG harris_m_Page_090thm.jpg
b5bf4737cac63abd4c08203a3c786004
c0018a97fc073038413fc6504b358becc7b7896a
F20101115_AAAPBS harris_m_Page_081thm.jpg
89b3cd4427d507490524b6d45d4a6fb8
4f4acf4b86c084f0246a9e6a7f1b4d3b02324211
6524 F20101115_AAAOXA harris_m_Page_012thm.jpg
0eea755826f19f5498141bfc4d622b4e
1b82348f4afe893fe87984cc192dba8df8b4f821
14138 F20101115_AAAOWM harris_m_Page_005.QC.jpg
2df0c1de1ec746cb12f8dd0ecf50402c
18d37cb4fbf6e547c04a20559465c05f28317fd3
3024 F20101115_AAAOVX harris_m_Page_177.txt
c43e899c33ee16d1081b72ad12dcc512
263fc2082d2421254019fa0928f763260e3e95d5
72709 F20101115_AAANTK harris_m_Page_083.jpg
eb60c27b1a0207e1d0dd609f0d35564d
154bd84d29fd205ff53a76b97611bb98a321bbb4
70248 F20101115_AAANSV harris_m_Page_067.jpg
dab6d2ab23b870c4e8323db3b32db903
5c4da29d192b4cc782523c4dd2f17048f361e386
23495 F20101115_AAAPCH harris_m_Page_091.QC.jpg
880b23bc2428dd38a968e405a70811ed
6da840b8687ae9da9bece3c1767a8c323425aa8c
26001 F20101115_AAAPBT harris_m_Page_082.QC.jpg
343a5325f15733d808e4c9579eba1d24
c7a8c29a592864885dc62cc9875ae41d698f6553
6326 F20101115_AAAOXB harris_m_Page_013.QC.jpg
70b99828ce62acc061335c47a9582e29
993d6114c016f6c760c2cb1bd25f6f4c0e1bfeb1
4238 F20101115_AAAOWN harris_m_Page_005thm.jpg
12bd513c46b26c5a56f8b8cef7210f0a
50a89135a71fe56d3a4b11cadc51c61de01a203c
1879 F20101115_AAAOVY harris_m_Page_178.txt
1cc77274cbaa0fb5523868e80f323f6e
2a22e694227599c2084ffd7e896865b4c5847471
78469 F20101115_AAANTL harris_m_Page_084.jpg
63a1c3b96eb0b217a502d79fa2c47fc3
abd586ac42fa3e4c193c7112a26e4156b0d8317a
81659 F20101115_AAANSW harris_m_Page_068.jpg
85a3bff2aa020499e736ab832e57d804
a0629cbd7bcf7e979d2ee216f059b144299e56c4
F20101115_AAAPCI harris_m_Page_091thm.jpg
76fed3ccb623c34c3389393abd3539eb
f8f256efa99dc1514cfd57e017375b12639c3766
7175 F20101115_AAAPBU harris_m_Page_082thm.jpg
c36d9e1a83f929df7986aa63d6c400b6
ebf1da421fc26cb455c7880a34cd4e0443e2f918
2192 F20101115_AAAOXC harris_m_Page_013thm.jpg
c19b1792a3490e045f446ffdcf9b20ae
52d82153b6a5a35a8e228fb1a5252bd65055676a
22233 F20101115_AAAOWO harris_m_Page_006.QC.jpg
35967e9745b468133b166062ab97be2c
8385791b7f9ccd3932b82fb0e613e8acad8a69aa
2213 F20101115_AAAOVZ harris_m_Page_179.txt
a3cdf31339676dd4cf7db7e820161ed0
90224c1f45359b019112a7837311b11b72e6a2fa
62019 F20101115_AAANTM harris_m_Page_086.jpg
08b42c54be0890eedc30579da486b6bf
d837bcabea7e09e38e392cf75cf63a2b4e824342
15375 F20101115_AAANSX harris_m_Page_070.jpg
97dc57039546e598b0333f051ded3c7c
35736795952fb891e0434de66ad7ecb44a5fb1b5
77164 F20101115_AAANUA harris_m_Page_103.jpg
d65e7e3e7b8f3c34dc2eec664821ad3e
b0958d60bd72b1dd6aff74a5f5163d3a8580ce66
24618 F20101115_AAAPCJ harris_m_Page_092.QC.jpg
2c0038fc7448ce71a4f142e11a3772f4
24e5cd326e30f8d8d7e16143eb13d017f5d83279
23443 F20101115_AAAPBV harris_m_Page_083.QC.jpg
ac1a689d51bc332e3067a9c7f1af1a4b
35391e1a2f69c0f9cdc924f0800dc8f34856c899
20318 F20101115_AAAOXD harris_m_Page_014.QC.jpg
c172673a4fa7301995643b097016c635
c3115468b2bcb41de445596b83f5b9b5956615ad
5536 F20101115_AAAOWP harris_m_Page_006thm.jpg
102a013eab714555f7d177fff435434f
2b42d69bf3cb1d00d10717edfa1f90317bbf3cd5
86349 F20101115_AAANTN harris_m_Page_087.jpg
447bc6ab60e1e70c7d6c7d26e60a0c89
ac414fc94663e64ca8ce3b48d1365748bcdc068f
22454 F20101115_AAANSY harris_m_Page_071.jpg
09bc84718f1db4e631457c1591aa9d0c
944e25baf507e1e33832644712d97393f0f5fd1b
70053 F20101115_AAANUB harris_m_Page_104.jpg
deb5ae11462962ca69af3ff2001fb324
82b692f7368d8b2b81078c6c68bc84df6d8eb706
6665 F20101115_AAAPCK harris_m_Page_092thm.jpg
a0d366b2362d526909bd307fdafe889a
5e303ec385612cd031e4f77ce04109ad6c892e20
6510 F20101115_AAAPBW harris_m_Page_083thm.jpg
bdf65494b66d6c6a055064b239d11d40
bec5f6cc56f990100fa0514cd1ebfa343409f280
6066 F20101115_AAAOXE harris_m_Page_014thm.jpg
6fa7a0843da9143471a6d09841968cf5
c2fb30cf0468b24c3b7b6203ba763eb783e38132
25170 F20101115_AAANSZ harris_m_Page_072.jpg
3a8a208fd310cfa9d35c3e6420de3b2d
59652dd5b59bf9def2c362ff75685656b6248e4b
73285 F20101115_AAANUC harris_m_Page_105.jpg
c5af7a98993a2eeffd6fb855d9a73b9c
763c9e7fa135e38928f7ebb8dfd591ffba49ccf4
24495 F20101115_AAAPCL harris_m_Page_093.QC.jpg
17b79b8f27b84781e695d156de443719
d7975e491f4ebee874c5375b68495426054a915a
25976 F20101115_AAAPBX harris_m_Page_084.QC.jpg
eed3cb3434a64ae168cc6b8dfbc2e0cc
8bd14adeab2daf81e34cf085e8ae6d1c6843753d
6758 F20101115_AAAOXF harris_m_Page_015thm.jpg
ab7cd6b43c9e0f5a035c3073b628c639
57252852fff06e37b6b40e84c555d44ffb133bcb
27404 F20101115_AAAOWQ harris_m_Page_007.QC.jpg
b2434dca9cb47ef10880342c1b49a2e2
8aa4b1b49cd8b228cd3667692aae1718f40240f5
102475 F20101115_AAANTO harris_m_Page_088.jpg
aac00c91268c62e231ee0cbc0ce15283
d498ab39972ceeedfd19e64dde371818715aa849
75442 F20101115_AAANUD harris_m_Page_106.jpg
f673270965410b49c02362d6c60136ee
58a6616699f7dc0271fd3286b07ffea0c9e42836
25949 F20101115_AAAPDA harris_m_Page_101.QC.jpg
ab48bc921855c5b85c7f69d69be69eaf
045278e1bc80e48936893867e6f775fbc648f011
F20101115_AAAPCM harris_m_Page_093thm.jpg
3b9b6573d0ae2442a481c15ba146c76c
5c5f1243c06e0bc6410a73afa6bdbf6bdb946c0b
22915 F20101115_AAAPBY harris_m_Page_085.QC.jpg
39f27a580e2d6dcb60283565ae53fabc
bd438b950fa82714e4fa594bf981f79faf02a7df
25198 F20101115_AAAOXG harris_m_Page_016.QC.jpg
21c028177215a94e8d5d60114ee0fc1b
85e38c0b33f9b83bf86cebe58108a7e317048287
6407 F20101115_AAAOWR harris_m_Page_007thm.jpg
b5fb18edf81fea753f4ae9bcea25e56a
1379786b2abb0679775e7afe73346f879173b79a
75405 F20101115_AAANTP harris_m_Page_089.jpg
4693c0974ff9b9a0e69176824b00aa0c
bbd2b37f61dd0676bbe9d23039c1eb7dc50e7e67
70821 F20101115_AAANUE harris_m_Page_107.jpg
65246de533c433eb904ecce346470c36
fb6546a0f86833781f243dd8bd525d2ca2aa5038
6898 F20101115_AAAPDB harris_m_Page_101thm.jpg
f641f928f75364ec9e0d1043bbd433ac
2627fd67c05f8c87bc5c0562786f20f24e673b8e
23690 F20101115_AAAPCN harris_m_Page_094.QC.jpg
e6eb6cbcb14816f5b8768cea9e0da25b
152080638d756d7eda368c54e38ab7711ee414e6
19937 F20101115_AAAPBZ harris_m_Page_086.QC.jpg
96a4f6eb019186982601b7b2417627b7
58589ae4ba45ede51f09ea5f73bc2956a388690e
6842 F20101115_AAAOXH harris_m_Page_016thm.jpg
401607a8e4204bd300c777cb9e3e267f
975bb49f9acb6a2100b6820f70597ad1489270a8
14529 F20101115_AAAOWS harris_m_Page_008.QC.jpg
10bb577dae978065e765fb74ef1a2309
1940081e35904c5ab3c0f099956833cc4c6ac635
76085 F20101115_AAANTQ harris_m_Page_090.jpg
880ec4de23cd64786d7c8556f8b82c17
c6ba76774a710a980364bd9b79b776b18d0223ed
24489 F20101115_AAANUF harris_m_Page_109.jpg
1f9d00c7373a7835fa6b7d150baefbf7
27c9879a4f5542c4e674044e361bfd311f66d197
6701 F20101115_AAAPDC harris_m_Page_102thm.jpg
0172c810fb697c73de99f50d5f82270b
c521fc6bfe9ec57ff43f29f5392315f64bb01818
6628 F20101115_AAAPCO harris_m_Page_094thm.jpg
79c77926d9a0b06afe50201d1e06edc4
5eead0d5ac41031d0b8388de8e07ccbd00b457e2
16809 F20101115_AAAOXI harris_m_Page_017.QC.jpg
78b5cba412bfdf610104ec08d70b7f77
80cc0819773c744c5b3e47cf7065bd2d887416fb
4110 F20101115_AAAOWT harris_m_Page_008thm.jpg
fbaadab4a786a778d9dd9c2b689335de
d2ec4f1726d2a7db905250ade8383250f0dfae04
71890 F20101115_AAANTR harris_m_Page_091.jpg
5788f1136142770a3ab4296b44646cf6
51eb252e29598329ace5ef944287c5ff9b845092
113724 F20101115_AAAOAA harris_m_Page_094.jp2
1ae2091f4a73c4e6b97f4c6f16dcefac
230da27346170c66fbbb11c593db6fab1e7c2023
21848 F20101115_AAANUG harris_m_Page_110.jpg
f1c2e044f3a58c552a8983c68bf206a0
f3e42657c67df0689360a19d392fc9010ffe69ae
25430 F20101115_AAAPDD harris_m_Page_103.QC.jpg
3e5ba3a59334ce7e537ed8d31771af48
5f52dd2edfc2f33bfc8a3b17a612699423c1dc3f
23251 F20101115_AAAPCP harris_m_Page_095.QC.jpg
0dec167b502595a49512bd69874f6c8a
f6bc2b122312a244eee063006c4a8dfacea3e6e3
5160 F20101115_AAAOXJ harris_m_Page_017thm.jpg
7e5a1b6cf6db53323fa777ed6156a0d6
7e4afb40578ac77b46daca5b1b49da87748ab35f
24339 F20101115_AAAOWU harris_m_Page_009.QC.jpg
92d2a25e7c7c0c249a2e723c2b09f3ba
9293df56b9dbbf703a579e73eb74edab6c93627b
73768 F20101115_AAANTS harris_m_Page_092.jpg
cf1e828bd4a2bfb8d9d409add097fcf6
cd441bacfba6620f8ac3550138acddb4e637f4e7
108160 F20101115_AAAOAB harris_m_Page_095.jp2
20321d0252d2ba1e2e257740af3a8f0d
e8016fba852f3e901c08fc358319e72a387faf58
28963 F20101115_AAANUH harris_m_Page_111.jpg
20ab1c88dfc6f2c745a6c8857a884fb3
364e8f030c84edb76fbbb689b2777a0896178899
22385 F20101115_AAAPDE harris_m_Page_104.QC.jpg
09e927216011f1ab094bc065c3da6a2b
9ad59ad35b5a859b025a03a5188f033cfb864b7e
25463 F20101115_AAAPCQ harris_m_Page_096.QC.jpg
6d6be07364720eaf8c1a413bf86e7280
560080832f5cfd7c44d7a09bce034dfb4530cc85
25584 F20101115_AAAOXK harris_m_Page_018.QC.jpg
3962dd0a835308a3cec4cb5a0a98550a
dc92ac34a4d7c041d741582f18f25be8b4250fe9
22725 F20101115_AAAOWV harris_m_Page_010.QC.jpg
a7113587f896ef85fe40e53be4bb2191
6590b82ac1f486d5b5c67288a60ce402439863e3
74911 F20101115_AAANTT harris_m_Page_093.jpg
4524efceadf57aae0270aa9c00c6fa3e
c64308599185156e974111079eb2ebd534f19741
115948 F20101115_AAAOAC harris_m_Page_096.jp2
7522840b425563015d0b8bca10c2a225
681bb91e0007babf7913d6ddeca45e4f7ea97929
24280 F20101115_AAANUI harris_m_Page_112.jpg
76e94b19afdf16146e1d7ea28f84ff60
b0b675976d95f47866a6d21c85cc1da68c19860b
6478 F20101115_AAAPDF harris_m_Page_104thm.jpg
41d1b8d8872b617a4ce996a21fc6736f
c5aad1f708685536df40abcc6aada55242c9f02d
6974 F20101115_AAAPCR harris_m_Page_096thm.jpg
f6300679fbe020854b3a3e810fd73674
970c1364e036da6b9e1c08b9122711cc8e413acc
7022 F20101115_AAAOXL harris_m_Page_018thm.jpg
ad0909af1c23e8868783ec7ac62bfb7a
0761cd28d4f003f4a67086badcaa3a63dc60025c
6032 F20101115_AAAOWW harris_m_Page_010thm.jpg
0e286bfc1fe89df7f77702982c495237
119f5da173c374af9f9e48dfc9cac91c60af646c
69847 F20101115_AAANTU harris_m_Page_095.jpg
a8ab38e4e389d820adaa0f8f77f9358e
9aa4f4308b2b3b03cfe58b339edda9327a0df4b6
1051948 F20101115_AAAOAD harris_m_Page_097.jp2
c10553dc8606bbc830ea6864cbd51d8a
884f761dd469c367f79d1986a0414ecc799e8a5d
34269 F20101115_AAANUJ harris_m_Page_113.jpg
b46a0773f3a3df4d8f110a270f0abc7e
0d7480eef4f105f93395087fe3b2c0d1f01ccc57
24371 F20101115_AAAPDG harris_m_Page_105.QC.jpg
32ccd2887ec1def5b9d0557a45db4854
3dbbedf59fa6b2c1cfb95f73416465d761ac220c
24034 F20101115_AAAPCS harris_m_Page_097.QC.jpg
910c6664dec5fe87224bd05e11c72f8f
04d52b001eb1503b24f8210e9ab228527e450c56
16377 F20101115_AAAOYA harris_m_Page_028.QC.jpg
1bc623028219babe61f7f50e535e301b
673940932e4f20d9beae6549ce4fae7079b448f6
5415 F20101115_AAAOXM harris_m_Page_019thm.jpg
6d797c3ac844f318510c738b4318cff6
a92c1d9557e98e30cce7ab08d1c9589fde93fa4b
18431 F20101115_AAAOWX harris_m_Page_011.QC.jpg
8b4a08a5f8cc1e758a304beea9b79515
82f29cf948509396f0b1f099752e6df92651cbee
75742 F20101115_AAANTV harris_m_Page_096.jpg
5192794f34715aa75d631da6f13f2324
4ad835bad60a8707bd8b4d21bbc228d45cf2ead3
1051969 F20101115_AAAOAE harris_m_Page_098.jp2
9a05767dc2253c3e8b0c66ed9dc2bdb5
68df390b7524bbab76a1bbef8a26ffb6bef60a17
24824 F20101115_AAANUK harris_m_Page_115.jpg
c10eabefac9a0621eb9301e2e4714bfd
05abe0e8f568f624c5946bf7cb0422dfe59b6460
6491 F20101115_AAAPDH harris_m_Page_105thm.jpg
05308c3b344bbccd0ada4c787df7c5fa
71461793a84b97e5fff336a0a324b5e94228e410
6401 F20101115_AAAPCT harris_m_Page_097thm.jpg
f28276ca8fc6741da6b2db2ad701be9c
2f44cf206e07799b00410300df54168e2a7a14ef
5137 F20101115_AAAOYB harris_m_Page_028thm.jpg
10eb74cf289257a438d5b66292c59f33
4be2c0bd90e545eaaf19f73d6739f05f84f87bdc
25624 F20101115_AAAOXN harris_m_Page_020.QC.jpg
ca05005838c5066d1aa45601611e93ac
5ec7f8387947ac799247673e62774f724a1e111f
4981 F20101115_AAAOWY harris_m_Page_011thm.jpg
5be1aa74aa18b39c90082c3d992ba31a
ee593b8bb220c0436e3dbaf55130170acf0d51a3
76829 F20101115_AAANTW harris_m_Page_097.jpg
85b99496dc32d9bfb506c07e2a05cdf5
943919c45067c7570f040c3628f095da37b56bcc
119163 F20101115_AAAOAF harris_m_Page_099.jp2
26cbad3ca1b6e0112c3af143deaf3d4e
c5a3da52f55b1f3c71b314083f119c8a3763889e
63048 F20101115_AAANUL harris_m_Page_116.jpg
b42f40a6c93304b300170ebe7a01374f
ac630380b355d080db3e30deace38a1b4be14d4a
24394 F20101115_AAAPDI harris_m_Page_106.QC.jpg
6ae9b1cfc769e7246a4c16fff7911d16
c9c1f9dd16db57bb219f1828a8b19d64e9713660
23064 F20101115_AAAPCU harris_m_Page_098.QC.jpg
942e64be0d3119d9493c41e08766765a
d9c60a9cdf39b0c13cd5b5e6f0fc861736d111a1
24079 F20101115_AAAOYC harris_m_Page_029.QC.jpg
fe3bfa77355a25c404fcb0dcbac5ee50
29e74691d27ce12e42d3cb19f3d90459202cf515
6980 F20101115_AAAOXO harris_m_Page_020thm.jpg
de8cbcb1a0f6cb0e4592701924592940
cf069ac2e18d32965ef527c69744bbe8c4c58bad
23139 F20101115_AAAOWZ harris_m_Page_012.QC.jpg
aec1d5f77ba7bd53cf39f2daa6304bca
e17b879107fc98db465c71f88e7eea2b6d000e24
74316 F20101115_AAANTX harris_m_Page_100.jpg
0d9c24efceccb7bb990ed20bdca7b813
a7ea39a7f3489c97ddce29e69f5c4b2dabb78911
109210 F20101115_AAAOAG harris_m_Page_100.jp2
222f13b3abe2ff9632eaf832557eb042
61b3667a590d7fff31e7f038ae542cdb210a0110
41439 F20101115_AAANVA harris_m_Page_132.jpg
ad7b99270404142d35ea9ed343324d4a
8b298ad18f3af3794737f6432ad7b144ac4f2c9f
21763 F20101115_AAANUM harris_m_Page_117.jpg
116985a2dc562e97f2eba9fda1ee3712
92d9f0404aff086e566033106faec9a74428d15e
6614 F20101115_AAAPDJ harris_m_Page_106thm.jpg
a51765272c6ddb0ecb351b3bf49c7ff4
cd617c194ff8eb77b507d286bf78fac504c0ca94
6320 F20101115_AAAPCV harris_m_Page_098thm.jpg
1df2e524f1ec3126fe8b161357888c17
593644b9204b11fa5599119ea92ec8402bec94bc
6751 F20101115_AAAOYD harris_m_Page_029thm.jpg
e0fc4ba3c44e1d04c0a1f2f952fb7e0e
65d9188a5ee34b380d20ef63feee19af7aa8beeb
18095 F20101115_AAAOXP harris_m_Page_021.QC.jpg
d838e5bd0be812b6e0c7a20dd982a4b1
0d1027958af97298394c4055ca898a68a7cab292
79124 F20101115_AAANTY harris_m_Page_101.jpg
e86aa723c9f041c291c7030d2806ca6f
f7a9e1456f861de32a1fbeb7ac7d5e04b9dd9243
120437 F20101115_AAAOAH harris_m_Page_101.jp2
949f1bc8eb6a0927091565e13802027c
f0528d32b1666aaf72ddc2c99efda409ae88169c
76652 F20101115_AAANVB harris_m_Page_133.jpg
17eb10a5dddac9f38458eef1ecf1203d
16df7fd0ba9647d4cb4a2528e1edc5004943011d
21534 F20101115_AAANUN harris_m_Page_118.jpg
a33d4ef29b50d86069a56058aee31014
5f2317e29e697eb13c915b0305ec0c939830c47a
23517 F20101115_AAAPDK harris_m_Page_107.QC.jpg
fb17456df516e765dd8a151f000ddb6a
8043cf02df6193f363ea4b265d8800924d02899a
25698 F20101115_AAAPCW harris_m_Page_099.QC.jpg
3072126f52fd5b387b603995202c2991
7b08bc38ff09ff7bc3ec8936d9ed04216772ff82
25576 F20101115_AAAOYE harris_m_Page_030.QC.jpg
e099df40d02e37b1d66349cd4bf52637
c6abb73e8aa87b813836413c69ff6f01dd302492
5314 F20101115_AAAOXQ harris_m_Page_021thm.jpg
6f5eb019fc5aa06fbb332960bf153b31
ad8083bbcc773e4964bf74bade8880435e508a1d
73491 F20101115_AAANTZ harris_m_Page_102.jpg
773ded23a8908056359d6c14b476cb7c
e6b9642156fb3e9174ccc28f31a7c1fc23759f38
111788 F20101115_AAAOAI harris_m_Page_102.jp2
7081ac134d15589d8043d8fc793cc273
ace48d6ba224697d85e7e291ad29cfc022d55931
77790 F20101115_AAANVC harris_m_Page_134.jpg
0089be784d7c46e858f22e20664eab23
e462e6fb3cea369839ca81a3b88da08aff3c31e4
19960 F20101115_AAANUO harris_m_Page_119.jpg
53f25920dd01c36435b2991209460c41
95307ca2fccf2761457abb896b36508e8efd4393
6350 F20101115_AAAPDL harris_m_Page_107thm.jpg
fdd10669af36f182f86bb0f5c91be022
83cb57172610361f625cc4498ca62b75144ae18d
6830 F20101115_AAAPCX harris_m_Page_099thm.jpg
13b589d39c6f85577753bcc429d3470f
0ec881827d580878100a32d039a1c654dc15b806
6914 F20101115_AAAOYF harris_m_Page_030thm.jpg
4a852dc5b9ab2026f7871aa54802c4c4
edfb88670c670990c683f9148e5cdb72f4effebb
107473 F20101115_AAAOAJ harris_m_Page_104.jp2
550114e0fcc8feabc8cdb03234245c20
29136bd325bf2d35f10a0afc364162b72a6ab6f0
77950 F20101115_AAANVD harris_m_Page_135.jpg
32037d6f77271aaf7c909491c35c3433
74095dbad7a9c8874e293919775e0de87c81a392
2498 F20101115_AAAPEA harris_m_Page_117thm.jpg
d7b56a0fcdbb48282049a64e3e223395
7ff4ee0a63271e4ae2793ee94dac67ef4311e4cf
1698 F20101115_AAAPDM harris_m_Page_108thm.jpg
f4b568e202563950fc1dc7e8bf8015b1
6abd6b67081785602ee06b223fdee687e30710c1
23819 F20101115_AAAPCY harris_m_Page_100.QC.jpg
5acc73b943b38c91b161d48ee10fc699
8b257ba64d276ce0a9af8eb6b639be465f2f3adb
25791 F20101115_AAAOYG harris_m_Page_031.QC.jpg
61e5d9ede46238b887ca0bf418661a1d
b1875ae5a3e61358fe6a1907cd7c61c1c96a6530
5636 F20101115_AAAOXR harris_m_Page_022thm.jpg
25ae2ccd6235e5e89fce16c866259701
f3e1341e6590a3af52e1dbcf928acb96b6e7b538
113390 F20101115_AAAOAK harris_m_Page_105.jp2
b643dc6a7ea0e160e46ab8584e00e774
eb32e4716190b6355629c17f339bda2ef0633df6
78467 F20101115_AAANVE harris_m_Page_136.jpg
4b7ca04c138956a2d2000f34b7ccbcb7
73257351be990561428f84022226fb51c9e9ebc2
34678 F20101115_AAANUP harris_m_Page_120.jpg
98414b54ca90b242b4a9ba3803e7f2be
a72d2e14f3def7b20575e63b4d0af2de98277ddb
7134 F20101115_AAAPEB harris_m_Page_118.QC.jpg
01fe114abe3b51268c31b4013367863c
7db5c65ca62a624e1bc1e720c363ddbef883bd65
7855 F20101115_AAAPDN harris_m_Page_109.QC.jpg
ed6b67b638fefc394cc17a87d4e5f442
444581087595d4fc1298cfe8b078f1f12b1a43ab
6366 F20101115_AAAPCZ harris_m_Page_100thm.jpg
593b6a16cdd7379e21c3a6da58cce956
f03f8b9c4f719316cda10b42105d02ae7a3adaea
6969 F20101115_AAAOYH harris_m_Page_031thm.jpg
0b890065ca0438bc1d653d8f082b810d
59c3d9a86648445100da8cef638a63e7cbbaa33b
24767 F20101115_AAAOXS harris_m_Page_023.QC.jpg
611ca8002e0a9b4a32b2416c7149b5dc
dc94bc1611777b0b37ffdd03346ea54b9428eb1d
116444 F20101115_AAAOAL harris_m_Page_106.jp2
f9f967241457f5915115c42ad66e7e4b
f0d5e29d5ae6b975c6a520900101722e52391c23
71667 F20101115_AAANVF harris_m_Page_138.jpg
2d7645c94aaa2c5833314df050fb2cc9
63538bc9b1e290c43fb6c0cb2ca2afad03acbf15
21655 F20101115_AAANUQ harris_m_Page_121.jpg
9dc1354084fb0ee27ec0daea5297cb86
5ecb94e17cc17839d2ba3656fce6cdca5803759d
2847 F20101115_AAAPEC harris_m_Page_118thm.jpg
488f663f14a26ada99af2bd637922491
429f627b1d108b3df2bd14726b279d23b6245221
2780 F20101115_AAAPDO harris_m_Page_110thm.jpg
00f6714da2901fcc0b26cfa10f254c1f
cb2f856f1a72cdae2d9a92b522ca1d2931af0cd0
25066 F20101115_AAAOYI harris_m_Page_032.QC.jpg
f81ee525907f387089c634138d6a5d5b
02a90ac94008eaf606567aabdf559019c9b97806
6434 F20101115_AAAOXT harris_m_Page_023thm.jpg
457be1a15025a2c033d51c41f9784770
b5256e20054780acde3f1ef4a96b6922f327e5d5
108061 F20101115_AAAOAM harris_m_Page_107.jp2
a2dc0f17bb522874823098d29058ea8f
6feb1eb474c477c3f07e1e970877e5f1283fe090
74624 F20101115_AAANVG harris_m_Page_139.jpg
1f050f6e89158e75b03994991d84f552
a9d66d78ea79b2a10bdefa93a60f131de3a8d2d3
82351 F20101115_AAANUR harris_m_Page_122.jpg
fb3dbcc15f9698fefb915f9628695692
9f2d889e4b9192f98385855f159dd38394e1431c
119369 F20101115_AAAOBA harris_m_Page_122.jp2
399a793ea3cf2601fee95110b02ba34d
0ea2d369a188bc0914a0c5c022fbda944510feb3
6395 F20101115_AAAPED harris_m_Page_119.QC.jpg
ec40f22e16ae83a221244c3ca36dc113
72d4516753b36ae9bf0687622d7e2e1d60e93d44
10178 F20101115_AAAPDP harris_m_Page_111.QC.jpg
25c66290af50b80a3340625d5d2d614f
aed7d43a82f1a11b719c3c2c51cfdb1f0ed3a7a5
6922 F20101115_AAAOYJ harris_m_Page_032thm.jpg
ce14b436b6f04337fc04a79be5701544
a16e41f739de165246cabac30bd431c3a1f399fb
24248 F20101115_AAAOXU harris_m_Page_024.QC.jpg
b03a2e260e7c107de49b7bede15ac4b8
7e2e53a5a87adfd765c69afe2e4fe73fb537ebd4
12373 F20101115_AAAOAN harris_m_Page_108.jp2
4d8f04d11d66661e3004a34ef0448330
be0721a3f2f76419a6a63a796880aca930d76b75
78645 F20101115_AAANVH harris_m_Page_140.jpg
c675f92242b6238dd06edc2f54249b2f
059ede8e0bd185b366c426ddd87c5b3547014b20
85929 F20101115_AAANUS harris_m_Page_123.jpg
cee2cb015be2a6926e91cc487f9b9889
c54c2393f20e4801755f5698841e341c86ffc0af
126802 F20101115_AAAOBB harris_m_Page_123.jp2
c7070c0eeb996b7183cb08c70227f3ac
82dfd54ea05a763816c0b2b575e8f3867cd39e51
2589 F20101115_AAAPEE harris_m_Page_119thm.jpg
717c41dd6d56871b9b2beb0311a3d865
78f94986bb4cb851f6af2129bf92745366c059e2
3512 F20101115_AAAPDQ harris_m_Page_111thm.jpg
12e678b6aa6b817fb72a5e62f59dd6b4
d0c8583c502cec850deae85433e7f65bc0edf425
21222 F20101115_AAAOYK harris_m_Page_033.QC.jpg
9b6fed3116ee8ad9401a73333362193c
2a93931a6fff01338b330dd9f3bb93b3413910ba
13315 F20101115_AAAOXV harris_m_Page_025.QC.jpg
6e77cbf52a08f4b677d985b28ecea4bd
ccfb3ccc7727bbf5710abe3cdf959b18867f6247
249468 F20101115_AAAOAO harris_m_Page_109.jp2
af19f1ffadcc5c394271ca13e686121a
6f833d97f7f222f0f3782b248974c591c93a4b0c
61403 F20101115_AAANVI harris_m_Page_141.jpg
a15a6c8bab3f0cdbe7bf4a7126b54118
57964682ee577de64c5f4e52439cbd650b329684
52858 F20101115_AAANUT harris_m_Page_124.jpg
15f15d5ee48138e3124e46b2b9ebb8d6
7412556fabcc58df5e8851e244ae9a7508657fd6
68874 F20101115_AAAOBC harris_m_Page_124.jp2
fe392e9f3bd90ce26bfc517ca141feea
ed9b0f5a1ec7c6d4b0f681d37f0927bdaf6d9595
11127 F20101115_AAAPEF harris_m_Page_120.QC.jpg
b04b7b12686e9106b977d51c4cd1046b
6bf6ac053465672ef529ac385786ccc803491307
7844 F20101115_AAAPDR harris_m_Page_112.QC.jpg
e19f6d21af9cc96f0b5295881e3b31c4
beb94dfae9d7d3635c4b438dce07c3297706d11b
5947 F20101115_AAAOYL harris_m_Page_033thm.jpg
8dfaf8e514e5933e858e4a1225ff5522
1bd48d6405d1cd55438bd1d80f043795b17b45f3
4557 F20101115_AAAOXW harris_m_Page_025thm.jpg
7382862bac02c59a3f0602b321304a1a
a284eb1d1d21204ead06c54651fa0e044ea4e259
318868 F20101115_AAAOAP harris_m_Page_111.jp2
154270a33cf5f2af9799bca48aac9f8d
aebcf0bfe854ce7159d08d8eaef56a071301482d
70585 F20101115_AAANVJ harris_m_Page_142.jpg
327bd381f96abd05f9ac2d18a9d1962a
7f12c7f41a5c35de35d9f3df25c742382360f3fb
77460 F20101115_AAANUU harris_m_Page_125.jpg
4357e56a6808b4bc495d7b960f1af9c5
28d404215d31dfaf59afa00f0df46af3bbcf6b20
113252 F20101115_AAAOBD harris_m_Page_125.jp2
fea0bba2e6a085f743b8372cc45806e8
9db018bcee6612e0972635c3e20e86ecad1f8609
4078 F20101115_AAAPEG harris_m_Page_120thm.jpg
dacdcb0daefdfac373af6428e135ddd8
4249f9e28fc8340631ab280d12670a3fcc6f2672
2967 F20101115_AAAPDS harris_m_Page_112thm.jpg
806b7b057e7cbfe3f3bba685501ab559
3c63865f23f77a0d35b8f8e7c83f0370d55d5962
22268 F20101115_AAAOZA harris_m_Page_041.QC.jpg
a4ea97868754f2469a28e58739e0aacd
95fdee9d6ea87310907fcf5114bcf57969bf5f9d
24764 F20101115_AAAOYM harris_m_Page_034.QC.jpg
b047b8f88dca65185dea7931f06090ee
b1ade172cad8f3b06fd8a48bb513f182a9197690
15982 F20101115_AAAOXX harris_m_Page_026.QC.jpg
1f1b143d6120044048a1dd42743f1cf5
a285d682b7c7d115724c2bd35aa9ee441df166bd
273516 F20101115_AAAOAQ harris_m_Page_112.jp2
8148b3c2b01f61b48379a7ea71c845fb
bb9eff818324490d3da66cf2e803b3749061940d
74590 F20101115_AAANVK harris_m_Page_143.jpg
f13315222fdab64bddeb82d967e1b2d9
725115dbf3d0127c855c94c412ece85a178d8eae
73986 F20101115_AAANUV harris_m_Page_126.jpg
6b70f47f3b9be220f5cab430c44b209c
8d3af085945eebbcec6f17620a0859b0b5784688
106000 F20101115_AAAOBE harris_m_Page_126.jp2
081502dc5b70cc793ae9a3b270684727
bf57d94d15fbcc70dca5e36b6d0a90b3875c7abc
7245 F20101115_AAAPEH harris_m_Page_121.QC.jpg
2e9cd5bb762be16bf543d1983aeb8d7e
a78993f49993786f8a18ddbc084a86d17044c608
12221 F20101115_AAAPDT harris_m_Page_113.QC.jpg
c5b0e82c84da3f0580495ce45be70e7c
cd93045818d2db2e3b2bf74feff37ab48acca8c9
6235 F20101115_AAAOZB harris_m_Page_041thm.jpg
13fb78bffb742fb004fbbd574c83146b
1f8dd30da113f7c8a9fa6266566f185a83a5008a
6726 F20101115_AAAOYN harris_m_Page_034thm.jpg
693411d53a91b1386817cef6edb1e97b
fffca7a8accec14ab299f48d7e0a08fcae0f906a
4598 F20101115_AAAOXY harris_m_Page_026thm.jpg
93f63c05081b2d9b6c81c5b760d2f11b
3981dbc3f014ef530b45d77d12a741fc0145fe11
370325 F20101115_AAAOAR harris_m_Page_113.jp2
369e4ca88670268d23b37130d148503b
dd5c32fe8753f60b4dd13da94056f0b696d0bfba
65336 F20101115_AAANVL harris_m_Page_144.jpg
aa68997ebffd99487968cf85829ac6fe
67a46331c473e0b5fc64e365f035d1835faa7c8e
82967 F20101115_AAANUW harris_m_Page_128.jpg
7647001cb6ad9eda0f939d0d718bb050
c8fb6bf21aff51ce63dd66e77ebf33c3073e9275
121734 F20101115_AAAOBF harris_m_Page_127.jp2
da64655a2ee288fc0dbcb69e835665ac
717ba57f19088935815bde25e6ca183dbdb66395
3043 F20101115_AAAPEI harris_m_Page_121thm.jpg
02c897b55a3bb2064206b83fa726103d
8b20c400d90bc60247eb97eb3841b349e0ea03f0
4164 F20101115_AAAPDU harris_m_Page_113thm.jpg
69cebcf8b3f7f3b6c5137e510d5d6ce5
2e8227aaf5379d9cba2cf55b401ffa6cd67b0e4a
16624 F20101115_AAAOZC harris_m_Page_042.QC.jpg
a64f2498f57282e71fb16ab1f1cb61fb
cadb65dffdf796bd9a1837e25635f4da90a54381
21115 F20101115_AAAOYO harris_m_Page_035.QC.jpg
0daa1ad8fae8bfcebc013980e9c2fcd5
db17547fac89b59392cc2648f84c8c77053975ce
24496 F20101115_AAAOXZ harris_m_Page_027.QC.jpg
7aa945c0d89b5a2e566bd06aee1f47d4
145d0af925610eadafa37a38f4fcd0afb9ba72fd
61261 F20101115_AAANWA harris_m_Page_160.jpg
10dd19918e9aa8894c2163f91ea365ba
01ac32ccb70259850282f8809b80b648ce154203
360538 F20101115_AAAOAS harris_m_Page_114.jp2
ba8db87546e482e24036b126f57e162a
c0d80e8f765b8fb261ca48e33440571b7ebb1535
69966 F20101115_AAANVM harris_m_Page_145.jpg
e244eb87c99fd39d03c6458f6c254f50
495cac55554283f175e61f7e863b8d4dc76debf6
82930 F20101115_AAANUX harris_m_Page_129.jpg
5cb4ff10b7031c47611f642e4c2c2db5
300b3deccf6ad33e090401c3c1c235157ba25c8b
124134 F20101115_AAAOBG harris_m_Page_128.jp2
3c1a6f2cb540baeb2eb0ab7d35ec99f2
948904425fd0124e6f362af69f3e4b779e1747f6
23801 F20101115_AAAPEJ harris_m_Page_122.QC.jpg
406f1add0db8db64254d0b737dcb3252
7cc2717407e162a1e1f84a524f43cf41bab08eef
11145 F20101115_AAAPDV harris_m_Page_114.QC.jpg
7e579552e11c7ded6490cb210973e7ed
b9516be2692461eb2b23555c23c6f07238ca4746
5002 F20101115_AAAOZD harris_m_Page_042thm.jpg
375762923924597353851ada21424245
33fd8b203a20f65ee7ea0e96887c7c23c130a656
5734 F20101115_AAAOYP harris_m_Page_035thm.jpg
0eacfe26f87999bb5a6e907901b1fb0f
920a02f103e0713ecd1e9931b015f49b96f0e531
68219 F20101115_AAANWB harris_m_Page_161.jpg
cd1f6d31495ed509caee83c50eef929e
e5e9a645f6180e25b50cb95a9c894d839de3c7d6
265488 F20101115_AAAOAT harris_m_Page_115.jp2
c3188726e69820b19648ff8504237d97
c0e06d7b39ea93a6b6d46ae816e68ad410dbdd2a
71293 F20101115_AAANVN harris_m_Page_146.jpg
212d37a0052b8db39c292b540f24f3c2
651944b0d19529315e809f74cc29ec3c798ab1e4
75458 F20101115_AAANUY harris_m_Page_130.jpg
f684bb1c184b9196db7617446ddea4a8
9ad8c4af6a8c7e38d0f687249d79f410f809bb6a
123771 F20101115_AAAOBH harris_m_Page_129.jp2
14c9c05c8a8a1a7b042ccb64af1448df
bdf0c5fb961181fdb0314323448ac1592c8a35ae
F20101115_AAAPEK harris_m_Page_122thm.jpg
0a7189041655ab65874cdad703804347
2a8db4dd1cc5e13bfd15a184d750606c46b40562
8305 F20101115_AAAPDW harris_m_Page_115.QC.jpg
d38e5be1e7936f7d7658dbde8ff781c0
7b34b7738627fb012a68338d303e5148d2d326a1
6839 F20101115_AAAOZE harris_m_Page_043thm.jpg
3b0711a6df8bd8d0bfa1bfd5cdbfc20e
5181c6c54045f4136536c7a993e79d22961e4c6c
24948 F20101115_AAAOYQ harris_m_Page_036.QC.jpg
6ed1dd03e3a48565a1210e0d6b9798fb
d5f46aabbaa99ba4a7af9b70d102ca65938706ee
71261 F20101115_AAANWC harris_m_Page_162.jpg
7fa5bccbcfd5fc2e7a6868eb2b7f7598
fd6d9244b8af0bcba9197b9448a0ec76c9be6dfe
88319 F20101115_AAAOAU harris_m_Page_116.jp2
938a20a9ffad7a17be6b65ad9de0903b
ceb1731e4def0623897a9fa9199dcb806522685f
76713 F20101115_AAANVO harris_m_Page_147.jpg
8fa858566e808a271539faed8bd7a838
0c11d41e85f25815c8da3e04cd587d0fad36ed92
71563 F20101115_AAANUZ harris_m_Page_131.jpg
1a2b39d1ff1e551abc0fed9168cebe52
39f250e6cb666d6a165c902aceefde08154a715d
113082 F20101115_AAAOBI harris_m_Page_130.jp2
acce5a32eaff663db81289908fe9f3fe
c4f5cbc58764ed16ea2c37c79799b332fda91c2a
F20101115_AAAPEL harris_m_Page_123.QC.jpg
15d943fd3c5f8ba0f52759b41c2be325
c1779e68b17d14d10baa5ff0c59cc1bbc8b41e22
3180 F20101115_AAAPDX harris_m_Page_115thm.jpg
f29da6489dff11abe1e52696e236cb46
ce5260f121669294c50708bbed9f596a42d95024
26233 F20101115_AAAOZF harris_m_Page_044.QC.jpg
f138860042df98d3240b8fa43d042c22
2705b303acd8b5ff67481ae4b51009f0af010d3b
6884 F20101115_AAAOYR harris_m_Page_036thm.jpg
a6f4fb1c992794e2aab076ec03429d3d
24a1cdee212551497c2c1e09aeb1dfebcaae60a7
48892 F20101115_AAANWD harris_m_Page_163.jpg
2b021fedc35341e4ea7bf8012b8146ea
27170f8a6a105e6c45aadb3455f10d4cda362b2c
21203 F20101115_AAAOAV harris_m_Page_117.jp2
54acec554c44649b1565fb790e839f85
0c3705f5d390a84f13f5d47653c18249b004d13a
94060 F20101115_AAANVP harris_m_Page_148.jpg
5170b2b30335f68f8452ea1097f8d0cc
d0499eadc8de84582672a7815835c28493725812
111376 F20101115_AAAOBJ harris_m_Page_131.jp2
6e4be4a28f1b7cab4fa6cecc96f5a4f8
cf2b2de69dc152250b7e13f362e155c134840b6b
6785 F20101115_AAAPFA harris_m_Page_130thm.jpg
7b0a8777734d75770027f25612e5d9f0
174f21a9ed1d35285af2bb4f91e4d7abf285a73d
6397 F20101115_AAAPEM harris_m_Page_123thm.jpg
ac203ce3377e8e3b8e81a2715cbc11e0
434e6fc436fb7810a5f3f2aefd3719cae6a365d7
19032 F20101115_AAAPDY harris_m_Page_116.QC.jpg
ecda903538a7bd0f26268e11cf3822c0
3dc7b01ed9d74fa6360729925b624e4bf8c09217
7033 F20101115_AAAOZG harris_m_Page_044thm.jpg
733d517e0a7b9d83bfcf48d84cfe2177
13ee918cd6cb898ec9ba91422a4c4e3f64ce0333
75547 F20101115_AAANWE harris_m_Page_164.jpg
be479b03de4f564d3b08768a0924a3f6
88f99d684d62dd07163d4c9b98bd317bccff0275
21112 F20101115_AAAOAW harris_m_Page_118.jp2
17dda71c48747639d2531d30640d386a
49c4a959660e6cbf921c4835ebcc2ea9cbf4af5d
57904 F20101115_AAAOBK harris_m_Page_132.jp2
f14e9675824adca40a5d85ef700dd71b
69183039b15ed055aae733f9ccffc3fd1ad14914
23204 F20101115_AAAPFB harris_m_Page_131.QC.jpg
7fa4374d04dd45f2238b99f0968e31c3
8353abd98e06359f6f7be09733b80bacfd157685
15332 F20101115_AAAPEN harris_m_Page_124.QC.jpg
8e47f50d1f561663e907029dbb9da75e
d6c25d1fd708cb4ae038879f00217b9915e79610
7261 F20101115_AAAPDZ harris_m_Page_117.QC.jpg
cbb516bfe8393955d30e173a20503bdc
963cc373460e5fc30bf400c55a156d55fab0ab9d
24788 F20101115_AAAOZH harris_m_Page_045.QC.jpg
0b7e4c9d38816834baa9bcb43e9b7a7d
b3d67d02064b5b7c63293d5145f082a6fd07f2c8
28360 F20101115_AAAOYS harris_m_Page_037.QC.jpg
56c41ff8ba72839f417e2109bab5afd2
e6d2bfbac98a895e68885213adcb7ce64a402688
72136 F20101115_AAANWF harris_m_Page_165.jpg
501bdb33ec9ede5b177bb3e6adb093a7
7acaa98ef7daf856dac1e2e6e05680df9a54de19
159689 F20101115_AAAOAX harris_m_Page_119.jp2
d020ac611baa15ea683bfb68f751925e
a44b6c1b1fc1109a6f874d8a38dc47787e182409
52203 F20101115_AAANVQ harris_m_Page_149.jpg
7a17146b34afa1e169d8f9a4d5437118
abd2e76d373ef77a8dc3206d9325215f317d9b4a
114125 F20101115_AAAOBL harris_m_Page_133.jp2
8b05c739124a76c71f6b154d88f8fafa
eb7f41f34d80c83b47531f8ef8848dd36552c49d
6516 F20101115_AAAPFC harris_m_Page_131thm.jpg
55e7086d81f68246a964528ea2ab6bf3
a8c07c6bf4b352c3dbac6520d75cb79e57835471
4329 F20101115_AAAPEO harris_m_Page_124thm.jpg
0a0939cc267f15642837509302c0ff44
f4b67f4917097e979ffa8555c96e008662192131
6803 F20101115_AAAOZI harris_m_Page_045thm.jpg
b3cd21dfc9d9be0240037a53acd1c8af
f8dfd9daf4686934dedc3cb50300f1ac5250cfc8
7428 F20101115_AAAOYT harris_m_Page_037thm.jpg
05dee4f881acc8c4297f81651a9b8584
ea8d70b56da4434c1e7409a9145260dedba5a3e4
65711 F20101115_AAANWG harris_m_Page_166.jpg
942dd2328711d981a71edf34ce61e199
08e11cda34c68610245678f89168d54d2d14c1e3
344881 F20101115_AAAOAY harris_m_Page_120.jp2
86f01e86d52c95df8c2288dbf3a3491d
80576ac559171cc7f4e55f83e70d418646bb2658
36812 F20101115_AAANVR harris_m_Page_150.jpg
127abca19998fc210489b9d55eeba765
4bb1cee885ab05b844309227ce62ce2d61f97014
662998 F20101115_AAAOCA harris_m_Page_150.jp2
f8be5f4ad834408905f2a3b3e2c75815
c01669ea33d6071aea53cc398853627a515cf808
119651 F20101115_AAAOBM harris_m_Page_134.jp2
9e33fb3fc86b4769d66a8702e1e4520f
092b013e6ca3098dd50ec3039bf06db35c784118
12599 F20101115_AAAPFD harris_m_Page_132.QC.jpg
bd5ca79e9145114c1550ea820414be61
3daef532b12377c63adfbf1334ee83569a7993dc
21730 F20101115_AAAPEP harris_m_Page_125.QC.jpg
56a94a9ebeb1590dd2103b34211736ff
7ff15e4a45eb40ae910d2532673d97d90d4ee88a
6385 F20101115_AAAOZJ harris_m_Page_046thm.jpg
2435cd1c508d452b9cb6e9690033e49e
a1ebe22821a621df8d4a0b0d4f7dc8e5390bfe9b
24598 F20101115_AAAOYU harris_m_Page_038.QC.jpg
f56f0d642f72511417a3482f6178a11c
7ca8abe2e443c37d72adf55011d2bc4169cfc3ba
84856 F20101115_AAANWH harris_m_Page_167.jpg
bb23e5178f7ebaa8e1b8dec63bb7f78f
58b580f38812ac14f258d2a081ab1959cadff7a1
22051 F20101115_AAAOAZ harris_m_Page_121.jp2
725afa9eb86fa2868754d4001fd3b301
3cfbce5c6f5d654ad29f12cd856483ecfdbe3d7a
77593 F20101115_AAANVS harris_m_Page_151.jpg
abfb6d925b2851364b2a112be72b0d5e
f3d3508ded2e955a36f398a87755f119c282a135
116197 F20101115_AAAOCB harris_m_Page_151.jp2
aa2e4584f43d03e0d70adbb3cd79e7f3
fb51bb9e9ebe3df6a157c5d76f75c12e9c216757
118948 F20101115_AAAOBN harris_m_Page_136.jp2
e0f84628af60d096c46ca1aaf7505571
8ab30fbf3d97053825227e9d690eb521298b8024
25054 F20101115_AAAPFE harris_m_Page_133.QC.jpg
07b073b60ff1ba56cacf3c13f303ab04
ca920fe47713f308e8b59548798378a9efe6b8cb
5399 F20101115_AAAPEQ harris_m_Page_125thm.jpg
810b2da81a113c4540253dcccff80a73
58645cb4ad833c671f841d3497a2019e18fd6448
23213 F20101115_AAAOZK harris_m_Page_047.QC.jpg
a063294b73053e95b7f5dbd493716617
7a013b96af97307d7e2e7d8da82849cdf8a94e5e
6699 F20101115_AAAOYV harris_m_Page_038thm.jpg
28aa253a69c7527510918d34cef8068c
74b79b74ca93b5e43834d80463808c57f31016c9
66245 F20101115_AAANWI harris_m_Page_168.jpg
1a861ff1b1c08a67b7f15ce5424c69af
3ea5ab379f989282b0ed257e289dd3b7772c948b
74413 F20101115_AAANVT harris_m_Page_152.jpg
9e549b0f133fe2b9333c54825a3c07b8
2a7a30728e5e45cfc9ebc3952ad740ab94b31918
105847 F20101115_AAAOCC harris_m_Page_152.jp2
896fd0c49841f52691542c71d6d72a5b
b7ba3744fc4782e9dd6d65c6c2268e3b00bc1632
116522 F20101115_AAAOBO harris_m_Page_137.jp2
9adac166998ed625aec4d0564db7888c
4ec42942730b301b9ca079e4e5e195ed4a6d1e16
6806 F20101115_AAAPFF harris_m_Page_133thm.jpg
f892c80583bf7f01ce9e784d2cb0134b
1445b886a74f5388992ba3e8b7bd9d75b0011a83
20656 F20101115_AAAPER harris_m_Page_126.QC.jpg
ad5504534567f8e68d76b120228d2cde
824973770c54a34d90b7fe87265a7c04e0c350d5
6595 F20101115_AAAOZL harris_m_Page_047thm.jpg
47f7d136b167f6150c912f2442310358
551852217fbea3543a5b911ec3c2584130db52e8
21409 F20101115_AAAOYW harris_m_Page_039.QC.jpg
b1561a51503f42a500fc80d536de2758
65a2b9ffea433d1da0b96426e9ab488db4f10179
25810 F20101115_AAANWJ harris_m_Page_169.jpg
cab3e368b14facfe82019bb3ad3a1b6d
3e9b068f16ed5757653aee4f6b2b712a38898f2a
80583 F20101115_AAANVU harris_m_Page_153.jpg
d216f7734747c5434ad6bc119ca38e9c
8eb5191242f9136db16698e0aa81229f7524c149
118449 F20101115_AAAOCD harris_m_Page_153.jp2
da756405b386bca534aba8ca79875a57
9d85e025ec3465f0d3888fa72ff0ef0d3ac6795b
109349 F20101115_AAAOBP harris_m_Page_138.jp2
fb300008ecf66e26c649f84d2d036164
8b278cedce2b167cc350a7b65884a48fc3ac9a53
7158 F20101115_AAAPFG harris_m_Page_134thm.jpg
418f89e3a690c298ecab7388f48b1aaf
05d6e6821f36ceb6462bf6b8f7a5521458a736f6
5309 F20101115_AAAPES harris_m_Page_126thm.jpg
86cf53933ddecb65c0b5b80ef4fa79c2
317ec544a9ba29c5a85c12a5961442cde45311f7
24466 F20101115_AAAOZM harris_m_Page_048.QC.jpg
2f90d5f2e26221e2a0cd0391bb2842d7
62b8662cefbdc2d936c15c90d6b02a9331e019e7
6156 F20101115_AAAOYX harris_m_Page_039thm.jpg
d38e7b70c659cdd7272c129d79469095
9477f79845bcf746b29867db7f9802bcc491a802
69465 F20101115_AAANWK harris_m_Page_170.jpg
ea966fa5a8c17464d9cd0ffc2e2dee25
cf571cb389833b570bc8240ce9b38e3e10193085
39051 F20101115_AAANVV harris_m_Page_154.jpg
6c41df525d02c729cca2e535c3e7031d
3501f2f86a231d13706af47c973f3c19f8d60e87
50341 F20101115_AAAOCE harris_m_Page_154.jp2
43b35e1eceaafb59ed35b310848293f5
50d71289bb4483324ba2b1c19fc4198178353a0b
114473 F20101115_AAAOBQ harris_m_Page_139.jp2
e88f2f38fdd8efb0e5f6648954271d4e
c100410118482863960cbe867cb440364f44daa1
26112 F20101115_AAAPFH harris_m_Page_135.QC.jpg
fb72f89635fb096cba1d70f1116dfd7b
82197a4f7f9756c3f0b8ad5ad71c87faadbc2df9
23270 F20101115_AAAPET harris_m_Page_127.QC.jpg
63a505613b718e120611006aff170238
f1d85a410b896cb2b4c5c272c9b9ff72eaa1cedf
6511 F20101115_AAAOZN harris_m_Page_048thm.jpg
82833964c1bccfae1e6bbfc36c6e6175
daf6cc67a19cae025b41345864a43d6ce5b2ca74
22345 F20101115_AAAOYY harris_m_Page_040.QC.jpg
9ba84646e494fd005f2c5dc4ccf7023a
fd2297c7f4d1a6c402fea0cd7509b25d29ddfd4d
80833 F20101115_AAANWL harris_m_Page_171.jpg
8b1f1b244839a473f3fabb1d77a6b240
9b4e2fba166b65bf04bf955447ae9729fd6a47b0
66802 F20101115_AAANVW harris_m_Page_156.jpg
07388334dad4edf6a0c3778b3022d6ab
0934839b195e8b7c64b61bfec28da0dfab531e56
89428 F20101115_AAAOCF harris_m_Page_155.jp2
c7f5f329d4f26f69577ff3b925759f78
419b4b2ff36bf5fd49eea9255468a6832c5ec3a5
119641 F20101115_AAAOBR harris_m_Page_140.jp2
6fad294ffa36f22a75c64712dc0ddd59
587e552b471c6eb83d7f4e6d518210c46efe8943
24997 F20101115_AAAPFI harris_m_Page_136.QC.jpg
09df0587d03c091f84f8ac3bf9c06aaf
233b474537109a4772056a6bb71f17b235166ced
5958 F20101115_AAAPEU harris_m_Page_127thm.jpg
8933622e95067610f3a2fdb7214c7914
f1238f973cac6ab090d332aecf0a1c58d57ec370
15364 F20101115_AAAOZO harris_m_Page_049.QC.jpg
e3d8604c18d08f9e9f67e727965a2b66
41b7077a204965d5cbbd3138245abb4e548350f7
6262 F20101115_AAAOYZ harris_m_Page_040thm.jpg
9be0664029d08de529e80001680901fa
22c75add7838041b9b15fd42a9edeb90148b71a5
69439 F20101115_AAANWM harris_m_Page_173.jpg
f08f64a3f998f179d2a0cbb197242a82
d53a4ce8e0adceddad6dbcc0f043a7ef57da31ab
72683 F20101115_AAANVX harris_m_Page_157.jpg
0773875e7f037ef8abc8143e690b015d
6dd9e4b54a0ffedbe887ca8a593be2cada102a63
99667 F20101115_AAAOCG harris_m_Page_156.jp2
2adf41987a358f55d3ea1b16c12489d1
19966b4eb8d7369f45a738f43734d33af0a03117
1051965 F20101115_AAANXA harris_m_Page_007.jp2
0937e20cea9621f468fdf0f1b04720e8
3cee49825fa176961a5466f80a08579b3aaa9592
840581 F20101115_AAAOBS harris_m_Page_141.jp2
ae8ff13922dcf4cad73a62be1641e36b
9b19089120ae8e6a86083c5b1824e4b4ee92a613
6910 F20101115_AAAPFJ harris_m_Page_136thm.jpg
34d9ec61198f7455362692dd486cdde5
d99eaf9a0ad00739f9e87687240da9c8b98e1981
23351 F20101115_AAAPEV harris_m_Page_128.QC.jpg
f9a3d184891760cbb526543241742ca6
94e0dd787d2b0aec088a6d8489dbd253fc4a1b4a
4291 F20101115_AAAOZP harris_m_Page_049thm.jpg
8a985af975c5b28ec53b63d788659c93
19bcc10890094b7849affc7aa5f1a04e2b130b49
88742 F20101115_AAANWN harris_m_Page_174.jpg
b1e9f3670513542d78d813b2dfd89e40
895d947dc1088e73ea80f7816f16340aebac018b
71143 F20101115_AAANVY harris_m_Page_158.jpg
1ac38ff5f7258fe92534581659654831
712a55d369a1eeeb267c45aaacfee45f099b2384
102580 F20101115_AAAOCH harris_m_Page_158.jp2
292b36dae7f1c0053a8f5a29d10a4b80
31c334b978a998984293bf522dc09f51c9806f2a
1051899 F20101115_AAANXB harris_m_Page_008.jp2
82f51bb7ddd7601787eb8e4727e0990c
b27e4c80ffe142027b921fc8d2a47058708750b4
105372 F20101115_AAAOBT harris_m_Page_142.jp2
2336dd52612bf2e509b1eff1e08116d9
508521b7f11499c70ee1c2c8a9dd625dea7d1d23
25004 F20101115_AAAPFK harris_m_Page_137.QC.jpg
f36396af58880855b8fdcf4dd753c683
c2d80e3634639948f52f1b6a644479366e89e1a6
6063 F20101115_AAAPEW harris_m_Page_128thm.jpg
2fc3005e3cf4b2e80f212b06b28db722
a4fcb39448a57ebac10b93f1e9312fa0d2a078ca
20978 F20101115_AAAOZQ harris_m_Page_050.QC.jpg
01b4cad2f04441aa5a6e75ab48ec4b23
bac8ccab9a059b6659e1c4e4b1feac06fc955c76
76853 F20101115_AAANWO harris_m_Page_177.jpg
a0c5d2e7a519206089b6990c1300a964
052b74d12b9accc9c85063d9fdd461f86614f7d0
61522 F20101115_AAANVZ harris_m_Page_159.jpg
18fd2d790cd8864894fa7dd0a5a6789c
31240cbf10199ce1ed59d8f19f2b0512f2be5b75
89446 F20101115_AAAOCI harris_m_Page_159.jp2
fb46ee5bd0fa0d467fad106f7e56821a
d13069477974d266db6c87d623e37d86d1e3db66
1051973 F20101115_AAANXC harris_m_Page_009.jp2
728b1924c98a5a72c63f99689e2ed648
cfe57c3bf1e3d8b8035c12619f90d49f4dc48067
114430 F20101115_AAAOBU harris_m_Page_143.jp2
8f2a3b787a8a2bc6aceacf5b725adea6
77a151fa649a743fbf47e7d158cdfb1f72d5e673
6686 F20101115_AAAPFL harris_m_Page_137thm.jpg
daaba1bb38bcb3d3efd7a72151e50be0
a6816ad1c39f1b232919d041144a20af6d20cfe7
23260 F20101115_AAAPEX harris_m_Page_129.QC.jpg
a7e318f239334617c16255f68ba21282
a42767e7dae9670ed5f3503d1d9c7cbd93322cce
6134 F20101115_AAAOZR harris_m_Page_050thm.jpg
c2ede171dec261d8cccf19b6d1dd7d14
8f7b01c0c9c22f61a0cf757f07caf43e2706f206
53523 F20101115_AAANWP harris_m_Page_178.jpg
4d97072fe0fbf038a28a4bbda9e1cf61
e4ce4e87a9ac289a9d86d2f0416ed8a086bffd46
87418 F20101115_AAAOCJ harris_m_Page_160.jp2
f76ea7ef1db61e0a213a345a8e8caf6a
0356a5638591b77ce83e2897a766cf6d501c14db
1051986 F20101115_AAANXD harris_m_Page_010.jp2
2a99f1a2fe2af96acc12e31b2ce19eff
4bd685ca20cf32f9b1dbd9c2e2a16c8b5a87d6e9
99825 F20101115_AAAOBV harris_m_Page_144.jp2
3c534737a80e25bf5a64852c1e9fe3cf
b406b4870731a505536ff33dbf612a99651c1efe
6339 F20101115_AAAPGA harris_m_Page_145thm.jpg
628862f119dd00220e7e64d5861340fa
f971c7cb29e755dddb6294d5faf6f92f73666e50
23588 F20101115_AAAPFM harris_m_Page_138.QC.jpg
b4c29f2d86c71c6c2d1a0c58c4447e38
b191b8db220056c50b54e5511ca38dc809017e02
6068 F20101115_AAAPEY harris_m_Page_129thm.jpg
8250bbfc69695a14448802fa9d9a5897
cc5fdc56796ac6f9e2b73ceff43c4b23d0d68b43
23381 F20101115_AAAOZS harris_m_Page_051.QC.jpg
0ab3c2f9e22ca5ba57c7951fabcb48db
6b070ff72d0463767ce19e107d7bc226d6cd7383
81965 F20101115_AAANWQ harris_m_Page_179.jpg
81fe9152ff15ab285cd13453ef55eda5
29ef6b91b2c1b1041d0315ebc7afa374d39c2da1
97751 F20101115_AAAOCK harris_m_Page_161.jp2
db59a7720729163c7bcd551be155a204
2eee71a8cb7dc2d99775c27e079da19ca618c46d
1051940 F20101115_AAANXE harris_m_Page_011.jp2
f5911d4440d7cd0818924c34d7e5083c
34deaba40898480a5354e65665776901f584ebdf
106554 F20101115_AAAOBW harris_m_Page_145.jp2
a5f3e8a28fdfa03a9d3bd49b58dfc3aa
309aaca2480ca6db8b17444d6c98ad9723fb8610
F20101115_AAAPGB harris_m_Page_146.QC.jpg
0ce7f6d287f82e92132320f31c849a3f
cb8411739af91164717b7540493463308596f2b6
23834 F20101115_AAAPFN harris_m_Page_139.QC.jpg
254a18facce63271cef55723715b7eb3
4da43aa1af2677a007a76fba036989cbc6e95ed3
24574 F20101115_AAAPEZ harris_m_Page_130.QC.jpg
0fd3f715ffcb7ffa167da76f19931ff1
32f31c7db99eb6995d56935144926e2b0e1cf67a
100394 F20101115_AAAOCL harris_m_Page_162.jp2
8f04f611891d706ae6a6a540290b0daa
3cd6d6730539752e31cb3b82ca2b72a0b5c15e79
107776 F20101115_AAANXF harris_m_Page_012.jp2
dbfb21b71738ce3625d168b58c8bd196
3c096d575c97f5dd26aeb24bd35233b5964e93e5
117057 F20101115_AAAOBX harris_m_Page_147.jp2
b4161fd368cddc2bf6c1609a97ca74be
66e8bd0358df37c4247109ff5b23db278020d62e
6815 F20101115_AAAPGC harris_m_Page_146thm.jpg
795da3b8e8c82c3f63e6ed4cbed3ccc4
c4fec1227189f09646cfb8f59c0730858bc93c47
6824 F20101115_AAAPFO harris_m_Page_139thm.jpg
a6d295baccf12b418ace20ba669bd446
566ee2e48a1da9506a91458ad1873396467e8744
6514 F20101115_AAAOZT harris_m_Page_051thm.jpg
e0e04c29f558832557f867e5d371094a
227cb06373746c16502bb9962946b1d18b18a5f9
91079 F20101115_AAANWR harris_m_Page_180.jpg
b9b8e8ec82ddd04213cb43ce89e645f0
b144186a7ed867bb49bfb24e2e30a548172d9758
121960 F20101115_AAAODA harris_m_Page_177.jp2
a7e2ce9f70dc8b1dc912b4ab49bd7458
48bd7fe5b4c46c30f5546007a7ea6dc8e5c5c663
66470 F20101115_AAAOCM harris_m_Page_163.jp2
635940de764915bad3298a62e4d9b622
71793da46f598e1f5ff1d330c92102256b488969
22115 F20101115_AAANXG harris_m_Page_013.jp2
8689414959defd7741dc693b37df9ad6
794b56188e2e3c6ddddf00a517ccbfa026dc052c
1051966 F20101115_AAAOBY harris_m_Page_148.jp2
d0f31ea6f4688624a577878567010e2f
fade426e5717127d4c70ecc9536a2dc3e9307993
24546 F20101115_AAAPGD harris_m_Page_147.QC.jpg
ec25e3c4ef57c6db14b9c632b9bb30de
87aa87a416504e4a4a5766d5c90c92a070ecb7a9
25830 F20101115_AAAPFP harris_m_Page_140.QC.jpg
37e0ef73250e517c8f64884969956aca
197fcd48b55fb10818a4eb0c3c02a614d3d5ef35
25895 F20101115_AAAOZU harris_m_Page_052.QC.jpg
d763839977ffaefdc6ce55daf352e7b2
befa349f410fea6581859a075e9956dd5561a460
95947 F20101115_AAANWS harris_m_Page_181.jpg
e288a5b329b69c5e4a73cfc9efb463e8
33d9bbb4762aa8d769ed15fe1326e4db09758864
78578 F20101115_AAAODB harris_m_Page_178.jp2
8c3da161f832a64dc186cd9312906d74
633a027693fa20127399796a759fc1aef6720fbc
113179 F20101115_AAAOCN harris_m_Page_164.jp2
f6ed7c890ce9463c347c8870bd8f137f
576067b36865b56a337aed041c872e034110ac5e
94243 F20101115_AAANXH harris_m_Page_014.jp2
96eb1b908582f3a04186596436eff858
be4f8a6513a928815b09c0878ba5597413dfc187
76907 F20101115_AAAOBZ harris_m_Page_149.jp2
72d927985ab2cd7ec2bd7d7803b22171
00fb0e072983bc521dde88489471c0d28db7d437
6555 F20101115_AAAPGE harris_m_Page_147thm.jpg
32b39d00568b6d2ab9095a4d3bcd9f4e
9e35b7c30157b26e1dba53198867cf5b6d0ede01
6923 F20101115_AAAPFQ harris_m_Page_140thm.jpg
c024f632b0c348e44fce077da2067986
b46ac06e44bba2ce77db2d4870cd82039ad8b2ce
6953 F20101115_AAAOZV harris_m_Page_052thm.jpg
8556082e5aed79cfdb832aa5eadabd9b
9e9dd122344b4aafca2490e7f2bd4d300b28ce21
81557 F20101115_AAANWT harris_m_Page_182.jpg
ae9229fb4d1a1ae791784d434500f30e
61e554f42e816802ba83e421667f5786adb98df6
1051928 F20101115_AAAODC harris_m_Page_179.jp2
388853e847062a2cc355ce0e0774f940
adb8acd0e74968fa4b6cc1d6a57f60f820a8480a
111287 F20101115_AAAOCO harris_m_Page_165.jp2
46ccc635de82c9ae79e36a607d8248f3
7a9dc997aa7aed907a47b926105cccafcebd0070
1051970 F20101115_AAANXI harris_m_Page_015.jp2
326f63bbd69b93d85733ecd7a8905451
26b5cd3f6f45c9bb3783f8e23ab55d2e460ac185
28885 F20101115_AAAPGF harris_m_Page_148.QC.jpg
bb32f33fa946850586dce062476277f8
9e47796a43f4e6f694be91a479a2a532ae82b09c
19727 F20101115_AAAPFR harris_m_Page_141.QC.jpg
2bcd0ed4c4e85f845ad101800f4d4b30
2ee4a56466b9f77c88c6996a463b171ca5982695
6477 F20101115_AAAOZW harris_m_Page_053thm.jpg
9758032fd1f8850fc99a145081de3704
2755a3ae26f4bf340048580808c958f0a41d8676
53649 F20101115_AAANWU harris_m_Page_184.jpg
854b9262280bd745d669881a8999f029
36782da917c469c8877fee47fcac4dbe8df3440a
1051952 F20101115_AAAODD harris_m_Page_180.jp2
645d89e4502c3fbd4c810147e3a617af
39f83f563ed0ff77abd75daace6979b7435de1a0
103013 F20101115_AAAOCP harris_m_Page_166.jp2
a395cbe4b293046718e22178a50ee7e8
33a4d55053824724e97d336054a4d04c2228a0b1
121892 F20101115_AAANXJ harris_m_Page_016.jp2
cd3d38439565f5002a6ae1f01b58e7cf
355b346898d2cc2602ccab14d0d8200f256cc69b
7491 F20101115_AAAPGG harris_m_Page_148thm.jpg
31388e7a305efbc6a67c72a736d7ded7
048554a74ce011eaf214c1e5a3c6b1327fa61836
5528 F20101115_AAAPFS harris_m_Page_141thm.jpg
dd1ed1b4b7a75cc13c882fbc11f4a8ef
698ba0185491edac05786370a23b5c4108c31af9
20847 F20101115_AAAOZX harris_m_Page_054.QC.jpg
2ddb9ed04a25094f6e3d592359475611
a8284e07aa6864b9c55b454ce3fd1e85ab7bdc19
21079 F20101115_AAANWV harris_m_Page_001.jp2
a876860e4257632059d3f60838a89641
a2729b3e9fc350ac7033e7a825a48bed2a685652
F20101115_AAAODE harris_m_Page_181.jp2
173b06d4a4838d15d7a78266b1834710
6db8a8832b89b942642d2198f287ff205df9153c
133344 F20101115_AAAOCQ harris_m_Page_167.jp2
316e90a9dd0920ce43ce227b63a686af
30c8fb145ea162c3b44fd1c2fac8a6960a2b1229
738853 F20101115_AAANXK harris_m_Page_017.jp2
1348c4ca00016235ba295f1b3200bfab
ffb57dd00519f9302352edf77dba9c3549707dd2
17417 F20101115_AAAPGH harris_m_Page_149.QC.jpg
06ef7be982736b9584b5bf1d539d76dc
5933870a7fcfaf7603691de54524c5f1a185c81a
23362 F20101115_AAAPFT harris_m_Page_142.QC.jpg
271745bb8d5e7de622366e6dad2d9599
dc6a7bbfd856d63eb0d33de5d6aed746565c113d
25467 F20101115_AAAOZY harris_m_Page_055.QC.jpg
f21f76815b45147ac573a51b0f05f4ce
50803729cd4eaf3958b1ecbb6f59e4144c1f61ed
5483 F20101115_AAANWW harris_m_Page_002.jp2
c3a116ff91443e04d991a044928d9725
54f238bfacb9d1bc94fa456ebe8eb9a4ba3e50c0
127469 F20101115_AAAODF harris_m_Page_182.jp2
aed61e72ba03775857aba1d9b53dd900
fe0eb16654f80c060ad00a77c2bd4a5e4db01f02
104392 F20101115_AAAOCR harris_m_Page_168.jp2
b3e9df5e73db16fbf2fb810cb8a044b8
274abab6d4c75092287f3601e98a3acf42f5cde8
118123 F20101115_AAANXL harris_m_Page_018.jp2
178e5c15e30acae82d06d791b3701a09
b5437bd8ed1bf5cdae18aacc70c71f914a923335
5061 F20101115_AAAPGI harris_m_Page_149thm.jpg
89923a3d2760c0bfc21e447cfae5d579
fc6cd002cc4848af2b3a6259b237f8e62ee7d058
6617 F20101115_AAAPFU harris_m_Page_142thm.jpg
e022bdfd195dcb44077e20d79a65d08e
a7d66ff604f82eb3f0a5a8b78bee5f1954ee4468
6934 F20101115_AAAOZZ harris_m_Page_055thm.jpg
986f546f80d00e62aecb3cf497c4b9b6
4810a9527ff6e6424b32152f39c9ca4e5cdab999
47144 F20101115_AAAODG harris_m_Page_183.jp2
52c4c335224dedd8acc158255d830300
1867878d69a83158fd0c606938eb249486b9ec12
114415 F20101115_AAANYA harris_m_Page_034.jp2
91e34a5733f3d084096131540d0ab06a
64c0a0e733586aec473b4a9898a32a2eeb19d06f
34928 F20101115_AAAOCS harris_m_Page_169.jp2
d3474232d208c24d40a0ba3cfda1f5fc
140bb9cb5ed6675ef44bb023e6369e813fb1f9ea
824357 F20101115_AAANXM harris_m_Page_019.jp2
e1000021eb28060b22758b24c18d5033
e5502c3d68a7fbf60624f302ef5c5a166777ad7a
8797 F20101115_AAANWX harris_m_Page_003.jp2
9371dad197b054dedc9eb15601617214
ed2ad343385f682688771282a1131aa1be545f64
11499 F20101115_AAAPGJ harris_m_Page_150.QC.jpg
6c9507bdcd910a35e61bb5ab94f3cbfb
5920f035f6d1aa6b436902344b7818416482bf3e
24520 F20101115_AAAPFV harris_m_Page_143.QC.jpg
12d340798491a43ab64d7fbe814f10fc
9502b4e883e1130a91d39fc7950b270047987fd5
77631 F20101115_AAAODH harris_m_Page_184.jp2
f7df970fa5ec296d7575249a484b20d1
2293953e42f75bfe819055b535516fff2b05d9b8
114030 F20101115_AAANYB harris_m_Page_036.jp2
ed10aadd82d77db474b8d0f9f3f716bd
8557075b2b0a16c1ea1c9710151c3758b5143fcc
104742 F20101115_AAAOCT harris_m_Page_170.jp2
1a728074914321ffb34d4fb84c795773
7236d37fe2ebcefc0fa79c625f2635023eda210b
115199 F20101115_AAANXN harris_m_Page_020.jp2
1c12e4ab359ddd513470e90a9dbb0b1c
ff0c4f1353f521f419f18d7a21bd574562e320f8
119158 F20101115_AAANWY harris_m_Page_004.jp2
217daf97b3e87b5ed4cabea8429b5563
3031631dec3772c503e68ad8dd09e662aedab1e3
3375 F20101115_AAAPGK harris_m_Page_150thm.jpg
d13ca1761d467334774a7613d2fabd86
dbb12c9b41a141c13caf1e1958b6969c77f186ed
6675 F20101115_AAAPFW harris_m_Page_143thm.jpg
a2ed5f5afc45721b08a6f3a656ff7c52
845002c5d2262378e6fa7e81a946e826c821ef29
F20101115_AAAODI harris_m_Page_001.tif
aadfb88ca64b74bbf294dea21e7e0ed8
7cc908ed8512b83fc01c75a869772571081afd41
139001 F20101115_AAANYC harris_m_Page_037.jp2
4bb022a1b0c2b02fc07fa106eda85929
9842a5360b41739461e4c69f000d3e668cce0bb9
129475 F20101115_AAAOCU harris_m_Page_171.jp2
e239caf632cd5521e1667ba60d18785d
bc00a7445f43a594604fca422ba569860ab1890d
82506 F20101115_AAANXO harris_m_Page_021.jp2
c2cbe5882a97ee0cda8c4a6fe5226985
fb94de6dca2cfe9c4e45460d23507b0f3dad75af
57244 F20101115_AAANWZ harris_m_Page_005.jp2
f8579eb1238140b002f27fc1e61ec91b
be45997304c04ecde514f4469f44cc2079e3350c
24012 F20101115_AAAPGL harris_m_Page_151.QC.jpg
477ef7aeb604c186fb2b384afab0c7ec
39d689c788932d04c46381a189dff1ac7cf56843
21499 F20101115_AAAPFX harris_m_Page_144.QC.jpg
d99cdbe05a90c0831a33fb6010b1c102
bb774f894aed5dbe9e18f07e0ad1c554cb6599c3
F20101115_AAAODJ harris_m_Page_002.tif
40f22b3615e9fe276fa70c6dd0b9e8e2
604465fa862b9f8dd56e3d3a7d2e5b2950171d59
123032 F20101115_AAANYD harris_m_Page_038.jp2
fbbe9d3e51ad81c0ae6bb541bdaa3be9
6b53217090cc4ca6dced2ab3fda6587ea05d9e66
142858 F20101115_AAAOCV harris_m_Page_172.jp2
fd5c9431615149feb16d344871e8b418
8fc1d58c5ae265a817e7fa951e1ce0202b736e6d
86789 F20101115_AAANXP harris_m_Page_022.jp2
a9d0c9c1b064caac3a3aaf1d20244bf1
125092e61201e3109f42559ec2bfd17430ce5a12
19554 F20101115_AAAPHA harris_m_Page_161.QC.jpg
537bdc0174c30bf598f7be54e7e4f054
b8f1834af2c76b22b1ac5b14dd5599f785e53c55
6626 F20101115_AAAPGM harris_m_Page_151thm.jpg
241793fc359f94e14173ebf481d9496c
a33c4b3e187e05c07b78dd5411f3b9c98839c0c9
6165 F20101115_AAAPFY harris_m_Page_144thm.jpg
d1a3636d7dcde7e6ac271e2d051703f8
6fe4592f7f93a282ad19344ed84b019abe2c81a0
F20101115_AAAODK harris_m_Page_003.tif
327d4bef4a47fd7fe73f3a22cb697e06
39dd128a0bfe7513dac6abb353a4321d7d46f79c
928115 F20101115_AAANYE harris_m_Page_039.jp2
8b7a1cbefad834de6f695ff663f76e73
05831ebf27dc1ffae42b4fd83d23758948b0d236
109412 F20101115_AAAOCW harris_m_Page_173.jp2
efb8b69ad8eec088ca7628a97ce8e23f
4abb05d48869569344e082854dc39bcf8362b4a0
117422 F20101115_AAANXQ harris_m_Page_023.jp2
4d386a9d12c4dca237b9500387fd222f
3c969c8b280ee1bc63a99433e1923727d4d3dc4f
20004 F20101115_AAAPHB harris_m_Page_162.QC.jpg
05f0db4f181e8cd23d6e9b0b2a580983
aa93bc49b0dc883f7a0e727a5b251d61ab6eb617
22371 F20101115_AAAPGN harris_m_Page_152.QC.jpg
edcba45106e9ee1f6cedaa327a41a51b
a7b4dc56f88d2cb6ee32ab33d6ae08215680052f
22251 F20101115_AAAPFZ harris_m_Page_145.QC.jpg
8992999a50c768d879b9ae7c3defca44
d04d08c0258b37dac707183c9aa4687d340b9694
F20101115_AAAODL harris_m_Page_004.tif
fa5118a74ca8d900b7c4b49f1731c549
abf08ae126a793a67c02d7b72fdb441b6e06be10
104080 F20101115_AAANYF harris_m_Page_040.jp2
282120e38a6515f7319d1c052488f6ef
64c394c4605d214eee6269ae06d2493db5af5110
143586 F20101115_AAAOCX harris_m_Page_174.jp2
2ad85b15a7e93794556d1129f64ad31b
42fe76e215e2ec26f73c3477047690b10b4e8f1d
116384 F20101115_AAANXR harris_m_Page_024.jp2
91d20caa41dba1d97f1527adf4f94376
c21cd0e3509099d435f07c103b354ed67d57fa62
5243 F20101115_AAAPHC harris_m_Page_162thm.jpg
3073f38383c3d9cba137234288dca1d6
cffa46ccbefcff4b5a20b6d00674a95bb5e9997b
6098 F20101115_AAAPGO harris_m_Page_152thm.jpg
5f55e00127b6a17614abf52d9bfcc645
c4b85f7afb657a22c11b54b3940c7f9a4c7b5dd5
F20101115_AAAODM harris_m_Page_005.tif
8f2ddf00442230685cc31140387c6c2a
c1ef6bd9c91176871b9082190b70ea6462d633db
105795 F20101115_AAANYG harris_m_Page_041.jp2
2b53dff0de56104109a3d193253e01d1
5d74652f43acaf7128298e005c2ebb00b9e9ef60
122805 F20101115_AAAOCY harris_m_Page_175.jp2
1755256ec3b6777bae30acb1b58e59dd
51e544b1653be692a3a1d32f9814fae36f50f05a
F20101115_AAAOEA harris_m_Page_020.tif
ce587aacada1ac777d9cd0d8757458b3
6e773f8267f78089eed71eb357fde7cd1641834d
14400 F20101115_AAAPHD harris_m_Page_163.QC.jpg
0a704df41f4bbd9f2720cf63d46247a7
1e8f590f31ae24d026c39cb7c5cee4be4a60643d
24333 F20101115_AAAPGP harris_m_Page_153.QC.jpg
cefd0c03e42611c880f1568e22eb77e1
8448314867ce430d5b4a7904e0ca3d81f9f72757
F20101115_AAAODN harris_m_Page_006.tif
39a6131afcabca803c682238fe8bc0ef
43210a1bb4c7a5f22a7bbad97ae39c5c64a62fe0
72982 F20101115_AAANYH harris_m_Page_042.jp2
66b1a6f4ae29b2ca7ea085f92bfb346e
c27aeb831c31265c7bb80b291323161170348c9e
131915 F20101115_AAAOCZ harris_m_Page_176.jp2
222011751f096841ef7e7445aa4f60c6
1705f23d583775ed05e93c1bc0230a1005f109be
490874 F20101115_AAANXS harris_m_Page_025.jp2
02d12bbba0e8abbd2ba1681c9b5869ac
f9bea0933d0111ffe58816ceeebd7a5544d580e2
F20101115_AAAOEB harris_m_Page_021.tif
f611a8b39d351fa0c2c0160ab7c693e5
56a7b21c7d67eb846f861179c38518f3f7332352
4043 F20101115_AAAPHE harris_m_Page_163thm.jpg
135e8f28a6f139e502b317f58b96de04
8e73e07b99c3aa80535a42bc1cb6f3799a598372
6730 F20101115_AAAPGQ harris_m_Page_153thm.jpg
e99064019b29bc306bafddfda6fc4ede
d0ea88ea0bdfc0bff929151369c44e73d0c4987a
F20101115_AAAODO harris_m_Page_007.tif
40def3d843c67b54ed7e5ea224c5e9b9
5fd3cc21ec4f6ea31e72b17e9b7d88085ae1150a
116974 F20101115_AAANYI harris_m_Page_043.jp2
194a725b6de24da306d5c9b1a8048b79
a0bff08113afdbdf49df134ab23b91e8b2ba0832
668786 F20101115_AAANXT harris_m_Page_026.jp2
2344dbcf68439fdb09fc95a743ff1343
96b619e94623ab54c735926821cdc0bd93c7fd87
F20101115_AAAOEC harris_m_Page_022.tif
121cd5b2d102d9b3dbc8d5e4b34270e7
32445266bb8f483847763553d82ce4fd08604f7f
19782 F20101115_AAAPHF harris_m_Page_164.QC.jpg
6bb2000a8d5322565dae97ae9c8bfb5a
490ba54b6d3e87bc712cf34b95a44a84ff9462c7
12047 F20101115_AAAPGR harris_m_Page_154.QC.jpg
05ce7978b19856b18a64df85a58521ce
304cb8d844b20eca639ef5df2c26b6bc9feae6fd
F20101115_AAAODP harris_m_Page_009.tif
ec253839efbc173ee3ad0860e7e4be3c
c91a0d853aa1a9cbcd8125af58798e29f16f542d
132262 F20101115_AAANYJ harris_m_Page_044.jp2
4dc239dd005d3fc2513d53716512e6a3
073f41dd61e895c2b300f2e30d4fbf331a43bd3e
113443 F20101115_AAANXU harris_m_Page_027.jp2
c82aba939adcd91b8ef7218e10ae3e5f
4e130c8be444dde2209edb3069413977bc3fb8f7
F20101115_AAAOED harris_m_Page_025.tif
40bda353ed32dad62b1cf3169ea9fa79
3a85fc2945c47fc7e97f8d743df68388718e910d
18389 F20101115_AAAPHG harris_m_Page_165.QC.jpg
30686d07bb3ba90029a6d48d608562e1
e803277dc752d3d3fdeab8465516674641653600
3400 F20101115_AAAPGS harris_m_Page_154thm.jpg
bc946c34260a1cf526a2917c36e05553
0bf17334f912130479f779ab484715b77e23054a
F20101115_AAAODQ harris_m_Page_010.tif
1d8751c379d60c973669154c42f9cb4a
6f0bdf347d992daafb5178d42e9e63e6cedb4af7
118080 F20101115_AAANYK harris_m_Page_045.jp2
cd914b874016464b7008a68db0b7907e
9de0dde94d6e2d7a55d46721d4c7f9ae00b6cce5
771564 F20101115_AAANXV harris_m_Page_028.jp2
1a836a453495c1f66637623177121001
6a2c84ad162e2bc0b61f57f0d0afdd1b5ac0e8ae
F20101115_AAAOEE harris_m_Page_026.tif
2c4d6d9f1c339cb831eee9681c6d7641
e88f0e0876d0875203cc6dce6a9f6b45a92064d6
4854 F20101115_AAAPHH harris_m_Page_165thm.jpg
11dae71d659fb21141355710101b1db9
72664bc45877ed7e79f38833c9529b9f1b3bcea4
19468 F20101115_AAAPGT harris_m_Page_155.QC.jpg
69645396ecf20bc386e64853ba0e9750
f5217c5680ca8de6df466201f5495ce54b2f424d
F20101115_AAAODR harris_m_Page_011.tif
01325915fd3320ce6606b6fd5379d948
f6636b1e21c562d06fb3f3150e14e83427e9db5e
107198 F20101115_AAANYL harris_m_Page_046.jp2
e1ca0435bbb79110dbb4cbcd9fef58e2
243762da057cb83cb674f5afffe3b29e8a48902a
112133 F20101115_AAANXW harris_m_Page_029.jp2
40837ed5b773573ba21e1a3be421fb50
bcdcae5ec5b896bcf26ad010b4c6ecbe0c2a7fee
F20101115_AAAOEF harris_m_Page_027.tif
1726994da7765fd02ac67869fb522d54
143a3edfb15e453d14b925b73c16340dc9bd6508
17311 F20101115_AAAPHI harris_m_Page_166.QC.jpg
a30f71f65ed5d06839aa3418af182676
3a6df76c2575e7cd19b53e1177edf6b783e021eb
5294 F20101115_AAAPGU harris_m_Page_155thm.jpg
d6107470107e48c9dfed767f2250fe2c
2e2e32d0eae28f9023279fb7ebfbc8532d56e5b9
F20101115_AAAODS harris_m_Page_012.tif
20ec49a6727f6308f3420b31b2a857d9
6b6c2f1268b3dd625908e58a916d2c76af0f1598
109888 F20101115_AAANYM harris_m_Page_047.jp2
1de12e0744d3c773e52c5128c9f1100a
e8e84441f0f95935f3daf9798a20126c09d669eb
118757 F20101115_AAANXX harris_m_Page_030.jp2
41663fea2e0c80efbda04bfb40416657
34ad2869897283b3151006ab287d3237767bd736
F20101115_AAAOEG harris_m_Page_028.tif
be1e232642cc82a0f6ebb01d13409a2f
fbbe8087583ff8a2b54152f7285d739aad2049b5
113183 F20101115_AAANZA harris_m_Page_062.jp2
11c965b2587ddde2263a3208f31712b3
1551041029fe1081f942e22b244731cbc942e071
4661 F20101115_AAAPHJ harris_m_Page_166thm.jpg
b5f8e12d2d9ce466e1140e151b778300
42ddfa0abb934dc1d0ab81a30d18075d019e2c32
5651 F20101115_AAAPGV harris_m_Page_156thm.jpg
dd1f611f6638854234d5ab2a35a4360a
9eaf4309328f638a54126a79c0582fa0cf329237
F20101115_AAAODT harris_m_Page_013.tif
ed7b411d57c0126549493d83b1ca9c12
5479db8b8357c7015ecbbe03a6e9d911c2a62153
111060 F20101115_AAANYN harris_m_Page_048.jp2
d54817bcc202e6423fc0f731856d7371
8b919905e73fd285d82eb16c61eab6c40d89871a
120996 F20101115_AAANXY harris_m_Page_032.jp2
d34b5eeed99e3a30f24e0d350bd9817d
5d1f6df2302eb0c2a3d51a6fe47b4432735d74d1
F20101115_AAAOEH harris_m_Page_029.tif
d61c0af0a76e5214dcbf9bd7d81067fd
562c436e77049ad8a82fd68a6880e5064f414441
115062 F20101115_AAANZB harris_m_Page_063.jp2
46da5cecbaa12024e0515e98dfa3034e
d62bf56a7aa42ecc9312e874963ea4ff2251cdc7
21375 F20101115_AAAPHK harris_m_Page_167.QC.jpg
e2e07c1a53fd16c6b3cc625f58a3fe03
cd279c551322e4c01c4b9db30c98a69772d22a2e
5900 F20101115_AAAPGW harris_m_Page_157thm.jpg
a4718ffc9fbc33123b6bbeece65c2e6b
f0b5517d930e666f6329d600dd7d396c83c8124b
F20101115_AAAODU harris_m_Page_014.tif
7b6940122aff92d467a702f1c639df65
e15585107b7d4622504a77806b5b80d2f5de773a
67215 F20101115_AAANYO harris_m_Page_049.jp2
325b08610225f81251c7c051d0cead8f
b94fc3543c66c0d0998a5c8986f0685176b1d95d
978512 F20101115_AAANXZ harris_m_Page_033.jp2
0a5ef5951718cd3212bf07a209551756
a5b27452450e2cb4d96bdb3abbbe88c2251630db
F20101115_AAAOEI harris_m_Page_030.tif
5ae38173fba30d1f71951287f58d3e44
f61f8c59e9bf45884b4934ef97c6b2d54120ea91
93705 F20101115_AAANZC harris_m_Page_065.jp2
9805ebf4d904a2de52149f648ed5b6d4
f4d88fdab815c08ee221a264c57067ec00c9ae2b
20801 F20101115_AAAPIA harris_m_Page_176.QC.jpg
28f239fa24f429b72f99ea4634f65f92
4ad33ced9a3d3cbe15075a68374b4e241158a2c8
18008 F20101115_AAAPHL harris_m_Page_168.QC.jpg
41273683c19380f458777d2ce1e53800
98725e4e5326b459364b743adf7687b67946ae83
22849 F20101115_AAAPGX harris_m_Page_158.QC.jpg
801ec1773b1998446e81b504e16edde5
ce6ee43b0c3f9d40305c201f39a7512036e713ad
96974 F20101115_AAANYP harris_m_Page_050.jp2
92e745d04321f9807f15e7bd43be465e
aad804a4b201cfb04a06c18c1df7aafc3be0eaf5
F20101115_AAAOEJ harris_m_Page_031.tif
0d1ce2ae848483d057c95824b9d7623b
0752f9b3d1fa86c0ac5219b2ea0d05e8aaafb3ec
106919 F20101115_AAANZD harris_m_Page_066.jp2
08c4e88d7e155e88f196d9b425b9b71d
744ae408d7b64fa69fad6d6dd3e0eb399d21f1b3
8423998 F20101115_AAAODV harris_m_Page_015.tif
5e649762c642b3320da95cd88b548e2c
51668361838a2ca9409ca13c9060904bce9fde9f
4969 F20101115_AAAPHM harris_m_Page_168thm.jpg
b4f818ededb7b788c6caf986a8c840f8
7588a3e0b3d235234c31b1bb38a3c678f5895bae
6093 F20101115_AAAPGY harris_m_Page_158thm.jpg
8a20ef17ddb5ed085d3c708d31734719
1bbf04991c9ff8eea2fcc850a560d1b33ad4fc5b
110862 F20101115_AAANYQ harris_m_Page_051.jp2
b358f955e6c493fb3684a30392bd0cd6
891d8a9deaa85372d95b06d34af2c7ee763cb504
F20101115_AAAOEK harris_m_Page_032.tif
d1d2ca578a650613f58fb6339c0bd85c
040f014644743dc6bc7d9b3de2d0f70ada848528
109219 F20101115_AAANZE harris_m_Page_067.jp2
5cb84fb4bde7fe467b30a621fbcfe524
e21b198f7c6f2b3a41c1ee93c1391b6082da25d1
F20101115_AAAODW harris_m_Page_016.tif
13b27b7c6ddab67df1792665dd70d306
05ba7dc2c5501b4c188057eaef3164fa6533d2a0
F20101115_AAAPIB harris_m_Page_176thm.jpg
39d25a0948aafc4385f5d8c8edee1e77
ff5bd8a3e9fa4e94171a48063650013666ae0e6b
7676 F20101115_AAAPHN harris_m_Page_169.QC.jpg
edb9dfd939c29ed0322379d897925862
e7aabb2345622b24a4c6d8b052b7f9c943786f51
5287 F20101115_AAAPGZ harris_m_Page_159thm.jpg
53a33f7f596f28575df8dfa2f65cd2cf
497f13ac3a7002dedb33bca4d301f623a811d228
122828 F20101115_AAANYR harris_m_Page_052.jp2
ef50588c55d3f15e8eca48f2b5e8c62b
aad5a12d61cae8024b859405b599e1625c4b6e90
F20101115_AAAOEL harris_m_Page_033.tif
2907ceca95d80ee912a6b557153135d9
7e0a4ccd1cd5e9639ed45408d0c5359fdb5a8c04
110623 F20101115_AAANZF harris_m_Page_069.jp2
7db94c137537d9c47d62f98b0a0145a5
679440d80fc45199b08ce4d97eab69fc668adb42
F20101115_AAAODX harris_m_Page_017.tif
4a80731633c05bab02456eb390518770
4fac287c3e0c8a93c8acfd77be443bdc53b6b21a
F20101115_AAAPIC harris_m_Page_177.QC.jpg
772c06c0800cc1525441fb0445df9dec
2b1dfda0298678822f6a428d449f8bb7fbe3bad4
2495 F20101115_AAAPHO harris_m_Page_169thm.jpg
29c60153d3a06117d970cfcc48433f19
c4830cd9b732a11a3bd81d728e702fcaec01368f
110075 F20101115_AAANYS harris_m_Page_053.jp2
58cf4953c7413a5edda0a2d1265cf0aa
1c5464731716f442f9b0e254ea1eddc78cc2b5b1
F20101115_AAAOFA harris_m_Page_050.tif
256f17917ac1f77b9b40f855c4ba8ffb
58e9d9e3e0f87da5bb5469f73fec50b56d280816
F20101115_AAAOEM harris_m_Page_034.tif
2d9ce5103b95b1441b194fed0feccef2
b9625414c2ca8c26f608b93cf30b17c126697fba
14761 F20101115_AAANZG harris_m_Page_070.jp2
fbf1e02d8a4e3742eb5d218d878d4561
3980c75b8823425322a3b07a1c7530bf09b1ace5
F20101115_AAAODY harris_m_Page_018.tif
8feb4d00e94dcbb0e4cdfe108be72229
19cf73d7bd0ef9800be0eb3777e9876f63b5b5f6
5345 F20101115_AAAPID harris_m_Page_177thm.jpg
49cb06204498eb3f0f9b112d476a1c0c
829a223f7f555060159ee534a1fbcce1059cef7d
18813 F20101115_AAAPHP harris_m_Page_170.QC.jpg
6b39e91c637bc2e09352cb9a96f77d3c
1b4d03f30592e1fa1d80dd911ebb4e5067934a3b
F20101115_AAAOFB harris_m_Page_051.tif
b9b8b57229babfdf8edade846fbae4c1
30152beccf01edd3bf2332c447558400e80013ab
F20101115_AAAOEN harris_m_Page_035.tif
9d133483fb815e74ce6dbfd0162c6329
71f278afd65bed9b78d7834f33c61015f27126ec
367336 F20101115_AAANZH harris_m_Page_072.jp2
9f427e80c6061c33d74fc3aa622f460b
160d6eb9caa642d61d0b9cf05255ca3a4e79d88d
F20101115_AAAODZ harris_m_Page_019.tif
fc0b53c515bc76319d8397986db18573
4dcd5507d5d3899859a8ebd312823511a9406c4e
14069 F20101115_AAAPIE harris_m_Page_178.QC.jpg
20fb0edfdc654f94b14d72be759b6eab
f5308f033b21791163b540911eae1848130f5384
5076 F20101115_AAAPHQ harris_m_Page_170thm.jpg
929aaa51a498873b0a52d639c3ea3de7
1becb8526b4f9ef59adfa99c0793ba7cf3df95b8
101218 F20101115_AAANYT harris_m_Page_054.jp2
779ec7c3ec768cc1a4d099e982cd9a16
c34361cb1ec08e9feb4ea8d6141bfc4fbabf9433
F20101115_AAAOFC harris_m_Page_052.tif
ae23f0747142acf4753df693c844c2b6
8ed522c0222cdd02d2de8381217b91bd76b01e6b
F20101115_AAAOEO harris_m_Page_036.tif
f052b99f13dc945bf926d557922a2efc
4aacddb32c8ccd7ba31cb8f09abf3094e4a7c62e
613605 F20101115_AAANZI harris_m_Page_073.jp2
fda5260751e6471c61c5ca1604754467
2c15152e9cf5293e06b222b0fbe42e4f8c472e27
3856 F20101115_AAAPIF harris_m_Page_178thm.jpg
0429abcef9335f2e931d88c3c9b19f1a
dd62fa1a31cb75eace4802fd4723685a904c9bec
21166 F20101115_AAAPHR harris_m_Page_171.QC.jpg
51f6ef9b1a3223b041a86dd12374a874
4dab6626567bbeafecb3baba1246ec7f478e1d10
1051972 F20101115_AAANYU harris_m_Page_055.jp2
a5643097b2c478a98470e982e125703c
66cdf24b76faa73dbc0dd70ce72d8b2dfde0429a
F20101115_AAAOFD harris_m_Page_053.tif
a2824f5886c27a5b30083622b9396049
6fb46203b9c7a61e20cb99964b47a0881fa47b0f
F20101115_AAAOEP harris_m_Page_037.tif
e8e27ccba07c312dd3677aa92d1296fe
08c4630bbf61b5cf047ab40177ec3b08bf8c2f59
595872 F20101115_AAANZJ harris_m_Page_074.jp2
429eecff6461d8ba65e29878766e16b0
e095a7d365bdbbd022646d47216e961278e02ccf
24970 F20101115_AAAPIG harris_m_Page_179.QC.jpg
981270f0e3b931c2c94f25fc691e49ef
b3593aad341b4b8c7f50c10a6ba27023f666eb7e
5486 F20101115_AAAPHS harris_m_Page_171thm.jpg
b23b647ee813cc33d4557f394a4cfd43
f8e6dec4a8d5702103b12462d989cfaa4a1cc8e6
151756 F20101115_AAANYV harris_m_Page_057.jp2
a6fbfe9f0196bcb910c971c9daa214a9
bd9988666cbbcc43ffd29dc1cc6cdc6fb4cdc1bd
F20101115_AAAOFE harris_m_Page_056.tif
2f107af391d3afe29d223681e1ea63c0
a2243c1d5065a9340f1eb3ce61040bee20ebf5d7
F20101115_AAAOEQ harris_m_Page_039.tif
89ebe001d85b7842ce4608f0cfb4b23f
b28b767b157b7977874bca7bc91caccb83432085
488507 F20101115_AAANZK harris_m_Page_075.jp2
cfa797944abdf17cb72955c2751e91a3
3ab1547d3f6ff0d1bdb027c01768259b7ad5d0e8
6631 F20101115_AAAPIH harris_m_Page_179thm.jpg
cdc6247d706710c7a544ae367193e1b7
0040003f85e8eb10c410d99fc3428ebe10f4c4a1
22271 F20101115_AAAPHT harris_m_Page_172.QC.jpg
2f1e6552407c3da1e08392e888ffb584
b5f9d769bd444fc7700809538c294aeb98457fcf
111877 F20101115_AAANYW harris_m_Page_058.jp2
b7e93310b4a3d239ff4832c20371c3f2
182e300790e121d5b6ad9120d6901c1ab582eeb0
F20101115_AAAOFF harris_m_Page_057.tif
46f08c8537e9213b0c0aa95c39011653
be674cbd7d91da6d5bf3079cc1cfffd9fc68dfc5
F20101115_AAAOER harris_m_Page_040.tif
3200b4dec5d6ec93dedfc4f53d5fbb40
1de26d3f1b820aea6dbef498b4c0c89d8713a84e
594890 F20101115_AAANZL harris_m_Page_076.jp2
a9b32d6ff9279cc2a7692f9abb35a2e7
b6531e34bcf608ce3085bebe222d55a0b217e5ff
26593 F20101115_AAAPII harris_m_Page_180.QC.jpg
3edccccceb5039eceda31d616652d462
cf69e730bf534cf213f9a83e21783aa48fef1476
5725 F20101115_AAAPHU harris_m_Page_172thm.jpg
21c6ab69014aeee4f0b57c9f69d10799
b565fbd82f20e9194b23014c5b079e17825395cb
111860 F20101115_AAANYX harris_m_Page_059.jp2
f29d008d992d4649ef6a8f1f9b976d7d
f58305ea32736e663ff9ea333c131009307ddbc0
F20101115_AAAOFG harris_m_Page_058.tif
0c4f55fb4f90847e3e8d4e6002654376
b69477b601c2a7db9fb1f85edbf20022328b14dc
F20101115_AAAOES harris_m_Page_042.tif
dd2d221aa43eb4d5708563cb8b838cc6
3217cd7bcd5e1cda3ec458e142959a54f162407d
576076 F20101115_AAANZM harris_m_Page_077.jp2
c48be017bcbe958ab80497a680b32c36
8d241116983b10cedddc730947f9a0df6fd49de0
7287 F20101115_AAAPIJ harris_m_Page_180thm.jpg
bf074d75ce30a0151c83bad4d0ec5089
4e8b715ceb6646d9bbde9e4966c0fce30ea22759
17898 F20101115_AAAPHV harris_m_Page_173.QC.jpg
33f8ea822be23beb383a8f43a81804b8
2b35dd82126dd9e5c72981ebbe932cc632cfcb1f
113217 F20101115_AAANYY harris_m_Page_060.jp2
03f9f867092763a0277e4bcd96a8843c
f4bddd3788c648c5186a043e4112927d3fda65b4
F20101115_AAAOFH harris_m_Page_059.tif
67bd19411f8451b26c9766d1a9458e39
70cb6a02428a87f1ae3c829d9e89cb1d0408f409
F20101115_AAAOET harris_m_Page_043.tif
8d82a67d2b12ef86db14b613c30277b3
e5db22670e49ddbff44f5674a99fff248ce4153f
117943 F20101115_AAANZN harris_m_Page_078.jp2
06a4d49f8f621c72ff70c54a78d9c9b5
5b1d56b33661593a8f9fbd8b69e29dd811eb9ab0
28201 F20101115_AAAPIK harris_m_Page_181.QC.jpg
e5a60d210c4389c8eabdb4611b73a705
01b985857051173c6abf3547e86a1920f1a4d145
4795 F20101115_AAAPHW harris_m_Page_173thm.jpg
d5fc446c21d1e9f773b5ef7d30ad652c
af02a4221957898484be21c0c9bf120833fdd2fd
119472 F20101115_AAANYZ harris_m_Page_061.jp2
403bd9539e947fe4eb22cde5f080affe
f236938cfc0c091a951ed73da613263fea4561d2
F20101115_AAAOFI harris_m_Page_060.tif
a59b9262288da146bec6b81e0443ee5e
bbea3e6b05b842976ff85b92f6e968efbcc739e1
F20101115_AAAOEU harris_m_Page_044.tif
c0fcaf7c758075eef476fa71bb4848ff
97b88a0f5a4fd5ec077d93d7509fbb1d38f586ab
116454 F20101115_AAANZO harris_m_Page_080.jp2
686d19ef99a6f548171eb6a46b217a20
8728a9d949156b8ba186ca4061100a6ce9618534
7560 F20101115_AAAPIL harris_m_Page_181thm.jpg
f1d379e3197a51d5d25f1220fe8cba12
c9c494b62ec1a0bedc68197e8d27a011ae6e0c2c
22677 F20101115_AAAPHX harris_m_Page_174.QC.jpg
c12f22510bad14398ee82f65497698ce
87f40d419112251f2cb93b31418b8bcbf01f94b4
F20101115_AAAOFJ harris_m_Page_062.tif
96907b36dcfa35b1a9ae12da272a6ef0
ef2fd43c0d904cd94b1370f4aa598f5efbc06cfa
F20101115_AAAOEV harris_m_Page_045.tif
feb8b15ecd435c5fbee60c2fd4030bab
bbbcd1cb518fe669bb14bbe48c56301930f4f9d7
126705 F20101115_AAANZP harris_m_Page_081.jp2
2644c7dcc8e376280fac3fc4e4f880ac
eb2a44bb18fef045b03104771520e7b0c615f03a
25377 F20101115_AAAPIM harris_m_Page_182.QC.jpg
f5558f9ef30a7a534033c28a6cf24868
1948434b8fd9a4047387e4114bc54ba0abc80171
19314 F20101115_AAAPHY harris_m_Page_175.QC.jpg
152fbbd5b9b2e995c4712b1f884b2a6f
f56cf0e5a77bb8717f9ea3ae0819af8657e9e35d
F20101115_AAAOFK harris_m_Page_063.tif
4aac1d94765c55da0659f542910b4f64
f18544102d1793b24098b623b5918746cd6993a6
F20101115_AAAOEW harris_m_Page_046.tif
7bcf69c96e68c8fa7bcfcce67ab1f0d1
c2330d3c9cabd26e9ded491091b1cd2611a2275c
112137 F20101115_AAANZQ harris_m_Page_083.jp2
b3f1e4888dc7cc30722f4ba320a05d55
9576183734a9cd9dc7acc624779bf479397d0ab8
F20101115_AAAPIN harris_m_Page_182thm.jpg
033da5c79384d33bc66d9724700f965d
c18e08b6ec7d28c29b437c2dc150afc4ee0549ac
5129 F20101115_AAAPHZ harris_m_Page_175thm.jpg
3eaf1116ce6ff5a444df7694d00b7896
9f54998d2d3255764acc55b1442700d375dafbce
F20101115_AAAOFL harris_m_Page_064.tif
0e3c8a2751d75429c77976b1fc177e21
3cf3ecf8485c28d7fd942f01f4f11d3c31ad6a45
F20101115_AAAOEX harris_m_Page_047.tif
634eb5ddf485f56cd89bd5836b351a47
58aacd9844de348327dbe087db06f28e4c40431a
119690 F20101115_AAANZR harris_m_Page_084.jp2
e433f67ea9a18f27b7673ebad1172c51
40fd23f9692956b60d6562d1a9996e22cbbc5480
10200 F20101115_AAAPIO harris_m_Page_183.QC.jpg
641b2db8d442d073804ccc3572c4015a
0d06a9d9c517019a873780d3d6e9f56db03e9fe5
F20101115_AAAOFM harris_m_Page_065.tif
267ba76d3bf107643332f11dc4e4eae7
adc359de5744900d8f59315a896944e9d1b54203
F20101115_AAAOEY harris_m_Page_048.tif
6e3b41d73d58755a29234d4ac9505b28
b1f929cdc3e3afe6c2232532d7ac8ae97d579ee6
92223 F20101115_AAANZS harris_m_Page_086.jp2
c0ca122659edcafbfa3090d9d493ff08
0d58def33d022716efc1cd1a68bb9402d7c978f3
F20101115_AAAOGA harris_m_Page_080.tif
c7b00261128a0b231a5b357b2b51a280
8962f59579ec9d418f22d465993e02a8e7ddbd48
3052 F20101115_AAAPIP harris_m_Page_183thm.jpg
35fb509d883d216d2173d5af8e906b09
e1a6b1b49a8628619925f4f731b04be79ca0363b
F20101115_AAAOFN harris_m_Page_067.tif
fcc2b6f29e3b6454679d0d9724aa5b98
29afa6f19dab7a22af5cc540c52ff42b10358121
F20101115_AAAOEZ harris_m_Page_049.tif
7523e645585f5cbadd365f5ab1ad9d9a
ca3cebc4bedf06b25fcdfdc2dc652720f37127be
1051959 F20101115_AAANZT harris_m_Page_087.jp2
d3b7fdfbabd3f673a6436d20c867803d
f43234be8851e12be655d9636e9d3457629fed56
F20101115_AAAOGB harris_m_Page_081.tif
faf05d8d26c849d4132d6489fe689173
39f2c1824c16979d885a03e46b219c01cb657a93
17797 F20101115_AAAPIQ harris_m_Page_184.QC.jpg
9277c7c12ea139928424ffd7702169b1
626e4d06a9c8e92db334db03e412119dee4778a5
F20101115_AAAOFO harris_m_Page_068.tif
9b4a180bed59b5235659eeb6f009dbd6
298c4fcc872e62ba19bf4079f25066505a854f05
F20101115_AAAOGC harris_m_Page_083.tif
9fd45ef185a4352664585e6a0a193269
1e0945a92683e8d687e7790c80da7aa1580e35fb
5021 F20101115_AAAPIR harris_m_Page_184thm.jpg
ef03186dcce5aacbb7ad712f1a92235b
847d314e1acb3e243377ff878be05be62f10abf2
F20101115_AAAOFP harris_m_Page_069.tif
406c80147efa7d53244ec840cfbe0ecd
e9564d287ce529159e357b0e24aa78caa72e0272
157371 F20101115_AAANZU harris_m_Page_088.jp2
8771f89d526178b0852e5f2b6480124d
96eae5375fa4c46324ad8f45d0c0fe005cb38cdf
F20101115_AAAOGD harris_m_Page_085.tif
12e21fa227aebea29ba51b494c79a953
581a3da8c8332f7d0f2407de98b8c33d69656f7b
211594 F20101115_AAAPIS UFE0021347_00001.mets
d025cf0b76f0c7339d035d1afea0e34f
fa71f8c80b078bc132cfccc376b6ac4b16fbc0c5
F20101115_AAAOFQ harris_m_Page_070.tif
8086c0c411787e6ef566d79edefdd9fb
68351df3ccfc87f97dff6b5fcfe1d48850569003
114086 F20101115_AAANZV harris_m_Page_089.jp2
3cd95b641fcfdaea26f96be1235d18b0
9e4a3abc5fad3aac2d1bbafb3b43440ce9659662
F20101115_AAAOGE harris_m_Page_086.tif
24b2322e21bd7488d8bf02adee8b2cf2
9cdb8cdbccd18d1f7173340f80775dab9a152211
F20101115_AAAOFR harris_m_Page_071.tif
4402a7778a1171b26842a6cbe3a31214
41afbf193315ca5d663896aaf5190dbcd4813ce9
115843 F20101115_AAANZW harris_m_Page_090.jp2
16734bfd5d35c0a5a75c18853020fc64
95587084e1ab386c324e22cb8d0cf557eddb48ce
F20101115_AAAOGF harris_m_Page_087.tif
4a58026648a6ff46dca49a22605b5ff9
5e76fe7c20fd442936121f16f370212f3255e205
F20101115_AAAOFS harris_m_Page_072.tif
c130086f8f1bc4a769143afb8adee911
c41fd0b32272a6852a160390a234fb72c3edb823
110846 F20101115_AAANZX harris_m_Page_091.jp2
97d61bb88a58fbbddb9fc0c233d32aaa
ea4e200057ed0e1b25c2d0f6003aae0928f988ba
F20101115_AAAOGG harris_m_Page_088.tif
1517e5b6f39b063120eab63453ae31d6
f331de7f2917cb134c82b2486db99166d39cca6d
F20101115_AAAOFT harris_m_Page_073.tif
826bd8e150acee847723a13646bf680a
f494f9f4a8951eb296af61619c9663d074c2f9dd
112870 F20101115_AAANZY harris_m_Page_092.jp2
5e9e19da2b3daac60512d0fe4c2bb033
ff624d02f0fe600e29885d80ba69c685a576be99
F20101115_AAAOGH harris_m_Page_089.tif
050722fc84bbf999c0554c5432be6ebb
507b8cf1958fc77260b086db8681e03af87556d9
F20101115_AAAOFU harris_m_Page_074.tif
51f1fcf2bc365add41d3c9e3bfca114b
8160daa0540eed897bd5ef76eea389f7a915a883
116103 F20101115_AAANZZ harris_m_Page_093.jp2
035c8d6b61257199ca80f37e5920aa11
5dafed8078e08faf7a331bfdfb9047473e868bbb
F20101115_AAAOGI harris_m_Page_090.tif
54678c80fe24e98ec9fcec27ed29e4f5
706735c08e166f2519ba285460ee1ed69547de79
F20101115_AAAOFV harris_m_Page_075.tif
58597838271055425f90026e9ffd8a52
ba62ea80b81107c76513ce081f9ac6a92416c069
F20101115_AAAOGJ harris_m_Page_092.tif
00ec29834138f9e47696dd9ac3dd546d
1c333a7cbaea1430a3d160f714dcb5938ca9e8a4
F20101115_AAAOFW harris_m_Page_076.tif
a1fc2ba1a80bcca3b011345fe7c28a4f
b90f9d43512160ec6618c929d2380631d6e9b7ff
F20101115_AAAOGK harris_m_Page_093.tif
ee5209b307bd4de4f1fcf72291967237
3e7c1ef6c15caaf43982ad53b55d8796c1261d5b
F20101115_AAAOFX harris_m_Page_077.tif
ac43fe4291861aecbf320b1ac7a554d4
fff6cf99c3275ba145d9541124d3b67aa870d5cc
F20101115_AAAOHA harris_m_Page_111.tif
eeb65d221f38ed64ea96832c87526742
33aaf12f167d5f91d7cbcb3cff2e6c680f8023fa
F20101115_AAAOGL harris_m_Page_094.tif
5e114b154a953f2505a59baa37b3977e
80a4ade73bf3c5587a9917457b607ab05511b282
F20101115_AAAOFY harris_m_Page_078.tif
36bae848b7bb6bd1118c3e25a78ae586
ac4fb8605024f240017d9c18e4d16d2987417e4f
F20101115_AAAOGM harris_m_Page_095.tif
57e3dbe001cc522452c49012f460b876
e95dbd817f1274a5feed0e5c12e4f7cad074218a
F20101115_AAAOFZ harris_m_Page_079.tif
01294f0373c2dd778dbf8d901ce78d57
be648086c9c9cc486b2251b09933c759ee4c8b5e
F20101115_AAAOHB harris_m_Page_112.tif
3f1b74e2b5c363f917f1de737b8f5387
b373b4509385cdb7421e73a5d1c3022a5f631b2c
F20101115_AAAOGN harris_m_Page_096.tif
70c4de656b4b5b909b6812583b4aa72c
383dd4ea3919b457b2525d8aa4c80e02b4eb1447
F20101115_AAAOHC harris_m_Page_113.tif
c36ee7c1e6947be33d623457744b5d59
a9224a38e78084ba03006347047e48aa10cc03ce
F20101115_AAAOGO harris_m_Page_097.tif
c288917a987a6814fd609ba722f3265c
bf54f90ed847b54eb245f078770dd5933d9af729
F20101115_AAAOHD harris_m_Page_114.tif
52e72557306610fe6cb5f83a0453666c
781e68c8e134d83fec6fc4601c0d21c1af27a190
F20101115_AAAOGP harris_m_Page_098.tif
1f77b3a7678864c8dea6876b72aef378
5be649087d57532812e0a45d0e7f2b38ddb7ea2a
F20101115_AAAOHE harris_m_Page_115.tif
17f70e00b853359a1c78f0d91599c6fb
065fc546ed8c31687e17db9999dfadb0ebc1c167
F20101115_AAAOGQ harris_m_Page_099.tif
8600d84d3294fb2bb816c50a63cb9790
841b81e557ca8f47818dbf9de569942d4be2b6ac
F20101115_AAAOHF harris_m_Page_116.tif
27d90e5d68269244f1bcbfd8664216fe
1736a45c5ebb89a7b59088085d0a4ba3f806000a
F20101115_AAAOGR harris_m_Page_100.tif
6da459fcd3c84f1a9b4457d03733ab07
ab2be269bfe4933592656cb3ac2e507658709019
F20101115_AAAOHG harris_m_Page_117.tif
343f4e0e599062a75d05271d324e3a43
da2ad1899599c7e571473a094e69ec7646c1a6d1
F20101115_AAAOGS harris_m_Page_101.tif
8ce5ff1895576a7f17ca7b5b7ebde476
c6123f9a4bb7d77b49a524248e519e51e9feeee4
F20101115_AAAOHH harris_m_Page_118.tif
448a060e6f80dc07a7c19042ffa000f8
3b2dfc1b8e202205aff3a817e275ab09a682cd78
F20101115_AAAOGT harris_m_Page_102.tif
15df8e07bc99c2da57121e54c0392772
7f5692c2a00c951f962ca61538044157819e3d77
F20101115_AAAOHI harris_m_Page_119.tif
1c73c736ed2f88c4f71f4d3b2800124b
875c0d471a102b7028b1c58b21009ce0d189124c
F20101115_AAAOGU harris_m_Page_103.tif
545eb8a024407c46b9309b444889e860
c809bd989118d89334985308f06e6419366e8f25
F20101115_AAAOHJ harris_m_Page_121.tif
3f491aceede9735a643331f29351386c
f21c01060969108dc280e62fb13913224db0aa9f
F20101115_AAAOGV harris_m_Page_104.tif
41565f3e1e33d39e53518c9c760aa013
c0bae56ec6485924f46022d8283bfc3455d0ea1f
F20101115_AAAOHK harris_m_Page_122.tif
790275e1f3a453d7070937771633a637
5e5057ef03ee0989eeec318a2cde8380f19e02d3
F20101115_AAAOGW harris_m_Page_105.tif
fcf7eb80879eff2193d484957f92d9ab
ed26092a4c659bd4af7343f17f83eeadf6559eec
F20101115_AAAOIA harris_m_Page_139.tif
ce378015fe712cd26a2922090f91e8ff
c93afcb78e07fc4fde9c38cd84e8c426fbe7e37a
F20101115_AAAOHL harris_m_Page_123.tif
af6974c9fd9651be5a46d6480da3b7d6
7cf53f70e29dec00c031c813ca63c0e21644bc7f
F20101115_AAAOGX harris_m_Page_108.tif
ef37234d85d8deabf2323f5692b7eb2c
a890469507e85a5f6b21e9ec1dd584c1a990fa8c
F20101115_AAAOIB harris_m_Page_140.tif
b3dd6de9012d45bb42f80b9c1d3cc739
601440a55cbbb4e904b9e8adc4aefde76341a9be
F20101115_AAAOHM harris_m_Page_124.tif
b849327ea3a97546ce2d3778ff037430
fb1f06a113a34455a9b11a38b5a16ebfd73a5810
F20101115_AAAOGY harris_m_Page_109.tif
53a3d143c46cdbea2fdc72c79fec5011
6cdb656d044b7736fb87da737bb259e2b3f7082f
F20101115_AAAOHN harris_m_Page_125.tif
00bc84c052365a1e2e8a5adb90915aea
7c4aa03879806e57d67a2583e2e1834c0de11d55
F20101115_AAAOGZ harris_m_Page_110.tif
d26f0b71e7cd645fe63a316500ad9539
7e0f26d6a4f5d547ed123e563a63c9d7e777edee
F20101115_AAAOIC harris_m_Page_141.tif
0fa9375e434f607b0a8848dfe16abd60
bb6a41ab7972b48d41f9c5a196acd861ff585a1e
F20101115_AAAOHO harris_m_Page_126.tif
59750f0c447bf3c30545aea447b64ef9
68a257bf611a8b903f199b0ca828e0a67896b968
F20101115_AAAOID harris_m_Page_142.tif
21cd4b0d1245a63542840b6f9d239ffc
bd4f44537d06fd3885c6e1bb311bad4fcfb3d90e
F20101115_AAAOHP harris_m_Page_127.tif
266f7000da32d91d9586a5956e8c4d16
b1458883a530c53ae5e119c50638e50adf6a069e
F20101115_AAAOIE harris_m_Page_143.tif
3f8a7ce02b311d5091887248e02b0fd5
3b4b145db3ef5dca1eca578a52d4860ab074a9de
F20101115_AAAOHQ harris_m_Page_128.tif
42eb4797ab0161135e25fbb514c8fa1e
1d1b0d4bbbbdc954c02bc7f69b66372f69d0c8ab
F20101115_AAAOIF harris_m_Page_144.tif
418309381d8e4e0b4cdeb8a38e494782
2872fc8c508486d7896c247ab6407e39d3857f74
F20101115_AAAOHR harris_m_Page_129.tif
bd4467e02d03591474dbaf785bd958e9
34ac4842d3cbdbbde8b305e57e01ce6b2724c3da
F20101115_AAAOIG harris_m_Page_145.tif
cd21f4c96b6b8ec0d9cf60710f833281
ec350c5e6916e913d08af09531ef7a30dc2078f8
F20101115_AAAOHS harris_m_Page_130.tif
98c6312882fd66085e95c7552e26bbfe
a8d178d201795da48ac8a0d995b56d11d7d99cb4
F20101115_AAAOIH harris_m_Page_146.tif
f3a82b2f28ff93e6812c6e3d1e084bf2
85e89f21d5814df4eef69734d4e5a4f7089fc475
F20101115_AAAOHT harris_m_Page_131.tif
c02a9b56f228cec6a88f576c28a10b8e
9e08b1ccdb7711dc0ce0e0d51c2902fc72a965ff
F20101115_AAAOII harris_m_Page_147.tif
5d96b5d0812afa7b6180a170a83a7167
bff67287880b2184aac709b4fc6ad679464c5698
F20101115_AAAOHU harris_m_Page_132.tif
9953217b6c3bafcadbeaaf20fc7df1fd
9b3ba3faf7406dd8a864a455c5bf41bffa42292c
F20101115_AAAOIJ harris_m_Page_148.tif
e2fdfa559931b7cfa4e34d3094b44731
c8d8ccfbbc577aa071f8b19e21efa9b3b855847a
F20101115_AAAOHV harris_m_Page_134.tif
366708d3b9f5d6bdb7011b2b02bb8204
8834a91d150012b145016f92340676bde3a82521
F20101115_AAAOIK harris_m_Page_149.tif
8dda18151771b3b90f7c9a49fee375bd
5d9c7e1115489d3ecc425f3bd93806858b45c19c
F20101115_AAAOHW harris_m_Page_135.tif
f4390a751847cf414ceaee55b8c8d288
bd0f82f6cf268ec3fa77352a5bddb6153895122c
F20101115_AAAOIL harris_m_Page_150.tif
fe9863b5f7a8bac982cb8fc0adcc7f76
00faeef926dddf63ede715fe90386bc702f49db5
F20101115_AAAOHX harris_m_Page_136.tif
fdd7cef8c0462aa742d0748f8541dc17
f61a3939e8d30b9834a9685547e38a2e70c4e2f0
F20101115_AAAOJA harris_m_Page_166.tif
b0f75640a70e6e28e572ce290d26c84b
aae210bbb9f35899d84e851285d931dad6b8d10a
F20101115_AAAOIM harris_m_Page_151.tif
c78b307bfaa106e5a6c6799518dcb507
789e68ee1c128f9d58bd6d270392d0dac34a541b
F20101115_AAAOHY harris_m_Page_137.tif
682d4ab51e5130168e3df9876bf456f1
11b290e39ce2e2998b909565addca54a3363b4fd
F20101115_AAAOJB harris_m_Page_167.tif
beb11c2bbe8c17f9fe6f948670097433
46e2ea9decbb9ca035db7638a7974f9522a5fded
F20101115_AAAOIN harris_m_Page_152.tif
550807cf4ce599beae37bb94110efcb0
8ed18e0d5f0517251c5add7a85a56718cdfde6a8
F20101115_AAAOHZ harris_m_Page_138.tif
ebbf2c4a1fd96bab09444ce0f9450361
1439198af27fe48003d10953a8e56667806bbcab
F20101115_AAAOJC harris_m_Page_168.tif
61d46838925401c372adefb705dc8a9e
5e904fbd6459325cdfe460fe4d79d5baca306ef6
F20101115_AAAOIO harris_m_Page_153.tif
eeae0f9fe03335bc39df25412e105619
e8eb604ceb0f5db301f56d50534c59bf7351ca03
F20101115_AAAOIP harris_m_Page_154.tif
5e118ad58206f2fb33e5b2527530b23d
5ac26756dc20c6bb66758e3bc267dd17182fcd58
F20101115_AAAOJD harris_m_Page_169.tif
c5a7011d74bda6a2e80f41e05d8de37b
7e8546b1bb91f198b7c578ce622ef10b161f9b9a
F20101115_AAAOIQ harris_m_Page_155.tif
e6ec959f732ee1694784e9894902356f
0fcd09bc0440de644539421fb75b7fc3c7cf448e
F20101115_AAAOJE harris_m_Page_170.tif
82144f8a50bf7211d44a449df599f8e7
a3a424d5eb37b6715d161b39203481b3d36c26f0
F20101115_AAAOIR harris_m_Page_156.tif
d93b69171c6f04937f4aa6a2b817c0e2
4bfb363b159d2181a81069b3cf1605ea0ea86a15
F20101115_AAAOJF harris_m_Page_171.tif
5a79ae0de0f5317225ddd35904865490
210f923345a97b1381ea00a4543d1e385b070b77
F20101115_AAAOJG harris_m_Page_172.tif
4e2f5211363552cf2616bce34a25181b
1177449502e0f9034dc0f01551f3470038bec22e
F20101115_AAAOIS harris_m_Page_157.tif
e7e7a08f861ce10370c4fa4f349fde4b
1f9bccd011612716d7b93101f3487a31461a4b30
F20101115_AAAOJH harris_m_Page_173.tif
28d53229b4167b7d707d9bb2b49df8cd
0a2ae10683fa24349a867729946ab58b187dfb1d
F20101115_AAAOIT harris_m_Page_158.tif
4f6973100e3919ed4b27a29eb0814f06
01707da56d58be4c9cc0dffc6674fb1d4b0ed2bc
F20101115_AAAOJI harris_m_Page_174.tif
a10eea4050757942d19c73c27c430e63
7207326e9f471943c540df729bed07807aaff435
F20101115_AAAOIU harris_m_Page_159.tif
348a2a843be96d1daa7b8a4e7fa5e465
37e93438feffa5a21b9c2ac649e7cba45dbf26b8
F20101115_AAAOJJ harris_m_Page_175.tif
e10b13aa8a490450ab7084b5f236ac89
c6498be220a64857ebad2c4f3c8982f695b90aa6
F20101115_AAAOIV harris_m_Page_160.tif
fa8b4d285668f95e1ef173049d4171c5
68a6cc4d6f19326efb9ac33cce2ed94db4a3c812
F20101115_AAAOJK harris_m_Page_176.tif
af5e1731e1e0305406bcc08c2e32e858
fe170c3617cfab3d22e9d0b7c6744aa28ecb6890
F20101115_AAAOIW harris_m_Page_161.tif
446cfcad5e826a03dfe903a5ea51da6b
0bbc87990e02d21224a9c11578f4161260f6e29f
63764 F20101115_AAAOKA harris_m_Page_009.pro
afbb0ddf8d9348308e9d8d5f4cb9c82c
510e96220bd6398fa94b0780c4a5b87b21988244
F20101115_AAAOJL harris_m_Page_177.tif
0106b6dbbea38d1e78f99a571fc6f594
4616ee452a23c78f7bc37774c518811cd8123b52
F20101115_AAAOIX harris_m_Page_162.tif
047e73ea898bfbfbffa4860af8a668d6
8aa8d53aada053a47ea29364e8a3772382b0b093
60884 F20101115_AAAOKB harris_m_Page_010.pro
b3bd63b68c487943ee98cac3cc7f087e
a07bceb54bb8f3c6aa8094c6116b98e2ed7afe79
F20101115_AAAOJM harris_m_Page_178.tif
fa4b924e9f6b16d8913477016ce099a6
45cb532c04275155d7df9e95ea13c84b599be3ef
F20101115_AAAOIY harris_m_Page_163.tif
c7766356d3b3f9783eaca441bcdaa9aa
ce67be1c424f5c0a40bf0fb7d67bf09844a9af57
8493 F20101115_AAAOKC harris_m_Page_013.pro
31a0dcbaf87873bc28742be84e5b5d3b
8d3af65784bc656483ada7281d759af9e2e50dfc
F20101115_AAAOJN harris_m_Page_179.tif
c6fc1e8e068db61a80c91f95155971dd
a9b8969ec62230cff783cd8ba1bfc11b065a14d1
F20101115_AAAOIZ harris_m_Page_164.tif
974c52607ee69383852723487b0dadfc
ca9a498bf50c824f5f339c706743a9a6676237ec
43146 F20101115_AAAOKD harris_m_Page_014.pro
328505bce9f322d45c54e6f154afe535
af326c2d13b44b7d1f5d57def7484ff0a2647efb
F20101115_AAAOJO harris_m_Page_180.tif
bdcc11cb2bbb4e59fc09e54a1eb9c4b0
f72f5ad3f5e47865dcdcb82ef9e4ba35f7fc3219
F20101115_AAAOJP harris_m_Page_181.tif
8579dcc18eabace4f05521ccaab920c7
f808bef3dac1e720e28ca16527423e12a73aeb98
52259 F20101115_AAAOKE harris_m_Page_015.pro
b59ac82bfed98341fd7f680dea8f6d07
7990af6027c1dd23cc1581a69af9c0ab1e6ca5ad
F20101115_AAAOJQ harris_m_Page_182.tif
83ff364d300c8283debb2e842231862e
75becb8fcf8c5e0c778b4ec97eeb820ebd2a0038
57827 F20101115_AAAOKF harris_m_Page_016.pro
c52ec1d062eed35485b5c2697054b60f
98ef4b1f56c547458ccb7338fb06bac44471eb3c
F20101115_AAAOJR harris_m_Page_183.tif
c85ee3cc21895c6f9da27d7623a0ee96
9f34b998ba045a6bf342a1cefa0d1ca29726f7ff
27180 F20101115_AAAOKG harris_m_Page_017.pro
4e76d0fec2e5f08120b325ff219c5f7d
ca10377cefa633a83e8056607b7b96266b3a808e
F20101115_AAAOJS harris_m_Page_184.tif
216fcbc9e560978830494e84d14c37f8
a736c8e03dd0a05214461b2550e915618db8af89
54352 F20101115_AAAOKH harris_m_Page_018.pro
e6e7753c5025014c48fee320a109ff29
f2e2290dd77ece662c182b244faa59cccf36c4e7
908 F20101115_AAAOJT harris_m_Page_002.pro
c586b5007bae4ce9602462a812405532
8a19541720ebe237bdfd4758ad75846e3265e63c
37125 F20101115_AAAOKI harris_m_Page_021.pro
ca670e8f73b91f7c67fb1981fa0cf620
d35fcf8a8fbd8ad7f591eb5ba7becde97b9b7869
2732 F20101115_AAAOJU harris_m_Page_003.pro
5fb5abf59d74872667b1b0dc477a716c
8946f6eb681a0e37ab17bb8b988d9e0cbba068a2
40816 F20101115_AAAOKJ harris_m_Page_022.pro
7da15dc611a5415c10be241650502ed6
8bdd5a1af89ba35e4afccf9e86ecca668804a09b
57001 F20101115_AAAOJV harris_m_Page_004.pro
1925b1f756cdc79855cf1b6a4748e72f
8f323d4fd9eae76c32e6aa601d7e263bce8954e7
56650 F20101115_AAAOKK harris_m_Page_023.pro
17e980dca1db6ca332d0a500265d985b
0680cb1b38b10fda434f2587baa4b916b14be6d0
25061 F20101115_AAAOJW harris_m_Page_005.pro
de0b2d8018b4868bbfc4d87f20c0fa49
e896dd7ac67bed4342faa106708f048105b02172
53983 F20101115_AAAOKL harris_m_Page_024.pro
d26a276ba0638fde0535ab9ac5f3089c
6a0782677b0e0f916a771c7f829e5faf523c7f8b
74212 F20101115_AAAOJX harris_m_Page_006.pro
c9851bbb9ecf236d551ecacdc667f759
1e33bf59042d2a3ba3028e8e003cb0738206da6a
53520 F20101115_AAAOLA harris_m_Page_043.pro
b96682878438ebdab2e5de4ed09200a9
1d819840525a5cfadd495e8cb5b3f35971e73f4f
19882 F20101115_AAAOKM harris_m_Page_025.pro
0495505a2340a84b3a8c444f0a97c1fb
cb41f53d1d70e272d93f3381c65a954bb944ab6f
85433 F20101115_AAAOJY harris_m_Page_007.pro
ec1955ed9dbfa93d2406e584a29fe81d
ce86be7fae817b15b555a03e4c57dc3a54a693df
60649 F20101115_AAAOLB harris_m_Page_044.pro
206562fce3521dc6d2cb87bedd1203f1
8fc0af0c3b68709e6629ff8cb10f4763b476e9fe
25783 F20101115_AAAOKN harris_m_Page_026.pro
8423678d75205b10afda5ebc90fb4acb
ba4bd840b941c92dd28cc23c2e907bb160c6ab35
38314 F20101115_AAAOJZ harris_m_Page_008.pro
81551ba7499db2c78af83e26e7d290a2
75a79292ba1c1c3a0e7125eef06e318e271554e4
54224 F20101115_AAAOLC harris_m_Page_045.pro
ec3c8e40f73e69971b9cea91e5a06926
8a935c60477acd9f0543f2d6b846a2c363e5c381
52260 F20101115_AAAOKO harris_m_Page_027.pro
fe58d7fe347037ec1655c3438dd724e3
9b98007b64262623fb34d9b189fca6479a25fda0
48662 F20101115_AAAOLD harris_m_Page_046.pro
cf961e78ed92e5233bb1241200f0468c
3c6e3a9b2b84b78a036a92854dc222391cbfa629
23155 F20101115_AAAOKP harris_m_Page_028.pro
95220d6aa4b2b12e15a115adc9d2d27b
3e09060b88705f3efe9a9ecc61dcd1fa01d2848c
49923 F20101115_AAAOLE harris_m_Page_047.pro
6786cbabdb4c50a1e0aede6e1ea0c3ed
854eefbbdf8f6dcfd4a91b377aa031afb61aac35
51307 F20101115_AAAOKQ harris_m_Page_029.pro
ce710d37ff0ff548a7be33b61dbc9ed7
ed7ebbab48eb0fdc52ccbfca98ec1f36d76ea9e2
55630 F20101115_AAAOKR harris_m_Page_030.pro
d3aec02917c1bef3617d8a298d034f18
c0c7a2d89546294aae361ec7113701fa52ef1f20
50406 F20101115_AAAOLF harris_m_Page_048.pro
7f5ef11422c433028ef70d77404dfcf6
19d714500f817221823f1c414273e262e1ac215f
42319 F20101115_AAAOKS harris_m_Page_033.pro
7833983d12825335205097b6ef3777fe
fd5950f2e93a38584444760dd1be3d07a897f9e4
29401 F20101115_AAAOLG harris_m_Page_049.pro
2abd2458e461bdb18b78988ef7c91d01
c87c2dca5891358ae9ae49c2f8783d066de6bb8b
51233 F20101115_AAAOKT harris_m_Page_034.pro
3bf9ac80f34716e38f3ccec296d0bb7d
f05a6764d5df823daede2928b38175e8b501bcd7
43814 F20101115_AAAOLH harris_m_Page_050.pro
5e068eb05a352f83e25635af887844a9
e956093edf8847a387e1bf7bbc279a96ed55ac76
52543 F20101115_AAAOKU harris_m_Page_036.pro
0868b246084bc5943496df4105064d32
4deba031c9ddcc20f94a15a846be0032d2d64c5e
F20101115_AAAOLI harris_m_Page_051.pro
662995ce7fdc1d48b0c38a16af28c07e
a221c2bea90b03384f5c987c555d91b060b7fb24
57101 F20101115_AAAOKV harris_m_Page_038.pro
2b541bb44f566e121e01171ea683989a
58bf3f04b961c64124b1e87251fa5e201ea9a1ff
57568 F20101115_AAAOLJ harris_m_Page_052.pro
f77ec78d6488d4d6e131793d6b11426b
d5ff76d66a8fd01441e1949fa54d4ee4599c414f
36647 F20101115_AAAOKW harris_m_Page_039.pro
f01e40e8bbe8a44196018e9ec9efe76d
20767303a8f5034a67ec1285fcca0e6d668e883f
53117 F20101115_AAAOLK harris_m_Page_053.pro
23b8c1b04214eaf8649663da5406ec34
b3fa876cc1551cb2c1718a3f26eb8efc2cf670eb
46697 F20101115_AAAOKX harris_m_Page_040.pro
ba55a849fd5a60e0e82fabfa29dce7a6
5b58ff0f1a9dfa51183298ead31bd94cad5fd1bd
5539 F20101115_AAAOMA harris_m_Page_072.pro
dd689e44623d5aa7ae29c90fe8076ecf
abf1d7091c8a5c396e3afa14fde7db51405c2bfe
48254 F20101115_AAAOLL harris_m_Page_054.pro
15bce99e461d5413d79d676301293d47
e2681d3fdd9ba73fe0a46ff74b4a6d4047aa373b
48721 F20101115_AAAOKY harris_m_Page_041.pro
17c3602bd2cc68cbf72d814883de353e
a0bf9ec40f3c4f6b370e199cd8e1ca711a1c2f90
5147 F20101115_AAAOMB harris_m_Page_073.pro
30157d0b8312890311d765a098a03f26
27bbd658ba482c6498f808918c2cd1921b401b3e
48590 F20101115_AAAOLM harris_m_Page_056.pro
d1921c079f070b333a46a325ab8e13a2
69de1834d8df0ff7c6aeaeb5e59dd4fa83f8a222
31169 F20101115_AAAOKZ harris_m_Page_042.pro
aeabb4d4ba852145ea13a8c8e246aba4
d87c9b2ad0f339b8db7d2a0c7c9173f281199fce
7269 F20101115_AAAOMC harris_m_Page_074.pro
d5fc280cc2296ab29fee4b07a3de60d6
43fee5e6cb4c4afb052902f1c6102f29971a9a62
74968 F20101115_AAAOLN harris_m_Page_057.pro
75f0f4e06b5daa6b715d897bffb5561a
aa157cf793d9f2eb238757b4d0481d58336cfdb5
3248 F20101115_AAAOMD harris_m_Page_075.pro
9e7aa3e379014f12801ecaa81a27257c
c50e7b037fd699017942c8390459876fe0de7cda
51287 F20101115_AAAOLO harris_m_Page_058.pro
f45a1b24423da4539d4fc63e34ed148e
b2cf698712aa9dd209bb565c89a06d3cd5d5d026
7302 F20101115_AAAOME harris_m_Page_076.pro
3296c53573e2183968e83e60bbb02a5e
5c5ae78c0deacacad52e21a928f4247eb40190bc
52475 F20101115_AAAOLP harris_m_Page_060.pro
db1459433f2f92ecff680f83c70e36c5
36a58b5e0a69ce38afeff82ede1fa13449f99be4
3364 F20101115_AAAOMF harris_m_Page_077.pro
00003026d5d3fa1262c66c59875f223b
472193ede040afe5296d98cb2df9a6a233255190
54996 F20101115_AAAOLQ harris_m_Page_061.pro
ae3129551efd363a65f1d501a531b7b9
18022ab6e31e72d0921f04fcbcb9f6a356b12789
52441 F20101115_AAAOLR harris_m_Page_062.pro
a38dc48a5f3648d799003925e8c11e16
745fabf72ec07c759a45babb11fad3440b8382f3
55373 F20101115_AAAOMG harris_m_Page_078.pro
756d2e0cd763b65c44cfcbcf7f25a236
c17a9ab333199a6049f1465c4b75930c688a0f85
52733 F20101115_AAAOLS harris_m_Page_063.pro
e542e63204c4f9b419ef8020746adf8a
678153f28cb8c31615f1fdd0b9becd94a55ecc2d
50466 F20101115_AAAOMH harris_m_Page_079.pro
ff47af81f29c80f2bf4f7e78c96118a8
96bc06b688f09938731daa485b4ca3317cc684ce
28548 F20101115_AAAOLT harris_m_Page_064.pro
a8dd394efe283409df71f517986b4213
2b67183d62c40e2a033360aa8c491999e70dfeee
53884 F20101115_AAAOMI harris_m_Page_080.pro
00c1004c38e08619b0dde26d388d5fe9
52d03cdf4389aeb0088abe969fa4f6da5426fa97
48174 F20101115_AAAOLU harris_m_Page_066.pro
b327472e4b0012ae7c96223939fda9bb
52bde718976087a2d6441645e1592d7d7f211c7a







DEVELOPING A SCORECARD
TO EVALUATE
THE USE OF PERSONAL FALL ARREST SYSTEMS
























By

MATTHEW A. HARRIS


A DISSERTATION
PRESENTED INT PARTIAL FULFILLMENT
OF THE REQUIREMENTS FOR THE DEGREE OF
DOCTOR OF PHILOSOPHY

UNIVERSITY OF FLORIDA

2007





































@ 2007 Matthew A. Harris





























To my father,
John Albert Harris,
an individual of visionary interests and magnanimous spirit









ACKNOWLEDGMENTS

I especially thank my most beloved wife Debra for her unwavering support and her belief

in my skills and talents.

Thanks go to Dr. Jimmie Hinze, a trailblazer in his discipline. It is hard to imagine how

this research would have been possible without reference to his numerous previous studies and

countless helpful suggestions. A sincere thank you also goes to the thoughtful and critical

contributions of my dissertation committee: Dr. Charles Glagola, Dr. Bob Stroh, Sr., and Dr.

Leon Wetherington. I appreciate the scholarship that each them has cultivated and the

conversations that helped to refine my study. I felt as though we were underneath an olive tree at

times during these conversations.

This study was supported by the generous contributions of several very important

individuals and organizations with interests in the fall protection discipline and industry. Thanks

go to the following parties:

* Joseph Feldstein and Victor Vendetti of the Mine Safety Appliance Co. for opening their
production and training facilities to the researcher, and for sharing their expertise and
insights about fall protection;

* The members of the ASSE/ANSI Z3 59 Committee, in particular Randy Wingfield, Tim
Fisher, Thom Kramer, W. Joe Shaw, and Robert Aguiluz. Also, special mention goes to
Dr. Nigel Ellis for his pioneering role in advancing and publishing scientific literature on
fall arrest systems.

* The American Society of Safety Engineers Foundation for the funding to study the
anchorage subcomponent of personal fall arrest systems. This funding and exploratory
research was instrumental in setting a course for the current study.

* The distinguished group of safety management practitioners that responded to the surveys
and participated in the case studies. These individuals shall remain anonymous for research
confidentiality reasons. This study has attempted to fairly portrait their ideas and
professionalism.

Thanks go to Dr. Michael Slater and Mrs. Dianne Slater, my dear cousin and her honorable

husband, for moral support and for setting a good example. I thank two special ladies in my life:










my daughter Natalie Ray for inspiring me to build a better future than I could have ever

imagined without her and my mom, Julie Harris, for her persistent promotion of art and literature

in my life.

I thank all the design professionals who helped to impart to me the meaning of being a true

professional: Donald Corner, Howard Davis, G. Z. Brown, Gary Moye, Rob Thallon, James

Tice, Virginia Cartwright, John Reynolds, Charles Gromatzky, Robert Dupree, Mel Streeter,

James Kresbach, Ralph Bauer, Jon Holtzheimer, Larry Feuss, Jack Corgan, Heather McKinney,

Al York, DeWitt Gayle, Milton Hime, Tim Pelowski, Kevin Scott, Michael McCaffrey and

Harold Barrand.

Lastly, thanks go to the craftsmen and building contractors that hired me to pound nails,

pull wire and dig ditches, but also taught me about the nobility of their craft: Forest McKown,

Jeff Ferguson, Peter Ryan, J. Peter Goetz, James Gray, Brian Francis, Kenneth Gates, and Andy

Ralwell.












TABLE OF CONTENTS


page

ACKNOWLEDGMENT S .............. ...............4.....


LI ST OF T ABLE S ........._.___..... .__. ...............9....


LIST OF FIGURES .............. ...............10....


AB S TRAC T ........._._ ............ ..............._ 12...


CHAPTER


1 INTRODUCTION ................. ...............14.......... ......


Significance ofFall Injuries................ ............ ... ...........1
Fall Protection and Control Methods in OSHA Regulations............... ..............2
Research Objective ................ ...............21.................

2 LITERATURE REVIEW ................. ...............22................


Hierarchy of Fall Hazard Control Methods ................. ...............23...............
Fall Injuries Relating to PFASs .............. ...............24....
Best Practices in Safety ........................... .... .............2
Balancing Quantitative and Qualitative Measurement ................. ................ ...._..29
A Balanced Measurement System ............... ...... ...............31_ ......
Continuous Improvement in Construction Safety .............. ...............34....
Best Practices in Safety Studies .............. ...............34....
Upper Management Commitment ............ .....___ ...............35..
Strategic Planning for Fall Protection............... ...............3
Goal Alignment and the Project Team .............. ...............36....
Design for Safety Resources .............. ...............40....
Pretask Planning ................... ...............41..
Worker Involvement in Safety ................ ..... .....__ ......__ ............4
Participative Management and Quality Control Circles ....._____ .........__ ...............45
Work Crew Dynamics .............. .......... ................4
Influence of Crew Leaders, Foremen and Superintendents ................. ................ ....._.46
Obstacles to Best Practice Program Effectiveness .............. ...............47....
W orker Training .............. ...............48....

3 METHODOLOGY .............. ...............50....


Research Design .............. ...............50....
Sample Selection .............. ...............50....
Hypothesis Testing .............. ...............52....
Sample Size Determination ..........._..._ ...............53..._.._.......
Data Collection .............. ...............54....












Preliminary Survey .................. ....... .._ ...............55.......
Fall Protection and Fall Arrest System Survey .............. ...............56....
Data Analysis............... ...............58
Assum options .............. ...............59....
Procedure .............. .. .................. ._. ............5
Data Collection and Analysis from a Related Sample............... ...............61.
Development of the Scorecard............... ...............6

4 ANALYSIS OF FALL INJURY DATA ................. ...............65...............


NIO SH Data ................. ...............65........... ....
OSHA Data ................. ...............66.................
Data Analysis............... ...............66
Fault-tree Analysis............... ...............67

5 RESULTS OF THE FALL PROTECTION AND FALL ARREST SYSTEM SURVEY ....78


Descriptive Statistics for the Sample ............ ..... ._ ...............79..
Subcontractor M management .............. .. ... ..._ ............... 1....
Proj ect Delivery and Preconstruction Coordination ......___ ..... ... ................. 82
Design and Construction Integration............... .. ..................8
Anchorage Engineering and Fall Arrest System Hardware Management.......................84
Training ............... ......... .... ....... ........8
Descriptive Data for the TRIR Variable .............. .... ...............86_ ....
Model for the Safety-Practices-Implemented Variable .............. ...............87....
Results of the Test for Independence. ............ ..... .__ ...............90.
Development of the Scorecard............... ...............9
Scorecard Validation Case Studies............... ...............92
Scorecard Case Study 1 .............. ...............93....
Scorecard Case Study 2 ............ ..... .__ ...............96..
Scorecard Case Study 3 .............. ...............99....
Scorecard Case Study 4 ............ ..... .__ ...............102..
Scorecard Case Study 5 ............ ..... ._ ...............103..
Revising the Scorecard .............. ...............105....

6 RESULTS OF THE INTEGRATED DESIGN AND CONSTRUCTION SURVEY..........130


7 CONCLUSIONS .............. ...............133....


Basic Fall Safety Compliance and Subcontractor Management ................. ............... ....133
Design and Construction Integration ................. ........... ...............134 ....
Fall Arrest Equipment and Engineered Components .................... ... ...... ............. 13
Associations between Better Safety Records and Fall Arrest System Best Practices.......... 138
Definition of Better Safety Records .............. ...............138....
Conclusions about the Scorecard ................. ...............139...............
Conclusions about the Designer-Builders .............. ...............140....

8 RECOMMENDATIONS ................. ...............142................











Recommendations for Regulatory Revisions .............. ...............142....
Recommendations for Changes in Practice ................. ............. .......... ............4
Recommendations for Changes in Engineering Coordination .............. ......................4
Recommendations for Future Research ................. ...............146...............
Final Remarks ................. ...............149................

APPENDIX


A FALL ARREST EQUIPMENT MANUFACTURERS ................. .......... ................1 50

B SURVEY FORM S ................. ...............15. 1......... ....


Preliminary Survey .............. ... ....... ....... ...............151......
Fall Protection and Fall Arrest Systems Survey ................. .......... ............. ......15
Fall Protection and Fall Arrest Systems Survey, follow-up version .................. ...............158
Integrated Design and Construction Survey ................. ....___.....__ ............6

C POPULATION DATA FOR DESIGN-BUILD EXPOSITION ATTENDEES .................. 161

D FALL INJURY CASES ANALYZED FROM THE NIOSH DATA ................. ...............164

E FALL INJURY CASES ANALYZED FROM THE OSHA DATA ................. ................1 70

LI ST OF REFERENCE S ................. ...............179................

BIOGRAPHICAL SKETCH ................. ...............184......... ......










LIST OF TABLES


Table page

5-1. Response rates for survey instruments. ............. ...............78.....

5-2. Descriptive data for the TRIR variable. ........... ....._ .. ...............8

5-3. Data categories in the Fall Protection and Fall Arrest System survey. ............. ..................87

5-4. Descriptive data for individual variables used in the safety-practices-implemented
variable development model. ........... ..... ._ ...............116..

5-5. Descriptive data for the safety-practices-implemented variable. ..........._.. ..............116

5-6. Fall protection and fall arrest systems scorecard (proj ect version) ...........__... .................122

5-7. Fall protection and fall arrest system scorecard (companywide version) ............................123

5-8. Classification of population based on annual revenue. ............. .....................124

5-9. Scorecard for Case Study 1 .............. ...............124....

5-10. Scorecard for Case Study 3 (based on their PFAS survey response) ........._..... ...............124

5-11. Scorecard (companywide version) for Case Study 3............... ....................125

5-12. Scorecard (proj ect version) for Case Study 4 ................. ...............126.....____.

5-13. Fall protection and PFAS scorecard (proj ect version for construction manager-oriented
contractors) with revisions based on case study respondent comments. .........................127

5-14. Fall protection and PFAS scorecard (proj ect version for traditional contractors with
self-performance capability) with revisions based on case study respondent
com m ents. ............. ...............128....

5-15. Fall protection and PFAS scorecard (companywide version) with revisions based on
case study respondent comments. .............. ...............129....

6-1. Response frequencies for designer-builders. .............. ...............132....

A-1. Website addresses for maj or U. S. fall arrest equipment manufacturers ............................150

C-1. Population for the Designer-builders. .............. ...............161....

D-1. Fall injury cases analyzed from the NIOSH data. ............. ...............164....

E-1. Fall injury cases analyzed from the OSHA data. ............. ...............170....











LIST OF FIGURES


Figure page

1-1. Anchorage connector strap; materials: drop-forged steel alloy dee-ring and polyester
webbing with 5000 pound minimum breaking strength. .................. ................1

1-2. Causes of fatalities in construction investigated by OSHA, 1990 to 2001 ........._._.................19

2-1. NIOSH fall injury (FACE) data ................. ...............25..............

2-2. Rooftop anchor connector. ............. ...............26.....

2-3. Twin-leg lanyard .......__ ..........__ ........._._.....__ ...._._.................28

2-4. Safety management system for strategic and operational implementation. ...........................33

2-5. Market share of maj or project delivery methods for non-residential design and
construction in the United States. ............. ...............39.....

2-6. Fishbone diagram for causes of unprotected excavation. ....._____ ... ......_ ...............42

4-1. Graphic key to the fault-tree diagrams. ............. ...............71.....

4-2. Sample fault-tree diagrams. .............. ...............72....

4-3. Formwork construction fault tree. ..........._ ..... .__ .....__ ....__ ..............73

4-4. Maintenance painting fault tree. ............. ...............74.....

4-5. Steel erection fault tree. .............. ...............75....

4-6. Tower maintenance fault tree .............. ...............76....

4-7. Splicing telephone cable fault tree............... ...............77..

5-1. Frequency of OSHA compliance. ............ ..... .__ ...............109

5-2. Exceeding OSHA compliance: which trades specified (n = 58). ................... ...............10

5-3. Assignment of PFAS-competent persons by subcontract agreement (n = 97). ................... .1 10

5-4. Requirement for proj ect specific fall protection and fall arrest plans (n = 97). ................... 110

5-5. Subcontract agreements that require documentation of anchorage locations in PFAS
plans (n= 71). ................ ...............111......... .....

5-6. Percentage of contracts that are design-build contracts (n = 90) ................. ................ ...111











5-7. Comments are made to the owners that are intended to improve fall protection (n = 93). ..112

5-8. Suggestions are made to the design team that are intended to improve fall protection (n
= 86) ................. ...............112................

5-9. Suggestions to designers included raising height of roof parapets (n = 77). ................... .....1 13

5-10. Types of engineering service providers utilized by contractors (n = 37). ................... .......1 13

5-11. Policies implemented to control specific hardware risks (n = 91). ................ ................1 14

5-12. Percentage of superintendents that received PFAS-training (n = 96). ............. ..... ........._.114

5-13. Superintendent training typically includes a competency test (n = 65).............._..._. ..........115

5-14. Contractors are customers of the major fall protection manufacturers' training
seminars (n = 54). ................ ...............115......... .....

5-15. Scatter plot for the correlation of the all-inclusive tie-off policy and TRIR variables (n
= 61). ...._ _................. ...............117 .....

5-16. Scatter plot for the test of independence (n = 61). ................ ...............118..........

5-17. Means plot for test of independence (n = 61) .....__ ................. .. ............... 11

5-18. Revised scatter plot for the test of independence, preliminary version (n = 49)......._.......120

5-19. Median plot for the revised test of independence (n = 45) ................. .......................120

5-20. Revised scatter plot for the test of independence, final version (n = 45). ................... .......121









Abstract of Dissertation Presented to the Graduate School
of the University of Florida in Partial Fulfillment of the
Requirements for the Degree of Doctor of Philosophy

DEVELOPING A SCORECARD
TO EVALUATE
THE USE OF PERSONAL FALL ARREST SYSTEMS
By

MATTHEW A. HARRIS

August 2007

Chair: Jimmie Hinze
Maj or Department: Design, Construction and Planning

The structural erection of buildings and other structures is associated with a high frequency

of serious fall injuries and fatalities. Routine maintenance activities such as roofing replacement

are also associated with high rates of occupational fall injuries. Falls from elevation is the

leading category of serious injury and fatalities in the construction industry. Annually, more than

1000 construction worker fatalities (15% attributable to falls from elevation) occur in the United

States. The Occupational Safety and Health Administration (OSHA) Construction Standard,

Subpart M, Fall Protection, contains requirements for employers to follow to insure the health

and safety of their employees that are exposed to fall injury hazards. Any employee working at a

height of six feet or more above the walking surface is required to have fall protection. The

requirements for fall protection may be satisfied by passive systems, such as 40 inch-height

guardrails, or by the use of active systems. The typical equipment of an active system consists of

a safety harness and lifeline assembly known as a personal fall arrest system (PFAS). By

receiving the proper training and equipment, workers exposed to fall hazards may use PFASs to

significantly reduce their risk of fall injury. A complete PFAS is typically defined as a full body

harness (similar to a parachute harness), a lanyard to connect the harness and anchorage, and an

anchorage (a heavy-duty steel alloy ring solidly connected to the structure). This study









investigated the implementation of fall protection practices and policies, specifically PFASs as

used in large construction companies. A scorecard was developed to assist employers in

effectively evaluating the safety performance of fall protection and PFASs at either the

individual proj ect or companywide level.









CHAPTER ONE
INTRODUCTION

Construction management is the management sub-discipline that has evolved parallel to

other management disciplines in the industrial era to address the specialized processes and issues

that exist when the planning and construction of a civil structure (buildings, roads, bridges, and

industrial plants) commences on a specific site. These construction-related processes for civil

structures have distinctive features regarding:

* Worker safety
* Risk management
* Ownership
* Financing
* Design
* Contracts
* Procurement
* Time management.

Of all these features, worker safety is paramount to creating a safe and rewarding basis or

foundation from which construction enterprises and their employees can prosper. Construction

proj ects are inherently hazardous environments. Of all the fatalities sustained in the construction

industry, over a third of all fatalities are related to falls. Therefore, if a safety management

system is to be implemented, fall injuries and fall protection must be included in that

management process.

This study investigated the safety management aspect of personal fall arrest systems

(PFASs), an engineered system (that is, a type of personal protective equipment) for the fall

protection of construction workers. Complex safety management issues arise in the course of

implementing, training for and controlling PFASs on a construction proj ect. Drucker (2001)

stated that the immutable task of management is to make people capable of joint performance

through common goals. This task of managing people and their performance as a group or unit is









fundamental to safety management problems and issues. Construction workers and managers

must be properly trained to use personal protective equipment. Construction tasks performed by

these workers and their managers should optimally take place within the context of a

management philosophy or safety culture (Hinze 2006). And lastly, a well-conceived fall

protection program on a safe proj ect site requires careful consideration of supportive engineering

measures (that is, engineered hardware and features that support fall protection practices and the

PFASs).

A complete personal fall arrest system (PFAS) is typically defined as a full body harness

(similar to a parachute harness), a lanyard to connect the harness and anchorage, and an

anchorage (Ellis 2001). When a worker is tied-off to a single anchorage point, mobility is limited

by the length of the lanyard. Standard lanyard lengths vary between six and twelve feet. Formal

definitions for the components in a PFAS are defined in the Occupational Safety and Health

Administration (OSHA) Construction Standards, Subpart M and the Safety Requirements for

Personal Fall Arrest Systems as published by ANSI, the American National Standards Institute

(ASSE 1992).

Fall arrest equipment was historically derived from rigging equipment and other sources.

Full-body harness designs were borrowed from parachuting and adapted to fall arrest usage. A

comprehensive catalogue of the different types of equipment manufactured in the United States

would contain hundreds of individual pieces of hardware and fall arrest system components.

Documentation of the full range and variety of equipment types is not in the scope of this

research; however, the internet provides easy access to the most common types of equipment in

use in the construction industry. This researcher frequently used a web search using the term fall

protection equipment to gain access to the equipment sold by the maj or PFAS equipment









manufacturers in the United States (Appendix A). A discussion of essential equipment features

follows; all OSHA Subpart M defined terms have been italicized.

Most systems in use in the construction industry include a component feature within the

lanyard (or connecting components) for shock absorption. The purpose of the shock absorber (or

deceleration device) is the partial absorption of the fall forces (of a falling worker) generated by

the acceleration of gravity. In the event of a fall arrest, the magnitude of the forces transferred to

the body by the harness have the potential to cause injury. The research and development of the

shock absorber was an important innovation in fall arrest systems.

PFAS user mobility while tied off to secure anchorage is greatly increased by the use of

one or more of the following:

* Horizontal lifelines (HLL): Commonly used in floor decking operations, HLLs are
considered connecting components in the same component category as lanyards.

* Vertical lifelines (VLL): Commonly used in steep roof operations, VLLs are also used in
work involving vertical shafts, such as elevator shafts. VLLs are also in the same category
as lanyards. In fact, lanyards and VLLs are usually used together, connected together by a
rope grab, and ultimately tied to an anchorage.

* Self-retracting lanyards (SRL): A special type of lanyard that automatically retracts and
extends by means of a spring. The spring action of the SRL is regulated by a safety
mechanism that locks when a fall arrest condition occurs, thereby limiting the fall distance.
A typical SRL allows up to twenty feet of movement about an anchorage.

Subpart M defines the anchorage as a secure point of attachment for lifelines, lanyards or

deceleration devices. Strictly speaking, the anchorage is a combination of the anchor (the

structural building component or material that is directly resisting the fall arrest loading

condition), and the anchor connector (the engineered materials that connect to the anchor and

provides an attachment point). The attachment point is typically a heavy-duty, cast metal dee-

ring rated to withstand a 5000 pound fall arrest load (Figure 1-1).










The dee-ring has likewise been specified to perform the secure attachment point function

for the body harness. The ANSI Z359 standard specifies that the primary secure attachment point

for the body harness be located between the shoulder blades in the upper region of the user' s

back.

Dee-rings and snaphooks are members of the overall family of connecting hardware,

known as connectors. Because dee-rings and snaphooks are the connecting hardware in PFASs,

they are critical to the safe usage of fall arrest systems. Connectors are subj ect to frequent


Figure 1-1. Anchorage connector strap; materials: drop-forged steel alloy dee-ring and polyester
webbing with 5000 pound minimum breaking strength.

engineering improvements. Snaphooks have automatically closing and locking gates that permit

the connector to receive an obj ect and then remain closed until unlocked by the user. Snaphooks

are typically specified for both ends of the lanyard (for attachment to the dee-ring located on the









anchorage and the dee-ring on the back of the full-body harness). Unintentional opening of the

gates on snaphooks has been associated with fall fatalities in OSHA accident investigations.

Near-misses and injuries that occur when snaphooks malfunction are commonly referred to as

roll-out. Roll-out problems have been greatly reduced by the adoption of new OSHA rules that

require the use of only locking tyipe snaphooks in PFASs. Connector hardware is an evolving

engineering science. Roll-out is an example of why proactive safety programs must be updated

to include developments in PFAS hardware materials and engineering issues.

Significance of Fall Injuries

Compared with other industries, construction contributes a disproportionate number of

fatalities and disabling injuries to the national statistical rates as compiled by OSHA, the

National Safety Council, and the Centers for Disease Control and Prevention. Utilizing

occupational fall data found in the National Institute for Occupational Safety and Health

(NIOSH) National Traumatic Occupational Fatalities database, Suruda, Fosbroke and Braddee

(1995) showed that construction accounted for 80% (232/288) of the fall fatalities occurring at

work over a three year period (1984 to 1986).

Compared with other injuries within the construction industry, falls from elevation

constitute one of the most damaging and costly injury categories. A recent report on the

construction industry by a leading provider of workers' compensation insurance stated that falls

fr~om elevation were the construction industry's second highest cause of financial loss due to

worker injury. This statement of financial loss translates into substantial human suffering and

medical treatment for traumatic injuries sustained by workers in the construction field on a

regular basis (Liberty Mutual Insurance Co. 2006).

Worker deaths due to falls from elevation have been shown to be increasing in proportion

to all deaths. Fall fatalities increased between two published falls studies even as OSHA was









focusing attention on and making revisions in the fall protection regulations. In a 1990 report,

looking at construction-industry fatalities recorded by OSHA, falls (from the same level and

from elevation, 1985-89) constituted 33 percent of the total number of fatalities (U. S. Dept. of

Labor 1990). In a subsequent study (Huang and Hinze 2003), also examining construction-

industry fatalities recorded by OSHA (1990-2001), falls constituted over 36 percent of the total

number of fatalities (Figure 1-2), an increase of nearly ten percent.






Other, 14.40%

Caughtin orFalls, 36.30%
B between,
11.60%

Shock and
E lectrocuti on,
13.40% Struck By,
24.30%





Figure 1-2. Causes of fatalities in construction investigated by OSHA, 1990 to 2001. Adapted
from Huang and Hinze (2003).

During this same period (1990s), maj or modifications were made to the OSHA

Construction Regulations:

* Effective Sept. 2, 1997, competent persons were required to determine the feasibility and
safety of providing fall protection for employees erecting or dismantling supported
scaffolds (Subpart L).

* Effective Jan. 1, 1998, body belts were no longer allowed as components of a PFAS.

* Effective Jan. 1, 1998, only locking type snaphooks were allowed in PFASs (Subpart M).









NIOSH and OSHA have also used safety bulletins to alert employers about accident reports

associated with dangerous anchorage and inadequate fall protection practices (NIOSH 2004;

U.S. Dept. of Labor 2004b).

Another study that investigated falls from elevation also reported similar results. That

study investigated fatalities associated with the use of personnel lifts. Of the 339 fatalities

examined in that study (1992-1999), thirty-six percent were associated with falls from elevation

(McCann 2003). Personnel lifts are frequently used in the construction industry to give workers

access to work sites that are 8 feet or more above the walking or working surface. Personnel lifts

are regulated under the OSHA Construction Standards, Subpart L, as either aerial lifts or mobile

scaffolds. In the case of aerial lifts, PFASs are required for operators standing in the work

platform when the platform is elevated. In the case of mobile scaffolds, PFASs are recommended

but not required by Subpart L for operators when working at elevation.

Overall, researchers believe that a substantial percentage of the falls from elevation that

cause serious injury and fatalities in construction are associated with PFASs. Discussion of the

frequency and strength of the association of fall injuries and PFASs occurs in Chapter Two (refer

to Figure 2-1).

Fall Protection and Control Methods in the OSHA Regulations

The OSHA Construction Standards, Subpart M, contains definitions for PFASs and

components as noted above. Fall protection regulations are also described for scaffolds (Subpart

L) and steel erection (Subpart R). PFASs have customarily been considered a part of a series of

fall protection and fall control methods that progresses from passive means to active, more

complex means. This progressive methodology is referred to as the hierarchy of fall hazard

control methods. The most common methods as described in subpart M are:

*Warning lines and controlled access zones










* Guardrail systems
* Hole coverings
* Safety net systems
* Personal fall arrest systems.

These methods are generally intended to be implemented in a progressive manner moving

towards increasing levels of training and specialized user knowledge for the control method to

function effectively (Ellis 2001). The range of control methods in this progression starts with

what is considered a passive system (a warning line) with no required training or specialized

knowledge, and progresses to the use of personal protective systems, such as PFASs, which

require training and specialized user knowledge.

Although considered to be a fall hazard control measure of last resort in the hierarchy,

personal fall arrest systems (PFASs) are frequently used in the construction industry, especially

during the structural erection and exterior envelope installation phases of proj ects.

Research Objective

Because of the significance of fall fatalities and the frequency with which PFASs are used

in construction, promoting effective and high-quality management of PFAS usage within an

overall fall protection program is a critical component to overall safety performance success. The

goal of this research was to develop an industry-specific fall protection evaluation system or

scorecard to assist the construction industry in self-assessing and measuring the effectiveness of

fall protection and fall arrest systems.









CHAPTER TWO
LITERATURE REVIEW

Total fall distance (TFD) is an important concept for understanding fall arrest mechanics.

Comprehension of TFD and the resultant forces on the human body is considered a standard for

PFAS user competency (p. 68, ASSE 1992). The component parts of a personal fall arrest system

include the harness, lanyard and anchorage as described earlier. PFASs are designed to withstand

the considerable forces generated by a human body in free fall. The velocity of a falling obj ect is

given in the following basic mechanics equation:

V2 = VO2 + 2aAs

where

* v = velocity
* vo = initial velocity
* a = acceleration
* as = displacement or change in position

Based on a free fall height of 28 feet above a lower floor and converting the result to miles
per hour, the equation would result in the following value:

* vo = initial velocity = 0 ft/sec
* a = 32 ft/sec2
* as = 28 feet


v = [ 2 (32) (28) ]1/2 = [ 1792 ]1/2 = 42.3 ft/sec

42.3 ft/sec (3600 sec./hr.) (1 mile/5280 ft) = 28.86 mph

The calculation shows that from a height equal to a typical third floor level in commercial

construction, a velocity of over 25 mph would be reached by a mass (or human body) in free fall

at the point of impact at the floor level.

PFAS components are subj ect to elongation and stretching when exposed to the forces in a

fall arrest. Durable nylon and polyester webbing have been used as typical materials in harnesses

and lanyards; these materials have elastic properties. High-strength polyester rope (cross-









sectional diameter = 0.625 in.) is a typical specification for vertical lifelines. A rule of thumb

used to estimate the elongation (in the event of a fall) is critical to safe system performance.

Workers can be injured in construction by striking a lower floor level or other obstacle if

elongation and total fall distance is not considered. The following formula of typical variables

(all variables represent distances in vertical travel) found in a complete PFAS was adopted from

one of the maj or equipment manufacturers (MSA 2006):

Total fall distance (TFD) = FFD + DD + HEFF + VEL + SF

WHERE

Free fall distance (FFD) is the vertical travel from the fall start to the point where the
PFAS begins to arrest the fall force.

Deceleration distance (DD) is the vertical travel between activation of any shock-absorbing
devices included in the PFAS and the final stopping point of the fall. Shock-absorbing and
stretching of the lanyard is typically limited to 3 V/2 feet by most manufacturers and is
considered part of the deceleration distance.

Harness elongation effect (HEFF) is the travel attributed to stretch in the harness assembly.

Vertical elongation (VEL) is the travel attributed to stretch in any vertical or horizontal
lifelines.

Safety factor (SF) is an additional factor of safety to account for any unforeseen variables.
Safety factor distance should be determined by a competent person or an engineer
knowledgeable about fall arrest systems.


Hierarchy of Fall Hazard Control Methods

At a conceptual level, the hierarchy of fall hazard control methods typically includes the

complete elimination of fall hazards by means of design and engineering. Weisgerber and Wright

(1999) presented a conceptual version of the hierarchy of control methods as follows:

*Elimination: Elimination of the hazard is understood to not be applicable in all cases in
construction, for example, maintenance work on an existing structure. The intention of fall
hazard elimination as a method is probably the most challenging to conventional
engineering and construction practices. Elimination obligates all participants in the









construction and design process to creatively rethink design specifications and
construction assembly operations in search of hazard elimination opportunities.

* Engineering controls: Engineering controls include all safety systems on the construction
site that do not require specialized knowledge inputs from the users, for example, guardrail
sy stem s.

* Warnings: Safety signage and warning line systems

* Administrative controls: this method includes all fall controls that have a companywide
policy aspect, for example, specialized fall protection training for all superintendents.

* Personal protective equipment: this method includes positioning device systems, and
PFASs.

Fall Injuries Relating to PFASs

The Fatality Assessment Control Evaluation (FACE) summary reports for falls from

elevation in the construction sector (NIOSH 2000) were analyzed as a means of identifying

factors contributing to falls. These summary reports provide investigative details collected at the

incident sites of 91 fatalities (Figure 2-1). Of the injuries reported, fifty-nine percent of the cases

required PFAS use. The other 41% of the cases concerned fall protection issues such as ladders,

guardrails, holes and skylights. Of the cases where PFASs were required (labeled in Figure 2-1

as Faiheres in Policy), 43% did not have the correct equipment on-site for worker use. A safety

policy that required trained workers with appropriate PFAS equipment to be present and donned

before work started could have prevented accidents in these cases.

Equally tragic as the cases associated with policy failures were the cases where workers

were wearing harnesses and lanyards, but failed to comply with safe PFAS practice and OSHA

compliance regulations, e.g., lanyards not tied off to anchorage. These cases (labeled in the

figure as Faiheres in Compliance) represent an almost equal number of injuries as the Faiheres in

Policy. OSHA compliance failure represents a complex mix of unsafe behavior, weak

enforcement, and poor safety culture.




























I I


WAS PFAS
REQUIRED?










YES = 54
( 59%)


WAS PFAS
ON-SITE?




YES = 31
( 57%)


OSHA
COMPLIANCE?


,YES = 7
( 23%)


NO = 24
(77%)


FEApLURES IN


NO = 23
( 43%)


FAILURES IN
POLICY


NO = 37
(41%)


OTHER FALL PROTECTION
FAILURES (LADDERS,
GUARDRAILS, HOLES,
SKYLIGHTS)


TOTAL FATALITIES = 91






Figure 2-1. NIOSH fall injury (FACE) data.


The improper use of fall arrest systems has been noted in various types of construction

accidents. A recent NIOSH Alert publication identified critical safety practices for workers and


employers working in and around skylights and roof openings (NIOSH 2004). It was noted that

four of the highlighted practice recommendations discussed the use and management of PFASs.









The article indicated that PFASs are an important component in protecting workers from fall

hazards associated with skylights and roof openings.

As is well known in the industry, construction is a dynamic process. When a construction

proj ect is completed, control of the work site passes from the contractor to the facility owner,

including responsibility for fall protection. Unfortunately, owners often take over the control of

and liability for buildings that have no fall protection provision for the performance of

maintenance operations. Safety nets and guardrail systems are rarely appropriate fall protection

options for steep roofs. In the FACE report, 16 fatalities were investigated that occurred in

association with a sloped roof that required rooftop anchor connectors (Fig. 2-2) to be installed

for fall protection. In these reports, only one of thel6 proj ects investigated had a rooftop anchor

correctly installed.


Figure 2-2. Rooftop anchor connector.









Rooftop anchors for PFASs facilitate working safely at elevation. Rooftop anchorage can be

specified or installed at the following phases:

* design phase by an engineer or architect

* construction phase by a contractor

* maintenance phase (for example, roof replacement and repair) by a facility owner or
contractor.

The importance of rooftop anchors to the safe use of PFASs and the ability of the facility owner

and designer to influence their deployment indicate why design for safety is a critical area where

significant reductions can be made in falls from elevation.

Many construction firms have been successful in preventing falls that might have resulted

in fatalities and/or disabling injuries. PFASs have a complexity that requires careful site-specific

PFAS planning and hardware selection, to the extent that even good fall protection programs

have still resulted in fatalities. Of the 91 fatalities in the FACE report, three fatalities (less than

five percent of the total) occurred where very good fall prevention practices were observed

(anchorages, lanyards and body harnesses in use), but the fall protection program experienced a

systemic type of failure (refer Appendix C for abstracts of selected FACE reports). One of these

fatalities occurred where a lack of equipment inspection was indicated (damaged lanyard was not

detected, FACE report no. 89-21). In another fatality case, insufficient worker training in safe

fall arrest equipment usage was determined (victim disconnected the lanyard from the anchorage

for an unknown reason, FACE report no. 96-21). In the third incident, the accident was not

witnessed and the cause was not indicated (FACE report no. 97-10).

Four other fatalities occurred in cases where OSHA compliance was observed, but where

lives may have been saved by stricter adherence to a 100% tie-off practice and the use of twin-

leg lanyards (FACE reports nos. 89-03, 89-24, 90-12 & 92-05). Twin-leg lanyards support









continuous tie-off by allowing the worker to use the secondary leg of the lanyard to connect

across a gap in the system before disconnecting the primary leg (Fig. 2-3). These seven fatalities

represent almost eight percent of the total (7 of 91 cases), indicating that even in the better fall

protection programs involving PFAS, careful management of hardware usage and equipment

inspection can save lives.



























Figure 2-3. Twin-leg lanyard.

In a recent Construction Industry Institute study of large construction firms (firms having

annual revenues in excess of $100 million), 100% tie-off for workers working at elevations six

feet and above was required by several of the survey respondents as a positive fall protection

policy, but no known studies have investigated the extent or usage of the 100% tie-off policy in

the construction industry (Hinze 2002b).









Although no injury data were located, injuries associated with PFAS may occur after a

successful fall arrest has taken place due to the physical stress imposed on a fall victim by their

own body harness and the effects of being suspended mid-air for 15 minutes or longer. This

physical stress imposed on the fall victim by the body harness is known as suspension trauma,

and produces a physiological reaction known as orthostatic intolerance. Rapid rescue response

times are critical to controlling the dangers of suspension trauma that may result from being

suspended after a fall (Weems and Bishop, 2003). Documentation and training to insure safe

rescue techniques and first aid for victims suffering from suspension trauma are critical elements

in PFAS training programs.

Best Practices in Safety

In companies that have established zero injury incidents as a primary goal, new

opportunities for refinement have been suggested to reside in theories and studies of continuous

improvement. Construction safety frequently considers problems arising at the intersection of

safe behavior and personal protective equipment. The human factors aspect of managing

construction safety programs has qualitative characteristics in common with industrial firms

engaged in all types of general industry and manufacturing; the qualitative constant is of course

the human resource. Continuous improvement and total quality management (TQM) literature is

closely related to construction safety theories and has useful precedents and methods for best

practices.

Balancing Quantitative and Qualitative Measurement

Creating a balanced safety management approach composed of quantitative and qualitative

methods and measurements is an important guidepost for continuous improvement-oriented

safety programs. Accountability and quantitative measures must be balanced with behavior-

based, qualitative considerations (Petersen 1997 and 1998).









In a strictly quantitative sense, injury incidence rates (a lagging indicator) cannot be used

to assess safety performance related to a specific injury category without a revision in data

collection. The most widespread and reliable injury incidence rate used in the construction

industry has been the employer' s total recordable injury rate (TRIR). TRIR is defined as the

number of recordable injuries per 200,000 worker hours (the number of hours worked annually

by 100 workers). Continuing the example, the TRIR does not report the rate of fall protection

safety performance; TRIR reports the rate of overall safety performance across all hazards.

However, by making a qualitative inference, national fall injury statistics can be used to ascertain

an approximation of fall protection safety performance. A review of insurance injury data shows

that fall injuries contribute approximately 15% to the total national construction industry injury

frequency counts. It could be inferred that 15% of an individual firm's total recordable injury

rate is equivalent to the fall injury-specific TRIR.

Experience Modification Rates (EMR), often used in the industry to assess contractor

safety performance and qualification, have been cited for certain limitations. Hinze (1995) points

out that the EMR is computed with input variables not affected by safety performance. To

counteract this limitation, some safety managers have suggested that only direct observation of

subcontractor safety behavior and conversations with jobsite superintendents and foremen can

give a more accurate indication of expected safety performance.

A companywide commitment to achieving a zero-injury-incidence rate is felt to be an

absolute requirement of a high-quality safety program (p.39, Hinze 2006). Hinze explains that

planning and goal setting for anything other than a zero incidence rate is a form of tacit

acceptance of unsafe behavior as an innate or predestined human trait. A quantitative proof of the

necessity of the company wide zero injury philosophy, as a precursor and first priority to a high










quality safety program, is not possible. The validity of setting the companywide zero injury

philosophy as the penultimate feature of safety improvement must be understood on a qualitative

level. This line of thinking reflects the progressive safety theory that explains why proactive

construction safety innovators prefer the use of leading indicators.

A Balanced Measurement System

An article that discussed measurement systems in safety reasoned that a balance between

quantitative and qualitative factors was important to effective safety management (Mohamed

2003). A checklist of management issues was presented that showed a balance of quantitative

and qualitative factors. A management study that examined 12 case study companies for

industry-leading performance measurement practices was cited as the source of the balanced

factors approach to measurement (Kaplan and Norton 1992). Kaplan and Norton stated:

What you measure is what you get. Senior executives understand that their organization's
measurement system strongly affects the behavior of managers and employees. Executives
also understand that traditional financial accounting measures like return-on-investment
and earnings-per-share can give misleading signals for continuous improvement and
innovation activities today's competitive environment demands. The traditional financial
performance measures worked well for the industrial era, but they are out of step with the
skills and competencies companies are trying to master today.

Kaplan and Norton made it clear that managers should not have to choose one type of

measurement to the exclusion of others. In safety, recordable injuries are going to be used to

measure an aggregate safety performance. In considering how to construct an industry-leading

measurement approach, Kaplan and Norton' s balanced scorecard approach suggests that

analogous to an airplane cockpit, safety managers need detailed information from more than one

dial to effectively track safety's progress toward zero injuries.

Kaplan and Norton' s balanced scorecard creates four important perspectives from which

to consider four basic questions:

*How do customers see us? (customer perspective)










* What must we excel at? (intemal business perspective)
* Can we continue to improve and create value? (innovation and learning perspective)
* How do we look to shareholders? (financial perspective).

In the context of construction, consumers of construction services, such as commercial building

owners, are the customers. For example, these customers (the building owners) demand high

quality safety services when they use safety performance as a bidding qualification. Safety

customers are identified by Mohamed (2003) as also being individuals inside the company. For

example, how do the employees perceive the benefits of the firm' s safety programs?

The internal business and innovation and' learning perspective in the balanced scorecard

focus on operational improvements and inevitably employee training and learning, the same core

values that are found in safety management theory. One case study firm in Kaplan and Norton' s

article (1992) conducted monthly surveys of 600 randomly selected employees to determine if

they were aware of a new total quality management (TQM) program, had changed their behavior

because of it, believed the outcome was favorable, or had become missionaries to others.

Surveys designed to measure companywide attitudes and participation in safety are an important

component of safety improvement measurement.

Considering the innovation and learning perspective in Kaplan and Norton' s model for

safety management, continuous improvement is dependent on upper management' s willingness

to leamn or take suggestions for improvement from employees. Safety enforcement will certainly

continue to be a required supervisory control. Creating better trained and educated workers that

can lead participativee management) the firm into new territories of innovation and success is

critical to the continuous improvement theory of Kaplan and Norton.

Mohamed (2003) translated Kaplan and Norton balanced scorecard concept into a safety

management context. His interpretation of the balanced scorecard concept was summarized in a











diagram (Fig. 2-4). The diagram was created to communicate an overall management theory for

safety improvement with an emphasis on continuous improvement. Starting from twelve o'clock

in the diagram and progressing clockwise, strategies for safety improvements are created,


implemented and controlled by the company's executive management. At three o'clock,

strategies have been implemented and safety performance measurement commences. Safety


performance and productive activities are viewed as opportunities to learn from experience. The

area labeled "Evaluating and Communicating" is the segment of the process where worker

involvement and operational feedback occurs. Worker perception surveys should occur at this


segment in the circuit. The circuit is completed by the training that reinforces the strategy and

makes continuous improvement possible. The training that occurs at nine o'clock is informed by

the "Learning and Improving" segment so that the training expands and adapts over time to

include the best worker suggestions for company improvement.





Top-down driven strategy is the reference point for
the entire safety management system.

Safety
Identifying performance
Strategy and improvement is
Targets a continuous
process.

Implementing BALANCED Learning and
and .SCORECARD Improving
Monitoring

Planning, training
and empowerment Evaluating and
are the basis forComnctg
efficient
implementation.


Bottom-up approach is the source for operational
feedback and evaluation.


Figure 2-4. Safety management system for strategic and operational implementation. Adapted
from Mohamed (2003).









Continuous Improvement in Construction Safety

Total quality management (TQM) techniques, many developed in the auto industry in

Japan and the U.S., are similar to safety management techniques studied in the U.S., particularly

research that has studied human factors rooted in work process and crew teamwork (Samelson

1977; Hinze and Parker 1978; Hinze 1987; and Geller 2002). TQM requires companywide

commitment by management and workers to a systems approach with high levels of training,

worker input and overall worker involvement. Where TQM was concerned with achieving zero

defects in product quality (p. 21, Sasaki 1984), construction safety methodology was concerned

with zero accidents (Hinze 2002b). An important distinction between TQM and safety theory

that may have acted as a barrier between the two bodies of practice and theory in the past is that

TQM typically attributes a completely nonhuman cost to nonconformance in product quality

(p.345, Galloway et al. 2004). Nonconformance costs in safety are absolutely human and

preferably measured in moral terms.

Positing safety improvement efforts on continuous improvement challenges organizations

to engage in a companywide commitment at all levels of management and employees. This type

of companywide commitment has been cited as the fundamental feature of an effective and high

quality safety culture (p. 40, Hinze 2006).

Best Practices in Safety Studies

By the end of the 1980's, the construction industry had developed important safety

practices that contributed to performance improvement. These safety practices were examined

and summarized in the first maj or construction study of zero accident techniques (Liska,

Goodloe and Sen 1993). A subsequent study was conducted to track the evolution and expansion

of these best practices (Hinze 2002b). That study identified nine maj or safety practice categories

contributing to improved performance:










* Demonstrated upper management commitment
* Staffing for safety
* Pre-proj ect and pre-task planning
* Training (orientation and specialized training)
* Worker involvement
* Recognition and reward and evaluation programs
* Subcontracting activity (contracts and direct management)
* Accident investigations
* Drug and alcohol testing.

These practice categories were found to be statistically significant contributors to improved

safety performance. In a closely related study, the nine best practices of the Making Zero

Accidents a Reality investigation were applied to a sample of petro-chemical proj ects engaged in

shutdown proj ects (Hinze and Godfrey 2002). Five of these practice categories (pre-proj ect

planning, safety training, subcontractor management, accident investigations and drug testing)

were grouped into a single variable. Using this new variable, the researchers were able to show

that on proj ects where adoption of most or all of the five practice categories occurred,

statistically safer conditions also occurred (p < 0.01).

Upper Management Commitment

There are many ways that upper management in construction firms can lend support to

improved safety performance. Hinze states that the key to effective participation by upper

management is a physical presence and involvement at the proj ect level (Hinze 2002b). The

message sent to all employees when top managers engage in project safety visits and activities is

that management is concerned enough about safety issues to require direct witnessing and

personal engagement. Activities include:

* Field safety inspections
* Participation in training and orientation
* Accident and near-miss investigations
* Reviewing monthly safety reports.









Projects where company presidents were involved in all maj or accident investigations were

shown to be significantly safer on a statistical basis (Hinze 2002b).

Strategic Planning for Fall Protection

Many important factors affecting fall protection and PFASs on a project are set in motion

in the planning and preconstruction phase of a proj ect. PFAS planning begins as soon as the

constructor examines the proposed structure or facility. What is the extent of PFAS required to

provide fall protection? Will a constructability review suggest opportunities to reduce PFAS

requirements by means of the hierarchy of fall controls and elimination of active fall protection

systems? If PFAS cannot be eliminated, what types of anchorage will be used and where will

they be located?

Effective preconstruction planning for fall protection and fall control methods requires

some amount of coordination between the designer and constructor. On traditional design-bid-

build proj ects (with owner, design consultant and contractor) team partnering that encourages

early communication between the parties can be beneficial to fall protection planning. On

design-build proj ects, constructability reviews that include fall protection planning are likely to

occur as a standard procedure (Hinze and Wiegand 1992). Fall protection best practices must

include using the preconstruction planning phase to promote safety improvements (Hinze 2006).

It is important to note that eliminating fall hazards through design and engineering (as contained

in the hierarchy of hazard controls) is dependent on aligning the mindset of the designer (and

owner) to the obj ective.

Goal Alignment and the Project Team

An owner plays a central role in establishing and controlling the goal alignment for the

proj ect. While the owner is not in absolute control of the design and construction process, the

owner has budgetary control over the proj ect and thereby sets the proj ect' s safety agenda. The










agreement between the contractor and the proj ect owner has been investigated in relation to

safety issues. Upper management of the construction firm can negotiate with the owner on

several key issues to influence a proj ect' s safety climate and culture. These key issues include:

* Itemizing safety costs as a line item in the project budget: A study of safety on
industrial construction proj ects investigated this issue (Hinze and Godfrey 2002). Over
85% of the proj ects included in that study used explicit safety budgeting to improve
performance. Overall, the industrial-type proj ects in that study had excellent safety records.
The mean recordable injury rate for the typical proj ect in the sample was 0.7 injuries per
200,000 worker hours.

* Using an agreement that incentivizes safety performance: The Hinze and Godfrey study
(2002) of safety on industrial construction proj ects also investigated incentivized
agreements. While the results of that study did not show a statistically significant
association between safety performance and contract incentives, the researchers presented
their investigation of this issue as a contributor to safety improvements.

* Requesting that the project designers consider construction safety: Researchers
(Gambatese, Behm and Hinze 2005) have shown that designers who are required by the
owner to consider design for construction worker safety in the design process are decidedly
more knowledgeable and competent about safety. This finding was statistically significant
(p < 0.0 1).

However, before concluding that the owner is exclusively in control of the safety agenda

on a proj ect, it should be noted that construction accidents are a reflection of broad systemic

problems not fully understood by any single party in the owner-designer-constructor triangle. For

example, financial market pressure on commercial real estate value is a variable that an owner or

developer feels and understands more directly than a designer or constructor. Likewise, few

owners fully understand the complexity of issues that act as barriers to safety for the designers

and constructors that they hire.

A key deterrent to effective goal alignment for the proj ect team is the lack of construction

safety knowledge of the A/E designer (Hinze and Gambatese 1996). Except for the requirements

of maj or building code regulations, the A/E designer is often deficient with regard to using safe

design principles to control fall hazards or improve fall protection. Compounding the problem of









the A/E designer' s lack of construction safety knowledge is the risk management outlook of the

A/E designer.

A common theory of contracts states that "contracts assign risk exposure to the parties best

suited to manage a risk" (Abramowitz 2002). Ever since the case law precedent of Geer v.

Bennett (1970), A/E designers have taken great care to limit their liability and contractual

responsibility for construction worker safety.

Goal alignment, team partnering and integrated project management have become more

common in commercial building construction in the last ten years. Forces influencing the

increased level of interest in integrated proj ect management include:

* Increased frequency of design/build and fast-track proj ect delivery. Both of these delivery
methods require increased levels of proj ect team cooperation whether by contract or the
owner' s insistence.

* Research in industrial manufacturing that has shown the cost savings benefits of greater
integration between design and manufacturing (Ettlie and Stoll 1990). For example, Ettlie
and Stoll (p.68, 1990) state that when firms provide specialized training in design for
manufacturing (training to promote better integration of design and manufacturing) or
form teams tasked with design and manufacturing integration, improved productivity and
cost reductions occur.

An exploratory study investigated the safety benefits of integrated design/manufacturing

teams in a building construction context (Hecker, Gambatese and Weinstein 2005). The study

was based on a case study of an integrated design/constructor team that was used in the proj ect

management of a semiconductor manufacturing facility. The proj ect was constructed for the

owner, a large semiconductor manufacturer, for a construction cost of approximately $700

million USD. In order to promote improved construction safety, an integrated team that included

repre sentative s of the owner, the architecture/engi neeri ng (A/E) con sultant, and the con strcti on

manager was formed in the early design stages when conceptual design issues were still

outstanding and easily modified by the integrated team.










Another aspect of the integrated design/constructor team included trade contractors who

either had been pre-qualified or were planning to submit bids. Some trade contractors

participated in the early design phases, but were dropped from the team later because they were

not awarded contracts. The authors of the study stated that while explicit details about how to

implement integrated design/manufacturing teams for improved construction safety are not

common in the literature, the proj ect had demonstrated that such a process is feasible.

Design-build contracting and project delivery has been on a steady upward trend and has

become a maj or mode of proj ect delivery. The Design/Build Institute of America estimates that

design-build will become the dominant method of proj ect delivery (Fig. 2-5) in commercial

construction by the year 2015.






900.:.


604.:' 10 I CM(at risk)
S5009..
O m Traditional
a$ 4 0 9.:
300.:. Design-build
200.:.


1985 1990 1995 2000 2005 2010 2015





Figure 2-5. Market share of maj or proj ect delivery methods for non-residential design and
construction in the United States. Adapted from Design-Build (2007).

From the reference point of effective goal alignment, design-build contracts have the contractual

advantage of placing the constructor and A/E designer under the same contract with unified










obligations and duties. The design process operates with the benefit of shortened lines of

communication between designer and constructor.

Design-build firms have been cited for their innovative construction safety practices

(Gambatese, Behm and Hinze 2005). As part of a company mandate to improve A/E designer

participation in construction safety, the following practices were adopted by the design

department at a large design-build firm:

* Designers at the firm received a safety training course based on the 10-hour OSHA training
format.

* Site hazards for proj ects were designated with special alert symbols to improve
communication and awareness of hazards.

* Safety design guidelines were consulted for each proj ect to promote thorough
consideration of safety improvement options.

Design for Safety Resources

Computer software has been developed to provide construction safety resources for

designers and constructors interested in using the design process to eliminate hazards

(Gambatese 1996). Best practices for hazard mitigation were compiled and incorporated into a

computer program, entitled "Design For Construction Safety Toolbox."

These design guidelines for improved worker safety were meant to be considered and

incorporated during the proj ect design and planning phase. Almost a third of the design

guidelines address design features and improvements that directly impact PFAS. Included in the

body of these guidelines are important fall arrest concepts such as the need to incorporate

permanent anchor points into roofs and other high exposure areas in the structure so that

construction workers (during construction) and maintenance workers (during occupancy) can

readily find suitable anchor and anchor connector opportunities.









Pretask Planning

Pretask planning is a special form of participative management by workers at the craft

level where employees plan tasks involving their trade but also must consider required safety

equipment and compliance issues. The documentation of pretask planning allows the plans to be

reviewed by management on the proj ect, and also creates a record of safety performance. The

implementation of pretask safety planning was shown to have a significant impact (p < 0.05) in

lowering injury incidence rates in a study of industrial construction proj ects (Hinze and Godfrey

2002).

In the context of PFAS safety planning, pretask planning would be expected to consider:

* Anchorage placement and location
* Anchorage connector selection
* Horizontal lifelines (HLL) selection and engineering
* Leading-edge and deck perimeter fall protection
* PFAS system and task coordination.

No explicit descriptions for pretask planning in relation to fall protection and PFAS use were

found for the literature review.

TQM literature often contains a discussion of quality improvement tools (Sasaki 1984;

Galloway et al. 2004). The cause and effect diagram or fishbone diagram has been used in

participative management as a quality improvement tool. The name, wishbone diagram, is

attributable to the diagram's characteristic appearance of a fish skeleton. For illustrative

purposes, a hypothetical safety problem involving utilities and site work is diagramed in Figure

2-6. Potential accident cause categories that form the ribs of the fishbone diagram are established

before the exercise begins. Galloway et al. (2004) present possible starting categories:

* The four M's: men, machines, materials and methods
* The four P's: people, policies, places and procedures
* The four S's: skills, suppliers, systems and surroundings.











Possible starting categories for PFAS and pretask planning are materials, anchorages, lifelines,

and tasks (MALT). The materials category would allow consideration of any issues relating to

the specific structural and finish materials on the proj ect.





SOIL UNSTABLE
EQUIPMENT SOIL TYPE
CONDITIONS

SANDY LOAM
NO 80% SAND
SHORING
TRENCH
BOX
REMOVED
FROM SITE



EXCAVATION
UNPROTECTED




PHASE I
PLUMBING EETIA U
/ COMLETEON THE JOB
REOETRENCH / C M L T LC RC LU
BOX
SUBCONTRACT TRENCH BOX BY CM
MANAGEMENT





Figure 2-6. Fishbone diagram for causes of unprotected excavation.

Worker Involvement in Safety

Worker involvement is critical to successfully implementing safety best practices.


Engaging in a sincere human interaction with individual workers as a daily activity and

fundamental corporate value is one of the fundamental tenets of enlightened safety management.

Leading safety theorists have been emphatic about the fundamental importance of worker and

employee involvement and participation. Peterson stated that techniques to promote worker

involvement and participation, such as safety perception surveys, were the top priority for









initiating improvements in safety culture and best practices (Petersen 2007). As stated by Hinze,

employees categorized as workers have the potential to contribute far more than manual labor if

given the opportunity (p.261, Hinze 2007).

Cox (2001) states that "the ideal situation is when there is goal congruence among the

workforce and the organization. Common goals, or even the opportunity for workers to attain

personal goals on the way to helping the organization achieve its long-range obj ectives, certainly

impact workers' motivation and commitment to see a plan through." The management goal of

engaging the workforce in a dynamic interdependency of corporate and individual employee goal

attainment is supported by a safety theory known as goals freedom alertness (Kerr 1957). The

central hypothesis of this theory as stated by Kerr is that "great freedom to set reasonably

attainable goals is accompanied typically by high quality work performance (p. 5)." Kerr' s

theory regards an injury accident as an unsafe behavior by a somnolent individual with a low

level of personal engagement with the j ob or task. Kerr recommends creating a company culture

with a rewarding and rich psychological climate. This recommended company culture has

diverse (economic and personal) opportunities for employee reward and goal achievement.

In a major study that investigated the attitudes and sentiments of construction workers

(Hinze 1981), workers were surveyed about the extent to which their ideas for improvements

received serious consideration from their supervisors and companies. The results indicated that

workers who felt that their input was often given serious consideration had significantly lower

injury incidence rates (p < 0.01).

Enforcement of safe behavior is the traditional method of assuring compliance with safety

policies in the construction industry. While safety compliance enforcement is a required

management control, Geller (p. 1, 2002) points out that emphasizing enforcement possibly









creates a dependency mindset where passivity becomes the dominant mode of employee

behavior. For example, if management exclusively emphasizes compliance with safety policies,

workers might understandably adopt an attitude such as "my only obligation is to follow the

rules and the boss will be satisfied." Passivity in the face of witnessing unsafe work behavior or

job site hazards is rarely a best practice. Achieving an effective best practice environment in

safety requires empowering employees to contribute to and assist in improving safety programs.

Important techniques to promote worker involvement and participation in safety that have

been studied in construction safety over the past twenty years are:

* Toolbox Meetings: Weekly worker meetings at the crew level, led by the crew foreperson
are almost universal in construction. In a study of 27 petrochemical proj ects, every proj ect
without exception used weekly toolbox meetings to reinforce safe behavior (Hinze and
Godfrey 2002).

* Work Process Observations by Workers: Safety observers typically receive special
training to prepare them to make observations of safety behavior. In one study the average
median time for an observation was 2.5 hours (Hinze and Godfrey 2002). Research has
shown that proj ects where worker-to-worker observations were conducted had better safety
performance .

* Safety Committees: Members are drawn from different trades on the proj ect and may also
include safety managers. The committees have been used on proj ects to perform weekly or
monthly safety audits and to generally observe safety compliance and behaviors (Hinze
and Godfrey 2002).

* Employee Perception Surveys: Typically surveys ask employees to comment on existing
policies and practices, but may also request open-ended comments and suggestions for
improvements (Petersen 2007).

Employee suggestion programs have been used in industry to solicit innovative feedback

from employees. Human resource consultants have recommended that suggestion programs

require that employees identify themselves when making suggestions. When the worker' s

identity is included with the suggestion, the employer is obligated to implement well-designed

policies for rewarding and recognizing high quality suggestions (Heathfield 2007).









Participative Management and Quality Control Circles

An example of how worker involvement has been extended in general industry is where

production-level employees participate in and give direction to management. The general theory

of participative management is that the craft workers have an intimate knowledge of the work

processes that give them a distinct and valuable perspective on safety and productivity

improvements that should be respected and developed (p. 17, Mohr and Mohr 1983).

Quality control (QC) circles are a form of participative management that was developed in

post-WWII Japan, but were imported into American industry starting in the early 1980's. QC

circles have been used in many notable firms to improve quality and safety, including Hewlett-

Packard, Honeywell, Hughes Aircraft and Lockheed Martin (Mohr and Mohr 1983). There is a

general acceptance of the fact that the ever-increasing market share of Japanese auto

manufacturers rests predominantly on the stellar reputation that their products have for quality

and reliability.

QC circles constitute a basic general improvement concept. Small teams of workers from

the same operational area meet with first-level supervisors to examine operational problems and

recommend solutions to the company. As one article points out (Hutchins 1984), this seemingly

simplistic and familiar sounding quality committee:

...differs radically from other techniques, both in concept and manner of operation. The
Quality Circle works from the bottom up, drawing directly on the knowledge and skills at
shop-floor level an unfamiliar approach to those accustomed to applying top-down
management techniques.

Hutchins went on to say that while "no single concept or management policy has been

responsible for the extraordinary success of Japan, the employment of Quality Circles has been

very important." Of course, part of the familiarity of the concept is due to the gradual

importation of Japanese TQM techniques into U. S. business culture and continuous improvement









theory over the last twenty years. What is still fairly distinct about quality circles is that workers

establish their own target goals one after another from their own autonomous ideas, including

strategies for achieving the targets. The quality circle concept has also been noted as being

applicable to safety improvement as well as improving productivity and quality (p.21, Sasaki

1984).

Work Crew Dynamics

Investigations of the work crew have also taken place in the context of construction safety.

The primary hypotheses of one study was that excessive pressures placed on workers and direct

supervisors (presumably accountable to the company for results) to achieve production quotas or

proj ect schedule targets would lead to increased safety problems and injury rates (Hinze and

Parker 1978). With the goal of investigating this hypothesis, the following factors were studied

as influencers of increased injury frequency:

* Use of cost information (to measure the extent the project was meeting cost estimates);

* Use of proj ect schedules (to measure the extent the foremen and superintendents were
using scheduling tools to motivate workers);

* Competition between crews; and

* Perceived support for safety best practices from upper management policies or attitudes.

Influence of Crew Leaders, Foremen and Superintendents

The display of sincere concern for worker health and safety through policy and direct

management practices of supervisory personnel (superintendents and foremen) is associated with

better safety performance (Hinze 1987; Hinze 2002). A good leader from a safety perspective is:

* An effective planner
* A well-organized individual with a high-level of involvement and coordination with other
members of the proj ect team
* A good role model, especially regarding safety behavior (Hinze 1987).










The good leader in safety is also knowledgeable about the personal issues and concerns of

workers in their charge (Hinze 1987). Fostering a work environment where the workers are

afforded an opportunity to contribute their expertise about safety, productivity and quality in a

meaningful and legitimate manner satisfies basic human needs for recognition and appreciation

(Geller 1997).

Obstacles to Best Practice Program Effectiveness

Obstacles to achieving safety best practices program effectiveness may be avoided by

monitoring factors known to cause problems for new programs. All the factors outlined in this

literature review, as components of safety best practice, are subj ect to incompetence and failure.

Safety practices that are known to be problematic or controversial have been identified in the

literature.

Hinze (2002a) researched the use of safety incentives as a method for motivating safe

worker behavior and improving safety performance. The study's results showed that some

construction firms feel that incentives are ineffective because they do not actually measure

improvements in safety behavior and technical execution, but instead draw conclusions from the

absence of injuries. Worst case, incentive programs may even reward employees for not

reporting injuries. That study found that firms with better safety performances considered safe

behavior and observations about work processes in conjunction with lower injury rates when

awarding incentives.

The following list of obstacles was cited in regard to implementing TQM programs in

general industry (adopted from Greshner 1984):

* Lack of approval and understanding of best practices by upper management

* Problems with supervisors and middle managers, including inadequate training in best
practices for managers, resistance to innovation or change; or disinterest in best practice
program










* Lack of comprehension of best practice philosophy

* Coordination problems in implementing and administering a new best practices program

* Employee turnover or other problems influencing the availability of properly trained
personnel

* Obstacles to implementation rooted in marrying TQM techniques with existing
management hierarchy

* Lack of resources or other issues relating to procurement of equipment.

Worker Training

Researchers of basic human motivations have proposed that humans have an innate interest

in being able to successfully solve problems and complete tasks. This need has been

characterized as the desire to be competent (White 1959). Because of the technical complexity

and associated injury severity of improperly-implemented PFASs, worker competency to follow

the recommended procedures and to understand risk exposure is critical to safety performance

and the self-preservation of the individual worker. When workers learn the specific practices for

100% tie-off, they feel competent. When the individual feels a high level of competency, their

overall performance and well-being as an employee is enhanced (Geller 2002).

OSHA Construction Regulation, Subpart C, states that "the employer shall instruct each

employee in the recognition and avoidance of unsafe conditions and the regulations applicable to

his work environment to control or eliminate any hazards or other exposure to illness or injury."

This regulatory clause is a statement of the employer' s duty to conduct a hazard analysis. This

hazard analysis must be followed up by the employer's commitment to train the employees to

recognize and avoid these same hazards. Clearly, the employer is on the frontline of defending

against working-at-elevation injuries and obligated to increase the PFAS user' s awareness of the

risks associated with using anchorage and fall protection equipment effectively.









The safe use of PFAS requires intensive baseline worker training in equipment care,

compatibility and safe anchor connection techniques in compliance with OSHA training

requirements for employees exposed to fall hazards. A study (Hinze 2002) that examined the

practices used by construction firms to lower worker injury rates found intensive safety training

programs to have a significant (p < 0.01) impact in lowering injury rates. That is, firms providing

more hours of worker training were associated with better safety performances. Intensive safety

training programs were defined as proj ects that provided monthly training to each worker

consisting of four or more hours beyond basic orientation.

Standards for worker training are given in the U.S. national PFAS standard (ASSE 1992).

As mentioned above, comprehension of the influence of total fall distance (TFD) is considered a

standard for PFAS user competency. Research focusing on the anchorage component of PFASs

has shown that worker orientation training that is trade and proj ect specific with regard to

anchorage is critical to worker competency.









CHAPTER THREE
IVETHODOLOGY

The two obj ectives of this research were: 1) to identify best practices related to the use of

PFASs; and 2) to synthesize the identified best practices into a tool for continuous improvement.

Identification and analysis of root causes that place workers at risk through the improper use of

PFASs was also considered by examining injury data available from OSHA. The methodology

and analysis for the injury data are given in Chapter 4.

Research Design

The hypothesis for this research was that the companies within the ENR Top 400 general

contractor population with the better safety records had implemented more robust and aggressive

policies in fall protection and fall arrest systems than contractors with underperforming safety

records, that is, with safety records that were not as good. These robust and aggressive policies

were investigated to determine the specific best practices that significantly influence the injury

incidence rate.

Sample Selection

Large construction firms were selected for investigation because these firms were expected

to be more proactive in the use of aggressive and robust safety practices, including progressive

fall protection and fall arrest systems. A list of large contractors, commonly known in the

industry as the ENR Top 400, was selected as a sampling frame for the large contractor

population. This list has been compiled and published annually by a leading publisher of

construction industry information and data (ENR 2006). Other construction safety studies (Hinze

2002b) have also investigated the safety practices of these large construction contractors (ENR

Top 400).









The specific Top 400 list used for the study was created from data provided on a voluntary

basis by large construction contracting firms for the year 2005. The Top 400 reported combined

total revenues of over $230 billion US Dollars for the year 2005. These contractors had annual

domestic revenues that ranged from $120 million to over $10 billion US Dollars.

The ENR Top 400 population has been characterized as a population with a wide range of

construction activities, commonly called a general building market (ENR 2006). The types of

construction proj ects and market sectors in a general building market include:

* Building construction
* Buildings and structures for manufacturing
* Petroleum and chemical plant construction
* Water supply proj ects
* Sewer and waste treatment plants and piping systems
* Horizontal (transportation, highway and bridge) construction
* Hazardous waste proj ects
* Power plant construction
* Telecommunications (towers and underground) construction.

Construction safety practices would be expected to have a wide range and high degree of

variance for a general building market population; however, the variance for the population

selected was considered acceptable because the selection of this sample population was

consistent with the research obj ective discussed in Chapter 1.

No attempt was made to classify fall protection and fall arrest system practices by proj ect

type. All employers are affected by the OSHA regulations for fall protection because working at

elevation, that is, working at a height of 6 feet or more above the walking surface, is a common

and widespread phenomenon. The character of fall protection and fall arrest systems practices of

firms in the ENR 400 population was considered to be defined by two factors:


* The nature of a typical commercial or governmental construction contract with standard
subcontracting and construction management practices.









*The transitory and dynamic nature of construction proj ects as compared to the fall
protection and fall arrest systems practices developed and implemented for general
industry that use permanent locations and facilities.

The injury data collected by OSHA (from which the significance of fall fatalities and

serious injuries was determined) is associated with a liberal classification for the construction

industry. The liberal characteristic of the general building market (as represented in the ENR Top

400 population) was deemed to be equivalent to the limits and bounds of the construction

industry as defined by the OSHA injury recording and data management process. The ENR Top

400 contractors were selected for investigation because they reflected similar characteristics as

the source population for the OSHA injury data. In summary, if the significance of the injury

data was determined from a broad classification of the construction industry, then the

significance of best practices implemented with the objective of reducing those same injuries

should be determined from data collected and analyzed from a similarly broad classification (or

sampling) of the construction industry.

Hypothesis Testing

Two parameters of interest ( 6 ) in the population were investigated in this study: 1) the

optimum group of safety practices (the best practices), specifically fall protection and fall arrest

practices, that would effectively reduce fall fatalities and serious injuries; and 2) the contractor' s

total recordable injury rate (TRIR). Fatalities and serious injuries must be recorded by all

employers with more than 10 employees as mandated by the OSHA regulations. The employer's

total recordable injury rate (TRIR) is defined as the number of recordable injuries per 200,000

worker hours (the number of hours worked annually by 100 workers). The term, recordable

injuries, is also defined by the OSHA regulations (section 1904.4 "Recording Criteria").

The hypothesis test specified was a correlation of the construction contractor' s TRIR and a

given set of safety practices (implemented as a component of a contractor' s safety plan). Because









correlation assigns an equivalent status to the two variables, there was no dependent variable in

this study. TRIR and the safety practices implemented (as a safety management treatment for fall

protection) are both response variables given equal consideration in all respects.

In this research design, the null hypothesis is for independence. The null hypothesis tested

was that the TRIR was not associated with an increase in the number of best practices in fall

protection and fall arrest systems implemented. Stated in terms of the test statistic, the null

hypothesis to rej ect or accept was that the true value for the correlation coefficient was equal to

zero, indicating no association or zero correlation between the x-value (the best practices) and

the y-value (the TRIR).

The historical source of the mean TRIR for the construction industry has been the Bureau

of Labor and Statistics (BLS) and OSHA. The historical data for the population in this study has

shown the following:

* The mean TRIR for the construction industry for 2005 was approximately 6.35 injuries per
200,000 worker hours.

* The assumption of a standard normal probability distribution for the population of TRIR
values in the construction industry has not been considered reliable. Historically, the
estimated range and variance of the TRIR population have not been published by BLS or
OSHA.

Sample Size Determination

Sample size determination is related to the establishment of a decision protocol for either

rej ecting or accepting the null hypothesis. Two types of errors were taken into account in the

design of this study:

* A type I error is committed if the null hypothesis is rej ected when it is true. The probability
of making a type I error is denoted by the Greek letter alpha ( ac ). This probability is
typically defined as the level ofsignificance for the hypothesis test. To protect against
committing a type I error, the significance level of ac for testing was specified at or below
0.05.










* A type II error is committed if the null hypothesis is accepted when, in fact, it is false. The
probability of making a type II error is denoted by the Greek letter beta ( P ). To protect
against committing a type II error, the power of the test ( 1- P ) for testing was specified at
0.90.

Hollander and Wolfe (1999) present a method for determining an approximate sample size n for

a one-sided, Kendall sample correlation test for independence. This approximate value of n is


n = 4 (za + zg )2 / 9 z2

where
z, = z.os = 1.645
zp = z~l 1.285
z = lowest level for the Kendall correlation coefficient at which significance could
be detected = 0.30
Thus,

n = 4 (1.645 + 1.285 )2 / 9 (- 0.30)2 = 42.39.

To be conservative, the minimum sample size was taken to be n = 43.

Data Collection

This research investigated safety practices in the ENR Top 400 population with a survey

instrument. The survey instrument investigated the population in two phases as follows:

* A preliminary survey to measure response frequencies in the different categories of safety
management (for fall protection and fall arrest systems).
* The fall protection and fall arrest systems survey to identify the most effective safety
practices in PFASs.

These surveys were developed by an iterative process. The initial material considered for the

survey form was derived from a precedent fall protection safety study (Hinze and Harris 2007b).

The survey development process considered the following factors:

* Contractor demographics and standard industrial classification (SIC)
* The types of trades involved in different phases of construction and various types of
structural erection that use fall protection and fall arrest systems
* The significance of engineering and preconstruction in the effective management of
anchorage










* The importance of subcontractor management for promoting robust safety practices as a
general contractor (a sample of subcontract agreements was considered)
* Lists of significant best safety practices from precedent construction safety studies
* Safety compliance checklists.

The Einal versions of the survey forms are presented in Appendix B.

Preliminary Survey

The preliminary survey was mailed to the sampling frame (the ENR Top 400 contractors); the

completed surveys were returned in a postage-paid envelope. The survey inquired about the

following practices:

* Practices for writing subcontracts and monitoring the PFASs used by subcontractors
* Extent and type of training received by workers
* Regular inspections of PFAS equipment
* Company requirements regarding the use of PFASs
* Company strategy to ensure that employees utilize PFASs
* Preconstruction and engineering coordination practices
* Extent to which OSHA-compliance was met or exceeded.

More than half of the questions were designed for a nominal yes or no response. The

balance of the questions recorded a multiple choice or an open-ended comment response.

The exploratory nature of the preliminary survey was intended to investigate the attitudes

and practices of the population. The use of a sequential survey structure with a preliminary data

collection phase was chosen to improve the probability that the survey would collect statistically

significant responses for the parameters of interest in the population. That is, some questions

regarding certain safety practices in the preliminary survey were dropped from further

exploration based on the results from the first stage of data collection. For example, the result for

Question 10 in the preliminary survey (Is subcontractor compliance with the OSHA regulations

mandated in your firm' s subcontract agreements?) was that 100% of the responding companies

answered in the affirmative for this question. From this result, it was determined that, although









this question presents an important safety practice, further exploration of this practice was

unwarranted.

Fall Protection and Fall Arrest System Survey

In order to generate more specific data about certain policies and practices for which data

had been collected in the preliminary survey, clarifications were sought from the population

regarding particular parameters of interest. For example, several respondents to the preliminary

survey commented that their companies had adopted an all inclusive tie-off rule for all workers

on site (to exceed OSHA regulations). A question for the Fall Protection and Fall Arrest System

Survey was created to collect data on the number of companies that had implemented similar all-

inclusive tie-off policies.

A specific goal of the survey was to collect data on practices with a high probability of

influencing the parameters of interest for the population. In order to meet this goal, the frequency

of nominal questions was increased as the study progressed. In the preliminary survey, nominal

yes-or-no questions comprised less than fifty-five percent of the questions. Nominal yes-or-no

questions occurred at a frequency rate of almost 90% in the Fall Protection and Fall Arrest

System Survey.

Another concern for the survey design at the completion of the preliminary survey (that is,

during the second stage of data collection) was to assure a high response rate by controlling the

length of the subsequent survey. Twenty-six questions were eliminated for the purpose of

reducing the time and effort required to fill out the survey form. The mail-out format was used in

both phases of the survey.

The Fall Protection and Fall Arrest System Survey (the second stage of data collection)

was sent to the entire population of the ENR 400 contractors. Two versions of the survey were









distributed in this second stage of data collection. A follow-up version of the survey instrument

was required because of two interrelated factors:

* Fourteen questions from the preliminary survey were deemed to be useable data for use in
the testing of the hypothesis.

* Forty-seven respondents provided their contact information for the purpose of receiving a
copy of the final report. Because of the apparent interest in the research of these 47
respondents, it was decided to send the second stage of data collection directly to these
individuals. Due to their expressed interest in obtaining the final report, it was concluded
that they represented a group of the population that would be likely to respond to the
second stage of data collection. Since they had already provided viable information to the
preliminary survey (first stage), they were sent a shortened survey that asked for
information on a few additional topics. That is, the information they provided in this
shortened second stage survey was appended to the information they had previously given.

Forty-seven respondents to the preliminary survey were asked to participate in the second stage

of the survey. Because they had already provided viable data that could be used in the final

analysis of the survey results, it was determined that two versions of the second stage of data

collection were necessary. These two versions are described as follows:

* The Fall Protection and Fall Arrest Systems survey (titled the same in Appendix B) was a
38-question version (14 questions reused from the Preliminary survey and 24 new
clarification-oriented questions). This version was mailed to 353 companies in the ENR
Top 400 sample frame (the total number of companies in the ENR Top 400 sample frame
less the 47 respondents to the preliminary survey).

* The Fall Protection and Fall Arrest Systems survey, follow-up version (titled the same in
Appendix B), was sent out with a personalized cover letter addressed to the 47 individual
respondents to the preliminary survey. This version of the survey contained only the 24
new clarification-oriented questions. The actual survey form contained 25 questions as
shown in Appendix B. The one extra question was a duplicated question because question
22 in the follow-up version also appeared in the preliminary survey (question 37).

As a quality assurance measure, the cover letters for the follow-up surveys were addressed

personally to the individuals who had identified themselves in the preliminary phase. The

personalized cover letters assured that the specific individuals that responded to the preliminary

survey were the same individuals who were submitting information for the follow-up survey. At

the conclusion of the data collection period for the study, the data collected from the preliminary-










phase respondents (total survey data collected in two separate mail-out survey forms) were

expected to be equivalent to data collected from new respondents (who were sent the 38-question

survey version).

The second stage of data collection/survey instrument requested data on the company's

OSHA recordable injuries. The total recordable injury rate (TRIR) has been widely used as a

measure of safety performance in the construction industry. As noted above, the research was

designed to use the TRIR as one of the response variables for statistical testing.

Because the respondents who had identified themselves in the first stage were assumed to

have an active interest in the research, it was expected that the response rate would be high. A

web search was conducted about response rates for panel studies, also called longitudinal studies

(Flood et al. 2007; Jennings et al. 2007). The literature reported that 80-90% response rates (or

10-20% attrition rates) were typical for follow-up surveys in longitudinal studies. However,

because the literature cited was not reporting on the population of interest for this study,

skepticism towards these response rates was warranted. Data were sought from the balance of the

population (the preliminary phase non-respondents) so as to improve the odds of receiving an

acceptable sample size for the hypothesis testing.

Data Analysis

The data analysis in this study was concerned with the statistical relationship between two

variables (TRIR and the safety management practices implemented) involved in a bivariate

structure. The statistical procedure used was a test to determine whether or not these two

variables were independent. The probability distribution-free method used for testing

independence in this study is known as a nonparametric statistic. Nonparametric statistics are a

broad family of methods that includes rank correlation tests (Kendall 1962; Kruskal 1958;









Hollander and Wolfe 1999). Rank correlation tests were the primary means of data analysis used

in this study.

Assumptions

The lack of historical data for the population selected (ENR Top 400 contractors) made

assumptions of a normal probability distribution for the population unreliable. By assigning

ranks to the individual values for the two variables of interest (the TRIR and the safety

management treatment), a distribution-free statistical test could be conducted. That is, a test was

conducted without determining the distribution of the population.

The historical data provided the expectation that a bivariate correlation of TRIR and the

safety management treatment would produce a coefficient limited to the bottom half of the

interval [-1, 1]. That is, the TRIR is negatively correlated with the quantity of safety management

practices. Data analysis from previous safety studies (Hinze and Godfrey 2002) showed that the

assumption of a correlation coefficient value limited to the interval [-1, 0] was reliable. That is,

TRIR was reliably decreased when more robust and aggressive safety practices were

implemented. Therefore, a one-tailed statistical test to protect against an error (that is, an error in

rej ecting the null hypothesis) in the negative range of the sample was justified.

The Kendall rank correlation, type b, is a statistical correlation test that is useful when

there are a number of tied data points in the in the sample data. Because tied observations were

exp ected to occur i n the s ample data for the s afety -practi ce s-i mpl em ented vari able (that i s, it was

expected that two or more cases in the sample could implement the same number of safety

practices), the Kendall's tau, type b test of the Kendall rank correlation was used in this study.

Procedure

A software package for data analysis and statistical testing (SPSS 12.0 for Windows) was

used for data input and analysis. From the SPSS menu list of bivariate correlation tests, the









Kendall tau, type b, test with the one-tailed test option was selected for testing the null

hypothesis.

The first step in the procedure for this test was the computation of the Kendall sample

correlation statistic, K. The computation methodology for Kendall's K statistic was presented in

a textbook format in Kendall's book on rank correlation methods (Kendall 1962). The Kendall

test for independence in the context of nonparametric statistical procedures was presented by

Hollander and Wolfe (1999). Both of these textbooks were used as reference sources.

Previous safety studies (Hinze and Godfrey 2002) have used a data analysis procedure

where associations were found by synthesizing important safety practices into a single ordinal

variable for use in a correlation test. In this study, an ordinal value was assigned to the total

number of practices implemented as scored from the total available safety practices investigated.

Individual sample cases were assigned one point for each safety practice implemented; or a zero

if the safety practice was not implemented.

Correlation tests were conducted that measured the rank correlation between the ordinal

variable (created from the safety practices implemented) and the total recordable injury rate

(TRIR) variable. In these correlations, the nominal values assigned to the safety practices could

assume a value between zero (no practices implemented) and 9 (all nine practices implemented).

The relative significance and importance of the specific nine variables that were tested was

determined by investigating the individual frequencies and individual correlation coefficients

(when correlated with the TRIR) for these variables.

An iterative process was then conducted that correlated various and alternate combinations

of the nine nominal variables with the TRIR. These iterations continued until the strongest

association was identified between a selected group of safety practices and the total recordable









incidence rate (TRIR). In this study, a combination of Hyve safety practices was found to yield the

most compelling results or the strongest correlation with the TRIR. These Hyve specific safety

practices (that were found to have the strongest correlation with the TRIR) were used in the

formal correlation that was used to test the study's hypothesis.

Data Collection and Analysis from a Related Sample

Because proj ect designers can influence hazard elimination through design, data were

sought from firms participating in integrated design and construction, either by design-build

contracting or traditional A/E consulting. The population selected for investigation was defined

by a sampling frame. The sampling frame was defined by a published list of attendees from a

maj or industry exposition and conference for integrated design and construction (Design-Build

2006). This population was referred to formally as the designer-builders or designer-builder

population in this study.

The concept of interest concerning the designer-builder population investigated in this

study was that when designers (engineers and architects) and builders are in more frequent

communication with each other (as is facilitated by a design-build contract or proj ect

management method), enhanced construction safety practices will be a measurable outcome.

The data for this sample were collected by an on-line survey. The population selected for

sampling contained 40 companies with engineering and architecture design services (Appendix

C). Initial contact was made via telephone. If the individual contacted was interested in

participating in the survey, the individual was directed to a website address to complete the

survey form. The 40 companies in the population were aggressively contacted, which included

multiple contacts when deemed prudent to maximize the sample response level.

The surveys were designed to gather information about engineering and integrated design-

build practices related to PFASs that had been implemented from the designer's perspective. A










list of practices that had been collected from a leading design-build firm in an earlier study was

used as a baseline of proactive design-for-safety practices. Insights into the importance of design

and engineering for the effective management of anchorage and fall arrest planning gained from

an earlier study were also used to develop the survey questions (Hinze and Harris 2007b).

Fourteen questions were included in the survey. The final version of this survey form is

presented in Appendix B.

The data collected and analyzed from this sample of engineering and design firms were

considered an exploratory investigation to gain clarification and insight into design influences on

construction and fall protection safety. Due to the small sample size and exploratory nature of

this component, statistical tests were not used to analyze the data. Data were analyzed by

descriptive statistics, for example, frequencies observed for individual engineering practices.

Development of the Scorecard

In order to allow implementation of best practices in fall protection and PFASs in a

comprehensive and flexible manner, a scorecard (or evaluation tool) was created for

implementation in the industry. Results of this study were used to develop a method that could

be used to quantitatively measure PFAS policies and practices within a given company. A safety

measurement system of this type that has the capability of evaluating safety conditions prior to

actual safety failures, injuries, and fatalities is considered a leading-indicator or proactive safety

measure.

The scorecard was created by combining best practices investigated in the test of the

study's hypothesis with supporting policies and practices derived from the literature review. Two

scorecard versions were created to address the distinct evaluation needs of:

* Firms interested in companywide safety improvement
* Firms interested in safety improvement of field operations (evaluation per proj ect).










It was believed that many of the best practices that would be used to develop the scorecard had

already been implemented by large contracting firms with proactive safety programs. In order to

test the hypothesis that the scorecard was well-designed, comments from practicing safety

managers and safety experts were solicited on the basis of purposive sampling to assist in

refining the content of the scorecard.

Purposive sampling, also known as directed sampling, uses the researcher' s insight to

identify cases that are information-rich or to identify individuals with expert knowledge as a

means of efficiently discovering patterns and factors pertaining to the subject area under

investigation (p. 82, Erlandson et al. 1993). The purposive sampling methodology was used to

select individuals believed to have knowledge of critical importance to the overall assessment of

PFAS. This review and comment process was considered a means of validating the scorecard by

subj ecting its content to the analysis and criticism of safety management practitioners. In this

research, each individual instance of this process is presented as a case study.

The case studies were conducted by contacting safety managers who had participated in

the survey of fall protection and fall arrest system practices and had given their contact

information for the benefit of the researcher. These practicing safety managers were asked to

review the scorecard and comment on issues and possible limitations. Safety experts known to

the researcher through industry associations were also contacted to review and comment on the

scorecard.

Generally the case study participants were asked to comment on the usefulness and

limitations (strengths and weaknesses) of the scorecard. The following types of questions were

suggested to the case study participants in the course of the discussion:

* Do you already have scorecards or checklists that you use in your business?
* Does the scorecard seem valid?










* If one of your company's proj ects was scored using these criteria, would you consider that
to be a reasonable assessment?

* If not, what qualifications or exceptions would you want noted?
* Are there any questions that are poorly worded or that need to be adjusted?
* Are there any important issues that are missing from the scorecard?
* Could you use this scorecard in your business?

Profiles of the case study participants who had submitted completed surveys were developed

from survey data. Survey data used in the profiles included

* classification of their company based on annual revenue

* Hypothetical scores for fall protection practices implemented that were created by filling in
the scorecard with the case study respondent' s survey data, if no additional specific
clarifications were collected during the scorecard validation/case study process.

The criticisms received during the case studies were an important component of the scorecard

development and refinement process. The results of the critique were incorporated into the final

versions of the scorecards.









CHAPTER FOUR
ANALYSIS OF FALL INJURY DATA

Safety research often begins with an analysis of recorded injury data in order to find the

root causes and factors contributing to the particular category of injuries being studied (Hinze

and Russell 1995; Hinze, Pederson and Fredley 1998; Loosemore, M. et al. 1999). Two sources

of injury data were investigated: 1) a National Institute for Occupational Safety and Health

report; and 2) an Occupational Safety and Health Administration data set obtained directly from

OSHA.

NIOSH Data

In 2000, the National Institute for Occupational Safety and Health (NIOSH 2000)

published a summary of surveillancel~~~~~1111~~~~ data and investigative reports offatal work-related falls

fiom elevations. The fatalities in the report occurred during the period from January 1982

through 1997; most of these fatalities occurred in the construction industry.

The injury data summarized events from ninety one fatalities in a narrative manner, and

typically included the following information:

* Year of incident
* Age and gender of the victim
* Location (state) of injury occurrence
* Relative strength of the safety program
* Company safety policy and safety training
* Whether or not victim had been issued PPE
* Important details of PPE usage and condition
* Anchorage details observed
* Scope of work.

Extensive information about the fatality accidents was provided in this publication.

Because of the high level of detail contained in the report, all of the injury cases were analyzed.

The individual cases were reviewed and coded for the extent that they pertained to PFASs. A









statistical software package (SPSS 12.0 for Windows) was used to code the data. The data were

categorized by answering the following questions:

* Was PFAS usage and compliance required?
* Was PFAS equipment provided or available on the proj ect for PFAS compliance?
* Was the worker in compliance with Subpart M when the accident occurred?
* Could non-compliance be characterized as a flagrant violation of safe PFAS practices?

OSHA Data

The OSHA data were collected through site investigations where construction workers

were killed (U. S. Dept. of Labor 2004a). The data were provided in a form that was converted to

an MS Excel file. The data represented information obtained from 1990 through mid-2004 and

consisted of over 10,000 fatalities representing a multitude of injury categories. The descriptions

for each injury case were recorded in a brief narrative form. For example, fall height, gender of

the victim, and age of the victim were typically reported. Approximately half of the cases

contained calendar dates of the occurrence time. The keyword, harness, was used to search the

database for cases pertaining to PFASs.

The OSHA data were examined with a similar intent as the NIOSH data. Unfortunately,

due to the brief nature of the accident descriptions, fault-tree analysis was not possible for these

data. Data were examined to understand general causation of fall accidents involving PFASs.

Because of an earlier study that comprehensively examined OSHA fall injury data (Huang and

Hinze 2003), no further study of these data was deemed warranted.

Data Analysis

For both the NIOSH and OSHA data, some cases were eliminated from in-depth analysis.

Cases were eliminated for the following reasons:

* The accident involved suspended scaffold systems and the workers) did not have a PFAS
in use;










* By the logic of the hierarchy of fall control methods, PFASs were not deemed the
appropriate fall control method;

* The workers were noted as not wearing their harnesses or not connected to competently-
designed anchorages or lifelines in plain sight (a strictly behavioral violation). Conditions
where workers temporarily disconnected their lanyards were often analyzed for insights
into why workers violated the 100% tie-off obj ective;

* Confounding factors were involved that made characterizing the causes as strictly PFAS-
related difficult; and

* The cases did not contain sufficient detail to make an informative analysis possible.

A sample of injury cases analyzed from the NIOSH and OSHA data are documented in

Appendices D and E, respectively.

The overall analysis considered the following types of issues related to PFAS injuries:

* Was the employer committed to safety?
* Were fall arrest best practices reflected in administrative policies for correct equipment and
practices?
* Was a hazard analysis of the task performed?
* Was a PFAS required?
* Were required anchorages and anchorage connectors identified at the planning stage?
* Was the PFAS inspected prior to use?
* Was the PFAS properly maintained?
* Was the PFAS properly used?
* Was the worker properly trained in the use of the PFAS?

Fault-tree Analysis

Fault-tree analysis was used by Loosemore et al. (1999) to identify causal factors in

specific injury categories. Fault-tree diagrams have been used by engineers in general industry to

analyze the interrelationship of various factors leading to failures of quality, reliability and

safety. "A fault-tree diagram follows a top-down structure and represents a graphical model of

the pathways within a system that can lead to a foreseeable, undesirable loss event" (Weibull

2007). The fault-tree analysis (from the top down) represented the following (Figure 4-1 and 4-

2):










* The description of how the accident happened; a general narrative statement of the PFAS
failure event

* Explanatory blocks containing general PFAS safety principles that were violated. A
secondary level of narrative blocks was used in some cases if additional pathways for
contributing factors were required

* Final level of the tree contained failures of specific safety management categories that
were responsible for the loss. These categories were safety culture, hazard' analysis,
administrative, supervision, training, and safe behavior. These failure categories are the
root causes of the fatality sought by the analysis.

Five fall injury cases from the NIOSH data were analyzed by the fault-tree analysis method

(Fig. 4-3 through 4-7). The violations of PFAS safety principles that were identified from the

initial analysis of the fatality reports were used as a starting point in the fault-tree analysis. If

more than one central tenet of fall arrest system safety was not in compliance, the fault-tree

diagram would show two main branches for PFAS safety principles violated. In general, the

fault-tree analysis showed that fatalities associated with PFASs are complex events where a

multitude of safety program features have underperformed or failed.

In order to comprehend the fault-tree analysis presented, the corresponding fatality report

in Appendix D can be consulted. For example, Figure 4-3 refers to NIOSH report number 89-24.

The report numbers listed in the left-hand column of Appendix D can be used to locate the

transcript of the report. From the transcript of the report, it can be ascertained that the victim was

a carpenter and that the victim fell 90 feet before coming to rest. The transcript explains in detail

the noncomplying tie-off practice that was summarized in the Figure 4-3 as a lanyard that was

creatively tied-o~ff to rebar. This completes the first function of the analysis, which was to

identify the failure event or general proximity of the problem. In other words, the simple

explanation of the accident causation was that the lanyard came loose.

The fault-tree analysis is a root-cause oriented analysis technique. Therefore the analysis

continues by examining the PFAS safety principles that would have been followed by










knowledgeable safety engineers and managers in the construction industry. In Figure 4-3, this

next level down in the examination of underlying causes (the safety principles violated) states

that two aspects of the PFAS safety principles that were violated can be considered:

* Correct anchorage connectors were not used
* Correct personal protective equipment principles were not followed. That is, the PFAS
user did not have a competent understanding of the required components in the fall arrest
system. Specifically, the victim did not have the competency or correct training to choose
the safe and appropriate anchorage for his task.
This is the level of underlying causation that would be subj ect to widespread recognition by

knowledgeable safety professionals in the construction industry.

The Einal level of analysis in Figure 4-3 sought to further investigate the root causes by

separating the causation into specific categories of safety management. As was noted above,

when a fatality occurs on a construction site, the causation is fairly complex due to the fact that

the proj ect safety plan, the company safety program, and company safety culture are all

contributors. In Figure 4-3, all of the management failures (hazard analysis, administrative,

supervision, training, and safe behavior) are included in the diagram. The failure of safety culture

as a root cause was not included in Figure 4-3, although it can be noted that a summation of all

the management failure categories cited is equivalent to a safety culture failure.

This last observation about Figure 4-3 illustrates one limitation of the fault-tree analyses

presented. The resulting analyses cite an average of four management category failures as root

causes. Possible explanations for this result are as follows:

* Fatalities generally indicate a maj or or all-inclusive failure of safety management and
culture

* The Hyve cases presented in this chapter all examine fatalities.










The limitation of the analysis is that the fault-tree diagrams do not address accidents where

serious and significant lost time injuries occur and the root causes that contribute to non-fatal

mnjunes.


















INCIDENT
START (FALL)




BEIGE OVAL


ROYAL BLUE RECTANGLE


SIENA RECTANGLE


GREEN RECTANGLE


LIGHT BLUE SQUARE


Figure 4-1. Graphic key to the fault-tree diagrams.







































CATEGORY
OF
MANAGEMENT
FAI LURE


CATEGORY
OF
MANAGEMENT
FAILURE


CATEGORY
OF
MANAGEMENT
FAI LURE


TASK
CRAFT OF WORKER
PROJECT TYPE
CASE NUMBER


Figure 4-2. Sample fault-tree diagrams.
















INCIDENT
START (FALL)


TRAINING SAFE BEHAVIOR
FAILURE FAILURE





FORMWORK CONSTRUCTION
CARPENTER
PRECAST PARKING GARAGE
NIOSH 89-24, PAGE 163


Figure 4-3. Formwork construction fault tree.















"*" "


INCIDENT
START (FALL)


HLL = HORIZONTAL LIFE LINE



MAINTENANCE PAINTING
PAINTER
STEEL BRIDGE
SUPERSTRUCTURE
NIOSH 89-03. PAGE 145


Figure 4-4. Maintenance painting fault tree.


-I


TRAIINGSAFETY SAFE
FAIURE CULTURE BEHAVIOR
FAILURE FAILURE






























STEEL ERECTION
IRONWORKER
ONE-STORY COMMERCIAL
NIOSH Of~l- PAAF 101


Figure 4-5. Steel erection fault tree.


Ai



















INCIDENT
START (FALL)


g


HAZARD
ANALYSIS
FAILURE






ADMINISTRATIVE
FAILURE


TOWER MAINTENANCE
TOWER ERECTOR
COMMUNICATIONS TOWER
NIOSH 97-10, PAGE 296






TRAIING SAFETY SAFE
FAIURE CULTURE BEHAVIOR
FAILURE FAILURE


Figure 4-6. Tower maintenance fault tree





SPLICING TELEPHONE CABLE
LINEPERSON
TELECOM MAINTENANCE
OSHA DATA


Figure 4-7. Splicing telephone cable fault tree.









CHAPTER FIVE
RESULTS OF THE FALL PROTECTION AND FALL ARREST SYSTEM SURVEY

Demographic and fall-protection-practices data were received from 99 survey respondents.

There were 74 respondents who provided complete information regarding fall arrest system

policies and practices implemented that were directly related to the research hypothesis. The

response rates for data received from the three survey forms used in the data collection process

are summarized in Table 5-1.


Table 5-1. Response rates for survey instruments.
Description Preliminary Fall Protection and Fall Fall Protection and Fall
Survey Arrest System Survey, Arrest System Survey3
follow-up version

Data collection phase First Stage Second Stage4 Second Stage


Respondent 59 34 40

Non-respondent 341 13 313

Total surveys sent 400 47 353

1. Survey as presented in Appendix B. The first stage column count of respondents consists of
47 respondents (who gave contact information and were subsequently sent the follow-up
survey version) and 12 respondents (no contact information, not included in follow-up survey)
that sum to 59 respondents total. The response rate was 14.75%.
2. Survey as presented in Appendix B. This column presents the response rate for the
companies that participated in the Preliminary survey and were subsequently sent the
clarifications-oriented survey version with 24 questions. Regarding the count of total
respondents, all thirty-four of the respondents in this column were counted as new survey
respondents in the first stage column (that is, there were no new survey participants for this
column). The response rate was 72.34%.
3. This column presents the response rate for the companies that were sent the safety survey
version with 38 questions. Survey as presented in Appendix B. The response rate was 11.33%.
4. A total of 400 surveys were sent for the second stage data collection.



Thirty-four respondents to the first stage (who also responded to the follow-up survey) and

forty respondents in the second stage of data collection sum to 74 total responses received. The










response rate to the second stage data collection phase was critical to the study's objectives

because the total recordable injury rate (TRIR) information was only sought in the second stage

survey instruments. Testing the study's hypothesis was dependent on receiving data for each

respondent' s TRIR.

Data were collected in the following categories:

* OSHA compliance for various standard industrial classifications for workers
* Subcontractor management and safety clauses in subcontracts
* Proj ect delivery methods and preconstruction coordination
* Design and construction integration
* Anchorage engineering
* Fall arrest system hardware management
* Worker and management safety training.
TRIRs were provided by sixty-three of the responding contracting firms. Two responses were

removed from further consideration because of conflicting information in the data. It was

determined in a comparison of these two cases that two safety managers from the same firm had

inadvertently submitted information about the same company and that the information submitted

was not consistent for all variables in the survey. With no way of resolving which responses

reflected that company's policies, both of these responses were excluded from further analysis.

The removal of these two responses resulted in a final sample size for analysis of 97 responses,

with 61 providing information on the TRIR.


Descriptive Statistics for the Sample

This section gives results from the survey that includes information about:

* The specific fall arrest system practices implemented

* Qualitative comments collected from the respondent on an optional basis to clarify answers
given or provide additional information.

As a baseline of compliance with the OSHA regulations for fall protection and fall arrest systems

(as contained in OSHA, Subparts L, M, R & X), respondents were asked whether their firm's










policies exceeded the regulations [Question 1, Fall Protection and Fall Arrest Systems (PFAS)

Survey; refer to Appendix B]. Over 80% of the respondents (n = 72) answered in the affirmative

for this question (Figure 5-1). Respondents answering in the affirmative were asked to specify

which trades might be included in their company's mandate to exceed OSHA compliance:

* Steel erectors and ironworkers
* Scaffold erectors
* All trades without exception.
Of the 58 respondents that indicated in the affirmative for having a mandate to exceed OSHA

regulations, 86% indicated the third option, which was interpreted as making the other options

non-applicable by virtue of being an all inclusive answer (Figure 5-2). The fourteen percent of

the respondents that did not select the all-inclusive policy option, instead indicated either

steelworkers or scaffolding erectors or both steelworkers and scaffolding erectors as trades to

which their firm's beyond-O SHA-compliance mandate applied.

The twin-leg lanyard is a PFAS component that gives workers the option of being

continuously tied-off when used correctly. The secondary (or extra) leg of the lanyard is intended

to be attached across any gaps in the anchorage or horizontal lifeline before the primary lanyard

is detached. When used in this manner, workers remain tied-off to solid anchorage for 100% of

the timeframe for a fall hazard exposure. Regarding the all-inclusive nature of the first question

in the survey, respondents were then asked if their companies had a policy requiring all workers

using PFASs to exclusively use twin-leg lanyards. Forty-two percent of the 72 respondents

indicated that all PFAS-users were required to use the twin-leg lanyard. Four survey respondents

declined to affirm the exclusive usage policy for twin-leg lanyards, but offered anecdotal

comments that their firm did have either task-specific or trade-specific policies for the twin-leg

lanyard equipment. One of these anecdotal comments also indicated that the adoption of a new










policy requiring exclusive use of twin-leg lanyards was pending Einal approval (or soon to be

implemented) .

Subcontractor Management

A series of questions examined subcontractor management issues because of their

importance to overall safety performance for general contractors. The respondents universally

recognized the need to contractually clarify the importance of compliance with the OSHA safety

regulations as a baseline of safe proj ects; all 97 responses in the survey answered in the

affirmative when asked if OSHA compliance was specifically addressed in their typical

subcontractor agreements. Other questions that asked about subcontracts included:

* To measure the extent that the contractors valued having a PFAS-competent person
associated with each work crew, respondents were asked if their subcontract agreements
required trade contractors to assign a foreman trained in fall arrest systems to each crew
using PFASs. Over 75% of the respondents answered that assignment of competent
persons was required by their subcontract agreements (Fig. 5-3).

* To measure the importance placed on monitoring the subcontractor' s fall protection and
fall arrest system planning by the general contractor, the respondents were asked about
subcontract requirements and proj ect specific fall protection plans (Fig. 5-4). Over 70% of
the respondents answered that subcontractor submission of fall arrest plans was required
by subcontract agreement.

Proj ect-specific PFAS plans are important to fall arrest system safety performance because

they provide a baseline level of documentation and planning for trade and task coordination. Fall

arrest system plans also provide the opportunity to document that pre-proj ect planning has

considered specific proj ect conditions pertaining to anchorage. The survey specifically asked for

clarification regarding the anchorage component of the plans to measure the extent that

contractors recognized the benefits of anchorage documentation (Question 9, PFAS Survey).

When asked if anchorage was included in the fall protection and fall arrest system plans

submitted by their subcontractors, the percentage of fall arrest plans that met this criterion was

77% (Fig. 5-5).










Project Delivery and Preconstruction Coordination

In addition to more well-known benefits accruing to design-build proj ect delivery such as

the elimination of change orders, the enhanced communication and coordination between the

constructor and designer typically has provided better opportunities for safety improvements. To

the measure the influence of design-build proj ect delivery on safety performance, respondents

estimated the percentage of recent proj ects that were under design-build contracts out of the total

contracts within the company (Fig. 5-6). Design-build contracts were utilized by more than 30%

(median of 20%) of the respondents.

Design and Construction Integration

Several survey questions pertained to fall protection and fall arrest systems and how they

were influenced during the preconstruction phase by the communications between the proj ect

owners, the contractors, and designers. This area of the investigation was characterized as

strategic planning for fall protection and arrest systems at the proj ect management level in the

literature review for this study. Questions were intended to investigate three aspects of strategic

planning to reduce worker exposure to falls:

* Suggestions made to the owners that were intended to improve fall protection and arrest
systems;
* Suggestions made to the designers (engineers and architects) that were intended to improve
fall protection and arrest systems; and
* Suggestions made that indicated an awareness (within the responding contracting firm) of
the elimination of fall exposure hazards per the hierarchy of fall controls theory (the
hierarchy of fall controls theory was presented in the literature review of this study).

Eighty-five percent of the respondents indicated that they had provided preconstruction

comments to the owners (Fig. 5-7) (Question 33, Preliminary Survey and Question 19, PFAS

Survey). Several respondents commented that their firms had implemented deck-to-deck vertical

net/guardrail systems as an improvement over the OSHA-compliant, 39-inch-height perimeter

guardrail systems. Seventy-four percent of the respondents indicated that suggestions intended to










improve fall protection safety were shared with the architects and engineers (Fig. 5-8) (Question

27, PFAS Survey).

In a recent study of fatalities that involved full-body harnesses, injuries associated with

roofs and PFASs were shown to be the most frequent category (24%) for accidents when

analyzed by location (Hinze and Harris 2007a). An important engineering measure that greatly

reduces hazards for workers when applicable (as is the case with most low-slope roofs) is to

include a permanent roof parapet (that complies with the OSHA guardrail safety standard) in the

design of proj ects. To measure strategic fall protection activity in regard to these facts,

respondents were asked if their communications with the design team had included raising a

building' s permanent roof parapet up to a safety guardrail height (Question 31i, Fall Protection

and Fall Arrest Systems Survey). Forty percent of the respondents answered that the parapet

safety suggestion was made either frequently or on "every applicable proj ect" (Fig. 5-9).

Comments were received (in the preliminary survey) about preconstruction

communications with the proj ect designer to improve fall protection and arrest systems.

Respondents were asked to provide comments for applicable proj ects in two categories:

* General suggestions to A/E consultants and proj ect designers; and
* Specific communications about parapet heights not in compliance with OSHA guardrail
regulations.

The comments covered a wide range of sentiments about managing the design in the

preconstruction phase. Comments ranged from proactive and positive actions to passive and

negative approaches. Several proactive responses noted their companies had implemented a

design-for-safety or "safer-design-principles" program. For example, one respondent noted that

their superintendents were actively engaged in constructability reviews during the design phase.









On the negative end of the spectrum, one frustrated respondent stated that there had been a

"huge resistance from architects to get involved in safety. Building operations/maintenance

[safety] is easy to get architects to consider. Not so for construction [safety]." In regard to the

suggestion that parapets be raised to comply with OSHA regulations, one respondent reported

about their attempts that "it [the suggestion to raise parapet heights] changes their design so they

are pushing back." In other words, some designers do not appreciate design suggestions offered

by the contractors, and they generally ignore such input.

One respondent commented that on proj ects involving historic structures, permanent fall

protection and arrest system improvements were limited by compliance requirements set by

historical restoration standards.

Nonparametric statistical tests for independence were conducted on the data regarding the

offering of suggestions to the proj ect designers intended to improve fall protection safety

(nominal answers to Question 27 in the Fall Protection and Fall Arrest System Survey). The

Kendall tau-b correlation coefficient was computed using the data for Question 27 and the TRIR

as the response variables. The resulting tau-b was not significant at the a = 0.05 level, and the

variables were deemed to be independent.

Anchorage Engineering and Fall Arrest System Hardware Management

In order to better understand the population's behavior regarding the occasional need for

custom-engineered PFAS components such as specialized anchorage or horizontal lifelines,

respondents were asked about engineering services (Questions 21-25, Preliminary Survey).

Respondents indicated the type of engineering services they had obtained for engineered

components (Fig. 5-10); any combination of four common types of service providers could be

selected. The categories were not presented as mutually exclusive. That is, the respondents were

instructed to select all responses that applied. Engineering services provided by the consulting










groups operating within the maj or fall protection manufacturing companies were the most

popular choice (nearly forty percent).

Other questions were asked about managing the risks inherent in the fall arrest hardware.

In order to investigate the extent that the contractors were monitoring common risks in connector

hardware (snaphooks, anchor connectors and lanyards), the respondents were asked about

policies implemented to address the following issues:

* High impact side-loading of carabineer/snaphook gates
* Usage of connectors or lanyards with damaged webbing
* Usage of inadequately engineered rigging or anchor connectors
* Safe anchorage availability (or lack of the same)
* Unsafe usage of small diameter wire ropes.

Respondents were instructed to select all applicable categories (Fig. 5-11). Policies and practices

implemented to control the availability (or absence) of safe anchorage and to control risk due to

worn-out or damaged webbing (a material used in all of the three maj or components of PFAS:

anchor connectors, lanyards and harnesses) were the most frequently selected (80% of the

respondents) items in the group. Inadequately-engineered anchorage and other rigging (for

example, horizontal life lines) was selected at a frequency of 72 % for the sample. High-impact

side-loading on snaphook and carabineer gates was selected by forty-two percent of the

respondents, a frequency that was considerably less than for the other choice categories.

Training

In order for supervisors to facilitate and enforce safety compliance, they would be expected

to receive specialized fall arrest systems training. Respondents were asked about the percentage

of their superintendents that had received specialized PFAS-training (Question 7, Preliminary

Survey and Questions 12-14, PFAS Survey). Over seventy-five percent of the respondents










answered that all (100%) of their firm's superintendents had received specialized fall arrest

systems training (Fig. 5-12).

Respondents were also asked to provide information on the number of hours of specialized

training in fall arrest systems that their managers and superintendents received. No attempt was

made to assess the time frame or quality of the training. The mean quantity of hours of PFAS

training for the sample was 5.4 hours and the median was 4 hours. Respondents were also asked

if the training offered to superintendents and managers typically included a competency test

(Figure 5-13). A maj ority of the responding companies have been requiring middle management

to complete a competency test as a component of their fall protection and fall arrest system

training.

In the preliminary survey, to measure the extent that the respondents relied on the maj or

fall protection manufacturers for educational support, respondents were asked if their company

had utilized the training seminars offered by the fall protection manufacturers (Question 55).

Eighty-one percent of the respondents answered affirmatively (Figure 5-14).

Descriptive Data for the TRIR Variable

Information was requested on the total recordable injury rate of the responding firms.

Sixty-one companies provided this information. These data are presented in Table 5-2.

Table 5-2. Descriptive data for the TRIR variable.
STATISTIC' VALUES
Mean 2.84
Std. Error of Mean 0.25
Median 2.41
Variance 3.89
Std. deviation 1.97
Range 10.04
Minimum 0.24
Maximum 10.28
1. Distribution for the variable is continuous.
2. n= 61.









Model for the Safety-Practices-Implemented Variable

The safety-practices-implemented variable (for use in the correlation test for

independence) was created by synthesizing important safety practices from the Fall Protection

and Fall Arrest System survey (38 variables total) into a single ordinal variable. A data analysis

model was developed through an iterative process that explored and refined the safety-practices-

implemented variable. The output obj ective of the model was a variable (an aggregate of safety

practices and policies implemented) that had been selected and tested for its effectiveness in

influencing the safety culture and fall protection program.

Descriptive statistics were generated for the 34 variables derived from the nominal survey

questions; Table 5-3 presents a summary of the data from the Fall Protection and Fall Arrest

System survey.

Table 5-3. Data categories in the Fall Protection and Fall Arrest System survey.
Measure of Variable Count
Nominal (yes or no questions) 34
Scalar 4
Total 38

The following nine nominal variables were selected for testing using the model:

* Beyond OSHA compliance: tie-off applies to all workers without exception;
* Policy requires all workers using PFASs to exclusively use twin-leg lanyards;
* Subcontractors are required to assign a competent person to each work crew (PFAS);
* Subcontractors are required to provide proj ect specific fall protection plans;
* Required fall protection plans specify the location of anchorage connection points;
* Worker attitudes toward PFAS safety are examined;
* Specialized PFAS-training for superintendents includes a competency test;
* One-hundred-percent ANSI label or manufacturer labels required on all fall arrest
equipment on-site; and
* All custom-designed anchorage and lifelines must be stamped and signed by a professional
engineer (PE).

In addition to the descriptive statistics already generated, correlation coefficients were also

generated for these nine variables. The correlations measured the rank correlation between the









nine nominal variables and the total recordable injury rate (TRIR) variable. The frequencies and

correlation coefficients for these variables are presented in Table 5-4. The correlations were

expected to be positive values because of the coding for the practice-implemented variable (yes =

1 and no = 2). The values for the TRIR variable were expected to increase if fewer safety

practices were implemented (equivalent to a "no" answer). For example, a scatter plot diagram

for the correlation of the all-inclusive tie-off variable and the TRIR variable reflects this result

(Figure 5-15). Not all of the correlations followed this pattern; negative correlation coefficients

were generated for a few of the variables tested.

Twenty-five nominal variables were not selected for analysis in the model. Justifications

for these exclusions from the model were as follows:

* The answers to a survey question with an affirmative response rate (yes answers) between
90% and 100% were not expected to be significant in differentiating the proactive and
robust fall protection programs from the balance of the sample (5 cases).

* The questions in the preconstruction section of the survey (Project Management and
PFASs was the equivalent section in the preliminary survey) regarding the influence of
owners and proj ect designers were predominantly exploratory in nature. These questions
were not deemed useful in developing the safety-practices-implemented variable. The
responses to the questions in this area of the study are compromised by the presence of
unresolved variance within the survey questions (12 cases). The meaning of the term
unresolved variance can be clarified by consideration of the following example. When a
respondent answered affirmatively to the question, "Has your firm made suggestions to the
owner about using design for safety to lessen the extent of fall protection and arrest system
usage," a high degree of variance is imbedded in the nominal yes answer because it is not
known if the owner appreciated the value of the information and intended to respond
proactively to improve safety on the project. It is also not known what actions were taken
by the owner to compel the proj ect designers to address the safety of construction workers
by adding safety features to the proj ect.

* The question associated with answers 34-38 regarding practices implemented "to reduce
risks" from any of five typical hardware problems was deemed to be too vague with regard
to specifying the details of how the risk was being controlled (5 cases).

* The balance of the questions (3 cases) in the survey was associated with the first question
in the survey regarding policies and practices that exceeded OSHA compliance. The data
collected for these variables were important, but were superseded in importance by the
affirmative answer that an all inclusive policy had been implemented.









The model used an iterative process where alternate configurations of the variables were

tested. For example, a grouping of Hyve practices was formed by ganging individual practices

together and assigning a score from zero to Hyve (0-5). This grouped and scored variable was then

used in a rank correlation with the TRIR variable. This preliminary test was based on the

expected format to be used later in the study with the formal test of independence used for

testing the hypothesis.

The intensity of the rank correlation (where a higher value for the coefficient equals higher

intensity of correlation) for the individual variables in the model was used to determine an

individual iteration of the model. Due to the significance and high coefficient value ( z = 0.221, p

< 0.05), the implemented safety policy requiring 100% ANSI label or manufacturer labels on all

fall arrest equipment on-site was used as a starting point for all the iterations generated. Although

the coefficient for the implemented safety policy requiring the exclusive use of twin-leg lanyards

for all PFAS-users on site had a relatively weak correlation coefficient, the strength of the

original survey question was considered in the model.

At the conclusion of the testing using the safety-practices-implemented variable

development model, the aggregate information determined to have the strongest association with

the TRIR was formed into a variable by synthesizing the following fiye safety policies

(descriptive data for the safety-practices-implemented variable are presented in Table 5-5):

* Beyond OSHA compliance tie-off applies to all workers without exception
* Policy requires all workers using PFASs to exclusively use twin-leg lanyards
* Required fall protection plans specify the location of anchorage connection points
* One-hundred-percent ANSI label or manufacturer labels required on all fall arrest
equipment on-site
* All custom-designed anchorage and lifelines stamped and signed by a professional
engineer (PE).









Results of the Test for Independence

As described earlier in the methodology for this study, the null hypothesis to rej ect or

accept was that the TRIR was independent of (or not significantly associated with) the best

practices in fall protection and fall arrest systems. In terms of the statistical procedure used,

independence was measured by the degree of association in a Kendall tau-b rank correlation. The

null hypothesis to accept or rej ect using this procedure was that the value for the correlation

coefficient was equal to zero, indicating no association or zero correlation between the x-value

(the best practices) and the y-value (the TRIR).

Based on sixty-one valid cases (n=61) from the survey data, the statistical software

package (SPSS) was used to run the Kendall tau-b correlation test, one-sided test option. A

general overview of the data for this procedure is presented in a scatter plot (Figure 5-16) and a

means plot (Figure 5-17).

The results of the test (the Kendall tau-b correlation procedure, one-sided option) showed

that an association (or dependence) between TRIR and an increase in the best practices in fall

arrest systems does exist (p < 0.05). The Kendall tau-b correlation coefficient for the procedure

was -0.208. From this result of the test for independence, the null hypothesis was rej ected.

A stronger association was thought to be obtainable by eliminating outlying values in the

initial correlation test. A revised test of independence was conducted that eliminated the high and

low correlation values in each of the six scorecards for best practices categories on the x-axis.

Twelve outlier values were excluded according to this procedure (Fig. 5-18).

When observing the revised scatter plot for the test, it was noted that the small number of

remaining data points in the zero and one categories of the x-axis made the inclusion of these

two categories in the revised correlation test unreliable. These four data points were also

eliminated from the final version of the revised test of independence.









The Kendall tau-b correlation coefficient for the revised test was -0.315. The significance

level for this revised test was p < 0.01. A plot of median values (Fig. 5-19) and a final revised

scatter plot were generated (Figure 5-20). The results of the procedure (when limited to the lower

right quadrant of the scatter plot by applying the outlier exclusion procedure described earlier)

showed a stronger association (correlation coefficient z = -0.315, p < 0.01) between TRIR and an

increase in the best practices in fall arrest systems exists for those contractors scoring above 1.0

points (equivalent to 2 or more of the best practices implemented). This result (n = 45) was

achieved by excluding sixteen of the total respondents.

Development of the Scorecard

The best practices in fall arrest system safety presented earlier and found to be statistically

significant were incorporated into an evaluation tool called the Fall Protection andFallArrest

Systems Scorecard, project version (Table 5-6). The supporting practices included in the

evaluation process were not tested as rigorously as the core group of best practices and were

weighted appropriately. The supporting practices were either 1) developed from policies and

practices identified in the literature review; 2) directly and logically support the core group of

best practices; or 3) were developed through conversations with safety managers working in the

construction industry. This scorecard was intended to focus on the field operations of a

construction firm.

A second scorecard was developed that incorporated the home office functions or

companywide operations of a construction company. This second scorecard allowed for a focus

on corporate level issues at a large contracting firm, including:

* Proj ect delivery methods
* Strategic planning issues for safety management
* The third party (owners and designers) effects on fall protection and PFASs.










Many of these factors and effects were discussed under the Strategic Planning for Fall Protection

subheading in the literature review of this study. This second version of the scorecard is

presented in Table 5-7.

The scorecard was intended to be implemented as a self-evaluation tool by a firm seeking

fall protection excellence, whether companywide or on a specific proj ect. Because the items on

the scorecard reflect management practices and policies, the scorecard does not require a

physical inspection of the j obsites and the scorecard can be completed in the home office. All of

the questions on the scorecard require nominal yes-no answers.

To complete the scorecard, answers must be provided on the top five questions (the core

best practices). To compute a score, the number of yes answers would be added, and the sum

multiplied by 10 points as noted on the scorecard. This process creates a subtotal score for the

core best practices area. The same process is completed for the supporting practices section and

the two subtotals (core best practices and supporting practices) would be combined to generate

the final score. The highest score possible is 100 points.

Scorecard Validation Case Studies

Critical review by safety management practitioners was sought to test the validity of the

scorecard with regard to implementation as a safety evaluation tool in the construction industry.

The critical review of an individual practitioner is presented as a case study. The individual

interviews with the safety managers are presented in series below. The series order does not

imply any type of ranking and is based solely on the order in which the data was received. Table

5-8 presents five different classes of companies in the study's population that are classified

according to the companies' total annual revenues (annual revenues for contracts signed). The

data for this classification was collected during the study's data collection phase. These









classifications are intended to augment the general profie of each respondent that is presented in

the introduction to each case study.

All of the case study respondents were participants in the Fall Protection and Fall Arrest

System survey (preliminary and follow-up versions). Generally, these respondents can be

considered proactive and aggressive safety managers with excellent safety performance records

(company TRIR values for the case study participants ranged from 0.5 to 2.5). Several of the

case study interviews included the submission of scorecards that were completed by the

respondents. Respondents were typically supportive of the content and wording of scorecard

items that generated yes answers. Scorecard items that generated no answers often generated

questions and clarifieations that resulted in important suggestions for scorecard revisions.

Personal telephone conversations with the respondents were the primary means of data

collection. These phone interviews were used to discuss the respondent's questions and

criticisms of the scorecard' s content and/or intention.

Scorecard Case Study 1

The case study 1 respondent was an upper management-level safety manager for a

contractor engaged in commercial building construction. This company has nationwide

operations and employs 750 Hield workers. Craft work is performed exclusively by

subcontractors. Based on the revenue classification in Table 5-8, this company was classified as

a class-A company ($1 billion and over in annual revenue). Overall, the respondent commented

that the scorecard was a useful resource that could easily benefit companies in the construction

industry. The respondent stated that checklists and audit forms similar to the scorecard were

frequently used in the safety department at their company.

With regard to the proj ect version of the scorecard, the respondent was concerned that the

scorecard should address the "documentation trail" aspect of the proj ect safety plan. Because the










respondent' s company acts as a construction manager on a typical proj ect, their safety

management system can be characterized as emphasizing safety metrics. Safety metrics is a term

commonly used in the industry to describe document management systems and performance

verification practices that rely heavily on computer systems and Internet-based communications.

Internet communications with subcontractors and intranet communications between different

levels of management play an important role in safety management, particularly in large

construction companies with nationwide and/or global operations. Fall protection related items

that could be addressed and documented with reports and logs include

* Coordination meetings with owners, designers, and vendors
* Proj ect-specific hazard analysis
* Pretask planning
* Preconstruction meetings prior to subcontractors coming on site
* Orientation of workers
* Specialized PFAS-training of workers, foremen and superintendents
* OSHA reporting systems
* Testing of equipment and fall arrest systems
* Periodic formal safety inspections.

Line item 9, proj ect version (Are workers empowered to stop any work deemed unsafe?)

was specifically noted by the respondent for possible inclusion in a revised scorecard as a core

best practice. The respondent felt that creating a proj ect safety culture where all workers on site

were trusted and empowered to assure safe behavior was critical to dispersing safety

enforcement and participation over the entire proj ect (regardless of the presence of a j obsite

coordinator or safety manager).

Based on the discussion of the scorecard (and the respondent' s survey data), the

respondent' s company scored 50 points of the possible 50 points for the core practices section of

the scorecard on the maj ority of their proj ects (Figure 5-9). Regarding the obstacles that the

respondent has encountered to full compliance with the core best practices, the respondent










reported that ironworkers and their trade unions have resisted implementation of the twin-leg

lanyard requirement for applicable trades and tasks. The respondent estimated that 60% of

proj ects in the United States had been successful in implementing the twin-leg lanyard

requirement.

The respondent stated that steel erection was a trade specialty where implementation of the

twin-leg lanyards can be effective in reducing injuries. For example, when ironworkers move

from one beam to the next beam in the structure, the redundant tie-off function of the twin-leg

lanyard allows 100% tie-off. The respondent noted that the resistance to twin-leg lanyards

implementation was decreasing as trade unions became better informed about the philosophy of

100% tie-off. With regard to the non-applicability of the twin-leg lanyard to certain tasks, the

respondent confirmed this study's postulate that personnel lift operators are a common class of

workers that can be exempted from the twin-leg lanyard requirement.

The respondent made comments on the companywide version of the scorecard that

concerned upper management interaction with middle managers and workers. As a companywide

indicator of a strong safety culture, the respondent recommended adding a line item in the

scorecard that addressed the benefits of collaborative management efforts between all the

different levels of managers and workers:

* Upper management
* Middle managers
* First-level supervisors
* Craft workers.

The obj ective of this collaborative management would be to work together on best practices

development and other problems-solving tasks that can improve safety performance. Another

progressive management practice that the respondent recommended for the scorecard was the

implementation of a safety performance accountability system. The respondent felt strongly that









a line item in the scorecard should address the importance of accountability and the individual

employee' s actions (positive or negative contribution to the overall success of the company's

safety program).

Scorecard Case Study 2

The case study 2 respondent was the safety director for a contractor engaged in commercial

building construction with regional operations. This respondent's company operates primarily as

a construction manager and employs 200 field workers as general laborers. Based on the revenue

classification in Table 5-8, this company was classified as a class-D company (annual revenue

range from $200 million up to $300 million).

In the respondent' s Fall Protection and Fall Arrest Systems survey response, a negative

answer was given to question 1 (PFAS survey, follow-up version) regarding jobsite safety

practices that exceeded the OSHA regulations. In the course of discussing the scorecard, the

respondent clarified that under favorable contract conditions, the opposite was true for proj ects at

his company. That is, the OSHA regulations were exceeded as noted in the scorecard (there are

no exceptions to to the mandate that all workers shall be tied-off when working at 6 feet or more

above the walking surface). The respondent stated that under these same favorable conditions

(characterized as projects with proactive, safety-oriented owners and contract values at or above

$ 25,000,000), a proj ect scorecard for the core practices (50 total points possible) would typically

be scored at 50 points (all 5 core practices implemented). A substantial discussion and

explanation regarding the variables that contributed to the erosion of the beyond OSHA

compliance ethos ensued.

The respondent's comments focused on the critical items in the owner' s decision tree for

proj ect safety whereby proactive and robust safety practices can be nourished or discouraged.

The general comment was that on the smaller proj ects (contracts less than $25,000,000 and









structures less than 3 stories tall), the owner' s behavior tends to reflect a laissez-faire attitude

toward the proj ect safety plan whereby OSHA compliance is the governing standard of safe

behavior.

The respondent stated that the bidding process was the critical juncture for proj ect safety

on the smaller proj ects (contracts less than $25,000,000). An important characteristic of the

laissez-faire owner attitude was the unwillingness to commit to an aggressive safety mandate

whereby all bid documents (plans, specifications and submittals) can be required to support

proj ect safety by means of safety-oriented revisions and inclusions. Without the safety-oriented

bidding mandate from the owner, OSHA compliance is the typical industry assumption in

commercial building construction. The respondent provided examples of how the subcontractor' s

attitude towards proj ect safety was typically influencing the general contractor' s bid. For

example, steel erectors had submitted bids about 25-30% higher when they were required to

comply with the 6 foot tie off requirement. Masonry contractors had added about 15-20% when

the 6 foot rule was applied to their scaffold building and worker access. Hence, the general

contractor' s bid would remain competitive only if the 6-ft. tie-off rule was owner-mandated for

all bidders.

The respondent stated that when a general contractor acts as a construction manager, the

owner' s influence on proj ect safety (by creating a safety-oriented bidding process) can be critical

to receiving bids from proactive, safety-oriented subcontractors. When general contractors

perform substantial amounts of structural erection and other craft work with their own

workforces, actual costs for safety training, equipment and overall safety culture management

can be easily absorbed into the operations budget. When the general contractor relies heavily on

specialty trade contractors (as is a common condition for commercial building construction), the










respondent stated that going beyond OSHA compliance is dependent on the directives from the

owner to the extent that a fair, orderly and safety-oriented bidding process can be expected.

The respondent stated that another driver for the smaller proj ects (contracts less than

$25,000,000) was the lack of a dedicated safety coordinator for the proj ect. For example, if the

scorecard was completed at the start of one of these proj ects, and the score generated was 80

points or more, the actual safety performance on the proj ect could be comprimised due to the

relatively weak safety coordination and enforcement effort. Without dedicated safety staffing,

the superintendent is forced to bear the sole responsibility for safety enforcement and is

inevitably worn down by the burden of managing the safety compliance issues pertaining to the

trade contractors.

In reviewing the line items in the scorecard, the respondent cited typical fall protection-

oriented practices that the safety department at his company was responsible for, including

* Fall protection training for the superintendents
* Weekly safety inspections which include checklists related to fall protection
* Pre-construction meetings with the subcontractors that involve safety issues including fall
protection
* Periodic inspections of all jobsites by the corporate safety director (the respondent)
* Serious disciplinary actions for superintendents failing to enforce safety rules, especially
fall protection safety rules.

Overall, the respondent summarized his commentary by stating that the score that an

individual proj ect would receive from the scorecard was dependent on which proj ects at his

company were being evaluated. The respondent stated that "we [the safety department] have very

strong support from management and the [company] owner himself but the realities of the

variables listed above make this scorecard difficult to apply universally in the construction

business."









Scorecard Case Study 3

This case study respondent was the safety director for a commercial building construction

contractor with operations in one of the maj or regional markets. This contractor relies heavily on

trade contractors to provide skilled labor for its proj ects. The trade contractors are expected to

train the workers to conform to the general contractor' s safety culture. The company employs

750 field workers and was classified as a class E company (less than $200 million in annual

revenue) .

Based on the PFAS survey data submitted, the company scored 40 points out of the

available 50 points for the core practices section of the scorecard (Figure 5-10). After the

discussion began during the interview, the respondent clarified that anchorage locations were a

strong component of preconstruction safety meetings with subcontractors (Line item 3 was the

only core practice that the respondent had marked as a no answer in their survey response). The

respondent stated that during the preconstruction subcontractor orientation process, the job safety

plan was reviewed with the trade contractors and subsequently attached to their agreement with

his company. The respondent was concerned that whatever the anchorage requirements were for

the proj ect, that these requirements can be described in the j obsite safety plan, not the site-

specific fall protection plan submitted by the subcontractor. After discussion of possible

language that might clarify the intent of line 3, the following alternate wording was proposed:

Was anchorage identified in a site-specific job safety or fall protection plan?

The respondent stated that the scorecard' s omission of requirements for training

documentation for individual PFAS-users employed by subcontractors was a source of concern.

The respondent stated that if training documentation was not required of the trade contractors

before their workers came on site, compliance with the jobsite fall protection plan was uncertain.

Regarding line 6, proj ect version, the respondent stated that terminating a subcontract agreement









was not a preferred solution to safety non-compliance problems because of the impact on the

proj ect schedule. The discussion with the respondent suggested that line 6 could be reworded as

follows

Fall protection noncompliance: does your company have a threshold whereby retraining
for entire subcontractor work crews can be required for noncompliance with safety rules?

The retraining of an entire subcontractor crew tactic came from an actual proj ect safety

intervention that the respondent offered as an example of an aggressive safety management

action that could be used as an alternative to terminating a subcontract agreement.

Concerning line 4 and the procedures for inspecting PFAS harnesses and equipment, the

respondent referred to an innovative use of radio frequency identification (RFID) technology that

was being applied to PFAS equipment inspection and management by one of the maj or

manufacturers. RFID tags were being sewed into the webbing of full-body harnesses to allow

database integration and the generation of inspection reports in support of daily equipment

readiness and inspection activities. For example, the safety coordinator conducts inspections of

the condition of each worker' s full body harness. The coordinator can use a radio frequency hand

held device to collect data on

* The identification number of the harness
* The date of the last inspection
* The date the equipment was put into service
* Comments about wear and tear from previous inspections.

The respondent noted that the RFID technology could be helpful in improving efficiency in

the equipment inspection process, especially on large proj ects where hundreds of individual

pieces of PFAS equipment could be on-site.

The respondent inquired if the rescue of stranded or injured workers was considered for

inclusion in the scorecard. It was noted by the researcher that the preliminary survey had









included two questions designed to explore this topic. In support of the deferment of rescue

operations to professionally-trained emergency rescue teams, an actual proj ect incident

witnessed by the respondent involving the local fire department was discussed. In summary, the

respondent commented that professionally-trained emergency workers possess skills that his

safety department would be reluctant to implement (due to a cost-benefit analysis) on a proj ect

with access to an emergency response network (911 -telecommunications system). In support of

contractor emergency readiness, the respondent commented that having superintendents that

were informed about suspension trauma could facilitate the application of simple first aid

activities for fallen PFAS users. For example, giving aid to a suspended worker can be a fairly

simple practice to implement if individuals are trained to recognize first aid opportunities and

take corrective action. The suspension pressure that acts on the legs and groin area can be

relieved by standing in a foot harness, passed down to the victim from above if a knowledgeable

person and the correct equipment are available.

The respondent completed the companywide version of the scorecard during the interview

process; as shown in Table 5-11. In regard to item 7 (upper management participation in fall

protection compliance reviews per proj ect), the respondent asked for clarification about whether

the question required participation in a fall protection compliance review that included a physical

walk-through on-site by the company upper management. The respondent commented that upper

management at his company was aggressively supporting the safety director (the respondent) and

the entire safety department even if they might not actually make a physical visit to the site.

In regard to line 13 (all inclusive staff safety perceptions surveys), the respondent

commented that his company had not considered conducting a safety perception survey, although

the respondent referred to a book published in 2006, Safety 2-1 7 by R. Lorber and G. Anderson









that concerned companywide safety culture. The respondent stated that the book had been

influential in influencing his company's safety culture and had been widely read by the

company's upper management.

Scorecard Case Study 4

The case study respondent 4 was the safety director for a heavy civil general contractor

with proj ects throughout the southeastern United States. The company employs 1500 Hield

workers and self-performs the maj ority of work on bridge, marine, transportation and industrial

proj ects. Based on the classification in Table 5-8, this company was classified as a class-C

company (annual revenue of $300 million up to $500 million).

The interview was structured by a copy of the scorecard which was completed by the

respondent; a facsimile copy (which had been returned to the researcher) was used to direct the

discussion about the scorecard content (Table 5-12). In regard to line 4, the respondent initially

marked a no answer, which the respondent justified due to the fact that horizontal lifelines at the

company were self-manufactured and engineered and therefore did not bear the label of a maj or

fall protection manufacturer. The researcher clarified that a properly engineered lifeline was a

legitimate exception to the intent of the question.

Similarly to the other case studies, the no answers to the scorecard were discussed in detail,

in order to confirm that the negative response was warranted. In response to line 7, the

respondent commented that the schedule of his firm' s proj ects and structural erection in general

proceeded at a pace that made the monthly time-frame cited in the question inappropriate. The

respondent also commented about this same question that his safety program was oriented more

towards a behavior-based safety management philosophy where unsafe behavior was managed

on a daily basis by safety coordinators. He suggested that the scorecard revisions can consider









the behavior-based perspective of general contractors who employ large numbers of skilled

craftsman and self-perform large amounts of the work under contract.

The respondent challenged the importance given to ANSI Z359 fall protection standards in

line 13. The respondent stated that practicing safety managers were obligated to carefully

consider the formal education level of their average PFAS user and to design training materials

accordingly. The respondent stated that fall protection standards created under the auspices of the

American National Standards Institute were more appropriate for review by the safety director

than craft workers. The respondent suggested that upgrades in hardware and other PFAS

equipment can be reviewed by safety directors and managers, and then passed on to the worker

and j ob site operations. For example, if ANSI Z3 59 is considering upgrading the standard for

snaphook sideload resistance, then the information can be passed on to the users in a simplified

version after review by the safety managers without reference to ANSI Z359 committees or

standards. The respondent commented that as long as the company's fall protection training,

procurement and hardware practices reflected the state-of the-art developments in fall protection

equipment that the PFAS users in the field can rely on the safety managers to make

recommendations in their best interest.

The researcher explained that the concern for implementing policies requiring the most

robust and heavy-duty snaphooks available was deemed important due to the fatalities that had

been recorded in association with large snaphooks (also known colloquially as pelican hooks).

The respondent commented that workers at his company used the pelican hooks exclusively for

positioning tie-off functions.

Scorecard Case Study 5

This case study respondent was the safety director for a private real estate company

specializing in the development of high-quality multi-family residential properties nationwide.









The company's portfolio includes residential high-rise, mid-rise, mixed use and suburban

projects. The company owns and constructs all of the properties in their portfolio; 100% of the

company's proj ects are delivered using design-build contracts. All specialty trade work is

performed by subcontractors and the company employs a relatively small workforce of 150 field

workers. The respondent's company was classified as a class E company (less than $200 million

in annual revenue).

Overall, the respondent commented that the scorecard content was reasonable and well

conceived as a fall protection evaluation aid. The discussion began with a clarification by the

researcher regarding the assumptions of the scorecard' s applicability. That is, the assumptions

for application of the information were based on the typical safety practices and management

structure of the study's sample of large contractors.

Similar to case study 3, the respondent asked for clarification on the companywide version,

question 7. The respondent asked if a vice-president level of the upper management team was

required to play an active role in the fall protection safety practices in order to generate a yes

answer to this question.

The respondent asked for clarification with regard to the proj ect version, line 7 (does

proj ect safety plan require that a formal fall protection and PFAS compliance review be

completed monthly?). The discussion that followed assisted in shaping the researcher's

perspective regarding general contractors who function as construction managers and rely

heavily on subcontractors to manage worker training and safe behavior. The respondent

commented that because his company manages their typical proj ects as a construction manager

with proj ects nationwide that they use audits and inspections as leading indicators of safety










performance. The respondent stated that requiring their subcontractors to participate in these

audits is an important aspect of his company's proactive safety culture.

In regard to the proj ect version of the scorecard, line 13 (does all PFAS-user training

include ANSI standards (Z359) for fall arrest equipment?), the respondent generally expressed

that he was unfamiliar with the Z359 standard. The respondent continued by stating that he was

under the impression that it was applicable to general industry and not applicable to the

construction industry.

Revising the Scorecard

The critique of the scorecards (the review and comment process presented in the case

studies) generated valuable suggestions that warranted making revisions to the scorecards. The

discussions with the industry practitioners were a collaborative process that resulted in the

scorecards being hypothetically implemented by the five construction contractors. The results of

the industry critique (that is, the revisions incorporated into the scorecards) are presented in the

following explanations and presentations of the scorecards. Discussion of the individual line

items where adjusted wording or wholesale content revision occurred is presented with

commentary regarding the logic and/or justification for the revisions. For example, line 6 in the

proj ect version of the scorecard was reworded based on the comments from the case study 3

respondent about the realities of terminating subcontract agreements (Table 5-13).

One of the respondents (case study 1) recommended that the implementation of a safety

performance accountability system be added as a scorecard line item. The researcher agreed that

individual accountability is an important value for a progressive management system.

Accountability can have a positive effect on reinforcing the importance of the individual

employee' s contribution to the overall success of the company's safety program. However, if the









fall protection focus of the scorecard is considered, deferment of this suggestion to other

revisions to a company's safety program can be justified.

The commentary of the case study respondent 1, when taken as an aggregate, represents a

safety management philosophy that includes elements of safety metrics (as defined in the same

case study section) and behavior-based safety practices. This philosophy matches the analogy

suggested by Kaplan and Norton (1992) whereby effective managers can consider the

management system to be analogous to a modern aircraft cockpit with a multitude of gauges.

That is, receiving feedback and data from a large number of point sources in the operations can

be beneficial to building the safety managers understanding of their program's performance.

The construction manager (CM)-oriented contractors in the case studies responded that the

scorecard was defieient in regard to subcontractor management requirements and the types of

documentation that they typically required of their trade contractors. In contrast, the case study

respondent 4 manages a large workforce of Hield workers and made comments that emphasized

the concerns of an employer with direct control and responsibility for worker behavior.

Discussion with this respondent (case study 4) suggested that either a self-performance-oriented

contractor or a CM-oriented contractor might find line item 7 in the proj ect version of the

scorecard in need of adjustment. This suggested the creation of the two alternate versions of the

project scorecard presented in Tables 5-13 and 5-14.

Scorecard line item 7 in the newly-created proj ect version for construction manager-

oriented contractors (Tables 5-13) was revised to emphasize subcontractor management and

safety metrics documentation. The revised question was worded as follows:

Does the safety manager receive subcontractor documentation for worker training and
conduct periodic audits to verify compliance with the proj ect safety plan?









The same line item in the scorecard was also revised to suit the needs of the safe behavior-

oriented contractor. The revised version for line 7 in the behavior-based version of the scorecard

(called the proj ect version for traditional contractors with self-performance capability) is worded

as follows:

Is the safety program based on behavior-based safety management with safety-oriented
foremen and superintendents and aggressive daily safety compliance inspections?

The clarification requested for line 4 (from Case study 4) regarding custom engineered

lifelines was addressed with the addition of a clarification clause. The wording for line 3 was

revised to reflect the common terminology used by safety managers in the construction industry.

The question was revised as follows:

Does the j ob hazard analysis and proj ect safety plan identify all anchorage on the proj ect?

Several of the respondents challenged the importance given to ANSI Z3 59 fall protection

standards in line 13 in the proj ect version. The researcher' s intention for line 13 was that the

highest standards of fall arrest system practices be reflected in the scorecard. Line 13 was revised

to read as follows:

Is the safety director or manager required to review and implement the latest fall protection
standards (ANSI Z359 or A10.32)?

More than one of the respondents asked if a vice-president level of the upper management

team was required to play an active role in the fall protection safety practices in order to generate

a yes answer for line 7 in the scorecard, companywide version. The commentary of the case

study respondents suggested a revised approach to the question. The wording of line 7,

companywide version (Table 5-15) was modified to read:

Does the safety director have the aggressive and proactive support of upper management to
implement a state-of-the-art safety program?










Overall, the critical reviews received during the case study discussions were a useful process that

resulted in important revisions to the scorecard.


























40-



20-



C
yes
Beyond OSHA FAS


Figure 5-1. Frequency of OSHA compliance (n


no
Compliance


72).


SAll trades
without
exceptions
86%


mSteel only,
scaffold only

combination
14%


Figure 5-2. Exceeding OSHA compliance: which trades specified (n = 58).















NO
23%


YES
77%


Figure 5-3. Assignment of PFAS-competent persons by subcontract agreement (n = 97).












NO
27






73%





Figure 5-4. Requirement for proj ect specific fall protection and fall arrest plans (n = 97).















NO
23%


Figure 5-5. Subcontract agreements that require documentation of anchorage locations in PFAS
plans (n= 71).












20-











~10









Men=31.33
Std. Dev. = 27.102

0 20 40 60 80 100
What % projects are DB?

Figure 5-6. Percentage of contracts that are design-build contracts (n = 90).




















YES
85%


Figure 5-7. Comments are made to the owners that are intended to improve fall protection (n
93).


NO
26%


YES
74%


Figure 5-8. Suggestions are made to the design team that are intended to improve fall protection
(n 86).























30-










20






never Ia few times I Every applicable project
once Frequently
Raising roof parapet included in comments?

Figure 5-9. Suggestions to designers included raising height of roof parapets (n = 77).


45%
40%
35%
30%
25%
20%
1 5%
10%
5%
0%


Fall safety
manufacturers engi


Specialty fall Other consulting
~ept. protection engi neer
engineer


In-house
sneering d


Figure 5-10. Types of engineering service providers utilized by contractors (n = 37).















































770


90%
80%
70%
60%
50%
40%
30%
20%
10%
0%


Sideloading Bad webbing Poor rigging Safe Undersized
hazard anchorage wire ropes
avai liability


Figure 5-11. Policies implemented to control specific hardware risks (n


91).


90%
80%
70%
60%
50%
40%
30%
20%
10%
0%


Some superintendents do not
receive PFAS-training


All superintendents are PFAS-
trained


Figure 5-12. Percentage of superintendents that received PFAS-training (n











70%

60%

50%

40%

30%

20%

10%

0%


60c'o


40'' c.


YES


Figure 5-13. Superintendent training typically includes a competency test (n = 65).














NO
19%


Figure 5-14. Contractors are customers of the maj or fall protection manufacturers' training
seminars (n = 54).










Table 5-4. Descriptive data for individual variables used in the safety-practices-implemented
variable development model.


Reference
number


Safety Practice Implemented




Beyond OSHA compliance: tie-off
applies to all workers without
exception
Twin-leg lanyards required
Subcontractors required to assign a
competent person to each work crew
(PFAS)
Subcontractors required to provide
proj ect-specific fall protection plans
Anchorage shown in PFAS plans
Measurement of worker attitudes
toward PFAS safety conducted
Specialized PFAS-training for
superintendents includes a
competency test
100% ANSI label or manufacturer
labels required on all fall arrest
equipment on-site
All custom-designed anchorage and
lifelines stamped and signed by PE


Yes No Sample Kendall
(%) (%) size (n) correlation
coefficient

79 21 61 0.124


0.019
-0.036


74 26 61 0.056


0.113
-0.111


64 36 56 -0.006



70 30 60 0.221, p<
0.05


78 22 60 0.117


Notes: 1. Parenthetical notation in Appendix B identifies each question by this reference
number.
2. Cases coded as non-applicable [as warranted by the preceding variable (Reference 8)]
were included in sample.


Table 5-5. Descriptive data for the safety-practices-implemented variable.


STATISTIC CONTINUOUS VALUES
Mean 3.30
Std. Error of Mean 0.163
Median
Variance 1.75
Std. deviation 1.32
Range
Minimum
Maximum
1. Distribution for the variable is discreet.
2. n= 66.


DISCREET VALUES
















12.00-


OO

OO
oe
S8.00-
P 0



a 6.00 O




4.00 -




2.00-




0.00-


1 1 .2 1 .4 1 .6 1 .8 2
Tie off applies to AII workers?


Figure 5-15. Scatter plot for the correlation of the all-inclusive tie-off policy and TRIR variables
(n = 6 1).





12.00-


OO

O
S8.00-
0



U 6.00 O

O O O
O O O
4.0 _O O 8
o a
o~o @
o o 8
o o o @
2.00 OO

8g O
O O O
0.00-


0 1 2 3 4 5
Scorecard for Best Practices


Figure 5-16. Scatter plot for the test of independence (n = 61).





4.50 -


4.00-





3.50-




I-
O 3.00-





2.50-





2.00-





1.50-


0 1 2 3 4 5

Scorecard for Best Practices



Figure 5-17. Means plot for test of independence (n = 61).





6.00 -


5.00-
co O
o O
oO
h( O O
O 4.00-O
oo


a 3.00 O

o o

oo 8
oo o


aO O
oO O




0.00-


0 1 2 3 4 5
Scorecard for Best Practices


Figure 5-18. Revised scatter plot for the test of independence, preliminary version (n = 49).






1.00

3.50 3.0
S3.00 -1 3.4
12 2.50-
c* 2.00 1.6
1.915
*= 1.50-
S1.00-
0.50-
0.00
2 3 4 5

Score for Safety practices implemented


Figure 5-19. Median plot for the revised test of independence (n = 45).





5.00-


O
O O
ne O
L O O

4.00-( O O

0o O
o O
Oo



ol 0
ct0 O

eo O

2.00-

2 25 33.54 45O
Ocrcr O o etPrcie
Fiur 520 Rviedscttr lo fr hetet f ndpedece fna vrson(n= 0 )










Table 5-6. Fall protection and fall arrest systems scorecard projectt version)


CORE BEST PRACTICES (10 points each)
1 Beyond OSHA compliance: 100% tie-off (tieoff applied to
all workers on site at or above 6 feet above the walking
level)?
2 Twin-leg lanyards requirement for all applicable personal
fall arrest system (PFAS) users? (typical exceptions: PFASs
with self-retracting lanyards and users in personnel lifts)
3 Anchorage shown in proj ect-specific PFAS plans?
4 Maj or fall protection manufacturer label or ANSI-label
requirement for all fall arrest equipment on-site?
5 All custom-designed anchorage and lifelines stamped and
signed by a professional engineer (PE)?
Subtotal count of "yes" responses
Multiply the yes count by 10 ( 10x )

SUPPORTING PRACTICES (5 points each)
6 Does your company have a policy whereby a subcontract
agreement could be terminated for noncompliance with fall
protection and PFAS requirements?
7 Does proj ect safety plan require that a formal fall protection
and PFAS compliance review be completed monthly?
Worker Involvement
8 Are workers' suggestions about safety improvement
encouraged through a reward or recognition program?
9 Are workers empowered to stop any work deemed unsafe?
Training
10 Is safety orientation required for all workers and
management on site?
11 Do all superintendents receive a minimum of 4 hours of
specialized training on PFASs?
12 Do all PFAS users receive a minimum of 4 hours of
specialized training on safe system use and equipment?
13 Does all PFAS-user training include ANSI standards (Z359)
for fall arrest equipment?
Engineering Coordination and Planning
14 Does comprehensive fall protection planning occur for all
phases and tasks of the proj ect?
15 Does proj ect safety plan require that all fall protection
engineered systems and anchorages be identified?
Subtotal count for Supporting Practices
Multiply the yes count by 5 ( 5x )


POINTS


I yes 0 no


o yes


O no


0 yes 0 no
0 yes 0 no


o yes


O no


Subtotal


POINTS


a yes 0 no


0 yes 0 no


a yes 0 no

0 yes 0 no


o yes


O no


a yes 0 no

I yes 0 no


o yes


O no


0 yes a no

0 yes 0 no


Subtotal


Total Score (100 points maximum)










Table 5-7. Fall protection and fall arrest system scorecard (companywide version)


CORE BEST PRACTICES (10 points each)
1 Beyond OSHA compliance: 100% tie-off (tieoff applied to
all workers on site at or above 6 feet above the walking
level)?
2 Twin-leg lanyards requirement for all applicable personal
fall arrest system (PFAS) users? (typical exceptions: PFASs
with self-retracting lanyards and users in personnel lifts)
3 Anchorage shown in proj ect-specific PFAS plans?
4 Maj or fall protection manufacturer label or ANSI-label
requirement for all fall arrest equipment on-site?
5 All custom-designed anchorage and lifelines stamped and
signed by a professional engineer (PE)?
Subtotal count of "yes" responses
Multiply the yes count by 10 ( 10x )

SUPPORTING PRACTICES (5 points each)
6 Is the company owner (or chief executive) committed to a
zero incidence rate (TRIR) for serious injuries?
7 Does upper management participate in fall protection
compliance reviews per proj ect?
8 Does constructability review include fall protection and
strategies to eliminate fall arrest systems through
engineering and design options (on every applicable
proj ect)?
9 Are recommendations for permanent roof anchorages
forwarded to the owner (on every applicable project)?
10 Does the company maintain a design for safety database of
safe design principles and design-for-safety guidelines?
11 Is safety for maintainability (including fall protection)
coordinated with owners operations (on every applicable
proj ect)?
12 Does your firm coordinate fall protection policies and
practices with risk management officer (in-house or with
firm's insurance company)?
Worker and Staff Involvement
13 Has your company ever conducted an all inclusive,
companywide survey of safety perceptions (must have
included all employees)?
14 Are workers' suggestions about safety improvement
encouraged through a reward or recognition program?
15 Are workers empowered to stop any work deemed unsafe?
Subtotal count for Supporting Practices
Multiply the yes count by 5 ( 5x )


POINTS


I yes 0 no


o yes


O no


0 yes 0 no
0 yes 0 no


o yes


O no


Subtotal


POINTS


0 yes 0 no

0 yes 0 no


a yes


O no


0 yes 0 no


o yes


O no


0 yes 0 no


o yes


O no


O yes 0 no


a yes 0 no

0 yes 0 no

Subtotal


Total Score (100 points maximum)











Table 5-8. Classifieation of population based on annual revenue.


Total annual revenue
1000 or more
500 to < 1000
300 to <500
200 to <300
Less than 200


CompanV Classifieation


Ranking
1- 41
42 -87
88-171
172-260
261 -400


Count
41
46
84
89
140


400


Total
1. Values are given in U.S. Dollars; one unit equals one million dollars.


Table 5-9. Scorecard for Case Study 1
Core Best Practices
1 Beyond OSHA compliance: 100% tie-off
2 Twin-leg lanyards requirement for all applicable PFAS users
3 Anchorage shown in proj ect-specific PFAS plans
4 ANSI-label requirement for all fall arrest equipment on-site
5 All custom-designed anchorage and lifelines stamped and signed by a PE
Total


Points
10
10
10
10
10
50


Table 5-10. Scorecard for Case Study 3 (based on their PFAS survey response)
Core Best Practices
1 Beyond OSHA compliance: 100% tie-off
2 Twin-leg lanyards requirement for all applicable PFAS users
3 Anchorage shown in proj ect-specific PFAS plans
4 ANSI-label requirement for all fall arrest equipment on-site
5 All custom-designed anchorage and lifelines stamped and signed by a PE
Total


Points
10
10
0
10
10
40









Table 5-11. Scorecard (companywide version) for Case Study 3
CORE BEST PRACTICES (10 points each) POINTS
1 Beyond OSHA compliance: 100% tie-off (tieoff applied to 10
all workers on site at or above 6 feet above the walking
level)?
2 Twin-leg lanyards requirement for all applicable personal 10
fall arrest system (PFAS) users? (typical exceptions: PFASs
with self-retracting lanyards and users in personnel lifts)
3 Anchorage shown in proj ect-specific PFAS plans? 10
4 Maj or fall protection manufacturer label or ANSI-label 10
requirement for all fall arrest equipment on-site?
5 All custom-designed anchorage and lifelines stamped and 10
signed by a professional engineer (PE)?
Subtotal 50

SUPPORTING PRACTICES (5 points each) POINTS
6 Is the company owner (or chief executive) committed to a 5
zero incidence rate (TRIR) for serious injuries?
7 Does upper management participate in fall protection 5
compliance reviews per proj ect?
8 Does constructability review include fall protection and 5
strategies to eliminate fall arrest systems through
engineering and design options (on every applicable
proj ect)?
9 Are recommendations for permanent roof anchorages 5
forwarded to the owner (on every applicable project)?
10 Does the company maintain a design for safety database of 0
safe design principles and design-for-safety guidelines?
11 Is safety for maintainability (including fall protection) 5
coordinated with owners operations (on every applicable
proj ect)?
12 Does your firm coordinate fall protection policies and 5
practices with risk management officer (in-house or with
firm's insurance company)?
Worker and Staff Involvement
13 Has your company ever conducted an all inclusive, 0
companywide survey of safety perceptions (must have
included all employees)?
14 Are workers' suggestions about safety improvement 5
encouraged through a reward or recognition program?
15 Are workers empowered to stop any work deemed unsafe? 5
Subtotal count for Supporting Practices 40
Total Score 90









Table 5-12. Scorecard (project version) for Case Study 4
CORE BEST PRACTICES (10 points each) POINTS
1 Beyond OSHA compliance: 100% tie-off (tieoff applied to 10
all workers on site at or above 6 feet above the walking
level)?
2 Twin-leg lanyards requirement for all applicable personal 10
fall arrest system (PFAS) users? (typical exceptions: PFASs
with self-retracting lanyards and users in personnel lifts)
3 Anchorage shown in proj ect-specific PFAS plans? 10
4 Maj or fall protection manufacturer label or ANSI-label 10
requirement for all fall arrest equipment on-site?
5 All custom-designed anchorage and lifelines stamped and 10
signed by a professional engineer (PE)?
Subtotal 50

SUPPORTING PRACTICES (5 points each) POINTS
6 Does your company have a policy whereby a subcontract 5
agreement could be terminated for noncompliance with fall
protection and PFAS requirements?
7 Does proj ect safety plan require that a formal fall protection 0
and PFAS compliance review be completed monthly?
Worker Involvement
8 Are workers' suggestions about safety improvement 5
encouraged through a reward or recognition program?
9 Are workers empowered to stop any work deemed unsafe? 5
Training
10 Is safety orientation required for all workers and 5
management on site?
11 Do all superintendents receive a minimum of 4 hours of 5
specialized training on PFASs?
12 Do all PFAS users receive a minimum of 4 hours of 5
specialized training on safe system use and equipment?
13 Does all PFAS-user training include ANSI standards (Z359) 0
for fall arrest equipment?
Engineering Coordination and Planning
14 Does comprehensive fall protection planning occur for all 5
phases and tasks of the proj ect?
15 Does proj ect safety plan require that all fall protection
engineered systems and anchorages be identified?
Subtotal count for Supporting Practices 40
Total Score 9










Table 5-13. Fall protection and PFAS scorecard (proj ect version for construction manager-
oriented contractors) with revisions based on case study respondent comments.


CORE BEST PRACTICES (10 points each)
1 Beyond OSHA compliance: 100% tie-off (tieoff applied to all
workers on site at or above 6 feet above the walking level)?
2 Twin-leg lanyards requirement for all applicable personal fall
arrest system (PFAS) users? (typical exceptions: PFASs with self-
retracting lanyards and users in personnel lifts)
3 Does job hazard analysis and project safety plan identify all
anchorage on the project?
4 Major fall protection manufacturer label requirement for all fall
arrest equipment on-site (with exception of engineered lifelines)?
5 All custom-designed anchorage and lifelines stamped and signed
by a professional engineer (PE)?
Subtotal count of "yes" responses
Multiply the yes count by 10 ( 10x )

SUPPORTING PRACTICES (5 points each)
6 Fall protection noncompliance: does your company have a
threshold whereby retraining for entire subcontractor workcrews
can be required for noncompliance with safety rules?
7 Does the safety manager receive subcontractor documentation for
worker training and conduct periodic audits to verify compliance
with the project safety plan?
Worker Involvement
8 Are workers' suggestions about safety improvement encouraged
through a reward or recognition program?
9 Are workers empowered to stop any work deemed unsafe?
Training
10 Is safety orientation required for all workers and management on
site?
11 Do all superintendents receive a minimum of 4 hours of
specialized training on PFASs?
12 Do all PFAS users receive a minimum of 4 hours of specialized
training on safe system use and equipment?
13 Is the safety director or manager required to review and
implement the latest fall protection standards (ANSI Z359 or
A10.32)?
Engineering Coordination and Planning
14 Does comprehensive fall protection planning occur for all phases
and tasks of the project?
15 Does project safety plan require that all fall protection engineered
systems and anchorages be identified?
Subtotal count for Supporting Practices
Multiply the yes count by 5 ( 5x )


0 yes 0 no

0 yes 0 no


0 yes 0 no

0 yes 0 no

0 yes 0 no


Subtotal


0 yes 0 no


0 yes 0 no



0 yes 0 no

0 yes 0 no

0 yes 0 no


o yes


O no


0 yes 0 no

0 yes 0 no



0 yes 0 no

0 yes 0 no


Subtotal


Total Score (100 points maximum)


POINTS


POINTS










Table 5-14. Fall protection and PFAS scorecard (project version for traditional contractors with
self-performance capability) with revisions based on case study respondent
comments .


CORE BEST PRACTICES (10 points each)
1Beyond OSHA compliance: 100% tie-off (tieoff applied to all
workers on site at or above 6 feet above the walking level)?
2 Twin-leg lanyards requirement for all applicable personal fall
arrest system (PFAS) users? (typical exceptions: PFASs with self-
retracting lanyards and users in personnel lifts)
3 Does job hazard analysis and project safety plan identify all
anchorage on the project?
4 Major fall protection manufacturer label requirement for all fall
arrest equipment on-site (with exception of engineered lifelines)?
5 All custom-designed anchorage and lifelines stamped and signed
by a professional engineer (PE)?
Subtotal count of "yes" responses
Multiply the yes count by 10 ( 10x )

SUPPORTING PRACTICES (5 points each)
6 Fall protection noncompliance: does your company have a
threshold whereby retraining for entire subcontractor workcrews
can be required for noncompliance with safety rules?
7 Is safety program based on behavior-based safety management
with safety-oriented foremen and superintendents and aggressive
daily safety compliance inspections?
Worker Involvement
8 Are workers' suggestions about safety improvement encouraged
through a reward or recognition program?
9 Are workers empowered to stop any work deemed unsafe?
Training
10 Is safety orientation required for all workers and management on
site?
11 Do all superintendents receive a minimum of 4 hours of
specialized training on PFASs?
12 Do all PFAS users receive a minimum of 4 hours of specialized
training on safe system use and equipment?
13 Is the safety director or manager required to review and
implement the latest fall protection standards (ANSI Z359 or
A10.32)?
Engineering Coordination and Planning
14 Does comprehensive fall protection planning occur for all phases
and tasks of the project?
15 Does project safety plan require that all fall protection engineered
systems and anchorages be identified?
Subtotal count for Supporting Practices
Multiply the yes count by 5 ( 5x )


POINTS


0 yes 0 no

0 yes 0 no


0 yes 0 no

0 yes 0 no


o yes


O no


Subtotal


POINTS


0 yes 0 no


0 yes 0 no



0 yes 0 no

I yes 0 no


o yes


O no


I yes 0 no

0 yes 0 no

0 yes 0 no


o yes


O no


a yes 0 no


Subtotal


Total Score (100 points maximum)











Table 5-15. Fall protection and PFAS scorecard (companywide version) with revisions based on
case study respondent comments.
CORE BEST PRACTICES (10 points each) POINTS
1 Beyond OSHA compliance: 100% tie-off (tieoff applied to all o yes o no
workers on site at or above 6 feet above the walking level)?
2 Twin-leg lanyards requirement for all applicable personal fall o yes o no
arrest system (PFAS) users? (typical exceptions: PFASs with self-
retracting lanyards and users in personnel lifts)
3 Does job hazard analysis and project safety plan identify all o yes o no
anchorage on the project?
4 Major fall protection manufacturer label requirement for all fall o yes o no
arrest equipment on-site (with exception of engineered lifelines)?
5 All custom-designed anchorage and lifelines stamped and signed o yes o no
by a professional engineer (PE)?
Subtotal count of "yes" responses
Multiply the yes count by 10 ( 10x ) Subtotal


SUPPORTING PRACTICES (5 points each)
6 Is the company owner (or chief executive) committed to a zero
incidence rate (TRIR) for serious injuries?
7 Does the safety director have the aggressive and proactive support
of upper management to implement a state-of-the-art safety
program?
8 Does constructability review include fall protection and strategies
to eliminate fall arrest systems through engineering and design
options (on every applicable project)?
9 Are recommendations for permanent roof anchorages forwarded
to the owner (on every applicable project)?
10 Does the company maintain a design for safety database of safe
design principles and design-for-safety guidelines?
11 Is safety for maintainability (including fall protection)
coordinated with owners operations (on every applicable project)?
12 Does your firm coordinate fall protection policies and practices
with risk management officer (in-house or with firm's insurance
company)?
Worker and Staff Involvement
13 Has your company ever conducted an all inclusive, companywide
survey of safety perceptions (must have included all employees)?
14 Are workers' suggestions about safety improvement encouraged
through a reward or recognition program?
15 Are workers empowered to stop any work deemed unsafe?
Subtotal count for Supporting Practices
Multiply the yes count by 5 ( 5x )


I yes 0 no


o yes


O no


0 yes 0 no


0 yes 0 no

0 yes 0 no

0 yes 0 no

0 yes 0 no


o yes


O no


0 yes 0 no

0 yes 0 no

Subtotal


Total Score (100 points maximum)


POINTS









CHAPTER SIX
RESULTS OF THE INTEGRATED DESIGN AND CONSTRUCTION SURVEY

The designer-builders, defined in the methodology chapter as the firms that had attended

the Design-Build Exposition, were investigated to explore the influence of designers on the

construction process. The concept of interest concerning the designer-builder population

investigated was that when designers and builders work under the same contractual agreement

with the owner, the design tends to support design-for-safety practices that are more conducive

to construction safety improvements.

Forty-three different companies were contacted. Appendix C presents a detailed

explanation of companies included in the sample frame. Not all companies that participated in

the Design-Build Exposition offer architectural or engineering services and therefore not all

exposition participants were included in the survey. The response rate for the integrated design

and construction survey was 23% (n=1 1). Design services offered by the respondents were

provided within one of the following types of firms:

* Predominantly architecture services
* Predominantly engineering services
* Combined architecture and engineering services
* Fully-integrated design and construction services (defined as companies with self-
performance capabilities in either design or construction).

The data set included descriptive information defining the type and quantity of proj ects

completed by the individual designer (the respondent) and at the company-wide level. Over 60%

of the respondents were employed by firms where the annual design-build contracts equaled or

exceeded eighty percent.

Having design-build proj ects for eighty percent or more of all their contracts should be

noted as being definitive of leaders in the design-build industry. It could be assumed that leading

companies of design-build practices would be more proactive in implementing design-for-safety










practices into their typical proj ects; however, the findings of this investigation are limited due to

the small sample size. Caution should be exercised in attempting to draw inferences about the

overall designer-builder population.

The balance of the data collected were nominal (yes or no) answers to questions about

design-for-safety engineering practices. Thirty percent of the nominal practice and policy

questions referred to fall protection or fall arrest system issues that were directly related to the

research hypothesis. In addition to fall protection and fall arrest systems, data were collected in

the following categories:

* OSHA regulations and compliance
* Hazard analysis and control documentation by the engineering team
* Lessons-learned databases and continuous improvement
* Safety-for-maintainability design review and quality assurance
* Use of safer design principles to eliminate hazards from the proj ect by means of design.

In order to understand the response frequencies of the nominal practice and policy

questions in relation to each other, a table was prepared to present an overview of the sample

(Table 6-1). Nine of the respondents indicated that training in the OSHA regulations, fall

protection, and other aspects of construction safety had been implemented at their companies.

Training and instruction in how to use safety principles and engineering means to eliminate

construction safety job site hazards was noted as being an implemented practice by seven of

eleven respondents. Three of eleven respondents (27%) indicated that they regularly specified

roof anchorage. Seven of the respondents use dedicated sheets or notes in the construction

documents to highlight construction safety concerns. The implementation and usage of databases

of design-for-safety guidelines that improve safety conditions for construction workers were

indicated as an implemented practice by six of the respondents.









Table 6-1. Response frequencies for designer-builders.
Counts
Question
yes no n/a
(1) Training on the OSHA regulations? 9 2 0
(2) Training on fall protection anchorage? 9 2 0
(3) Instruction in how to use engineering to 7 4 0
eliminate construction hazards?
(4) If yes, does this instruction cover fall 5 2 4
protection and the elimination of the need
for fall arrest systems?
(5) Dedicated sheets in the construction 7 4 0
drawings to highlight safety hazards?
(6) Database of design-for-safety 6 5 0
guidelines?
(7) If yes, do these guidelines cover safety 6 0 5
for construction workers?
(8) Do designers at your firm specify roof 3 8 0
anchorages?
(9) Safety-for-maintainability review for 4 7 0
every applicable project?
(10) Do company designers make job-site 6 5 0
visits to observe safety performance?
1. Numbers assigned to the questions in this table do not reflect numbers assigned in
Appendix B documentation of the actual survey and survey questions.









CHAPTER SEVEN
CONCLUSIONS

This study investigated a select set of personal fall arrest system (PFAS) safety

management policies and practices that constituted the best safety practices in the fall protection

area of construction safety. In order to validate the best practices, the study sought to determine

whether or not a typical ENR Top 400 contractor' s TRIR was dependent on the successful

implementation of the best practices for PFASs. Important topics for fall protection safety

management and the safe use of fall arrest systems included OSHA compliance policies (within

an individual contracting company), PFAS-user training, and engineering coordination. It was

concluded that a select set of best practices for fall protection and PFAS management does exist

and that the contractor's TRIR (and improved safety performance) depends on the successful

implementation of this same set of fall arrest system policies and practices.

Basic Fall Safety Compliance and Subcontractor Management

The findings show that the contractors with better safety records had adopted company

policies that exceed OSHA regulations for fall protection. The most proactive contractors in the

study had adopted the policy of requiring the use of PFASs (when other fall protection measures

are not applicable) for all trades and workers working at an elevation of 6 feet or more above the

walking surface, often referred to in the industry as "100% tie-off." The findings demonstrated

that this policy was a frequently used and effective management technique for eliminating the

exceptional clauses and loopholes for the various trades that can weaken the intent of Subpart M

of the OSHA Construction regulations. From the standpoint of compliance facilitation and field

operations, the 100% tie-off policy has a simplicity and elegance to it that makes it a

fundamental building block to controlling unsafe worker behavior and creating an effective

safety culture for a given proj ect.









The results show that although many contractors require subcontractors to submit fall

protection plans that are proj ect specific, almost one-fifth of these plans do not address

anchorage locations for projects when applicable. Requiring subcontractors to address anchorage

in the preconstruction and task coordination context (whether included in subcontract agreement

or not) is a corollary to an effective 100% tie-off policy. When safe anchorage is unavailable or

rendered ineffective by work flow conflicts, for example, removing horizontal lifelines (HLL)

located at the perimeter of a floor plate to allow the movement of large building components,

100% tie-off is vulnerable to unsafe behavior pressures, for example, no HLL is available for tie-

off.

The requirement for proj ect-specific fall protection plans that specify anchorage locations

allows the proj ect manager to more easily examine potential task coordination conflicts in

critical areas such as the installation of the exterior cladding or wall system. For example,

potential coordination conflicts frequently exist for mid-rise and high-rise condominium proj ects

where large windows and patio doors must be installed at the floor plate perimeter. Since the

large windows and patio doors span from floor to ceiling, fall arrest systems, specifically HLLs,

may need to be removed during the installation of exterior glazing components.

Design and Construction Integration

In order to investigate global and proj ect-wide factors that could be used to give the fall

protection safety culture the most robust and aggressive features possible, the influence of 1) the

proj ect owners) and 2) the proj ect design team were investigated. Because of the observed

improvement in overall proj ect coordination and other benefits such as the elimination of change

orders, design-build contracts are continuing to be used to a greater extent in the construction

industry. In this research, the mean total percentage of design-build contract agreements with

owners equaled almost one-third of all construction contracts. Although data were not sought on










specific explanations for the frequency of design-build proj ect delivery, the overall proj ect

enhancement of coordination issues between owner, designer and constructor, including

improved safety culture, are well-known in the industry.

Although no significance was found in any of the statistical tests performed for owner and

designer effects on fall protection and fall arrest system safety practices, this study identified

important items associated with fall protection and PFASs that can be controlled for when the

constructor has an aggressive and proactive role in the design phase, such as is the case when

design-build and engineer-procure-construct (EPC) proj ect delivery methods are used. Those

important items include:

* The consideration for the placement of anchorages as permanent fixtures for the proj ect
when applicable
* The coordination of rooftop equipment requiring regular maintenance and the provisions
for fall protection, such as guardrail systems, single-point anchorages, and horizontal
lifeline systems
* The elimination of fall exposure hazards by means of design-for-safety design and
engineering strategies that consider wholesale revisions to the erection and cladding
concepts.

Although fall protection and fall arrest system performance factors that are governed by the

design team cannot be controlled by the contractor (excepting the design-build and EPC proj ect

delivery options), contractors can continue to promote greater involvement in fall protection by

design professionals through their proj ect coordination phase communications and suggestions

for safer structures. The high frequency (over seventy percent on typical proj ects) of suggestions

shared with the design team indicates that contractors remain optimistic and assertive when it

comes to promoting a better understanding of fall protection requirements with designers.

Fall Arrest Equipment and Engineered Components

This study did not include a comprehensive description of fall protection equipment

although the products and services of the maj or fall protection manufacturers (as defined by the









list in Appendix A) were an important source of information for this study. Simply based on the

fundamental nature of and volume of goods and services associated with the fall protection

equipment, the manufacturers clearly have a maj or influence on fall protection and construction

safety. The results for the role served by the fall protection equipment and services showed:

* The respondents' preference for utilizing the services and expertise of the engineered-
systems consulting groups operating within the manufacturing companies

* The high frequency (82%) of the respondents that utilizes the specialized training seminars
offered by the fall protection manufacturers

* The important role (statistically significant) played by the safety policy requiring 100%
ANSI label or manufacturer label on all fall arrest equipment on-site.

These results showed that the contractor population strongly depends on the fall protection

manufacturers for:

* Their expertise and assistance
* The research and development behind the published inspection and maintenance protocols
* The availability of technical and educational support.

The support given to the contractor population through the specialty engineering consulting

services and the training seminars (responsible for educating the "competent personss" as

defined in the ANSI Z359 standard) clearly ties the contractors utilizing personal fall arrest

systems to the maj or fall protection manufacturers. The degree of this interrelationship and

dependency indicates that strong mutual obj ectives exist between contractors proactive in safety

and the fall protection manufacturers.

The results showed that of the safety policies tested on an individual basis for their

association with the TRIR, the safety policy requiring 100% ANSI label or manufacturer label on

all fall arrest equipment on-site had a statistically significant correlation with the TRIR, i.e., this

policy was associated with lower injury rates. This result was cited above for its role in the

overall character of the relationship between the maj or fall protection manufacturers and the










large contractor (ENR Top 400) respondents. Another important aspect of this result was its

implications for:

* Safety facilitation, supervision and enforcement
* Formal equipment inspection in the field
* Worker training for equipment and hardware knowledge.

Taken together, these three issues were characterized as the critical components of field

operations and fall arrest system use. The importance of maintaining a trained workforce of

PFAS users and middle managers that recognize and understand fall arrest equipment in the

context of the industry standards (as adopted by the ANSI Z3 59 committee) was concluded to be

a fundamental feature of a best practices safety program. Furthermore, it is imperative that the

construction industry's goals for PFAS-competency recognize the technical nature of PFAS

equipment and the manufacturing and testing standards that assure the equipment' s performance

integrity. The recognition and comprehension of industry-standard marks (or identification tags

and labels) for assuring the quality of PFAS equipment (that is, the system integrity represented

by the presence of an ANSI or maj or fall protection manufacturer label) should be considered a

component of baseline PFAS training for all users and supervisors.

Workforce competency is also strongly influenced by the expectations from the company's

upper management. Upper management' s expectation that PFASs will be used with integrity on

all company proj ects is of paramount importance. Corporate-level management support for high-

quality training and high-quality equipment procurement is an integral component of the

company policy and culture for the safe use of fall arrest systems. In summary, as a baseline of a

best practice-PFAS safety program and safety culture, a contractor must train middle managers

(superintendents and safety managers) to recognize and facilitate quality assurance for fall arrest

equipment. The better safety programs will add to this baseline obj ective, the aggressive and










proactive safety training features and content that will promulgate this same equipment quality

assurance behavior and competency in all PFAS users (direct-hire employees and workers

managed through subcontract) on a given proj ect.

Associations between Better Safety Records and Fall Arrest System Best Practices

The significance of the test for independence (from which the null hypothesis was rej ected

and the research hypothesis was validated) shows that an influential and important set of best

practices in PFASs does exist. A reasonable extension of the research hypothesis is that a

distinctive subcomponent of an overall safety culture, a component that is specific to fall

protection and fall arrest system safety, does exist and can be defined as the best practices in fall

arrest system safety.

These best practices were used as the basis for an evaluation criterion (the scorecard). The

scope of best practices associated with lower TRIRs is well balanced across the spectrum of

proj ect safety management categories. When implemented as a scorecard for proj ect evaluation,

these five practices represent a balanced and durable range of evaluation criteria across the full

range of PFAS management issues for a typical proj ect.

Definition of Better Safety Records

The results of the revised procedure where the outliers were excluded from the test

procedure showed that a reliable definition for the term, better safety record, could be

ascertained. Using the median plot shown in Figure 5.19, contractors who had implemented at

least 4 out of the 5 best practices had a mean TRIR value below 2.0 recordable injuries per

200,000 worker hours. A contractor with an injury incidence rate (TRIR) below 2.0 was thereby

shown to be a reasonable definition for the statement (from the study's hypothesis), contractors

in the population 0I ithr the better safety records.









Conclusions about the Scorecard

Because the best practices for PFAS were validated, the concept of developing a process to

implement, evaluate and continuously improve the best practices is viable. Rather than making

safety performance evaluations based on TRIR (a lagging indicator), a scorecard is a means of

implementing a leading indicator method of safety improvement and evaluation. At the company

level, the scorecard can be used as an assessment tool for evaluating fall protection practices and

overall company safety culture issues that need strengthening and modification. At the proj ect

level, the policies and practices contained in the scorecard can be used to shape and guide the

proj ect safety plan including preconstruction meetings with subcontractors and proj ect training

needs.

The respondents to the case study comment and review process engaged in a collaborative

process with the researcher whereby questions and clarifications resulted in generating important

revisions to the scorecards. One of the respondents commented on how the scorecard would be

implemented and integrated into a construction company's operations. Specifically, the

respondent asked what action might be suggested by the researcher if any of the scorecard items

generated a "no" answer. This question (what procedure is suggested for addressing a "not

applicable" answer?) can best be interpreted by the safety manager or company using the

scorecard. Does the company agree that a "yes" answer would likely generate improvements in

fall protection safety performance for their proj ects? Safety managers and upper management

should consider that the items in the scorecard are validated by the following methods applied

during this study:

* The literature review which presents best practice recommendations from other safety
experts and research
* The data collection and hypothesis testing
* The critical review process presented in the case studies.










Companies can use the scorecards as presented in this study or as materials to be

incorporated into other scorecards that can be created to address the specific needs of an

individual company's operations or proj ects. Companies within this study's sample of large

construction contractors represent a wide diversity of construction operations and safety needs.

Different scorecards for fall protection can be created that address variations in

* Emphasis within fall protection safety for different construction tasks
* The detail level of fall protection equipment included and evaluated by the scoring criteria
* The detail level of safety behaviors monitored by the scorecard.

Safety checklists and scorecards are widely used in the construction industry to monitor

and evaluate safety issues and performance. In order to effectively serve as continuous

improvement tools, these scorecards must be reviewed and revised on a periodic basis with

regard to changes in the best practices and current events in construction safety.

Conclusions about the Designer-Builders

The concept of interest concerning the designer-builder population investigated in this

study was that when designers (engineers and architects) and builders are in more frequent

communication with each other (as is facilitated by a design-build contract), enhanced

construction safety practices will be a measurable outcome.

Although the designer-builder investigation did have limitations with regard to making

inferences about the true population due to the small number of respondents, the process of

conducting the integrated design and construction survey yielded some interesting information

and a template for future research proj ects. The ten nominal practice and policy questions in the

survey do serve to define a working list of progressive practices for fall protection and PFAS

safety in the context of design-build and EPC proj ects.

Although unconfirmed by any direct communications, this researcher concluded from the

prevailing climate of legal liability for professional engineering consultants that designers










(engineers and architects) are reluctant to provide information about any of their consulting

activities that could increase their exposure to legal liabilities. Construction safety-related topics

are commonly perceived by architects and engineers to have a strong tendency to increase their

exposure to legal liabilities, whether justified or not. These liability concerns of designers are

based on the legal precedents (Geer v. Bennett 1970) and customary project management

practices that result in a formal separation between the designer' s specifications (and

recommended engineering measures contained within those specifications) and the constructor's

responsibility for engineering measures that concern the means and methods of construction.

Design-build contracts and employment by companies organized on a design-build model

(fully-integrated design and construction services) do ease the liability concerns of designers to

some extent. However, based on the data collection phase of this research, the researcher

concluded that the quantity of companies organized on a true design-build model (defined as

companies offering fully-integrated design and construction services and possessing self-

performance capabilities in both design and construction) was a small percentage (that is,

approximately ten percent) of the overall number of companies participating in design-build

contracts .









CHAPTER EIGHT
RECOMMENDATIONS

This study has focused on fall protection safety as a subcomponent of a safety plan.

Although an important core group of best practices was identified, contractors and other

employers interested in applying the Eindings and conclusions must recognize that the

effectiveness of these best practices in PFASs is dependent on their effective integration into an

extensive, fully-developed, and proactive safety culture. The long range success of safety

programs and a companywide safety culture will be positively affected by the integration of

these best practices into a contractor' s safety management plan and it is strongly recommended

that every employer in the construction industry consider the immediate implementation of these

best practices in PFASs. Further, the best practices in fall arrest systems identified will be

effectively implemented when integrated across all operations and on multiple proj ects within an

individual company.

Recommendations for Regulatory Revisions

Building code revision to protect maintenance workers against significant fall hazard

exposures. The discontinuity of the maj or health and safety codes that apply to structures at

various points in the lifecycle of the building are deemed to be responsible for avoidable

conflicts and waste in the industry. The lifecycle of the building is defined as any activities

occurring in a temporal sequence during

* Erection and construction process
* Conventional use by the end-user occupants
* The operational maintenance.

For example, the facility owner's maintenance operations frequently involve access to rooftop

equipment. The maj or building codes do not typically address the health and safety of

maintenance workers. Studies have shown that when workers do not have access to anchorage,









particularly in roof areas, safe behavior and correct use of PFASs are compromised (Hinze and

Harris 2007a).

The maj or building codes, by not cross-referencing the OSHA regulations, create conflicts

and inefficiencies between designers and constructors that are wasteful and can unnecessarily

endanger maintenance workers. The expense and burden of resolving these conflicts often is

assumed by the owner, who is placed in the position of retrofitting a new building to bring it into

compliance with OSHA standards after the proj ect is delivered.

Revising and amending the maj or building codes is a complex process. Initial discussion

and debate should consider the opportunities and obstacles to including permanent roof

anchorage in the maj or building codes. This permanent roof anchorage requirement for

applicable building permits would target the protection of maintenance workers.

The energy expended by owners, constructors and designers to address and manage this

type of discontinuity in the regulations is wasteful and unnecessary. The consideration of

permanent roof anchorage in every applicable proj ect should be addressed at the building

permitting stage by the maj or building codes.

Improve fall protection and anchorage requirements in Subparts L and X of the

OSHA regulations. Many opportunities to improve the field operations of contractors exist in

the elimination of fall risks arising during the use of 1) scaffolding, whether stationary or mobile,

and 2) ladders. Because scaffolding (Subpart L) and ladders (Subpart X) are regulated outside of

the main fall protection section (Subpart M), discrepancies pertaining to fall protection and safe

fall arrest system use are detectable, particularly in regard to anchorage requirements. The same

conclusion could be applied to Subpart R, but for the maj ority of cases, contractors with robust

and aggressive safety plans recognize that the reduction of risk for steel erection and ironworkers









is controlled by specialized training. Steel erectors and ironworkers should receive the highest

level of training possible, in terms of training hours required and specialized content offered

during that training.

Recommendations for Changes in Practice

The scorecard is recommended for use in evaluating the status of fall protection and PFAS

usage and management for the construction industry. The scorecard provides proactive

companies interested in safety with a means to quickly assess the status of fall protection and

PFAS practices and policies. The immediate concerns of safety performance on current proj ects

can be addressed by the proj ect version of the scorecard. When a company commits to using the

scorecard on applicable company proj ects, earlier recorded scores from the scorecard can be used

to assess safety improvement over a period of time. The scorecard can also be considered for

proj ect implementation at maj or milestones as follows:

* Preconstruction planning with owners
* Preconstruction meetings with subcontractors
* Pretask planning
* Risk management reviews
* Maj or training milestones
* Post-proj ect review and assessment.

For example, maj or proj ect training milestones occur when large numbers of subcontractors and

workers commence working on a proj ect. The peak in the total number of PFAS users on a

proj ect site might warrant evaluation by the scorecard. When training is outsourced, the

scorecard could be used as a checklist by fall protection instructors to assure that the best

practices in PFASs are addressed.

Large contractors concerned about the influences on fall protection performance and

company safety culture from

* Upper management attitudes










* Staff attitudes
* Contracts and proj ect delivery methods
* The owner effects on fall protection and PFASs (also described as strategic planning)
* The designer effects on fall protection and PFASs.

can consider using the companywide version of the scorecard. Making significant inroads into

the companywide safety culture and strategic planning issues influencing fall protection and

PFAS usage is an ambitious agenda. The intention of creating a companywide version of the

scorecard was that the effects the home office operations and departments, for example, the

preconstruction department, would be considered for their impact on fall protection in the field.

Another aspect of the companywide evaluation criteria is the behavior and practices of upper

management, also a department or group of individuals that spend a significant amount of time in

the home office. The companywide version of the scorecard should be used as an annual

management audit tool, or integrated into existing periodic safety program reporting and

evaluation systems.

A process of continuous improvement that integrates the scorecard and its best practices

into the safety program and culture of a company is highly recommended. When the scorecard is

placed in this context, new policies and practices not included in the scorecard presented in this

study can be added to future scorecard versions. When a no answer is given to an item in the

scorecard, management should consider

* Revising company practices and policy to reflect the recommended best practices from the
scorecard

* Establishing a collaborative improvement process including the participation of upper and
middle managers, safety managers, fall protection equipment vendors, fall prevention
training consultants and PFAS users to review and implement fall protection
improvements.









In summary, the three versions of the scorecard are recommended to be used together to

achieve maximum benefit to a company; one scorecard applied to all applicable proj ects, and the

other applied to the home office.

Recommendations for Changes in Engineering Coordination

Closer coordination between the ENR Top 400 population and the fall protection

manufacturers. Based on their interaction and customer-supplier relationship, the leaders of the

ENR Top 400 population and the maj or fall protection manufacturers should be more obligated

and committed to working together. In the United States, the existence of two separate

committees charged with fall arrest system standards for general industry (ANSI Z359) and

construction (ANSI A10.32) appears to be wasteful and imprudent.

The OSHA regulations for general industry (Standard 1910) do not contain a fall

protection standard. The fall protection standards for general industry and the construction

industry reside in one location, Subpart M of the OSHA Construction Standards. The

development and standards committees of the American National Standards Institute should

logically follow this same structure.

Recommendations for Future Research

Certain issues in future improvements in fall protection and PFASs that have been

identified in the process of conducting this research require additional investigation. Some of the

proposed topics for future research may have already been initiated in the construction industry

by large contracting companies and fall protection manufacturers and should receive additional

exploration in the context of peer-reviewed research.

Research recommendation 1: Twin-leg lanyards were shown to be a type of equipment

that is frequently selected due to its benefits in improving safety performance and 100% tie-off










compliance. A study that investigates unidentified unsafe behaviors should be a high priority for

the industry leaders, safety professionals and researchers.

Research recommendation 2: Investigation of the role of engineering and design for their

potential for eliminating and reducing risks in fall protection and fall arrest systems through the

application of design-for-safety principles should be a priority for future research. This would be

an excellent topic for exploration in the context of 4D visualization and engineering. This is also

an excellent interdisciplinary research opportunity between architectural engineering and

construction management researchers and academics.

Research recommendation 3: An investigation focused on the assessment of PFAS-user

competency would be an important study for better understanding worker participation and

conceptual understanding of the technical aspects of PFASs. The technical nature of PFAS

equipment presents safety managers with the challenge of training workers to participate in a

technically complex safety system. One of the differences between the ANSI Z3 59 and A1 0.32

fall protection standards concerns the requirements (and definitions) for PFAS user competency

that can be ascertained from comparing the training sections in each standard. This research

could address the following questions:

* Who is competent and qualified to evaluate and monitor the safe usage and protocols for
anchorage?

* Is the current competent person approach (typically a foreperson) to safe anchorage
compliance effective in minimizing unsafe behavior associated with anchorage?

* How well do PFAS users understand fall arrest equipment quality assurance and inspection
protocols in general? How well do PFAS users recognize and understand the importance of
the maj or fall protection manufacturer or ANSI-compliant labels for quality assurance?
These questions are asked because they relate to assessing the extent that PFAS users can
participate in the equipment inspection process.









Research recommendation 4: Additional studies designed to confirm the validity of the

following statement would be important for supporting the growing body of literature that has

investigated the construction safety benefits of design-build contracts.

The overall proj ect enhancement of design-build agreements between the owner, designer
and constructor, includes significant improvements in the safety culture for a given proj ect.

Research recommendation 5: An exploratory study that investigated the engineering and

design implications of implementing a fall protection-oriented revisions to the maj or building

codes (one that addressed the protection of maintenance workers working in hazardous roof

areas) would be an important study in support of the regulatory changes proposed earlier in this

chapter. The following issues could be considered in the study:

* Design standards (typical details and specifications) that would be required for the
construction documentation of permanent roof anchorage

* Risk management strategies and policies that would be acceptable to owners, design
consultants and companies with direct liability for and control over workers.

An important population for this investigation is the specialty engineering consultants that

possess specialized knowledge about anchorage and fall arrest system design. These engineering

firms provide engineering services to general and construction industry clients with regard to

custom-designed anchorage and fall arrest system components such as horizontal lifelines and

certified anchorages (anchorages with lower test load levels that are allowed when accompanied

by the stamp and signature of a licensed engineer). Because of their active consulting practices in

the fall protection area, these engineers possess valuable experience with appropriate risk

management practices that address liability issues for designers.

Future research about the designer-builder (or other designer-related) population would be

well-advised to carefully consider a data collection methodology which addresses the designer' s

reluctance to provide data for research purposes. As was noted earlier, avoiding liability for










damages and injuries associated with construction safety is an active category of risk

management for architects and engineers. Future research could be most effective if care and

consideration were devoted to a research design that accounts for the predominant attitude of

designers with regard to construction safety.

Final Remarks

The management of PFASs includes many components that could potentially be permanent

engineered features of a structure, such as roof top anchorages and horizontal lifelines. These

components are influenced by the proj ect planning and procurement areas of a construction

proj ect. The primary legal obligations for the safety of employees reside with the employee' s

direct employers, who must provide overall management and safety leadership to control risks

associated with PFASs and their usage on construction proj ects. However, employers, proj ect

owners, and members of the engineering community need to work together to assure that fall

protection and PFAS usage receive careful attention in the constellation of construction safety

issues. Roof environments in particular pose high risks for all construction and maintenance

workers and should be a special focus of all discussions regarding safety culture and proj ect

safety improvements.









APPENDIX A
FALL ARREST EQUIPMENT MANUFACTURERS

Table A-1. Website addresses for major U.S. fall arrest equipment manufacturers
Company Website

Buckingham Manufacturing http://www. buckinghammfg. com/linem en/

The Crosby Group, Inc. http: //www.thecrosbygroup .com/

DBI/SALA http://www. dbisala. com/us/

Guardian http:.//www.guardi anfall .com/

Miller Fall Protection http://www. millerfallprotection. com/miller/index. html

MSA Safety http ://www.msanorthamerica.com/catalog/catalo56hm

Reliance Industries http://www. rels afe. com/

Summit Anchor Company http://www. summitanchor. com/index.html









APPENDIX B
SURVEY FORMS

Preliminary Survey

Section I: General

(1)Please estimate what percent of your firm' s proj ects are design/build contracts: %
(2)Does your firm have a worker tie-off and personal fall arrest systems (PFASs) rule for all
workers on-site, including all subcontractors? o yes o no

(3)If yes, please describe:
(4)As a general contractor, does your firm typically monitor the PFAS usage of subcontractors?
0 yes 0 no
(5)How many field workers does your firm typically employ? (6)Of those
workers, how many are trained in the use of PFASs (per OSHA Construction Regulations,
Subpart M)?
(7)Please estimate what percent of your firm' s superintendents receive specialized training in
PFASs? %

(8)Are your proj ect managers required to develop fall protection plans on proj ects that use fall
arrest systems? o yes o no

(9)If yes, do these plans include or incorporate work performed by subcontractors using fall
arrest systems? o yes o no


Section II: Subcontractor Management (skip this section if no work is subcontracted)

(10)Is subcontractor compliance with the OSHA regulations mandated in your firm's subcontract
agreements? I yes 0 no
(11)Are your subcontractors that use PFAS contractually required to assign a foreman (who
meets the OSHA definition of a competent person) to each work crew using PFASs? o yes
o no

(12)Are your subcontractors that use PFAS contractually required to keep documentation of
training provided to workers (per OSHA Construction Regulations, Subpart M)?
0 yes 0 no
(13)Are your subcontractors that use PFAS contractually required to provide proj ect specific fall
protection plans? o yes o no (14)If yes, do these plans specify the location of
anchorage connection points or lifelines to be used? o yes o no

(15)Has your firm ever exercised its right to intervene or suspend the work of a subcontractor
due to poor safety practices? o yes o no

(16)If yes, in the last three years how many such instances have occurred?
(17)If yes, how many of these instances were related to PFASs?










(18)Does your firm have specific safety requirements that subcontractors must comply with that
are more stringent than the OSHA regulations? o yes o no
(19)If yes, do any of these safety requirements relate to PFASs? o yes o no
(20)Please describe any PFAS requirements implemented by your firm?

Section III: PFAS Hardware

(21)Has your firm ever enlisted the services of an engineer to design components of a PFAS?
o yes o no
If yes, was this engineer employed by: (Check the best description)
(22) o Manufacturer of PFAS hardware (24) o PFAS consulting engineering firm
and equipment
(23) o In-house engineering department (25) o Other type of consulting engineer

Do you have any policies or practices to reduce risks from any of following hardware problems
(Check all that apply):
(26) o High impact sideloading of (29) o Safe anchorage availability (or lack
carabineer/snaphook gates of the same)
(27) o Usage of connectors or lanyards with (30) o Unsafe usage of small diameter wire
damaged webbing ropes
(28) o Usage of inadequately engineered
rigging or anchor connectors

(31) How often are equipment inspections performed?
(32) What percentage of these inspections are performed by a safety coordinator? o/
Section IV: Project Management and PFASs

(33) During preconstruction, has your firm made suggestions to the owner on ways to improve
safety conditions for the construction worker? o yes o no
(34) If yes, were any of these suggestions intended to reduce worker exposure to falls? o yes
o no
(35)If yes, please comment:
(36) Are j ob hazard analyses conducted for each proj ect that is built? o yes o no
(37) If yes, are suggestions for improvements in fall protection ever communicated to the
design team (architect or engineer)? o yes o no (3 8) If yes, please comment:










(39) Did these fall protection concerns and communications include raising a building's
permanent roof parapet up to a safety guardrail height (per OSHA Construction
Regulations, Subpart M)?
o Never o Once o A few times o Frequently o Every applicable project


(40) Have you had a proj ect where permanent PFAS roof anchorage was designed for the
project? I yes 0 no
If yes, which of the following anchorage types were specified:
(41) o Window washing davits (43) o Parapet anchors
(42) o Bollard-type anchors (44) o Other:
(45)Were any other types of permanent PFAS anchorages designed into the project? o yes o no

(46)Does your firm typically prepare a project specific emergency preparedness plan? o yes o no

(47)Does your firm have specific provisions for the rescue of workers who have fallen? o yes o
no

Section V: Training
Please estimate by percentage the source of worker training for PFAS usage:

Union Other classes On the job Total
Source of (48) (49) (50) 100%
Training

(51) Does your firm conduct in-house safety training sessions? o yes o no
(52) If yes, to what extent is the promotion of positive safety attitudes incorporated into
your firm's safety training programs? low o medium o high o
(52) Does your firm offer safety recognition rewards (monetary or material prizes) to promote
safe behavior or attitudes for PFAS-certified workers? o yes o no
(53) Does your firm have required content of competent person training? o yes o no
(54) Does your firm train new competent persons in house? o yes o no
(55) Does your firm utilize the training seminars offered by the maj or manufacturers of fall
protection hardware? 0 yes 0 no
(56) To what extent do you rely on existing competent persons to mentor the trainees and to
manage the training process? low o medium o high o
(57)Does your firm conduct field observations ofPFAS worker behavior? o yes o no
(58)Does your insurance provider conduct loss control audits that evaluate PFAS use? o yes
o no

(59)Does your firm engage in any measurement of worker attitudes toward PFAS safety? o yes
o no










(60) If yes, what is the most important safety attitudes) for workers using PFASs? (Please
comment)

(61) Does your firm have a policy for specific fall protection or PFAS safety violations that will
result in disciplinary action? o yes o no (62) If yes, please specify?

(63) Does your firm have a policy for specific fall protection or PFAS safety violations that will
result in required retraining? o yes o no

(64) If yes, please specify?
Optional
A Summary of this research study will be prepared. If you would like to receive a copy of a
summary report as soon as it is available, you may include your name and address below and one
will be provided to you. Note that your firm's identity will not be used in any way other than to
transmit a report to you. Thank you for your participation in this research study.
Name :
Firm:
Street Address:
City: State: Zip:











Fall Protection and Fall Arrest Systems Survey

(1)Does your firm have a worker tie-off and personal fall arrest systems (PFASs) policy that
goes beyond OSHA-compliance? o yes o no

If yes, to which trades does the tie-off at six feet above the walking surface rule apply?
(please select all applicable categories)

(2) o Steel erectors and ironworkers

(3) o Scaffold erectors

(4) o All trades without exceptions

(5) Does your firm have a policy that requires all workers using arrest systems to exclusively use
twin-leg lanyards? 0 yes 0 no
(6) Is subcontractor compliance with the OSHA regulations mandated in your firm's subcontract
agreements? I yes 0 no
(7) Are your subcontractors that use PFASs contractually required to assign a foreman (who
meets the OSHA definition of a competent person) to each work crew
using PFASs? I yes 0 no

(8) Are your subcontractors that use fall arrest systems contractually required
to provide project specific fall protection plans? o yes o no

(9) If yes, do these plans specify the location of anchorage connection
points or lifelines to be used? o yes o no
(10) What was your firm's recordable injury rate for 2006 (or other recent recording period)?


(1 1) Does your firm engage in any measurement of worker attitudes toward PFAS safety? o yes
o no

TRAINING

(12) What percent of your firm' s superintendents receive specialized PFAS training? %
(13) How many hours of specialized fall arrest systems training do they receive? hours
(14) Does this training include a competency test? o yes o no












(15) On large proj ects (contracts over $50 million), does your firm require safety
orientation training for all workers starting on the proj ect? I yes 0 no

(16) If yes, does this training include fall arrest tie-off rules and
enforcement policies? o yes o no

(17) On small proj ects (contracts under $10 million), does your firm require safety
orientation training for all workers starting on the proj ect? I yes 0 no

(18) If yes, does this training include fall arrest tie-off rules and
enforcement policies? o yes o no

PRECONSTRUCTION

(19) Has your firm made suggestions to the owner about using design for safety to lessen the
extent of fall protection and arrest system usage? o yes o no
(20) Please estimate what percent of your firm's proj ects are design/build contracts: %

What types of relationships to designers exist on proj ects at your firm?
(please select all applicable categories)

(21) o In-house design department

(22) o Design-build alliance (independent A/E firm working under D-B contract)

(23) o A/E consultants under separate contract with owner

(Please fill out applicable sections below)
In-house design departments and desinn-build alliances
(24) Does your firm provide any specific instruction to designers in how to use engineering to
eliminate the need for fall arrest from projects? o yes o no
(25) Does your firm provide any construction safety instruction to designers, for example, a
10-hour OSHA training course? o yes o no
(26) Do your designers participate in planning and drawings for fall protection and arrest
system pre-task planning? o yes o no
A/E consultants under separate contract with owner:
(27) Are suggestions for improvements in fall protection ever communicated to the design
team (architect or engineer)? o yes o no












(28) Has your firm participated in any team partnering or integrated proj ect
delivery mandates at the request of the owner? o yes o no

(29) If yes, was safety for construction workers a topic for coordination
with the design team (architect or engineer)? o yes o no

(30) If yes, was fall arrest anchorage a topic for coordination? o yes o no
(31) Did these fall protection communications include raising a building's permanent roof
parapet up to a safety guardrail height (per OSHA Regulations 1926, Subpart M)?
o Never o Once o A few times o Frequently o Every applicable project

FALL ARREST HARDWARE

(32) Does your firm have a policy that requires 100-percent ANSI label or manufacturer label on
all fall arrest equipment on-site? o yes o no
(33) Except for widely recognized standards, such as wire rope splices with U-bolts, does your
firm have a policy that requires all custom-designed arrest components on-site to be
engineered (signed and sealed by a PE)? o yes o no
Do you have any policies or practices to reduce risks from any of following hardware problems
(Check all that apply):
(34) o High impact sideloading of (37) o Safe anchorage availability (or lack
carabineer/snaphook gates of the same)
(35) o Usage of connectors or lanyards with (38) o Unsafe usage of small diameter wire
damaged webbing ropes
(36) o Usage of inadequately engineered
rigging or anchor connectors

Contact Information

If you would like to receive a copy of a summary report as soon as it is available, you may
include your name and address below and one will be provided to you. Note that your firm's
identity will not be used in any way other than to transmit a report to you. Thank you for your
participation in this research study.
Name :
Firm:
Street Address:
City: State: Zip:
If a follow-up call for clarifications is needed, may we contact you by phone?
Phone:










Fall Protection and Fall Arrest Systems Survey, follow-up version


(1) Does your firm have a worker tie-off and personal fall arrest systems (PFASs) policy that
goes beyond OSHA-compliance? o yes o no

If yes, to which trades does the tie-off at six feet above the walking surface rule apply?
(please select all applicable categories)

o (2) Steel erectors and ironworkers

o (3) Scaffold erectors

o (4) All trades without exceptions

(5) Does your firm have a policy that requires all workers using arrest systems to exclusively use
twin-leg lanyards? 0 yes 0 no
(6) What was your firm's recordable injury rate for 2006 (or other recent recording period)?


In regard to specialized fall arrest system training for superintendents,
(7) How many hours of specialized fall arrest systems training do they receive? hours
(8) Does this training include a competency test? o yes o no
In regard to training for workers,

(9) On large projects (contracts over $50 million), does your firm require
safety orientation training for all workers starting on the proj ect? o yes o
no

(10) If yes, does this training include fall arrest tie-off rules and
enforcement policies? o yes o no

(1 1) On small proj ects (contracts under $10 million), does your firm require
safety orientation training for all workers starting on the proj ect? o yes o
no

(12) If yes, does this training include fall arrest tie-off rules and
enforcement policies? o yes o no


In regard to anchorage and engineering,
(13) Does your firm have a policy that requires 100% ANSI label or manufacturer label on all
fall arrest equipment on-site? o yes o no
(14) Except for widely recognized standards, such as wire rope splices with U-bolts, does your
firm have a policy that requires all custom-designed arrest components on-site to be
engineered (signed and sealed by a PE)? o yes o no











Preconstruction

(15) Has your firm made suggestions to the owner about using design for safety to lessen the
extent of fall protection and arrest system usage? o yes o no

What types of relationships to designers exist on proj ects at your firm?
(please select all applicable categories)

o (16) In-house design department

o (17) Design-build alliance (independent A/E firm working under D-B contract)

o (18) A/E consultants under separate contract with owner

(Please fill out applicable sections below)
In-house design departments and design-build alliances

(19) Does your firm provide any specific instruction to designers in how to use engineering to
eliminate the need for fall arrest from projects? o yes o no
(20) Does your firm provide any construction safety instruction to designers, for example, a
10-hour OSHA training course? o yes o no
(21) Do your designers participate in planning and drawings for fall protection and arrest
system pre-task planning? o yes o no
A/E consultants under separate contract with owner:
(22) Are suggestions for improvements in fall protection ever communicated to the design
team (architect or engineer)? o yes o no

(23) Has your firm participated in any team partnering or integrated proj ect
delivery mandates at the request of the owner? o yes o no

(24) If yes, was safety for construction workers a topic for coordination
with the design team (architect or engineer)? o yes o no

(25) If yes, was fall arrest anchorage a topic for coordination? o yes o no


Contact Information
Name:

Company:
Phone:










Integrated Design and Construction Survey


1. How many proj ects did you work on in the last year?
2. How many of these proj ects were design-build contracts?
3. How many proj ects does your firm undertake each year?
4. What percentage of your firm's proj ects were design-build contracts? %

5. Does your firm provide any training on the OSHA regulations? o yes o no
6. Does your firm provide any training on fall protection anchorage? o yes o no
7. Does your firm provide any specific instruction in how to use engineering to eliminate
construction hazards from projects? o yes o no
8. If yes, does this instruction cover fall protection and the elimination of the need
for fall arrest systems? o yes o no

9. Does your firm include special notes or dedicated sheets in the construction drawings to
highlight safety hazards and concerns for construction workers? o yes o no
10. Has your firm developed a database of design-for-safety guidelines to be designed
into applicable projects? o yes o no
1 1. If yes, do these guidelines cover safety for construction workers? o yes o no

12. Do designers at your firm specify roof anchorages (for worker tie-off)? o yes o no
13. Does your firm have a policy implemented that requires every applicable proj ect to go
through a safety-for-maintainability checklist? o yes o no (Safety for maintainability
is defined as coordinating the design with the owner' s maintenance operations)
14. Do company designers make job-site visits to observe safety performance in relation to
design-for-safety features that were specified? o yes o no










APPENDIX C
POPULATION DATA FOR DESIGN-BUILD EXPOSITION ATTENDEES

Table C-1. Population for the Designer-builders.
A-E


3Com Corporation*
3D/International, Inc.
Abbott Laboratories*
ADP Marshall, Inc.
American Institute of Architects*
American Red Cross*
Amtrak*
Anheuser-Busch Cos.*
Army Corps of Engineers*
Army National Guard*
Aspen Group
AT& T*
The Austin Company
Baker Concrete Construction*
Barton Malow Company
BE&K Engineering
Bechtel Corporation
Beers Construction Company*
The Beck Group
BFW Construction Co., Inc.*
Black & Veatch
The Boeing Company*
Bovis Lend Lease*
Boyle Engineering Corporation
Bread Loaf Corporation*
Brown & Root Services (KBR)
Bureau of Naval Personnel*
Burns & McDonnell Engineering
Butler Manufacturing Company
California Dept. of General Services*
Cannon Design
Carlson Design/Construct Corp.
Carter & Burgess, Inc.


Caterpillar, Inc.*
CDM Engineers & Constructors, Inc.
Centex Construction Company*
CH2M Hill
Charles Pankow Builders, Ltd.*
Chicago Metro. Pier & Exposition Auth.*
Chicago Utilities Commission*
Church Building Architects, Inc.
Cisco Systems*
City of Atlanta*
City of Los Angeles / Department of Public
Works*"
City of Orlando*
City of Toronto -- Works & Emergency
Services*
The Clark Construction Group, Inc.*
Clayco Construction Company*
Colorado DOT*
Comfort Systems USA*
CORE Construction*
CSX Transportation Director Facilities
Design*
Dan Vos Construction*
Dick Corporation*
Dick Pacific Construction Co., Ltd.*
Dillingham Construction Corporation*
DMJM + Harris
Donley's, Inc.*
E-470 Public Highway Authority*
Earth Tech
Exxcel Contract Management*










Table C-1 (continued).


F-R
M.A. Mortenson Co.*
Marnell Corrao Associates*
Martin K. Eby Construction Co., Inc.*
McCarthy Building Company*
McShane Construction Corporation*
Mercedes-Benz USA*
Minnesota Dept of Transportation*
MWH
National Cancer Institute NIH*
National Corrections Corporation*
National Park Service*
Naval Facilities Engineering Command*
New York City School Constr. Authority*
O'Brien/Atkins Associates, PA
Ohio Department of Transportation*
Opus Companies
Oracle*
Orange County Government*
Oregon Department of Transportation*
P.J. Dick Incorporated*
Parsons Engineering
PB Constructors Inc.*
PCL Construction Services, Inc.*
Kiewit*
Philip Morris USA*
The Pillsbury Company*
Proctor & Gamble*
RTKL Associates
Rudolph & Sletten, Inc.*
Ryan Companies US, Inc.


Fannie Mae*
Federal Bureau of Prisons*
First Industrial Realty Trust*
Florida Department of Transportation*
Fluor Daniel
Frederic R. Harris, Inc. (merged with DMJM)
Frito-Lay*
Fru-Con Construction Corp.*
General Services Administration*
Gerber Products Company*
Gilbane Building Company*
Glaxo Wellcome Inc.*
Goodkind & O'Dea
Granite Construction Inc.*
H+M Construction*
Harkins Builders*
Harold O'Shea Builders*
The Haskell Company
HBE Corporation
HBG Constructors Inc.*
HDR, Inc.
Hellmuth, Obata & Kassabaum, Inc.
Hensel Phelps Construction Co.*
HNTB Design/Build, Inc.
Hoffman Corporation
Honeywell Corporation*
Integrated Electrical Services*
Intel Corporation*
J.R. Filanc Construction Company*
J.S. Alberici Construction Co., Inc.*
Jacobs Engineering Group
James McHugh Construction*
James N. Gray Company*
Kajima Construction Services*
KINETICS/ U. S. Filter Bio/Pharm Div.*
Korte Construction Company*
Los Alamos National Laboratory*










Table C-1 (continued).
S-Z
Sega Inc.*
Skanska, Inc.*
State of Arizona Dept. Construction Services*
State of California Franchise Tax Board*
The Stellar Group
STV Construction Services*
Suitt Construction Company*
Sundt Construction, Inc.*
Trane Company*
Trauner Consulting*
Turner Construction Company*
Union Pacific Railroad*
U.S. Army Community & Family Support
Center*
U.S. Dept. of General Services*
U.S. Dept. of State*
U. S. Dept. of Veterans Affairs*
University of Chicago*
Utah Department of Transportation*
ValleyCrest Companies
The Walgreen Company*
Walker Parking Consultants
The Walsh Group*
Walt Disney Imagineering
Washington Group International
Webcor Builders*
The Weitz Company*
Western Summit Constructors, Inc.*
Whirlpool Corporation*
Wight Construction Services, Inc.*
York International Corp.*

Notes:
1. Company names followed by an asterisk (*) do not offer architecture or engineering services
and were not contacted.
2. Note from Design-Build Institute of America about the population: "Organizations who have
recently attended the Design-Build EXPO (Partial List)."










APPENDIX D
FALL INJURY CASES ANALYZED FROM THE NIOSH DATA

Table D-1. Fall injury cases analyzed from the NIOSH data.


NIOSH Data'

The victim, working as a member of a three-man crew, was
painting a highway bridge spanning a large river. The victim and
his co-workers had been working on the same bridge for
approximately 6 weeks prior to the incident. On the day of the
incident the victim and one co-worker had just finished lunch
and were moving materials from one "bay" beneath the roadway
to an adjacent "bay" prior to beginning the afternoon's work.
Both men were wearing a safety belt and lanyard, with the
lanyards secured to a steel lifeline running along the side of the
bridge. To reach the new work area it was necessary to step
from one steel "I" beam to another approximately 4 feet away.
An expansion joint in the area prevented the workers from
making this step while their lanyards were connected to the
lifeline. Although the incident was not witnessed, it appears that
the victim, while carrying a partially filled 5-gallon paint bucket,
disconnected his lanyard and attempted to step across the 4-foot
gap to the next beam. In doing so, he either slipped or lost his
balance and fell 96 feet, striking the back of his head on the
rocky ground below. The co-worker, and a supervisor who
arrived on the scene just as the incident occurred, immediately
summoned local police and rescue personnel. The victim was
pronounced dead at the scene by the local medical examiner.
Strong association with exterior painting
At the time of the incident the men had completed the interior
finish of the third silo and had begun to
disassemble the scaffolding. Each man was using a nylon rope
lanyard attached to a chain on a scaffold
bracket. The brackets were spaced 6 feet apart. As each man
reached a point in the operation where he was
ready to drop a bracket to the ground, he hooked his lanyard to
the chain on the next bracket.
At some point the victim lost his balance and fell off the end of
the scaffolding. The co-worker stated that
he saw the victim fall and jerk upwards as the lanyard caught
him. As the victim's weight dropped back
on the lanyard, it snapped, causing him to fall 160 feet to the
concrete floor below.
When the lanyard was inspected, burn damage was discovered
in several places, including the point at which it had snapped.
This damage probably occurred during welding or burning
operations from a previous job.

Association with concrete finishing


Face No. PFAS Safety Principle
Violated
89-03 Not 100% tie-off.
























89-21 Equipment failure; Lack of
regular equipment inspection
may have been a cause.











Table D-1 (continued).
Face No. PFAS Safety Principle
Violated
89-24 Improper use of anchorage
















90-12 Not 100% tie-off.


















92-05 Not 100% tie-off.


NIOSH Data'

A male carpenter fell 90 feet to his death from the top of a
precast concrete parking garage which was under construction.
The victim, working from a wooden beam, was tied off to a 1
1/2-inch- diameter rebar in the following manner. The victim
secured one end of a 6-foot lanyard to one "D" ring on his safety
belt, fed the other end of the lanyard through a second "D" ring
on his belt, and then secured it to the first "D" ring. This created
a loop with the lanyard. He took an 8-foot lanyard and, at its
midpoint, wrapped it several times around the 1 1/2-inch rebar.
He took one end of the 8-foot lanyard, passed it through the loop
of the 6-foot lanyard and fastened the snap hook to the snap
hook at the other end. The victim asked his co-worker to get him
a portable power saw. The co-worker turned and saw the victim
fall off the edge of the building.

Association with concrete erection
A journeyman painter died when the swing scaffold he was
using to access the interior of a 68-foot-tall by 32-foot-diameter
municipal water tank fell. The painter was working from a
single point suspension scaffold near the top of the tank. The
painter was wearing a safety belt and lanyard secured to a
lifeline. When he finished painting the upper area of the tank the
painter disconnected his lanyard from the lifeline and moved to
the other end of the scaffold to hand the spray paint gun he was
using to his foreman. The foreman had just taken the spray paint
gun from the victim when he heard a "pop" and saw the scaffold
on which the victim was standing fall to the floor of the tank 65
feet below. Investigation after the incident revealed that the two
"U" bolts on the cable which supported the block and tackle
from which the scaffold was suspended had loosened enough to
allow the cable to slip through them, causing both the scaffold
and all of its supporting hardware to fall.
Strong association with painting and water tanks.
A 31-year-old painter (victim) died from injuries sustained in an
80-foot fall from a 120-foot-high electrical transmission tower.
The victim was a member of a four-man crew painting the
tower. The crew had painted one side of the tower, from top to
bottom, and had begun to paint the other side. The four crew
members were working at the same level on the tower and all
were wearing safety belts and lanyards. As the victim unhooked
his lanyard to reposition himself on the tower, he lost his
balance and fell to the ground.
Strong association with transmission tower work











Table D-1 (continued).
Face No. PFAS Safety Principle
Violated
92-08 No personal fall arrest
system or other fall
protection used.




















92-11 No personal fall arrest
system or other fall
protection used.


NIOSH Data'

The company had been contracted to re-roof a private residence
that was currently occupied. The main roofing work had been
completed approximately 2 weeks prior to the incident.
However, the homeowner complained about a section of the
roofing which was misaligned. The victim was working alone on
the roof, which had a pitch of 4:12 (4 feet of vertical rise to 12
feet of horizontal width). He had realigned all but two shingles,
when he fell from the edge of the roof to a concrete patio deck
16 feet, 3 inches below (Figures 1 and 2). The victim was not
using any type of fall protection devices or systems. Although
no one saw the victim fall, the estimated time of occurrence was
6:42 p.m. The homeowner reported hearing an unusual sound
and looked out a window. She saw the victim lying on the patio;
he was unresponsive and bleeding from the back of the head.
She called 911 and an emergency medical service (EMS) team
arrived at the scene approximately 3 to 4 minutes later. They
found the victim traumatized, unresponsive, and in cardiac
arrest. The EMS team administered CPR, stabilized the victim,
and transported him to a local hospital. He remained in a
comatose condition and died 3 days later.
Association with residential roofing
A 41-year-old male ironworker (the victim) died after falling
from a structural steel framework to a concrete
floor during the construction of an automobile repair shop. The
victim and two other ironworkers coworkerss)
were assembling the steel frame "skeleton" (measuring 50 feet
wide, 86 feet long and 18 feet high
at the roof edge) of the structure. Sway-bracing rods had not
been installed between the beams (combination
column-roof truss units) the bolts at the base of the beams had
not been fully tightened, and two steel beams
had not yet been connected at the roof-line apex. As the victim
walked on top of a stack of unsecured purlins
(steel joists) along one edge of the frame to make a final
measurement, the frame began to sway. The victim
lost his balance, and fell 18 feet to the concrete floor, receiving
fatal injuries. There was no fall protection
equipment in place, and the victim was not wearing a helmet.

Strong association with steel erection.











Table D-1 (continued).
Face No. PFAS Safety Principle
Violated
95-09 No personal fall arrest
system or other fall
protection used.



























96-01 No personal fall arrest
system or other fall
protection used.


NIOSH Data'

A male carpenter died after falling 16 feet from a roof onto a
concrete porch floor. The victim was a member of a five-man
(foreman and four carpenters) crew laying roofing felt on the
gable roof of a newly-constructed, prefabricated church and
sacristy. The roof was 48 feet wide by 106 feet long. The crew
had completed applying the felt to one half of the roof and was
applying the eighth course to the second half of the roof when
the incident occurred. The victim was walking backward on the
roof unrolling the felt. Approximately 8 feet in front of the
victim, a second crew member was temporarily nailing down the
felt. A short distance behind the second crew member, the two
additional crew members were permanently nailing the felt to
the roof sheeting. The foreman was on the roof observing the
crew. The men were only unrolling 8 feet of felt at a time
because it was a windy day, with gusts up to 25 miles per hour.
As the men approached the end of the roof, the foreman was
called to the ground to discuss the color of the shingles with the
church preacher. The worker temporarily affixing the shingles
looked up to see the victim approaching the edge of the roof and
yelled for him to "watch out." The victim lost his balance and
fell backward off the roof. The victim fell approximately 6 feet,
struck a cross brace on the framework of the church's porch,
then fell another 10 feet, striking his head on the concrete floor
of the porch. The crew members left the roof and ran to the
victim, finding him unresponsive, bleeding from the nose and
ears. The victim was later pronounced dead at the site.
Strong association with residential roofing
A male sign installer died after falling from a canopy located
above a loading dock, and striking his head on the bed of a truck
crane. The victim and a co-worker had been assigned to remove
four wooden signs above a loading dock at a food distribution
warehouse. While attempting to remove the fourth sign, the
victim was standing on a canopy which was about 15 feet above
the ground and was not using any personal protective equipment
(Note: a safety belt and lanyard were available in the truck
crane). The co-worker positioned the truck crane beneath the
canopy where the sign was located and extended the boom
above the sign. The victim attached the crane's load line around
one of the metal brackets which secured the sign to the building.
He then removed five lag screws which secured the sign to the
building. As he removed the fifth screw the sign swung free. At
that time the lag screw which attached the metal bracket to the
wooden sign frame pulled out of the wood. The sign dropped
and struck a diagonal canopy pipe support. The sign then slid
down the support and struck the victim, knocking him off the
canopy. The victim fell about 12 feet and struck his head on the
corner of the truck bed. The coworker, who witnessed the event,
ran to aid the victim. He found the victim unresponsive and
bleeding profusely.

Association with sign installers.











Table D-1 (continued).
Face No. PFAS Safety Principle
Violated
96-21 Not 100% tie-off.

























97-08 No personal fall arrest
system or other fall
protection used. Behavioral
failure (failure to respect
warning line).


NIOSH Data'

On June 27, 1996, a 27-year-old laborer (the victim) was fatally
injured when he fell through an unguarded
roof opening while repairing the rubber roof membrane of a
college sports coliseum. The victim and his
foreman were repairing the membrane after it had been sliced
open to provide access to the underlying roof
structure. The victim had been cleaning the existing membrane
while his foreman, working behind him,
was completing the patch. The victim had progressed to the peak
of the arched roof, out of sight of the
foreman, and had disconnected his fall protection lanyard from
the lifelines. For an unknown reason, the
victim stepped on an exposed ceiling tile which gave way,
allowing the victim to fall 90 feet to the gym
floor. Workers inside the gym saw the victim fall and hit the
floor. One of the workers, an EMT,
immediately went to the victim and began CPR while another
worker notified 911. The campus emergency
medical squad (EMS) responded within 8 minutes and
transported the victim to a local emergency room,
where he was pronounced dead.

Association with roofing.
A 22-year-old male carpenter's helper (the victim) died of
injuries he received after crawling from an
unprotected floor edge onto an unsecured piece of plywood and
falling 120 feet to the ground. At the time
of the incident, concrete forming work had been completed on
12 floors of a condominium under
construction. The victim was part of a crew removing form
materials (plywood, etc.) and was assigned to
work on the 10th floor. The victim had been on the 12th floor
obtaining a safety harness and was en route
to the 10th floor via a personnel hoist when he stopped the hoist
and exited at the 11Ith floor. A co-worker
from the floor above had yelled down to the victim, asking him
to plug in an extension cord that was hanging
from the 12th to the 11Ith floor. He crawled under a red tape
warning line at the floor edge of the atrium
onto a piece of unsecured plywood. The plywood gave way and
the victim fell 120 feet to the ground. The
local emergency medical service responded in less than 10
minutes, but the victim was pronounced dead
at the scene.

Association with concrete formwork and erection.











Table D-1 (continued).
Face No. PFAS Safety Principle
Violated
97-10 Not 100% tie-off.


NIOSH Data'

A male tower erector died as a result of injuries sustained in a
200-foot fall from a telecommunications tower. The incident
occurred while the victim and a co-worker were connecting
antenna-support brackets onto a leg of the tower. The victim
apparently disconnected or was attempting to re-connect his fall
protection and was climbing down the leg of the tower from 220
feet to 200 feet when he fell to the ground.


Strong association with telecommunication towers.
Notes:
1. Selected excerpts of the original NIOSH transcripts (National Institute for Occupational Safety and
Health. 2000).











APPENDIX E
FALL INJURY CASES ANALYZED FROM THE OSHA DATA

Table E-1. Fall injury cases analyzed from the OSHA data.


PFAS Safety
Case Principle Violated









Correct tieoff
policy not used
1 (continuity)






Positioning device
2 no PFAS


OSHA Data
The employee was worlang in a personnel basket hoisted by a 100 ton
Linkbelt [crane]. The victim was equipped with a full body harness with
lanyard and a chain wall hook. The victim exited the basket to station
himself on the outside face of the bridge column. He failed to first attach
his lanyard prior to exiting the personnel basket. He had climbed onto the
horizontal rebar of the bridge column and attached his wall hook to the
outside rebar band. The victim leaned back to retrieve his lanyard and
shifted his full body weight to the wall hook attached to the horizontal
rebar. The wire ties broke from the excessive weight of his body causing
the wall hook to slide off the end of the rebar. The victim fell 90 feet to the
concrete footer of the column resulting in fatal injuries.
Strong association with positioning devices

On 12/28/98 at approximately 10:15 a.m., the victim was removing bolts on
a vertical concrete form inside of a bridge pier. He was wearing a body
harness with one lanyard and also had a wall chain for a positioning device.
The victim fell approximately 43 feet to the base of the pier. His lanyard
was not being used, and the hook on the wall chain had a defective safety
latch.
Strong association with positioning devices


Employee 1 was using a pry bar to position a 6 ft by 20 ft by 1/4 in, steel
sheet on the roof of a tank. He fell 43 ft from the roof to the inside floor of
the tank. Employee 1 died. He was equipped with a safety harness and a
lifeline, but did not have a place to tie off on top of the tank.
No association

At approximately 11:20 a.m. on July 22, employee 1, an apprentice
carpenter employed by [construction] co., fell approximately 76 feet from
the temporary deck of the Bridge to the ground. Employee 1 was wearing a
full body harness with a lanyard, but was not attached to a secure anchor
point while placing form panels. Employee 1 received severe internal
injuries and broken bones. He was pronounced dead at approximately 12:20
p.m. at the medical center.
Strong association with concrete formwork


Anchorage not
3 installed





1. Not 100% tie-off
2.Either anchorage
not installed or not
4 used properly.











Table E-1 (continued).

PFAS Safety
Case Principle Violated


OSHA Data


Shortly after 2:00 pm on may 8, 1996, employees were installing sheet
metal decking on the 3rd level of a steel structure building under
construction. An employee was placing short sections (16') of decking on 3
joists. As he progresses with this task, he kicked the last sheet placed to
make it fall into place and interlock with the previously laid sheet. The
sheet slipped away from the 3rd joist and the employee started falling
through to the lower level. At the time of this event, the victim was wearing
a full body harness and was tied-off to a retractable cable block about 15'-
18' away. As he fell, somehow the cable hook came undone/slipped out of
the "d" ring attached to the body harness. (Note:) the block had been
recently purchased and put into service just a couple of days before the
event. The victim fell approximately 36' to a concrete floor below.


Employee 1 and a coworker were unloading 20 ft sheets of metal roofing
material on a two-story, multi-family building. While unloading the
material, employee 1 was using a full body harness and safety line.
Witnesses said he unfastened his line from the harness and attempted to
walk across four metal panels to another roof line. He slipped and fell 19 ft
to the concrete, striking his head. He was taken to the hospital, where he
died the next morning.
Strong association with decking



On 2-22-01 at a manufacturing site, a contracting company, that has had a
long standing contract with the manufacturer for performing contracting
work, such as constructing buildings, was demolishing a wood existing
building. The contractor had previously built a new building over the
existing building that was being demolished on this date. An employee,
approximately 1 yr in the employment of the contractor had been working
from a boom lift man basket. A harness and lanyard were in the basket but
had not been womn by the employee. Although it was company policy to
wear the PPE, the employee had not at this time, and apparently had exited
the man basket and stepped onto the roof of the wooden structure that was
being demolished. The employee apparently had fallen through one of the
openings in the roof. There were no direct witnesses, but 2 other employees
(supervisor and laborer) working nearby heard a thump and discovered that
the employee had fallen.
Strong association with aerial lift


Employee 1 was working in an elevated bucket approximatley eleven feet
above the ground splicing telephone cables. He was wearing a harness and
lanyard that had not been tied off to the boom. Somehow he either leaned
or otherwise shifted his weight onto the door of the bucket and the door
opened, causing him to fall to the ground and suffer fatal head/neck
injuries. The door latch was found to be defective.
Strong association with aerial lift


5 Roll-out









6 Not 100% tie-off


100% Tie-off for
7 aerial lift users








100% Tie-off for
8 aerial lift users











Table E-1 (continued).

PFAS Safety
Case Principle Violated


















100% Tie-off for
9 aerial lift users













No anchor
10 connector installed















100% tie-off for
11 aerial lift users


OSHA Data
The deceased age 50, was operating an aerial lift when he was thrown from
the basket per eye witnesses. Employees who had been using the aerial lift
were not wearing body belts or harnesses with appropriate lanyards
attached to the boom or basket. Mr. [name] was operating the condor 48
foot aerial lift at a height of approximately 14 feet above the pavement
when he fell. Demolition of the curtainwall (back wall) of the 2 story motel
involved removing glass windows and wooden soffits. Employees pried
with bars and the lift basket to remove the soffit from the underhang/wall
and had been using the lift this morning to reach the 2nd floor and to lower
windows once removed. The lift gave some indications of erratic action but
was not removed from service. Another operator believed it "Ijumped" or
reacted rapidly to control input at one point before the deceased took over
operating the aerial lift this morning. After the incident the equipment was
tested and the platform leveling mechanism failed to respond. This may
have been what caused the deceased to be thrown from the basket. The
eyewitness did not see the action of the lift but did tumn in time to observe
the victim travel in an arc over the guardrails and fall headfirst to the
pavement.
Strong association with aerial lift
Employee 1 was working on the seventh floor level of an office building
under construction. The building was in the process of having the floors
formed and poured. Employee 1 was on the perimeter edge on the east side
of the structure. He was patching/filling post tensioning holes with concrete
on the exterior side of the outer columns, between the floors, when he fell
approximately 80 feet. Employee 1 was wearing a safety harness and
lifeline. There were no witnesses (from the seventh floor level) who saw
employee 1 fall. Employee 2 was on the second floor level when employee
1's body passed by. Employee 2 (site superintendent) thought that it was
trash being tossed over the side and went to the perimeter to see what it
was. He then saw employee 1 laying on the ground. Employee 3 who was
facing the building at ground level about 100 feet away looked up and saw
employee 1 fall to the ground.
Strong association with Concrete formwork

Employee 1 was working from a Skyhook Aerial Crane with a manbasket
attached to the end of the boom. He was approximately 80 feet in the air
cutting brackets which held a sign. Another crane was used to lift the sign
once the sign was cut away from its support. The large sign was actually
two signs bolted together and held in place by six brackets. Four brackets
held the lower sign and two brackets held the upper sign. Employee 1 was
going to cut the four lower brackets with an oxy-acetylene torch and then
reposition his aerial lift on top to cut the final two brackets. This was he
would be above the sign when making his last cuts. When the fourth
bracket was cut on the lower sign, it became detached from the upper sign
and fell striking the aerial lift. Employee 1 was not wearing a harness and
was bounced out of the basket fall 80 feet to the ground below. He died
from injuries sustained in the fall.
Strong association with aerial lift











Table E-1 (continued).

PFAS Safety
Case Principle Violated













Correct tieoff
policy not used
12 (continuity)











Correct tieoff
policy not used
13 (100% PFAS)


OSHA Data
On 05/15/97, employee 1 was involved in the erection of a communications
tower located in [deleted name] county. Employee 1 was working on the
tower at a level of 200 feet from the ground. He was issued and wearing a
body harness with a 10 foot lanyard, no energy absorbing, and a short
positioning lanyard with a large hook designed to quickly snap onto the
structure to keep the employee centered. Employee 1 was in the process of
moving from one face of the tower to another, when he fell to the ground
sustaining multiple fatal injuries to chest, back, head, and other portions of
the body. The tower was a steel lattice structure being erected for a
[telecom co.] and would have a completed height of 300 feet. Employee 1
was working bolting the legs of the tower together and had erected 20 feet
that morning and was working at the 200 foot level when he attempted to
move from one side to the other. A witness stated that he heard a noise
possibly as employee 1 attempted to hook onto the structure with the large
positioning hook, and miscued and fell 200 feet to his death,
strong association with telecom tower


On 6-26-2001 the employees of [telecom co.] were in the process of
erecting a telecommunication cellular tower, they working at approximately
100 feet. The foremen and another employee had just finished bolting a
section of the tower. The employee next to the foreman stated the foreman
hooked his positioning belt to a bolt and leaned back. The hook apparently
slipped off and the foreman feel 100 feet to his death. The foreman was
wearing a harness but did not have a lifeline or lanyard attached. He was
only using the positioning belt which had a chain attached in the front and a
hook, the employees called a pelican hook, attached to the chain. When the
hooked slipped he had no secondary fall protection.
strong association with telecom tower

Employee working at an elevation of 28 feet above the next level. The
employee was making a double connection and was removing the last 2
bolts from the existing beam, the employee was using a body harness and
lanyard when he bent over to remove the 2 bolts he rolled out of his lanyard
and fell to the concrete pad below. The lanyards self-closing latch remained
fully open.
Association with steel erection


Roll-out (Locking
14 snaphook not used)











Table E-1 (continued).

PFAS Safety
Case Principle Violated

























15 Not 100% tie-off




Correct anchor
16 connector not used










Anchorage not
17 installed









18 Not 100% tie-off


OSHA Data
A bridge was being constructed. On one span of that bridge, sheet metal
decking had been incorrectly installed over the openings (bays) between the
concrete bridge beams. It was at the wrong angle. A three-man work crew
was assigned to remove the decking, cut off the supporting angle iron, re-
install the angle iron and then replace the decking. Two employees were
actually placing the sheet metal panels over the opening and screwing them
down while the other employee was handing the panels to them. These
employees were all wearing safety harnesses with double lanyards. They
were instructed to be tied off to the shear connectors in the bridge beams at
all times. The shear connectors were resin-coated 5/8 inch rebar that ran
virtually all the way through the beams and had a pull out strength well
over 5000 pounds. The decking had been replaced over almost all of one of
the bays between the beams. The only remaining opening in the bay was
smaller than a sheet of metal decking. The workers disconnected their
lanyards from the shear connectors and moved away from the opening to
cut off a sheet of decking. When they had cut the sheet off, they returned to
the opening but did not tie off, the worker who did not fall said that he
thought that the sheet metal would provide fall protection. The decking
apparently did not fit down on the angle iron sufficiently, possibly because
it had been cut off. The victim stood with both feet on the sheet metal panel
which was in position over the opening. As he was about to screw it down,
the decking gave way. He fell through the opening about 56 feet to the
ground below. After the event, the sheet of decking was hanging in the
opening.
Strong association with decking
A carpenter/laborer was placing pins at the top of a column form with the
safety lanyard of the full body harness looped around the steel rebar
sticking up from the top. The form and employee fell from the 12th floor to
the ground level deck approximately 130 feet.
Strong association with concrete formwork

Two iron workers were assigned to close up an opening on the roof and
install fascia along the edge of a section of roof which had been left open
on the top floor of a highrise building so that the final roof could be
installed. This work was to have been done from the protected floor below,
however, for some both employees climbed on to the roof which was
covered with a light ice or frost. Both employees were wearing full body
harnesses and had lanyards attached, but did not have a tie off point at the
area where they were working. They slipped and fell approximately 84 feet
and were killed .
Association with ironworkers

Steel worker was working at the site address of [deleted]. The worker was
connecting a steel beam at the highest point of the new building being built.
He was in the center of the building when he fell twenty eight feet five
inches to the ground. The worker was wearing a full body harness with two
lanyards. The worker unsnapped his lanyard from the attachment point, and
reached out to disconnect a steel choker used to set the beam in place when
the fall occurred.
Mild association with steel erection











Table E-1 (continued).

PFAS Safety
Case Principle Violated


OSHA Data


An employee of [company name] erectors was killed when he fell while
installing steel roof trusses at a height of about 20 feet. He was wearing a
safety harness with the lanyard properly attached to a point having the
required load carrying strength. The lanyard, a ripstich shock-absorbing
type, broke before the ripstitch shock absorber functioned. The victim
struck steel floor joists that had already been installed at the floor level to
accommodate removable flooring typical for a computer room.
Mild association with steel erection


An employee of an electrical contractor fell while attempting to adjust
lights on a newly constructed light system at a [university] Stadium. The
light pole reaches more than 116 feet above a concrete base below. The
employee had attached his safety harness and 6 foot lanyard to the safety
sleeve which he attached to the cable that was fixed to the side of the pole.
He climbed up to the bottom of the first section of lights which where about
96 feet above the ground. He lost control before leaving the pole; he never
entered the cat walk to adjust the lights. He fell 81 feet down the side of the
pole while still attached to his safety harness, lanyard, and safety sleeve
(cable grab). The safety sleeve (cable grab) did not arrest his fall. His body
apparently struck foot pegs and cable guides along the way down the pole,
which produced injuries that caused his death. The employee had no vital
signs when the medical emergency team attempted to rescue the man.



A steel erector working 24' to 28' above concrete floor was not using
personal fall protection system when he accidentally stepped off of steel
decking and fell 24' to floor. Victim was wearing personal fall protection
equipment harnesss) but was not tied off to a lanyard or life line.
Mild association with decking

Two workers were in the process of removing concrete panels from a wall
that was approximately 38 feet high. The victim was wearing a full-body
harness with a chain positioning device and "d" ring in the front. The
employees would use the positioning device by attaching to re-bar or taper-
ties at waist level and remove the tie at shoulder height and then move
down to the next taper-tie. The employee would then reattach his
positioning device and remove the next tie. The employees were not
utilizing lanyards on the full-body harnesses nor were they protected from
falls when moving from point (a) to point (b). It was when the employee
had unhooked to move down to the next taper-tie that he fell falling
approximately 32 to 36 feet to the ground.
Strong association with positioning device


Inspect equipment
19 before each use













Fall hazard
analysis must be
project specific
20 (pendulum swing)






21 Not 100% tie-off














22 Not 100% tie-off











Table E-1 (continued).

PFAS Safety
Case Principle Violated

















Temporary change
23 in work area


















Not 100% tie-off
24 (continuity)




100% PFAS for
25 aerial lifts




Special inspection
protocol for SRL
26 (SRL failure)


OSHA Data
The accident victim was part of a crew that was in the process of removing
a flying-form from the seventh floor of the concrete building which was
under construction. During normal construction activities the open sides of
all floors are guarded with chain guardrails. Employees are provided with
safety harnesses and lanyards and they are instructed to tie off anytime they
are required to work within 6 (six) feet of an open sided floor. At the time
of the accident the chain guardrail was removed so the flying-form could be
removed from the seventh floor. As the crew was pushing the form one of
the support rollers, located on the floor 25 inches from the edge of the
floor, did not appear to be turning freely. The victim went over to the roller
and hit it with a sledge hammer to free it up. The victim did not tie off to
perform this work. The crew supervisor saw what was going on and he told
the victim to stop. After the victim hit the roller, and heard the supervisor
yell, he quickly spun around to come back to the crew but he became
tangled with his own two feet. The victim fell backwards on his buttocks at
the edge of the floor and then fell backwards off of the edge of the floor, to
the ground below.
Strong association with concrete formwork



The deceased was working on the roof (west side) of a three story
apartment building installing 4 x 8 sheets as roof decking. Another
employee was performing the same type of work on the east side of the
roof. Both employee were wearing safety harnesses and were tied off. At
the end of the day, both employees discussed finishing up and going home.
Each employee went back to their work area and shortly after this it was
noticed that he was lying on the concrete ground level three stories below,
near his work area on the roof. There were no witnesses to his fall. He had
been wearing a safety harness and was attached to a life line secured to the
trusses as he worked throughout the day, but had removed the safety
harness, and apparently was in the process of climbing down the structure
to leave the work area, and slipped, falling to his death three floors below
because of the lack of a ladder to be used by employees to reach the work
area.
Mild association with decking
A 19 year old employee of [company name] Erectors, Inc. fell from a
second floor balcony after unlatching his lanyard from his harness and
leaving a man basket elevated by a forklift. Employees were installing
windows at the time of the accident.
Mild association with aerial lift


An employee fell 60 feet while decking a metal roof. The employee was
wearing a full body harness and a self-retracting lanyard, however, the
lanyard did not activate until he had fallen 29 feet. At that time the self
retracting lanyard cable broke and the employee fell another 31 feet.
Strong association with decking











Table E-1 (continued).

PFAS Safety
Case Principle Violated


OSHA Data


The victim was laying the initial metal decking on the steel beam of bridge
610 (an elevated highway) under construction over Interstate [deleted] at
Interstate [deleted] in Virginia. He was tied off wearing his body harness
and retractable fall protection device. While placing the metal decking
down on the bridge, he fell through the opening. The fall protection (the
retractable cord) broke and he fell one hundred feet to the ground below He
had multiple injuries to his body and died at the accident scene. There were
two other co-workers in the area, (on the elevated highway to the rear of the
victim) but they did not see him fall.
Strong association with decking


Employee 1 was in bucket of an extensible boom crane truck to
repair/replace a light bulb for a [deleted] Hotel sign. A grounds man was
stationed at the rear of the truck operating the crane boom to lift the
employee up to the sign (approximately 42 feet high). The groundsman
heard a loud "Pop" and the boom suddenly retracted to approximately 25
feet high. Upon coming to an abrupt stop, employee 1 was thrown through
the side of the fiberglass bucket (which was apparently already in disrepair)
and fell 25 feet to the ground where he either died upon impact or shortly
thereafter. Employee 1 was wearing a safety harness, but had not been tied
off.
Strong association with decking


The deceased was involved in connecting a steel beam approximately 15
feet above the ground. He was on the beam, and was wearing appropriate
personal fall protection equipment. After completing his connections, he
stood, and then fell from the beam. His harness and lanyard limited his fall
to approximately three feet, and prevented him from falling to the ground.
The lanyard caused him to swing into the support column, and to strike his
head. The Medical Examiner's report stated that his manner of death was
"natural", and the probable cause of death was "severe centrilobular
emphysema and generalized pleural fibrosis."
Strong association with steel erection


Victim fell approximately 15 feet to concrete floor while installing roof
trusses. Victim was wearing full body harness with lanyard. Victim had
unhooked lanyard from roof truss to move to, or reach to, next roof truss so
he could fasten cross brace in place which would secure roof truss in
position. No other employees present actually saw victim fall. All previous
trusses had been 24" on center, span to roof truss that victim was installing
was 45" on center due to ventilation passing between.
Association with building erection (specific trade unknown)


Special inspection
protocol for SRL
27 (SRL failure)


100% PFAS for
28 aerial lifts










PFAS user training
for pendulum
29 swing hazard








Hierarchy of fall
controls use aerial
30 lift











Table E-1 (continued).

PFAS Safety
Case Principle Violated


OSHA Data


At approximately 1:05 PM on January 13, 2004 the victim and another
employee had been working on wingwall C removing wood falsework form
from a concrete form. Both employees were working on opposite sides of
the 28 foot high wall. The victim was wearing a full-body harness and
using one positioning hook for fall protection. With this particular system it
would not protect the victim when moving from one work position to
another. Both employees were in the process of moving to a lower work
elevation, at approximately the 20 foot elevation. The other employee did
not see the victim fall. After attaching the grid reinforcement bar in front
him, he looked in the direction where the victim should be; at that moment
he heard another employee yelling that the victim fell. He then ran to a
fellow employee to make a phone call to 911 and the superintendent. The
victim was attended by local EMS personnel, he was pronounced dead at
the scene by [deleted] County Coroner.
Strong association with positioning device


On 5/14/04, at approximately 10:25am, two employees were installing
sheet metal roof on a section of highrise building. Both employees were
tied off to a rope via body harnesses and lanyards. Employee B lost his
balance and slid off the roof taking employee A with him. Employee B was
stopped by the fall protection system above the concrete floor which was
approximately 15 feet below. Employee a hit a 46 inch concrete wall with
his head. Both victims were transported to a local hospital where employee
B was released following an exam for bruised ribs. Employee A expired at
the hospital on 5/15/04.
Strong association with decking


31 Not 100% tie-off











Total Fall Distance
32 problem









LIST OF REFERENCES

Abramowitz, A. (2002). Architect 's Essentials of Contract Negotiation. American Institute of
Architects, Washington, D.C.

American Society of Safety Engineers. (1992) American National Standard Safety Requirements
for Personal Fall Arrest Systems, Subsystems, and Components Z359. 1-1992. ASSE, Des
Plaines, IL. Also known as ANSI, Z359.1 1992.

Cox, R. (2001). "Developing successful performance measurement systems." FM~I Quarterly
(formerly Contractors management 1) 3, 8-1 1.

Design-Build Institute of America. (2006). List of attendees for the 2006 Design-Build
Conference and Expo. Found at
http ://www.designbuildexpo. com/sponsoring_exhibiting.cfm on May 14, 2007.

Design-Build Institute of America. (2007). Design-build market share in the United States.
Found at http://www.dbia. org/indrinfo/mkt~chrt. html on July 11, 2007.

Drucker, P. (2001). The Essential Drucker. Harper Collins Publishers, New York, NY.

Ellis, N. (2001).1Introduction to Fall Protection. American Society of Safety Engineers, Des
Plaines, IL

Engineering News Record. (2006). "The Top 400 Contractors." ENR, 256 (20), 60-75.

Erlandson, D., E. Harris, B. Skipper and S. Allen. (1993). Doing Naturalistic Inquiry. Newberry
Park, CA: SAGE Publications, Inc.

Ettlie, J. and H. Stoll. (1990). Managing the Design-Ma'~nufa~cturing Process. McGraw-Hill, Inc.,
New York

Flood, L., A. Klevmarken and P. Olovsson. (2007). "A brief description of The Swedish Panel
Study: Market and Non-market Activities." Found at
http://www.nek.uu. se/faculty/klevmark/hus.htm on March 25, 2007.

Galloway, L., F. Rowbotham and M. Azhashemi. (2004). Operations Management in Context.
Elsevier Butterworth-Heinemann, Oxford, U.K.

Gambatese, J. (1996). "Addressing construction worker safety in the proj ect design." Ph.D.
dissertation, University of Washington.

Gambatese, J., M. Behm and J. Hinze. (2005). "Viability of designing for construction worker
safety." J. Constr. Eng. A~gmt., ASCE, 113, 1029-36.

Geer v. Bennett, 237 So. 2d 311 (Fla. 1970)










Geller, E. S. (1997). "Key processes for continuous safety improvement." Professional Safety.
42, 10; p. 40

Geller, E. S. (2002). The Participation Factor. ASSE, Des Plaines, IL

Greshner, O. (1984). "Reasons Why QCCs [quality control circles] do not attain expected
results." in The Japanese Approach to Product Quality. Pergamon Press, Oxford, U.K.
pp.93-107

Heathfield, S. (2007). "Harness the power of an employee suggestion program: beyond the
suggestion box." Found at
http:.//humanresources.ab out. com/od/quality/a/suggesti on_pro_2.htm on March 22, 2007.

Hecker, S., J. Gambatese and M. Weinstein. (2005). "Designing for worker safety." Professional
Safety. 50, 9. p. 32-45.

Hinze, J. (1981). "Human aspects of construction safety." J Constr. Eng. A~gmt., ASCE, 107,
61-72.

Hinze, J. (1987). "Qualities of safe superintendents." J. Constr. Eng. A~gmt., ASCE, 113, 169-
171.

Hinze, J. (2002a). "Safety Incentives: Do They Reduce Injuries?" Practice Periodical on
Structural Design and Construction. ASCE. 7, 8 1-84.

Hinze, J. (2002b). "Safety plus: Making zero accidents a reality." Research report 160-11,
Constr. Industry Inst., Austin, TX

Hinze, J. (2006). Construction Safety, SecondEd. Jimmie Hinze, Gainesville, FL

Hinze, J., D. Bren and N. Piepho. (1995). "Experience modification rating as a measure of safety
performance." J Constr. Eng. A~gmt., ASCE, 121, 455-458

Hinze, J. and J. Gambatese. (1996). "Addressing construction worker safety in the project
design." Research report 101-11, Constr. Industry Inst., Austin, TX

Hinze, J. and R. Godfrey. (2002). "Extending the scope of Making zero accidents a reality:
focusing on shutdowns, turnarounds, and outages." Research report 160A, Constr. Industry
Inst., Austin, TX

Hinze, J. and M. Harris. (2007a). "Problem Areas in Personal Fall Arrest Systems in the
Construction Industry." in By Design (an ASSE Engineering Practice Specialty periodical).
Vol. 6 (3). p. 10-14.

Hinze, J. and M. Harris. (2007b). "The Anchorage Component of Personal Fall Arrest Systems:
Usage and At-risk Practices in the Construction Industry." in Proceedings of the American
Society of Safety Engineers (ASSE) Annual Conference, Orlando, FL, June 2007.










Hinze, J. and H. Parker. (1978). "Safety productivity and job pressures." J. Constr. Eng. Mgnat.,
ASCE, 104, 27-34.

Hinze, J., C. Pederson and J. Fredley. (1998). "Identifying root causes of construction injuries."
J. Constr. Eng. Mgnat., ASCE, 124, 67-71.

Hinze, J. and D. Russell. (1995). "Analysis of fatalities recorded by OSHA." J. Constr. Eng.
M~gnt., ASCE, 121, 209-214.

Hollander, M. and D. Wolfe. (1999). Nonparantetric Statistical M~ethods, 2nd Ed. Wiley-
Interscience, N.Y., N.Y.

Huang, X. (2003). "The owner's role in construction safety." Ph.D. Dissertation, Univ. of
Florida.

Huang, X. and J. Hinze. (2003). "Analysis of construction worker fall accidents." J. Constr. Eng.
M~gnt., ASCE, 129, 262-271.

Hutchins, D. (1984). "How quality goes round in circles." in The Japanese Approach to Product
Quality. Pergamon Press, Oxford, U.K. pp. 27-32.

Jennings, K., G. Markus, R. Niemi and L. Stoker. (2007). "Youth-Parent Socialization Panel
Study, 1965-1997: Four Waves Combined." found at
http ://webapp.icpsr.umich.edu/cocoon/ICPSR-STUY007.xml on March 25, 2007.

Kaplan, R. and D. Norton (1992). "The balanced scorecard measures that drive performance."
Harvard Business Rev. 70, 1, 71-79.

Kendall, M. (1962). Rank Correlation M~ethods, ThirdEd. Chas. Griffin & Company Ltd.,
London, U.K.

Kerr, W. (1957). "Complementary theories of safety psychology." J. SocialPsychology. 45, 3-9.

Kruskal, W. (1958) "Ordinal measures of association." J. Anzer. Stat. Assoc. 53, 284, 814-861.

Liberty Mutual Insurance Co. (2006). Loss prevention report /workplace safety report by
industry sector for the construction industry. Found at
http://www.1ibertymutual.com/omapps/Conten re~i=045062099934&pagename=C
MInternet%2FPage%2F StandardTeal&c=Page on March 1, 2007.

Liska, R., D. Goodloe and R. Sen. (1993). "Zero accident techniques." Source document 86,
Constr. Industry Inst., Austin, TX

Loosemore, M., H. Lingard, D. Walker and J. Mackenzie. (1999). "Benchmarking safety
management systems in contracting organizations against best practices in other
industries." Insplententation of Safety and Health on Construction Sites /Proceedings of
the Secondlntl. Conference of CIB Working Conanission W99, Honolthe, Hawaii. A.A.
Balkema Publishers, Brookfield, VT. pp. 883-890.










MSA, the Safety Company. (2006). Fall protection. Preferred items catalog. Bulletin 2300-93-
MC. Available from www.msanet.com.

McCann, M. (2003). "Deaths in construction related to personnel lifts, 1992-1999." J Safety
Research. 34, 507-514

Mohamed, S. (2003). "Scorecard approach to benchmarking organizational safety culture in
construction." J Constr. Eng. A~gmt., ASCE, 129, 80-88.

Mohr, W. and H. Mohr. (1983). Quality Circles: Changinglmages of People at Work. Addison-
Wesley Publishing Co., Reading, MA

National Institute for Occupational Safety and Health. (2004). "Preventing falls of workers
through skylights and roof and floor openings." NIOSH Alert, Publication No. 2004-156.
U. S. Dept. of Health and Human Services

National Institute for Occupational Safety and Health. (2000). "Worker death by falls: a
summary of surveillance findings and investigative case reports." Publication No. 2000-
116. U. S. Dept. of Health and Human Services.

Petersen, D. (1997). "Accountability, culture and behavior." Professional Safety; 42, 10; p. 45

Petersen, D. (1998). "What measures should we use, and why?" Professional Safety. 43, 10, p.
37.

Petersen, D. (2007). "The culture of safety: an interview with safety pioneer Dan Petersen."
Professional Safety. 52, 3. p. 17.

Samelson, N. (1977). "The effect of foremen on safety in construction." Technical report no.
219. Stanford University, Dept. of Civil Engineering.

Sasaki, N. (1984). "Cases of quality control circle." in The Japanese Approach to Product
Quality. Pergamon Press, Oxford, U.K. pp. 15-25.

Suruda, A., D. Fosbroke and R. Braddee. (1995). "Fatal work-related falls from roofs." J Safety
Research, 26, 1-8.

U.S. Dept. of Labor. (1990). Analysis of construction fatalities; the OSHA database. 1985-89.
Washington, D.C.

U. S. Department of Labor. (2004a). Analysis of construction fatalities; the OSHA database.
1990-2004 Washington, D.C.

U. S. Dept. of Labor. (2004b). Hazards of Misusing Wire Form Anchorage Connectors for Fall
Protection. Safety and Health Information Bulletin 09-01-2004.

Weems, B. and P. Bishop. (2003). "Will your safety harness kill you?" Occupational Health and
Safety, 27, 86-90.










Weisgerber, F. and M. Wright. (1999). "Elements of a fall safety through design program." in
Implementation of Safety and Health on Construction Sites /Proceedings of the Second
Intl. Conference of CIB Working Commission W99, Honolulu, Hawaii. A.A. Balkema
Publishers, Brookfield, VT. pp. 867-874.

Weibul. (2007). Fault tree analysis: brief introduction. Found at
http:.//www.weibull .com/SystemRelWeb/fault tree_analysis,_reliaiiybokdarm~
nd the blocksim fti edition.htm

West, M. (2004) E~ffective teamwork, SecondEd. BPS Blackwell, Malden, MA

White, R. W. (1959). "Motivation reconsidered: the concept of competence." Psychological
Review. 66. p. 297-333, cited in Geller, E. S. (2002). The Participation Factor. ASSE, Des
Plaines, IL










BIOGRAPHICAL SKETCH

Matthew Albert Harris was born in Redwood City, California. He grew up in a family with

one other sibling (sister, Jennifer Ann Harris) and spent his formative years in the San Francisco

Bay Area. He went to elementary school at Willow Elementary School in Menlo Park. Mr.

Harris completed college preparatory courses at Palo Alto Senior High School in Palo Alto,

California. He began his college education at Foothill Junior College in Los Altos Hills. After

completing his general education requirements, Mr. Harris transferred to a four-year-degree-

granting university and graduated with a Bachelor of Arts degree in Art History from the

University of California, Santa Cruz. After attending the University of Oregon, where he was

awarded the degree of Master of Architecture, Mr. Harris spent several years working in the

architectural services industry as an architect. Mr. Harris' interests in healthcare systems design,

risk management, and other design issues pertaining to complex institutional facilities (such as,

airport terminals, research laboratories and fire stations) compelled him to return to school to

study construction management and worker safety. He enj oys sea kayaking, cycling and hiking

for recreational activities. He plans to live in Texas with his wife and daughter after graduation.





PAGE 1

1 DEVELOPING A SCORECARD TO EVALUATE THE USE OF PERSONAL FALL ARREST SYSTEMS By MATTHEW A. HARRIS A DISSERTATION PRESENTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY UNIVERSITY OF FLORIDA 2007

PAGE 2

2 2007 Matthew A. Harris

PAGE 3

3 To my father, John Albert Harris, an individual of visionary inte rests and magnanimous spirit

PAGE 4

4 ACKNOWLEDGMENTS I especially thank my most be loved wife Debra for her unwav ering support and her belief in my skills and talents. Thanks go to Dr. Jimmie Hinze, a trailblazer in his discipline. It is hard to imagine how this research would have been possible without reference to his numerous previous studies and countless helpful suggestions. A sincere thank you also goes to the thoughtful and critical contributions of my dissertation committee: Dr Charles Glagola, Dr. Bob Stroh, Sr., and Dr. Leon Wetherington. I appreciate the scholarship that each them has cultivated and the conversations that helped to refine my study. I fe lt as though we were undern eath an olive tree at times during these conversations. This study was supported by the generous c ontributions of several very important individuals and organizations with interests in the fall protection discipline and industry. Thanks go to the following parties: Joseph Feldstein and Victor Ve ndetti of the Mine Safety A ppliance Co. for opening their production and training facilities to the researcher, and for sharing their expertise and insights about fall protection; The members of the ASSE/ANSI Z359 Comm ittee, in particular Randy Wingfield, Tim Fisher, Thom Kramer, W. Joe Shaw, and Robe rt Aguiluz. Also, special mention goes to Dr. Nigel Ellis for his pioneering role in a dvancing and publishing scientific literature on fall arrest systems. The American Society of Safety Engin eers Foundation for the funding to study the anchorage subcomponent of pers onal fall arrest systems. This funding and exploratory research was instrumental in sett ing a course for the current study. The distinguished group of safety management practitioners that res ponded to the surveys and participated in the case st udies. These individuals shall remain anonymous for research confidentiality reasons. This study has attempted to fair ly portrait th eir ideas and professionalism. Thanks go to Dr. Michael Slater and Mrs. Dian ne Slater, my dear cousin and her honorable husband, for moral support and for setting a good exam ple. I thank two special ladies in my life:

PAGE 5

5 my daughter Natalie Ray for inspiring me to bui ld a better future than I could have ever imagined without her and my mom, Julie Harris, for her persistent promotion of art and literature in my life. I thank all the design professionals who helped to impart to me the meaning of being a true professional: Donald Corner, Howard Davis, G. Z. Brown, Gary Moye, Rob Thallon, James Tice, Virginia Cartwright, John Reynolds, Char les Gromatzky, Robert Dupree, Mel Streeter, James Kresbach, Ralph Bauer, Jon Holtzheimer, Larry Feuss, Jack Corgan, Heather McKinney, Al York, DeWitt Gayle, Milton Hime, Tim Pelo wski, Kevin Scott, Michael McCaffrey and Harold Barrand. Lastly, thanks go to the craftsmen and build ing contractors that hired me to pound nails, pull wire and dig ditches, but al so taught me about the nobility of their craft: Forest McKown, Jeff Ferguson, Peter Ryan, J. Peter Goetz, James Gray, Brian Francis, Ke nneth Gates, and Andy Ralwell.

PAGE 6

6 TABLE OF CONTENTS page ACKNOWLEDGMENTS...............................................................................................................4 LIST OF TABLES................................................................................................................. ..........9 LIST OF FIGURES................................................................................................................ .......10 ABSTRACT....................................................................................................................... ............12 CHAPTER 1 INTRODUCTION..................................................................................................................14 Significance of Fall Injuries.................................................................................................. ..18 Fall Protection and Control Methods in OSHA Regulations..................................................20 Research Objective............................................................................................................. ....21 2 LITERATURE REVIEW.......................................................................................................22 Hierarchy of Fall Haza rd Control Methods............................................................................23 Fall Injuries Relating to PFASs..............................................................................................24 Best Practices in Safety....................................................................................................... ...29 Balancing Quantitative and Qualitative Measurement....................................................29 A Balanced Measurement System...................................................................................31 Continuous Improvement in Construction Safety...........................................................34 Best Practices in Safety Studies......................................................................................34 Upper Management Commitment...................................................................................35 Strategic Planning for Fall Protection.....................................................................................36 Goal Alignment and the Project Team............................................................................36 Design for Safety Resources...........................................................................................40 Pretask Planning............................................................................................................... ......41 Worker Involvement in Safety................................................................................................42 Participative Management and Quality Control Circles.........................................................45 Work Crew Dynamics............................................................................................................46 Influence of Crew Leaders, Foremen and Superintendents....................................................46 Obstacles to Best Practic e Program Effectiveness.................................................................47 Worker Training................................................................................................................ .....48 3 METHODOLOGY.................................................................................................................50 Research Design................................................................................................................ .....50 Sample Selection.............................................................................................................50 Hypothesis Testing..........................................................................................................52 Sample Size Determination.............................................................................................53 Data Collection................................................................................................................ .......54

PAGE 7

7Preliminary Survey..........................................................................................................55 Fall Protection and Fall Arrest System Survey...............................................................56 Data Analysis.................................................................................................................. ........58 Assumptions....................................................................................................................59 Procedure...................................................................................................................... ...59 Data Collection and Analysis from a Related Sample............................................................61 Development of the Scorecard................................................................................................62 4 ANALYSIS OF FALL INJURY DATA................................................................................65 NIOSH Data..................................................................................................................... .......65 OSHA Data...................................................................................................................... .......66 Data Analysis.................................................................................................................. ........66 Fault-tree Analysis............................................................................................................ ......67 5 RESULTS OF THE FALL PROTECTION AND FALL ARREST SYSTEM SURVEY....78 Descriptive Statistics for the Sample......................................................................................79 Subcontractor Management.............................................................................................81 Project Delivery and Prec onstruction Coordination........................................................82 Design and Construction Integration...............................................................................82 Anchorage Engineering and Fall Arre st System Hardware Management.......................84 Training....................................................................................................................... ....85 Descriptive Data for the TRIR Variable.................................................................................86 Model for the Safety-Practices-Implemented Variable..........................................................87 Results of the Test for Independence......................................................................................90 Development of the Scorecard................................................................................................91 Scorecard Validation Case Studies.........................................................................................92 Scorecard Case Study 1...................................................................................................93 Scorecard Case Study 2...................................................................................................96 Scorecard Case Study 3...................................................................................................99 Scorecard Case Study 4.................................................................................................102 Scorecard Case Study 5.................................................................................................103 Revising the Scorecard.........................................................................................................105 6 RESULTS OF THE INTEGRATED DESI GN AND CONSTRUC TION SURVEY..........130 7 CONCLUSIONS..................................................................................................................133 Basic Fall Safety Compliance and Subcontractor Management...........................................133 Design and Construction Integration....................................................................................134 Fall Arrest Equipment and Engineered Components...........................................................135 Associations between Better Sa fety Records and Fall Arrest System Best Practices..........138 Definition of Better Safety Records.....................................................................................138 Conclusions about the Scorecard..........................................................................................139 Conclusions about the Designer-Builders............................................................................140 8 RECOMMENDATIONS......................................................................................................142

PAGE 8

8Recommendations for Regulatory Revisions.......................................................................142 Recommendations for Changes in Practice..........................................................................144 Recommendations for Changes in Engineering Coordination.............................................146 Recommendations for Future Research................................................................................146 Final Remarks.................................................................................................................. .....149 APPENDIX A FALL ARREST EQUIPMENT MANUFACTURERS........................................................150 B SURVEY FORMS................................................................................................................151 Preliminary Survey............................................................................................................. ..151 Fall Protection and Fall Arrest Systems Survey...................................................................155 Fall Protection and Fall Arrest Systems Survey, follow-up version....................................158 Integrated Design and Construction Survey.........................................................................160 C POPULATION DATA FOR DESIGNBUILD EXPOSITION ATTENDEES..................161 D FALL INJURY CASES ANALYZED FROM THE NIOSH DATA..................................164 E FALL INJURY CASES ANALYZED FROM THE OSHA DATA....................................170 LIST OF REFERENCES.............................................................................................................179 BIOGRAPHICAL SKETCH.......................................................................................................184

PAGE 9

9 LIST OF TABLES Table page 5-1. Response rates for survey instruments...................................................................................78 5-2. Descriptive data fo r the TRIR variable...................................................................................86 5-3. Data categories in the Fall Protec tion and Fall Arrest System survey...................................87 5-4. Descriptive data for indivi dual variables used in the safety-practices-implemented variable development model............................................................................................116 5-5. Descriptive data for the safety -practices-implemented variable..........................................116 5-6. Fall protection and fall arrest sy stems scorecard (project version)......................................122 5-7. Fall protection and fall arrest syst em scorecard (companywide version)............................123 5-8. Classification of populat ion based on annual revenue.........................................................124 5-9. Scorecard for Case Study 1................................................................................................ ..124 5-10. Scorecard for Case Study 3 (bas ed on their PFAS survey response).................................124 5-11. Scorecard (companywide version) for Case Study 3..........................................................125 5-12. Scorecard (project ve rsion) for Case Study 4.....................................................................126 5-13. Fall protection and PFAS scorecard (project version for construction manager-oriented contractors) with revisions base d on case study respondent comments..........................127 5-14. Fall protection and PFAS scorecard (project version for traditional contractors with self-performance capability) with revi sions based on case study respondent comments....................................................................................................................... ..128 5-15. Fall protection and PFAS scorecard (compa nywide version) with revisions based on case study respondent comments.....................................................................................129 6-1. Response frequencies for designer-builders.........................................................................132 A-1. Website addresses for major U.S. fall arrest equipmen t manufacturers..............................150 C-1. Population for the Designer-builders...................................................................................161 D-1. Fall injury cases analyzed from the NIOSH data................................................................164 E-1. Fall injury cases analyzed from the OSHA data..................................................................170

PAGE 10

10 LIST OF FIGURES Figure page 1-1. Anchorage connector strap; materials: drop-forged steel alloy dee-ring and polyester webbing with 5000 pound minimu m breaking strength....................................................17 1-2. Causes of fatalities in construc tion investigated by OSHA, 1990 to 2001.............................19 2-1. NIOSH fall injury (FACE) data............................................................................................. .25 2-2. Rooftop anchor connector.................................................................................................. ....26 2-3. Twin-leg lanyard.......................................................................................................... ...........28 2-4. Safety management system for st rategic and operational implementation............................33 2-5. Market share of major project deliv ery methods for non-residential design and construction in the United States.......................................................................................39 2-6. Fishbone diagram for causes of unprotected excavation........................................................42 4-1. Graphic key to the fault-tree diagrams...................................................................................71 4-2. Sample fault-tree diagrams................................................................................................ .....72 4-3. Formwork construction fault tree.......................................................................................... .73 4-4. Maintenance pa inting fault tree........................................................................................... ...74 4-5. Steel erection fault tree................................................................................................. ..........75 4-6. Tower maintenance fault tree.............................................................................................. ...76 4-7. Splicing telephone cable fault tree....................................................................................... ...77 5-1. Frequency of OSHA compliance..........................................................................................109 5-2. Exceeding OSHA compliance: whic h trades specified (n = 58)..........................................109 5-3. Assignment of PFAS-competent persons by subcontract agreement (n = 97).....................110 5-4. Requirement for project specific fall pr otection and fall arrest plans (n = 97)....................110 5-5. Subcontract agreements that require doc umentation of anchorage locations in PFAS plans (n= 71).................................................................................................................. ..111 5-6. Percentage of contracts that ar e design-build cont racts (n = 90)..........................................111

PAGE 11

11 5-7. Comments are made to the owners that ar e intended to improve fa ll protection (n = 93)...112 5-8. Suggestions are made to the design team th at are intended to improve fall protection (n = 86).......................................................................................................................... .......112 5-9. Suggestions to designers included raisi ng height of roof parapets (n = 77).........................113 5-10. Types of engineering service provide rs utilized by contractors (n = 37)...........................113 5-11. Policies implemented to control specific hardware risks (n = 91).....................................114 5-12. Percentage of superintendents th at received PFAS-training (n = 96)................................114 5-13. Superintendent traini ng typically includes a competency test (n = 65)..............................115 5-14. Contractors are customers of the ma jor fall protection manufacturers training seminars (n = 54).............................................................................................................115 5-15. Scatter plot for the correlation of the allinclusive tie-off policy and TRIR variables (n = 61).......................................................................................................................... .......117 5-16. Scatter plot for the test of independence (n = 61)..............................................................118 5-17. Means plot for test of independence (n = 61).....................................................................119 5-18. Revised scatter plot for the test of i ndependence, preliminary version (n = 49)................120 5-19. Median plot for the revised test of independence (n = 45).................................................120 5-20. Revised scatter plot for the test of independence, final version (n = 45)...........................121

PAGE 12

12 Abstract of Dissertation Pres ented to the Graduate School of the University of Florida in Partial Fulfillment of the Requirements for the Degree of Doctor of Philosophy DEVELOPING A SCORECARD TO EVALUATE THE USE OF PERSONAL FALL ARREST SYSTEMS By MATTHEW A. HARRIS August 2007 Chair: Jimmie Hinze Major Department: Design, Construction and Planning The structural erection of buildings and other st ructures is associated with a high frequency of serious fall injuries and fatalities. Routine ma intenance activities such as roofing replacement are also associated with high ra tes of occupational fall injuries Falls from elevation is the leading category of serious injury and fatalities in th e construction industry. Annually, more than 1000 construction worker fatalities (15% attributable to falls from elevation) occur in the United States. The Occupational Safety and Health Administration (OSHA) Construction Standard, Subpart M, Fall Protection, contains requirements for employers to follow to insure the health and safety of their employees that are exposed to fall injury hazards. Any employee working at a height of six feet or more above the walki ng surface is required to have fall protection. The requirements for fall protection may be satisfie d by passive systems, such as 40 inch-height guardrails, or by the use of active systems. The typi cal equipment of an active system consists of a safety harness and lifeline assembly known as a personal fall arrest system (PFAS). By receiving the proper training and equipment, workers exposed to fall hazards may use PFASs to significantly reduce their risk of fall injury. A complete PFAS is typically defined as a full body harness (similar to a parachute ha rness), a lanyard to connect the harness and anchorage, and an anchorage (a heavy-duty steel alloy ring soli dly connected to the st ructure). This study

PAGE 13

13 investigated the implementation of fall protecti on practices and policies, specifically PFASs as used in large construction companies. A scorecard was developed to assist employers in effectively evaluating the safety performance of fall protection and PFASs at either the individual project or companywide level.

PAGE 14

14 CHAPTER ONE INTRODUCTION Construction management is the management sub-discipline that ha s evolved parallel to other management disciplines in the industrial era to address the specialized processes and issues that exist when the planning and construction of a civil structure (buildings, roads, bridges, and industrial plants) commences on a specific site. These construction-relate d processes for civil structures have distinct ive features regarding: Worker safety Risk management Ownership Financing Design Contracts Procurement Time management. Of all these features, worker sa fety is paramount to creating a safe and rewarding basis or foundation from which construction enterprises a nd their employees can prosper. Construction projects are inherently hazardous environments. Of all the fatalities sustai ned in the construction industry, over a third of all fata lities are related to falls. Theref ore, if a safety management system is to be implemented, fall injuries a nd fall protection must be included in that management process. This study investigated the safety manageme nt aspect of persona l fall arrest systems (PFASs), an engineered system (that is, a type of personal protective equipment) for the fall protection of construction worker s. Complex safety management i ssues arise in the course of implementing, training for and controlling PFASs on a construction project. Drucker (2001) stated that the immutable task of mana gement is to make people capable of joint performance through common goals This task of managing people and thei r performance as a group or unit is

PAGE 15

15 fundamental to safety management problems a nd issues. Construction workers and managers must be properly trained to us e personal protective equipment. Construction tasks performed by these workers and their managers should optim ally take place with in the context of a management philosophy or safety culture (H inze 2006). And lastly, a well-conceived fall protection program on a safe proj ect site requires careful consid eration of suppor tive engineering measures (that is, engineered hardware and featur es that support fall protection practices and the PFASs). A complete personal fall arrest system (PFAS) is typically defined as a full body harness (similar to a parachute harness), a lanyard to connect the harness and anchorage, and an anchorage (Ellis 2001). When a worker is tied-off to a single anchorage point, mobility is limited by the length of the lanyard. Sta ndard lanyard lengths vary between six and twelve feet. Formal definitions for the components in a PFAS are de fined in the Occupational Safety and Health Administration (OSHA) Construc tion Standards, Subpart M a nd the Safety Requirements for Personal Fall Arrest Systems as published by ANSI, the American National Standards Institute (ASSE 1992). Fall arrest equipment was historically deri ved from rigging equipment and other sources. Full-body harness designs were borrowed from par achuting and adapted to fall arrest usage. A comprehensive catalogue of the different types of equipment manufactured in the United States would contain hundreds of individua l pieces of hardware and fa ll arrest system components. Documentation of the full range and variety of equipment types is not in the scope of this research; however, the internet provides easy ac cess to the most common types of equipment in use in the construction in dustry. This researcher frequently used a web search using the term fall protection equipment to gain access to the equipment sold by the major PFAS equipment

PAGE 16

16 manufacturers in the United St ates (Appendix A). A discussion of essential equipment features follows; all OSHA Subpart M define d terms have been italicized. Most systems in use in the construction indus try include a component feature within the lanyard (or connecting components) for shock absorption. The purpose of the shock absorber (or deceleration device ) is the partial absorption of the fall forces (of a falling worker) generated by the acceleration of gravity. In the event of a fall a rrest, the magnitude of the forces transferred to the body by the harness have the po tential to cause injury. The re search and development of the shock absorber was an important innovation in fall arrest systems. PFAS user mobility while tied off to secure an chorage is greatly increased by the use of one or more of the following: Horizontal lifelines (HLL): Commonly used in floor decking operations, HLLs are considered connecting components in the same component category as lanyards. Vertical lifelines (VLL): Commonly used in steep roof operations, VLLs are also used in work involving vertical shafts, su ch as elevator shafts. VLLs are also in the same category as lanyards. In fact, lanyards and VLLs are usually used together, connected together by a rope grab and ultimately tied to an anchorage. Self-retracting lanyards (SRL): A special type of lanyard that automatically retracts and extends by means of a spring. The spring acti on of the SRL is regulated by a safety mechanism that locks when a fall arrest condi tion occurs, thereby limiting the fall distance. A typical SRL allows up to twenty feet of movement about an anchorage. Subpart M defines the anchorage as a secure point of attachment for lifelines, lanyards or deceleration devices. Strictly speaking, the anchorage is a combination of the anchor (the structural building component or material that is directly resi sting the fall arrest loading condition), and the anchor connector (the engineered materials th at connect to the anchor and provides an attachment point). The attachment point is typically a heavy-duty, cast metal deering rated to withstand a 5000 pound fall arrest load (Figure 1-1).

PAGE 17

17 The dee-ring has likewise been specified to perform the secure attachment point function for the body harness. The ANSI Z359 standard specifi es that the primary s ecure attachment point for the body harness be located between the should er blades in the upper region of the users back. Dee-rings and snaphooks are members of the overall family of connecting hardware, known as connectors Because dee-rings and snaphooks are the connecting hardware in PFASs, they are critical to the safe us age of fall arrest systems. Connectors are subject to frequent Figure 1-1. Anchorage connector st rap; materials: drop-forged st eel alloy dee-ri ng and polyester webbing with 5000 pound mini mum breaking strength. engineering improvements. Snaphooks have automa tically closing and locking gates that permit the connector to receive an object and then rema in closed until unlocked by the user. Snaphooks are typically specified for both e nds of the lanyard (for attachme nt to the dee-ring located on the

PAGE 18

18 anchorage and the dee-ring on the back of the full-body harness). Unintentional opening of the gates on snaphooks has been associated with fall fata lities in OSHA accide nt investigations. Near-misses and injuries that occur when snaphooks malfuncti on are commonly referred to as roll-out. Roll-out problems have been greatly reduced by the adoption of new OSHA rules that require the use of only locking type snaphooks in PFASs. Connector ha rdware is an evolving engineering science. Roll-out is an example of why proactive safety programs must be updated to include developments in PFAS hardwa re materials and engineering issues. Significance of Fall Injuries Compared with other industries, constructi on contributes a disproportionate number of fatalities and disabling injuries to the natio nal statistical rates as compiled by OSHA, the National Safety Council, and the Centers fo r Disease Control and Prevention. Utilizing occupational fall data found in the National Institute for Occupational Safety and Health (NIOSH) National Traumatic Occupational Fataliti es database, Suruda, Fosbroke and Braddee (1995) showed that construction accounted for 80% (232/288) of the fall fatalities occurring at work over a three year period (1984 to 1986). Compared with other injuries w ithin the constr uction industry, falls from elevation constitute one of the most damaging and cost ly injury categories. A recent report on the construction industry by a leading provider of wo rkers compensation insurance stated that falls from elevation were the construction industrys second highest cause of financial loss due to worker injury. This statement of financial loss translates into substa ntial human suffering and medical treatment for traumatic injuries sustained by workers in the construction field on a regular basis (Liberty Mutual Insurance Co. 2006). Worker deaths due to falls from elevation ha ve been shown to be increasing in proportion to all deaths. Fall fatalities increased between two published falls studies even as OSHA was

PAGE 19

19 focusing attention on and making revisions in the fall protection regulations. In a 1990 report, looking at construction-industry fa talities recorded by OSHA, fa lls (from the same level and from elevation, 1985-89) constitute d 33 percent of the total number of fatalities (U.S. Dept. of Labor 1990). In a subsequent study (Huang a nd Hinze 2003), also examining constructionindustry fatalities recorded by OSHA (1990-2001), fa lls constituted over 36 percent of the total number of fatalities (Figure 1-2), an increase of nearly ten percent. Falls, 36.30% Struck By, 24.30% Shock and Electrocution, 13.40% Caught in or Between, 11.60% Other, 14.40% Figure 1-2. Causes of fatalities in construc tion investigated by OSHA, 1990 to 2001. Adapted from Huang and Hinze (2003). During this same period (1990s), major modifications were made to the OSHA Construction Regulations: Effective Sept. 2, 1997, competent persons were required to determine the feasibility and safety of providing fall protection for em ployees erecting or dismantling supported scaffolds (Subpart L). Effective Jan. 1, 1998, body belts were no longe r allowed as components of a PFAS. Effective Jan. 1, 1998, only locking type snaphooks were allowed in PFASs (Subpart M).

PAGE 20

20 NIOSH and OSHA have also used safety bulleti ns to alert employers about accident reports associated with dangerous anchorage and inad equate fall protection practices (NIOSH 2004; U.S. Dept. of Labor 2004b). Another study that investigated falls from elevation also reported similar results. That study investigated fatalities associated with th e use of personnel lifts. Of the 339 fatalities examined in that study (1992-1999), thirty-six percen t were associated with falls from elevation (McCann 2003). Personnel lifts are frequently used in the construction industry to give workers access to work sites that are 8 feet or more a bove the walking or working surface. Personnel lifts are regulated under the OSHA Constructi on Standards, Subpart L, as either aerial lifts or mobile scaffolds. In the case of aerial lifts, PFASs are re quired for operators standing in the work platform when the platform is elevated. In the case of mobile scaffolds, PFASs are recommended but not required by Subpart L for operators when working at elevation. Overall, researchers believe that a substantial percentage of the falls from elevation that cause serious injury and fatalities in constructio n are associated with PFASs. Discussion of the frequency and strength of the a ssociation of fall injuries and PFA Ss occurs in Chapter Two (refer to Figure 2-1). Fall Protection and Control Meth ods in the OSHA Regulations The OSHA Construction Standards, Subpart M, contains defini tions for PFASs and components as noted above. Fall protection regula tions are also describe d for scaffolds (Subpart L) and steel erection (Subpart R). PFASs have cust omarily been considered a part of a series of fall protection and fall control methods that pr ogresses from passive means to active, more complex means. This progressive methodology is referred to as the hierarchy of fall hazard control methods The most common methods as described in subpart M are: Warning lines and controlled access zones

PAGE 21

21 Guardrail systems Hole coverings Safety net systems Personal fall arrest systems. These methods are generally intended to be implemented in a progressive manner moving towards increasing levels of training and special ized user knowledge for the control method to function effectively (Ellis 2001). The range of control methods in this progression starts with what is considered a passive system (a warning line) with no required training or specialized knowledge, and progresses to the use of persona l protective systems, such as PFASs, which require training and spec ialized user knowledge. Although considered to be a fall hazard contro l measure of last reso rt in the hierarchy, personal fall arrest systems (PFA Ss) are frequently used in the construction industry, especially during the structural erection and exterior envelope inst allation phases of projects. Research Objective Because of the significance of fall fatalities and the frequency with which PFASs are used in construction, promoting effective and high-qu ality management of PFAS usage within an overall fall protection program is a critical compone nt to overall safety performance success. The goal of this research was to develop an indus try-specific fall protecti on evaluation system or scorecard to assist the construc tion industry in self-assessing and measuring the effectiveness of fall protection and fall arrest systems.

PAGE 22

22 CHAPTER TWO LITERATURE REVIEW Total fall distance (TFD) is an important c oncept for understanding fall arrest mechanics. Comprehension of TFD and the resultant forces on the human body is considered a standard for PFAS user competency (p. 68, ASSE 1992). The compone nt parts of a personal fall arrest system include the harness, lanyard and anchorage as de scribed earlier. PFASs are designed to withstand the considerable forces generated by a human body in free fall. The velocity of a falling object is given in the following basic mechanics equation: v2 = v0 2 + 2a s where v = velocity v0 = initial velocity a = acceleration s = displacement or change in position Based on a free fall height of 28 feet above a lo wer floor and converting the result to miles per hour, the equation would result in the following value: v0 = initial velocity = 0 ft/sec a = 32 ft/sec2 s = 28 feet v = [ 2 (32) (28) ]1/2 = [ 1792 ]1/2 = 42.3 ft/sec 42.3 ft/sec (3600 sec./hr.) (1 mile/5280 ft) = 28.86 mph The calculation shows that from a height equal to a typical third floor level in commercial construction, a velocity of over 25 mph would be reached by a mass (or human body) in free fall at the point of impact at the floor level. PFAS components are subject to elongation and stretching when exposed to the forces in a fall arrest. Durable nylon and polye ster webbing have been used as typical materials in harnesses and lanyards; these materials have elastic pr operties. High-strength pol yester rope (cross-

PAGE 23

23 sectional diameter = 0.625 in.) is a typical specification for verti cal lifelines. A rule of thumb used to estimate the elongation (in the event of a fall) is critical to sa fe system performance. Workers can be injured in construction by striki ng a lower floor level or other obstacle if elongation and total fall distance is not considered. The following formula of typical variables (all variables represent distances in vertical travel) found in a complete PFAS was adopted from one of the major equipment manufacturers (MSA 2006): Total fall distance (TFD) = FFD + DD + HEFF + VEL + SF WHERE Free fall distance (FFD) is the vertical travel from the fall start to the point where the PFAS begins to arrest the fall force. Deceleration distance (DD) is the vertical trav el between activation of any shock-absorbing devices included in the PFAS and the final stopp ing point of the fall. Shock-absorbing and stretching of the lanyard is t ypically limited to 3 feet by most manufacturers and is considered part of the deceleration distance. Harness elongation effect (HEFF) is the travel attributed to stretch in the harness assembly. Vertical elongation (VEL) is the travel attribut ed to stretch in any vertical or horizontal lifelines. Safety factor (SF) is an addi tional factor of safety to account for any unforeseen variables. Safety factor distance should be determin ed by a competent person or an engineer knowledgeable about fall arrest systems. Hierarchy of Fall Hazard Control Methods At a conceptual level, the hierarchy of fa ll hazard control methods typically includes the complete elimination of fall hazards by means of design and engineering. Weisgerber and Wright (1999) presented a conceptual version of th e hierarchy of control methods as follows: Elimination : Elimination of the hazard is understood to not be applicable in all cases in construction, for example, maintenance work on an existing structure. The intention of fall hazard elimination as a method is probabl y the most challenging to conventional engineering and construction practices. Elimin ation obligates all participants in the

PAGE 24

24 construction and design process to creatively rethi nk design specifications and construction assembly operations in sear ch of hazard elimin ation opportunities. Engineering controls : Engineering controls include all safety systems on the construction site that do not require specia lized knowledge inputs from the users, for example, guardrail systems. Warnings : Safety signage and warning line systems Administrative controls : this method includes all fall controls that have a companywide policy aspect, for example, specialized fall pr otection training for all superintendents. Personal protective equipment : this method includes positio ning device systems, and PFASs. Fall Injuries Relating to PFASs The Fatality Assessment Control Evaluation (FACE) summary reports for falls from elevation in the construction se ctor (NIOSH 2000) were analy zed as a means of identifying factors contributing to falls. These summary reports provide investigative details collected at the incident sites of 91 fatalities (Fi gure 2-1). Of the injuries reporte d, fifty-nine percent of the cases required PFAS use. The other 41% of the cases c oncerned fall protection issues such as ladders, guardrails, holes and skylights. Of the cases wher e PFASs were required (labeled in Figure 2-1 as Failures in Policy ), 43% did not have the co rrect equipment on-site for worker use. A safety policy that required trained workers with appr opriate PFAS equipment to be present and donned before work started could have pr evented accidents in these cases. Equally tragic as the cases associated with policy failures were the cases where workers were wearing harnesses and lanya rds, but failed to comply with safe PFAS practice and OSHA compliance regulations, e.g., lanyard s not tied off to anchorage. These cases (labeled in the figure as Failures in Compliance ) represent an almost equal number of injuries as the Failures in Policy OSHA compliance failure represents a complex mix of unsafe behavior, weak enforcement, and poor safety culture.

PAGE 25

25 TOTAL FATALITIES = 91WAS PFAS REQUIRED? WAS PFAS ON-SITE? OSHA COMPLIANCE?NO = 37( 41%)YES = 54( 59%)YES = 31( 57%)NO = 23( 43%)YES = 7( 23%)NO = 24( 77%)OTHER FALL PROTECTION FAILURES (LADDERS, GUARDRAILS, HOLES, SKYLIGHTS) FAILURES IN POLICY FAILURES IN COMPLIANCE Figure 2-1. NIOSH fall in jury (FACE) data. The improper use of fall arrest systems has been noted in various types of construction accidents. A recent NIOSH Alert publication identified critical safety practices for workers and employers working in and around skylights and r oof openings (NIOSH 2004) It was noted that four of the highlighted practice recommendations discussed the use and management of PFASs.

PAGE 26

26 The article indicated that PFASs are an importa nt component in protecting workers from fall hazards associated with skylights and roof openings. As is well known in the indus try, construction is a dynamic pr ocess. When a construction project is completed, cont rol of the work site passes from the contractor to the facility owner, including responsibility for fall protection. Unfort unately, owners often ta ke over the control of and liability for buildings that have no fa ll protection provision for the performance of maintenance operations. Safety nets and guardrail systems are rarely appropriate fall protection options for steep roofs. In the FACE report, 16 fa talities were investigat ed that occurred in association with a sloped roof that required roof top anchor connectors (Fi g. 2-2) to be installed for fall protection. In these reports, only one of th e16 projects investigated had a rooftop anchor correctly installed. Figure 2-2. Rooftop anchor connector.

PAGE 27

27 Rooftop anchors for PFASs facilitate working sa fely at elevation. Rooftop anchorage can be specified or installed at the following phases: design phase by an engineer or architect construction phase by a contractor maintenance phase (for example, roof repl acement and repair) by a facility owner or contractor. The importance of rooftop anchors to the safe us e of PFASs and the ability of the facility owner and designer to influence their deployment indicate why design for safety is a critical area where significant reductions can be made in falls from elevation. Many construction firms have been successful in preventing falls that might have resulted in fatalities and/or disabling injuries. PFASs have a complexity that requires careful site-specific PFAS planning and hardware selection, to the extent that even good fall protection programs have still resulted in fatalities. Of the 91 fatalities in the FACE repor t, three fatalities (less than five percent of the total) o ccurred where very good fall prev ention practices were observed (anchorages, lanyards and body harne sses in use), but the fall pr otection program experienced a systemic type of failure (refer Appendix C for abstra cts of selected FACE reports). One of these fatalities occurred where a lack of equipment in spection was indicated (damaged lanyard was not detected, FACE report no. 89-21). In another fatality case, insufficient worker training in safe fall arrest equipment usage was determined (vic tim disconnected the lanyard from the anchorage for an unknown reason, FACE report no. 96-21). In the third incident, the accident was not witnessed and the cause was not indicated (FACE report no. 97-10). Four other fatalities occurred in cases where OSHA compliance was observed, but where lives may have been saved by stricter adherence to a 100% tie-off practi ce and the use of twinleg lanyards (FACE reports nos. 89-03, 89-24, 90-12 & 92-05). Twin-leg lanyards support

PAGE 28

28 continuous tie-off by allowing the worker to use the secondary leg of th e lanyard to connect across a gap in the system before disconnecting th e primary leg (Fig. 2-3). These seven fatalities represent almost eight percent of the total (7 of 91 cases), indica ting that even in the better fall protection programs involving PFAS, careful mana gement of hardware usage and equipment inspection can save lives. Figure 2-3. Twin-leg lanyard. In a recent Construction Industry Institute st udy of large construction firms (firms having annual revenues in excess of $100 million), 100% ti e-off for workers working at elevations six feet and above was required by several of the su rvey respondents as a positive fall protection policy, but no known studies have in vestigated the extent or usage of the 100% tie-off policy in the construction industry (Hinze 2002b).

PAGE 29

29 Although no injury data were located, injuri es associated with PFAS may occur after a successful fall arrest has taken pl ace due to the physical stress imposed on a fall victim by their own body harness and the effects of being suspe nded mid-air for 15 minutes or longer. This physical stress imposed on the fall victim by th e body harness is known as suspension trauma, and produces a physiological reac tion known as orthostatic intole rance. Rapid rescue response times are critical to controlling the dangers of suspension trauma that may result from being suspended after a fall (Weems and Bishop, 2003). Documentation and training to insure safe rescue techniques and first aid for victims suffer ing from suspension trauma are critical elements in PFAS training programs. Best Practices in Safety In companies that have established zero injury incidents as a primary goal, new opportunities for refinement have been suggested to reside in theories an d studies of continuous improvement. Construction safety frequently cons iders problems arising at the intersection of safe behavior and personal protective equipment. The human factors aspect of managing construction safety programs has qualitative ch aracteristics in common with industrial firms engaged in all types of general industry and manufact uring; the qualitative constant is of course the human resource. Continuous improvement and to tal quality management (TQM) literature is closely related to construction safety theories and has useful precedents and methods for best practices. Balancing Quantitative and Qualitative Measurement Creating a balanced safety management approa ch composed of quantitative and qualitative methods and measurements is an important guidepost for continuous improvement-oriented safety programs. Accountability and quantitative measures must be balanced with behaviorbased, qualitative considerati ons (Petersen 1997 and 1998).

PAGE 30

30 In a strictly quantitative sense, injury incidence ra tes (a lagging indica tor) cannot be used to assess safety performance related to a spec ific injury category wit hout a revision in data collection. The most widespread and reliable in jury incidence rate us ed in the construction industry has been the employers to tal recordable injury rate (T RIR). TRIR is defined as the number of recordable injuries per 200,000 worker hours (the numb er of hours worked annually by 100 workers). Continuing the example, the TRIR does not report the rate of fall protection safety performance; TRIR reports the rate of overall safety performance across all hazards. However, by making a qualitative inference, national fall injury statistics can be used to ascertain an approximation of fall protection safety performa nce. A review of insurance injury data shows that fall injuries contribute approximately 15% to th e total national constr uction industry injury frequency counts. It could be infe rred that 15% of an individual firms total recordable injury rate is equivalent to th e fall injury-specific TRIR. Experience Modification Rates (EMR), often us ed in the industry to assess contractor safety performance and qualifica tion, have been cited for certain limitations. Hinze (1995) points out that the EMR is computed with input vari ables not affected by safety performance. To counteract this limitation, some safety managers have suggested that onl y direct observation of subcontractor safety behavior and conversations with jobsite superintendents and foremen can give a more accurate indication of expected safety performance. A companywide commitment to achieving a zeroinjury-incidence rate is felt to be an absolute requirement of a high-quality safety program (p.39, Hinze 2006). Hinze explains that planning and goal setting for anything other than a zero incidence rate is a form of tacit acceptance of unsafe behavior as an innate or predestined human tr ait. A quantitative proof of the necessity of the companywid e zero injury philosophy, as a precursor and first priority to a high

PAGE 31

31 quality safety program, is not possible. The va lidity of setting the companywide zero injury philosophy as the penultimate feat ure of safety improvement must be understood on a qualitative level. This line of thinking re flects the progressive safety theo ry that explains why proactive construction safety innovators pref er the use of leading indicators. A Balanced Measurement System An article that discussed measurement systems in safety reasoned that a balance between quantitative and qualitative factors was important to effective safety management (Mohamed 2003). A checklist of management issues was pres ented that showed a ba lance of quantitative and qualitative factors. A mana gement study that examined 12 case study companies for industry-leading performance measurement practices was cited as the source of the balanced factors approach to measurement (Kaplan and Norton 1992). Kaplan and Norton stated: What you measure is what you get. Senior ex ecutives understand that their organizations measurement system strongly affects the beha vior of managers and employees. Executives also understand that traditional financial acc ounting measures like return-on-investment and earnings-per-share can give misleadi ng signals for continuous improvement and innovation activities todays competitive environment demands. The traditional financial performance measures worked well for the industr ial era, but they are out of step with the skills and competencies companies are trying to master today. Kaplan and Norton made it clear that manage rs should not have to choose one type of measurement to the exclusion of others. In safet y, recordable injuries are going to be used to measure an aggregate safety performance. In co nsidering how to construct an industry-leading measurement approach, Kaplan and Nortons balanced scorecard approach suggests that analogous to an airplane cockpit, safety managers need detailed information from more than one dial to effectively track safetys progress toward zero injuries. Kaplan and Nortons balanced scorecard creates four important perspectives from which to consider four basic questions: How do customers see us? (customer perspective)

PAGE 32

32 What must we excel at? (int ernal business perspective) Can we continue to improve and create va lue? (innovation and l earning perspective) How do we look to shareholders ? (financial perspective). In the context of construction, consumers of c onstruction services, such as commercial building owners, are the customers. For example, thes e customers (the building owners) demand high quality safety services when they use safety performance as a bidding qualification. Safety customers are identified by Mohamed (2003) as al so being individuals inside the company. For example, how do the employees perceive the benefits of th e firms safety programs? The internal business and innovation and learning perspective in the balanced scorecard focus on operational improvements and inevitably employee training and learning, the same core values that are found in safety management th eory. One case study firm in Kaplan and Nortons article (1992) conducted monthly surveys of 600 randomly selected employees to determine if they were aware of a new total quality manage ment (TQM) program, had changed their behavior because of it, believed the outcome was favorab le, or had become missionaries to others. Surveys designed to measure companywide attitudes and participation in safety are an important component of safety improvement measurement. Considering the innovation and learning perspe ctive in Kaplan and Nortons model for safety management, continuous improvement is dependent on upper managements willingness to learn or take suggestions for improvement fr om employees. Safety enforcement will certainly continue to be a required superv isory control. Creating better tr ained and educated workers that can lead (participative management) the firm in to new territories of innovation and success is critical to the continuous improveme nt theory of Kaplan and Norton. Mohamed (2003) translated Kaplan and Norton balanced scorecard concept into a safety management context. His interpretation of the balanced scorecard concept was summarized in a

PAGE 33

33 diagram (Fig. 2-4). The diagram was created to communicate an overall management theory for safety improvement with an emphasis on continuous improvement. Starting from twelve oclock in the diagram and progressing clockwise, stra tegies for safety improvements are created, implemented and controlled by the company s executive management. At three oclock, strategies have been implemented and safety performance measurement commences. Safety performance and productive activities are viewed as opportunities to learn from experience. The area labeled Evaluating and Co mmunicating is the segment of the process where worker involvement and operational feedback occurs. Wo rker perception surveys should occur at this segment in the circuit. The circuit is completed by the training that reinforces the strategy and makes continuous improvement possible. The training that occurs at nine oclock is informed by the Learning and Improving segment so that the training expands and adapts over time to include the best worker sugges tions for company improvement. BALANCED SCORECARD Identifying Strategy and Targets Evaluating and Communicating Learning and Improving Top-down driven strategy is the reference point for the entire safety management system. Bottom-up approach is the source for operational feedback and evaluation. Safety performance improvement is a continuous process. Planning, training and empowerment are the basis for efficient implementation. Implementing and Monitoring Figure 2-4. Safety management system for st rategic and operational implementation. Adapted from Mohamed (2003).

PAGE 34

34 Continuous Improvement in Construction Safety Total quality management (TQM) techniques, many developed in the auto industry in Japan and the U.S., are similar to safety manageme nt techniques studied in the U.S., particularly research that has studied human factors rooted in work proces s and crew teamwork (Samelson 1977; Hinze and Parker 1978; Hinze 1987; and Geller 2002). TQM requires companywide commitment by management and workers to a sy stems approach with high levels of training, worker input and overall worker involvement. Where TQM was concerned with achieving zero defects in product quality (p. 21, Sasaki 1984), construction safety methodology was concerned with zero accidents (H inze 2002b). An important distinction between TQM and safety theory that may have acted as a barrier between the two bodies of practice and theory in the past is that TQM typically attributes a completely nonhuma n cost to nonconformance in product quality (p.345, Galloway et al. 2004). Nonconformance co sts in safety are absolutely human and preferably measured in moral terms. Positing safety improvement efforts on conti nuous improvement challenges organizations to engage in a companywide commitment at all levels of management and employees. This type of companywide commitment has been cited as th e fundamental feature of an effective and high quality safety culture (p. 40, Hinze 2006). Best Practices in Safety Studies By the end of the 1980s, the construction industry had developed important safety practices that contributed to performance improvement. These safety practices were examined and summarized in the firs t major construction study of zero accident techniques (Liska, Goodloe and Sen 1993). A subsequent study was c onducted to track the evolution and expansion of these best practices (Hinze 2002b). That study identified nine ma jor safety practice categories contributing to improved performance:

PAGE 35

35 Demonstrated upper management commitment Staffing for safety Pre-project and pre-task planning Training (orientation and specialized training) Worker involvement Recognition and reward and evaluation programs Subcontracting activity (contra cts and direct management) Accident investigations Drug and alcohol testing. These practice categories were found to be stat istically significant contributors to improved safety performance. In a closely related study, the nine best practices of the Making Zero Accidents a Reality investigation were applied to a sample of petro-chemical projects engaged in shutdown projects (Hinze and Godfrey 2002). Five of these practice categories (pre-project planning, safety training, subcont ractor management, accident inve stigations and drug testing) were grouped into a single variab le. Using this new variable, the researchers were able to show that on projects where adoption of most or all of the five practi ce categories occurred, statistically safer conditions also occurred (p < 0.01). Upper Management Commitment There are many ways that upper management in construction firms can lend support to improved safety performance. Hinze states that the key to effective participation by upper management is a physical presence and involve ment at the project level (Hinze 2002b). The message sent to all employees when top managers e ngage in project safety visits and activities is that management is concerned enough about safe ty issues to require direct witnessing and personal engagement. Activities include: Field safety inspections Participation in training and orientation Accident and near-m iss investigations Reviewing monthly safety reports.

PAGE 36

36 Projects where company presiden ts were involved in all major accident investigations were shown to be significantly safer on a statistical basi s (Hinze 2002b). Strategic Planning for Fall Protection Many important factors affecting fall protecti on and PFASs on a project are set in motion in the planning and preconstruction phase of a pr oject. PFAS planning begins as soon as the constructor examines the proposed structure or f acility. What is the extent of PFAS required to provide fall protection? Will a constructability review suggest opportunities to reduce PFAS requirements by means of the hierarchy of fall cont rols and elimination of active fall protection systems? If PFAS cannot be eliminated, what ty pes of anchorage will be used and where will they be located? Effective preconstruction planning for fall pr otection and fall control methods requires some amount of coordination betw een the designer and constructo r. On traditional design-bidbuild projects (with owner, design consultant a nd contractor) team part nering that encourages early communication between the parties can be beneficial to fall protection planning. On design-build projects, cons tructability reviews that include fall protection planning are likely to occur as a standard procedure (Hinze and Wi egand 1992). Fall protection best practices must include using the preconstruction planning phase to promote safety improvements (Hinze 2006). It is important to note that eliminating fall hazards th rough design and engineering (as contained in the hierarchy of hazard controls) is depende nt on aligning the mindset of the designer (and owner) to the objective. Goal Alignment and the Project Team An owner plays a central role in establis hing and controlling the goal alignment for the project. While the owner is not in absolute cont rol of the design and construction process, the owner has budgetary contro l over the project and thereby sets the projects safety agenda. The

PAGE 37

37 agreement between the contractor and the project owner has been inves tigated in relation to safety issues. Upper management of the cons truction firm can negotiate with the owner on several key issues to influence a projects safety climate and culture. These key issues include: Itemizing safety costs as a line item in the project budget : A study of safety on industrial construction project s investigated this issue (Hinze and Godfrey 2002). Over 85% of the projects included in that st udy used explicit safety budgeting to improve performance. Overall, the industr ial-type projects in that study had excellent safety records. The mean recordable injury rate for the typica l project in the sample was 0.7 injuries per 200,000 worker hours. Using an agreement that incentivizes safety performance : The Hinze and Godfrey study (2002) of safety on industrial construction projects also investigated incentivized agreements. While the results of that study did not show a statis tically significant association between safety performance and co ntract incentives, the researchers presented their investigation of this issue as a contributor to sa fety improvements. Requesting that the project design ers consider construction safety : Researchers (Gambatese, Behm and Hinze 2005) have show n that designers who are required by the owner to consider design for construction work er safety in the design process are decidedly more knowledgeable and competent about safety. This finding was statistically significant (p < 0.01). However, before concluding that the owner is exclusively in control of the safety agenda on a project, it should be noted that constructi on accidents are a reflection of broad systemic problems not fully understood by any single party in the owner-designer-cons tructor triangle. For example, financial market pressure on commercial re al estate value is a variable that an owner or developer feels and understands mo re directly than a designer or constructor. Likewise, few owners fully understand the complex ity of issues that act as barri ers to safety for the designers and constructors that they hire. A key deterrent to effective goal alignment for the project team is the lack of construction safety knowledge of the A/E de signer (Hinze and Gambatese 1996). Except for the requirements of major building code regulations, the A/E designer is often deficient with regard to using safe design principles to control fall hazards or improve fall protection. Compounding the problem of

PAGE 38

38 the A/E designers lack of cons truction safety knowledge is the risk management outlook of the A/E designer. A common theory of contracts st ates that contracts assign risk exposure to the parties best suited to manage a risk (Abramowitz 2002). Ever since the case law precedent of Geer v. Bennett (1970), A/E designers have taken great care to limit their liability and contractual responsibility for construction worker safety. Goal alignment, team partnering and integrat ed project management have become more common in commercial building construction in th e last ten years. Forces influencing the increased level of interest in inte grated project management include: Increased frequency of design/build and fast-tra ck project delivery. Both of these delivery methods require increased levels of project team cooperation whether by contract or the owners insistence. Research in industrial manufactur ing that has shown the cost savings benefits of greater integration between design and manufacturing (Ettlie and Stoll 1990). For example, Ettlie and Stoll (p.68, 1990) state that when firms provide specialized training in design for manufacturing (training to promote bette r integration of design and manufacturing) or form teams tasked with design and manufact uring integration, improved productivity and cost reductions occur. An exploratory study investigated the safety benefits of in tegrated design/manufacturing teams in a building construction context (H ecker, Gambatese and Weinstein 2005). The study was based on a case study of an integrated design /constructor team that wa s used in the project management of a semiconductor manufacturing f acility. The project wa s constructed for the owner, a large semiconductor manufacturer, fo r a construction cost of approximately $700 million USD. In order to promote improved construc tion safety, an integrated team that included representatives of the owner, th e architecture/engineering (A/E) consultant, and the construction manager was formed in the early design stages when conceptual design issues were still outstanding and easily modified by the integrated team.

PAGE 39

39 Another aspect of the integr ated design/constructor team included trade contractors who either had been pre-qualified or were pla nning to submit bids. So me trade contractors participated in the early design phases, but were dropped from the team later because they were not awarded contracts. The authors of the study st ated that while explic it details about how to implement integrated design/manufacturing team s for improved construction safety are not common in the literature, the project had dem onstrated that such a process is feasible. Design-build contracting and pr oject delivery has been on a steady upward trend and has become a major mode of project delivery. The De sign/Build Institute of America estimates that design-build will become the dominant method of project delivery (Fig. 2-5) in commercial construction by the year 2015. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%Frequency of Contract Type 1985199019952000200520102015 CM(at risk) Traditional Design-build Figure 2-5. Market share of ma jor project delivery methods for non-residential design and construction in the United States Adapted from Design-Build (2007). From the reference point of eff ective goal alignment, design-build contracts have the contractual advantage of placing the constructor and A/E de signer under the same contract with unified

PAGE 40

40 obligations and duties. The design process opera tes with the benefit of shortened lines of communication between desi gner and constructor. Design-build firms have been cited for thei r innovative construction safety practices (Gambatese, Behm and Hinze 2005). As part of a company mandate to improve A/E designer participation in construction safety, the follo wing practices were adopted by the design department at a large design-build firm: Designers at the firm received a safety trai ning course based on the 10-hour OSHA training format. Site hazards for projects were designated with special alert symbols to improve communication and awareness of hazards. Safety design guidelines were consulte d for each project to promote thorough consideration of safety improvement options. Design for Safety Resources Computer software has been developed to provide construction safety resources for designers and constructors interested in us ing the design process to eliminate hazards (Gambatese 1996). Best practices for hazard miti gation were compiled and incorporated into a computer program, entitled "Design For Construction Safety Toolbox." These design guidelines for improved worker safety were meant to be considered and incorporated during the project design and pl anning phase. Almost a third of the design guidelines address design features and improvement s that directly impact PFAS. Included in the body of these guidelines are important fall arrest concepts such as the need to incorporate permanent anchor points into roofs and other hi gh exposure areas in the structure so that construction workers (during construction) and maintenance workers (during occupancy) can readily find suitable anchor and anchor connector opportunities.

PAGE 41

41 Pretask Planning Pretask planning is a special form of participative manage ment by workers at the craft level where employees plan tasks involving their trade but also must consider required safety equipment and compliance issues. The documentation of pretask planning allows the plans to be reviewed by management on the pr oject, and also creates a record of safety performance. The implementation of pretask safety planning was show n to have a significant impact (p < 0.05) in lowering injury incidence rates in a study of indus trial construction projects (Hinze and Godfrey 2002). In the context of PFAS safety planning, pretas k planning would be expected to consider: Anchorage placement and location Anchorage connector selection Horizontal lifelines (HLL) selection and engineering Leading-edge and deck perimeter fall protection PFAS system and task coordination. No explicit descriptions for pr etask planning in relation to fa ll protection and PFAS use were found for the literature review. TQM literature often contains a discussion of quality improvement tools (Sasaki 1984; Galloway et al. 2004). The cause and effect diag ram or fishbone diagram has been used in participative management as a qua lity improvement tool. The name, fishbone diagram, is attributable to the diagrams characteristic appearance of a fish skeleton. For illustrative purposes, a hypothetical safety problem involving util ities and site work is diagramed in Figure 2-6. Potential accident cause categories that form the ribs of the fishbone diagram are established before the exercise begins. Galloway et al. (2004) present possibl e starting categories: The four Ms: men, machines, materials and methods The four Ps: people, polici es, places and procedures The four Ss: skills, supplie rs, systems and surroundings.

PAGE 42

42 Possible starting categories for PFAS and pretask planning are materials, anchorages, lifelines, and tasks (MALT). The materials category would al low consideration of any issues relating to the specific structural and fi nish materials on the project. EXCAVATION UNPROTECTED EQUIPMENT SOIL CONDITIONS SUBCONTRACT MANAGEMENT PHASE I PLUMBING COMPLETE TRENCH BOX REMOVED TRENCH BOX REMOVED FROM SITE SANDY LOAM 80% SAND UNSTABLE SOIL TYPE ELECTRICAL SUB ON THE JOB NO SHORING TRENCH BOX BY CM Figure 2-6. Fishbone diagram for causes of unprotected excavation. Worker Involvement in Safety Worker involvement is critical to successfully implementing safety best practices. Engaging in a sincere human interaction with individual workers as a daily activity and fundamental corporate value is one of the fundame ntal tenets of enlighten ed safety management. Leading safety theorists have been emphatic ab out the fundamental importance of worker and employee involvement and participation. Peterson stated that techniques to promote worker involvement and participation, such as safety perception surveys, were the top priority for

PAGE 43

43 initiating improvements in safety culture and best practices (Petersen 2007). As stated by Hinze, employees categorized as workers have the potentia l to contribute far more than manual labor if given the opportunity (p.261, Hinze 2007). Cox (2001) states that the ideal situation is when ther e is goal congruence among the workforce and the organization. Common goals, or even the opportunity for workers to attain personal goals on the way to helping the organiza tion achieve its long-range objectives, certainly impact workers motivation and commitment to see a plan through. The management goal of engaging the workforce in a dynamic interdepende ncy of corporate and individual employee goal attainment is supported by a safety theory known as goals freedom alertness (Kerr 1957). The central hypothesis of this theory as stated by Kerr is that great freedom to set reasonably attainable goals is accompanied typically by hi gh quality work performance (p. 5). Kerrs theory regards an injury accident as an unsafe behavior by a somnolent individual with a low level of personal engagement with the job or task. Kerr recommends creating a company culture with a rewarding and rich psychological c limate. This recommended company culture has diverse (economic and personal) opportunities for employee re ward and goal achievement. In a major study that investigated the attit udes and sentiments of construction workers (Hinze 1981), workers were survey ed about the extent to which their ideas for improvements received serious consideration from their superv isors and companies. The results indicated that workers who felt that their input was often given serious consid eration had significantly lower injury incidence rates (p < 0.01). Enforcement of safe behavior is the traditional method of assuring compliance with safety policies in the construction industry. While safety compliance enforcement is a required management control, Geller (p. 1, 2002) point s out that emphasizing enforcement possibly

PAGE 44

44 creates a dependency mindset where passivity becomes the dominant mode of employee behavior. For example, if management exclusiv ely emphasizes compliance with safety policies, workers might understandably adopt an attitude such as my only obligation is to follow the rules and the boss will be satisfied. Passivity in the face of witnessing unsafe work behavior or job site hazards is rarely a be st practice. Achieving an effec tive best practice environment in safety requires empowering employees to contribute to and assist in impr oving safety programs. Important techniques to promote worker involvement and participation in safety that have been studied in construction safety over the past twenty years are: Toolbox Meetings : Weekly worker meetings at the cr ew level, led by the crew foreperson are almost universal in constr uction. In a study of 27 petroche mical projects, every project without exception used weekly toolbox meetings to reinforce safe behavior (Hinze and Godfrey 2002). Work Process Observations by Workers : Safety observers typically receive special training to prepare them to make observations of safety behavior. In one study the average median time for an observation was 2.5 hour s (Hinze and Godfrey 2002). Research has shown that projects where worker-to-worker observations were conducte d had better safety performance. Safety Committees : Members are drawn from different trades on the project and may also include safety managers. The committees have been used on projects to perform weekly or monthly safety audits and to generally obser ve safety compliance and behaviors (Hinze and Godfrey 2002). Employee Perception Surveys: Typically surveys ask employees to comment on existing policies and practices, but may also request open-ended comments and suggestions for improvements (Petersen 2007). Employee suggestion programs have been used in industry to solicit innovative feedback from employees. Human resource consultant s have recommended that suggestion programs require that employees identify themselves when making suggestions. When the workers identity is included with the suggestion, the em ployer is obligated to implement well-designed policies for rewarding and recognizing hi gh quality suggestions (Heathfield 2007).

PAGE 45

45 Participative Management and Quality Control Circles An example of how worker involvement has be en extended in general industry is where production-level employees participate in and give direction to manageme nt. The general theory of participative management is that the craft workers have an intimate knowledge of the work processes that give them a di stinct and valuable perspectiv e on safety and productivity improvements that should be respected and developed (p. 17, Mohr and Mohr 1983). Quality control (QC) circles are a form of participative management that was developed in post-WWII Japan, but were imported into Ameri can industry starting in the early 1980s. QC circles have been used in many notable firms to improve quality and safety, including HewlettPackard, Honeywell, Hughes Aircraft and Lockh eed Martin (Mohr and Mohr 1983). There is a general acceptance of the fact that the ever-increasing mark et share of Japanese auto manufacturers rests predominantly on the stellar reputation that their prod ucts have for quality and reliability. QC circles constitute a basic general improvement concept. Small teams of workers from the same operational area meet with first-level supervisors to examine operational problems and recommend solutions to the company. As one arti cle points out (Hutchins 1984), this seemingly simplistic and familiar sounding quality committee: differs radically from other techniques, both in concept and manner of operation. The Quality Circle works from the bottom up, drawi ng directly on the knowledge and skills at shop-floor level an unfamiliar approach to those accustomed to applying top-down management techniques. Hutchins went on to say that while no si ngle concept or management policy has been responsible for the extraordinary success of Japan, the employment of Quality Circles has been very important. Of course, part of the familiarity of the concept is due to the gradual importation of Japanese TQM techniques into U. S. business culture and continuous improvement

PAGE 46

46 theory over the last twenty years. What is still fa irly distinct about quality circles is that workers establish their own targ et goals one after another from th eir own autonomous ideas, including strategies for achieving the targets. The quality circle concept has also been noted as being applicable to safety improvement as well as improving productivity a nd quality (p.21, Sasaki 1984). Work Crew Dynamics Investigations of the work crew have also ta ken place in the context of construction safety. The primary hypotheses of one study was that exce ssive pressures placed on workers and direct supervisors (presumably accountable to the compa ny for results) to achie ve production quotas or project schedule targets would lead to increased safety problems and injury rates (Hinze and Parker 1978). With the goal of investigating this hypothesis, the following factors were studied as influencers of increased injury frequency: Use of cost information (to measure the exte nt the project was meeting cost estimates); Use of project schedules (to measure the ex tent the foremen and superintendents were using scheduling tools to motivate workers); Competition between crews; and Perceived support for safety best practices fr om upper management policies or attitudes. Influence of Crew Leaders, Foremen and Superintendents The display of sincere concern for worker health and safety th rough policy and direct management practices of supervisory personnel (supe rintendents and foremen) is associated with better safety performance (Hinze 1987; Hinze 2002). A good leader fr om a safety perspective is: An effective planner A well-organized individual with a high-level of involvement and c oordination with other members of the project team A good role model, especially regard ing safety behavior (Hinze 1987).

PAGE 47

47 The good leader in safety is also knowledgeable about the personal issues and concerns of workers in their charge (Hinze 1987). Fosteri ng a work environment where the workers are afforded an opportunity to contribute their expe rtise about safety, productivity and quality in a meaningful and legitimate manner satisfies basi c human needs for recognition and appreciation (Geller 1997). Obstacles to Best Practice Program Effectiveness Obstacles to achieving safety best practices program effectiveness may be avoided by monitoring factors known to cause problems for ne w programs. All the factors outlined in this literature review, as com ponents of safety best practice, are subject to incompetence and failure. Safety practices that are known to be problematic or controversial have been identified in the literature. Hinze (2002a) researched the use of safety incentives as a method for motivating safe worker behavior and improving safety performa nce. The studys results showed that some construction firms feel that incentives are in effective because they do not actually measure improvements in safety behavior and technical executi on, but instead draw conclusions from the absence of injuries. Worst case, incentive programs may even reward employees for not reporting injuries. That study found that firms with better safety performances considered safe behavior and observations about work processes in conjunction with lower injury rates when awarding incentives. The following list of obstacles was cited in regard to implementing TQM programs in general industry (adopted from Greshner 1984): Lack of approval and understanding of best practices by upper management Problems with supervisors and middle managers including inadequate training in best practices for managers, resistan ce to innovation or change; or disinterest in best practice program

PAGE 48

48 Lack of comprehension of best practice philosophy Coordination problems in implementing and ad ministering a new best practices program Employee turnover or other problems influencin g the availability of properly trained personnel Obstacles to implementation rooted in marrying TQM techni ques with existing management hierarchy Lack of resources or other issues re lating to procurement of equipment. Worker Training Researchers of basic human motivations have pr oposed that humans have an innate interest in being able to successfully solve problems and complete tasks. This need has been characterized as the desire to be competent (White 1959). Becaus e of the technical complexity and associated injury severity of improperly-implemented PFASs, worker competency to follow the recommended procedures and to understand risk exposure is critical to safety performance and the self-preservation of the individual worker When workers learn the specific practices for 100% tie-off, they feel competent. When the in dividual feels a high leve l of competency, their overall performance and well-being as an employee is enhanced (Geller 2002). OSHA Construction Regulation, Subpart C, states that the employer shall instruct each employee in the recognition and avoidance of unsaf e conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury. This regulatory clause is a statement of the employers duty to conduct a hazard analysis. This hazard analysis must be followed up by the empl oyers commitment to train the employees to recognize and avoid these same hazards. Clearly, the employer is on the frontline of defending against working-at-elevation injuri es and obligated to increase the PFAS users awareness of the risks associated with using anchorage and fall protection equipment effectively.

PAGE 49

49 The safe use of PFAS requires intensive ba seline worker training in equipment care, compatibility and safe anchor connection t echniques in compliance with OSHA training requirements for employees exposed to fall haza rds. A study (Hinze 2002) that examined the practices used by construction firms to lower work er injury rates found intensive safety training programs to have a significant (p < 0.01) impact in lowering injury rates. That is, firms providing more hours of worker training were associated with better safety performances. Intensive safety training programs were defined as projects th at provided monthly training to each worker consisting of four or more hours beyond basic orientation. Standards for worker training are given in the U.S. national PFAS standard (ASSE 1992). As mentioned above, comprehension of the influence of total fall distance (TFD) is considered a standard for PFAS user compet ency. Research focusing on the anchorage component of PFASs has shown that worker orientati on training that is trade and proj ect specific with regard to anchorage is critical to worker competency.

PAGE 50

50 CHAPTER THREE METHODOLOGY The two objectives of this research were: 1) to identify best practices related to the use of PFASs; and 2) to synthesize the identified best pr actices into a tool for continuous improvement. Identification and analysis of root causes that place workers at risk through the improper use of PFASs was also considered by examining inju ry data available from OSHA. The methodology and analysis for the injury data are given in Chapter 4. Research Design The hypothesis for this research was that th e companies within the ENR Top 400 general contractor population with the be tter safety records had implemented more robust and aggressive policies in fall protection and fall arrest systems than contractors with underperforming safety records, that is, with safety records that were no t as good. These robust and aggressive policies were investigated to determine the specific best practices that significantly influence the injury incidence rate. Sample Selection Large construction firms were selected for inve stigation because these firms were expected to be more proactive in the use of aggressive and robust safety practi ces, including progressive fall protection and fall arrest systems. A list of large contractors, commonly known in the industry as the ENR Top 400, was selected as a sampling frame for the large contractor population. This list has been compiled and published annually by a leading publisher of construction industry information and data (ENR 2006). Other construction safety studies (Hinze 2002b) have also investigated the safety practices of these large construction contractors (ENR Top 400).

PAGE 51

51 The specific Top 400 list used for the study was created from data provided on a voluntary basis by large construction cont racting firms for the year 2005. The Top 400 reported combined total revenues of over $230 billi on US Dollars for the year 2005. These contractors had annual domestic revenues that ra nged from $120 million to over $10 billion US Dollars. The ENR Top 400 population has been characterized as a population with a wide range of construction activities, commonly called a general building market (ENR 2006). The types of construction projects and market sectors in a general building market include: Building construction Buildings and structures for manufacturing Petroleum and chemical plant construction Water supply projects Sewer and waste treatment plants and piping systems Horizontal (transportation, hi ghway and bridge) construction Hazardous waste projects Power plant construction Telecommunications (towers a nd underground) construction. Construction safety practices would be expect ed to have a wide range and high degree of variance for a general building market popula tion; however, the vari ance for the population selected was considered acceptable because th e selection of this sample population was consistent with the research objective discussed in Chapter 1. No attempt was made to classify fall protec tion and fall arrest system practices by project type. All employers are affected by the OSHA regu lations for fall protection because working at elevation, that is, working at a height of 6 feet or more above the walking surface, is a common and widespread phenomenon. The character of fall pr otection and fall arrest systems practices of firms in the ENR 400 population was consid ered to be defined by two factors: The nature of a typical commer cial or governmental construc tion contract with standard subcontracting and construction management practices.

PAGE 52

52 The transitory and dynamic nature of constr uction projects as compared to the fall protection and fall arrest sy stems practices developed and implemented for general industry that use permanent locations and facilities. The injury data collected by OSHA (from which the significance of fall fatalities and serious injuries was determined) is associated with a liberal classificat ion for the construction industry. The liberal characteristic of the general building market (as represented in the ENR Top 400 population) was deemed to be equivalent to the limits and bounds of the construction industry as defined by the OSHA injury recordin g and data management process. The ENR Top 400 contractors were selected for investigation be cause they reflected sim ilar characteristics as the source population for the OSHA injury data. In summary, if the significance of the injury data was determined from a broad classifi cation of the construc tion industry, then the significance of best practices im plemented with the objective of reducing those same injuries should be determined from data collected and an alyzed from a similarly broad classification (or sampling) of the construction industry. Hypothesis Testing Two parameters of interest ( ) in the population were investig ated in this study: 1) the optimum group of safety practices (the best practic es), specifically fall protection and fall arrest practices, that would effectively re duce fall fatalities and serious in juries; and 2) the contractors total recordable injury rate (TRIR). Fatalities and serious injuries must be recorded by all employers with more than 10 employees as ma ndated by the OSHA regulations. The employers total recordable injury rate (TRIR) is defined as the numbe r of recordable injuries per 200,000 worker hours (the number of hours worked annually by 100 workers). The term, recordable injuries, is also defined by the OSHA regulations (section 1904.4 Recording Criteria). The hypothesis test specified was a correlation of the construction contractors TRIR and a given set of safety practices (implemented as a co mponent of a contractors safety plan). Because

PAGE 53

53 correlation assigns an equivalent st atus to the two variables, ther e was no dependent variable in this study. TRIR and the safety practices implemen ted (as a safety management treatment for fall protection) are both response variables give n equal consideration in all respects. In this research design, the null hypothesis is for independence. The null hypothesis tested was that the TRIR was not associ ated with an increase in the nu mber of best practices in fall protection and fall arrest systems implemented. St ated in terms of the test statistic, the null hypothesis to reject or accept was that the true value for the corre lation coefficient was equal to zero, indicating no association or zero correlation between the x-value (the best practices) and the y-value (the TRIR). The historical source of the mean TRIR for the construction industry has been the Bureau of Labor and Statistics (BLS) and OSHA. The hist orical data for the popul ation in this study has shown the following: The mean TRIR for the construction industry for 2005 was approximately 6.35 injuries per 200,000 worker hours. The assumption of a standard normal probabi lity distribution for th e population of TRIR values in the construction industry has not b een considered reliable. Historically, the estimated range and variance of the TRIR population have not been published by BLS or OSHA. Sample Size Determination Sample size determination is related to the es tablishment of a decisi on protocol for either rejecting or accepting the null hypothesis. Two types of errors were taken into account in the design of this study: A type I error is committed if the null hypothesis is rejected when it is true. The probability of making a type I error is denot ed by the Greek letter alpha ( ). This probability is typically defined as the level of significance for the hypothesis test. To protect against committing a type I error, the significance level of for testing was specified at or below 0.05.

PAGE 54

54 A type II error is committed if the null hypothesi s is accepted when, in fact, it is false. The probability of making a type II error is denoted by the Greek letter beta ( ). To protect against committing a type II error, the power of the test ( 1) for testing was specified at 0.90. Hollander and Wolfe (1999) present a method for determining an approximate sample size n for a one-sided, Kendall sample correlat ion test for independence. This approximate value of n is n = 4 (z + z )2 / 9 2 where z = z.05 = 1.645 z = z.1 = 1.285 = lowest level for the Kendall correlati on coefficient at which significance could be detected = 0.30 Thus, n = 4 (1.645 + 1.285 )2 / 9 (0.30)2 = 42.39. To be conservative, the minimum sa mple size was taken to be n = 43. Data Collection This research investigated safety practices in the ENR Top 400 popul ation with a survey instrument. The survey instrument investigat ed the population in two phases as follows: A preliminary survey to measure response freque ncies in the different categories of safety management (for fall protection and fall arrest systems). The fall protection and fall arrest systems surv ey to identify the most effective safety practices in PFASs. These surveys were developed by an iterative pro cess. The initial material considered for the survey form was derived from a precedent fa ll protection safety study (Hinze and Harris 2007b). The survey development process co nsidered the following factors: Contractor demographics and standa rd industrial clas sification (SIC) The types of trades involved in different pha ses of construction and various types of structural erection that use fall pr otection and fall arrest systems The significance of engineer ing and preconstruction in th e effective management of anchorage

PAGE 55

55 The importance of subcontractor management for promoting robust safety practices as a general contractor (a sample of s ubcontract agreements was considered) Lists of significant best sa fety practices from precedent construction safety studies Safety compliance checklists. The final versions of the survey forms are presented in Appendix B Preliminary Survey The preliminary survey was mailed to the samp ling frame (the ENR Top 400 contractors); the completed surveys were returned in a postage -paid envelope. The survey inquired about the following practices: Practices for writing subcontracts and mon itoring the PFASs used by subcontractors Extent and type of trai ning received by workers Regular inspections of PFAS equipment Company requirements rega rding the use of PFASs Company strategy to ensure th at employees utilize PFASs Preconstruction and engineer ing coordination practices Extent to which OSHA-compliance was met or exceeded. More than half of the questions were de signed for a nominal yes or no response. The balance of the questions recorded a multiple choice or an open-ended comment response. The exploratory nature of the preliminary surv ey was intended to investigate the attitudes and practices of the population. The use of a sequen tial survey structure w ith a preliminary data collection phase was chosen to improve the probabil ity that the survey would collect statistically significant responses for the parameters of intere st in the population. That is, some questions regarding certain safety practi ces in the preliminary survey were dropped from further exploration based on the results from the first stage of data collec tion. For example, the result for Question 10 in the preliminary su rvey (Is subcontractor complia nce with the OSHA regulations mandated in your firms subcontract agreements ?) was that 100% of the responding companies answered in the affirmative for this question. Fr om this result, it was determined that, although

PAGE 56

56 this question presents an important safety pract ice, further exploration of this practice was unwarranted. Fall Protection and Fall Arrest System Survey In order to generate more specific data about certain policies and pr actices for which data had been collected in the preliminary surve y, clarifications were sought from the population regarding particular parameters of interest. For example, severa l respondents to the preliminary survey commented that their companies had adopte d an all inclusive tie-off rule for all workers on site (to exceed OSHA regulations). A question fo r the Fall Protection and Fall Arrest System Survey was created to collect data on the numbe r of companies that had implemented similar allinclusive tie-off policies. A specific goal of the survey was to collect data on practices with a high probability of influencing the parameters of interest for the popul ation. In order to meet this goal, the frequency of nominal questions was increased as the study progressed. In the preliminary survey, nominal yes-or-no questions comprised le ss than fifty-five percent of the questions. Nominal yes-or-no questions occurred at a frequency rate of almo st 90% in the Fall Prot ection and Fall Arrest System Survey. Another concern for the survey design at the completion of the preliminary survey (that is, during the second stage of data collection) was to assure a high response rate by controlling the length of the subsequent survey. Twenty-six questions were eliminated for the purpose of reducing the time and effort required to fill out the survey form. The mail-out format was used in both phases of the survey. The Fall Protection and Fall Arrest System Surv ey (the second stage of data collection) was sent to the entire populati on of the ENR 400 contractors. Tw o versions of the survey were

PAGE 57

57 distributed in this second stage of data collec tion. A follow-up version of the survey instrument was required because of tw o interrelated factors: Fourteen questions from the preliminary survey were deemed to be useable data for use in the testing of the hypothesis. Forty-seven respondents provided their contact information for the purpose of receiving a copy of the final report. Because of the apparent interest in the research of these 47 respondents, it was decided to send the second st age of data collection directly to these individuals. Due to their expre ssed interest in obtaining the final report, it was concluded that they represented a group of the populati on that would be likely to respond to the second stage of data collection. Since they ha d already provided viable information to the preliminary survey (first st age), they were sent a shor tened survey that asked for information on a few additional topics. That is, the information they provided in this shortened second stage survey was appended to the information they had previously given. Forty-seven respondents to the prel iminary survey were asked to participate in the second stage of the survey. Because they had already provided viable data that could be used in the final analysis of the survey results, it was determined that two versi ons of the second stage of data collection were necessary. These two versions are described as follows: The Fall Protection and Fall Arrest Systems surv ey (titled the same in Appendix B) was a 38-question version (14 questions reused from the Preliminary survey and 24 new clarification-oriented questions). This ve rsion was mailed to 353 companies in the ENR Top 400 sample frame (the total number of companies in the ENR Top 400 sample frame less the 47 respondents to th e preliminary survey). The Fall Protection and Fall Arrest Systems su rvey, follow-up version (titled the same in Appendix B), was sent out with a personalized cover letter addressed to the 47 individual respondents to the preliminary survey. This versio n of the survey contained only the 24 new clarification-oriented que stions. The actual survey form contained 25 questions as shown in Appendix B. The one extra questi on was a duplicated question because question 22 in the follow-up version also appeared in the preliminary survey (question 37). As a quality assurance measure, the cover letters for the fo llow-up surveys were addressed personally to the individuals who had identifi ed themselves in the preliminary phase. The personalized cover letters assured that the specific individuals that responded to the preliminary survey were the same individuals who were s ubmitting information for the follow-up survey. At the conclusion of the data collect ion period for the study, the data collected from the preliminary-

PAGE 58

58 phase respondents (total survey data collected in two separate mail-out survey forms) were expected to be equivalent to data collected from new respondent s (who were sent the 38-question survey version). The second stage of data collection/survey instrument requested data on the companys OSHA recordable injuries. The total recordable in jury rate (TRIR) has been widely used as a measure of safety performance in the construc tion industry. As noted above, the research was designed to use the TRIR as one of the response variables for statistical testing. Because the respondents who had identified themselves in the first stage were assumed to have an active interest in th e research, it was expect ed that the response rate would be high. A web search was conducted about response rates for panel studies, also ca lled longitudinal studies (Flood et al. 2007; Jennings et al. 2007). The literature reported that 80-90% response rates (or 10-20% attrition rates) were typical for followup surveys in longitudinal studies. However, because the literature cited wa s not reporting on the population of interest for this study, skepticism towards these response rates was warran ted. Data were sought from the balance of the population (the preliminary phase non-respondents) so as to improve the odds of receiving an acceptable sample size for the hypothesis testing. Data Analysis The data analysis in this study was concerned with the statistical re lationship between two variables (TRIR and the safety management pr actices implemented) involved in a bivariate structure. The statistical procedure used was a test to determine wh ether or not these two variables were independent. The probability distribution-free method used for testing independence in this study is known as a nonparametric statistic. Nonparametric statistics are a broad family of methods that includes rank correlation tests (Kendall 1962; Kruskal 1958;

PAGE 59

59 Hollander and Wolfe 1999) Rank correlation tests were the prim ary means of data analysis used in this study. Assumptions The lack of historical data for the populat ion selected (ENR Top 400 contractors) made assumptions of a normal probability distributi on for the population unreliable. By assigning ranks to the individual values for the two variables of intere st (the TRIR and the safety management treatment), a distribu tion-free statistical test could be conducted. That is, a test was conducted without determining the distribution of the population. The historical data provided the expectation that a bivariate correlation of TRIR and the safety management treatment would produce a co efficient limited to the bottom half of the interval [-1, 1]. That is, the TRIR is negatively correlated with the quantity of safety management practices. Data analysis from previous safety studies (Hinze and Godfrey 2002) showed that the assumption of a correlation coefficient value limited to the interval [-1, 0] was reliable. That is, TRIR was reliably decreased when more robus t and aggressive safety practices were implemented. Therefore, a one-tailed statistical test to protect agains t an error (that is, an error in rejecting the null hypothesis) in the nega tive range of the sample was justified. The Kendall rank correlation, type b, is a statistical correlation test that is useful when there are a number of tied data points in the in the sample data. Because tied observations were expected to occur in the sample data for the safe ty-practices-implemented variable (that is, it was expected that two or more cases in the sample could implement the same number of safety practices), the Kendalls tau, t ype b test of the Kendall rank co rrelation was used in this study. Procedure A software package for data analysis and statistical testing (SPSS 12.0 for Windows) was used for data input and analysis. From the SPSS menu list of bivariate correlation tests, the

PAGE 60

60 Kendall tau, type b, test with the one-tailed test option was selected for testing the null hypothesis. The first step in the procedure for this te st was the computation of the Kendall sample correlation statistic, K. The computation methodol ogy for Kendalls K statistic was presented in a textbook format in Kendalls book on rank co rrelation methods (Kendall 1962). The Kendall test for independence in the c ontext of nonparametric statistica l procedures was presented by Hollander and Wolfe (1999). Both of these text books were used as reference sources. Previous safety studies (Hinze and Godfrey 2002) have used a data analysis procedure where associations were found by synthesizing important safety pr actices into a single ordinal variable for use in a correlati on test. In this study, an ordina l value was assigned to the total number of practices implemented as scored from the total available safety practices investigated. Individual sample cases were assigned one point for each safety practice implemented; or a zero if the safety practice was not implemented. Correlation tests were conducte d that measured the rank co rrelation between the ordinal variable (created from the safety practices implemented) and the total recordable injury rate (TRIR) variable. In these correl ations, the nominal values assigne d to the safety practices could assume a value between zero (no practices implemen ted) and 9 (all nine practices implemented). The relative significance and importance of the sp ecific nine variables that were tested was determined by investigating the individual freq uencies and individual co rrelation coefficients (when correlated with the TRIR) for these variables. An iterative process was then conducted that co rrelated various and alternate combinations of the nine nominal variables with the TRIR. These iterations continue d until the strongest association was identified between a selected group of safety pract ices and the to tal recordable

PAGE 61

61 incidence rate (TRIR). In this study, a combination of five safety practices was found to yield the most compelling results or the st rongest correlation with the TRIR. These five specific safety practices (that were found to ha ve the strongest correlation with the TRIR) were used in the formal correlation that was used to test the studys hypothesis. Data Collection and Analysis from a Related Sample Because project designers can influence hazard elimination through design, data were sought from firms participating in integrated design and construction, either by design-build contracting or traditiona l A/E consulting. The population sele cted for investigation was defined by a sampling frame. The sampling frame was de fined by a published list of attendees from a major industry exposition and conference for inte grated design and construction (Design-Build 2006). This population was referred to formally as the designer-builders or designer-builder population in this study. The concept of interest concerning the desi gner-builder population i nvestigated in this study was that when designers (e ngineers and architects) and bu ilders are in more frequent communication with each other (as is facili tated by a design-build contract or project management method), enhanced construction safe ty practices will be a measurable outcome. The data for this sample were collected by an on-line survey. The population selected for sampling contained 40 companies with engineering and architect ure design services (Appendix C). Initial contact was made vi a telephone. If the individual contacted was interested in participating in the survey, the individual was di rected to a website address to complete the survey form. The 40 companies in the population were aggressively contacted, which included multiple contacts when deemed prudent to maximize the sample response level. The surveys were designed to gather inform ation about engineering and integrated designbuild practices related to PFASs that had been implemented from the designers perspective. A

PAGE 62

62 list of practices that had been collected from a leading design-build firm in an earlier study was used as a baseline of proactive design-for-safet y practices. Insights into the importance of design and engineering for the effective management of anchorage and fall arrest planning gained from an earlier study were also used to develop the survey questions (Hinze and Harris 2007b). Fourteen questions were include d in the survey. The final vers ion of this survey form is presented in Appendix B. The data collected and analyzed from this sample of engineering and design firms were considered an exploratory investigation to gain clarification and insight into design influences on construction and fall protection safety. Due to th e small sample size and exploratory nature of this component, statistical tests were not used to analyze the data. Data were analyzed by descriptive statistics, for example, frequencie s observed for individua l engineering practices. Development of the Scorecard In order to allow implementation of best practices in fall protection and PFASs in a comprehensive and flexible manner, a scor ecard (or evaluation tool) was created for implementation in the industry. Re sults of this study were used to develop a method that could be used to quantitatively measure PFAS policies and practices within a given company. A safety measurement system of this type that has the ca pability of evaluating sa fety conditions prior to actual safety failures, injuries, and fatalities is considered a leading-indicator or proactive safety measure. The scorecard was created by combining best pr actices investigated in the test of the studys hypothesis with supporting po licies and practices derived fr om the literature review. Two scorecard versions were created to ad dress the distinct evaluation needs of: Firms interested in companywide safety improvement Firms interested in safety improvement of field operations (evaluation per project).

PAGE 63

63 It was believed that many of the best practices that would be used to develop the scorecard had already been implemented by large contracting firms with proactive safety programs. In order to test the hypothesis that the scorecard was well-designed, comme nts from practicing safety managers and safety experts were solicited on the basis of purposive sampling to assist in refining the content of the scorecard. Purposive sampling, also known as directed sa mpling, uses the researchers insight to identify cases that are information-rich or to identify individuals with expert knowledge as a means of efficiently discovering patterns and factors pertaining to the subject area under investigation (p. 82, Erlandson et al. 1993). Th e purposive sampling methodology was used to select individuals believed to have knowledge of critical importance to the overall assessment of PFAS. This review and comment process was cons idered a means of valid ating the scorecard by subjecting its content to the anal ysis and criticism of safety ma nagement practitioners. In this research, each individual instance of th is process is presented as a case study. The case studies were conducted by contacting sa fety managers who had participated in the survey of fall protection and fall arrest system practices and had given their contact information for the benefit of the researcher. Th ese practicing safety ma nagers were asked to review the scorecard and comment on issues an d possible limitations. Safety experts known to the researcher through i ndustry associations were also cont acted to review and comment on the scorecard. Generally the case study participants were asked to comment on the usefulness and limitations (strengths and weaknesses) of the sc orecard. The following types of questions were suggested to the case stu dy participants in the course of the discussion: Do you already have scorecards or check lists that you use in your business? Does the scorecard seem valid?

PAGE 64

64 If one of your companys projects was scored using these criteria, would you consider that to be a reasonable assessment? If not, what qualifications or exceptions would you want noted? Are there any questions that are poorly wo rded or that need to be adjusted? Are there any important issues that are missing from the scorecard? Could you use this scorecard in your business? Profiles of the case study participants who had submitted completed surveys were developed from survey data. Survey data used in the profiles included classification of their comp any based on annual revenue Hypothetical scores for fall prot ection practices implemented that were created by filling in the scorecard with the case study respondents survey data, if no additional specific clarifications were collected during the scorecard validation/case study process. The criticisms received during the case studies were an important component of the scorecard development and refinement process. The results of the critique were incorporated into the final versions of the scorecards.

PAGE 65

65 CHAPTER FOUR ANALYSIS OF FALL INJURY DATA Safety research often begins with an analysis of recorded injury data in order to find the root causes and factors contributi ng to the particular category of injuries being studied (Hinze and Russell 1995; Hinze, Pederson and Fredley 1 998; Loosemore, M. et al. 1999). Two sources of injury data were investigated: 1) a National Institute for Occupational Safety and Health report; and 2) an Occupational Sa fety and Health Administration data set obtained directly from OSHA. NIOSH Data In 2000, the National Institute for Occupa tional Safety and Health (NIOSH 2000) published a summary of surveillance data and investigative repor ts of fatal work-related falls from elevations The fatalities in the report occurr ed during the period from January 1982 through 1997; most of these fatalities occurred in the construction industry. The injury data summarized events from nine ty one fatalities in a narrative manner, and typically included the fo llowing information: Year of incident Age and gender of the victim Location (state) of injury occurrence Relative strength of the safety program Company safety policy and safety training Whether or not victim had been issued PPE Important details of PPE usage and condition Anchorage details observed Scope of work. Extensive information about the fatality acci dents was provided in this publication. Because of the high level of detail contained in th e report, all of the inju ry cases were analyzed. The individual cases were review ed and coded for the extent that they pertained to PFASs. A

PAGE 66

66 statistical software package ( SPSS 12.0 for Windows) was used to code the data. The data were categorized by answering the following questions: Was PFAS usage and compliance required? Was PFAS equipment provided or availabl e on the project for PFAS compliance? Was the worker in compliance with S ubpart M when the accident occurred? Could non-compliance be characterized as a fl agrant violation of safe PFAS practices? OSHA Data The OSHA data were collected through site investigations where construction workers were killed (U.S. Dept. of Labor 2004a). The data were provided in a form that was converted to an MS Excel file. The data represented information obtained from 1990 through mid-2004 and consisted of over 10,000 fatalities representing a multit ude of injury categories. The descriptions for each injury case were recorded in a brief na rrative form. For example, fall height, gender of the victim, and age of the victim were typica lly reported. Approximately half of the cases contained calendar dates of the occurrence time. The keyword, harness, was used to search the database for cases pertaining to PFASs. The OSHA data were examined with a simila r intent as the NIOSH data. Unfortunately, due to the brief nature of the accident descriptio ns, fault-tree analysis wa s not possible for these data. Data were examined to understand genera l causation of fall accidents involving PFASs. Because of an earlier study that comprehensiv ely examined OSHA fall injury data (Huang and Hinze 2003), no further study of these data was deemed warranted. Data Analysis For both the NIOSH and OSHA data, some cases were eliminated from in-depth analysis. Cases were eliminated for the following reasons: The accident involved suspended scaffold syst ems and the worker(s) did not have a PFAS in use;

PAGE 67

67 By the logic of the hierarchy of fall c ontrol methods, PFASs were not deemed the appropriate fall control method; The workers were noted as not wearing their harnesses or not connected to competentlydesigned anchorages or lifelines in plain sight (a strictly be havioral violation). Conditions where workers temporarily disconnected their lanyards were often an alyzed for insights into why workers violated the 100% tie-off objective; Confounding factors were involved that made characterizing the causes as strictly PFASrelated difficult; and The cases did not contain sufficient detail to make an informative analysis possible. A sample of injury cases analyzed from the NIOSH and OSHA data are documented in Appendices D and E, respectively. The overall analysis considered the following ty pes of issues related to PFAS injuries: Was the employer committed to safety? Were fall arrest best practices reflected in administrative policies for correct equipment and practices? Was a hazard analysis of the task performed? Was a PFAS required? Were required anchorages and anchorage conne ctors identified at the planning stage? Was the PFAS inspected prior to use? Was the PFAS properly maintained? Was the PFAS properly used? Was the worker properly traine d in the use of the PFAS? Fault-tree Analysis Fault-tree analysis was used by Loosemore et al. (1999) to iden tify causal factors in specific injury categories. Faulttree diagrams have been used by engineers in general industry to analyze the interrelationship of various factors leading to failu res of quality, reliability and safety. A fault-tree diagram follows a top-down structure and represents a graphical model of the pathways within a system that can lead to a foreseeable, undesira ble loss event (Weibull 2007). The fault-tree analysis (from the top down) represented the following (Figure 4-1 and 42):

PAGE 68

68 The description of how the accident happened; a general narrative st atement of the PFAS failure event Explanatory blocks containing general PFAS safety principl es that were violated. A secondary level of narrative blocks was used in some cases if additional pathways for contributing factors were required Final level of the tree contained failures of specific safety management categories that were responsible for the loss. These categories were safety culture, hazard analysis, administrative, supervision, training, and safe behavior. These failure categories are the root causes of the fatal ity sought by the analysis. Five fall injury cases from the NIOSH data were analyzed by the faulttree analysis method (Fig. 4-3 through 4-7). The violations of PFAS safe ty principles that were identified from the initial analysis of the fatality reports were used as a starting point in the fault-tree analysis. If more than one central tenet of fall arrest syst em safety was not in compliance, the fault-tree diagram would show two main branches for PFAS safety principles viol ated. In general, the fault-tree analysis showed that fatalities asso ciated with PFASs are complex events where a multitude of safety program features have underperformed or failed. In order to comprehend the fault-tree analysis presented, the corresponding fatality report in Appendix D can be consulted. For example, Figure 4-3 refers to NIOSH report number 89-24. The report numbers listed in the left-hand column of Appendix D can be used to locate the transcript of the report. From the transcript of the repor t, it can be ascertained that the victim was a carpenter and that the victim fe ll 90 feet before coming to rest. Th e transcript explains in detail the noncomplying tie-off practice that was summari zed in the Figure 4-3 as a lanyard that was creatively tied-off to rebar This completes the first function of the analysis, which was to identify the failure event or general proximity of the problem. In other words, the simple explanation of the accide nt causation was that th e lanyard came loose. The fault-tree analysis is a root-cause orient ed analysis technique. Therefore the analysis continues by examining the PFAS safety principles that would have been followed by

PAGE 69

69 knowledgeable safety engineers and managers in the construction industry. In Figure 4-3, this next level down in the examination of underlying causes (the safety principles violated) states that two aspects of the PFAS safety principl es that were violated can be considered: Correct anchorage connectors were not used Correct personal protective equipment principl es were not followed. That is, the PFAS user did not have a competent understanding of the required components in the fall arrest system. Specifically, the victim did not have the competency or correct training to choose the safe and appropriate anchorage for his task. This is the level of underlying causation that would be subjec t to widespread recognition by knowledgeable safety professionals in the construction industry. The final level of analysis in Figure 4-3 sought to further investigat e the root causes by separating the causation into specific categorie s of safety management. As was noted above, when a fatality occurs on a construction site, the causation is fairly complex due to the fact that the project safety plan, the company safety program, and company safety culture are all contributors. In Figure 4-3, all of the manageme nt failures (hazard analysis, administrative, supervision, training, and safe behavi or) are included in the diagram. The failure of safety culture as a root cause was not included in Figure 4-3, although it can be noted that a summation of all the management failure categories cited is equivalent to a safety culture failure. This last observation about Figure 4-3 illustrates one limitation of the fault-tree analyses presented. The resulting analyses cite an average of four management category failures as root causes. Possible explanations for this result are as follows: Fatalities generally indicate a major or allinclusive failure of safety management and culture The five cases presented in this chapter all examine fatalities.

PAGE 70

70 The limitation of the analysis is that the faul t-tree diagrams do not address accidents where serious and significant lost time in juries occur and the root causes that contribute to non-fatal injuries.

PAGE 71

71 PFAS SAFETY PRINCIPLES VIOLATED WHAT HAPPENED INCIDENT START (FALL) SUPPORTING COMMENTARY MANAGEMENT FAILURE CATEGORIES BEIGE OVALROYAL BLUE RECTANGLE SIENA RECTANGLEGREEN RECTANGLE LIGHT BLUE SQUARE Figure 4-1. Graphic key to the fault-tree diagrams.

PAGE 72

72 PFAS SAFETY PRINCIPLES VIOLATED INCIDENT START (FALL) CATEGORY OF MANAGEMENT FAILURE CATEGORY OF MANAGEMENT FAILURE CATEGORY OF MANAGEMENT FAILURETASK CRAFT OF WORKER PROJECT TYPE CASE NUMBER SUPPORTING COMMENTARY SUPPORTING COMMENTARY SUPPORTING COMMENTARY WHAT HAPPENED Figure 4-2. Sample fault-tree diagrams.

PAGE 73

73 CORRECT ANCHORAGE CONNECTOR NOT USED LANYARD BECAME DISENGAGED INCIDENT START (FALL) TRAINING FAILURE LANYARD WAS CREATIVELY TIED-OFF TO REBAR TIE-BACK STYLE LANYARD OR OTHER APPROPRIATE ANCHOR CONNECTOR NOT USED SAFE BEHAVIOR FAILURE SUPERVISION FAILURE HAZARD ANALYSIS FAILURE FORMWORK CONSTRUCTION CARPENTER PRECAST PARKING GARAGE NIOSH 89-24, PAGE 163 CORRECTIVE ACTION NOT TAKEN CORRECT PFAS EQUIPMENT NOT PROVIDED PPE PRINCIPLES NOT APPLIED (HARNESS, LANYARD, ANCHORAGE) ADMINISTRATIVE FAILURE Figure 4-3. Formwork construction fault tree.

PAGE 74

74 CORRECT TIE-OFF POLICY NOT USED LANYARD TEMPORARILY DISCONNECTED INCIDENT START (FALL) SAFETY CULTURE FAILURE >90 FOOT EXPOSURE HEIGHT 100% TIE-OFF POLICY CRITICAL TO EXTREME EXPOSURE SAFE BEHAVIOR FAILURE HAZARD ANALYSIS FAILURE ADMINISTRATIVE FAILURE MAINTENANCE PAINTING PAINTER STEEL BRIDGE SUPERSTRUCTURE NIOSH 89-03, PAGE 145 HARNESS WORN, LANYARD ISSUED, & HLL INSTALLED HLL = HORIZONTAL LIFE LINE TWIN-LEG LANYARD NOT PROVIDED TRAINING FAILURE WORKER FAILURE TO RECOGNIZE EMINENT DANGER WORKER NOT EMPOWERED TO STOP WORK Figure 4-4. Maintenance painting fault tree.

PAGE 75

75 HARNESS + LANYARD WORN BUT NOT CONNECTED TO ANCHOR INCIDENT START (FALL) SINGLE STORY STRUCTURAL ERECTION ELIMINATE PFAS BY USE OF MOBILE PLATFORM SUPERVISION FAILURE HAZARD ANALYSIS FAILURE SAFE BEHAVIOR FAILURESTEEL ERECTION IRONWORKER ONE-STORY COMMERCIAL NIOSH 90-19, PAGE 191 HIERARCHY OF FALL CONTROL METHODS LACK OF SELF PRESERVATION FACTOR CORRECTIVE ACTION NOT TAKEN LANYARD TEMPORARILY DISCONNECTED Figure 4-5. Steel erection fault tree.

PAGE 76

76 CORRECT TIE-OFF POLICY NOT USED LANYARD TEMPORARILY DISCONNECTED INCIDENT START (FALL) SAFETY CULTURE FAILURE >200 FOOT EXPOSURE HEIGHT 100% TIE-OFF POLICY CRITICAL TO EXTREME EXPOSURE SAFE BEHAVIOR FAILURE HAZARD ANALYSIS FAILURE ADMINISTRATIVE FAILURETOWER MAINTENANCE TOWER ERECTOR COMMUNICATIONS TOWER NIOSH 97-10, PAGE 296 HARNESS WORN & LANYARD ISSUED TWIN-LEG LANYARD NOT PROVIDED WORKER NOT EMPOWERED TO STOP WORK WORKER FAILURE TO RECOGNIZE EMINENT DANGER TRAINING FAILURE Figure 4-6. Tower maintenance fault tree

PAGE 77

77 HARNESS + LANYARD WORN BUT NOT CONNECTED TO ANCHOR INCIDENT START (FALL) LACK OF REGULAR TOOLBOX MEETINGS TO REINFORCE SAFE BEHAVIOR IS SUSPECT TRAINING FAILURE SUPERVISION FAILURE SAFE BEHAVIOR FAILURESPLICING TELEPHONE CABLE LINEPERSON TELECOM MAINTENANCE OSHA DATA LACK OF SAFE PRACTICES COACHING LACK OF SELF PRESERVATION FACTOR PFAS REQUIRED FOR AERIAL LIFTS (SUBPART L) NOT PRACTICING 100% TIE-OFF INJURY ASSOCIATED WITH AERIAL LIFTS LANYARD TEMPORARILY DISCONNECTED Figure 4-7. Splicing telephone cable fault tree.

PAGE 78

78 CHAPTER FIVE RESULTS OF THE FALL PROTECTION AND FALL ARREST SYSTEM SURVEY Demographic and fall-protection-pr actices data were received from 99 survey respondents. There were 74 respondents who provided complete information regarding fall arrest system policies and practices implemented that were di rectly related to the research hypothesis. The response rates for data received from the three su rvey forms used in the data collection process are summarized in Table 5-1. Table 5-1. Response rates for survey instruments. Description Preliminary Survey1 Fall Protection and Fall Arrest System Survey, follow-up version2Fall Protection and Fall Arrest System Survey3 Data collection phase First StageSecond Stage4 Second Stage Respondent 593440 Non-respondent 34113313 Total surveys sent 40047353 1. Survey as presented in Appendix B. The first stage column count of respondents consists of 47 respondents (who gave contact information and were subsequently sent the follow-up survey version) and 12 respondents (no contact information, not included in follow-up survey) that sum to 59 respondents total. The response rate was 14.75%. 2. Survey as presented in Appendix B. This column presents the response rate for the companies that participated in the Preliminary survey and were subsequently sent the clarifications-oriented survey version with 24 questions. Re garding the count of total respondents, all thirty-f our of the respondents in this column were counted as new survey respondents in the first stage colu mn (that is, there were no new survey participants for this column). The response rate was 72.34%. 3. This column presents the res ponse rate for the companies that were sent the safety survey version with 38 questions. Survey as presente d in Appendix B. The response rate was 11.33%. 4. A total of 400 surveys were sent for the second stag e data collection. Thirty-four respondents to the first stage (who also responded to the follow-up survey) and forty respondents in the second st age of data collection sum to 74 total responses received. The

PAGE 79

79 response rate to the second stag e data collection phase was criti cal to the studys objectives because the total recordable inju ry rate (TRIR) information was only sought in the second stage survey instruments. Testing the studys hypothe sis was dependent on receiving data for each respondents TRIR. Data were collected in the following categories: OSHA compliance for various standard industrial classifica tions for workers Subcontractor management and sa fety clauses in subcontracts Project delivery methods a nd preconstruction coordination Design and construction integration Anchorage engineering Fall arrest system hardware management Worker and management safety training. TRIRs were provided by sixty-three of the res ponding contracting firms. Two responses were removed from further consideration because of conflicting information in the data. It was determined in a comparison of these two cases that two safety managers from the same firm had inadvertently submitted information about the sa me company and that the information submitted was not consistent for all variables in the su rvey. With no way of re solving which responses reflected that companys policies, both of thes e responses were excluded from further analysis. The removal of these two responses resulted in a final sample size for analysis of 97 responses, with 61 providing info rmation on the TRIR. Descriptive Statistics for the Sample This section gives results from the su rvey that includes information about: The specific fall arrest system practices implemented Qualitative comments collected from the responde nt on an optional basis to clarify answers given or provide additional information. As a baseline of compliance with the OSHA regulations for fall pr otection and fall arrest systems (as contained in OSHA, Subparts L, M, R & X) respondents were asked whether their firms

PAGE 80

80 policies exceeded the re gulations [Question 1, Fall Protectio n and Fall Arrest Systems (PFAS) Survey; refer to Appendix B]. Over 80% of the re spondents (n = 72) answered in the affirmative for this question (Figure 5-1). Respondents answer ing in the affirmative were asked to specify which trades might be included in their companys mandate to exceed OSHA compliance: Steel erectors and ironworkers Scaffold erectors All trades without exception. Of the 58 respondents that indicated in the a ffirmative for having a mandate to exceed OSHA regulations, 86% indicated the th ird option, which was interprete d as making the other options non-applicable by virtue of being an all inclusive answ er (Figure 5-2). The fourteen percent of the respondents that did not se lect the all-inclusive policy op tion, instead indicated either steelworkers or scaffolding erec tors or both steelworkers and sca ffolding erectors as trades to which their firms beyond-OSHA-compliance mandate applied. The twin-leg lanyard is a PFAS component that gives workers the option of being continuously tied-off when used correctly. The sec ondary (or extra) leg of the lanyard is intended to be attached across any gaps in the anchorage or horizontal lifeline before the primary lanyard is detached. When used in this manner, worker s remain tied-off to solid anchorage for 100% of the timeframe for a fall hazard exposure. Regarding the all-inclusive nature of the first question in the survey, respondents were then asked if their companies had a policy requiring all workers using PFASs to exclusively use twin-leg lanyards. Forty-two percent of the 72 respondents indicated that all PFAS-users were required to use the twin-leg lanyard. Four survey respondents declined to affirm the exclusive usage policy for twin-leg lanyards, but offered anecdotal comments that their firm did have either task-sp ecific or trade-specific policies for the twin-leg lanyard equipment. One of these anecdotal commen ts also indicated that the adoption of a new

PAGE 81

81 policy requiring exclusive use of twin-leg lanya rds was pending final approval (or soon to be implemented). Subcontractor Management A series of questions examined subcontract or management issues because of their importance to overall safety performance for ge neral contractors. The respondents universally recognized the need to contractually clarify th e importance of compliance with the OSHA safety regulations as a baseline of sa fe projects; all 97 responses in the survey answered in the affirmative when asked if OSHA compliance was specifically addressed in their typical subcontractor agreements. Other questions that asked about s ubcontracts included: To measure the extent that the contract ors valued having a PFAS-competent person associated with each work crew, respondents were asked if their s ubcontract agreements required trade contractors to assign a foreman tr ained in fall arrest systems to each crew using PFASs. Over 75% of the respondents answered that assignment of competent persons was required by their subc ontract agreements (Fig. 5-3). To measure the importance placed on monito ring the subcontractors fall protection and fall arrest system planning by the general contractor, the respondents were asked about subcontract requirements and pr oject specific fall protection pl ans (Fig. 5-4). Over 70% of the respondents answered that subcontractor submission of fall arre st plans was required by subcontract agreement. Project-specific PFAS plans are important to fall arrest system safety performance because they provide a baseline level of documentation and planning for trade and task coordination. Fall arrest system plans also provi de the opportunity to document th at pre-project planning has considered specific project conditio ns pertaining to anchorage. Th e survey specifically asked for clarification regarding the anchorage component of the plans to measure the extent that contractors recognized the bene fits of anchorage documentation (Question 9, PFAS Survey). When asked if anchorage was included in th e fall protection and fall arrest system plans submitted by their subcontractors, the percentage of fall arrest plans that met this criterion was 77% (Fig. 5-5).

PAGE 82

82 Project Delivery and Preconstruction Coordination In addition to more well-known be nefits accruing to design-bu ild project delivery such as the elimination of change orders, the enhan ced communication and coordination between the constructor and designer typically has provided better opportunities for safety improvements. To the measure the influence of design-build proj ect delivery on safety performance, respondents estimated the percentage of recent projects that were under design-build cont racts out of the total contracts within the company (Fig. 5-6). Designbuild contracts were utilized by more than 30% (median of 20%) of the respondents. Design and Construction Integration Several survey questions pertai ned to fall protection and fall arrest systems and how they were influenced during the preconstruction pha se by the communications between the project owners, the contractors, and de signers. This area of the inve stigation was characterized as strategic planning for fall protecti on and arrest systems at the pr oject management level in the literature review for this study. Qu estions were intended to investig ate three aspects of strategic planning to reduce worker exposure to falls: Suggestions made to the owners that were in tended to improve fall protection and arrest systems; Suggestions made to the designers (engineers an d architects) that were intended to improve fall protection and arrest systems; and Suggestions made that indicated an awarene ss (within the responding contracting firm) of the elimination of fall exposure hazards per th e hierarchy of fall controls theory (the hierarchy of fall controls theory was presente d in the literature review of this study). Eighty-five percent of the re spondents indicated that they had provided preconstruction comments to the owners (Fig. 5-7) (Question 33, Preliminary Survey and Question 19, PFAS Survey). Several respondents commented that their firms had implemented deck-to-deck vertical net/guardrail systems as an improvement ove r the OSHA-compliant, 39-inch-height perimeter guardrail systems. Seventy-four pe rcent of the respondents indicated that suggestions intended to

PAGE 83

83 improve fall protection safety were shared with the architects and engineer s (Fig. 5-8) (Question 27, PFAS Survey). In a recent study of fatalities that involved full-body harnesses, injuries associated with roofs and PFASs were shown to be the most frequent category (24%) for accidents when analyzed by location (Hinze and Harris 2007a). An important engineering measure that greatly reduces hazards for workers when applicable (as is the case with most low-slope roofs) is to include a permanent roof parapet (that complies w ith the OSHA guardrail safety standard) in the design of projects. To measure strategic fall pr otection activity in regard to these facts, respondents were asked if their communications with the design team had included raising a buildings permanent roof parapet up to a safe ty guardrail height (Que stion 31, Fall Protection and Fall Arrest Systems Survey). Forty percent of the respondents answ ered that the parapet safety suggestion was made either frequently or on every applicable project (Fig. 5-9). Comments were received (in the pre liminary survey) about preconstruction communications with the project designer to improve fall protection and arrest systems. Respondents were asked to provi de comments for applicable projects in two categories: General suggestions to A/E consul tants and project designers; and Specific communications about parapet hei ghts not in compliance with OSHA guardrail regulations. The comments covered a wide range of sen timents about managing the design in the preconstruction phase. Comments ranged from proactive and positive actions to passive and negative approaches. Several proactive respons es noted their companies had implemented a design-for-safety or safer-design-principles program. For example, one respondent noted that their superintendents were actively engaged in co nstructability reviews dur ing the design phase.

PAGE 84

84 On the negative end of the spectrum, one frustr ated respondent stated that there had been a huge resistance from architects to get involv ed in safety. Building operations/maintenance [safety] is easy to get architects to consider. Not so for construction [safety]. In regard to the suggestion that parapets be raised to comply with OSHA regulations one respondent reported about their attempts that it [the suggestion to ra ise parapet heights] change s their design so they are pushing back. In other words, some designe rs do not appreciate design suggestions offered by the contractors, and they generally ignore such input. One respondent commented that on projects i nvolving historic structures, permanent fall protection and arrest system improvements were limited by compliance requirements set by historical restoration standards. Nonparametric statistical tests for independe nce were conducted on the data regarding the offering of suggestions to the project designe rs intended to improve fall protection safety (nominal answers to Question 27 in the Fall Pr otection and Fall Arrest System Survey). The Kendall tau-b correlation coefficient was computed using the data for Question 27 and the TRIR as the response variables. The resu lting tau-b was not significant at the = 0.05 level, and the variables were deemed to be independent. Anchorage Engineering and Fall A rrest System Hardware Management In order to better understand the populations behavior regarding the occasional need for custom-engineered PFAS components such as speci alized anchorage or horizontal lifelines, respondents were asked about e ngineering services (Questions 21-25, Preliminary Survey). Respondents indicated the type of engineering services they had obtained for engineered components (Fig. 5-10); any combination of four common types of service providers could be selected. The categories were not presented as mutu ally exclusive. That is, the respondents were instructed to select all responses that applie d. Engineering services provided by the consulting

PAGE 85

85 groups operating within the major fall protecti on manufacturing companies were the most popular choice (nearly forty percent). Other questions were asked about managing the risks inherent in the fall arrest hardware. In order to investigate the extent that the contractors were monitoring common risks in connector hardware (snaphooks, anchor connectors and la nyards), the respondents were asked about policies implemented to address the following issues: High impact side-loading of carabineer/snaphook gates Usage of connectors or la nyards with damaged webbing Usage of inadequately engineered rigging or anchor connectors Safe anchorage availability (or lack of the same) Unsafe usage of small diameter wire ropes. Respondents were instructed to se lect all applicable categories (F ig. 5-11). Policies and practices implemented to control the availabi lity (or absence) of safe anchor age and to control risk due to worn-out or damaged webbing (a material used in all of the three major components of PFAS: anchor connectors, lanyards and harnesses) were the most freq uently selected (80% of the respondents) items in the group. Inadequately-e ngineered anchorage and other rigging (for example, horizontal life lines) wa s selected at a frequency of 72 % for the sample. High-impact side-loading on snaphook and carabineer gates wa s selected by fortytwo percent of the respondents, a frequency that was considerably less than for the other choice categories. Training In order for supervisors to facilitate and enfo rce safety compliance, they would be expected to receive specialized fall arrest systems trai ning. Respondents were aske d about the percentage of their superintendents that had received specialized PFAS-tr aining (Question 7, Preliminary Survey and Questions 12-14, PFAS Survey). Over seventy-five percent of the respondents

PAGE 86

86 answered that all (100%) of th eir firms superintendents had r eceived specialized fall arrest systems training (Fig. 5-12). Respondents were also asked to provide inform ation on the number of hours of specialized training in fall arrest systems that their manage rs and superintendents received. No attempt was made to assess the time frame or quality of the training. The mean quantity of hours of PFAS training for the sample was 5.4 hours and the median was 4 hours. Responde nts were also asked if the training offered to superintendents and managers typically included a competency test (Figure 5-13). A majority of the responding comp anies have been requiring middle management to complete a competency test as a component of their fall protection and fall arrest system training. In the preliminary survey, to measure the ex tent that the respondent s relied on the major fall protection manufacturers for ed ucational support, respondents were asked if their company had utilized the training seminars offered by the fall protection manuf acturers (Question 55). Eighty-one percent of the respondents an swered affirmatively (Figure 5-14). Descriptive Data for the TRIR Variable Information was requested on the total recordab le injury rate of the responding firms. Sixty-one companies provided this informati on. These data are presented in Table 5-2. Table 5-2. Descriptive data for the TRIR variable. STATISTIC1 VALUES2 Mean 2.84 Std. Error of Mean 0.25 Median 2.41 Variance 3.89 Std. deviation 1.97 Range 10.04 Minimum 0.24 Maximum 10.28 1. Distribution for the variable is continuous. 2. n = 61.

PAGE 87

87 Model for the Safety-Practices-Implemented Variable The safety-practices-implemented variable (for use in the correlation test for independence) was created by synt hesizing important safety pract ices from the Fall Protection and Fall Arrest System survey (38 variables total) into a single ordinal va riable. A data analysis model was developed through an ite rative process that explored a nd refined the safety-practicesimplemented variable. The output ob jective of the model was a vari able (an aggregate of safety practices and policies implemented) that had been selected and te sted for its effectiveness in influencing the safety culture and fall protection program. Descriptive statistics were generated for the 34 variables derived from the nominal survey questions; Table 5-3 presents a summary of the data from the Fall Protection and Fall Arrest System survey. Table 5-3. Data categories in the Fall Pr otection and Fall Arrest System survey. Measure of Variable Count Nominal (yes or no questions) 34 Scalar 4 Total 38 The following nine nominal variables were selected for test ing using the model: Beyond OSHA compliance: tie-off applies to all workers without exception; Policy requires all workers using PFASs to exclusively use twin-leg lanyards; Subcontractors are required to assign a competent person to each work crew (PFAS); Subcontractors are required to provide project specific fall protection plans; Required fall protection plans specify the location of anchorage connection points; Worker attitudes toward PFAS safety are examined; Specialized PFAS-training for superint endents includes a competency test; One-hundred-percent ANSI label or manufactur er labels required on all fall arrest equipment on-site; and All custom-designed anchorage and lifelines must be stamped and signed by a professional engineer (PE). In addition to the descriptive statistics alrea dy generated, correlation co efficients were also generated for these nine variables. The correla tions measured the rank correlation between the

PAGE 88

88 nine nominal variables and the total recordable in jury rate (TRIR) variab le. The frequencies and correlation coefficients for these variables are presented in Table 5-4. The correlations were expected to be positive values because of the coding for the pract ice-implemented variable (yes = 1 and no = 2). The values for the TRIR variable were expected to increase if fewer safety practices were implemented (equivalent to a no answer). For example, a scatter plot diagram for the correlation of the all-inclusive tie-off vari able and the TRIR variable reflects this result (Figure 5-15). Not all of the correlations followe d this pattern; negative correlation coefficients were generated for a few of the variables tested. Twenty-five nominal variables were not selected for analysis in the model. Justifications for these exclusions from the model were as follows: The answers to a survey question with an affi rmative response rate (yes answers) between 90% and 100% were not expected to be si gnificant in differentia ting the proactive and robust fall protection programs from th e balance of the sample (5 cases). The questions in the preconstruction section of the survey ( Project Management and PFASs was the equivalent section in the prelim inary survey) regarding the influence of owners and project designers were predominan tly exploratory in nature. These questions were not deemed useful in developing the safety-practices-implemented variable. The responses to the questions in this area of the study are compromised by the presence of unresolved variance within the survey questions ( 12 cases). The meaning of the term unresolved variance can be clarified by consideration of the following example. When a respondent answered affirmatively to the questi on, Has your firm made suggestions to the owner about using design for safety to lessen th e extent of fall protection and arrest system usage, a high degree of variance is imbedded in the nominal yes answer because it is not known if the owner appreciated the value of the information and intended to respond proactively to improve safety on the project. It is also not known what actions were taken by the owner to compel the project designers to address the safety of construction workers by adding safety features to the project. The question associated with answers 34-38 regarding practices implemented to reduce risks from any of five typical hardware probl ems was deemed to be too vague with regard to specifying the details of how the risk was bein g controlled (5 cases). The balance of the questions (3 cases) in the survey was associated with the first question in the survey regarding policies and practices that exceeded OSHA compliance. The data collected for these variables were important, but were superseded in importance by the affirmative answer that an all in clusive policy had been implemented.

PAGE 89

89 The model used an iterative process where alte rnate configurations of the variables were tested. For example, a grouping of five practic es was formed by ganging individual practices together and assigning a score from zero to five (0-5). This grouped and scored variable was then used in a rank correlation with the TRIR va riable. This preliminary test was based on the expected format to be used later in the study with the formal test of independence used for testing the hypothesis. The intensity of the rank corre lation (where a higher value fo r the coefficient equals higher intensity of correlation) for the individual variables in the model was used to determine an individual iteration of the model. Due to the significance and high coefficient value ( = 0.221, p < 0.05), the implemented safety policy requiring 100% ANSI label or manufacturer labels on all fall arrest equipment on-site was used as a starti ng point for all the iter ations generated. Although the coefficient for the implemented safety policy requiring the exclusive us e of twin-leg lanyards for all PFAS-users on site had a relatively weak correlation coefficient, the strength of the original survey que stion was considered in the model. At the conclusion of the testing using th e safety-practices-implemented variable development model, the aggregate information dete rmined to have the strongest association with the TRIR was formed into a variable by s ynthesizing the following five safety policies (descriptive data for the safety-practices-imple mented variable are presented in Table 5-5): Beyond OSHA compliance tie-off applies to all workers without exception Policy requires all workers using PFASs to exclusively use twin-leg lanyards Required fall protection plans specify th e location of anchorage connection points One-hundred-percent ANSI label or manufactur er labels required on all fall arrest equipment on-site All custom-designed anchorage and lifelin es stamped and signed by a professional engineer (PE).

PAGE 90

90 Results of the Test for Independence As described earlier in the methodology for this study, the null hypothesis to reject or accept was that the TRIR was independent of (or not significantly associ ated with) the best practices in fall protection and fa ll arrest systems. In terms of the statistical procedure used, independence was measured by the degree of asso ciation in a Kendall tau-b rank correlation. The null hypothesis to accept or reject using this pr ocedure was that the value for the correlation coefficient was equal to zero, indicating no associ ation or zero correlatio n between the x-value (the best practices) and the y-value (the TRIR). Based on sixty-one valid cases (n=61) from the survey data, the statistical software package (SPSS) was used to run the Kendall ta u-b correlation test, on e-sided test option. A general overview of the data for th is procedure is presented in a scatter plot (Figure 5-16) and a means plot (Figure 5-17). The results of the test (the Kendall tau-b corr elation procedure, one-sided option) showed that an association (or dependence) between TRIR and an increase in the best practices in fall arrest systems does exist (p < 0.05). The Kendall tau-b correlation coeffici ent for the procedure was -0.208. From this result of the test for independence, the null hypothesis was rejected. A stronger association was thought to be obtai nable by eliminating ou tlying values in the initial correlation test. A revise d test of independence was conducte d that eliminated the high and low correlation values in each of the six scorecards for best practices categories on the x-axis. Twelve outlier values were excluded according to this procedure (Fig. 5-18). When observing the revised scatter plot for the test, it was noted that the small number of remaining data points in the zero and one categor ies of the x-axis made the inclusion of these two categories in the revised correlation test unr eliable. These four data points were also eliminated from the final version of the revised test of independence.

PAGE 91

91 The Kendall tau-b correlation coefficient for the revised test was -0.315. The significance level for this revised test was p < 0.01. A plot of median values (Fig. 5-19) and a final revised scatter plot were generated (Fig ure 5-20). The results of the pro cedure (when limited to the lower right quadrant of the sc atter plot by applying th e outlier exclusion pro cedure described earlier) showed a stronger associati on (correlation coefficient = -0.315, p < 0.01) between TRIR and an increase in the best practices in fall arrest systems exists for those contractors scoring above 1.0 points (equivalent to 2 or more of the best practices implemen ted). This result (n = 45) was achieved by excluding sixteen of the total respondents. Development of the Scorecard The best practices in fall arrest system safety presented earlier and found to be statistically significant were incorporated into an evaluation tool called the Fall Protection and Fall Arrest Systems Scorecard, project version (Table 5-6) The supporting practices included in the evaluation process were not tested as rigorously as the core gr oup of best practices and were weighted appropriately. The suppor ting practices were either 1) developed from policies and practices identified in the literat ure review; 2) directly and l ogically support th e core group of best practices; or 3) were de veloped through conversations with safety managers working in the construction industry. This scorecard was inte nded to focus on the field operations of a construction firm. A second scorecard was developed that inco rporated the home office functions or companywide operations of a construction compa ny. This second scorecard allowed for a focus on corporate level issu es at a large contra cting firm, including: Project delivery methods Strategic planning issues for safety management The third party (owners and designers) effects on fall protection and PFASs.

PAGE 92

92 Many of these factors and effect s were discussed under the Strate gic Planning for Fall Protection subheading in the literature re view of this study. This second version of the scorecard is presented in Table 5-7. The scorecard was intended to be implemented as a self-evaluation tool by a firm seeking fall protection excellence, whether companywide or on a specific project. Because the items on the scorecard reflect management practices a nd policies, the scorecar d does not require a physical inspection of the jobsites and the scorec ard can be completed in the home office. All of the questions on the scorecard require nominal yes-no answers. To complete the scorecard, answers must be pr ovided on the top five questions (the core best practices). To compute a score, the numbe r of yes answers would be added, and the sum multiplied by 10 points as noted on the scorecard. This process creates a subtotal score for the core best practices area. The same process is completed for the supporting practices section and the two subtotals (core best practices and suppor ting practices) would be combined to generate the final score. The highes t score possible is 100 points. Scorecard Validation Case Studies Critical review by safety manage ment practitioners was sought to test the validity of the scorecard with regard to implementation as a sa fety evaluation tool in the construction industry. The critical review of an indi vidual practitioner is presented as a case study. The individual interviews with the safety managers are presente d in series below. The series order does not imply any type of ranking and is based solely on the order in which the data was received. Table 5-8 presents five differe nt classes of companies in the study s population that are classified according to the companies total annual revenu es (annual revenues for contracts signed). The data for this classification was collected during the studys data collection phase. These

PAGE 93

93 classifications are intended to augment the general profile of each respondent that is presented in the introduction to each case study. All of the case study respondent s were participants in the Fall Protection and Fall Arrest System survey (preliminary and follow-up vers ions). Generally, thes e respondents can be considered proactive and aggressive safety mana gers with excellent safety performance records (company TRIR values for the case study particip ants ranged from 0.5 to 2.5). Several of the case study interviews included the submission of scorecards that were completed by the respondents. Respondents were typically supportiv e of the content and wording of scorecard items that generated yes answer s. Scorecard items that genera ted no answers often generated questions and clarificat ions that resulted in important suggestions for scorecard revisions. Personal telephone conversations with the res pondents were the primary means of data collection. These phone interviews were used to discuss the respondents questions and criticisms of the scorecards content and/or intention. Scorecard Case Study 1 The case study 1 respondent was an upper management-level safety manager for a contractor engaged in comme rcial building construction. Th is company has nationwide operations and employs 750 field workers. Craft work is performed exclusively by subcontractors. Based on the revenue classificatio n in Table 5-8, this company was classified as a class-A company ($1 billion and over in annu al revenue). Overall, the respondent commented that the scorecard was a useful resource that co uld easily benefit companies in the construction industry. The respondent stated that checklists an d audit forms similar to the scorecard were frequently used in the safety department at their company. With regard to the project version of the scor ecard, the respondent was concerned that the scorecard should address the documentation trail aspect of the project safety plan. Because the

PAGE 94

94 respondents company acts as a construction manager on a typical project, their safety management system can be characterized as emphas izing safety metrics. Safety metrics is a term commonly used in the industry to describe do cument management systems and performance verification practices that rely heavily on com puter systems and Internet-based communications. Internet communications with s ubcontractors and intranet co mmunications between different levels of management play an important role in safety management, particularly in large construction companies with nationwide and/or global operations. Fall protection related items that could be addressed and documen ted with reports and logs include Coordination meetings with owners, designers, and vendors Project-specific hazard analysis Pretask planning Preconstruction meetings prior to subcontractors coming on site Orientation of workers Specialized PFAS-training of worker s, foremen and superintendents OSHA reporting systems Testing of equipment and fall arrest systems Periodic formal safety inspections. Line item 9, project version (Are workers empowered to stop any work deemed unsafe?) was specifically noted by the respondent for possi ble inclusion in a revise d scorecard as a core best practice. The respondent fe lt that creating a project safety culture where all workers on site were trusted and empowered to assure safe behavior was cr itical to dispersing safety enforcement and participation ove r the entire project (regardless of the presence of a jobsite coordinator or safety manager). Based on the discussion of the scorecard (and the respondents survey data), the respondents company scored 50 points of the possibl e 50 points for the core practices section of the scorecard on the majority of their projects (Figure 5-9). Regarding the obstacles that the respondent has encountered to full compliance with the core best pr actices, the respondent

PAGE 95

95 reported that ironworkers and their trade unions have resisted implementation of the twin-leg lanyard requirement for applicab le trades and tasks. The resp ondent estimated that 60% of projects in the United States had been succe ssful in implementing the twin-leg lanyard requirement. The respondent stated th at steel erection was a trade speci alty where implementation of the twin-leg lanyards can be effective in reducing injuries. For example, when ironworkers move from one beam to the next beam in the structur e, the redundant tie-off fu nction of the twin-leg lanyard allows 100% tie-off. The respondent noted that the resistance to twin-leg lanyards implementation was decreasing as trade unions became better informed about the philosophy of 100% tie-off. With regard to th e non-applicability of th e twin-leg lanyard to certain tasks, the respondent confirmed this studys postulate that personnel lift opera tors are a common class of workers that can be exempted from the twin-leg lanyard requirement. The respondent made comments on the comp anywide version of the scorecard that concerned upper management interaction with mi ddle managers and workers. As a companywide indicator of a strong safety culture, the respondent recomm ended adding a line item in the scorecard that addressed the benefits of co llaborative management efforts between all the different levels of managers and workers: Upper management Middle managers First-level supervisors Craft workers. The objective of this collaborative management w ould be to work together on best practices development and other problems-solving tasks th at can improve safety performance. Another progressive management practice that the res pondent recommended for the scorecard was the implementation of a safety performance accountabi lity system. The respondent felt strongly that

PAGE 96

96 a line item in the scorecard should address the importance of accountabi lity and the individual employees actions (positive or negative contri bution to the overall success of the companys safety program). Scorecard Case Study 2 The case study 2 respondent was the safety dire ctor for a contractor engaged in commercial building construction with regional operations. Th is respondents company operates primarily as a construction manager and employs 200 field work ers as general laborers. Based on the revenue classification in Table 5-8, this company was cl assified as a class-D company (annual revenue range from $200 million up to $300 million). In the respondents Fall Prot ection and Fall Arrest Systems survey response, a negative answer was given to question 1 (PFAS survey, follow-up version) rega rding jobsite safety practices that exceeded the OSHA regulations. In the course of discussing the scorecard, the respondent clarified that under favor able contract conditions, the oppos ite was true for projects at his company. That is, the OSHA regulations were exceeded as noted in the scorecard (there are no exceptions to to the mandate that all workers sh all be tied-off when working at 6 feet or more above the walking surface). The respondent stated that under these same favorable conditions (characterized as projects with proactive, safety-o riented owners and contra ct values at or above $ 25,000,000), a project scorecard for th e core practices (50 total points possible) would typically be scored at 50 points (all 5 core practices implemented) A substantial discussion and explanation regarding the variables that contribute d to the erosion of the beyond OSHA compliance ethos ensued. The respondents comments focused on the critic al items in the owners decision tree for project safety whereby proactive and robust safe ty practices can be nour ished or discouraged. The general comment was that on the sma ller projects (contract s less than $25,000,000 and

PAGE 97

97 structures less than 3 stories tall ), the owners behavior tends to reflect a laissez-faire attitude toward the project safety plan whereby OSHA compliance is the governi ng standard of safe behavior. The respondent stated that the bidding process was the critical juncture for project safety on the smaller projects (contracts less than $25,000,000). An important ch aracteristic of the laissez-faire owner attitude was the unwillingness to commit to an aggressive safety mandate whereby all bid documents (plans, specificati ons and submittals) can be required to support project safety by means of safety-oriented revisi ons and inclusions. Without the safety-oriented bidding mandate from the owner, OSHA complia nce is the typical industry assumption in commercial building construction. The respondent provided examples of how the subcontractors attitude towards project safety was typically influencing the general contractors bid. For example, steel erectors had submitted bids about 25-30% higher when they were required to comply with the 6 foot tie off requirement. Ma sonry contractors had added about 15-20% when the 6 foot rule was applied to their scaffold building and worker access. Hence, the general contractors bid would remain co mpetitive only if the 6-ft. tie-off rule was owner-mandated for all bidders. The respondent stated that when a general contractor acts as a construction manager, the owners influence on project safety (by creating a safety-oriented bi dding process) can be critical to receiving bids from proactive, safety-ori ented subcontractors. Wh en general contractors perform substantial amounts of structural er ection and other craft work with their own workforces, actual costs for safety training, equi pment and overall safety culture management can be easily absorbed into the operations budget When the general cont ractor relies heavily on specialty trade contractors (as is a common cond ition for commercial building construction), the

PAGE 98

98 respondent stated that going be yond OSHA compliance is dependent on the directives from the owner to the extent that a fair, orderly and safety-oriented bidding pr ocess can be expected. The respondent stated that a nother driver for the smaller projects (contracts less than $25,000,000) was the lack of a dedicated safety coordi nator for the project. For example, if the scorecard was completed at the start of one of these projects, and th e score generated was 80 points or more, the actual safety performance on the project could be comprimised due to the relatively weak safety coordination and enforcem ent effort. Without dedicated safety staffing, the superintendent is forced to bear the sole responsibility for safety enforcement and is inevitably worn down by the burden of managing th e safety compliance issues pertaining to the trade contractors. In reviewing the line items in the scorecar d, the respondent cited typical fall protectionoriented practices that the safety department at his company was res ponsible for, including Fall protection training for the superintendents Weekly safety inspections which include checklists related to fall protection Pre-construction meetings with the subcontractors that involve safety issues including fall protection Periodic inspections of all jobsites by the corporate safety director (the respondent) Serious disciplinary actions for superintendents failing to enfo rce safety rules, especially fall protection safety rules. Overall, the respondent summar ized his commentary by stati ng that the score that an individual project would receive from the sc orecard was dependent on which projects at his company were being evaluated. The respondent stated that we [the safety department] have very strong support from management and the [compa ny] owner himself but the realities of the variables listed above make this scorecard difficult to apply universally in the construction business.

PAGE 99

99 Scorecard Case Study 3 This case study respondent was the safety dir ector for a commercial building construction contractor with operations in one of the major re gional markets. This contractor relies heavily on trade contractors to provide ski lled labor for its projects. The trade contractors are expected to train the workers to conform to the general c ontractors safety culture. The company employs 750 field workers and was classified as a cl ass E company (less than $200 million in annual revenue). Based on the PFAS survey data submitted, the company scored 40 points out of the available 50 points for the core practices sec tion of the scorecard (Figure 5-10). After the discussion began during the intervie w, the respondent clarified that anchorage locations were a strong component of preconstruction safety meeti ngs with subcontractors (Line item 3 was the only core practice that the respondent had marked as a no answer in their survey response). The respondent stated that during the preconstruction subcontractor orient ation process, the job safety plan was reviewed with the trade contractors and subsequently attached to their agreement with his company. The respondent was concerned that whatever the anchorage requirements were for the project, that these requirements can be desc ribed in the jobsite safety plan, not the sitespecific fall protection plan submitted by the subcontractor. After discussion of possible language that might clarify the intent of line 3, the following al ternate wording was proposed: Was anchorage identified in a site-specific job safety or fall protection plan? The respondent stated that the scorecards omission of requirements for training documentation for individual PFAS-users employed by subcontractors was a source of concern. The respondent stated th at if training documentation was not required of the trade contractors before their workers came on site compliance with the jobsite fall protection plan was uncertain. Regarding line 6, project version, the respondent stated that term inating a subcontract agreement

PAGE 100

100 was not a preferred solution to safety non-compliance problems because of the impact on the project schedule. The discussion with the responde nt suggested that line 6 could be reworded as follows Fall protection noncompliance: does your comp any have a threshold whereby retraining for entire subcontractor work cr ews can be required for noncom pliance with safety rules? The retraining of an entire subcontractor crew tactic came from an actual project safety intervention that the respondent offered as an example of an aggressive safety management action that could be used as an alternative to terminat ing a subcontract agreement. Concerning line 4 and the pro cedures for inspecting PFAS harnesses and equipment, the respondent referred to an innovati ve use of radio frequency iden tification (RFID) technology that was being applied to PFAS equipment inspec tion and management by one of the major manufacturers. RFID tags were being sewed into the webbing of full-body harnesses to allow database integration and the generation of in spection reports in support of daily equipment readiness and inspection ac tivities. For example, the safety coordinator conducts inspections of the condition of each workers full body harness. Th e coordinator can use a radio frequency hand held device to collect data on The identification number of the harness The date of the last inspection The date the equipment was put into service Comments about wear and tear from previous inspections. The respondent noted that the RFID technology could be helpfu l in improving efficiency in the equipment inspection process, especially on large projects where hundreds of individual pieces of PFAS equipment could be on-site. The respondent inquired if the rescue of stranded or injure d workers was considered for inclusion in the scorecard. It was noted by the researcher that the preliminary survey had

PAGE 101

101 included two questions designed to explore this t opic. In support of the deferment of rescue operations to professionally-trained emergenc y rescue teams, an actual project incident witnessed by the respondent involving the local fire department was discussed. In summary, the respondent commented that prof essionally-trained emergency wo rkers possess skills that his safety department would be reluctant to implem ent (due to a cost-benefit analysis) on a project with access to an emergency response network (9 11-telecommunications system). In support of contractor emergency readiness, the respondent commented that having superintendents that were informed about suspension trauma could fa cilitate the a pplication of simple first aid activities for fallen PFAS users. For example, givi ng aid to a suspended worker can be a fairly simple practice to implement if individuals ar e trained to recognize fi rst aid opportunities and take corrective action. The suspension pressure that acts on the legs and groin area can be relieved by standing in a foot harness, passed down to the victim from above if a knowledgeable person and the correct equipment are available. The respondent completed the companywide vers ion of the scorecard during the interview process; as shown in Table 5-11. In regard to item 7 (upper management participation in fall protection compliance reviews per project), the respondent asked fo r clarification about whether the question required participati on in a fall protection compliance review that included a physical walk-through on-site by the company upper mana gement. The respondent commented that upper management at his company was aggressively suppor ting the safety director (the respondent) and the entire safety department even if they might not actually make a physi cal visit to the site. In regard to line 13 (all inclusive staff safety perceptions su rveys), the respondent commented that his company had not considered conducting a safety perception survey, although the respondent referred to a book published in 2006, Safety 24/7 by R. Lorber and G. Anderson

PAGE 102

102 that concerned companywide safety culture. The respondent stated that the book had been influential in influencing his companys safe ty culture and had been widely read by the companys upper management. Scorecard Case Study 4 The case study respondent 4 was the safety dir ector for a heavy civil general contractor with projects throughout the southeastern Un ited States. The company employs 1500 field workers and self-performs the majority of work on bridge, marine, tran sportation and industrial projects. Based on the classifica tion in Table 5-8, this company was classified as a class-C company (annual revenue of $300 million up to $500 million). The interview was structured by a copy of the scorecard which was completed by the respondent; a facsimile copy (which had been returned to the resear cher) was used to direct the discussion about the scorecard content (Table 5-12) In regard to line 4, the respondent initially marked a no answer, which the respondent justified due to the fact that horizontal lifelines at the company were self-manufactured and engineered a nd therefore did not bear the label of a major fall protection manufacturer. The researcher clarif ied that a properly engineered lifeline was a legitimate exception to the intent of the question. Similarly to the other case studies, the no answer s to the scorecard were discussed in detail, in order to confirm that the negative res ponse was warranted. In response to line 7, the respondent commented that the sche dule of his firms projects and structural erection in general proceeded at a pace that made the monthly time -frame cited in the question inappropriate. The respondent also commented about th is same question that his safety program was oriented more towards a behavior-based safety management philosophy where unsafe behavior was managed on a daily basis by safety coordinators. He suggest ed that the scorecard revisions can consider

PAGE 103

103 the behavior-based perspective of general contractors who em ploy large numbers of skilled craftsman and self-perform large amounts of the work under contract. The respondent challenged the importance give n to ANSI Z359 fall protection standards in line 13. The respondent stated that practicing safety managers were obligated to carefully consider the formal education level of their av erage PFAS user and to design training materials accordingly. The respondent stated that fall protec tion standards created under the auspices of the American National Standards Institute were more appropriate for review by the safety director than craft workers. The respondent suggested that upgrades in hardware and other PFAS equipment can be reviewed by safe ty directors and managers, and then passed on to the worker and jobsite operations. For example, if ANSI Z3 59 is considering upgrad ing the standard for snaphook sideload resistance, then the information can be passed on to the users in a simplified version after review by the safety managers without reference to ANSI Z359 committees or standards. The respondent commented that as long as the companys fa ll protection training, procurement and hardware practices reflected the state-of the-art developments in fall protection equipment that the PFAS users in the field can rely on the safety managers to make recommendations in their best interest. The researcher explained that the concern for implementing policies requiring the most robust and heavy-duty snaphooks available was deemed important due to the fatalities that had been recorded in associ ation with large snaphooks (also known colloquially as pelican hooks ). The respondent commented that workers at his company used the pelican hooks exclusively for positioning tie-off functions. Scorecard Case Study 5 This case study respondent was the safety dir ector for a private real estate company specializing in the development of high-quality multi-family residential properties nationwide.

PAGE 104

104 The companys portfolio include s residential high-rise, mid-rise, mixed use and suburban projects. The company owns and c onstructs all of the properties in their portfolio; 100% of the companys projects are delivered using design-build contracts. All specialty trade work is performed by subcontractors and the company em ploys a relatively small workforce of 150 field workers. The respondents company was classified as a class E company (less than $200 million in annual revenue). Overall, the respondent commented that th e scorecard content was reasonable and well conceived as a fall protection ev aluation aid. The discussion bega n with a clarification by the researcher regarding the assumptions of the sc orecards applicability. That is, the assumptions for application of the information were based on the typical safety practices and management structure of the studys sample of large contractors. Similar to case study 3, the respondent asked for clarification on th e companywide version, question 7. The respondent asked if a vice-president level of the upper management team was required to play an active role in the fall protec tion safety practices in order to generate a yes answer to this question. The respondent asked for clarif ication with regard to the project version, line 7 (does project safety plan require that a formal fall protection and PFAS compliance review be completed monthly?). The discussion that follo wed assisted in shaping the researchers perspective regarding general contractors who function as co nstruction managers and rely heavily on subcontractors to manage worker training and safe beha vior. The respondent commented that because his company manages thei r typical projects as a construction manager with projects nationwide that they use audits and inspections as leading indicators of safety

PAGE 105

105 performance. The respondent stat ed that requiring th eir subcontractors to participate in these audits is an important aspect of hi s companys proactive safety culture. In regard to the project version of the sc orecard, line 13 (does all PFAS-user training include ANSI standards (Z359) for fall arrest eq uipment?), the respondent generally expressed that he was unfamiliar with the Z359 standard. The respondent continued by stating that he was under the impression that it was applicable to general industr y and not applicable to the construction industry. Revising the Scorecard The critique of the scorecards (the review and comment process presented in the case studies) generated valuable suggestions that wa rranted making revisions to the scorecards. The discussions with the industry practitioners were a collaborative process that resulted in the scorecards being hypothetically implemented by the five construction contr actors. The results of the industry critique (tha t is, the revisions incorporated into the scorecards) are presented in the following explanations and presentations of the scorecards. Discussion of the individual line items where adjusted wording or wholesale c ontent revision occurred is presented with commentary regarding the logic and/ or justification for the revisi ons. For example, line 6 in the project version of the scorecard was reworded based on the comments from the case study 3 respondent about the realities of terminating subcontract agreements (Table 5-13). One of the respondents (case study 1) recommen ded that the implementation of a safety performance accountability system be added as a sc orecard line item. The researcher agreed that individual accountability is an important value for a progressive management system. Accountability can have a positive effect on re inforcing the importance of the individual employees contribution to the overall success of the companys safety program. However, if the

PAGE 106

106 fall protection focus of the scorecard is consid ered, deferment of this suggestion to other revisions to a companys safety program can be justified. The commentary of the case study respondent 1, wh en taken as an aggr egate, represents a safety management philosophy that includes elements of safety metrics (as defined in the same case study section) and behavior-based safety practices. This philosophy matches the analogy suggested by Kaplan and Norton (1992) wher eby effective managers can consider the management system to be analogous to a modern aircraft cockpit with a multitude of gauges. That is, receiving feedback and da ta from a large number of point sources in the operations can be beneficial to building the safety managers understanding of their pr ograms performance. The construction manager (CM)-oriented contra ctors in the case studies responded that the scorecard was deficient in regard to subcontractor management requirements and the types of documentation that they typically required of their trade contract ors. In contrast, the case study respondent 4 manages a large workforce of fiel d workers and made comments that emphasized the concerns of an employer with direct c ontrol and responsibility for worker behavior. Discussion with this respondent (c ase study 4) suggested that eith er a self-performance-oriented contractor or a CM-oriented contractor might find line item 7 in the project version of the scorecard in need of adjustment. This suggested the creation of the two al ternate versions of the project scorecard presented in Tables 5-13 and 5-14. Scorecard line item 7 in the newly-created project version for construction manageroriented contractors (Tables 5-13) was revise d to emphasize subcontractor management and safety metrics documentation. The revised question was worded as follows: Does the safety manager receive subcontract or documentation for worker training and conduct periodic audits to verify comp liance with the proj ect safety plan?

PAGE 107

107 The same line item in the scorecard was also re vised to suit the needs of the safe behaviororiented contractor. The revised version for line 7 in the behavior-based version of the scorecard (called the project version for traditional contract ors with self-performance capability) is worded as follows: Is the safety program based on behavior-based safety management with safety-oriented foremen and superintendents and aggressi ve daily safety compliance inspections? The clarification requested fo r line 4 (from Case study 4) re garding custom engineered lifelines was addressed with the addition of a cl arification clause. The wording for line 3 was revised to reflect the common te rminology used by safety managers in the construction industry. The question was revised as follows: Does the job hazard analysis and project safety plan identify all anchorage on the project? Several of the respondents challenged the im portance given to ANSI Z359 fall protection standards in line 13 in the projec t version. The research ers intention for li ne 13 was that the highest standards of fall arrest sy stem practices be reflected in the scorecard. Line 13 was revised to read as follows: Is the safety director or mana ger required to review and implement the latest fall protection standards (ANSI Z359 or A10.32)? More than one of the respondents asked if a vi ce-president level of the upper management team was required to play an active role in the fall protection safety practice s in order to generate a yes answer for line 7 in the scorecard, comp anywide version. The commentary of the case study respondents suggested a revised approach to the question. The wording of line 7, companywide version (Table 515) was modified to read: Does the safety director have the aggressive and proactive support of upper management to implement a state-of-the-art safety program?

PAGE 108

108 Overall, the critical reviews r eceived during the case study discussi ons were a useful process that resulted in important revi sions to the scorecard.

PAGE 109

109 yesnoBeyond OSHA FAS Compliance 0 20 40 60 80 100Percent 81% 19% Figure 5-1. Frequency of OSHA compliance (n = 72). All trades without exceptions 86% Steel only, scaffold only or combination 14% Figure 5-2. Exceeding OSHA compliance: which trades specified (n = 58).

PAGE 110

110 YES 77% NO 23% Figure 5-3. Assignment of PFAS-competent pe rsons by subcontract agreement (n = 97). YES 73% NO 27% Figure 5-4. Requirement for projec t specific fall protection and fall arrest plans (n = 97).

PAGE 111

111 YES 77% NO 23% Figure 5-5. Subcontract agreements that require documentation of anchorage locations in PFAS plans (n= 71). 020406080100What % projects are DB? 0 5 10 15 20Frequency Mean = 31.33 Std. Dev. = 27.102 N = 90 Figure 5-6. Percentage of contracts that are design-build contracts (n = 90).

PAGE 112

112 YES 85% NO 15% Figure 5-7. Comments are made to the owners that are intended to improve fall protection (n = 93). YES 74% NO 26% Figure 5-8. Suggestions are made to the design te am that are intended to improve fall protection (n = 86).

PAGE 113

113 never once a few times Frequently Every applicable projectRaising roof parapet included in comments? 0 10 20 30 40Percent Figure 5-9. Suggestions to design ers included raising height of roof parapets (n = 77). 23% 11% 18% 39% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% Fall safety manufacturers In-house engineering dept. Specialty fall protection engineer Other consulting engineer Figure 5-10. Types of engineering service provi ders utilized by cont ractors (n = 37).

PAGE 114

114 42% 65% 72% 80% 80% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% Sideloading hazard Bad webbingPoor riggingSafe anchorage availability Undersized wire ropes Figure 5-11. Policies implemented to cont rol specific hardware risks (n = 91). 77% 23% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% All superintendents are PFAStrained Some superintendents do not receive PFAS-training Figure 5-12. Percentage of superintendent s that received PFAS-training (n = 96).

PAGE 115

115 60% 40% 0% 10% 20% 30% 40% 50% 60% 70%YESNOFrequency Figure 5-13. Superintendent training typically includes a competency test (n = 65). YES 81% NO 19% Figure 5-14. Contractors are customers of th e major fall protection manufacturers training seminars (n = 54).

PAGE 116

116 Table 5-4. Descriptive data for individual variab les used in the safety-practices-implemented variable development model. Table 5-5. Descriptive data for the sa fety-practices-implemented variable. STATISTIC1 CONTINUOUS VALUES2 DISCREET VALUES Mean 3.30 Std. Error of Mean 0.163 Median 3.5 Variance 1.75 Std. deviation 1.32 Range 5 Minimum 0 Maximum 5 1. Distribution for the variable is discreet. 2. n = 66. Reference number1 Safety Practice Implemented Yes (%) No (%) Sample size (n) Kendall correlation coefficient ( ) 4 Beyond OSHA compliance: tie-off applies to all workers without exception 79 21 61 0.124 5 Twin-leg lanyards required 44 56 61 0.019 7 Subcontractors required to assign a competent person to each work crew (PFAS) 77 23 61 -0.036 8 Subcontractors required to provide project-specific fall protection plans 74 26 61 0.056 9 Anchorage shown in PFAS plans 58 42 602 0.113 11 Measurement of worker attitudes toward PFAS safety conducted 35 65 57 -0.111 14 Specialized PFAS-training for superintendents includes a competency test 64 36 56 -0.006 32 100% ANSI label or manufacturer labels required on all fall arrest equipment on-site 70 30 60 0.221, p< 0.05 33 All custom-designed anchorage and lifelines stamped and signed by PE 78 22 60 0.117 Notes: 1. Parenthetical notation in Appendix B identifies each question by this reference number. 2. Cases coded as non-applicable [as warranted by the preceding vari able (Reference 8)] were included in sample.

PAGE 117

117 11.21.41.61.82Tie off applies to All workers? 0.00 2.00 4.00 6.00 8.00 10.00 12.00TRIR Incidence rate for 2006 Figure 5-15. Scatter plot for the correlation of the all-inclusive tie-off policy and TRIR variables (n = 61).

PAGE 118

118 012345Scorecard for Best Practices 0.00 2.00 4.00 6.00 8.00 10.00 12.00TRIR Incidence rate for 2006 Figure 5-16. Scatter plot for the test of independence (n = 61).

PAGE 119

119 012345Scorecard for Best Practices 1.50 2.00 2.50 3.00 3.50 4.00 4.50Mean of TRIR Figure 5-17. Means plot for te st of independence (n = 61).

PAGE 120

120 012345Scorecard for Best Practices 0.00 1.00 2.00 3.00 4.00 5.00 6.00TRIRR Incidence rate for 2006 Figure 5-18. Revised scatter plot for the test of independence, preliminary version (n = 49). 1.6 1.915 3.4 3.0 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 2345 Score for Safety practices implementedMedian TRIR Figure 5-19. Median plot for the revi sed test of independence (n = 45).

PAGE 121

121 22.533.544.55Scorecard for Best Practices 0.00 1.00 2.00 3.00 4.00 5.00TRIRR Incidence rate for 2006 Figure 5-20. Revised scatter plot for the test of independence, final version (n = 45).

PAGE 122

122 Table 5-6. Fall protection and fall arrest systems scorecard (project version) CORE BEST PRACTICES (10 points each) POINTS 1 Beyond OSHA compliance: 100% ti e-off (tieoff applied to all workers on site at or a bove 6 feet above the walking level)? yes no 2 Twin-leg lanyards requiremen t for all applicable personal fall arrest system (PFAS) user s? (typical exceptions: PFASs with self-retracting lanyards and users in personnel lifts) yes no 3 Anchorage shown in proj ect-specific PFAS plans? yes no 4 Major fall protection manuf acturer label or ANSI-label requirement for all fall arrest equipment on-site? yes no 5 All custom-designed anchorag e and lifelines stamped and signed by a professional engineer (PE)? yes no Subtotal count of yes responses Multiply the yes count by 10 ( 10x ) Subtotal SUPPORTING PRACTICES (5 points each) POINTS 6 Does your company have a policy whereby a subcontract agreement could be terminated for noncompliance with fall protection and PFAS requirements? yes no 7 Does project safety plan require that a formal fall protection and PFAS compliance review be completed monthly? yes no Worker Involvement 8 Are workers suggestions about safety improvement encouraged through a reward or recognition program? yes no 9 Are workers empowered to stop any work deemed unsafe? yes no Training 10 Is safety orientation required for all workers and management on site? yes no 11 Do all superintendents recei ve a minimum of 4 hours of specialized training on PFASs? yes no 12 Do all PFAS users receive a minimum of 4 hours of specialized training on safe system use and equipment? yes no 13 Does all PFAS-user training include ANSI standards (Z359) for fall arrest equipment? yes no Engineering Coordination and Planning 14 Does comprehensive fall protection planning occur for all phases and tasks of the project? yes no 15 Does project safety plan re quire that all fall protection engineered systems and an chorages be identified? yes no Subtotal count for Supporting Practices Multiply the yes count by 5 ( 5x ) Subtotal Total Score (100 points maximum)

PAGE 123

123 Table 5-7. Fall protection and fall arrest system scorecard (companywide version) CORE BEST PRACTICES (10 points each) POINTS 1 Beyond OSHA compliance: 100% ti e-off (tieoff applied to all workers on site at or a bove 6 feet above the walking level)? yes no 2 Twin-leg lanyards requiremen t for all applicable personal fall arrest system (PFAS) user s? (typical exceptions: PFASs with self-retracting lanyards and users in personnel lifts) yes no 3 Anchorage shown in proj ect-specific PFAS plans? yes no 4 Major fall protection manuf acturer label or ANSI-label requirement for all fall arrest equipment on-site? yes no 5 All custom-designed anchorag e and lifelines stamped and signed by a professional engineer (PE)? yes no Subtotal count of yes responses Multiply the yes count by 10 ( 10x ) Subtotal SUPPORTING PRACTICES (5 points each) POINTS 6 Is the company owner (or chief executive) committed to a zero incidence rate (TRIR) for serious injuries? yes no 7 Does upper management participate in fall protection compliance reviews per project? yes no 8 Does constructability revi ew include fall protection and strategies to eliminate fa ll arrest systems through engineering and design opti ons (on every applicable project)? yes no 9 Are recommendations for permanent roof anchorages forwarded to the owner (on every applicable project)? yes no 10 Does the company maintain a design for safety database of safe design principles and design-for-safet y guidelines? yes no 11 Is safety for maintainability (including fall protection) coordinated with owners opera tions (on every applicable project)? yes no 12 Does your firm coordinate fall protection policies and practices with risk manageme nt officer (in-house or with firms insurance company)? yes no Worker and Staff Involvement 13 Has your company ever conducted an all inclusive, companywide survey of safety perceptions (must have included all employees)? yes no 14 Are workers suggestions about safety improvement encouraged through a reward or recognition program? yes no 15 Are workers empowered to stop any work deemed unsafe? yes no Subtotal count for Supporting Practices Multiply the yes count by 5 ( 5x ) Subtotal Total Score (100 points maximum)

PAGE 124

124 Table 5-8. Classification of popul ation based on annual revenue. Company Classification Total annual revenue1 Ranking Count A 1000 or more 141 41 B 500 to < 1000 42 87 46 C 300 to < 500 88 171 84 D 200 to < 300 172 260 89 E Less than 200 261 400 140 Total 400 1. Values are given in U.S. Dollars; one unit equals one million dollars. Table 5-9. Scorecard for Case Study 1 Core Best Practices Points 1 Beyond OSHA compliance: 100% tie-off 10 2 Twin-leg lanyards requirement for all applicable PFAS users 10 3 Anchorage shown in proj ect-specific PFAS plans 10 4 ANSI-label requirement for all fall arrest equipment on-site 10 5 All custom-designed anchorage and lif elines stamped and signed by a PE 10 Total 50 Table 5-10. Scorecard for Case Study 3 (based on their PFAS survey response) Core Best Practices Points 1 Beyond OSHA compliance: 100% tie-off 10 2 Twin-leg lanyards requirement for all applicable PFAS users 10 3 Anchorage shown in proj ect-specific PFAS plans 0 4 ANSI-label requirement for all fall arrest equipment on-site 10 5 All custom-designed anchorage and lif elines stamped and signed by a PE 10 Total 40

PAGE 125

125 Table 5-11. Scorecard (companywid e version) for Case Study 3 CORE BEST PRACTICES (10 points each) POINTS 1 Beyond OSHA compliance: 100% ti e-off (tieoff applied to all workers on site at or a bove 6 feet above the walking level)? 10 2 Twin-leg lanyards requiremen t for all applicable personal fall arrest system (PFAS) user s? (typical exceptions: PFASs with self-retracting lanyards and users in personnel lifts) 10 3 Anchorage shown in proj ect-specific PFAS plans? 10 4 Major fall protection manuf acturer label or ANSI-label requirement for all fall arrest equipment on-site? 10 5 All custom-designed anchorag e and lifelines stamped and signed by a professional engineer (PE)? 10 Subtotal 50 SUPPORTING PRACTICES (5 points each) POINTS 6 Is the company owner (or chief executive) committed to a zero incidence rate (TRIR) for serious injuries? 5 7 Does upper management participate in fall protection compliance reviews per project? 5 8 Does constructability revi ew include fall protection and strategies to eliminate fa ll arrest systems through engineering and design opti ons (on every applicable project)? 5 9 Are recommendations for permanent roof anchorages forwarded to the owner (on every applicable project)? 5 10 Does the company maintain a design for safety database of safe design principles and design-for-safet y guidelines? 0 11 Is safety for maintainability (including fall protection) coordinated with owners opera tions (on every applicable project)? 5 12 Does your firm coordinate fall protection policies and practices with risk manageme nt officer (in-house or with firms insurance company)? 5 Worker and Staff Involvement 13 Has your company ever conducted an all inclusive, companywide survey of safety perceptions (must have included all employees)? 0 14 Are workers suggestions about safety improvement encouraged through a reward or recognition program? 5 15 Are workers empowered to stop any work deemed unsafe? 5 Subtotal count for Supporting Practices 40 Total Score 90

PAGE 126

126 Table 5-12. Scorecard (project version) for Case Study 4 CORE BEST PRACTICES (10 points each) POINTS 1 Beyond OSHA compliance: 100% ti e-off (tieoff applied to all workers on site at or a bove 6 feet above the walking level)? 10 2 Twin-leg lanyards requiremen t for all applicable personal fall arrest system (PFAS) user s? (typical exceptions: PFASs with self-retracting lanyards and users in personnel lifts) 10 3 Anchorage shown in proj ect-specific PFAS plans? 10 4 Major fall protection manuf acturer label or ANSI-label requirement for all fall arrest equipment on-site? 10 5 All custom-designed anchorag e and lifelines stamped and signed by a professional engineer (PE)? 10 Subtotal 50 SUPPORTING PRACTICES (5 points each) POINTS 6 Does your company have a policy whereby a subcontract agreement could be terminated for noncompliance with fall protection and PFAS requirements? 5 7 Does project safety plan require that a formal fall protection and PFAS compliance review be completed monthly? 0 Worker Involvement 8 Are workers suggestions about safety improvement encouraged through a reward or recognition program? 5 9 Are workers empowered to stop any work deemed unsafe? 5 Training 10 Is safety orientation required for all workers and management on site? 5 11 Do all superintendents recei ve a minimum of 4 hours of specialized training on PFASs? 5 12 Do all PFAS users receive a minimum of 4 hours of specialized training on safe system use and equipment? 5 13 Does all PFAS-user training include ANSI standards (Z359) for fall arrest equipment? 0 Engineering Coordination and Planning 14 Does comprehensive fall protection planning occur for all phases and tasks of the project? 5 15 Does project safety plan re quire that all fall protection engineered systems and an chorages be identified? 5 Subtotal count for Supporting Practices 40 Total Score 90

PAGE 127

127 Table 5-13. Fall protection and PFAS scorecard (project version for construction manageroriented contractors) wi th revisions based on case study respondent comments. CORE BEST PRACTICES (10 points each) POINTS 1 Beyond OSHA compliance: 100% tie-off (tieoff applied to all workers on site at or above 6 feet above the walking level)? yes no 2 Twin-leg lanyards requirement for all applicable personal fall arrest system (PFAS) users? (typical exceptions: PFASs with selfretracting lanyards and users in personnel lifts) yes no 3 Does job hazard analysis and project safety plan identify all anchorage on the project? yes no 4 Major fall protection manufacturer label requirement for all fall arrest equipment on-site (with exception of engineered lifelines)? yes no 5 All custom-designed anchorage and lifelines stamped and signed by a professional engineer (PE)? yes no Subtotal count of yes responses Multiply the yes count by 10 ( 10x ) Subtotal SUPPORTING PRACTICES (5 points each) POINTS 6 Fall protection noncompliance: does your company have a threshold whereby retraining for entire subcontractor workcrews can be required for noncompliance with safety rules? yes no 7 Does the safety manager receive subcontractor documentation for worker training and conduct periodic audits to verify compliance with the project safety plan? yes no Worker Involvement 8 Are workers suggestions about safety improvement encouraged through a reward or recognition program? yes no 9 Are workers empowered to stop any work deemed unsafe? yes no Training 10 Is safety orientation required fo r all workers and management on site? yes no 11 Do all superintendents receive a minimum of 4 hours of specialized training on PFASs? yes no 12 Do all PFAS users receive a minimum of 4 hours of specialized training on safe system use and equipment? yes no 13 Is the safety director or manager required to review and implement the latest fall protection standards (ANSI Z359 or A10.32)? yes no Engineering Coordination and Planning 14 Does comprehensive fall protection planning occur for all phases and tasks of the project? yes no 15 Does project safety plan require that all fall protection engineered systems and anchorages be identified? yes no Subtotal count for Supporting Practices Multiply the yes count by 5 ( 5x ) Subtotal Total Score (100 points maximum)

PAGE 128

128 Table 5-14. Fall protection and PFAS scorecard (project version for traditional contractors with self-performance capability) with revi sions based on case study respondent comments. CORE BEST PRACTICES (10 points each) POINTS 1 Beyond OSHA compliance: 100% tie-off (tieoff applied to all workers on site at or above 6 feet above the walking level)? yes no 2 Twin-leg lanyards requirement for all applicable personal fall arrest system (PFAS) users? (typical exceptions: PFASs with selfretracting lanyards and users in personnel lifts) yes no 3 Does job hazard analysis and project safety plan identify all anchorage on the project? yes no 4 Major fall protection manufacturer label requirement for all fall arrest equipment on-site (with exception of engineered lifelines)? yes no 5 All custom-designed anchorage and lifelines stamped and signed by a professional engineer (PE)? yes no Subtotal count of yes responses Multiply the yes count by 10 ( 10x ) Subtotal SUPPORTING PRACTICES (5 points each) POINTS 6 Fall protection noncompliance: does your company have a threshold whereby retraining for entire subcontractor workcrews can be required for noncompliance with safety rules? yes no 7 Is safety program based on behavior-based safety management with safety-oriented foremen a nd superintendents and aggressive daily safety compliance inspections? yes no Worker Involvement 8 Are workers suggestions about safety improvement encouraged through a reward or recognition program? yes no 9 Are workers empowered to stop any work deemed unsafe? yes no Training 10 Is safety orientation required fo r all workers and management on site? yes no 11 Do all superintendents receive a minimum of 4 hours of specialized training on PFASs? yes no 12 Do all PFAS users receive a minimum of 4 hours of specialized training on safe system use and equipment? yes no 13 Is the safety director or manager required to review and implement the latest fall protection standards (ANSI Z359 or A10.32)? yes no Engineering Coordination and Planning 14 Does comprehensive fall protection planning occur for all phases and tasks of the project? yes no 15 Does project safety plan require that all fall protection engineered systems and anchorages be identified? yes no Subtotal count for Supporting Practices Multiply the yes count by 5 ( 5x ) Subtotal Total Score (100 points maximum)

PAGE 129

129 Table 5-15. Fall protection and PFA S scorecard (companywide versio n) with revisions based on case study respondent comments. CORE BEST PRACTICES (10 points each) POINTS 1 Beyond OSHA compliance: 100% tie-off (tieoff applied to all workers on site at or above 6 feet above the walking level)? yes no 2 Twin-leg lanyards requirement for all applicable personal fall arrest system (PFAS) users? (typical exceptions: PFASs with selfretracting lanyards and users in personnel lifts) yes no 3 Does job hazard analysis and project safety plan identify all anchorage on the project? yes no 4 Major fall protection manufacturer label requirement for all fall arrest equipment on-site (with exception of engineered lifelines)? yes no 5 All custom-designed anchorage and lifelines stamped and signed by a professional engineer (PE)? yes no Subtotal count of yes responses Multiply the yes count by 10 ( 10x ) Subtotal SUPPORTING PRACTICES (5 points each) POINTS 6 Is the company owner (or chief executive) committed to a zero incidence rate (TRIR) for serious injuries? yes no 7 Does the safety director have the aggressive and proactive support of upper management to implement a state-of-the-art safety program? yes no 8 Does constructability review incl ude fall protection and strategies to eliminate fall arrest systems through engineering and design options (on every applicable project)? yes no 9 Are recommendations for permanent roof anchorages forwarded to the owner (on every applicable project)? yes no 10 Does the company maintain a d esign for safety database of safe design principles and design-for-safety guidelines? yes no 11 Is safety for maintainability (including fall protection) coordinated with owners operations (on every applicable project)? yes no 12 Does your firm coordinate fall protection policies and practices with risk management officer (in-house or with firms insurance company)? yes no Worker and Staff Involvement 13 Has your company ever conducted an all inclusive, companywide survey of safety perceptions (must have included all employees)? yes no 14 Are workers suggestions about safety improvement encouraged through a reward or recognition program? yes no 15 Are workers empowered to stop any work deemed unsafe? yes no Subtotal count for Supporting Practices Multiply the yes count by 5 ( 5x ) Subtotal Total Score (100 points maximum)

PAGE 130

130 CHAPTER SIX RESULTS OF THE INTEGRATED DESI GN AND CONSTRUCTION SURVEY The designer-builders, defined in the methodology chapter as the firms that had attended the Design-Build Exposition, were investigated to explore the influence of designers on the construction process. The concept of intere st concerning the desi gner-builder population investigated was that when de signers and builders work under the same contractual agreement with the owner, the design tends to support desi gn-for-safety practices that are more conducive to construction safety improvements. Forty-three different companies were c ontacted. Appendix C presents a detailed explanation of companies included in the sample frame. Not all companies that participated in the Design-Build Exposition offer architectural or engineering services and therefore not all exposition participants were incl uded in the survey. The response rate for the integrated design and construction survey was 23% (n=11). Desi gn services offered by the respondents were provided within one of the following types of firms: Predominantly architecture services Predominantly engineering services Combined architecture and engineering services Fully-integrated design and construction services (defined as companies with selfperformance capabilities in ei ther design or construction). The data set included descriptive information defining the type and quantity of projects completed by the individual designer (the responden t) and at the company-wide level. Over 60% of the respondents were employed by firms wher e the annual design-build contracts equaled or exceeded eighty percent. Having design-build projects for eighty percent or more of all their contracts should be noted as being definitive of leaders in the design -build industry. It could be assumed that leading companies of design-build practices would be mo re proactive in implem enting design-for-safety

PAGE 131

131 practices into their typical project s; however, the findings of this investigation are limited due to the small sample size. Caution should be exerci sed in attempting to draw inferences about the overall designer-builder population. The balance of the data collected were nomin al (yes or no) answers to questions about design-for-safety engineering practices. Thirty percent of the nominal practice and policy questions referred to fall protection or fall arrest system issues that were directly related to the research hypothesis. In addition to fall protection and fall arrest sy stems, data were collected in the following categories: OSHA regulations and compliance Hazard analysis and control documentation by the engineering team Lessons-learned databases and continuous improvement Safety-for-maintainability desi gn review and quality assurance Use of safer design principles to eliminate hazards from the project by means of design. In order to understand the response freque ncies of the nominal practice and policy questions in relation to each othe r, a table was prepared to pres ent an overview of the sample (Table 6-1). Nine of the respondents indicated that training in the OSHA regulations, fall protection, and other aspects of construction safe ty had been implemented at their companies. Training and instruction in how to use safety principles and engineering means to eliminate construction safety job site hazards was noted as being an implemented practice by seven of eleven respondents. Three of eleven respondents (27%) indicated that th ey regularly specified roof anchorage. Seven of the respondents use dedicated sheets or notes in the construction documents to highlight construction safety conc erns. The implementation and usage of databases of design-for-safety guidelines that improve sa fety conditions for construction workers were indicated as an implemented prac tice by six of the respondents.

PAGE 132

132 Table 6-1. Response frequencies for designer-builders. Counts Question yes no n/a (1) Training on the OSHA regulations? 9 2 0 (2) Training on fall protection anchorage? 9 2 0 (3) Instruction in how to use engineering to eliminate construction hazards? 7 4 0 (4) If yes, does this instruction cover fall protection and the elimination of the need for fall arrest systems? 5 2 4 (5) Dedicated sheets in the construction drawings to highlight safety hazards? 7 4 0 (6) Database of design-for-safety guidelines? 6 5 0 (7) If yes, do these guidelines cover safety for construction workers? 6 0 5 (8) Do designers at your firm specify roof anchorages? 3 8 0 (9) Safety-for-maintainability review for every applicable project? 4 7 0 (10) Do company designers make job-site visits to observe safety performance? 6 5 0 1. Numbers assigned to the questions in this table do not reflect numbers assigned in Appendix B documentation of the actual survey and survey questions.

PAGE 133

133 CHAPTER SEVEN CONCLUSIONS This study investigated a sele ct set of personal fall arre st system (PFAS) safety management policies and practices that constituted th e best safety practices in the fall protection area of construction safety. In order to validate the best practices, the st udy sought to determine whether or not a typical ENR T op 400 contractors TRIR was dependent on the successful implementation of the best practices for PFASs Important topics for fall protection safety management and the safe use of fall arrest sy stems included OSHA compliance policies (within an individual contracting compa ny), PFAS-user training, and engi neering coordination. It was concluded that a select set of best practices for fall protection and PFAS management does exist and that the contractors TRIR (and improved safety performance) depends on the successful implementation of this same set of fa ll arrest system policies and practices. Basic Fall Safety Compliance and Subcontractor Management The findings show that the contractors with better safety record s had adopted company policies that exceed OSHA regulations for fall prot ection. The most proactive contractors in the study had adopted the policy of re quiring the use of PFASs (when other fall protection measures are not applicable) for all trades and workers working at an elevati on of 6 feet or more above the walking surface, often referred to in the industr y as % tie-off. Th e findings demonstrated that this policy was a frequen tly used and effective management technique for eliminating the exceptional clauses and loopholes for the various trades that can w eaken the intent of Subpart M of the OSHA Construction regulations. From th e standpoint of complian ce facilitation and field operations, the 100% tie-off policy has a simp licity and elegance to it that makes it a fundamental building block to controlling unsaf e worker behavior and creating an effective safety culture for a given project.

PAGE 134

134 The results show that although many contract ors require subcontractors to submit fall protection plans that are projec t specific, almost one-fifth of these plans do not address anchorage locations for projects when applicab le. Requiring subcontractor s to address anchorage in the preconstruction and task coordination cont ext (whether included in subcontract agreement or not) is a corollary to an eff ective 100% tie-off policy. When safe anchorage is unavailable or rendered ineffective by work flow conflicts, fo r example, removing horiz ontal lifelines (HLL) located at the perimeter of a fl oor plate to allow the movement of large building components, 100% tie-off is vulnerable to unsafe behavior pres sures, for example, no HLL is available for tieoff. The requirement for project-specific fall protec tion plans that specify anchorage locations allows the project manager to more easily exam ine potential task coor dination conflicts in critical areas such as the inst allation of the exterior claddi ng or wall system. For example, potential coordination conflicts fr equently exist for mid-rise a nd high-rise condominium projects where large windows and patio doors must be inst alled at the floor plate perimeter. Since the large windows and patio doors span from floor to ceiling, fall arrest systems, specifically HLLs, may need to be removed during the instal lation of exterior glazing components. Design and Construction Integration In order to investigate global and project-wide factors that co uld be used to give the fall protection safety culture the most robust and aggre ssive features possible, the influence of 1) the project owner(s) and 2) the project design team were investigated. Because of the observed improvement in overall project coordination and othe r benefits such as the elimination of change orders, design-build contracts ar e continuing to be used to a gr eater extent in the construction industry. In this research, the m ean total percentage of designbuild contract agreements with owners equaled almost one-third of all constr uction contracts. Although data were not sought on

PAGE 135

135 specific explanations for the frequency of de sign-build project delivery, the overall project enhancement of coordination issues between ow ner, designer and constructor, including improved safety culture, are well-known in the industry. Although no significance was found in any of the statistical tests performed for owner and designer effects on fall protecti on and fall arrest system safety practices, this study identified important items associated with fall protection a nd PFASs that can be controlled for when the constructor has an aggressive a nd proactive role in th e design phase, such as is the case when design-build and engineer-procu re-construct (EPC) project delivery methods are used. Those important items include: The consideration for the placement of anchorages as permanent fixtures for the project when applicable The coordination of rooftop equipment requir ing regular maintenance and the provisions for fall protection, such as guardrail system s, single-point anchorages, and horizontal lifeline systems The elimination of fall exposure hazards by means of design-for-safety design and engineering strategies that consider wholesale revisions to the erection and cladding concepts. Although fall protection and fall arrest system performance f actors that are governed by the design team cannot be controlled by the contract or (excepting the design-build and EPC project delivery options), contractors can continue to promote greater involvement in fall protection by design professionals through thei r project coordination phase co mmunications and suggestions for safer structures. The high fre quency (over seventy percent on t ypical projects) of suggestions shared with the design team indicates that cont ractors remain optimistic and assertive when it comes to promoting a better understanding of fa ll protection requirements with designers. Fall Arrest Equipment and Engineered Components This study did not include a comprehensive description of fall protection equipment although the products and services of the major fall protection manufactur ers (as defined by the

PAGE 136

136 list in Appendix A) were an important source of information for this study. Simply based on the fundamental nature of and volume of goods and services associated with the fall protection equipment, the manufacturers clearly have a ma jor influence on fall protection and construction safety. The results for the role served by the fall protection equipment and services showed: The respondents preference for utilizing the services and expertis e of the engineeredsystems consulting groups operating within the manuf acturing companies The high frequency (82%) of th e respondents that utilizes the specialized training seminars offered by the fall protection manufacturers The important role (statistically significant) played by the safety policy requiring 100% ANSI label or manufacturer label on all fall arrest equipment on-site. These results showed that th e contractor population strongly depends on the fall protection manufacturers for: Their expertise and assistance The research and development behind the publ ished inspection and maintenance protocols The availability of technical and educational support. The support given to the contractor populati on through the specialty engineering consulting services and the training seminars (responsible for educating the competent person(s) as defined in the ANSI Z359 standa rd) clearly ties the contractor s utilizing personal fall arrest systems to the major fall protection manufactur ers. The degree of this interrelationship and dependency indicates that strong mu tual objectives exist between contractors proactive in safety and the fall protection manufacturers. The results showed that of the safety policies tested on an individual basis for their association with the TRIR, the safety policy requiring 100% ANSI la bel or manufacturer label on all fall arrest equipment on-site had a statistica lly significant correlation with the TRIR, i.e., this policy was associated with lower injury rates. Th is result was cited above for its role in the overall character of the relationship between the major fall protection manufacturers and the

PAGE 137

137 large contractor (ENR Top 400) respondents. Another important as pect of this result was its implications for: Safety facilitation, supervision and enforcement Formal equipment inspection in the field Worker training for equipment and hardware knowledge. Taken together, these three issues were charac terized as the critical components of field operations and fall arrest system use. The impor tance of maintaining a trained workforce of PFAS users and middle managers that recognize and understand fall arrest equipment in the context of the industry standards (as adopted by the ANSI Z359 committee) was concluded to be a fundamental feature of a best practices safety program. Furthermore, it is imperative that the construction industrys goals for PFAS-competency recognize the techni cal nature of PFAS equipment and the manufacturing and testing sta ndards that assure the equipments performance integrity. The recognition and comprehension of i ndustry-standard marks (o r identification tags and labels) for assuring the quality of PFAS equipm ent (that is, the system integrity represented by the presence of an ANSI or major fall protecti on manufacturer label) s hould be considered a component of baseline PFAS training for all users and supervisors. Workforce competency is also strongly influe nced by the expectations from the companys upper management. Upper managements expectation that PFASs will be used with integrity on all company projects is of paramount importan ce. Corporate-level management support for highquality training and high-quality equipment pr ocurement is an integral component of the company policy and culture for the safe use of fall arrest systems. In summary, as a baseline of a best practice-PFAS safety program and safety cu lture, a contractor must train middle managers (superintendents and safety managers) to recognize and facilitate quality a ssurance for fall arrest equipment. The better safety programs will add to this baseline objective, the aggressive and

PAGE 138

138 proactive safety training features and content th at will promulgate this same equipment quality assurance behavior and competency in all PFA S users (direct-hire employees and workers managed through subcontract) on a given project. Associations between Better Safety Record s and Fall Arrest System Best Practices The significance of the test for independen ce (from which the null hypothesis was rejected and the research hypothesis was validated) shows th at an influential and important set of best practices in PFASs does exist. A reasonable extension of the re search hypothesis is that a distinctive subcomponent of an overall safety cu lture, a component that is specific to fall protection and fall arrest system sa fety, does exist and can be defined as the best practices in fall arrest system safety. These best practices were used as the basis fo r an evaluation criteri on (the scorecard). The scope of best practices associated with lower TRIRs is well balanced across the spectrum of project safety management categories. When im plemented as a scorecard for project evaluation, these five practices represent a balanced and dur able range of evaluation criteria across the full range of PFAS management issues for a typical project. Definition of Better Safety Records The results of the revised procedure where the outliers were excluded from the test procedure showed that a reli able definition for the term, better safety record could be ascertained. Using the median plot shown in Figure 5.19, contr actors who had implemented at least 4 out of the 5 best practices had a mean TRIR value below 2.0 recordable injuries per 200,000 worker hours. A contractor with an injury incidence rate (TRIR) below 2.0 was thereby shown to be a reasonable definition for the statement (from the studys hypothesis), contractors in the population with the better safety records.

PAGE 139

139 Conclusions about the Scorecard Because the best practices for PFAS were vali dated, the concept of developing a process to implement, evaluate and continuously improve the best practices is viable. Rather than making safety performance evaluations based on TRIR (a lagging indicator), a scorecard is a means of implementing a leading indicator method of safe ty improvement and evaluation. At the company level, the scorecard can be used as an assessmen t tool for evaluating fall protection practices and overall company safety culture issues that need strengthening and modi fication. At the project level, the policies and practices contained in th e scorecard can be used to shape and guide the project safety plan including preconstruction m eetings with subcontract ors and project training needs. The respondents to the case study comment and review process engaged in a collaborative process with the researcher whereby questions and clarifications resulted in generating important revisions to the scorecards. One of the res pondents commented on how the scorecard would be implemented and integrated into a constr uction companys operations. Specifically, the respondent asked what action might be suggested by the researcher if any of the scorecard items generated a no answer. This question (what procedure is suggested for addressing a not applicable answer?) can best be interpreted by the safety manager or company using the scorecard. Does the company agree that a yes answer would likely generate improvements in fall protection safety performance for their pr ojects? Safety managers and upper management should consider that the items in the scorecard are validated by the following methods applied during this study: The literature review which pr esents best practice recomm endations from other safety experts and research The data collection and hypothesis testing The critical review process pr esented in the case studies.

PAGE 140

140 Companies can use the scorecards as presente d in this study or as materials to be incorporated into other scorecards that can be created to address the specific needs of an individual companys operations or projects. Companies within this studys sample of large construction contractors represent a wide diversity of constructi on operations and safety needs. Different scorecards for fall protection can be created that address variations in Emphasis within fall protection safe ty for different construction tasks The detail level of fall protection equipment included and evaluated by the scoring criteria The detail level of safety beha viors monitored by the scorecard. Safety checklists and scorecard s are widely used in the co nstruction industry to monitor and evaluate safety issues and performance. In order to effectively serve as continuous improvement tools, these scorec ards must be reviewed and re vised on a periodic basis with regard to changes in the best practices and current events in construction safety. Conclusions about the Designer-Builders The concept of interest concerning the desi gner-builder population i nvestigated in this study was that when designers (e ngineers and architects) and bu ilders are in more frequent communication with each other (as is facili tated by a design-build contract), enhanced construction safety practices will be a measurable outcome. Although the designer-builder i nvestigation did have limitations with regard to making inferences about the true populat ion due to the small number of respondents, the process of conducting the integrated design and construction survey yielded some interesting information and a template for future research projects. Th e ten nominal practice and policy questions in the survey do serve to define a working list of pr ogressive practices for fall protection and PFAS safety in the context of de sign-build and EPC projects. Although unconfirmed by any direct communicati ons, this researcher concluded from the prevailing climate of legal liability for profe ssional engineering consultants that designers

PAGE 141

141 (engineers and architects) are reluctant to prov ide information about any of their consulting activities that could increase their exposure to lega l liabilities. Construction safety-related topics are commonly perceived by architec ts and engineers to have a st rong tendency to increase their exposure to legal liabilities, whet her justified or not. These liab ility concerns of designers are based on the legal precedents (Geer v. Bennett 1970) and customary project management practices that result in a formal separati on between the designe rs specifications (and recommended engineering measures contained with in those specifications) and the constructors responsibility for engineering measures that c oncern the means and methods of construction. Design-build contracts and employment by co mpanies organized on a design-build model (fully-integrated design and constr uction services) do ease the liabili ty concerns of designers to some extent. However, based on the data collect ion phase of this research, the researcher concluded that the quantity of companies organized on a true design-build model (defined as companies offering fully-integrated design a nd construction services and possessing selfperformance capabilities in both design and cons truction) was a small percentage (that is, approximately ten percent) of the overall numbe r of companies participating in design-build contracts.

PAGE 142

142 CHAPTER EIGHT RECOMMENDATIONS This study has focused on fall protection safety as a subcomponent of a safety plan. Although an important core group of best prac tices was identified, contractors and other employers interested in appl ying the findings and conclusi ons must recognize that the effectiveness of these best practices in PFASs is dependent on their effective integration into an extensive, fully-developed, and proactive safe ty culture. The long range success of safety programs and a companywide safety culture will be positively affected by the integration of these best practices into a contractors safety management plan and it is strongly recommended that every employer in the construction industry consider the immediate implementation of these best practices in PFASs. Further, the best practices in fall a rrest systems identified will be effectively implemented when integrated across all operations and on multiple projects within an individual company. Recommendations for Regulatory Revisions Building code revision to protect maintenanc e workers against significant fall hazard exposures. The discontinuity of the major health and sa fety codes that apply to structures at various points in the lifecycl e of the building are deemed to be responsible for avoidable conflicts and waste in the indus try. The lifecycle of the building is defined as any activities occurring in a temporal sequence during Erection and construction process Conventional use by the end-user occupants The operational maintenance. For example, the facility owners maintenance op erations frequently i nvolve access to rooftop equipment. The major building codes do not ty pically address the health and safety of maintenance workers. Studies have shown that when workers do not have access to anchorage,

PAGE 143

143 particularly in roof areas, sa fe behavior and correct use of PFASs are compromised (Hinze and Harris 2007a). The major building codes, by not cross-refere ncing the OSHA regulations, create conflicts and inefficiencies between designers and constr uctors that are wastef ul and can unnecessarily endanger maintenance workers. The expense and burden of resolving thes e conflicts often is assumed by the owner, who is place d in the position of retrofitting a new building to bring it into compliance with OSHA standards af ter the project is delivered. Revising and amending the major building codes is a complex process. Initial discussion and debate should consider th e opportunities and obstacles to including permanent roof anchorage in the major building codes. This permanent roof anchorage requirement for applicable building permits would target th e protection of maintenance workers. The energy expended by owners, constructors and designers to address and manage this type of discontinuity in the regulations is wasteful and unnecessary. The consideration of permanent roof anchorage in every applicable project should be addressed at the building permitting stage by the major building codes. Improve fall protection and anchorage re quirements in Subparts L and X of the OSHA regulations Many opportunities to improve the fiel d operations of contractors exist in the elimination of fall risks arisi ng during the use of 1) scaffoldi ng, whether stationary or mobile, and 2) ladders. Because scaffolding (Subpart L) and ladders (Subpart X) ar e regulated outside of the main fall protection section (S ubpart M), discrepancies pertaini ng to fall protection and safe fall arrest system use are detectab le, particularly in regard to anchorage requirements. The same conclusion could be applied to Subpart R, but fo r the majority of cases, contractors with robust and aggressive safety plans recognize that the re duction of risk for steel erection and ironworkers

PAGE 144

144 is controlled by specialized trai ning. Steel erectors and ironworke rs should receive the highest level of training possible, in terms of traini ng hours required and specia lized content offered during that training. Recommendations for Changes in Practice The scorecard is recommended for use in eval uating the status of fall protection and PFAS usage and management for the constructi on industry. The scorecard provides proactive companies interested in safety with a means to quickly assess the status of fall protection and PFAS practices and policies. The immediate concer ns of safety performance on current projects can be addressed by the project version of the scorecard. When a company commits to using the scorecard on applicable company pr ojects, earlier recorded scores from the scorecard can be used to assess safety improvement over a period of ti me. The scorecard can also be considered for project implementation at major milestones as follows: Preconstruction planning with owners Preconstruction meetings with subcontractors Pretask planning Risk management reviews Major training milestones Post-project review and assessment. For example, major project training milestones o ccur when large numbers of subcontractors and workers commence working on a project. The p eak in the total number of PFAS users on a project site might warrant evaluation by the scorecard. When traini ng is outsourced, the scorecard could be used as a checklist by fall protection instructors to assure that the best practices in PFASs are addressed. Large contractors concerned about the influences on fall protection performance and company safety culture from Upper management attitudes

PAGE 145

145 Staff attitudes Contracts and project delivery methods The owner effects on fall protection and PFASs (also described as strategic planning) The designer effects on fall protection and PFASs. can consider using the companyw ide version of the scorecard. Ma king significant inroads into the companywide safety culture and strategic planning issues influenc ing fall protection and PFAS usage is an ambitious agenda. The inten tion of creating a companywide version of the scorecard was that the effects the home office operations and departments, for example, the preconstruction department, would be considered for their impact on fall protection in the field. Another aspect of the companyw ide evaluation criteria is the behavior and practices of upper management, also a department or group of individua ls that spend a signifi cant amount of time in the home office. The companywide version of th e scorecard should be used as an annual management audit tool, or integrated into existing periodic safety program reporting and evaluation systems. A process of continuous improvement that inte grates the scorecard a nd its best practices into the safety program and culture of a compa ny is highly recommended. When the scorecard is placed in this context, new polic ies and practices not included in the scorecard presented in this study can be added to future scorecard versions. When a no answer is given to an item in the scorecard, management should consider Revising company practices and policy to refl ect the recommended best practices from the scorecard Establishing a collaborative improvement pro cess including the part icipation of upper and middle managers, safety managers, fall prot ection equipment vendors, fall prevention training consultants and PFAS users to review and implement fall protection improvements.

PAGE 146

146 In summary, the three versions of the scorec ard are recommended to be used together to achieve maximum benefit to a company; one scorecar d applied to all applicable projects, and the other applied to the home office. Recommendations for Changes in Engineering Coordination Closer coordination between the ENR To p 400 population and the fall protection manufacturers Based on their interaction and custome r-supplier relationship, the leaders of the ENR Top 400 population and the major fall protecti on manufacturers should be more obligated and committed to working together. In the United States, the existence of two separate committees charged with fall arrest system st andards for general industry (ANSI Z359) and construction (ANSI A10.32) appears to be wasteful and imprudent. The OSHA regulations for general industr y (Standard 1910) do not contain a fall protection standard. The fall pr otection standards for general industry and the construction industry reside in one location, Subpart M of the OSHA Construc tion Standards. The development and standards committees of the American National Standards Institute should logically follow this same structure. Recommendations for Future Research Certain issues in future improvements in fall protection and PFASs that have been identified in the process of conducting this resear ch require additional investigation. Some of the proposed topics for future research may have al ready been initiated in the construction industry by large contracting companies and fall protection manufacturers and should receive additional exploration in the context of peer-reviewed research. Research recommendation 1 : Twin-leg lanyards were show n to be a type of equipment that is frequently selected due to its benefits in improving safety perf ormance and 100% tie-off

PAGE 147

147 compliance. A study that investigates unidentified unsafe behaviors should be a high priority for the industry leaders, safety pr ofessionals and researchers. Research recommendation 2 : Investigation of the role of engineering and design for their potential for eliminating and reduc ing risks in fall protection a nd fall arrest systems through the application of design-for-safety prin ciples should be a priority for future research. This would be an excellent topic for exploration in the context of 4D visualizati on and engineering. This is also an excellent interdisciplinary research opport unity between architect ural engineering and construction management researchers and academics. Research recommendation 3: An investigation focused on the assessment of PFAS-user competency would be an important study for better understanding work er participation and conceptual understanding of th e technical aspects of PFASs. Th e technical nature of PFAS equipment presents safety managers with the ch allenge of training worker s to participate in a technically complex safety system. One of the differences between the ANSI Z359 and A10.32 fall protection standards concerns the requirements (and definiti ons) for PFAS user competency that can be ascertained from comparing the trai ning sections in each standard. This research could address the following questions: Who is competent and qualified to evaluate and monitor the safe usage and protocols for anchorage? Is the current competent person approach (t ypically a foreperson) to safe anchorage compliance effective in minimizing unsafe behavior associated with anchorage? How well do PFAS users understand fall arrest equipment quality assu rance and inspection protocols in general? How well do PFAS user s recognize and understand the importance of the major fall protection manufacturer or ANS I-compliant labels for quality assurance? These questions are asked because they relate to assessing the extent that PFAS users can participate in the equipment inspection process.

PAGE 148

148 Research recommendation 4 : Additional studies designed to confirm the validity of the following statement would be important for supp orting the growing body of literature that has investigated the construction safety benefits of design-build contracts. The overall project enhancemen t of design-build agreements between the owner, designer and constructor, includes significant improvement s in the safety culture for a given project. Research recommendation 5 : An exploratory study that i nvestigated the engineering and design implications of implementing a fall protec tion-oriented revisions to the major building codes (one that addressed the protection of ma intenance workers worki ng in hazardous roof areas) would be an important study in support of the regulatory ch anges proposed earlier in this chapter. The following issues could be considered in the study: Design standards (typical details and specifi cations) that would be required for the construction documentation of permanent roof anchorage Risk management strategies and policies that would be accepta ble to owners, design consultants and companies with direct liability for and control over workers. An important population for this investigation is the specialty engineering consultants that possess specialized knowledge abou t anchorage and fall arrest sy stem design. These engineering firms provide engineering services to general an d construction industry cl ients with regard to custom-designed anchorage and fall arrest system components such as horizontal lifelines and certified anchorages (anchorages with lower test load levels that are allowed when accompanied by the stamp and signature of a lic ensed engineer). Because of thei r active consulting practices in the fall protection area, these engineers possess valuable experience with appropriate risk management practices that addre ss liability issues for designers. Future research about the desi gner-builder (or other designer -related) population would be well-advised to carefully consider a data colle ction methodology which a ddresses the designers reluctance to provide data for research purposes. As was noted earlier, avoiding liability for

PAGE 149

149 damages and injuries associated with constr uction safety is an act ive category of risk management for architects and engineers. Future research could be most effective if care and consideration were devoted to a research design that accounts fo r the predominant attitude of designers with regard to construction safety. Final Remarks The management of PFASs includes many compone nts that could potentially be permanent engineered features of a structure, such as r oof top anchorages and hor izontal lifelines. These components are influenced by the project pla nning and procurement areas of a construction project. The primary legal obligations for the sa fety of employees reside with the employees direct employers, who must provide overall management and safety leadership to control risks associated with PFASs and their usage on cons truction projects. However, employers, project owners, and members of the engin eering community need to work together to assure that fall protection and PFAS usage receive careful attention in the conste llation of construction safety issues. Roof environments in particular pose high risks for all construction and maintenance workers and should be a special focus of all di scussions regarding safety culture and project safety improvements.

PAGE 150

150 APPENDIX A FALL ARREST EQUIPMENT MANUFACTURERS Table A-1. Website addresses for major U.S. fall arrest equipment manufacturers Company Website Buckingham Manufacturing http://www.buckinghammfg.com/linemen/ The Crosby Group, Inc. http://www.thecrosbygroup.com/ DBI/SALA http://www.dbisala.com/us/ Guardian http://www.guardianfall.com/ Miller Fall Protection http://www.millerfallprot ection.com/miller/index.html MSA Safety http://www.msanorthameric a.com/catalog/catalog506.html Reliance Industries http://www.relsafe.com/ Summit Anchor Company http://www.summitanchor.com/index.html

PAGE 151

151 APPENDIX B SURVEY FORMS Preliminary Survey Section I: General (1)Please estimate what percent of your firm s projects are design/build contracts: ________% (2)Does your firm have a worker tie-off and pe rsonal fall arrest systems (PFASs) rule for all workers on-site, including all subcontractors? yes no (3)If yes, please describe: ____________________________________________________ (4)As a general contractor, does your firm typical ly monitor the PFAS usage of subcontractors? yes no (5)How many field workers does your firm typically employ? __________ (6)Of those workers, how many are trained in the use of PFASs (per OSHA Construction Regulations, Subpart M)? _________ (7)Please estimate what percent of your firms superintendents receive specialized training in PFASs? ________% (8)Are your project managers requi red to develop fall protection pl ans on projects that use fall arrest systems? yes no (9)If yes, do these plans include or incorpor ate work performed by subcontractors using fall arrest systems? yes no Section II: Subcontractor Management (skip this section if no work is subcontracted) (10)Is subcontractor compliance with the OSHA regulations mandate d in your firms subcontract agreements? yes no (11)Are your subcontractors that use PFAS contractually requir ed to assign a foreman (who meets the OSHA definition of a competent pe rson) to each work crew using PFASs? yes no (12)Are your subcontractors that use PFAS contractually requir ed to keep documentation of training provided to workers (per OSHA Construction Regula tions, Subpart M)? yes no (13)Are your subcontractors that us e PFAS contractually required to provide project specific fall protection plans? yes no (14)If yes, do thes e plans specify the location of anchorage connection points or lifelines to be used? yes no (15)Has your firm ever exercised its right to intervene or suspe nd the work of a subcontractor due to poor safety practices? yes no (16)If yes, in the last th ree years how many such inst ances have occurred? __________ (17)If yes, how many of these inst ances were related to PFASs? ______________

PAGE 152

152 (18)Does your firm have specific safety requirem ents that subcontractors must comply with that are more stringent than the OSHA regulations? yes no (19)If yes, do any of these safety requirements relate to PFASs? yes no (20)Please describe any PFAS requi rements implemented by your firm? __________________________________________________________________________ Section III: PFAS Hardware (21)Has your firm ever enlisted the services of an engineer to design components of a PFAS? yes no If yes, was this engineer employed by: ( Check the best description ) (22) Manufacturer of PFAS hardware and equipment (24) PFAS consulting engineering firm (23) In-house engineering department (25) Other type of consulting engineer Do you have any policies or practices to reduce risks from any of following hardware problems ( Check all that apply ): (26) High impact sideloading of carabineer/snaphook gates (29) Safe anchorage availability (or lack of the same) (27) Usage of connectors or lanyards with damaged webbing (30) Unsafe usage of small diameter wire ropes (28) Usage of inadequately engineered rigging or anchor connectors (31) How often are equipment inspections performed? _________________________ (32) What percentage of these inspections are performed by a safety coordinator? ________% Section IV: Project Ma nagement and PFASs (33) During preconstruction, has your firm made suggestions to the owner on ways to improve safety conditions for the construction worker? yes no (34) If yes, were any of these suggestions in tended to reduce worker exposure to falls? yes no (35)If yes, please comment: ____________________________________________________ (36) Are job hazard analyses conducte d for each project that is built? yes no (37) If yes, are suggestions for improvements in fall protection ever communicated to the design team (architect or engineer)? yes no (38) If yes, please comment: ___________________________________________________________________________ ___________________________________________________________________________

PAGE 153

153 (39) Did these fall protection concerns and communications include raising a buildings permanent roof parapet up to a safety guardrail height (per OSHA Construction Regulations, Subpart M)? Never Once A few times Frequently Every applicable project (40) Have you had a project where permanen t PFAS roof anchorage was designed for the project? yes no If yes, which of the following anchorage types were specified: (41) Window washing davits (43) Parapet anchors (42) Bollard-type anchors (44) Other: __________________________ (45)Were any other types of permanent PFAS anchorages designed into the project? yes no (46)Does your firm typically prepare a pr oject specific emergency preparedness plan? yes no (47)Does your firm have specific provisions for the rescue of workers who have fallen? yes no Section V: Training Please estimate by percentage the source of worker training for PFAS usage: Union Other classes On the job Total Source of Training (48) (49) (50) 100% (51) Does your firm conduct in -house safety training sessions? yes no (52) If yes to what extent is the promotion of positive safety attitudes incorporated into your firms safety training programs? low medium high (52) Does your firm offer safe ty recognition rewards (monetary or material prizes) to promote safe behavior or attitudes for PFAS-certified workers? yes no (53) Does your firm have required content of competent person training? yes no (54) Does your firm train new competent persons in house? yes no (55) Does your firm utilize the training seminars offered by the major manufacturers of fall protection hardware? yes no (56) To what extent do you rely on existing comp etent persons to mentor the trainees and to manage the training process? low medium high (57)Does your firm conduct field obs ervations of PFAS worker behavior? yes no (58)Does your insurance provider conduct loss control audits that evaluate PFAS use? yes no (59)Does your firm engage in any measurement of worker attitudes toward PFAS safety? yes no

PAGE 154

154 (60) If yes, what is the most important safety attitude(s) for workers using PFASs? (Please comment) _______________ (61) Does your firm have a policy for specific fall protection or PFAS safety violations that will result in disciplinary action? yes no (62) If yes, please specify? ___________________ (63) Does your firm have a policy for specific fall protection or PFAS safety violations that will result in required retraining? yes no (64) If yes, please specify? __________________________________________________ Optional A Summary of this research study will be prepar ed. If you would like to receive a copy of a summary report as soon as it is available, you ma y include your name and address below and one will be provided to you. Note that your firms iden tity will not be used in any way other than to transmit a report to you. Thank you for your participation in this research study. Name: ___________________________________________________ Firm: ____________________________________________________ Street Address: ____________________________________________ City: __________________________ State: _____ Zip: ____________

PAGE 155

155 Fall Protection and Fall Arrest Systems Survey (1)Does your firm have a worker tie-off and pe rsonal fall arrest systems (PFASs) policy that goes beyond OSHA-compliance? yes no If yes, to which trades does the tie-off at six feet above the walking surface rule apply? ( please select all applicable categories) (2) Steel erectors and ironworkers (3) Scaffold erectors (4) All trades without exceptions (5) Does your firm have a policy that requires all workers using a rrest systems to exclusively use twin-leg lanyards? yes no (6) Is subcontractor compliance with the OSHA regulations mandate d in your firms subcontract agreements? yes no (7) Are your subcontractors that use PFASs cont ractually required to assign a foreman (who meets the OSHA definition of a competent person) to each work crew using PFASs? yes no (8) Are your subcontractors that use fall arrest systems cont ractually required to provide project specific fall protection plans? yes no (9) If yes, do these plans specify the location of anchorage connection points or lifelines to be used? yes no (10) What was your firms recordable injury rate for 2006 (or other r ecent recording period)? _________ (11) Does your firm engage in any measurem ent of worker attitude s toward PFAS safety? yes no TRAINING (12) What percent of your firms superintende nts receive specialized PFAS training? _______% (13) How many hours of specialized fall ar rest systems training do they receive? _____ hours (14) Does this training include a competency test? yes no

PAGE 156

156 (15) On large projects (contracts over $50 million), does your firm require safety orientation training for all worker s starting on the project? yes no (16) If yes, does this training in clude fall arrest tie-off rules and enforcement policies? yes no (17) On small projects (contracts under $10 million), does your firm require safety orientation training for all worker s starting on the project? yes no (18) If yes, does this training in clude fall arrest tie-off rules and enforcement policies? yes no PRECONSTRUCTION (19) Has your firm made suggestions to the ow ner about using design for safety to lessen the extent of fall protection and arrest system usage? yes no (20) Please estimate what percent of your firm s projects are design/ build contracts: ________% What types of relationships to design ers exist on projects at your firm? ( please select all applicable categories) (21) In-house design department (22) Design-build alliance (independent A/E firm working under D-B contract) (23) A/E consultants under se parate contract with owner (Please fill out applicable sections below) In-house design departments and design-build alliances (24) Does your firm provide any specific instru ction to designers in how to use engineering to eliminate the need for fall arrest from projects? yes no (25) Does your firm provide any construction sa fety instruction to designers, for example, a 10-hour OSHA training course? yes no (26) Do your designers particip ate in planning and drawings for fall protection and arrest system pre-task planning? yes no A/E consultants under separate contract with owner: (27) Are suggestions for improvements in fall protection ever communicated to the design team (architect or engineer)? yes no

PAGE 157

157 (28) Has your firm participated in an y team partnering or integrated project delivery mandates at the request of the owner? yes no (29) If yes, was safety for constr uction workers a topic for coordination with the design team (architect or engineer)? yes no (30) If yes, was fall arrest anc horage a topic for coordination? yes no (31) Did these fall protection communications include raising a build ings permanent roof parapet up to a safety guardrail height (per OSHA Regulations 1926, Subpart M)? Never Once A few times Frequently Every applicable project FALL ARREST HARDWARE (32) Does your firm have a policy that requires 100-percent ANSI label or manufacturer label on all fall arrest equipment on-site? yes no (33) Except for widely recognized standards, such as wire rope splices with U-bolts, does your firm have a policy that requires all custom -designed arrest components on-site to be engineered (signed and sealed by a PE)? yes no Do you have any policies or practices to reduce risks from any of following hardware problems (Check all that apply): (34) High impact sideloading of carabineer/snaphook gates (37) Safe anchorage availability (or lack of the same) (35) Usage of connectors or lanyards with damaged webbing (38) Unsafe usage of small diameter wire ropes (36) Usage of inadequately engineered rigging or anchor connectors Contact Information If you would like to receive a copy of a summar y report as soon as it is available, you may include your name and address below and one will be provided to you. Note that your firms identity will not be used in any way other than to transmit a report to you. Thank you for your participation in this research study. Name: ___________________________________________________ Firm: ____________________________________________________ Street Address: ____________________________________________ City: __________________________ State: _____ Zip: ____________ If a follow-up call for clarifications is needed, may we contact you by phone? Phone:_____________________

PAGE 158

158 Fall Protection and Fall Arrest Systems Survey, follow-up version (1) Does your firm have a worker tie-off a nd personal fall arrest systems (PFASs) policy that goes beyond OSHA-compliance? yes no If yes, to which trades does the tie-off at six feet above the walking surface rule apply? ( please select all applicable categories) (2) Steel erectors and ironworkers (3) Scaffold erectors (4) All trades without exceptions (5) Does your firm have a policy that requires all workers using a rrest systems to exclusively use twin-leg lanyards? yes no (6) What was your firms recordable injury ra te for 2006 (or other recen t recording period)? ___ In regard to specialized fall arrest sy stem training for superintendents, (7) How many hours of specia lized fall arrest systems training do they receive? _______ hours (8) Does this training include a competency test? yes no In regard to training for workers, (9) On large projects (contracts over $50 million), does your firm require safety orientation training for all wo rkers starting on the project? yes no (10) If yes, does this training in clude fall arrest tie-off rules and enforcement policies? yes no (11) On small projects (contracts under $10 million), does your firm require safety orientation training for all wo rkers starting on the project? yes no (12) If yes, does this training in clude fall arrest tie-off rules and enforcement policies? yes no In regard to anchorage and engineering, (13) Does your firm have a policy that requir es 100% ANSI label or manufacturer label on all fall arrest equipment on-site? yes no (14) Except for widely recognized standards, such as wire rope splices with U-bolts, does your firm have a policy that requires all custom -designed arrest components on-site to be engineered (signed and sealed by a PE)? yes no

PAGE 159

159 Preconstruction (15) Has your firm made suggestions to the ow ner about using design for safety to lessen the extent of fall protection and arrest system usage? yes no What types of relationships to design ers exist on projects at your firm? ( please select all applicable categories) (16) In-house design department (17) Design-build alliance (independent A/E firm working under D-B contract) (18) A/E consultants under separate contract with owner (Please fill out applicable sections below) In-house design departments and design-build alliances (19) Does your firm provide any specific instru ction to designers in how to use engineering to eliminate the need for fall arrest from projects? yes no (20) Does your firm provide any construction sa fety instruction to designers, for example, a 10-hour OSHA training course? yes no (21) Do your designers particip ate in planning and drawings for fall protection and arrest system pre-task planning? yes no A/E consultants under separate contract with owner: (22) Are suggestions for improvements in fall protection ever communicated to the design team (architect or engineer)? yes no (23) Has your firm participated in an y team partnering or integrated project delivery mandates at the request of the owner? yes no (24) If yes, was safety for constr uction workers a topic for coordination with the design team (architect or engineer)? yes no (25) If yes, was fall arrest anc horage a topic for coordination? yes no Contact Information Name: _________________________________________ Company: ______________________________________ Phone: ______________________________________

PAGE 160

160 Integrated Design a nd Construction Survey 1. How many projects did you work on in the last year? _______________ 2. How many of these projects we re design-build contracts? ____________ 3. How many projects does your firm undertake each year? ____________ 4. What percentage of your firms proj ects were design-build contracts? ________% 5. Does your firm provide any training on the OSHA regulations? yes no 6. Does your firm provide any training on fall protection anchorage? yes no 7. Does your firm provide any specific instruct ion in how to use engi neering to eliminate construction hazards from projects? yes no 8. If yes, does this instruction cover fall protection and the elimination of the need for fall arrest systems? yes no 9. Does your firm include special notes or dedi cated sheets in the cons truction drawings to highlight safety hazards and concerns for construction workers? yes no 10. Has your firm developed a database of de sign-for-safety guidelines to be designed into applicable projects? yes no 11. If yes, do these guidelines cove r safety for construction workers? yes no 12. Do designers at your firm specify roof anchorages (for worker tie-off)? yes no 13. Does your firm have a policy implemented th at requires every app licable project to go through a safety-for-maintainability checklist? yes no (Safety for maintainability is defined as coordinating the design w ith the owners maintenance operations) 14. Do company designers make job-site visits to observe safety performance in relation to design-for-safety features that were specified? yes no

PAGE 161

161 APPENDIX C POPULATION DATA FOR DESIGN-BUILD EXPOSITION ATTENDEES Table C-1. Population for the Designer-builders. A E 3Com Corporation* 3D/International, Inc. Abbott Laboratories* ADP Marshall, Inc. American Institute of Architects* American Red Cross* Amtrak* Anheuser-Busch Cos.* Army Corps of Engineers* Army National Guard* Aspen Group AT&T* The Austin Company Baker Concrete Construction* Barton Malow Company BE&K Engineering Bechtel Corporation Beers Construction Company* The Beck Group BFW Construction Co., Inc.* Black & Veatch The Boeing Company* Bovis Lend Lease* Boyle Engineering Corporation Bread Loaf Corporation* Brown & Root Services (KBR) Bureau of Naval Personnel* Burns & McDonnell Engineering Butler Manufacturing Company California Dept. of General Services* Cannon Design Carlson Design/Construct Corp. Carter & Burgess, Inc. Caterpillar, Inc.* CDM Engineers & C onstructors, Inc. Centex Construction Company* CH2M Hill Charles Pankow Builders, Ltd.* Chicago Metro. Pier & Exposition Auth.* Chicago Utilities Commission* Church Building Architects, Inc. Cisco Systems* City of Atlanta* City of Los Angeles / Department of Public Works* City of Orlando* City of Toronto -Works & Emergency Services* The Clark Construction Group, Inc.* Clayco Construction Company* Colorado DOT* Comfort Systems USA* CORE Construction* CSX Transportation Director Facilities Design* Dan Vos Construction* Dick Corporation* Dick Pacific Construction Co., Ltd.* Dillingham Construction Corporation* DMJM + Harris Donleys, Inc.* E-470 Public Highway Authority* Earth Tech Exxcel Contract Management*

PAGE 162

162 Table C-1 (continued). F R Fannie Mae* Federal Bureau of Prisons* First Industrial Realty Trust* Florida Department of Transportation* Fluor Daniel Frederic R. Harris, Inc. (merged with DMJM) Frito-Lay* Fru-Con Construction Corp.* General Services Administration* Gerber Products Company* Gilbane Building Company* Glaxo Wellcome Inc.* Goodkind & ODea Granite Construction Inc.* H+M Construction* Harkins Builders* Harold OShea Builders* The Haskell Company HBE Corporation HBG Constructors Inc.* HDR, Inc. Hellmuth, Obata & Kassabaum, Inc. Hensel Phelps Construction Co.* HNTB Design/Build, Inc. Hoffman Corporation Honeywell Corporation* Integrated Electrical Services* Intel Corporation* J.R. Filanc Construction Company* J.S. Alberici Construction Co., Inc.* Jacobs Engineering Group James McHugh Construction* James N. Gray Company* Kajima Construction Services* KINETICS/ U.S. Filter Bio/Pharm Div.* Korte Construction Company* Los Alamos National Laboratory* M.A. Mortenson Co.* Marnell Corrao Associates* Martin K. Eby Construction Co., Inc.* McCarthy Building Company* McShane Construction Corporation* Mercedes-Benz USA* Minnesota Dept of Transportation* MWH National Cancer Institute NIH* National Corrections Corporation* National Park Service* Naval Facilities Engineering Command* New York City School Constr. Authority* OBrien/Atkins Associates, PA Ohio Department of Transportation* Opus Companies Oracle* Orange County Government* Oregon Department of Transportation* P.J. Dick Incorporated* Parsons Engineering PB Constructors Inc.* PCL Construction Services, Inc.* Kiewit* Philip Morris USA* The Pillsbury Company* Proctor & Gamble* RTKL Associates Rudolph & Sletten, Inc.* Ryan Companies US, Inc.

PAGE 163

163 Table C-1 (continued). S Z Sega Inc.* Skanska, Inc.* State of Arizona Dept. Construction Services* State of California Franchise Tax Board* The Stellar Group STV Construction Services* Suitt Construction Company* Sundt Construction, Inc.* Trane Company* Trauner Consulting* Turner Construction Company* Union Pacific Railroad* U.S. Army Community & Family Support Center* U.S. Dept. of General Services* U.S. Dept. of State* U.S. Dept. of Veterans Affairs* University of Chicago* Utah Department of Transportation* ValleyCrest Companies The Walgreen Company* Walker Parking Consultants The Walsh Group* Walt Disney Imagineering Washington Group International Webcor Builders* The Weitz Company* Western Summit Constructors, Inc.* Whirlpool Corporation* Wight Construction Services, Inc.* York International Corp.* Notes: 1. Company names followed by an asterisk (*) do not offer architecture or engineering services and were not contacted. 2. Note from Design-Build Institute of America about the population: Organizations who have recently attended the Design-Bu ild EXPO (Partial List).

PAGE 164

164 APPENDIX D FALL INJURY CASES ANALYZED FROM THE NIOSH DATA Table D-1. Fall injury cases analyzed from the NIOSH data. Face No. PFAS Safety Principle Violated NIOSH Data1 89-03 Not 100% tie-off. The victim, workin g as a member of a three-man crew, was painting a highway bridge spanning a large river. The victim and his co-workers had been working on the same bridge for approximately 6 weeks prior to the incident. On the day of the incident the victim and one co-worker had just finished lunch and were moving materials from one "bay" beneath the roadway to an adjacent "bay" prior to beginning the afternoon's work. Both men were wearing a safe ty belt and lanyard, with the lanyards secured to a steel lifeline running along the side of the bridge. To reach the new work area it was necessary to step from one steel "I" beam to anot her approximately 4 feet away. An expansion joint in the area prevented the workers from making this step while their lanyards were connected to the lifeline. Although the incident was not witnessed, it appears that the victim, while carrying a partially filled 5-gallon paint bucket, disconnected his lanyard and attemp ted to step across the 4-foot gap to the next beam. In doing so, he either slipped or lost his balance and fell 96 feet, striking the back of his head on the rocky ground below. The co-worker, and a supervisor who arrived on the scene just as th e incident occurred, immediately summoned local police and rescue personnel. The victim was pronounced dead at the scene by the local medical examiner. Strong association with exterior painting 89-21 Equipment failure; Lack of regular equipment inspection may have been a cause. At the time of the incident the men had completed the interior finish of the third silo and had begun to disassemble the scaffolding. Each man was using a nylon rope lanyard attached to a chain on a scaffold bracket. The brackets were spaced 6 feet apart. As each man reached a point in the operation where he was ready to drop a bracket to the ground, he hooked his lanyard to the chain on the next bracket. At some point the victim lost his balance and fell off the end of the scaffolding. The co-worker stated that he saw the victim fall and jerk upwards as the lanyard caught him. As the victim's weight dropped back on the lanyard, it snapped, causing him to fall 160 feet to the concrete floor below. When the lanyard was inspected, burn damage was discovered in several places, including the point at which it had snapped. This damage probably occurred during welding or burning operations from a previous job. Association with concrete finishing

PAGE 165

165 Table D-1 (continued). Face No. PFAS Safety Principle Violated NIOSH Data1 89-24 Improper use of anchorage A male carpenter fell 90 feet to his death from the top of a precast concrete parking garage which was under construction. The victim, working from a wooden beam, was tied off to a 1 1/2-inchdiameter rebar in the following manner. The victim secured one end of a 6-foot lanyard to one "D" ring on his safety belt, fed the other end of the lanyard through a second "D" ring on his belt, and then secured it to the first "D" ring. This created a loop with the lanyard. He took an 8-foot lanyard and, at its midpoint, wrapped it several times around the 1 1/2-inch rebar. He took one end of the 8-foot lanyard, passed it through the loop of the 6-foot lanyard and fastened the snap hook to the snap hook at the other end. The victim asked his co-worker to get him a portable power saw. The co-wor ker turned and saw the victim fall off the edge of the building. Association with concrete erection 90-12 Not 100% tie-off. A journeyman painter died when the swing scaffold he was using to access the interior of a 68-foot-tall by 32 -foot-diameter municipal water tank fell. The painter was working from a single point suspension scaffold near the top of the tank. The painter was wearing a safety belt and lanyard secured to a lifeline. When he finished painting the upper area of the tank the painter disconnected his lanyard from the lifeline and moved to the other end of the scaffold to hand the spray paint gun he was using to his foreman. The foreman had just taken the spray paint gun from the victim when he h eard a "pop" and saw the scaffold on which the victim was standing fall to the floor of the tank 65 feet below. Investigation after th e incident revealed that the two "U" bolts on the cable which supported the block and tackle from which the scaffold was suspended had loosened enough to allow the cable to slip through them, causing both the scaffold and all of its supporting hardware to fall. Strong association with painting and water tanks. 92-05 Not 100% tie-off. A 31-year-old painter (victim) died from injuries sustained in an 80-foot fall from a 120-foot-high electrical transmission tower. The victim was a member of a four-man crew painting the tower. The crew had painted one side of the tower, from top to bottom, and had begun to paint the other side. The four crew members were working at the same level on the tower and all were wearing safety belts and lanyards. As the victim unhooked his lanyard to reposition himself on the tower, he lost his balance and fell to the ground. Strong association with transmission tower work

PAGE 166

166 Table D-1 (continued). Face No. PFAS Safety Principle Violated NIOSH Data1 92-08 No personal fall arrest system or other fall protection used. The company had been contracted to re-roof a private residence that was currently occupied. The main roofing work had been completed approximately 2 w eeks prior to the incident. However, the homeowner complained about a section of the roofing which was misaligned. The victim was working alone on the roof, which had a pitch of 4:12 (4 feet of vertical rise to 12 feet of horizontal width). He had realigned all but two shingles, when he fell from the edge of the roof to a concrete patio deck 16 feet, 3 inches below (Figures 1 and 2). The victim was not using any type of fall protection devices or systems. Although no one saw the victim fall, the estimated time of occurrence was 6:42 p.m. The homeowner reported hearing an unusual sound and looked out a window. She saw the victim lying on the patio; he was unresponsive and bleeding from the back of the head. She called 911 and an emergency medical service (EMS) team arrived at the scene approximately 3 to 4 minutes later. They found the victim traumatized, unresponsive, and in cardiac arrest. The EMS team administered CPR, stabilized the victim, and transported him to a local hospital. He remained in a comatose condition and died 3 days later. Association with residential roofing 92-11 No personal fall arrest system or other fall protection used. A 41-year-old male ironworker (the victim) died after falling from a structural steel framework to a concrete floor during the construction of an automobile repair shop. The victim and two other ironworkers (coworkers) were assembling the steel frame "skeleton" (measuring 50 feet wide, 86 feet long and 18 feet high at the roof edge) of the structure. Sway-bracing rods had not been installed between the beams (combination column-roof truss units) the bolts at the base of the beams had not been fully tightened, and two steel beams had not yet been connected at the roof-line apex. As the victim walked on top of a stack of unsecured purlins (steel joists) along one edge of the frame to make a final measurement, the frame be gan to sway. The victim lost his balance, and fell 18 feet to the concrete floor, receiving fatal injuries. There was no fall protection equipment in place, and the vict im was not wearing a helmet. Strong association with steel erection.

PAGE 167

167 Table D-1 (continued). Face No. PFAS Safety Principle Violated NIOSH Data1 95-09 No personal fall arrest system or other fall protection used. A male carpenter died after falling 16 feet from a roof onto a concrete porch floor. The victim was a member of a five-man (foreman and four carpenters) cr ew laying roofing felt on the gable roof of a newly-constructed, prefabricated church and sacristy. The roof was 48 feet wi de by 106 feet long. The crew had completed applying the felt to one half of the roof and was applying the eighth course to the second half of the roof when the incident occurred. The victim was walking backward on the roof unrolling the felt. Approximately 8 feet in front of the victim, a second crew member was temporarily nailing down the felt. A short distance behind the second crew member, the two additional crew members were permanently nailing the felt to the roof sheeting. The foreman was on the roof observing the crew. The men were only unrolling 8 feet of felt at a time because it was a windy day, with gusts up to 25 miles per hour. As the men approached the end of the roof, the foreman was called to the ground to discuss the color of the shingles with the church preacher. The worker tem porarily affixing the shingles looked up to see the victim approaching the edge of the roof and yelled for him to watch out. The victim lost his balance and fell backward off the roof. The victim fell approximately 6 feet, struck a cross brace on the frame work of the churchs porch, then fell another 10 feet, striking his head on the concrete floor of the porch. The crew members left the roof and ran to the victim, finding him unresponsive, bleeding from the nose and ears. The victim was later pronounced dead at the site. Strong association with residential roofing 96-01 No personal fall arrest system or other fall protection used. A male sign installer died after falling from a canopy located above a loading dock, and striking his head on the bed of a truck crane. The victim and a co-worker had been assigned to remove four wooden signs above a loading dock at a food distribution warehouse. While attempting to remove the fourth sign, the victim was standing on a canopy which was about 15 feet above the ground and was not using any personal protective equipment (Note: a safety belt and lanyar d were available in the truck crane). The co-worker positione d the truck crane beneath the canopy where the sign was located and extended the boom above the sign. The victim attach ed the crane's lo ad line around one of the metal brackets which secured the sign to the building. He then removed five lag screws which secured the sign to the building. As he removed the fifth screw the sign swung free. At that time the lag screw which attached the metal bracket to the wooden sign frame pulled out of the wood. The sign dropped and struck a diagonal canopy pipe support. The sign then slid down the support and struck the victim, knocking him off the canopy. The victim fell about 12 feet and struck his head on the corner of the truck bed. The co worker, who witnessed the event, ran to aid the victim. He found the victim unresponsive and bleeding profusely. Association with sign installers.

PAGE 168

168 Table D-1 (continued). Face No. PFAS Safety Principle Violated NIOSH Data1 96-21 Not 100% tie-off. On June 27, 1996, a 27-year-old laborer (the victim) was fatally injured when he fell through an unguarded roof opening while repairing the rubber roof membrane of a college sports coliseum. The victim and his foreman were repairing the membrane after it had been sliced open to provide access to the underlying roof structure. The victim had been cleaning the existing membrane while his foreman, working behind him, was completing the patch. The victim had progressed to the peak of the arched roof, out of sight of the foreman, and had disconnected his fall protection lanyard from the lifelines. For an unknown reason, the victim stepped on an exposed ceiling tile which gave way, allowing the victim to fall 90 feet to the gym floor. Workers inside the gym saw the victim fall and hit the floor. One of the workers, an EMT, immediately went to the victim and began CPR while another worker notified 911. The campus emergency medical squad (EMS) responded within 8 minutes and transported the victim to a local emergency room, where he was pronounced dead. Association with roofing. 97-08 No personal fall arrest system or other fall protection used. Behavioral failure (failure to respect warning line). A 22-year-old male carpenter's helper (the victim) died of injuries he received after crawling from an unprotected floor edge onto an unsecured piece of plywood and falling 120 feet to the ground. At the time of the incident, concrete forming work had been completed on 12 floors of a condominium under construction. The victim was part of a crew removing form materials (plywood, etc.) and was assigned to work on the 10th floor. The victim had been on the 12th floor obtaining a safety harness and was en route to the 10th floor via a personnel hoist when he stopped the hoist and exited at the 11th floor. A co-worker from the floor above had yelled down to the victim, asking him to plug in an extension cord that was hanging from the 12th to the 11th floor. He crawled under a red tape warning line at the floor edge of the atrium onto a piece of unsecured plywood. The plywood gave way and the victim fell 120 feet to the ground. The local emergency medical service responded in less than 10 minutes, but the victim was pronounced dead at the scene. Association with concrete formwork and erection.

PAGE 169

169 Table D-1 (continued). Face No. PFAS Safety Principle Violated NIOSH Data1 97-10 Not 100% tie-off. A male tower erector died as a result of injuries sustained in a 200-foot fall from a telecommunications tower. The incident occurred while the victim and a co-worker were connecting antenna-support brackets onto a leg of the tower. The victim apparently disconnected or was attempting to re-connect his fall protection and was climbing down the leg of the tower from 220 feet to 200 feet when he fell to the ground. Strong association with telecommunication towers. Notes: 1. Selected excerpts of the original NIOSH transc ripts (National Institute for Occupational Safety and Health. 2000).

PAGE 170

170 APPENDIX E FALL INJURY CASES ANALYZED FROM THE OSHA DATA Table E-1. Fall injury cases analyzed from the OSHA data. Case PFAS Safety Principle Violated OSHA Data 1 Correct tieoff policy not used (continuity) The employee was working in a pers onnel basket hoisted by a 100 ton Linkbelt [crane]. The victim was equipped with a full body harness with lanyard and a chain wall hook. The vi ctim exited the basket to station himself on the outside face of the bridge column. He failed to first attach his lanyard prior to exiting the personnel basket. He had climbed onto the horizontal rebar of the bridge column and attached his wall hook to the outside rebar band. The victim leaned back to retrieve his lanyard and shifted his full body weight to the wall hook attached to the horizontal rebar. The wire ties broke from the excessive weight of his body causing the wall hook to slide off the end of the rebar. The victim fell 90 feet to the concrete footer of the column resulting in fatal injuries. Strong association with positioning devices 2 Positioning device no PFAS On 12/28/98 at approximately 10:15 a.m., the victim was removing bolts on a vertical concrete form inside of a bridge pier. He was wearing a body harness with one lanyard and also had a wall chain for a positioning device. The victim fell approximately 43 feet to the base of the pier. His lanyard was not being used, and the hook on the wall chain had a defective safety latch. Strong association with positioning devices 3 Anchorage not installed Employee 1 was using a pry bar to position a 6 ft by 20 ft by 1/4 in. steel sheet on the roof of a tank. He fell 43 ft from the roof to the inside floor of the tank. Employee 1 died. He was equi pped with a safety harness and a lifeline, but did not have a place to tie off on top of the tank. No association 4 1. Not 100% tie-off 2.Either anchorage not installed or not used properly. At approximately 11:20 a.m. on July 22, employee 1, an apprentice carpenter employed by [construction] co., fell approximately 76 feet from the temporary deck of the Bridge to the ground. Employee 1 was wearing a full body harness with a lanyard, but was not attached to a secure anchor point while placing form panels. Em ployee 1 received severe internal injuries and broken bones. He was pronounced dead at approximately 12:20 p.m. at the medical center. Strong association with concrete formwork

PAGE 171

171 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 5 Roll-out Shortly after 2:00 pm on may 8, 1996, employees were installing sheet metal decking on the 3rd level of a steel structure building under construction. An employee was placing short sections (16') of decking on 3 joists. As he progresses with this task he kicked the last sheet placed to make it fall into place and interlock w ith the previously laid sheet. The sheet slipped away from the 3rd jo ist and the employee started falling through to the lower level. At the time of this event, the victim was wearing a full body harness and was tied-off to a retractable cable block about 15'18' away. As he fell, somehow the cable hook came undone/slipped out of the "d" ring attached to the body harness. (Note:) the block had been recently purchased and put into servi ce just a couple of days before the event. The victim fell approximatel y 36' to a concrete floor below. 6 Not 100% tie-off Employee 1 and a coworker were unloading 20 ft sheets of metal roofing material on a two-story, multi-family building. While unloading the material, employee 1 was using a full body harness and safety line. Witnesses said he unfastened his line from the harness and attempted to walk across four metal panels to anothe r roof line. He slipped and fell 19 ft to the concrete, striking his head. He was taken to the hospital, where he died the next morning. Strong association with decking 7 100% Tie-off for aerial lift users On 2-22-01 at a manufacturing site, a contracting company, that has had a long standing contract with the manufacturer for performing contracting work, such as constructing buildings, was demolishing a wood existing building. The contractor had previously built a new building over the existing building that was being demolished on this date. An employee, approximately 1 yr in the employment of the contractor had been working from a boom lift man basket. A harness and lanyard were in the basket but had not been worn by the employee. Although it was company policy to wear the PPE, the employee had not at this time, and apparently had exited the man basket and stepped onto the roof of the wooden structure that was being demolished. The employee apparently had fallen through one of the openings in the roof. There were no direct witnesses, but 2 other employees (supervisor and laborer) working nearby heard a thump and discovered that the employee had fallen. Strong association with aerial lift 8 100% Tie-off for aerial lift users Employee 1 was working in an elevated bucket approximat ley eleven feet above the ground splicing telephone ca bles. He was wearing a harness and lanyard that had not been tied off to the boom. Somehow he either leaned or otherwise shifted his weight onto the door of the bucket and the door opened, causing him to fall to the ground and suffer fatal head/neck injuries. The door latch was found to be defective. Strong association with aerial lift

PAGE 172

172 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 9 100% Tie-off for aerial lift users The deceased age 50, was operating an aerial lift when he was thrown from the basket per eye witnesses. Employees who had been using the aerial lift were not wearing body belts or harnesses with appropriate lanyards attached to the boom or basket. Mr [name] was operating the condor 48 foot aerial lift at a height of approximately 14 feet above the pavement when he fell. Demolition of the curtai nwall (back wall) of the 2 story motel involved removing glass windows and wooden soffits. Employees pried with bars and the lift basket to remove the soffit from the underhang/wall and had been using the lift this morning to reach the 2nd floor and to lower windows once removed. The lift gave some indications of erratic action but was not removed from service. Another operator believed it "jumped" or reacted rapidly to control input at one point before the deceased took over operating the aerial lift this morning. After the incident the equipment was tested and the platform leveling mechanism failed to respond. This may have been what caused the deceased to be thrown from the basket. The eyewitness did not see the action of the lift but did turn in time to observe the victim travel in an arc over th e guardrails and fall headfirst to the pavement. Strong association with aerial lift 10 No anchor connector installed Employee 1 was working on the seventh floor level of an office building under construction. The building was in the process of having the floors formed and poured. Employee 1 was on the perimeter edge on the east side of the structure. He was patching/filling post tensioning holes with concrete on the exterior side of the outer columns, between the floors, when he fell approximately 80 feet. Employee 1 was wearing a safety harness and lifeline. There were no witnesses (f rom the seventh floor level) who saw employee 1 fall. Employee 2 was on the second floor level when employee 1's body passed by. Employee 2 (site superintendent) thought that it was trash being tossed over the side and went to the perimeter to see what it was. He then saw employee 1 laying on the ground. Employee 3 who was facing the building at ground level ab out 100 feet away looked up and saw employee 1 fall to the ground. Strong association with Concrete formwork 11 100% tie-off for aerial lift users Employee 1 was working from a Skyhoo k Aerial Crane with a manbasket attached to the end of the boom. He was approximately 80 feet in the air cutting brackets which held a sign. Another crane was used to lift the sign once the sign was cut away from its support. The large sign was actually two signs bolted together and held in place by six brackets. Four brackets held the lower sign and two brackets held the upper sign. Employee 1 was going to cut the four lower brackets with an oxy-acetylene torch and then reposition his aerial lift on top to cu t the final two brackets. This was he would be above the sign when making his last cuts. When the fourth bracket was cut on the lower sign, it became detached from the upper sign and fell striking the aerial lift. Employee 1 was not wearing a harness and was bounced out of the basket fall 80 feet to the ground below. He died from injuries sustained in the fall. Strong association with aerial lift

PAGE 173

173 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 12 Correct tieoff policy not used (continuity) On 05/15/97, employee 1 was involved in the erection of a communications tower located in [deleted name] co unty. Employee 1 was working on the tower at a level of 200 feet from the ground. He was issued and wearing a body harness with a 10 foot lanyard, no energy absorbing, and a short positioning lanyard with a large hook designed to quickly snap onto the structure to keep the employee centere d. Employee 1 was in the process of moving from one face of the tower to another, when he fell to the ground sustaining multiple fatal injuries to chest, back, head, and other portions of the body. The tower was a steel lattice structure being erected for a [telecom co.] and would have a completed height of 300 feet. Employee 1 was working bolting the legs of the tower together and had erected 20 feet that morning and was working at the 200 foot level when he attempted to move from one side to the other. A witness stated that he heard a noise possibly as employee 1 attempted to hook onto the structure with the large positioning hook, and miscued and fell 200 feet to his death. strong association with telecom tower 13 Correct tieoff policy not used (100% PFAS) On 6-26-2001 the employees of [teleco m co.] were in the process of erecting a telecommunication cellular tower, they working at approximately 100 feet. The foremen and another employee had just finished bolting a section of the tower. The employee next to the foreman stated the foreman hooked his positioning belt to a bolt and leaned back. The hook apparently slipped off and the foreman feel 100 feet to his death. The foreman was wearing a harness but did not have a lifeline or lanyard attached. He was only using the positioning belt which had a chain attached in the front and a hook, the employees called a pelican hook attached to the chain. When the hooked slipped he had no secondary fall protection. strong association with telecom tower 14 Roll-out (Locking snaphook not used) Employee working at an elevation of 28 feet above the next level. The employee was making a double connection and was removing the last 2 bolts from the existing beam, the employee was using a body harness and lanyard when he bent over to remove the 2 bolts he rolled out of his lanyard and fell to the concrete pad below. The lanyards self-closing latch remained fully open. Association with steel erection

PAGE 174

174 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 15 Not 100% tie-off A bridge was being constructed. On one span of that bridge, sheet metal decking had been incorrectly installed over the openings (bays) between the concrete bridge beams. It was at th e wrong angle. A three-man work crew was assigned to remove the decking, cut off the supporting angle iron, reinstall the angle iron and then repl ace the decking. Two employees were actually placing the sheet metal panels over the opening and screwing them down while the other employee was handing the panels to them. These employees were all wearing safety ha rnesses with double lanyards. They were instructed to be tied off to the shear connectors in the bridge beams at all times. The shear connectors were re sin-coated 5/8 inch rebar that ran virtually all the way through the beams and had a pull out strength well over 5000 pounds. The decking had been replaced over almost all of one of the bays between the beams. The only remaining opening in the bay was smaller than a sheet of metal deckin g. The workers disconnected their lanyards from the shear connectors and moved away from the opening to cut off a sheet of decking. When they ha d cut the sheet off, they returned to the opening but did not tie off, the worker who did not fall said that he thought that the sheet metal would provide fall protection. The decking apparently did not fit down on the angle iron sufficiently, possibly because it had been cut off. The victim stood with both feet on the sheet metal panel which was in position over the opening. As he was about to screw it down, the decking gave way. He fell through the opening about 56 feet to the ground below. After the event, the sheet of decking was hanging in the opening. Strong association with decking 16 Correct anchor connector not used A carpenter/laborer was placing pins at the top of a column form with the safety lanyard of the full body harness looped around the steel rebar sticking up from the top. The form and employee fell from the 12th floor to the ground level deck approximately 130 feet. Strong association with concrete formwork 17 Anchorage not installed Two iron workers were assigned to close up an opening on the roof and install fascia along the edge of a section of roof which had been left open on the top floor of a highrise building so that the final roof could be installed. This work was to have been done from the protected floor below, however, for some both employees climbed on to the roof which was covered with a light ice or frost. Both employees were wearing full body harnesses and had lanyards attached, but did not have a tie off point at the area where they were working. They slipped and fell approximately 84 feet and were killed Association with ironworkers 18 Not 100% tie-off Steel worker was working at the site address of [deleted]. The worker was connecting a steel beam at the highest point of the new building being built. He was in the center of the building when he fell twenty eight feet five inches to the ground. Th e worker was wearing a full body harness with two lanyards. The worker unsnapped his lanyard from the attachment point, and reached out to disconnect a steel choker used to set the beam in place when the fall occurred. Mild association with steel erection

PAGE 175

175 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 19 Inspect equipment before each use An employee of [company name] erectors was killed when he fell while installing steel roof trusses at a height of about 20 feet. He was wearing a safety harness with the lanyard properly attached to a point having the required load carrying strength. The lanyard, a ripstich shock-absorbing type, broke before the ripstitch shock absorber functioned. The victim struck steel floor joists that had already been installed at the floor level to accommodate removable flooring ty pical for a computer room. Mild association with steel erection 20 Fall hazard analysis must be project specific (pendulum swing) An employee of an electrical contract or fell while attempting to adjust lights on a newly constructed light system at a [university] Stadium. The light pole reaches more than 116 feet above a concrete base below. The employee had attached his safety harness and 6 foot lanyard to the safety sleeve which he attached to the cable th at was fixed to the side of the pole. He climbed up to the bottom of the first section of lights which where about 96 feet above the ground. He lost control before leaving the pole; he never entered the cat walk to adjust the lights. He fell 81 feet down the side of the pole while still attached to his safety harness, lanyard, and safety sleeve (cable grab). The safety sleeve (cable grab) did not arrest his fall. His body apparently struck foot pegs and cable guides along the way down the pole, which produced injuries that caused his death. The employee had no vital signs when the medical emergency team attempted to rescue the man. 21 Not 100% tie-off A steel erector working 24' to 28' above concrete floor was not using personal fall protection system when he accidentally stepped off of steel decking and fell 24' to floor. Victim was wearing personal fall protection equipment (harness) but was not tied off to a lanyard or life line. Mild association with decking 22 Not 100% tie-off Two workers were in the process of removing concrete panels from a wall that was approximately 38 feet high. The victim was wearing a full-body harness with a chain positioning device and "d" ring in the front. The employees would use the positioning device by attaching to re-bar or taperties at waist level and remove the tie at shoulder height and then move down to the next taper-tie. The employee would then reattach his positioning device and remove the next tie. The employees were not utilizing lanyards on the full-body harnesses nor were they protected from falls when moving from point (a) to point (b). It was when the employee had unhooked to move down to the next taper-tie that he fell falling approximately 32 to 36 feet to the ground. Strong association with positioning device

PAGE 176

176 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 23 Temporary change in work area The accident victim was part of a crew that was in the process of removing a flying-form from the seventh floor of the concrete building which was under construction. During normal construction activities the open sides of all floors are guarded with chain guar drails. Employees ar e provided with safety harnesses and lanyards and they are instructed to tie off anytime they are required to work within 6 (six) feet of an open sided floor. At the time of the accident the chain guardrail was removed so the flying-form could be removed from the seventh floor. As the crew was pushing the form one of the support rollers, located on the floor 25 inches from the edge of the floor, did not appear to be turning freely. The victim went over to the roller and hit it with a sledge hammer to free it up. The victim did not tie off to perform this work. The crew supervisor saw what was going on and he told the victim to stop. After the victim hit the roller, and heard the supervisor yell, he quickly spun ar ound to come back to the crew but he became tangled with his own two feet. The vic tim fell backwards on his buttocks at the edge of the floor and then fell backwards off of the edge of the floor, to the ground below. Strong association with concrete formwork 24 Not 100% tie-off (continuity) The deceased was working on the ro of (west side) of a three story apartment building installing 4 x 8 sheets as roof decking. Another employee was performing the same type of work on the east side of the roof. Both employee were wearing safety harnesses and were tied off. At the end of the day, both employees discussed finishing up and going home. Each employee went back to their work area and shortly after this it was noticed that he was lying on the concrete ground level three stories below, near his work area on the roof. There were no witnesses to his fall. He had been wearing a safety harness and was attached to a life line secured to the trusses as he worked throughout the day, but had removed the safety harness, and apparently was in the process of climbing down the structure to leave the work area, and slipped, falling to his death three floors below because of the lack of a ladder to be used by employees to reach the work area. Mild association with decking 25 100% PFAS for aerial lifts A 19 year old employee of [company name] Erectors, Inc. fell from a second floor balcony after unlatching his lanyard from his harness and leaving a man basket elevated by a forklift. Employees were installing windows at the time of the accident. Mild association with aerial lift 26 Special inspection protocol for SRL (SRL failure) An employee fell 60 feet while decking a metal roof. The employee was wearing a full body harness and a self-retracting lanyard, however, the lanyard did not activate until he had fallen 29 feet. At that time the self retracting lanyard cable broke and the employee fell another 31 feet. Strong association with decking

PAGE 177

177 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 27 Special inspection protocol for SRL (SRL failure) The victim was laying the initial metal decking on the steel beam of bridge 610 (an elevated highway) under construction over Interstate [deleted] at Interstate [deleted] in Virginia. He was tied off wearing his body harness and retractable fall protection device. While placing the metal decking down on the bridge, he fell through the opening. The fall protection (the retractable cord) broke and he fell one hundred feet to the ground below He had multiple injuries to his body and di ed at the accident scene. There were two other co-workers in the area, (on the elevated highway to the rear of the victim) but they did not see him fall. Strong association with decking 28 100% PFAS for aerial lifts Employee 1 was in bucket of an extensible boom crane truck to repair/replace a light bulb for a [del eted] Hotel sign. A grounds man was stationed at the rear of the truck operating the crane boom to lift the employee up to the sign (approximately 42 feet high). The groundsman heard a loud "Pop" and the boom suddenly retracted to approximately 25 feet high. Upon coming to an abrupt stop, employee 1 was thrown through the side of the fiberglass bucket (which was apparently already in disrepair) and fell 25 feet to the ground where he either died upon impact or shortly thereafter. Employee 1 was wearing a sa fety harness, but had not been tied off. Strong association with decking 29 PFAS user training for pendulum swing hazard The deceased was involved in connec ting a steel beam approximately 15 feet above the ground. He was on th e beam, and was wearing appropriate personal fall protection equipment. After completing his connections, he stood, and then fell from the beam. His harness and lanyard limited his fall to approximately three feet, and prevented him from falling to the ground. The lanyard caused him to swing into the support column, and to strike his head. The Medical Examiner's report stated that his manner of death was "natural", and the probable cause of death was "severe centrilobular emphysema and generalized pleural fibrosis." Strong association with steel erection 30 Hierarchy of fall controls use aerial lift Victim fell approximately 15 feet to concrete floor while installing roof trusses. Victim was wearing full body harness with lanyard. Victim had unhooked lanyard from roof truss to move to, or reach to, next roof truss so he could fasten cross brace in place which would secure roof truss in position. No other employees present actually saw victim fall. All previous trusses had been 24" on center, span to roof truss that victim was installing was 45" on center due to ventilation passing between. Association with building erection (specific trade unknown)

PAGE 178

178 Table E-1 (continued). Case PFAS Safety Principle Violated OSHA Data 31 Not 100% tie-off At approximately 1:05 PM on January 13, 2004 the victim and another employee had been working on wingwall C removing wood falsework form from a concrete form. Both employees were working on opposite sides of the 28 foot high wall. The victim was wearing a full-body harness and using one positioning hook for fall protection. With this particular system it would not protect the victim when moving from one work position to another. Both employees were in the process of moving to a lower work elevation, at approximately the 20 fo ot elevation. The other employee did not see the victim fall. After attaching the grid reinforcement bar in front him, he looked in the direction where the victim should be; at that moment he heard another employee yelling that the victim fell. He then ran to a fellow employee to make a phone call to 911 and the superintendent. The victim was attended by local EMS personnel, he was pronounced dead at the scene by [deleted ] County Coroner. Strong association with positioning device 32 Total Fall Distance problem On 5/14/04, at approximately 10:25am, two employees were installing sheet metal roof on a section of highrise building. Both employees were tied off to a rope via body harnesses and lanyards. Employee B lost his balance and slid off the roof taking employee A with him. Employee B was stopped by the fall protection system above the concrete floor which was approximately 15 feet below. Employee a hit a 46 inch concrete wall with his head. Both victims were transpor ted to a local hospital where employee B was released following an exam for bruised ribs. Employee A expired at the hospital on 5/15/04. Strong association with decking

PAGE 179

179 LIST OF REFERENCES Abramowitz, A. (2002). Architects Essentials of Contract Negotiation. American Institute of Architects, Washington, D.C. American Society of Safety Engineers. (1992) American National Standard Safety Requirements for Personal Fall Arrest Systems, Subs ystems, and Components Z359.1-1992. ASSE, Des Plaines, IL. Also known as ANSI, Z359.1 1992. Cox, R. (2001). Developing successful performance measurement systems. FMI Quarterly (formerly Contractors Management J.) 3, 8-11. Design-Build Institute of America. (2006). List of attendees for the 2006 Design-Build Conference and Expo. Found at http://www.designbuildexpo.com/sponsoring_exhibiting.cfm on May 14, 2007. Design-Build Institute of America. (2007). Desi gn-build market share in the United States. Found at http://www.dbia.org/ind_info/mkt_chrt.html on July 11, 2007. Drucker, P. (2001). The Essential Drucker Harper Collins Publishers, New York, NY. Ellis, N. (2001). Introduction to Fall Protection. American Society of Safety Engineers, Des Plaines, IL Engineering News Record. (2006). The Top 400 Contractors. ENR, 256 (20), 60-75. Erlandson, D., E. Harris, B. Skipper and S. Allen. (1993). Doing Naturalistic Inquiry Newberry Park, CA: SAGE Publications, Inc. Ettlie, J. and H. Stoll. (1990). Managing the Design-Manufacturing Process. McGraw-Hill, Inc., New York Flood, L., A. Klevmarken and P. Olovsson. (2007). A brief description of The Swedish Panel Study: Market and Non-mark et Activities. Found at http://www.nek.uu.se/facu lty/klevmark/hus.htm on March 25, 2007. Galloway, L., F. Rowbotham and M. Azhashemi. (2004). Operations Management in Context. Elsevier Butterworth-Heinemann, Oxford, U.K. Gambatese, J. (1996). Addressi ng construction worker safety in the project design. Ph.D. dissertation, University of Washington. Gambatese, J., M. Behm and J. Hinze. (2005). V iability of designing for construction worker safety. J. Constr. Eng. Mgmt. ASCE, 113, 1029-36. Geer v. Bennett, 237 So. 2d 311 (Fla. 1970)

PAGE 180

180 Geller, E. S. (1997). Key processes for continuous safety improvement. Professional Safety. 42, 10; p. 40 Geller, E. S. (2002). The Participation Factor. ASSE, Des Plaines, IL Greshner, O. (1984). Reasons Why QCCs [quality control circles] do not attain expected results. in The Japanese Approach to Product Quality. Pergamon Press, Oxford, U.K. pp.93-107 Heathfield, S. (2007). Harness the power of an employee suggestion program: beyond the suggestion box. Found at http://humanresources.about.com /od/quality/a/su ggestion_pro_2.htm on March 22, 2007. Hecker, S., J. Gambatese and M. Weinstei n. (2005). Designing for worker safety. Professional Safety. 50, 9. p. 32-45. Hinze, J. (1981). Human asp ects of construction safety. J. Constr. Eng. Mgmt. ASCE, 107, 61-72. Hinze, J. (1987). Qualities of safe superintendents. J. Constr. Eng. Mgmt. ASCE, 113, 169171. Hinze, J. (2002a). Safety Incentives: Do They Reduce Injuries? Practice Periodical on Structural Design and Construction ASCE. 7, 81-84. Hinze, J. (2002b). Safety plus : Making zero accidents a reality Research report 160-11 Constr. Industry Inst., Austin, TX Hinze, J. (2006). Construction Safety, Second Ed. Jimmie Hinze, Gainesville, FL Hinze, J., D. Bren and N. Piepho. (1995). Experi ence modification rating as a measure of safety performance. J. Constr. Eng. Mgmt. ASCE, 121, 455-458 Hinze, J. and J. Gambatese. (1996). Addressing construction worker safety in the project design Research report 101-11, Constr. Industry Inst., Austin, TX Hinze, J. and R. Godfrey. (2002). Extending the scope of Making zero accidents a reality: focusing on shutdowns, turnarounds, and outages. Research report 160A Constr. Industry Inst., Austin, TX Hinze, J. and M. Harris. (2007a). Problem Areas in Personal Fall Arrest Systems in the Construction Industry. in By Design (an ASSE Engineering Pract ice Specialty periodical). Vol. 6 (3). p. 10-14. Hinze, J. and M. Harris. (2007b). The Anchorag e Component of Personal Fall Arrest Systems: Usage and At-risk Practices in the Construction Industry. in Proceedings of the American Society of Safety Engineers (ASSE) Annual Conference, Orlando, FL, June 2007.

PAGE 181

181 Hinze, J. and H. Parker. (1978). Saf ety productivity and job pressures. J. Constr. Eng. Mgmt. ASCE, 104, 27-34. Hinze, J., C. Pederson and J. Fredley. (1998). I dentifying root causes of construction injuries. J. Constr. Eng. Mgmt. ASCE, 124, 67-71. Hinze, J. and D. Russell. (1995). Analy sis of fatalities recorded by OSHA. J. Constr. Eng. Mgmt. ASCE, 121, 209-214. Hollander, M. and D. Wolfe. (1999). Nonparametric Statistical Methods, 2nd Ed. WileyInterscience, N.Y., N.Y. Huang, X. (2003). The owners role in construction safety. Ph.D. Dissertation, Univ. of Florida. Huang, X. and J. Hinze. (2003). Analysis of construction worker fall accidents. J. Constr. Eng. Mgmt. ASCE, 129, 262-271. Hutchins, D. (1984). How quality goes round in circles. in The Japanese Approach to Product Quality. Pergamon Press, Oxford, U.K. pp. 27-32. Jennings, K., G. Markus, R. Niemi and L. Stoker. (2007). Youth-P arent Socialization Panel Study, 1965-1997: Four Waves Combined. found at http://webapp.icpsr.umich.edu/cocoon/ICPSR-STUDY/04037.xml on March 25, 2007. Kaplan, R. and D. Norton (1992). The balanced scorecard measures that drive performance. Harvard Business Rev. 70, 1, 71-79. Kendall, M. (1962). Rank Correlation Methods, Third Ed. Chas. Griffin & Company Ltd., London, U.K. Kerr, W. (1957). Complementary theories of safety psychology. J. Social Psychology. 45, 3-9. Kruskal, W. (1958) Ordinal measures of association. J. Amer. Stat. Assoc. 53, 284, 814-861. Liberty Mutual Insurance Co. (2006). Loss pr evention report /workplace safety report by industry sector for the cons truction industry. Found at http://www.libertymutual.com/omapps/ ContentServer?cid=1045062099934&pagename=C MInternet%2FPage%2FStandardTeal&c=Page on March 1, 2007. Liska, R., D. Goodloe and R. Se n. (1993). Zero accident techniques. Source document 86, Constr. Industry Inst., Austin, TX Loosemore, M., H. Lingard, D. Walker and J. Mackenzie. (1999). Benchmarking safety management systems in contracting organi zations against best practices in other industries. Implementation of Safety and Health on Construction Sites / Proceedings of the Second Intl. Conference of CIB Wo rking Commission W99, Honolulu, Hawaii. A.A. Balkema Publishers, Brookfield, VT. pp. 883-890.

PAGE 182

182 MSA, the Safety Company. (2006). Fall protection. Preferred items catalog. Bulletin 2300-93MC. Available from www.msanet.com. McCann, M. (2003). Deaths in construction related to personnel lifts, 1992-1999. J. Safety Research. 34, 507-514 Mohamed, S. (2003). Scorecard approach to be nchmarking organizational safety culture in construction. J. Constr. Eng. Mgmt. ASCE, 129, 80-88. Mohr, W. and H. Mohr. (1983). Quality Circles: Changing Images of People at Work. AddisonWesley Publishing Co., Reading, MA National Institute for Occupational Safety and Health. (2004). Preventing falls of workers through skylights and roof and floor openings NIOSH Alert, Publication No. 2004-156. U. S. Dept. of Health and Human Services National Institute for Occupational Safety and Health. (2000). Worker death by falls: a summary of surveillance findings and investigative case reports. Publication No. 2000116. U. S. Dept. of Health and Human Services. Petersen, D. (1997). Accountabil ity, culture and behavior. Professional Safety ; 42, 10; p. 45 Petersen, D. (1998). What measur es should we use, and why? Professional Safety 43, 10, p. 37. Petersen, D. (2007). The culture of safety: an interview with safety pi oneer Dan Petersen. Professional Safety. 52, 3. p. 17. Samelson, N. (1977). The effect of foremen on safety in construction. Technical report no. 219 Stanford University, Dept. of Civil Engineering. Sasaki, N. (1984). Cases of quality control circle. in The Japanese Approach to Product Quality. Pergamon Press, Oxford, U.K. pp. 15-25. Suruda, A., D. Fosbroke and R. Braddee. ( 1995). Fatal work-related falls from roofs. J. Safety Research 26, 1-8. U.S. Dept. of Labor. (1990). Analysis of cons truction fatalities; th e OSHA database. 1985-89. Washington, D.C. U.S. Department of Labor. (2004a). Analysis of construction fatalities; the OSHA database. 1990-2004 Washington, D.C. U.S. Dept. of Labor. (2004b). Hazards of Misu sing Wire Form Anchorage Connectors for Fall Protection. Safety and Health Inform ation Bulletin 09-01-2004. Weems, B. and P. Bishop. (2003). Will your safety harness kill you? Occupational Health and Safety 27, 86-90.

PAGE 183

183 Weisgerber, F. and M. Wright. (1999). Elements of a fall safety through design program. in Implementation of Safety and Health on Constr uction Sites / Proceedi ngs of the Second Intl. Conference of CIB Worki ng Commission W99, Honolulu, Hawaii. A.A. Balkema Publishers, Brookfield, VT. pp. 867-874. Weibul. (2007). Fault tree analys is: brief introduction. Found at http://www.weibull.com/SystemRelWeb/fault_ tree_analysis,_reliability_block_diagrams_a nd_the_blocksim_fti_edition.htm West, M. (2004) Effective teamwork, Second Ed. BPS Blackwell, Malden, MA White, R. W. (1959). Motivation recons idered: the concept of competence. Psychological Review. 66. p. 297-333, cited in Geller, E. S. (2002). The Participation Factor. ASSE, Des Plaines, IL

PAGE 184

184 BIOGRAPHICAL SKETCH Matthew Albert Harris was born in Redwood City, California. He grew up in a family with one other sibling (sister, Jennifer Ann Harris) an d spent his formative years in the San Francisco Bay Area. He went to elementary school at Willow Elementary School in Menlo Park. Mr. Harris completed college preparatory courses at Palo Alto Senior High School in Palo Alto, California. He began his college education at F oothill Junior College in Los Altos Hills. After completing his general education requirements, Mr. Harris transferred to a four-year-degreegranting university and graduated with a Bachel or of Arts degree in Art History from the University of California, Santa Cruz. After a ttending the University of Oregon, where he was awarded the degree of Master of Architecture, Mr. Harris spent several years working in the architectural services industry as an architect. Mr. Harris interests in healthcare systems design, risk management, and other design issues pertaini ng to complex institutiona l facilities (such as, airport terminals, research laboratories and fire stations) compelled him to return to school to study construction management and worker safet y. He enjoys sea kayaking, cycling and hiking for recreational activities. He pl ans to live in Texas with his wi fe and daughter after graduation.