Transforming an urban arterial into a multiway boulevard

University of Florida Institutional Repository
xml version 1.0 encoding UTF-8
REPORT xmlns http:www.fcla.edudlsmddaitss xmlns:xsi http:www.w3.org2001XMLSchema-instance xsi:schemaLocation http:www.fcla.edudlsmddaitssdaitssReport.xsd
INGEST IEID E20101208_AAAAJB INGEST_TIME 2010-12-08T15:32:11Z PACKAGE UFE0017945_00001
AGREEMENT_INFO ACCOUNT UF PROJECT UFDC
FILES
FILE SIZE 25271604 DFID F20101208_AABFUP ORIGIN DEPOSITOR PATH mikulski_a_Page_057.tif GLOBAL false PRESERVATION BIT MESSAGE_DIGEST ALGORITHM MD5
63b0a455b7c9db1ad428714bacd287ec
SHA-1
d6a4a3dde36301d240d0229e214a7eb9f9dad642
2235 F20101208_AABGAJ mikulski_a_Page_034.txt
c719577bd9cf8de32c891a71fb957758
ec6b9640158534dc5db4700eb3c77f6ee5cf5ece
1053954 F20101208_AABFVD mikulski_a_Page_048.tif
6358c8a44a2d26a47c5ad2c89fb32a0b
06bb839948b584481a36748acb1be5a05b4b41c0
16348 F20101208_AABFUQ mikulski_a_Page_087.pro
6e861b7c9140673c2db9b6e89b9e61a1
5b9ea93d7b978ca8f1661bbc9edd87eb1bd85fc4
684 F20101208_AABGAK mikulski_a_Page_041.txt
d3ed02a276328ca5db2256aff9d7296b
488c0da0f1835b311a23c61b991296fdd6f51fb3
8645 F20101208_AABFVE mikulski_a_Page_063thm.jpg
dd149a5f6110081aa4448abefc49f469
9890eda67ba789cd2f5c7ef9f5b0113db0210d23
F20101208_AABFUR mikulski_a_Page_060.tif
aeaeee9d42ae3f530751c02738773ad3
03e21b0fef3833b20a026138d43e2aa1b7c74ee7
40960 F20101208_AABGBA mikulski_a_Page_013.pro
4c39a2fb9241ef98bca605ba0aff3c24
5384209c9af5d3f312aa7ae59aac2d1c6c11d5f1
8868 F20101208_AABGAL mikulski_a_Page_017thm.jpg
594a5279d7310e5d4d50666a2a3bda65
0e7dcf227da66f32cab05dfca117ebe30defe924
104758 F20101208_AABFVF mikulski_a_Page_048.jpg
7412ebac3bf1a973cf0f98245999427c
f31966be26f13f8c498c7c15e937b3691417e8b7
429180 F20101208_AABFUS mikulski_a_Page_101.jp2
2df5e1aecfe51a2d79ccb0c308332008
92deaa860acad08b4636eccbe45749771b370bc0
29761 F20101208_AABGBB mikulski_a_Page_090.pro
8eae1680f43611b01a76cea88f5bb160
5b53b2da6fa8ddd7dc818bda5f3cd2aa4bf81b33
16489 F20101208_AABGAM mikulski_a_Page_098.QC.jpg
593dee033438e77d0ccd5a9b19eb1818
6488bcc2954255d7567ad366288f8c9a6f12a7c6
2218 F20101208_AABFVG mikulski_a_Page_103.txt
7259aca5bc1d19d48f4d510127952157
5915b30cbabe34c7c3191f5ee08ffe11f42235ea
60351 F20101208_AABFUT mikulski_a_Page_026.pro
7fc092d2858246cf9c1a4c4efda8e4c3
90d175250091656dac4e65606eb8ad786f9a1abb
319868 F20101208_AABGBC mikulski_a_Page_041.jp2
22c7cc7670fbcf8b1393521391c8589b
28723827424933f937fb8fd665f225a437e462bb
2064 F20101208_AABGAN mikulski_a_Page_047.txt
42b8c695802a4e6ebc1c3db665221ca4
c3559b4dbfcfc1ce21a2964162091410841b21d0
F20101208_AABFVH mikulski_a_Page_058.tif
b150df10e01199294d18faf443461a76
f04e0d5393c8842ac26f77f757407d0dd6e6c47a
495 F20101208_AABFUU mikulski_a_Page_072.txt
794559c234551ea156a41cba6bbe397d
5ec65d9a67927159913469329dbdd86c7373e546
F20101208_AABGBD mikulski_a_Page_009.tif
ae5cf3ba73bdd315a25c5c4818da328c
9836c2f581412ddcff8d652078409377fb57a11a
1051955 F20101208_AABGAO mikulski_a_Page_070.jp2
ec7e13cf51857ef498d461bfa80191f8
83f32169b5b19c0ae9ccd11727722cc083ab9cb2
2157 F20101208_AABFVI mikulski_a_Page_016.txt
14ca5b01fbbfdee8745ef05f0fd1af9f
a6b649f8281b2aa4f4a4f99f47bab7b16d56c8af
115475 F20101208_AABFUV mikulski_a_Page_022.jp2
8834310d2234b23c35041bd35a2534b4
d55f7ff2b0dd74e51c8c0e314c21d4ee132a2e1f
5757 F20101208_AABGBE mikulski_a_Page_075thm.jpg
9d218311be1f55a9e9744df5eab2c9d1
694014b1f13a060b248b1b59f68a2177eadcbfa1
6601 F20101208_AABGAP mikulski_a_Page_078thm.jpg
83a841171fdf90e30639b211a33e8e82
c12c79411d3fae01c16adcb4fa8dbb1dea1b0b6c
2107 F20101208_AABFVJ mikulski_a_Page_022.txt
5fa44577bbfead55d947d732c6552f20
c56fa159ddf736248320456031be4c9c6a7539cd
36227 F20101208_AABFUW mikulski_a_Page_059.jpg
9eaa5213ae9c7a785ac9486dad80140b
4485f1910ac0f82013f3beccb7fa25dc7f02b74f
1041569 F20101208_AABGBF mikulski_a_Page_097.jp2
747e2e5a427c6d41333652b87d21c6ea
b6b2a98fa2af69f83a9e2c1b2f4f75fca6e727c2
113487 F20101208_AABGAQ mikulski_a_Page_066.jp2
9a29800cd283ae2ca46a426301bac747
919d351dd37e11ecc229bdb9d0d7086aedfc6a3f
57662 F20101208_AABFVK mikulski_a_Page_004.jp2
b3fa612e1e5d5a8fcd16decbdd85cd2c
8130557f8a8c4b8c8bc51f182e31726978c3998d
7311 F20101208_AABFUX mikulski_a_Page_081.pro
c0c8d16d9551ffedb6ce5855a762beb0
626f8a68c3963cc247d362947d8c733cbb0ff67a
3202 F20101208_AABGBG mikulski_a_Page_076thm.jpg
9b628843a0ecfb6628267c17f70aeb16
7ba6c961f870f37162ae6a4ad4c0cc4d4f26762c
49029 F20101208_AABGAR mikulski_a_Page_065.pro
a09e3ace627f6c418c20c69abfd21c75
a3984b806c29cca3b6876b186a834ca2e02532f0
1051740 F20101208_AABFVL mikulski_a_Page_082.jp2
cf2e9ab415c420252182a5ea2ff93ae2
78c1e9bf6654883f57cedb5fa908709d3d8fd668
51825 F20101208_AABFUY mikulski_a_Page_037.pro
58ea5e659ee5046e243f18e59f827b12
ba0f054e4258ccc405d6bd4cb469ee7e24c9edf8
3040 F20101208_AABGBH mikulski_a_Page_009.txt
68cc4cc004223e42f7b5d245d662960b
5dbd4452eb194ac711d60f902b68f82ca70acc9a
57276 F20101208_AABFWA mikulski_a_Page_102.pro
4b96b15c0e2ddaa61f259c0b5f4ae071
424e1a87b70da930683e9d2ed6d700e33d45ad0d
36330 F20101208_AABGAS mikulski_a_Page_023.QC.jpg
2a887ab37b6a8414076db95bbb854ecf
344264b6e2c4e5772d4545ad3e8f2621eb0ba109
866 F20101208_AABFVM mikulski_a_Page_044.txt
2a7d2aa7557c00feba34669dff6e2cd2
74f853beb712eaac324434246d308ae852f4b835
32929 F20101208_AABFUZ mikulski_a_Page_067.jp2
3ec73a4c0b4774b814754c300ddd9381
22b4e4408e0159a46438a110d3f23afe8c5e928d
33079 F20101208_AABGBI mikulski_a_Page_060.QC.jpg
70f13d1471cc631a1f2810fe5780c436
918f8d0a5b72b94009412d866e037fbc886a7cf8
7541 F20101208_AABFWB mikulski_a_Page_019thm.jpg
b5ab2e75eac343b252cd775aab1a07d5
6f5cdb83af17ec079531d7a0659500b8bc556ab8
89444 F20101208_AABGAT mikulski_a_Page_014.jp2
e72319149cb67e31dffbc8d432370954
6dbaa6e6ce8aac3a7a184c10731d15d15fd8264a
14510 F20101208_AABFVN mikulski_a_Page_032.pro
4cf7b6b103769b24fb236f2344c654ac
c53a524c96f9c23d190e6e2b343f5d9f7e6cf6cb
F20101208_AABFWC mikulski_a_Page_051.tif
a4c03beab7c2f99065480b5d1efda786
2c008d190e82d6f684a5fff76ad6fc1e7e57151e
32670 F20101208_AABGAU mikulski_a_Page_104.pro
cc0e500eedb37b4f1c8b0cb5f236996c
3ff2523426ca1e49063780fa1aed7369b14f7a7a
709 F20101208_AABFVO mikulski_a_Page_032.txt
2292f0876dbc6389e84a2aa8ebacbc0d
79c0aa5f8a8b148fbde93c7a79a375ad6b675727
1051928 F20101208_AABGBJ mikulski_a_Page_096.jp2
464d21948cf766e0371f317ce4533f10
000618afba695f61ac5990430b16b8bddd62d608
93918 F20101208_AABFWD mikulski_a_Page_027.jpg
84e394829df66af827f19a08cee82658
e4c90b2261079049ad806868f4d12304e407bab3
26103 F20101208_AABGAV mikulski_a_Page_014.QC.jpg
9e3278d6e2fd9e6c60e762bb69a82957
090baa26b86bdc4987114076557122d64d5a1a26
2057 F20101208_AABFVP mikulski_a_Page_059.pro
e5ac63bfd8d90757d4170e5d4d73c09e
ced8823090d899b6266e865eeda1ca368d4a2ef9
F20101208_AABGBK mikulski_a_Page_036.tif
07151b4c2979419b3cf2fe4d37c8d6dd
0bfea2b3f498e94c3f8eb8dcd06ba1b614648fc9
16502 F20101208_AABFWE mikulski_a_Page_073.QC.jpg
b3624f28a90b355035a80731e93f464d
2f95d55e8a0545a5a2d8fa7cb040fd46bd2fa420
18381 F20101208_AABGAW mikulski_a_Page_033.QC.jpg
b8e5eef91519ef6f257a11e76e952cce
3358fa43161b1c6cea74298a1f6df7a8dd173cff
3086 F20101208_AABFVQ mikulski_a_Page_007.QC.jpg
61c20085687cc35ae6b10c591450889d
22616daf91057116585e48ad7411b4485f933ada
F20101208_AABGBL mikulski_a_Page_070.tif
589c46b98507214802dfafb943462dd6
fc0b94cbe95d127c63e8897ab7cc32cb8533c7d9
5119 F20101208_AABFWF mikulski_a_Page_054thm.jpg
1ccc7eb2b460421f193fd4b0a95f5b5f
8b1ba45d583684e152627af1113123496833cdfa
8309 F20101208_AABGAX mikulski_a_Page_045thm.jpg
0eb2ad21c11e6a9b4618db576993b283
dc887ae9de676d1ad9ff8bda2910e539943af4db
104863 F20101208_AABFVR mikulski_a_Page_030.jpg
48c9570b10cea7bbe05ce029324d9ae0
e58b25a7ae75feb81daca7c5d8a124a9974c79c0
F20101208_AABGCA mikulski_a_Page_065.tif
fc252d686a6738058a314634dc49f2b0
96ab3fd9e11a79ad87d445c1aff505b80a194b6f
34400 F20101208_AABGBM mikulski_a_Page_030.QC.jpg
1fd2223ddea102ecba4252500b3bd264
c1a9c162998a908b8632827dc6e75906fcb29816
F20101208_AABFWG mikulski_a_Page_045.tif
514ac142ba3e252cdf558c5cf4213560
825db5fe322c4797ec9c0f0a93d116448e6d71dc
F20101208_AABGAY mikulski_a_Page_080.tif
809f068df5e3687eec77e3c8a0ab8f92
c43e0d9b6d43e48a01a5c1601d708fa6245ae663
F20101208_AABFVS mikulski_a_Page_027.tif
29001b462e93b25d2fc19bf9de0e626d
8f0f0152022daf537f6e1f5229de61a9cf29359c
2084 F20101208_AABGCB mikulski_a_Page_037.txt
4d807f3da3838b16bdddad4ea46c2661
5201808ef284804695bfc920af583a090f3e54a6
12774 F20101208_AABGBN mikulski_a_Page_012.QC.jpg
0bc9da437c192e399bea7421286bff12
6948e3650d7e287b62fcc4d31f8259929705d1cd
5953 F20101208_AABFWH mikulski_a_Page_031thm.jpg
b2ba9c45a238cde1290d4bc37e8eff47
a9132fa64bdddf61eee3738020fb54a2b5850f96
2597 F20101208_AABGAZ mikulski_a_Page_067thm.jpg
8f870a2bfaf65f071885aaf4eb5bf077
d276376d4082213a4d4669af4e6b3303f193f500
1463 F20101208_AABFVT mikulski_a_Page_094.txt
353202993c861e85c9fbfd3f935dab0f
6f76a425cf88f69f3742aa8bb2242440ec2d4840
1051953 F20101208_AABGCC mikulski_a_Page_071.jp2
fa681aff9c4f8977ee66ce3f54cdd98c
f376450812ae7c127ba07865afb3d6290b25173c
9750 F20101208_AABGBO mikulski_a_Page_001.QC.jpg
a0a70540b7cf43128c77bef525c9a8f0
7044f0e720bbcd258ac096bbd3ddec356485d258
2019 F20101208_AABFWI mikulski_a_Page_064.txt
168a4d99f4cde0dfff5a9a94a87b1f85
73bb544f79222c311fbe10348aca9e7956106c6a
8774 F20101208_AABFVU mikulski_a_Page_050thm.jpg
bd94350d2149023a6534ef1a4e719e6a
969e68812645d3c964345af30895de0907f76900
1051932 F20101208_AABGCD mikulski_a_Page_069.jp2
babc06edde02a38fe7e05668f6d9f502
828b34a4d63c062fbc8e3da9f4e0712470ec6afd
4621 F20101208_AABGBP mikulski_a_Page_069thm.jpg
179cb2aa59e9609480500b1b045014cd
c1feddfa17e0042bde1dd594717cd7032111d55a
64141 F20101208_AABFWJ mikulski_a_Page_080.jpg
2c66a1dd1cb1748a453084d372f42952
9da460b5835c55dc0cdf3025a7630d6cf2f2bcae
6383 F20101208_AABFVV mikulski_a_Page_068.QC.jpg
2f40994ffeeee83cdaf508d79d699d61
7a5931df9986107d4fb68da8e0f96a1a49be9a3e
7523 F20101208_AABGCE mikulski_a_Page_014thm.jpg
dee80401418d2244ef0c97b747fc73d8
7f55659ffa510beb7faf5f3bfbefb525e353ffcc
50285 F20101208_AABGBQ mikulski_a_Page_105.jpg
6392aeadd86976b0e3c2d613abe9b62b
15a6c72c02063455b35a3553e5ba77850695642b
17606 F20101208_AABFWK mikulski_a_Page_068.pro
121d134e0fce4269383b13016755c9f4
7f0620f9bf77defff7053415c18164b3f9a01c62
114496 F20101208_AABFVW mikulski_a_Page_037.jp2
7d7456192df6ed030ff04ae8fc70c96b
b9ae83281d8f7b4190b9991eaa47cfebda207613
103000 F20101208_AABGCF mikulski_a_Page_029.jpg
8d570a7cdd520dd6365f1457392ef27d
50342af7730565f538f57031022d2f2dee0cd30b
84688 F20101208_AABGBR mikulski_a_Page_056.jpg
002bec661b13856f6f1f00ec8a6a6acc
035fd647aa7e7a4d23b7f36d3f984abb5ab5fa1e
1288 F20101208_AABFWL mikulski_a_Page_104.txt
ce7d02c553666c2afe6bd122a68bf13b
1ace824fcb9a5a644de8bb670f827ef5b2f34636
100553 F20101208_AABFVX mikulski_a_Page_083.jpg
1399fab4b4cb9f67a2a25c0ad04de20e
d5aef025ea8567257f81fc0da8fcbf504e2080cb
2473 F20101208_AABGCG mikulski_a_Page_076.pro
79e9862e87b17ca0c3682468183807f3
5c68782bd099338d6c7825f46c7cb20d41de4f2a
72486 F20101208_AABFXA mikulski_a_Page_091.jp2
ebfc6ad3c7e4ee3b55a348c48e7ef723
054e2d15aea8a746c845c48c8cf88ef797333afd
2523 F20101208_AABGBS mikulski_a_Page_056.pro
819333d6cccc4f399859b15f4e942896
696ca3968bdf4dd2780e696872b9fdcf8806e2c9
51902 F20101208_AABFWM mikulski_a_Page_052.pro
ee39e189e91abc49f99b1f775a18353e
635ffacd4f0b56481caea0445211148217f1a6ca
8945 F20101208_AABFVY mikulski_a_Page_023thm.jpg
dbd82718f92d3294e4ab49606dfab9e4
3f52b1410eb09d07f886ae60d451b3330d484fff
7266 F20101208_AABGCH mikulski_a_Page_087thm.jpg
f2e658156bc9b81acf48208c65ce716d
7217ec94693c0902d42ba0a0c82532e5211bb6ba
68973 F20101208_AABFXB mikulski_a_Page_033.jpg
d7e505254817c1ab0d62ad2da4205afb
e95e7e19f1e3053bbeaa1de21f0815ca035baeed
183 F20101208_AABGBT mikulski_a_Page_095.txt
99e6d8651d7389193beaedb424c60624
2c911e7f2a98a5d8f1cc5cb187ce18efba8a6370
52658 F20101208_AABFWN mikulski_a_Page_105.jp2
e88c8de7876e3a9337f705d9680889fb
84a0dc6a816b844528c7a8f1f64f0572096a2f86
62315 F20101208_AABFVZ mikulski_a_Page_077.jpg
37b391e667f6f127332f54c5f5858e34
560a2c4114ee60df97f0e7f30168fb04f9158736
8735 F20101208_AABGCI mikulski_a_Page_062thm.jpg
54256352c1792627885818defb7ac994
c1a1c871887e8d01c32dc282b4a64b734fdecfa1
F20101208_AABFXC mikulski_a_Page_063.tif
823457207662a0f9599204d56b391abf
fe508b2a5f086235617d7e39a4a69a1ffa5293f3
5407 F20101208_AABGBU mikulski_a_Page_090thm.jpg
c0e33f7180eb0738c1d459db6fc5f243
e2409a13781355fdd18d2fb61a9eba69be7bd1ea
1054428 F20101208_AABFWO mikulski_a_Page_068.tif
b07277ad48527f582d910bce925bb243
1cafa4bf1f6a440baa649fec3797fda794e9c27e
123320 F20101208_AABGCJ UFE0017945_00001.mets FULL
8fd9eb2e98f2a7a2715a8498a2dfaada
444f783fef2485e6e892ec89e6bfe1eee9efd165
F20101208_AABFXD mikulski_a_Page_096.tif
54aa205b752877d9e103afdebcb0d3a7
0c65a75dd793108a4586ef504c90eb8b931fb622
F20101208_AABGBV mikulski_a_Page_062.tif
3abab231eada09b7718760baaf1d66ab
4f2c40e49b5f4b5be727b48fe26576a680a2c1c6
1221 F20101208_AABFWP mikulski_a_Page_095thm.jpg
28f7793d87fbdb79cd3477e02e8ed881
d758a31e14fb74e7bec0fd919cbf40571bceb5bb
99 F20101208_AABFXE mikulski_a_Page_054.txt
5f7d105b426bac866360bd3001da3013
15c889417cfc3b8a7154a9379b7fe8f4ae8518cf
1051884 F20101208_AABGBW mikulski_a_Page_018.jp2
36b847d6003243fae526023c36a648cc
8640a0b5c78b1887c505d90bc97540da1c175af9
123 F20101208_AABFWQ mikulski_a_Page_097.txt
a7b18505656ec87082fd28ae59d9b0bf
b2c9cf4f0fff27885585e99ecdb3d1804d6e51ec
111203 F20101208_AABFXF mikulski_a_Page_016.jpg
123bca77ba1a79b77e4831550119b8cb
dff553f74c8bab6bd66255dc53a30740c9037e20
13104 F20101208_AABGBX mikulski_a_Page_078.pro
e3e6f7aeb4e91252009cf2d192132f1f
75edeab3313c15f0defa51e3dfb4c1f914713699
8816 F20101208_AABFWR mikulski_a_Page_047thm.jpg
c3a314ced07310e832f025f6d8ddd389
778c1f6cd5fe9d7eb208dc82f58db80402a14429
107708 F20101208_AABGDA mikulski_a_Page_015.jpg
f8a0a01b8bc875a46e652cc9e73bb527
1fe02d853445fc5a0a7956b56e71b1fa6bf35739
36329 F20101208_AABFXG mikulski_a_Page_063.QC.jpg
8cf9edd683b74c7e4c549cf2d7d3b4e0
8b213dfe70a66450548d6cd6d73f281d1e919736
8326 F20101208_AABGBY mikulski_a_Page_070thm.jpg
266edd27d080d3f6fcf969d0a56b68fe
a9b6d83650b93bb0f7e2a840c1bba60432a00975
130 F20101208_AABFWS mikulski_a_Page_002.txt
120cab1d31cdad2878b10b162c85a73c
16e4914ff604b3609711d33d34728252e44f9058
111177 F20101208_AABGDB mikulski_a_Page_017.jpg
b0bc9e2ab0d76217d9eb070002b4372d
8921b9bf0eb358251147a1fd30d38424eff4f6ed
32179 F20101208_AABGCM mikulski_a_Page_001.jpg
ee62a388432ae46d10a97e142d234238
d1c9d486bf1d4dc445c118f2ebc45426033f3f15
6055 F20101208_AABFXH mikulski_a_Page_079thm.jpg
2ee2c40334e7864fcff70e8fab1b4580
d2c4c6eaa144ae54d33f45a78897321b0b245c29
1051951 F20101208_AABGBZ mikulski_a_Page_020.jp2
83c79e52c6de6e22e217d268d907a533
7f84e4210bdf0703c1c4c81d97c62b05b3f5a0bb
37282 F20101208_AABFWT mikulski_a_Page_076.jpg
38e87a1faaa95006822897e2b2623053
e75c4206a4d15918da1bb3cb6424f863c6110c74
93952 F20101208_AABGDC mikulski_a_Page_018.jpg
d5d84dc2810a084d59414bdacaa60235
e8a8c17bfceb5dfc784efb3f4687f68267c67e9b
5381 F20101208_AABGCN mikulski_a_Page_002.jpg
f52f1e80543ba7e21c53d5d1c235103b
2e8e6dfa3b6a2ef6a08d3da3c3f1fc9fd8ffa16f
29387 F20101208_AABFXI mikulski_a_Page_039.QC.jpg
4c1507673aab9eb45ca95487af554b7d
a5f97d5f0f880a665fb13d51ebf9b95f4e44ca12
50620 F20101208_AABFWU mikulski_a_Page_024.pro
1c0a0326ac78550b2ba783a766aded00
08d29a0e006e9e6e222a18f317a1be327459075b
88624 F20101208_AABGDD mikulski_a_Page_019.jpg
ca040cd38b366ba76237119a8414b371
ed4272fe18ce5580d22272d43f8f4a3b3ba8fc38
5599 F20101208_AABGCO mikulski_a_Page_003.jpg
b36092057936baf2c0acde3185aae572
4505cbbf3de44d18afb26f4f5a92898365bceb77
F20101208_AABFXJ mikulski_a_Page_028.tif
3d5937399392d850f7e359d4ef7f8770
579400e0f9c95c34fec92861bd42ca7800ad5a56
F20101208_AABFWV mikulski_a_Page_029.tif
45e2b04f16377e31598044d1f2a8eefe
8205b4ef82c7fc422fa65c4b826e36d37821ee85
83684 F20101208_AABGDE mikulski_a_Page_020.jpg
0efd0809e9dae9351d357430d09e4386
e1e0bbc1dfb26fd7e040e6b9876eb8570376f0fb
55099 F20101208_AABGCP mikulski_a_Page_004.jpg
0c6a01f54f0ac460e64bb26311acf520
914764b6252fd39f50c8cdab52fcd8c92461de92
1846 F20101208_AABFXK mikulski_a_Page_053.txt
d7e77520ee56b448050c444028bb0298
e53a414a9eec1e93a525a28668bb763c34f4f6ca
51389 F20101208_AABFWW mikulski_a_Page_030.pro
ff7f5daeac7bbc27e83b43e367f4542b
5577720e5bd289bf3e81842dfb6266decd2bfb8a
105972 F20101208_AABGDF mikulski_a_Page_021.jpg
9a097fc5b58d980f79e16d02ddf07c9f
c2ef751b93189b41e8790b7ea6923d51c0733c45
115476 F20101208_AABGCQ mikulski_a_Page_005.jpg
d8179fd5517b71f973d0765ea97708ab
52635d175bbd1688781f09f8240e455655ebd778
1051986 F20101208_AABFXL mikulski_a_Page_078.jp2
f5ab8c385266595e6b53e7011e52850d
9acb0cb86c66e719a6303e3cea55b056661ab17f
2140 F20101208_AABFWX mikulski_a_Page_021.txt
3c6aff1e68e2f8e4830a1ab944b35340
8c6497b6ee08c652d72c9e7e4e443c1e04253b6f
110700 F20101208_AABGDG mikulski_a_Page_023.jpg
4d10c0318764c916fda7f6a0b74a655a
4909250ec01aab067112f2cce685360fb711738e
37466 F20101208_AABFYA mikulski_a_Page_017.QC.jpg
7bc7b0969f6132f31a5cd552086d96d1
0936e1a61ad8b66434a827b13ce16d901d86fa83
111804 F20101208_AABGCR mikulski_a_Page_006.jpg
3ae3a5646c4f3e575113da04698982b0
b593fc7869fb085ba67868f16b6af52969850e92
3678 F20101208_AABFXM mikulski_a_Page_095.QC.jpg
df450cdd858805cfdd7c46f6141d41af
62efe1e7d9451ba05df20aed693b5e0d8d7da0ab
8266 F20101208_AABFWY mikulski_a_Page_034thm.jpg
0308a13e224d46f636e87f02d1000b1a
c5c49b9f2bbaaf48271dc8cb5a86c5c6be251fcf
104275 F20101208_AABGDH mikulski_a_Page_024.jpg
b1b4cb421eeac10e12a06ef2de10d0d3
f9df5e1d730a6b285d723f16a1a69c1bcb3cefc9
9374 F20101208_AABGCS mikulski_a_Page_007.jpg
afdd15983b358e7c3f2c7b24564e4bb4
35fe09f63c49473c6350c8e6d70bf158d0f8541d
28050 F20101208_AABFXN mikulski_a_Page_013.QC.jpg
6fa09fea573a25b367d1f778d6caf44c
97b88f7f9c8183fa1e904937d407ef23ca4ac59f
49954 F20101208_AABFWZ mikulski_a_Page_083.pro
0b38b3ab74daf06d32fca95a0f6cd84e
9e67f3256f130d8b793967b99127114c1d37c9b4
109447 F20101208_AABGDI mikulski_a_Page_025.jpg
307d827d3d0ce8d79d994934f23ed667
a2fbcc8875603c5b7be934b97c164b9630676240
8337 F20101208_AABFYB mikulski_a_Page_024thm.jpg
29f2324efa224ca92438b007117acd71
49fee809917ec4db8a0308bd04ad88cbfa695b29
101201 F20101208_AABGCT mikulski_a_Page_008.jpg
669e76ee45130f5b7d585765543833ef
316b82effbf15427d4b3c564c67c6734b9c2b811
101427 F20101208_AABFXO mikulski_a_Page_064.jpg
208da24b8be846c922062d3fb00c480f
bfb48fe4eb5d70f3b8779c8ddf366bcdea5bd63a
121762 F20101208_AABGDJ mikulski_a_Page_026.jpg
814c1ba6b97fa9707b4b31d33a5fcfc6
07735b77f4a99e583f714a54cab677fbcfbe63f6
69150 F20101208_AABFYC mikulski_a_Page_008.pro
041a17cab15443b3f50c17410bb6520f
bd4b5567f6e643009e6be8a94e498b62147615a1
111227 F20101208_AABGCU mikulski_a_Page_009.jpg
9d2de04e0ae02a7cc638831e0a20c487
729d1e437f36bc9f1edd374b66e057585cd1694b
2086 F20101208_AABFXP mikulski_a_Page_015.txt
2d24cc442d85d1b3a2d9573e8acd66e2
81db39413965f2cee7dcdb987b84aa0ff5886910
87660 F20101208_AABGDK mikulski_a_Page_035.jpg
d1021c1907bfde1c7abc0d499f124563
2deb2dc3963bca08e16df0a1b9300ff42484cbfb
13171 F20101208_AABFYD mikulski_a_Page_095.jpg
5d1de98b8b64333fe696c2ec22a69ace
ca3317fe37628c6b174523e228952bf23f16c931
7846 F20101208_AABGCV mikulski_a_Page_010.jpg
8f2671e81b92f9387f84baf9cadb7d00
9d9add88d54033f8605ac9c284645b303271a616
34805 F20101208_AABFXQ mikulski_a_Page_048.QC.jpg
9e662842ca94279f5999b3aca5bfaf42
219505246c7236640847621f798068eadace8708
8100 F20101208_AABFYE mikulski_a_Page_096thm.jpg
2f82f3527ceaa888c39bc5284ad55387
3d565bf9d50df9ba44e947cb25757666a65d0aa5
99721 F20101208_AABGCW mikulski_a_Page_011.jpg
636e07170cdc18fe2ae14674179a93c5
937979cf6a36a58be67569fded514ee95873cf38
96482 F20101208_AABGEA mikulski_a_Page_053.jpg
0788b17246b728dc7d0839ffb3c185c6
d1f33662272d7a85efd60ae47a55555949fb755a
96047 F20101208_AABGDL mikulski_a_Page_036.jpg
883bef501435c3090304a0da0ff15f18
ac62efb95aaac686917c3896a7d4e04b4e211370
2106 F20101208_AABFYF mikulski_a_Page_066.txt
ce83fd0665721909b998ac84df8c5c68
a6638406848413b9b7167152fefe7ca30f736279
38219 F20101208_AABGCX mikulski_a_Page_012.jpg
9ab01aaa7deb0897b3a37b4ba9263ba7
b6874f3ec80835072a8d0d2541c81f4da3aa1374
1989 F20101208_AABFXR mikulski_a_Page_089.txt
0dc024f34f2a3f967114a7fc1bd6cebc
d8ed25e82118172dc276b4ff7dd553c189d23a8a
67241 F20101208_AABGEB mikulski_a_Page_054.jpg
84cc2431d2eeaad67d818053686d6837
be07e7bdd36ae6889fa478de63ce1bf183fe4f45
105730 F20101208_AABGDM mikulski_a_Page_037.jpg
14681c47efde3484e50b28027a1c7375
f0913110fd7ccb20ae04bdeb3d29123f7c8d79de
1699 F20101208_AABFYG mikulski_a_Page_091.txt
0e3766ba690467ac39066a45d573a0c6
cf3477f83dd77c85454b2e603a932ac8efa03148
87093 F20101208_AABGCY mikulski_a_Page_013.jpg
8c88bb6d7631043ab68ab7a066f98cc5
a181b5af44482d930e1213564978ab5f2d652255
53367 F20101208_AABFXS mikulski_a_Page_022.pro
2599ecde2f6da26521a12acdab9e6a75
c5e0f95bdaf0eada4e91cfd2ee94625cd07d71a6
86111 F20101208_AABGEC mikulski_a_Page_055.jpg
f63071fc781b95bfd3f9d5ebf78d0262
a87192ccfa9629f470d546557b2a998022a79dd1
110639 F20101208_AABGDN mikulski_a_Page_038.jpg
486b741711656d548e22320d26da60c8
7ac933ba4b27aaaf159b11fb57625bdfcc9c09e2
7659 F20101208_AABFYH mikulski_a_Page_053thm.jpg
7da4e7872f0e499f1be16825c464559f
1d14bff5e2f90ff0ef68353c06c8373d10b6a016
83144 F20101208_AABGCZ mikulski_a_Page_014.jpg
e99369db887b01e491e7b1d600ae33b8
f9cbd2b727c9c0f0bd6fd412eb21c53405585a59
F20101208_AABFXT mikulski_a_Page_004.tif
3ca37510a7d04cb059bda7a122814752
f7449832493e2787724b2e26e60d0a80b6d3b6d9
92898 F20101208_AABGED mikulski_a_Page_057.jpg
a2a9e7f46ab7c444be0ec91969445e94
3f0d824d1d366cbfc47211dccd4dbc9fed1ee686
89117 F20101208_AABGDO mikulski_a_Page_039.jpg
a9bcec62496eb4d3013a146cf28f14bb
881e70ec50ea4064b5de2db25875da3192164495
8451 F20101208_AABFYI mikulski_a_Page_074thm.jpg
47826e8066acc3276b3d9181dad14855
bfb8216de590b6762eb775cdb4ad854c408f7aeb
F20101208_AABFXU mikulski_a_Page_089.tif
85d63cc8543fbf6536b3d30ed89027c3
a8292216ac152bca917539aeffdb1f04706b9d7e
91420 F20101208_AABGEE mikulski_a_Page_058.jpg
0e542b964a1fe47d422b2e5a72397717
c93e0f09d53d24706c7ff054207609d96d407d98
104211 F20101208_AABGDP mikulski_a_Page_040.jpg
7ebad473657f65292b191731489ec9c7
768721aaa23bdf10fd866637ea3ebff3a9c06c34
28992 F20101208_AABFYJ mikulski_a_Page_001.jp2
7e603958c9df1a925d0d346f49a7b5be
fe14106f9bfba4ec0d6f0555f15fd365a756834f
52816 F20101208_AABFXV mikulski_a_Page_084.pro
eb318179134484e7af0837edbc5f418d
4c1bd4ee2e77d69c7887c6b05ab5317221b79639
103826 F20101208_AABGEF mikulski_a_Page_061.jpg
3a1ca8e5c058526d4b69273ae235458c
2a2305b2b14155fe030d22286eb273002027f783
41584 F20101208_AABGDQ mikulski_a_Page_041.jpg
e1413e7860e99eb284fe316e27863216
5e1ffa38e59b61a2737232eb15084d9826177018
870750 F20101208_AABFYK mikulski_a_Page_088.jp2
f11069d7c2c4368f94e623ff7bb89be6
b43b7a5070bf7fb835344c1a38eb37bf760b82b1
115609 F20101208_AABFXW mikulski_a_Page_050.jp2
154345cd519a918a57238671af44a2ee
ceebcec9f90a1069650f80f06f162388c98b4797
109457 F20101208_AABGEG mikulski_a_Page_062.jpg
45563fd6cd66f096ccf24d0dc43dd218
3649c99c836196c9c5681eee5343ea2c9a24cd9d
F20101208_AABFZA mikulski_a_Page_081.tif
77ee8e6ecb6ef3673c69ddd26b095d8a
b884ed397eefe2ccd049ef20062e0ba09228d9b5
57948 F20101208_AABGDR mikulski_a_Page_042.jpg
fe30f140b7dda237b957569e82023e73
0d94e3ec23c5d44273eb09201e12811b5121509d
105372 F20101208_AABFYL mikulski_a_Page_028.jpg
9760b82d899f19dcfdc0eff76562a7b4
5fe9a810e8ac3af6c3c7a95df96a828c1adc127f
1589 F20101208_AABFXX mikulski_a_Page_003.pro
b7068ad00607ca85cae858fa3be4d648
69ca6cf83058a387610a0613aeca0f9fecddc3ba
109688 F20101208_AABGEH mikulski_a_Page_063.jpg
cc566ec73055e53222e13e0912f9ef18
2829e6ee0d03165ba4e52670036dc3a2cb19db71
30809 F20101208_AABFZB mikulski_a_Page_067.jpg
98a3ed50fa94e996b9d917a59fe3f323
1d27565864deeb8cd60545b057229a027656881e
49868 F20101208_AABGDS mikulski_a_Page_043.jpg
6c946cbc5af16a052e0d8b891d026001
a8f8308378654d4894c40d89c7cabeb27cd0e890
514525 F20101208_AABFYM mikulski_a_Page_042.jp2
2519b95cd5151d9cdf6c11b77218ff5f
955facab450abddd2b6a2d2fb7e87724e15577be
6211 F20101208_AABFXY mikulski_a_Page_082thm.jpg
a4995872aeb44a19381a0089610b5558
55d6d40de8d97d7bb4ad2c96837929f2d9293d7a
108263 F20101208_AABGEI mikulski_a_Page_066.jpg
bc27db4131fcd9452b0f8d677a09c065
78dede18dbb903d1092b5d13633cca90b5190ad0
32433 F20101208_AABGDT mikulski_a_Page_044.jpg
4f7b085117722f4ff833d210616477a1
27eb7572385925ba717e227fa154080107288616
53372 F20101208_AABFYN mikulski_a_Page_066.pro
39911765779a6046f0e4273aeca1e32f
bfc77f3a9ff066e6deaa4a0ece6a352392fe4009
F20101208_AABFXZ mikulski_a_Page_059.tif
a1cc9565cba11c41d11cadac07c782c8
687b6ac15c84391fe926809cc68c39052a64fe1c
18514 F20101208_AABGEJ mikulski_a_Page_068.jpg
118b68ee6414cfa713481751d893deec
c16c491e4ad8666ab23ec3cd7d2f95ce3eb9ed4a
64222 F20101208_AABFZC mikulski_a_Page_032.jpg
037a15c3ac6b93944cd55f4cdf46e472
4dc9ad359709a15a2f602929b8144f8c5cba7907
F20101208_AABGDU mikulski_a_Page_045.jpg
d2036702151386d8d22648995c2b8d1d
271681e55b834acc9e659b83fdd4bc6f4b68f361
16275 F20101208_AABFYO mikulski_a_Page_088.QC.jpg
349c87907b38284e92ae25dd7f948ec9
4bde8eaf04c25d1cb4761a431706779fd08b5e15
55221 F20101208_AABGEK mikulski_a_Page_069.jpg
80c35b0bbed758799ae6c2b05a0617f3
9b735af769c65346c678d9cfdf205dca3393645b
127623 F20101208_AABFZD mikulski_a_Page_072.jpg
26ceb6896c561ad57b83ee95afda2f40
bfef52e5560e33bf6d8ea7508dc5e2a6664ddcab
93062 F20101208_AABGDV mikulski_a_Page_046.jpg
25a80b456621708a8132b7ad21bb254f
1ce239ce92a0f15176c7eff71b25e2bd0177875b
28925 F20101208_AABFYP mikulski_a_Page_070.QC.jpg
0be98a8469213b76186ef6255bcd28dd
d02e1ea0a726d4d4543a9e80e5a128403debcbac
93576 F20101208_AABGEL mikulski_a_Page_070.jpg
d9718336a4093159b3f45eceb2d4c6c4
85764bed82bdd8efa05706e9697a04099db3146c
F20101208_AABFZE mikulski_a_Page_039.tif
4a16f86c20ea13b62a82f0ef598ac014
6b0361aaddd19fcec287552f925b6e68432c2d5a
107424 F20101208_AABGDW mikulski_a_Page_049.jpg
b6204b1d8225f2b2315f078ed50df0b2
47b8c4e09e1877bf3536fba77e755a09e45bfb9a
61646 F20101208_AABFYQ mikulski_a_Page_031.jpg
dfe419cb38f627e23ec7ab6e0eddeb84
aab3f133c80dd95728a135c3620a36951513148c
31614 F20101208_AABFZF mikulski_a_Page_027.QC.jpg
0ad82cd461a5b5a9518262c85c5c441c
417821abb70c0c77d56f9090968802356a4ad82c
109524 F20101208_AABGDX mikulski_a_Page_050.jpg
d8ca3643098151669009353b0fd62df0
283030da7e3403a956ce23ad22995a695402e42c
15604 F20101208_AABFYR mikulski_a_Page_077.pro
7de78ebbc47bac893cc502e2372fc1c9
6b6e0c9e9f97bec29668d8976eec7ce225375cc4
67283 F20101208_AABGFA mikulski_a_Page_091.jpg
abbcefa9a97025f8e3bf474800381a55
e0cd92773084beab9d839c58716b6dad61e9f97b
69493 F20101208_AABGEM mikulski_a_Page_071.jpg
55cde13b2961fc28a2411adf6f514ad2
de6d7e1d30c24f3c54bf9d39445c8281ca681562
55726 F20101208_AABFZG mikulski_a_Page_017.pro
79b8f6eed6aca3b67022141f84590865
bd545e3b4ae125630f1ae6388ca3266a0096abaa
105640 F20101208_AABGDY mikulski_a_Page_051.jpg
87fc68a750bc7ba935ccac3ebd5a254d
743f97a1bb888a08e03eacedf41796e19b4eb7dc
123789 F20101208_AABFYS mikulski_a_Page_103.jpg
ae7cbd1c89811f7236c156ace6181593
77cba70483145b97be0bade9cff9ec1d764237c1
52822 F20101208_AABGFB mikulski_a_Page_092.jpg
6030c5512be7d05945dd5aee0d217571
8a0d1f18a3698f951f9b8888ca4bcc7c7becd25b
52975 F20101208_AABGEN mikulski_a_Page_073.jpg
eeeb1c6a89e388ae4963a1a44c5ebdf9
f4cc96c221e928f3eadbf93693828f79b1b6de55
2082 F20101208_AABFZH mikulski_a_Page_060.txt
ba67d12f998abaeeef70a42b7949a874
e87639b2c6d82486b5792ecd26a63def3731c24a
106208 F20101208_AABGDZ mikulski_a_Page_052.jpg
a8411580282e03dacb5ff20feb278b34
f89fdd4819c527a4b5c35046f0b028b9c397fc5d
18871 F20101208_AABFYT mikulski_a_Page_054.QC.jpg
a05706125728ac37885885ea3a5229d0
d6358c66c8c011e4f35c9cd3e525eb06f2e71095
57128 F20101208_AABGFC mikulski_a_Page_093.jpg
2efc408ffd3e228b5d92d1ef6a605ff7
274bf125ff8cfc061d9584250b7f97e5dbd7a259
28177 F20101208_AABFZI mikulski_a_Page_055.QC.jpg
29e291940a03ee898b2b6b3de80ecf94
171babad368b97906af1e400faa81782b6fdf56f
101930 F20101208_AABFYU mikulski_a_Page_034.jpg
856809c247e9cd14511359ae6579c067
b51cb772ee94d5c385f5a5a7c491835c53ba181f
62250 F20101208_AABGFD mikulski_a_Page_094.jpg
e7bedd2e1bb01ee56a6f5e7498c6667c
30fe0f3649ce5344b1dffab8fa6c7c43b10f0659
91468 F20101208_AABGEO mikulski_a_Page_074.jpg
9ea30776c7b2cf426ce78241078b55a3
e013ba82bae59e21c59c986831d95cecfccebf19
F20101208_AABFZJ mikulski_a_Page_084.txt
5de162199cf291d264a21cb9fc148be4
a7a498f9454adf2c2274b51f8ef7fb2a5bf6897d
F20101208_AABFYV mikulski_a_Page_047.tif
393560239f8404900885415d69d3fd57
329c20cc47639e37d12ade66d34d6e9c175c8c63
74332 F20101208_AABGFE mikulski_a_Page_096.jpg
ee6b9ef07d5241e82e69f14038d5bfaa
f464aa699ab07411e6241ad0b46d383ce902979a
73531 F20101208_AABGEP mikulski_a_Page_075.jpg
c411bf9a055624c060e3974de5d24f62
50eb2f6b65887d4c5122cc2415fa33cceb65e1ed
113 F20101208_AABFZK mikulski_a_Page_059.txt
0fcd3d49394e16b86c0d7b9da9b40d39
f7895b61f486490aa6dfb2e407f6376a62baa2b5
33979 F20101208_AABFYW mikulski_a_Page_029.QC.jpg
b2670e30f7c43b850644df2ce44eec4b
d20097a46dcc9f32b8a037f388833dddf4d54e52
53547 F20101208_AABGFF mikulski_a_Page_098.jpg
846cb15ef830bde3347781b28cc2ebc9
d8e4ecf6b7026daeffe218c36bef3f32c9ca70b6
92037 F20101208_AABGEQ mikulski_a_Page_078.jpg
2e6b7f15ee1264ebddeb87088a2a7a1a
a8bcd8a052d651a12d3cb6fc89e6d0da08a56522
2078 F20101208_AABFZL mikulski_a_Page_083.txt
3d50733fd781e6aaa5fd3bea9439086d
f01366d47e0433a73413d43b478da2791d479d68
33399 F20101208_AABFYX mikulski_a_Page_028.QC.jpg
bd83a287a264f6263e87db9d3b940599
17d6c6a172e10c2b5afdd6a9edd77c2c846b4dc2
51930 F20101208_AABGFG mikulski_a_Page_100.jpg
068a277457f5d8bff03ad6247215de3a
bc917056f38d4ec1ba6335efe251cc8a2c119890
82824 F20101208_AABGER mikulski_a_Page_079.jpg
64988a8f5dbaa36aec41e488bf2b5372
e84f886a01725b2647f2e75d7299e35d922e4a10
100900 F20101208_AABFZM mikulski_a_Page_027.jp2
8edf91abe8512dee692432505c55b9f8
6ba453f418f4dcbd257a76de07d6ac92b1027d69
98659 F20101208_AABFYY mikulski_a_Page_085.jpg
6c6d1ea57518b35f955f80521dba4286
ee240114cf05f0d621b0bc78d157fcfda2d94cab
34676 F20101208_AABGFH mikulski_a_Page_101.jpg
f7b0fd63126e989769e9968b9d90f3be
0d04bfb04de783f46927d8ed8330b8227fa39dd6
84309 F20101208_AABGES mikulski_a_Page_081.jpg
21f34d25e5f8cfd979c3e8712b54bd2a
6e31e3c345faf949f52b41bcd9ae20acdffd0d18
1051945 F20101208_AABFZN mikulski_a_Page_087.jp2
bc55113393556838a83a3f81e0550e16
e2829caa519fec9fa0a6403e346c12dbc2f936f8
44941 F20101208_AABFYZ mikulski_a_Page_046.pro
fdf821ecd0ad6eba961657ae4e2ea276
51733aa5081b4a4617c0e7a5be750e1cfda19191
125311 F20101208_AABGFI mikulski_a_Page_102.jpg
97bf5bbc1054c32a5448bfd7ff8501bf
768f26b8f2afaa6842fdb9dd8d2ff55fb0d40eaa
84930 F20101208_AABGET mikulski_a_Page_082.jpg
85318200e25b0820175d70198e8fecaf
2535f68f5ad44539e8588859fbfe256c8cdbaaf2
2878 F20101208_AABFZO mikulski_a_Page_097.pro
1641059830d6ce119b4e0e009b08bd23
8176cc53954d2c09e984beed169e97d9dc24fef4
6496 F20101208_AABGFJ mikulski_a_Page_002.jp2
df94f3d98965fad2bfe064650af94e18
66671a224241457e6cd5c0a442233147b7b2fe48
107149 F20101208_AABGEU mikulski_a_Page_084.jpg
b58be248ee73b6d575b7738f45899d75
aada9ff10e848798e597e703b5cea4e744caa518
F20101208_AABFZP mikulski_a_Page_018.tif
c614c371718650ce406bdd002c52b19a
24c46041d2f14e69d5877cf99be0f6a201f07c45
6710 F20101208_AABGFK mikulski_a_Page_003.jp2
b77c42a6c9fde7b590b84b3b158927f7
914fa02c903a5836d6e8cd98bf635cacae4f861e
110312 F20101208_AABGEV mikulski_a_Page_086.jpg
d67957048abd1452cd2207ecdae2bcfa
161f8fa5ae04146a51f3e54e30923827d2211fbb
4655 F20101208_AABFZQ mikulski_a_Page_077thm.jpg
1f921a817829b7b74a834e2f563f0067
c244a94d5bde09976c8eddbf96d7129062f55a64
1051983 F20101208_AABGFL mikulski_a_Page_005.jp2
fdcd333e63b2b534511eee5e9387d348
f0cee6b6085f0beb7899b1ca178808ea45f29824
102372 F20101208_AABGEW mikulski_a_Page_087.jpg
a521936e33755b5ca7c5530385201ad7
86923cc3079fdce0f925ab5a8e4498e4cf19b190
107136 F20101208_AABFZR mikulski_a_Page_047.jpg
7fffaff96e47b676ffa6225e6181f954
4be6ae004f93bbc2cb74eb1fc4a9c17eda13e7a3
113996 F20101208_AABGGA mikulski_a_Page_028.jp2
df0222341e07c4340faf46baf7613ac9
7c823618d94e143c608edcf3846e9af48513a783
F20101208_AABGFM mikulski_a_Page_006.jp2
4ba05df3f541a42da64006f77ee9671c
6a4437500cfa4a06a4b162d87f8b876e509578c2
56772 F20101208_AABGEX mikulski_a_Page_088.jpg
e08bdf4b3e5d924a88a6e664fe6fa478
778292793cf360a8923a8d808e3d9cb36791a40b
10608911 F20101208_AABFZS mikulski_a.pdf
f91548351c00d969ce5a69d2d838c9ae
226da1d01793a943ab2225749a673f162144d657
112549 F20101208_AABGGB mikulski_a_Page_029.jp2
110904fb5a818a4ce5193796d577b020
3882e71116154ade8310ae190742decd4cdec0f0
97706 F20101208_AABGEY mikulski_a_Page_089.jpg
b84bde40416f30462ba7c19881bd40b1
8789430c15b0049e5d1c1e890ac753392b261e7a
17632 F20101208_AABFZT mikulski_a_Page_012.pro
18b01f6a5259488e6fb3a9baca2d6b82
1b6d6b1f8ade64f8dfb5c9b95d18d654277bc5b7
111207 F20101208_AABGGC mikulski_a_Page_030.jp2
47ccb0c36a1d645a15f1288717292ee0
c6770af9af0903a0d16d5b50c7fe6b8ea543c2be
108252 F20101208_AABGFN mikulski_a_Page_007.jp2
e27d2573fb0d0683c5eb39773490d004
17231913876ab4ec9787210cf4d2068fe81f5566
62178 F20101208_AABGEZ mikulski_a_Page_090.jpg
dbe2c7e2aa722ba4deae74ce2c5d2295
2aaab98cf6979b255d25296711244df09d4fdb6f
412 F20101208_AABFZU mikulski_a_Page_033.txt
286504ea4432c14c9adfe97737a7c3e5
4c548f8b768d64b073807bde796fb068583b8d27
996269 F20101208_AABGGD mikulski_a_Page_032.jp2
7d442467241619c85932b9daf3ed033c
8bae7b8a0fd4c4827c6a64965892aa407acd7d18
1051964 F20101208_AABGFO mikulski_a_Page_008.jp2
b0cc077a6c5f30afa06e0b0d2d129c8e
59ec5107a521fd1a5f999971c32bd522c47547b9
35257 F20101208_AABFZV mikulski_a_Page_051.QC.jpg
2f0da3dd7e309b25d91ac27fbcc67181
959a0f80ae409f785eb90e3094e2593d4642188f
1051975 F20101208_AABGGE mikulski_a_Page_033.jp2
29ef0c5666311b93929e9c89f382f52c
aff64da5bbc9a75c3e240d2e267a1ea3554dae23
90052 F20101208_AABGFP mikulski_a_Page_010.jp2
66329fa0614e1b1b74d5572ef809480a
094d504384d523aaa645715f2052f3831c848530
95723 F20101208_AABFZW mikulski_a_Page_039.jp2
1b3774a6cd4e9462986571a4362c8929
3c0324f3ce0578ba5b027711b7758246ccb71973
112637 F20101208_AABGGF mikulski_a_Page_034.jp2
d36083db3c566b4ddfbf78dce9f5969e
f3ef534918e6e0b5d2ec87ab8547338d7b6cb473
103248 F20101208_AABGFQ mikulski_a_Page_011.jp2
1e52455e575c8ad7bdf438d6f7a25a4d
fa7f84f86c3950c78460a971d0a7d427f630dcc1
F20101208_AABFZX mikulski_a_Page_013.tif
f939078666f1892bc8e6a75d1e071198
0e0b2a0f8b68868990bcb5dd145d5046ae62645d
94907 F20101208_AABGGG mikulski_a_Page_035.jp2
cc91ebae294bc4e9231ec5a8244c6159
0f5f7a4ebfcd9e6faeb69442007f93473f23d14f
41409 F20101208_AABGFR mikulski_a_Page_012.jp2
161d36a469ef7036027a722b5364546e
08a6fc35ae0d50b739bd77dd021d22121b874606
430 F20101208_AABFZY mikulski_a_Page_101.txt
860249ef1a2cbf21607abbd7268b1b1c
d5f6c5e39c876005fcd58265b2b9eca9fec65a50
102991 F20101208_AABGGH mikulski_a_Page_036.jp2
87323e14fc56920adc2ca0c42e50b1fd
8a9b2dbe018795cd0efd9f20cc16f68dc37c2ad1
91048 F20101208_AABGFS mikulski_a_Page_013.jp2
33cc07ae5c93657009b245575fe52078
fdd7630d4ffabd1429c52b63d4846538c7a9c41a
143 F20101208_AABFZZ mikulski_a_Page_080.txt
8e218cb46d6dca3675dd34fe5bf4662b
3d2e8b02077995c026bba757e4ad527fef6d67d4
116858 F20101208_AABGGI mikulski_a_Page_038.jp2
9ed2a6b51aacce786b8e944cfd120b4b
9f43f59347f99d6bbb02bacd21de66ccf3202b8d
114953 F20101208_AABGFT mikulski_a_Page_015.jp2
1ca00e3b4a41f6c0838d65206547f163
d1001fcb44881062cb19578c33a16625855c5078
404563 F20101208_AABGGJ mikulski_a_Page_043.jp2
ca23f822af56cb109ea4639e5ad8f18d
1dbeb001b97719d0cc56a708b57043b52686ccaa
118518 F20101208_AABGFU mikulski_a_Page_016.jp2
f86c01eae4049adbc9d3d7fc35b788e9
2c45abab2e2ca4fb6afd8f2403f7bc3893aada42
262643 F20101208_AABGGK mikulski_a_Page_044.jp2
6e4a2f0c4f339cc2880a98f3280bc94a
49c4091d37e5713006d9ed3cd116fbbcd9ae2941
1051960 F20101208_AABGFV mikulski_a_Page_019.jp2
1d84f285bacd95b445bbc1b6d08af90f
611b9f2826b5a805ac675941a0ee5602cda005b9
106567 F20101208_AABGGL mikulski_a_Page_045.jp2
8c67d33d6f5e303adb87a891aea3a98a
11aff1d36b669ebb68b788305a4e287af52164ad
119278 F20101208_AABGFW mikulski_a_Page_023.jp2
355702d81be3a3ed65e1d1a68e0ebf6c
326ef26a2060025c27582d6d6636fce001478170
99365 F20101208_AABGGM mikulski_a_Page_046.jp2
d8f37be59f45eb4febe584026ccfaca1
eba495762805224ef660689dc0f1e544f39ffa18
110711 F20101208_AABGFX mikulski_a_Page_024.jp2
2b3c4883e1c044c174015727c48c10ee
d6c93cb9669894f77a06d294997a62c9028b08f9
115185 F20101208_AABGHA mikulski_a_Page_062.jp2
2b8655792011798e753cf2dfc7510e15
4bacfa5c23077c2389c2302d2395fe0b90bc0e6e
114583 F20101208_AABGGN mikulski_a_Page_047.jp2
7266883ef825dde99225fae5d2b8ee89
1069f93700b7e5508f1b87f62cf9393e9e0f2903
118280 F20101208_AABGFY mikulski_a_Page_025.jp2
550c65ba6aaf68dc5d5a3cc18760f92a
051f23717e8c425084aa148c103e1cd1f0769459
115127 F20101208_AABGHB mikulski_a_Page_063.jp2
e27ce042107ef86e406cf5b6a6286710
d15454e5a89edc00bb4a8833072dfba03f56a3e7
127917 F20101208_AABGFZ mikulski_a_Page_026.jp2
f0b48d6c0ca9d3376b98815de1bd7d19
768e0930cf0c93b1b64984e73a5e187442dcc2ac
107979 F20101208_AABGHC mikulski_a_Page_064.jp2
9e915d75db24e18c5625b91f32e03569
1608584dcd073db220ab2e1c894b576f107a66bd
113476 F20101208_AABGGO mikulski_a_Page_048.jp2
48274a62d72ff435df48c0db014e5c5f
b1821a5c03c8440151cf757020dbb39fe38bbddc
33531 F20101208_AABGHD mikulski_a_Page_068.jp2
74ada1335db88eb442149958d90766f2
687c3024f74495af30e6c5b5ee3eef0fd9180201
115513 F20101208_AABGGP mikulski_a_Page_049.jp2
56a5a882b452b486221d34730ff1ef3e
3090781c82321a2a7b6aa20cf1990bc55f594a4c
1051934 F20101208_AABGHE mikulski_a_Page_072.jp2
9185357fd9d3cb87034189960d458eec
f2b4fda5efd2709eaf8ab1943553062286320850
111919 F20101208_AABGGQ mikulski_a_Page_051.jp2
bc1105a50c46942df80879fe6085d081
611eb877beda1e59d397e7c6001c600041aea8f9
872582 F20101208_AABGHF mikulski_a_Page_073.jp2
94364eb7c3392190324d4ae35e1b7688
ab63ffc081778762374ba0767895e6e97120ca7b
114584 F20101208_AABGGR mikulski_a_Page_052.jp2
a721194099c8bce0cbabf290a5a52085
c2748b9ff829a9bac2548976986d96450e4a71eb
F20101208_AABGHG mikulski_a_Page_075.jp2
eca9ef6aa6ae69b54dcb72bdb2c90520
6e288d94936cae109a9468f42bc460dd94cb85d9
102913 F20101208_AABGGS mikulski_a_Page_053.jp2
e776eceb618ee1a1d215275138adb1fd
65c76a7f09f54314fb8ba64c9ab646b1f45a3ada
700309 F20101208_AABGHH mikulski_a_Page_076.jp2
55818f26846bc44b9b772bd6b0f7d4bb
6736fade0523d8bd81b4666eeeea2a8c9ccbe3bf
1051897 F20101208_AABGGT mikulski_a_Page_054.jp2
2a355635c178d3a0a98ec41d2efa46e9
ad589f89ea664c7471e72f26032d5f149c2ead15
1051769 F20101208_AABGHI mikulski_a_Page_077.jp2
3592e4c6a1c521e09e9fca6b7df17e3d
405153757ac8c3716a0c39fe285274882294933a
1051946 F20101208_AABGGU mikulski_a_Page_055.jp2
747d74899d13c103021c1bd2bdefd0a6
221dc1de1a131d324e6392c260d016bae83e2fc6
1051910 F20101208_AABGHJ mikulski_a_Page_079.jp2
33295d8d5c7e30d6ffa824a94b1a8173
45df27c7512b66768ad0430845e605de0b7e7d6f
1051811 F20101208_AABGGV mikulski_a_Page_057.jp2
ca7913c86f35a19bfcd08ce6c9077659
18e081fa577e459ad2af51935230d8a0bf292d0f
1023400 F20101208_AABGHK mikulski_a_Page_080.jp2
cb80e3c11acdb68bf169d8a478357126
a9873105d85d217d888b7b3bbefa1dc4670bda26
F20101208_AABGGW mikulski_a_Page_058.jp2
817117e47782472d061dc487f58bfbea
a4529768cf14d96fb8fe615598bb51bbc76755b4
1051971 F20101208_AABGHL mikulski_a_Page_081.jp2
eab1eec70dd619d08374170e506fbe02
662eeced28c62e314dc322e47334ae4d66f70794
707137 F20101208_AABGGX mikulski_a_Page_059.jp2
eb59d4d45df31bd3b640fb0acf23bba2
ca44d4636609d5963fdff2998f7abc7c59b74fd2
926488 F20101208_AABGIA mikulski_a_Page_104.jp2
0c6f4a212f3aed1717701efe7f66446b
16561d8a094527078f84e451c7c27ff5888de703
107475 F20101208_AABGHM mikulski_a_Page_083.jp2
174a3786690964ba75f901d4798a0559
615a2f96919c475dcd3a93467d31d9b8a6f2759d
107618 F20101208_AABGGY mikulski_a_Page_060.jp2
8fb24636e427421a2d08941558218ace
5c5994d5e6ec69481d5a35e20121851168daf6c2
F20101208_AABGIB mikulski_a_Page_001.tif
eac089f52ec9619806275766c696e0e9
8ba9cc6ac00a319de9ac22ed97afcf6f13590ebc
114860 F20101208_AABGHN mikulski_a_Page_084.jp2
6d486a0dcd109128e2ef6f99f42208f5
0e2781a1e2d02480f429b9a53035258fbe81d3dc
111192 F20101208_AABGGZ mikulski_a_Page_061.jp2
8e32346e6543e037c205bbbfb2d26fdf
b720028da12febb7fcdb4cf347e0f680b863afb1
F20101208_AABGIC mikulski_a_Page_002.tif
c6cc859be96a6467b700a3c773a68f6e
afe13e283366a2dcbfbb43fadd276970445725d6
105079 F20101208_AABGHO mikulski_a_Page_085.jp2
1c1795457c1d058fbfdd4f351740d2c8
52b861470e6597c194980bcf71bd59f43c690571
F20101208_AABGID mikulski_a_Page_003.tif
b19c4ea3c3d32e8486594f68a5f76449
5fa540524325d6d3cf93d412f7052f1855f2d1ca
F20101208_AABGIE mikulski_a_Page_005.tif
1d6b3f44b15c3028c6ba0ee5c0cdcb0e
dbdd4629c06879e86d5d2dedd4fdb308482a7797
117961 F20101208_AABGHP mikulski_a_Page_086.jp2
903cef106dbb1cc74b80dd33c071a319
3c4967215e7e1b1586d143d3255c82913ae92e59
F20101208_AABGIF mikulski_a_Page_006.tif
da69186260b3370876947e33efc85262
9a1a4e9c490f5cd7b11beb1f7e23b3004f3aca00
104997 F20101208_AABGHQ mikulski_a_Page_089.jp2
ae174906260e2e069f8d394e5abc998b
70f22898f9a8f03aa2fbd5125fe90591d11d2bb1
F20101208_AABGIG mikulski_a_Page_007.tif
80b56c910c1d3830d841fa3b15097b0c
21ce2a1c747767fe2a8247a8a45c1d88816fa3a3
67152 F20101208_AABGHR mikulski_a_Page_090.jp2
7b39c47c9dd7f4d0cf31c071dca1a590
55a3d423b663b0968386e402dbf8bc698772b0c6
F20101208_AABGIH mikulski_a_Page_008.tif
b2c8c749b4239bf7cbed0a205bc0b32f
6d9e2dd7d482818d663911082872c5285d0748b9
58172 F20101208_AABGHS mikulski_a_Page_092.jp2
40f44399f430b378b98592e05ffd269c
fc5571560b09249858bf91435893395a798fce5b
F20101208_AABGII mikulski_a_Page_010.tif
bfefa00ea5a66eb1e9f8a079c617377b
2214b811f0e3f13bd7ca99f2775dd40082187f12
59921 F20101208_AABGHT mikulski_a_Page_093.jp2
bd14994080018724198f819130d240d2
3e4adc6912873b059246627539a30a4ab34a0b04
F20101208_AABGIJ mikulski_a_Page_011.tif
766bdb6508c93d3511eb86e2b21463d8
c06c4d3fc03a45c2f917d78cd82469ed01b56a03
64543 F20101208_AABGHU mikulski_a_Page_094.jp2
265233b55963993cb3c50013cf6d9c61
b29b0502272d5e22fcec33bd24c75f1e61ad487d
F20101208_AABGIK mikulski_a_Page_014.tif
b732ed665eb48aaeb694160d8a2f6ae9
4bc40748dfeeec804c837da928c3f9cd09397b62
13278 F20101208_AABGHV mikulski_a_Page_095.jp2
24f9b5862aad00352648cd77399ca457
6937a4d070d34636512b4e0b9d465dcbaa6e3629
F20101208_AABGIL mikulski_a_Page_015.tif
d1d9ddcadc051a8ff6ca5367e4b83c3a
498eac44d3571d5ec9a7f5e0fe4962f08a22322e
990710 F20101208_AABGHW mikulski_a_Page_098.jp2
377c87e64e84bafd48819483d41b1a38
50026e48e7532a3a753ad1edea8e90fc22b39d3f
F20101208_AABGJA mikulski_a_Page_040.tif
775ebd5988b1d39e8d88f28ccc374fd0
af7cbf93ade484b0d807ac25b19f707e8ef9deb9
F20101208_AABGIM mikulski_a_Page_016.tif
b65540ec5a9dcd274942602c0bec02f9
5e1a2bb11ed14f98f4309b733c3c7ceabcfb4bce
588984 F20101208_AABGHX mikulski_a_Page_099.jp2
90200dd5ac41244ba2af98c23a6cfd0c
381997b992772c467e28070759e86ec9d610810b
F20101208_AABGJB mikulski_a_Page_041.tif
a5b6e26966aa31d7ee35f7c85b3dae1c
85486f8746aa2d4d7783ee4be22263a20360cb72
F20101208_AABGIN mikulski_a_Page_019.tif
ebea8b14cfed584d64c44f32acf55cf6
ec38fb77a0de92e60af7e47484b5d565f4aa9752
612886 F20101208_AABGHY mikulski_a_Page_100.jp2
84ea064385948974d197f47ce838e92f
3e6e5b2c8745af0db90e156b27f2c3ebc3c2847e
F20101208_AABGJC mikulski_a_Page_042.tif
cef76419113902d0eac56dd2fd52dd32
fc9a461560d59ea00f3db76b36f298677c0efb79
F20101208_AABGIO mikulski_a_Page_020.tif
5d7e2148453a1f6032beaf6b4cabc889
cd554376fcfce223f1cc46561c4eaa984412c87e
1051980 F20101208_AABGHZ mikulski_a_Page_103.jp2
8449d4a0a4d033285ecc618c12d19fca
bd69171298e5040ed292d3c69332158dfd7b6404
F20101208_AABGJD mikulski_a_Page_043.tif
d04462dcacba3d914e5cd697f368631c
41d3198ebdab873dff4c0e4e3e2993410089a4f8
F20101208_AABGIP mikulski_a_Page_021.tif
e4f0dec513bf23f0f33c4753600efcd2
278507f05d09cd606a4ca910edab3bd05a865f12
F20101208_AABGJE mikulski_a_Page_044.tif
6b022639a9984dd9608663acf3e5596b
96021bfd753a34781c40fbb6c5e2fb0687825c6e
F20101208_AABGJF mikulski_a_Page_046.tif
db423f8f2a21a9ec7f4305571f331a7c
1858363f74391ccdf501cbadf6bb0ae30173d6f7
F20101208_AABGIQ mikulski_a_Page_023.tif
4d94aea091ce79db35ca42a0f9188025
cacfea7790bad71cd9385e7740728a97dda34790
F20101208_AABGJG mikulski_a_Page_049.tif
500c609387264c9e9e866bffc5c9e400
272d3179f3df5f2427f81504b8d08304aafb28d3
F20101208_AABGIR mikulski_a_Page_024.tif
f127ab3809c0e6fbba315697d50227ec
f036669bdc8d62d930eeb3f092cf069fea6408a5
F20101208_AABGJH mikulski_a_Page_050.tif
e2aec32029b8eacaaf458e45a6723032
001f5d0bfb1be93a32d0f0f381d09a4ebdf0eefe
F20101208_AABGIS mikulski_a_Page_025.tif
e6957110b0c1ca40c8852d740950565e
529a3ef19d9b5986d36dc1317bf34e42d27abdf0
F20101208_AABGJI mikulski_a_Page_052.tif
382ab231a6df82945d1924ce6a624b49
ba97821f0fc224be4e0b51dd9475e3c3b014e394
F20101208_AABGIT mikulski_a_Page_026.tif
ec18bbb1ad22fcf9f8a7d541405c4f71
b482a1d4a32b7048b8727524b9e3b3106f32e552
F20101208_AABGJJ mikulski_a_Page_053.tif
fba4deaf51e75257f765c389dbc15347
c513270364a7ea0b3fbc48d99603257730bd1fcd
F20101208_AABGIU mikulski_a_Page_031.tif
b3d37a0c9b6d3040b5a393d77fff2c33
bae790499dd41c0d9e0d09ce5fbb896a507efff4
F20101208_AABGJK mikulski_a_Page_054.tif
c7fbf72ca793fcbb00afa3126b21622c
a18cf279f2281374836e46e7d22675b6011e0861
F20101208_AABGIV mikulski_a_Page_032.tif
2b4eb66dfb9729bf7cfb09c92543f1d4
d6c9581f7c2e99f7b2403a80b2e959957e107653
F20101208_AABGJL mikulski_a_Page_055.tif
e7d711b63a4df09e253fd8b3d049bd9b
e7eea1151856de5afd7091c8841e222d5f400d76
F20101208_AABGIW mikulski_a_Page_033.tif
c23ae807c315297572cfab0ede9f4cde
6ebc7bdd7a8d70df55f46c5a9b20a2b493d9536a
F20101208_AABGIX mikulski_a_Page_034.tif
47eca9ee4d45516c1ca1fe5766e8626c
3c6e6df224d39f493892e91544a8d796f67eb55a
F20101208_AABGKA mikulski_a_Page_082.tif
6106538512a984d6d76c8cd9c876158c
60cda1e3b393f826445dcaecae757f15c0f31c18
F20101208_AABGJM mikulski_a_Page_056.tif
7c83a80f9909448f67f2ca7f32d8cd2b
efd337ff284f06bde8fef27444e5bf89bae45508
F20101208_AABGIY mikulski_a_Page_037.tif
4feadce7f087122ea54e6a34ecdb3c85
87167594eb4a1a0c4a8b90d02f3e65e9d561654c
F20101208_AABGKB mikulski_a_Page_083.tif
ba966eb00f28432f28417929c639b2f5
b671a23ae91f7a2c8dcaf172b631d335f7bd2658
F20101208_AABGJN mikulski_a_Page_061.tif
0346b116c629e8ad8291d13e4fb358e6
0def4c48d6758959ded8896fd845a3de2add80c8
F20101208_AABGIZ mikulski_a_Page_038.tif
6b8239bce65410d166215fab00e93d7c
6789379eba3ccacea8af3e54e89515a38697f0a1
F20101208_AABGKC mikulski_a_Page_084.tif
3174ca4539ce563f29830780627534d3
6f369db79fd47fbf777858e11c7b2143d15e50bd
F20101208_AABGJO mikulski_a_Page_064.tif
425988c67a3fb274aa20a1aff5ab2e00
8a5902749c0e46b2fb33b8526305d3e2bf9acfda
F20101208_AABGKD mikulski_a_Page_085.tif
98e66a3985dfd168907f19a5e6e4e136
a22d9d1a5f76952427f4572040655f2960d5886f
F20101208_AABGJP mikulski_a_Page_066.tif
265e96ec53662a0ea367042c317c4ee9
b01e1fb148511efbaf31b1146a81f795e5e68bbe
F20101208_AABGKE mikulski_a_Page_086.tif
044ef4d367e52edcdee87b1bdd436146
9022283b8cc4ca42ac23f189fec5fb7072f8cbd4
F20101208_AABGJQ mikulski_a_Page_067.tif
c669192b5658fe0b337b7376744141f7
58a0e4be9e6eee91bd1cdc204f981edb668aed0b
F20101208_AABGKF mikulski_a_Page_087.tif
764f70a0610279be36ef6cb4ca460e25
78c191082f5a42f530fc1a9eaf622f5f43d57fba
F20101208_AABGKG mikulski_a_Page_090.tif
8a0e6a27ad89cec5dbfd6b7cc313d106
208fec5095d5ccdd060da6573bcb4051a3acdcb8
F20101208_AABGJR mikulski_a_Page_069.tif
b518e7a0715a9a91d8b8648539fbafdd
7916a649f236c5bbb5d0c1a693d4a7ffa896377a
F20101208_AABGKH mikulski_a_Page_091.tif
ed88c8f939c15f2f9aa426b81e3d76a7
9d93e1e4bc143c6335f7cc396356859a5c860039
F20101208_AABGJS mikulski_a_Page_071.tif
1262b949e8700652ffba2d7eb13b7fa9
626c70bafe8e72b7c7d77a0d2197a2a5f8061ee3
F20101208_AABGKI mikulski_a_Page_092.tif
0e5e7a028986aad21a0e44870f804f30
1d93987fcb03a906c999ef7ddf4f8a9081f3867f
F20101208_AABGJT mikulski_a_Page_072.tif
4c674eda0f8c9f67d157e9e565830c76
d09586bb375e7a7869fb81bf5cbc0e142a908f78
F20101208_AABGKJ mikulski_a_Page_093.tif
7858a7bdc0b016699c5f863b3cb62c6c
b142313fb7340ca92f2273b62bc48c6698837687
F20101208_AABGJU mikulski_a_Page_074.tif
6beed68f6fe3a0e15ff074c9b57e96b3
46340f3c5d8108d00f44958a84fdc0fdba019914
F20101208_AABGKK mikulski_a_Page_094.tif
03bce7c83242d896e57aedf9c723c09b
85ba4fb00805144ba47351abb0b3b0fcdda35074
F20101208_AABGJV mikulski_a_Page_075.tif
252b8d2cc44a006a9e268aa1c8c94692
0ade6d4f6d4f03f6960741c7838ccff8e1bc148f
F20101208_AABGKL mikulski_a_Page_095.tif
1e2dc54f6878015a4aab4fe0a352046e
9b64d0ed5aa2b1df9fcccaf3da5995ef27138dd8
F20101208_AABGJW mikulski_a_Page_076.tif
0e764161666924c111d4846467df5224
c4fbcf6ba19ff9d29ac23b14c8f6de180c8eb8fd
76126 F20101208_AABGLA mikulski_a_Page_009.pro
ff05d969bbf2270c13faf21d4d11dbb3
306f3b3c510d7931a552e37014c7df1b5034f7bf
F20101208_AABGKM mikulski_a_Page_097.tif
1614dba8e557473c4d2387128d56d338
9ba7c0ade231b0d742004df7b2d6ed8a23f47ee0
25265604 F20101208_AABGJX mikulski_a_Page_077.tif
ff06aaebf62118b3b4a4ed046d035ecb
a760919af1929099de7bb5069c787bd5f8088117
4485 F20101208_AABGLB mikulski_a_Page_010.pro
4f801ca04071dcd025db767c0671477b
bc7c99d89c5d58023a160dc4b014afdef00d1ca8
F20101208_AABGKN mikulski_a_Page_098.tif
ab09cb031425d9d8ab937f1d5317db55
7c4ed1cd404e57aa7941fbfd8424a46b10a81762
F20101208_AABGJY mikulski_a_Page_078.tif
6fe0e6492fb766ba34e4c18eb204bd3d
54a3f0b707bb158c7254717f302c797310ada9d4
46755 F20101208_AABGLC mikulski_a_Page_011.pro
fe486cf8f0e6d45b922258059cfcf4cd
1b71b2b5c0885fbfa53d4688ea61d1f144621ce8
F20101208_AABGKO mikulski_a_Page_099.tif
80c1c768c12e29cc78412ae9225a8dc8
30da6e22676401f82dcb6eebae1c97a146a2a721
F20101208_AABGJZ mikulski_a_Page_079.tif
d21dfbbcd9a5ef291ccac49d8598f55c
9c67acfd157526268ad6559abfa4a8982c3328ef
42015 F20101208_AABGLD mikulski_a_Page_014.pro
f00e449a770032cc1e3e90c7f44998d7
9bc72f47eb7be852a3a7d42b7dfc9894574103bd
F20101208_AABGKP mikulski_a_Page_100.tif
c44474035539f9565c3ee31ededd20aa
fb065bbfd5fdeef6caba5351e94ef966ae5b9e2f
53043 F20101208_AABGLE mikulski_a_Page_015.pro
02105a8d8bf0e02552c11308a40dfa7c
abca4dfbc5d5c340c4f474f3e664cde5386c8fbc
F20101208_AABGKQ mikulski_a_Page_101.tif
e05a3a3975180c7783f45e58040e57c8
ffbb4968d01d64fe28de42c8ca3fbaec6ffceeee
55051 F20101208_AABGLF mikulski_a_Page_016.pro
bf428e201660b7a3c7066ae4349e92c1
4b79e5dfe567e61a4762b17b6cc057ea41305df8
F20101208_AABGKR mikulski_a_Page_102.tif
c5a4f0383d5f4be21620ffcf7d833c99
4b8ed0d855a30910889ea46d8e4d8fef4264e420
30651 F20101208_AABGLG mikulski_a_Page_018.pro
50c4bbab40d2e6e72d6253113af25c1b
4774db80deae2f843c418067365b5b4a4509d5f4
12777 F20101208_AABGLH mikulski_a_Page_019.pro
ff997ad1f5feb828f1da84a0aa9291c7
bf026995b379962c79f8897a33b463ed661c0054
F20101208_AABGKS mikulski_a_Page_103.tif
fef17e1f7430c7a166a1790405a7d311
d3659c68ea39e19152036f96be19b9472cf88cad
6165 F20101208_AABGLI mikulski_a_Page_020.pro
9b650803e35b62fcb6f26495baa6baf0
754d2274e163d2fc024d312a3def0f29e99f91bd
F20101208_AABGKT mikulski_a_Page_104.tif
409ad97dd8712ff5f973de83f82f26d7
b0c343742c4214178ad237baabfdf176fa94fa25
51918 F20101208_AABGLJ mikulski_a_Page_021.pro
7e326ab3d272262a8b2ef0d6b9fbcde6
d6a2379a9e949eb1373179753fb3d98243166761
F20101208_AABGKU mikulski_a_Page_105.tif
d72eaddc83f093f3c2626918a9abdef2
4986a5463ed58f1284c776da880ec83aa91db0c9
56574 F20101208_AABGLK mikulski_a_Page_025.pro
9e7ef21a2857239025cef7bba6ce0199
0ca7607b87257fbd405fa1c5a179748e9c2dfa38
F20101208_AABGKV mikulski_a_Page_002.pro
23f2c1270d6eb30ceeed67489fd67299
d454bf1e9a0d625379bd79e488482c261574a8fb
46816 F20101208_AABGLL mikulski_a_Page_027.pro
fb033c8aa517e8d294a969a860a037bb
2dc9693a5a33e0f3f2b3c77dc6563e7bdee8530b
25259 F20101208_AABGKW mikulski_a_Page_004.pro
bf42fb780bcebf77a956e9e75bb3ede5
a4cfeedb1bc878f8a37da6a75cd8358503d064ce
52284 F20101208_AABGLM mikulski_a_Page_029.pro
737b747ecaf159ba96764642f0011bfc
4bcdf60d908f5d7f48a475a50a7c416a8a23e6f9
89664 F20101208_AABGKX mikulski_a_Page_005.pro
466b08b9beb2362be8069704a3fcdecb
06a9358f2560a3027452b007c6a1910781af2400
9342 F20101208_AABGMA mikulski_a_Page_055.pro
e40993571b2ead48e647153ad54171b5
1e23e623e2b82fb204263db2880246129e3512a4
21401 F20101208_AABGLN mikulski_a_Page_031.pro
9846b579fffb3a5033c2938509ab2309
3201af0daa77643cdf8482fdaef92c697f567436
92517 F20101208_AABGKY mikulski_a_Page_006.pro
cab10e22bacf4d04efd3b6f94bbce782
250ba03f2c69d302b6e0bc88731d9eface76cf22
6530 F20101208_AABGMB mikulski_a_Page_057.pro
88ab104463563a746ccedd8b6674d08c
5c3d4c3b5904d902a024e183f59c87fa5449bd7f
52914 F20101208_AABGLO mikulski_a_Page_034.pro
682f6b1df71db8ddc0ef2780e3cfa34d
17681c1d45f784e7d2e080bba1ac459e990814de
5821 F20101208_AABGKZ mikulski_a_Page_007.pro
6035daaba0fb218a1fb8ff0c2311a03c
8a9453f9b6b537e1dc3024a3fc49a203d8f0f2ed
7334 F20101208_AABGMC mikulski_a_Page_058.pro
acfb31daa9e463d820741890274fefe3
2b5de8c3265b1433e274f1613a3fa1c4a35b85cb
42941 F20101208_AABGLP mikulski_a_Page_035.pro
cdd2de5bd2af96b91ea76a48281844f9
4669ac76e28d038597d523c9d564120ae56d6419
49814 F20101208_AABGMD mikulski_a_Page_060.pro
507c3558ea61ca6d394a88db4506fee2
3f41bca5f416af7180f008e4d7c2700f4042cfe1
46751 F20101208_AABGLQ mikulski_a_Page_036.pro
d7be7a48c1522fff333ed0b615291ed1
1e3c54c61acae5e41adffbbc62448f2a0bf4ea2d
52605 F20101208_AABGME mikulski_a_Page_061.pro
c7bb374b4d4ef79b60337731a7db394e
b176e1c8d8361b81b47c85e5ca3de236d2f43f62
55120 F20101208_AABGLR mikulski_a_Page_038.pro
6ee2c69d9fa413e01a8909a5a469fc02
4b326f0097228d9240cd9e12ab455d53e785a493
54216 F20101208_AABGMF mikulski_a_Page_062.pro
65434d045b863c80c9a8f3953d78f292
9ea271fa294118870646a687586cd43930e4c9ec
42680 F20101208_AABGLS mikulski_a_Page_039.pro
8decda288a084b18c8f3153d52b6ea7d
9b6d8763d8bb78b01d90a8f386a06b4693366b6f
55228 F20101208_AABGMG mikulski_a_Page_063.pro
9304a8695a4851c40831cc4e0c72e641
878cc4ae55713d0fbbe5fd1ed06f4055a659859d
50974 F20101208_AABGMH mikulski_a_Page_064.pro
b4160fe44bd4b80736c1696590088db1
61bebf24cef03527108cdefa998d3e54c63f1fa4
20893 F20101208_AABGLT mikulski_a_Page_040.pro
71a26623ef7c0798a584479a10678f32
3d44433eea8ca3fa5e5ce89594e65d5b9f5ecc67
13962 F20101208_AABGMI mikulski_a_Page_067.pro
72257edeccc398aa0cf2c4d3b4c2047d
12a54218d5f1ad2fe083e5e3edf070c134befa82
17152 F20101208_AABGLU mikulski_a_Page_043.pro
77674ce1663a539c3dd07fca3468c138
690d6325b36ed191f248feaf146b1b11bf9bb748
3649 F20101208_AABGMJ mikulski_a_Page_069.pro
d4e38866eb8af2767141985586e4d8d8
d023e7f078cc355eecabf912df8e5cbc45708cf1
48390 F20101208_AABGLV mikulski_a_Page_045.pro
03b5ffcdea1ba8b693fd218169d3c9cd
6388d47148659744715616b5c40870c27a9496fd
3437 F20101208_AABGMK mikulski_a_Page_070.pro
ca9352624f596d7bef6e45d00ee9dc34
06ff1e7b42be5ad21c3b618f94e165ad16315aaa
52021 F20101208_AABGLW mikulski_a_Page_047.pro
a1e38562a04428512f5f8579408c0534
b81beba4b3adc211db5654b473e34aa5c4f766e9
1667 F20101208_AABGML mikulski_a_Page_071.pro
c534263091e410e8cba5706232ba71eb
18c60035d241ab3d2fd84cf5dae56120edaec0c1
52825 F20101208_AABGLX mikulski_a_Page_049.pro
fa6990a4c81b20c519790e275679c739
2e95a029a114a939213e0a8d7a25c8e8a98c4a5b
2551 F20101208_AABGNA mikulski_a_Page_098.pro
fc75f08173b9296b38473105aedfa0d9
96fa1970ebefb15d20391ea67efa247dd85d201e
11198 F20101208_AABGMM mikulski_a_Page_072.pro
dc3445b7fad92d0f05985eb46bfc0f2d
6ef63b523ad6978ad9002e2dd82cd0361d8f956a
51929 F20101208_AABGLY mikulski_a_Page_051.pro
5d42ccd8fa816219cac56cd26b94e1c7
bd7e8d0534bb8f7dda79be3db35519904e85f260
5001 F20101208_AABGNB mikulski_a_Page_101.pro
026e4f5c27c993cd0c9a8e2586fb88f3
ab06fbcd7574e7fc0f20cda4939fa4147df9337f
3892 F20101208_AABGMN mikulski_a_Page_073.pro
ed869543c9e3e4559c26da90b4c1f159
8ffc29b9e1511f8ade2b0a12db739f3bfd660d0c
46455 F20101208_AABGLZ mikulski_a_Page_053.pro
cf66c7922cb6f4d621f31377883a5e02
2c6639367a769e5f8f30f0a432e4a60ca1880f19
57311 F20101208_AABGNC mikulski_a_Page_103.pro
2b00e97d68931480c013eadf55f88bef
03e690e797db16ca11fe6baf2ff7961b4642f6a1
3693 F20101208_AABGMO mikulski_a_Page_074.pro
a365f183699e4737be7d11cf174d0674
4b236ee672e1422df3e6d65f5c1ae4546e8e7946
22343 F20101208_AABGND mikulski_a_Page_105.pro
997b76f8d84197dfda126e10443766e0
207891a6e4ec3828c13f4e4be005f41cd0d95294
7943 F20101208_AABGMP mikulski_a_Page_079.pro
de3ca8e546a7fc54268f357c4a8b0e66
349cf087b8023d5214e263e06970d7fcfaa3ebfa
518 F20101208_AABGNE mikulski_a_Page_001.txt
ed6533b66a0fd5de7eccb311dfa841f2
dbf22cae474c02c44e220fd8372b5b56811be56d
2161 F20101208_AABGMQ mikulski_a_Page_080.pro
01f49772b9e6fddb42d4d387131a6e8d
8d1981911b8e76bef0e0d9642aad170843ecc088
115 F20101208_AABGNF mikulski_a_Page_003.txt
82092587c40d9556c7b7df280e7139c9
26df2b0119ba76fc9d4e79effa349842cfd5929b
7768 F20101208_AABGMR mikulski_a_Page_082.pro
b01d461ce80f0a2a7aa1d7cbafb13b74
a143ba4b924a515826bca50fcf171f162d0306d0
1041 F20101208_AABGNG mikulski_a_Page_004.txt
08028e3a52a3424a021a688da10867d5
f6d20742a85e474f86e51d21140bb946f1dcfb39
48442 F20101208_AABGMS mikulski_a_Page_085.pro
2c05e32e42811c11ed78144501f2e333
12b9ff3552e87b9ce9d6f614d9c936446d0e1e0e
3680 F20101208_AABGNH mikulski_a_Page_005.txt
6af666458704349ceba38a87d7283b5f
1f17242f954bdb8ce1f08f1593282fcb039d3392
55077 F20101208_AABGMT mikulski_a_Page_086.pro
26d0f31b26684fd843577ef60abe6d29
b60663d494c1193d4f5969acecb67b49867be0a2
3764 F20101208_AABGNI mikulski_a_Page_006.txt
c1761d04a903028750aac53dac78824e
ab7a81973d866e19375e3e81f007310eedcc6877
190 F20101208_AABGNJ mikulski_a_Page_007.txt
288e274dbd230e6c22fda6547e0fda68
67ca833f1220fcdd3cf0f38e3faa8f516a948a48
7451 F20101208_AABGMU mikulski_a_Page_088.pro
76d80f51595ede6504e91bf945220b39
96de4bfe3a84512281c788b78ecef77a64e19440
2831 F20101208_AABGNK mikulski_a_Page_008.txt
ec3b62bf81c1bb09a1374b0c2acf832f
a94cd864fa203422f85b4b37fd149cf2ff738a01
48253 F20101208_AABGMV mikulski_a_Page_089.pro
a308c604a311c90b35cd0a1b79ebc389
93d1b4f5a3391e2d7ca7c9a1b84f21738dcdd422
149 F20101208_AABGNL mikulski_a_Page_010.txt
190915167e2d5ed6fe1b871e17c77d8c
5426d1a678679a12b464d3f3cf8d1474944bc87d
39431 F20101208_AABGMW mikulski_a_Page_091.pro
3ec86a22093744e1a0bd9fbc19df0602
41958b4c1c53189fb7f2408ab2811fe5c1b495e6
2063 F20101208_AABGOA mikulski_a_Page_029.txt
baf5989d099210781914a9022b3ee5ba
16bec2d84fdad0b26340529779d8be90167b3483
2022 F20101208_AABGNM mikulski_a_Page_011.txt
74a7de256159dbc348993adefe49e650
76cc46f7e54506b3ad50fecc0f55442bc39ed8af
27498 F20101208_AABGMX mikulski_a_Page_092.pro
59417c4012755efe333318db241cec21
e57c80d404c51fb7bd784df8e002159e85f87c41
1104 F20101208_AABGOB mikulski_a_Page_031.txt
8adfd3f46282b5609e768640ce9e3c81
52e5f9ee1bcf3bf537b00be8d0ff3adbf40afea5
707 F20101208_AABGNN mikulski_a_Page_012.txt
6ec288be550bebac237fe8b131bd8fa1
e1bb2b5fe1d00d774a105dd6deaadfa5dc11e3a5
31617 F20101208_AABGMY mikulski_a_Page_093.pro
68de2204b87685407364a6ea254f7fc3
d962d04753757b05af1e434330669e86514bbe90
1757 F20101208_AABGOC mikulski_a_Page_035.txt
f78569073786e78d9517a009a5335758
baa0df7cd209ecee06f9815b866ff568cd6c4577
1793 F20101208_AABGNO mikulski_a_Page_013.txt
4e7216dfade6a510ef1b17a33ad7b29b
d76e23da2025d745732092f6ddf93c4656d3647f
F20101208_AABGMZ mikulski_a_Page_096.pro
cdee1adc42e97a37da180b25a1e725c4
31f664cfef36038ea639c4a0126238795fc184e7
1939 F20101208_AABGOD mikulski_a_Page_036.txt
7184d8d9292bcc6a3f500ae1796e6db0
11b9e79a5281dbf49065eb3c1ac59d0aaa560104
1726 F20101208_AABGNP mikulski_a_Page_014.txt
9d42b6572c4183a63737cf3bd67a8279
269eeb947e2c7e8e30afe01d8eaede147fd7036d
2174 F20101208_AABGOE mikulski_a_Page_038.txt
afb80435e4281001d908f6845b9fe884
6c8f54f319bce39a720764a1e730596ff1043a21
2224 F20101208_AABGNQ mikulski_a_Page_017.txt
7112147442cbe6e3c107d4127cb1fcd0
86a9408a8b685f3da28ff1414814b98c74a636b2
1730 F20101208_AABGOF mikulski_a_Page_039.txt
f8bf192cfb6b4e01970326c7a0bdd479
7913a290169765d2ffb77f9e45dd0ee81fff015a
1228 F20101208_AABGNR mikulski_a_Page_018.txt
8c315e1978bce52d2ddd3bd17fca4925
29434e586e173f1892ba2fde7ee26e0b6e16ab54
1350 F20101208_AABGOG mikulski_a_Page_040.txt
b7975980f358e0ec4f0408edd7081011
08f2b621a269440ff44b37ee1f5708b6473da45a
626 F20101208_AABGNS mikulski_a_Page_019.txt
28cc7d8db13283a814a621fb64069b2d
cc2d5002b64f611a35d2ff04568719de3ee12721
1102 F20101208_AABGOH mikulski_a_Page_042.txt
db2affddab4060d606c093a95c492381
868cde81598c3c0981852a7cbc193dd7e039b571
266 F20101208_AABGNT mikulski_a_Page_020.txt
090e1fc8426832264647e21e3ba0e8bd
b5c231b4b2166fa98550c1e0056fec52372b41ee
1006 F20101208_AABGOI mikulski_a_Page_043.txt
478e7acf6e2473d6db493e5d3f09e8cb
c131c791f7fd1c3c294dbabb5082be64481050ba
2137 F20101208_AABGNU mikulski_a_Page_023.txt
f91ea428f8a01e69f49eaa885475526f
a8bf9969cf72ff74f3d7a7d2fdb4a4a8e91d5829
2009 F20101208_AABGOJ mikulski_a_Page_045.txt
a6fbec57e9d35c2be66ec19e7dbc9ca2
75a6d4447a7fe07f5e1ddcb704fed859f37e3daa
2001 F20101208_AABGNV mikulski_a_Page_024.txt
edc184d1a8c419e2c1149e4f0a6ef9e9
f5491de0b11965cfb57656928a852a2919ccc5c5
1800 F20101208_AABGOK mikulski_a_Page_046.txt
421ffa71e92d7e0d07571d7f1b8e8750
66a70a821c3e3f3e89efaa4f090106585e2e1449
2328 F20101208_AABGNW mikulski_a_Page_025.txt
5a539a49fdfda17b615f25e47c0b30a1
1bad8575cbd36e472dfa7d43c61c7fdc914b8d1e
2100 F20101208_AABGOL mikulski_a_Page_048.txt
86bdc5463be276d727cada9ea4036c34
39d1ba58fb19d0ea74a4d7e92e6325db590a9884
2427 F20101208_AABGNX mikulski_a_Page_026.txt
cd65c0293ddf4d1b9403834b7a9d46df
5fb8084f9e105106e8ecc6e6567a9a1b07c0b51b
240 F20101208_AABGPA mikulski_a_Page_070.txt
66c94a8d47ab9e0ca4ea8a44007708cd
bc3c3cc1352c1be893bcf50cf6720e62de29269c
F20101208_AABGOM mikulski_a_Page_049.txt
8effe7e3e3fd87f0fbd7ed770a8ed5f9
451aefe57000f70e4b5d18f82f7446ea38ab7fd5
1942 F20101208_AABGNY mikulski_a_Page_027.txt
07325539ad4149ef31e1444d9ce8efe2
bce5ab510a05728c87c6c32b083be0662f05c2f0
122 F20101208_AABGPB mikulski_a_Page_071.txt
d72055edc00296f8638333d1392b3a44
0ba2df31a4cdb357ee9da019155258f6dd9a43c9
2153 F20101208_AABGON mikulski_a_Page_050.txt
52864e6054d0dd854dd5c49231521709
21f7d76b009f632f85c2580ad8b83c37b709dfe6
2124 F20101208_AABGNZ mikulski_a_Page_028.txt
3214a73c6e21cd1cc699478a765a7252
d43db26a4d2112845fbddf2fa3317d8a462285a7
218 F20101208_AABGPC mikulski_a_Page_073.txt
2a5ee4913982d5f48ddb35c3e47d733f
d6003a8fdd4f1e11e40151c3d95dc38b34b3a5b0
F20101208_AABGOO mikulski_a_Page_051.txt
d8c41b82cbb1dc0828868aba30aba61b
44ed3340b9551d4e1c6b354185e025607dbf6f58
318 F20101208_AABGPD mikulski_a_Page_075.txt
651a3e2bb722e730bd4952b25e49c939
c6804969018ef8ef6d5648618ac497e0e42ae820
2041 F20101208_AABGOP mikulski_a_Page_052.txt
5d30e821f8cd96b8d82ca8e973033a57
7d566ed48c02a2ff67efa62cc4343ed03359442e
133 F20101208_AABGPE mikulski_a_Page_076.txt
a3823e088efdc11ef153ca08d92829fc
fa1bc6fca88af2ef6ddc3be641acf2ccdde19dd6
407 F20101208_AABGOQ mikulski_a_Page_055.txt
b57d3ace61bc8ca71569cbfb89973d64
eaec12ed1bdf04631c163cd00278978176a42591
722 F20101208_AABGPF mikulski_a_Page_077.txt
4330988c941d663b6e6241a2f958fc35
658e138501b6b3dee5e018fae46d45ffa24bace9
F20101208_AABGOR mikulski_a_Page_056.txt
2a4a0745d98a5b95c7fb4e7ad64a5ec0
27abfff91070a5e46465298d735087ef972c9775
413 F20101208_AABGPG mikulski_a_Page_079.txt
74c6afdae95cc4524dd797140005b9dc
995ff2f07ccdecc3996ccdc04369bbea540dd17a
305 F20101208_AABGOS mikulski_a_Page_057.txt
fa53476628f71c41f0387a2f976538ba
2143bd3bd77dbf3e1643af31321521402888c1d8
372 F20101208_AABGPH mikulski_a_Page_081.txt
6ba070440b8e490110ef6236424bb855
6b9e836d391c0925e5b8e011fc777e8d6a6dfaae
2079 F20101208_AABGOT mikulski_a_Page_061.txt
052db5660664d353da987afb3c085f12
2f752f26d81baff42a49d595262fcc582162b8ad
371 F20101208_AABGPI mikulski_a_Page_082.txt
22d539218a71c265857ebd3eb2b8c046
72d7dd1dc1cbc4675450a47db11419b705389a35
2179 F20101208_AABGOU mikulski_a_Page_062.txt
aaa38599bf7163ce516fa7117f7c3365
7dbb695f0ba1a8f38f103b3c3b1bb50e6bfee11f
1927 F20101208_AABGPJ mikulski_a_Page_085.txt
f84bef629d0bef23467dfa87b8845571
24a17d20f84210350af322f391eaee267c7b9850
2210 F20101208_AABGOV mikulski_a_Page_063.txt
93d067ab9d43204e870aff9a0af5f291
41a777c63b01a8df694b181046a44ef0711d7f97
740 F20101208_AABGPK mikulski_a_Page_087.txt
808d357564e90d64c44682860bd9286a
80ed386151307d3c2e945be1acd6247a123699b2
563 F20101208_AABGPL mikulski_a_Page_088.txt
7c1120c794b02a59722e346b2d8b7ed6
426562b94c9f70e996e8bdfb1056243abf7412f3
1937 F20101208_AABGOW mikulski_a_Page_065.txt
75bac1805379c971140ffd721f9b829a
5dd3cd360a4324c57e935b594f7ca808d799ec33
8875 F20101208_AABGQA mikulski_a_Page_086thm.jpg
e4cfdef71273adf14e94098b7a3fe650
2a9e628f47bb511266b31df6721e403359618144
1192 F20101208_AABGPM mikulski_a_Page_090.txt
c26ca30d408d31c26265969e873b7178
f8d76b35978279b3b8f2c1d90f7585e3e45b0eb9
555 F20101208_AABGOX mikulski_a_Page_067.txt
26f480d6d29064d3a9c724981ebff93d
ac27ed8dd7f2562439a545706987ae1599ae9b7d
4873 F20101208_AABGQB mikulski_a_Page_073thm.jpg
2f1548fa23890375140c5b8a760f439b
fa19acda302b2e72818f46cd815f1e283b8db84a
1328 F20101208_AABGPN mikulski_a_Page_092.txt
73e337ab72bea5d3ea9b1ed1da1ead8e
41e1e3752a535d751f08099dc5bc02dc540d8909
863 F20101208_AABGOY mikulski_a_Page_068.txt
8ae61da4321a6cbff09e179bd1708a11
3b08f3bf416d9d4c297d31fa289d78f5423c8631
17209 F20101208_AABGQC mikulski_a_Page_100.QC.jpg
55274f3b531409335e15c2b641b5d47c
916e856b0e833a7a30e960c25f741a77b36fe9be
1725 F20101208_AABGPO mikulski_a_Page_093.txt
4a9c7c87bd6e6e865c62d91e1583fcc6
ce0a677a73b4fafc64924a200d282d7fa7e663fa
176 F20101208_AABGOZ mikulski_a_Page_069.txt
28f466f3817f6dc324c87a49cc50f7f7
9dced1bcfa88cbd8e54182aac59bd4b49610eb78
22688 F20101208_AABGQD mikulski_a_Page_081.QC.jpg
6dc8eb868e7059cf41ce9c523f417b2c
e53753addbdd4ad37ecaf1d360bce611cafd253b
148 F20101208_AABGPP mikulski_a_Page_098.txt
6b024cbeaa4db70c44aa0b8c17afec36
ad229b6140ef5d54e7bae6f05bab3b46ff7fcf9f
7748 F20101208_AABGQE mikulski_a_Page_046thm.jpg
8b2d3b1800aebdf0dcd369566f2208ba
7fbf5c1ee1de9b0b6892cfcb35c40112b953b2dd
3253 F20101208_AABGPQ mikulski_a_Page_099.txt
f9ab07065ac08f46608ae642874b2861
faa851aa94abbe1ce45ff2b4f5a057ca32865f76
21672 F20101208_AABGQF mikulski_a_Page_080.QC.jpg
52b4ed4cbeeb7a6d6e2e579bfd2d4933
64a05ac1b9fa07f365d1f2e1f5ec1aadb723863e
1611 F20101208_AABGPR mikulski_a_Page_100.txt
b93f51af002651d2cc8c2315eb41bba1
40ef754f7d1955d03e0ab285f099391a0d6fa061
21257 F20101208_AABGQG mikulski_a_Page_075.QC.jpg
0422821d479957169c87d2e81f5b0d2a
3d9c20c5896992e69a516c1e72137309a3ae8e5e
2220 F20101208_AABGPS mikulski_a_Page_102.txt
04c38ecdbfbd212ee133a90166087b9a
ee17c59daf860df84cd07e2bd70e86fa36876570
905 F20101208_AABGQH mikulski_a_Page_010thm.jpg
2b205050cc2e8406f15ed7a57a422511
64f87fe3d2ec884f4152ac0e50a19e39e3145493
923 F20101208_AABGPT mikulski_a_Page_105.txt
4318779204eaf4198c919901c42de595
f0d2d4a96821859756d6f2efc7712772dcb7d27c
17043 F20101208_AABGQI mikulski_a_Page_043.QC.jpg
ac1607cf2248076bb739ae28a2711b0e
61dee72584fd230d9d186a1e5a99444908469f62
2148 F20101208_AABGPU mikulski_a_Page_001thm.jpg
39991c6f7d3e7c907767e60769257ced
7c81e469d8b618a270b69c008b51dafd4d0e59fc
34283 F20101208_AABGQJ mikulski_a_Page_064.QC.jpg
dd358897a37001b14a68724c38bb3565
b5c618057211e3d657084375b7d1bd274723e1ab
22404 F20101208_AABGPV mikulski_a_Page_079.QC.jpg
565a07421b74bc7322b47aefdb29c0bf
e9553ac8ceb8f20f1ee1a7c20b233ec624f27c2b
7502 F20101208_AABGQK mikulski_a_Page_009thm.jpg
54248e99b964b045144ed53a376b9553
bc82ad1107d5e408def0105269d1547cf0b1a46a
4890 F20101208_AABGPW mikulski_a_Page_041thm.jpg
65fc84e285e6f02182ce08c7d3026be8
6fb3be0120efeccfcf1d2003e6ade362abe7a7d2
1528 F20101208_AABGQL mikulski_a_Page_003.QC.jpg
48b68bbfc81b24095166b78102c7742d
dc06629eb661798e1176ea016fd13e6ed3d302f9
10077 F20101208_AABGQM mikulski_a_Page_059.QC.jpg
a102bb9200f3d5ab98593415b6c59f71
1e94aae3a045baac3b57b8765d119e313c32ed53
6126 F20101208_AABGPX mikulski_a_Page_081thm.jpg
f13431a396c427ba2790171a92651888
36b84666e9073d762427ff82a8bccc9ebe09e0c0
18557 F20101208_AABGRA mikulski_a_Page_032.QC.jpg
5c12d63d6ccc92bcab4e6f0acbefd2f1
c2abc803c80943c7251c3b3d7a6d91674a6fe229
8595 F20101208_AABGQN mikulski_a_Page_022thm.jpg
bf94727b10d029bddb4b1c0f4c1d7279
0d4b90569e31303a72a5d1f2a170b18a40cba566
672 F20101208_AABGPY mikulski_a_Page_002thm.jpg
0cc77358f9b667be1145898285ea4ab3
04478a874113d07c22f1335c112444a312d99cf3
10616 F20101208_AABGRB mikulski_a_Page_101.QC.jpg
fb3fb57c0e00f90027bde0a6faa03fd4
7704f3e1f582e3c59d8f5c867f6ebb0bbe1d3a84
9661 F20101208_AABGQO mikulski_a_Page_103thm.jpg
faf071143647433651227ec18116c92d
24970f999ad09d211c73de47c9707be4dafe3816
28514 F20101208_AABGPZ mikulski_a_Page_008.QC.jpg
2cf8206ec93d4f087360735939befe82
23626211b1661bde7053c2782b75f2b575c3de63
11109 F20101208_AABGRC mikulski_a_Page_076.QC.jpg
08b77b2bc5d761491051a2ad6e9ccb58
5160cb72dd26189bf2ffa43c0082ceadd315a6d1
8874 F20101208_AABGQP mikulski_a_Page_051thm.jpg
69b3f28a218091446ca7250c1dcfd096
5f9742b3b8dda1ba4148db4df0af29faeb610c14
31604 F20101208_AABGRD mikulski_a_Page_085.QC.jpg
dd07c68ec59b09ed26cec0b93319f508
98572e4cf9601eba7f29ac7ae9c9b34a81d420cd
4415 F20101208_AABGQQ mikulski_a_Page_004thm.jpg
f20b2385bdacb67d81035b6ea8b9f089
fca77c16e73e5255be58b5688a6a4760ba3790ec
37383 F20101208_AABGRE mikulski_a_Page_102.QC.jpg
1b2b22a3701493f68e7b2c0078107a87
554203002b9bccfdaf5effbf1dddb5d131780996
22907 F20101208_AABGQR mikulski_a_Page_082.QC.jpg
4723a2e4119dc1fc2bed69f7514a2a5a
fd7d9470561d2cc13eec2e020ca1dbf7313add5d
6156 F20101208_AABGRF mikulski_a_Page_006thm.jpg
7cd358652bf0e702f1c0d20f5a084259
1fb3b570ba88aff4d878e43fc09acbb8134ed488
8674 F20101208_AABGQS mikulski_a_Page_052thm.jpg
c1dad6593338fc800ae3f2d906d64976
d490e893530d47fee6deb305fd899b8578fbda78
37167 F20101208_AABGRG mikulski_a_Page_086.QC.jpg
474f3e2e9f43741970f21c0b63fc8665
a750f7816ca94104f4f28cb192f3ea7be25a3b3e
15682 F20101208_AABGQT mikulski_a_Page_092.QC.jpg
9eb217d68bfd19e33fd80b5dabc768ec
547a392690799abe6348d3b3e08aeff1e5ebcb01
16701 F20101208_AABGRH mikulski_a_Page_097.QC.jpg
060f915ae9a9127b92e92a28be9f93ec
c637dfd0e2d63de7187bdd533cc67d32270a70c1
3242 F20101208_AABGQU mikulski_a_Page_101thm.jpg
a8eeae78d333b295bba3774dd69c1eba
85cebd409695535450164b46af0d52544ec3de6f
3546 F20101208_AABGRI mikulski_a_Page_044thm.jpg
6db56842049fe81c560da0ea4f7f523d
db8779192f9c271fdd8ac5a86beef554314591e0
10492 F20101208_AABGQV mikulski_a_Page_067.QC.jpg
f8d965e576ef08ea38fa8e6c2bb12035
d9c0862b58bbf95e4adb157ece91f4ad8c0d7fd4
25913 F20101208_AABGRJ mikulski_a_Page_020.QC.jpg
9516db9fe626c3469c15a203f354d982
a3bc329c782e2c36bce96299334203bf2368b155
8024 F20101208_AABGQW mikulski_a_Page_025thm.jpg
3adfd1c99bb95b986ddd173d4a149a2d
8a6bd396a4f8f2399076f8ebfb93795eb56c1fe2
2426 F20101208_AABGRK mikulski_a_Page_010.QC.jpg
717309fc8927b0fb256b1ad9fa71fc40
9449192ff6ef0759ccc296c184224edf1d2e905e
30177 F20101208_AABGQX mikulski_a_Page_009.QC.jpg
9a09c8832a82843eb517865efe733159
60c8edf293454d77f0fc4b9a716e1078e377b0e9
36335 F20101208_AABGRL mikulski_a_Page_037.QC.jpg
91dbfff4b227632a8586641691e5c09d
50eb81f8d3883501e00756b50289ec36308cd933
32976 F20101208_AABGSA mikulski_a_Page_045.QC.jpg
4fb85a4dc2217e767a48ed933a6bded9
e8d13eeae83495f41ee4889c9d155901aa2b4166
36543 F20101208_AABGRM mikulski_a_Page_066.QC.jpg
aeebcccfff0cad8bdc063235bba23a1e
83f0915c409cc3c92c37af015a4f98d2dcbb8fa8
5040 F20101208_AABGQY mikulski_a_Page_098thm.jpg
130717f1fd36a7b1316e64be6f031950
f94c52dbb25fcc4286297a77996c7c83cb7af233
31421 F20101208_AABGSB mikulski_a_Page_089.QC.jpg
1eaf905a82bf85ea841ea5f15b0e8d3d
2ab73a00949830cbbc335b98d06b6a4e281bf271
17826 F20101208_AABGRN mikulski_a_Page_094.QC.jpg
39408b20e4a974bb663020c1d65658b3
30d6a08a1969cf732b0e5ece7faa67dfd846bb3f
24714 F20101208_AABGQZ mikulski_a_Page_006.QC.jpg
1601018499e4ecc8810c90d086870aa5
188bf93db5247f3af8e9878965aeb2efb3b7d6f7
7750 F20101208_AABGSC mikulski_a_Page_040thm.jpg
2486a3764882a685abc1ffbe25d35171
f0c30dd550bc67677c06f9f241dafd93551eac99
8062 F20101208_AABGRO mikulski_a_Page_060thm.jpg
c64e60c245ea991d76f608082d7e631b
f4666b580feab7e9d3a645ff8b26db806962344d
2641 F20101208_AABGSD mikulski_a_Page_059thm.jpg
6a940fa98bcb26c434ad034a3d0d980a
fc10758a0490af21f47a2f822ca3efb86b832f5f
9093 F20101208_AABGRP mikulski_a_Page_061thm.jpg
0f448958e1e7b0fa8428a39ad54cae82
ce5be190fc93dffec37df678e472222d75089142
7773 F20101208_AABGSE mikulski_a_Page_055thm.jpg
ca97b7265ff1138149f858623a1cc665
8c4726bbb8cca8b3d8d3929f0db57865eadeeae8
16519 F20101208_AABGRQ mikulski_a_Page_105.QC.jpg
2d4efa3ad3ef3d63c1daa7d24261026c
103a54dd81576506192404aeb3efccb0528d6ae6
8993 F20101208_AABGSF mikulski_a_Page_016thm.jpg
14bbf348164f91157bb1a514805541f1
61df9e2401f182ca9c4f68653793f0073919a55f
28526 F20101208_AABGRR mikulski_a_Page_087.QC.jpg
d2867053d18bdf3e72153f409055b475
788a9cc02425032643db9adffca17f113d640541
8809 F20101208_AABGSG mikulski_a_Page_084thm.jpg
e833fbc7ad8321eb2164fe5a370968cd
ebd86f03619153f4d27bc63d97f862bdf9f3cdd0
8457 F20101208_AABGRS mikulski_a_Page_015thm.jpg
0223c89137c0094fb0edee4f7b57b9c2
2be570200f198de51c7840ed79e394fb433f9c9d
36563 F20101208_AABGSH mikulski_a_Page_103.QC.jpg
5a2298548876dfcff3e70ade6a216bf2
40bdc2d1aa3f54b8b47be50d431e60143940942e
4778 F20101208_AABGRT mikulski_a_Page_092thm.jpg
b45a6092d9806282873e81d482e7e849
b0c612fa331c7545034783b84c14951d41bb8381
8902 F20101208_AABGSI mikulski_a_Page_029thm.jpg
6616da4574a9385c3d5c64ec6bb34677
7831cccb825597557f8032548fd21aa98705b838
29937 F20101208_AABGRU mikulski_a_Page_018.QC.jpg
43e5caea3a05f01867418f91263963fa
804b231479d9efd46742d72a2f5dcd6dcd5cea01
8312 F20101208_AABGSJ mikulski_a_Page_083thm.jpg
d1ff6c891cdf91430af6236f1524a2df
6a8d4119fb807971a8921167909b8c118749309a
30956 F20101208_AABGRV mikulski_a_Page_011.QC.jpg
eea1a0ffa63c3062e3367f239109706e
8eff8d5b84974536f997f8404da32f586c79e9ae
22478 F20101208_AABGSK mikulski_a_Page_104.QC.jpg
cdbb02272e0c2495a3bd4251b30f0514
ccbac0344b64b6d94f4d731113a6140f94a698b2
4808 F20101208_AABGRW mikulski_a_Page_094thm.jpg
1311780a0430fdfa5e39b0778eb03f19
c4297135c8aadf1b0fb5d26d76eb56507219f1b0
25841 F20101208_AABGSL mikulski_a_Page_005.QC.jpg
cf1ce171dc96094222a0e28c7a753ca2
05a796239fc1b90a1cd205775b3d741dc447ff0b
8664 F20101208_AABGRX mikulski_a_Page_072thm.jpg
ab0ce459ee134d57dae23820a3271df3
ab00946417bf7deff1beb4f8d78d53adc21fc42e
5900 F20101208_AABGTA mikulski_a_Page_042thm.jpg
6e372cdd421a5f0c34b929b122f75947
d0918d612c550e1672e99733be1c4f624937f099
8606 F20101208_AABGSM mikulski_a_Page_028thm.jpg
14e29f24913d0189dcd3760896d0578d
079855a3ade6d7c97a6513c2d21c02ee23996d60
32812 F20101208_AABGRY mikulski_a_Page_025.QC.jpg
c4abae1c70cd5f4006aa769c6e1ccbce
966021b600f12e4538bbb76374c5101fcb76dc3c
5024 F20101208_AABGTB mikulski_a_Page_032thm.jpg
d9d3508cf67e8d4081a00e65119cab78
bc174606727267cf9d532661f106295cc74fc8c5
36872 F20101208_AABGSN mikulski_a_Page_038.QC.jpg
9d47c5cea05fc7150faf9bad582c009d
a364e1bdbc9aad776141b8ccce8f10067ed6f395
8009 F20101208_AABGTC mikulski_a_Page_027thm.jpg
ac595f31ebb16fd604e1ddeac0e6014b
fc7a44b77129d5a07276ef11d0d65cd336a138a9
26807 F20101208_AABGSO mikulski_a_Page_019.QC.jpg
c78332b724fafcab704f76ab56b67abf
027455eb955846d05ae504125aa686ccdd95bb8b
8888 F20101208_AABGRZ mikulski_a_Page_049thm.jpg
f1e3baf752ad4f55e2e47a023c611e67
e147056198616b1ca067cc1ddb8159848483d723
1224 F20101208_AABGTD mikulski_a_Page_007thm.jpg
a721568af5ce5ad81b9b95cfafdca668
423c7cae948f58633064cf857ee94ea0dabc5d7c
18517 F20101208_AABGSP mikulski_a_Page_004.QC.jpg
947ada207205c1c275954497933ec66f
cfef9ca4bc03aff8fe12cb16a637ec770a088920
21072 F20101208_AABGTE mikulski_a_Page_071.QC.jpg
bfae807d98c79b55ae7daa44cb119f77
0ba6880e43edac008f0f23847c7972f86165b1bf
18050 F20101208_AABGSQ mikulski_a_Page_077.QC.jpg
acc3cf4323d896ec9ffe37bf0d46fb50
275a801d2815ac7b3535b7389ed5ede5260f234e
31514 F20101208_AABGTF mikulski_a_Page_034.QC.jpg
3f0288d748981a496d45c19d9751ed30
cf1afcf9a361a46887e175b4e8790d967c53279b
32231 F20101208_AABGSR mikulski_a_Page_036.QC.jpg
3aabdc5a5a1308be578c466bf017149f
12b32d1b09556f91b67e8ed3e40dedfce8d42b2b
8005 F20101208_AABGSS mikulski_a_Page_036thm.jpg
8a55dc5026e3a9f245cc8821e8c33d87
c65801a6d903600d06cf19aab0db90c595bcdafb
5256 F20101208_AABGTG mikulski_a_Page_100thm.jpg
adf0c5457f1c435c4859a52dfd93a0cf
668fc3e0af9d2f99a26f8de39739355ee7e36b14
5360 F20101208_AABGST mikulski_a_Page_043thm.jpg
217df5324b83317fea56f6b2628ef991
5e0b5b42adabe898851ec0d2198e357994cab3f6
8043 F20101208_AABGTH mikulski_a_Page_089thm.jpg
7fecb9e6872b4936e0775f848673eb77
8aa604e221e9cad5550bf11b9436a05d50d47b29
21178 F20101208_AABGSU mikulski_a_Page_031.QC.jpg
c162933310496f1b6c2a051a9c684555
a97021897df9114e4f28ea0827869975cb17bfd9
33464 F20101208_AABGTI mikulski_a_Page_024.QC.jpg
1d008f0d52195342b8689805a06a0176
9d88c6cbe2a675eea7d5d110306aff52020a5d10
6408 F20101208_AABGSV mikulski_a_Page_005thm.jpg
5fdfec3c4030a1a55df2b915dbd5b570
31415e32802594cfcb6cbc09537cee82e7ce5a64
8983 F20101208_AABGTJ mikulski_a_Page_026thm.jpg
a7f39ace45c65e74eb5eb6b15875ecea
2b36ca8d04e217d72d94aea07ef3f512cb348ad4
3269 F20101208_AABGSW mikulski_a_Page_012thm.jpg
e8da695944e81e781a00755c0e69d400
e5e22d8c00e3144b09afea865bd2576e5d431c3d
8877 F20101208_AABGTK mikulski_a_Page_038thm.jpg
f471b37ee4e5f5b90f65386598e914b9
a04fd1bdf0931ad660a023ed5f3108bcbbb84b91
8098 F20101208_AABGSX mikulski_a_Page_057thm.jpg
d883f5f08d6191383962f53a1061b2fd
d9675f95048b4a4315653ada3a9d5c059feb0f30
36979 F20101208_AABGTL mikulski_a_Page_062.QC.jpg
e0e6a297d03969cdff7fc1a27b3a2019
9ae0d7465a9400b605a32f653cc5ac88059d3a00
28800 F20101208_AABGSY mikulski_a_Page_057.QC.jpg
2d291c9243e0c063352c2eae4272813c
7990ab4d934b82631ea7370ae211d80c345978cc
159647 F20101208_AABGUA UFE0017945_00001.xml
9baa6574e56ba5999bcb7a9b3f4a7f2b
add579580c16074e7c0b3700e23c8fc58608a979
6966 F20101208_AABGTM mikulski_a_Page_039thm.jpg
b7c2a5de0afb474d7529141299f1b30f
46d441286a06ffe9a05fb3e398a5d9e9c7035249
36790 F20101208_AABGSZ mikulski_a_Page_050.QC.jpg
16f0ba62d90907fca5ed2a82ab4e7500
0bbb61dccbd3ee5d956f3fa9c34a0df25946f966
6787 F20101208_AABGUB mikulski_a_Page_008thm.jpg
0d0a79fba1a654724ed74fb213c54f6b
5230178af3a2e5a91e577951abead66b05639e52
6153 F20101208_AABGTN mikulski_a_Page_091thm.jpg
56e9655a604b7b6a2b67b157f7793f00
488731a17d6c321a89d86ca524b963ca895526c5
7067 F20101208_AABGUC mikulski_a_Page_013thm.jpg
187f513b24750dfe48276208055d2c58
b5ff3fb9e6250785d9b6dee68166ddd7fa26bf66
5021 F20101208_AABGTO mikulski_a_Page_099thm.jpg
9e859abe1e1c66fe76c46fcd0ec53403
4ea1a71d803a522436cdb3347ca95d84a060bf8d
35745 F20101208_AABGUD mikulski_a_Page_015.QC.jpg
ee75c92e4df0e992a26de42333063630
cae91999f63d742e5b0ce2231824cad3124c34a8
30801 F20101208_AABGTP mikulski_a_Page_053.QC.jpg
4a0c07301130719ea2dedd5a2ae6429b
9c93cded583ebd9f115834bd2c280e415c7493e0
37130 F20101208_AABGUE mikulski_a_Page_016.QC.jpg
2dc4e034e6589aa0f59a50a62a7912bd
2461fb82400c0464b138b669d11c462cbb45bb7c
8719 F20101208_AABGTQ mikulski_a_Page_066thm.jpg
354e45f44ef7753597b3675ea90e5c1f
cbeb92ac64b85737950926712bc782298e23d7c7
7382 F20101208_AABGUF mikulski_a_Page_018thm.jpg
6ab8456dc3942d23f6bf01c97de67302
e1fe369375603c9c347c0cfa855c9673af65d7e4
29304 F20101208_AABGTR mikulski_a_Page_040.QC.jpg
54e7a47d20c970f7a48333bde593bf66
10df448182324fd44ed7892f08b22d85a31096d3
7273 F20101208_AABGUG mikulski_a_Page_020thm.jpg
cba14b8a8c05182f6409b866d7922a3e
11815676bc3ac5273360aa7ff8916207ffdabb25
34706 F20101208_AABGTS mikulski_a_Page_052.QC.jpg
b8dadf18aaa48eba2b9a24e65433f2ae
c67c0f4e9e9e3cb63965c7ce8b968017e74191f2
8751 F20101208_AABGUH mikulski_a_Page_021thm.jpg
7beb30a9e04131af280f4247866210ab
efbcafeed8062ba636d982796ffbbf93ba9db21a
35540 F20101208_AABGTT mikulski_a_Page_049.QC.jpg
4aa5882557f13155586383d9b7860fc8
82f535cab51e3053e456415c40e5dcee6534ba82
8529 F20101208_AABGUI mikulski_a_Page_030thm.jpg
2a3070b640981904ac2849e324e42fb7
93828c16bfe769583d2ead2805ec39c2e11589e6
33779 F20101208_AABGTU mikulski_a_Page_065.QC.jpg
f7dc4982a4b79534c008d2283426a9ec
501ebf2fb4acb3a526e562f695ded1045f8b7e58
7539 F20101208_AABGUJ mikulski_a_Page_035thm.jpg
a5bc34fcc01097efd6e6b3eeacc7b4f9
7950ebf1418eb262fa44fdd180aec8d18b340664
4188 F20101208_AABGTV mikulski_a_Page_105thm.jpg
1c9c095f48131b92ffa200fadb16a118
64018c98d6e72fd6fc04bfa593cf352e0fc7322e
29875 F20101208_AABGUK mikulski_a_Page_035.QC.jpg
67e156fbe93d79b84edbec19e76dff91
200c82e6c186b2ea1f9dcf04cd2a4d614e13c694
18053 F20101208_AABGTW mikulski_a_Page_093.QC.jpg
082f488df8ae8de25d7189c9e826930c
6e846b08934253d01353c69950f4e9562f884c1b
8785 F20101208_AABGUL mikulski_a_Page_037thm.jpg
4a42fef5bb677828d884b1212e06b5c2
dfc79ff89448b008521789763ddd01a2c06d57ce
5070 F20101208_AABGTX mikulski_a_Page_033thm.jpg
4b02caf3daef3eedaa67be889fcc6fc3
03d000ed54175d65c93efd439e68cae6a139fccd
9590 F20101208_AABGVA mikulski_a_Page_102thm.jpg
2c8cd289b59347e7762258a11cd02645
b28fe80d57a6c9294d35ada7dd46211f26a87c95
15227 F20101208_AABGUM mikulski_a_Page_041.QC.jpg
23d414df216c501b15a7a41457cead40
b8dff6660c310cf56959c6376909ac054a61d703
10372 F20101208_AABGTY mikulski_a_Page_044.QC.jpg
fbd5f2fd483ee100e9e083def2624d9b
615268552fc3e9016eaf5c52b545bacd05a33ce1
F20101208_AABGVB mikulski_a_Page_104thm.jpg
956630792ed0d215160f317f31c1b679
b6b51dce4b0d268cddf77ac01472479147df4c28
29247 F20101208_AABGUN mikulski_a_Page_046.QC.jpg
0740aa4ebde048ba796885bca86cf483
ec75a2d50a9b44097921a903359d8b9a9bf4fd84
654 F20101208_AABGTZ mikulski_a_Page_003thm.jpg
5ed9fede561bf91ca16999cfdcb234a8
e04a87c8456bf2faa63361ddd3ce54e9715938ff
35886 F20101208_AABGUO mikulski_a_Page_047.QC.jpg
fc7c47c91ed9c86b721db2819fceac19
2c81e2b0916bd42f371902cefb96470d5e6bb47c
8641 F20101208_AABGUP mikulski_a_Page_048thm.jpg
9acdf2ca497bda627fa0a1cf9a8a6191
3ea0bf0a1e6485bd2c41cd90b2ead385363208be
25996 F20101208_AABGUQ mikulski_a_Page_056.QC.jpg
36f394986874a7542fed8dceedefa6f6
6baf53398984ac81e258bd2c923efdffb0867314
F20101208_AABGUR mikulski_a_Page_058thm.jpg
0efb256b235c32578c80d7396eaf1f53
2c5ece00b4b4ed8080759155f6d467849856dfb4
8133 F20101208_AABGUS mikulski_a_Page_064thm.jpg
fb9c1c3270fd11e7d2fe788c35a5c0d8
092d81e0d6cb1dd49304779ce6744f0a10140c9b
8270 F20101208_AABGUT mikulski_a_Page_065thm.jpg
8452c25d9d7a798a05369709f675ec18
432424860f90a8b45576a852792e375a3f1b5630
2244 F20101208_AABGUU mikulski_a_Page_068thm.jpg
13aec190e336da9bbee7d836381cbc04
367ba8439826ea8fbda33a680298be53d12ce15a
5848 F20101208_AABGUV mikulski_a_Page_071thm.jpg
20d0ff5bc46b33715cc89d28ba121310
156193121492918217f6a834118ee5bbcad3cb3f
28835 F20101208_AABGUW mikulski_a_Page_074.QC.jpg
82b68c103ec1362ae762ed79aed7e8da
4cea3feb77ec03e7b03bc2c11f332cd40916cdc2
24879 F20101208_AABGUX mikulski_a_Page_078.QC.jpg
56db4b81512d15233704016e813afd7f
1c96024768f8077cd3c3699c0d9c30b9a233f783
32836 F20101208_AABGUY mikulski_a_Page_083.QC.jpg
1e316fbbe53710aaaa04a9ed89229066
44fb9983cbce6bf4b763924caca1f60d9ba132d5
5242 F20101208_AABGUZ mikulski_a_Page_093thm.jpg
f4b0cb1bdf1c46c4f8e4c6e6f758b8da
32f8897b2586c21d31589280f6aa87002fdfbb2a
104 F20101208_AABFTA mikulski_a_Page_096.txt
e372554173726dd752c8acf1076bc349
a5db63805cbd1e439e563e0cd11e7375686ecac1
52290 F20101208_AABFTB mikulski_a_Page_028.pro
41828fd650b873a31d69c892bfc5adfb
2a0d8d3978e699067e0bd6453f2ed96a022a6cae
107644 F20101208_AABFTC mikulski_a_Page_022.jpg
9a46f60cbce2a6aec324e415fb81a457
e0da48fa964da131258913e03a2140071fd10ff8
328 F20101208_AABFTD mikulski_a_Page_058.txt
0ec6c734e9bd8481196d4680c1baafbd
c63795966462f5a27173b0d092ebadc15ee68279
112467 F20101208_AABFSQ mikulski_a_Page_021.jp2
09481302ae4e466a555ff13be2a4580d
faefa739e16b42d09f2fed54224adcb76b59f161
10431 F20101208_AABFTE mikulski_a_Page_041.pro
92912a1b2f6040d6e5b8423d967277ec
86e5bea59cfd0495738b218447e6551312082038
35101 F20101208_AABFSR mikulski_a_Page_061.QC.jpg
3f141f0c61d6f9207ad25cf1369091af
a69574e18e2f8bd7d8df3c48c4eba5f05cf0af36
21174 F20101208_AABFTF mikulski_a_Page_091.QC.jpg
c58f67096c018501fd75b943bc32b8eb
1f942af7b23163ca009f90676a715ce46a38d90e
117213 F20101208_AABFSS mikulski_a_Page_017.jp2
ad7ea85428e44a7c8eeabe3356ae0227
53f294c94785b37a5eacfa5dc77cd8e0913c2a63
4746 F20101208_AABFTG mikulski_a_Page_088thm.jpg
ac9c60e31594258268d858ee5aabd64a
716b6c629b1210e818d14e52e00b1ff9093714ad
16932 F20101208_AABFST mikulski_a_Page_099.QC.jpg
d8735206302972a7f67fe2ac06487308
89f4caba980e9c33dddc94eec5e1a6e5b3bf5478
34025 F20101208_AABFTH mikulski_a_Page_072.QC.jpg
30520caefe99255495db24749eecc3cf
3c5d95fb70843f2ba5ed5e0d800c77d1a1aec235
1051974 F20101208_AABFTI mikulski_a_Page_056.jp2
6276c59b4082432bd0092522d6e077cc
4caefecca655f937d8c07b34169e6892ca2130ca
7707 F20101208_AABFSU mikulski_a_Page_011thm.jpg
7c4b1c9c73529477f71073bc5b52e449
54ba78e97e7f2fc4d1499fe21b5c287e112ac8bc
8547 F20101208_AABFTJ mikulski_a_Page_033.pro
91347bc47edd1bc111a3cf0d1e16debe
e19900200fe1865f64b05e5df8346c04a5b3541f
F20101208_AABFSV mikulski_a_Page_073.tif
af61a3bd01994f74d4c617690e1f414b
1000fb502976240ff7bf2567ac645929a8bf79a8
4241 F20101208_AABFTK mikulski_a_Page_075.pro
b07372d4bfac357fd2c6b88f866f63d8
7954c0ed6c40beb4a42de5e8fea75fa864c9548d
2164 F20101208_AABFSW mikulski_a_Page_086.txt
42f329a275d36de54ade758ae92ef785
8a6de29bee62d7d1f2cf967e7f8f36f307851d22
F20101208_AABFTL mikulski_a_Page_009.jp2
49d5c3e3e30405c5a7b94740411d49da
1600cc5a68428916daa976eee65c5cf7217eb602
614 F20101208_AABFSX mikulski_a_Page_078.txt
dc2ae59c54b4ece192cc09bae90979b6
6bd6a02c43838f56b56edaf378fd08ffd972d6f0
101849 F20101208_AABFUA mikulski_a_Page_060.jpg
5638bc3d7053717a8f1b93303b3b8fe3
ba5d7fa5fe36b9e28a019b008288d7f19bffadb6
4920 F20101208_AABFTM mikulski_a_Page_097thm.jpg
c675b2900c6d56b74cd9aa134873b778
9f01e4bd1972f116aacec4be0f1e4bad0c2aee91
24826 F20101208_AABFSY mikulski_a_Page_096.QC.jpg
e263f9c0f8371c2e6586bcbdd4331cbb
0174c6d094b0704cca4855bc44ba3dcf39ac2584
54722 F20101208_AABFUB mikulski_a_Page_097.jpg
8f12cf3775f6083e3a5cb86289b1c4bc
e44bd5777eadbedf5beff2df9a5ce24578610a45
28721 F20101208_AABFTN mikulski_a_Page_094.pro
e7cb8c640db22adabebfe84fcc19b186
d7aca402563026a3f0be53e7dc35e60d58094d5f
74142 F20101208_AABFSZ mikulski_a_Page_104.jpg
e73409c77ad5ba2ac47da5f2af6820aa
563337be79fff58414fba4390d79374dcfd8df04
26392 F20101208_AABFUC mikulski_a_Page_058.QC.jpg
0965d7e85f80ff735a389f3a0538282c
660dd9e11432567275e0dce076f29f26e314e92f
6028 F20101208_AABFTO mikulski_a_Page_080thm.jpg
d0f94d68f09f73243e92f17449434740
7ecdabcc481a4d8d8c94f11b8e17adeb883127c0
51202 F20101208_AABFUD mikulski_a_Page_099.jpg
d9421fe218673722404a305a5c02e60e
f03ab64be0eac0ad996ea9d7f3ba1bb8db756f0b
8202 F20101208_AABFTP mikulski_a_Page_085thm.jpg
31ba905824c4e49ae91420f79f2d3ab6
23bdfa2cda1b99f314c0633207da91899dad0aa3
9689 F20101208_AABFUE mikulski_a_Page_001.pro
fd9c1baf629951c4bce92650ea7b26d5
8df1f87f6b4dbfff76cdeb045432f4aa3445747a
1870 F20101208_AABFTQ mikulski_a_Page_002.QC.jpg
da539993049e5d20f028afe0fa8087e4
2da8d4f844390eeffc7a5a3b5110f5962b1a1fe7
7302 F20101208_AABFUF mikulski_a_Page_056thm.jpg
f1f1595deebff5d4ba47ff7e010178ff
d13c7e368b97c1df77eda00c98ba12f2d90eaa65
101700 F20101208_AABFTR mikulski_a_Page_065.jpg
6f23f75994097499f155f998808cec3f
350c0fb799acc4d9e90472a9ab5973f6b57a079a
F20101208_AABGAA mikulski_a_Page_030.tif
d8c8d00566ba76d698dcf06fb5c09a37
6cf9528d3975856a12af783fa72a3b74f0e765b2
732027 F20101208_AABFUG mikulski_a_Page_031.jp2
9764477642f2db76a0664c5d39231f0d
5015786bdb621f965b643bf8047ec424f450a957
16009 F20101208_AABFTS mikulski_a_Page_044.pro
79b5c3bf324d3b0f481e55107cb92638
9ed8ab0a6477777518ef313c99bb27fb60eda3f6
160 F20101208_AABGAB mikulski_a_Page_074.txt
8a98a9531cff3779f82a6cda00561ce7
4dbacefeeca204ea4dee485cf7250e74e00b6ee0
20862 F20101208_AABFUH mikulski_a_Page_090.QC.jpg
50774a27b23da2784b6fca7ec807a56a
23355dcd85096ed5a3bd2f84150bd734b135bb7e
54428 F20101208_AABFTT mikulski_a_Page_050.pro
b160e6f5e1401531fc85081a3fa6b73f
7b54d3cc8496413c2a76e107b0341d8e632e25fa
16789 F20101208_AABGAC mikulski_a_Page_042.pro
ae1ce4f4e0a033879e294b66ef83eaf1
a784d73fa654e558ca133b05167c6c2fa76e93e3
35797 F20101208_AABFUI mikulski_a_Page_084.QC.jpg
6d11394c945fa219c63c8f0ddf56fb22
36cd32a03893111feb12bac484c49a57cdec33bd
35254 F20101208_AABFTU mikulski_a_Page_021.QC.jpg
5a252e3a973be02569ec999094bad086
6ae981ddb8ee8ec5d3584f0e5ddd4a49fc7005ea
2027 F20101208_AABGAD mikulski_a_Page_030.txt
f73f66df112a5cedd9e965d9839569ca
19e9152efa0348b7ff274769a37524d868b9d9bd
16245 F20101208_AABFUJ mikulski_a_Page_069.QC.jpg
1582f0238c0f381edcc9b8637ea1b4da
a8690605326cf457560b8425d5f9c7cb235d675a
F20101208_AABFTV mikulski_a_Page_022.tif
d82a025bf33c5f082dad0ee8ee394fd6
8b44a553e551d32f198f7cf4df489b71df061740
F20101208_AABGAE mikulski_a_Page_017.tif
5ae9ea61f6b4dd3bba5d9e07a2ae6667
7ca464f709622b521295ea758c15d5decf52a448
F20101208_AABFUK mikulski_a_Page_012.tif
f04619aa458ce0c7031997c96caa8df1
987ac6dc948f4ed0ed6db67b6fa3f4022b04c21e
36224 F20101208_AABFTW mikulski_a_Page_026.QC.jpg
708e1d9cbcf39a94649cf24bdb45cfe8
342576b1e06f2c8d461f254e6ba8f312108fcb2e
1051956 F20101208_AABGAF mikulski_a_Page_074.jp2
7f690518975a6587491dd81643053774
8cd08c797fb77fc4b26a759900952bc46b35fa97
53869 F20101208_AABFUL mikulski_a_Page_023.pro
6d165a1164c522c2415cb2ec14caf0b8
0f4402b7b5857c8deec9c314d4e3dab7e5f69b05
F20101208_AABFTX mikulski_a_Page_040.jp2
d13e4e59b10188b8454bd294fe71e0db
45aa91e7469dd735fbec3738a153a198a0aff4de
F20101208_AABGAG mikulski_a_Page_035.tif
7f1df9ec418dab2db4aaf8231499661f
7f59ee59073d1cc73973c5eb4b13f83a168def1d
1853 F20101208_AABFUM mikulski_a_Page_054.pro
4b2dd9b18166f2b77c28dc50a715547d
50b2f28f4da30f2f42a7e6c440502ea7ba458d8c
50660 F20101208_AABFTY mikulski_a_Page_099.pro
c36e65a66fad4acdb8fd9ea7a6490ff6
fe6cd00cf1057cb0c69259c60f6641088fcfa128
19487 F20101208_AABGAH mikulski_a_Page_042.QC.jpg
d230ce5a65e64ad67a5ce4ed2ea6d7f6
2466d2f2151e6d7d9e9c85a9d732a87e4447de06
4539 F20101208_AABFVA mikulski_a_Page_095.pro
fbdd69f49d83c1bafd5ddcc575ea6792
dfb9c946c6d3dc64c23a285fed2ea30b06948c4c
107226 F20101208_AABFUN mikulski_a_Page_065.jp2
49f76fc9cad802f6deb7c65bc09ea02c
2c96633c95d9baec13b9c5683d79d3b1031da294
35045 F20101208_AABFTZ mikulski_a_Page_022.QC.jpg
8475bd6e07465cd6782f6fc94dd07246
b9d87082b83fdced2e3401b82226b4f6dcf03560
F20101208_AABFVB mikulski_a_Page_088.tif
2bac569ad0271f840d59fa0683dbbaeb
57a478894b9fb93e29a0eb1fea77e3c6b780de93
33690 F20101208_AABFUO mikulski_a_Page_100.pro
ab08efee401f51ecc68994c1c2afe757
d6930efec562fbb9a8311aefb82537e6ad204b63
52530 F20101208_AABGAI mikulski_a_Page_048.pro
4a48ac61d14208da33fd09d3efb881af
50ad6183fff7f8b9e6372375b1fc3c4580a13084
1051984 F20101208_AABFVC mikulski_a_Page_102.jp2
e3778c211e24489628ce9a66ab76e21f
b7422762c3af9eb47489ce6f2939155be84c9852



PAGE 1

1 TRANSFORMING AN URBAN ARTERIAL INTO A MULTIWAY BOULEVARD: A DESIGN PROPOSAL FOR KENNEDY B OULEVARD IN TAMPA, FLORIDA By ANDRZEJ KRIS MIKULSKI, JR. A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLOR IDA IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF ARTS IN URB AN AND REGIONAL PLANNING UNIVERSITY OF FLORIDA 2006

PAGE 2

2 Copyright 2006 by Andrzej Kris Mikulski, Jr.

PAGE 3

3 To my parents, Andrzej Sr. and Christine Mikulski.

PAGE 4

4 4 ACKNOWLEDGMENTS First, I thank my parents for the unwaveri ng support in everything I do and always being there for me. I would also like to thank my committee chair, Dr. Joseli Macedo, and committee members, Dr. Ilir Bejleri and Dr. Martin Gold. Dr. Gold provided invaluable design knowledge and opened up my eyes to the smaller details of urban design. A huge thanks goes to Dr. Do Kim Hyung and Majdi Alkresheh; wi thout them none of the visual izations would be possible. They witnessed my struggles first hand and ga ve me all the technical help and knowledge I needed to complete this thesis. Without them I would not be able to express my vision and share it with others. Tim Witsil from Reynol ds, Smith, and Hills also provided valuable guidance on the three-dimensiona l modeling and photosimulations. I would also like to thank Matt Wolfe for sharing an interest in urban desi gn and providing valuable input from the earliest stages of this thesis.

PAGE 5

5 TABLE OF CONTENTS page ACKNOWLEDGMENTS...............................................................................................................4 LIST OF TABLEs................................................................................................................. ...........7 LIST OF FIGURES................................................................................................................ .........8 ABSTRACT....................................................................................................................... ............11 CHAPTER 1 INTRODUCTION..................................................................................................................13 Kennedy Boulevard History...................................................................................................13 Thesis Goals................................................................................................................... .........13 The Need for Improved Public Tran sportation in Tampa, Florida.........................................14 Hillsborough Area Regional Transit Authority...............................................................15 The Unstable Future of Oil..............................................................................................15 Increasing Population......................................................................................................16 Light Rail Transportation...................................................................................................... .17 2 LITERATURE REVIEW.......................................................................................................21 The Decline of Public Space in the United States..................................................................21 Current Road-Building Standards...........................................................................................23 New Urbanism, Traditional Neighborhood Design and Transit Oriented Development.......25 Multiway Boulevards............................................................................................................ ..28 3 METHODOLOGY.................................................................................................................34 Exploratory Research........................................................................................................... ...34 Selection of the Study Area....................................................................................................35 Literature Review.............................................................................................................. .....36 Case Studies................................................................................................................... .........36 Questionnaires................................................................................................................. .......37 Questionnaire Results......................................................................................................37 Summary of Questionnaire Results.................................................................................38 Digital Three-Dimensional Modeling.....................................................................................39 4 CASE STUDIES................................................................................................................... ..45 Atlantic Avenue: Delray Beach, Florida...............................................................................45 History and Context.........................................................................................................45 Implementing the Redesign.............................................................................................46 Design Elements..............................................................................................................47

PAGE 6

6 Impact of the Redesign....................................................................................................47 Clematis Street: West Palm Beach, Florida............................................................................48 History and Context.........................................................................................................48 Implementing the Redesign.............................................................................................49 Design Elements..............................................................................................................49 Impact of the Redesign....................................................................................................50 Octavia Boulevard: Sa n Francisco, California......................................................................51 History and Context.........................................................................................................51 Implementing the Redesign.............................................................................................52 Design Elements..............................................................................................................53 Impact of the Redesign....................................................................................................53 5 PROPOSAL....................................................................................................................... .....60 Kennedy Boulevard Redesigned.............................................................................................60 Alternative Redesigns.......................................................................................................... ...62 A Rail System for Tampa.......................................................................................................63 I-275 Alignment..............................................................................................................64 Cypress Street Alignment................................................................................................65 Kennedy Boulevard Alignment.......................................................................................65 Selecting the Correct Alignment.....................................................................................66 6 DISCUSSION..................................................................................................................... ....83 Implementing the Redesign....................................................................................................83 Obstacles to the Redesign................................................................................................83 Overcoming the Obstacles...............................................................................................84 Effects on Traffic.............................................................................................................86 7 CONCLUSION..................................................................................................................... ..89 APPENDIX A QUESTIONNAIRE................................................................................................................91 B VISUAL INVENTORY OF KENNEDY BOULEVARD.....................................................96 C PHOTOSIMULATIONS........................................................................................................97 D TRAFFIC COUNTS AND PROJECTIONS..........................................................................99 CITED REFERENCES............................................................................................................... .102 BIOGRAPHICAL SKETCH.......................................................................................................105

PAGE 7

7 LIST OF TABLES Table page 5-1 Possible Rail Alignments...................................................................................................68

PAGE 8

8 LIST OF FIGURES Figure page 1-1 The study area............................................................................................................. .......18 1-2 Cross section of Kennedy Boulevard (existing)................................................................19 1-3 Kennedy Boulevard before and after photosimulation......................................................19 1-4 New Orleans streetcar system............................................................................................19 1-5 Helsinki, Finland.......................................................................................................... ......20 1-6 Amsterdam, Holland......................................................................................................... .20 1-7 Copenhagen, Denmark.......................................................................................................20 2-1 Boulevard realms........................................................................................................... ....31 2-2 Boulevard overview......................................................................................................... ..32 2-3 Intersection configurations................................................................................................ .32 2-4 Access Road Exit........................................................................................................... ....33 2-5 Various functions of a median...........................................................................................33 3-1 The Study Area............................................................................................................. .....40 3-2 Reasons people come to Kennedy Boulevard....................................................................40 3-3 Mode of travel people use to get to Kennedy Boulevard...................................................41 3-4 Biggest problems along Kennedy Boulevard....................................................................41 3-5 Ratings of various elem ents of Kennedy Boulevard..........................................................42 3-6 Changes people would like to see along Kennedy Boulevard...........................................42 3-7 Frequency of transit usage.................................................................................................43 3-8 Factors that influence people to drive instead of using transit...........................................43 3-9 Factors that would incr ease transit ridership.....................................................................44 4-1 Atlantic Avenue, Delray Beach, Florida............................................................................54 4-2 Atlantic Avenue before the redesign..................................................................................55

PAGE 9

9 4-3 Atlantic Avenue after the redesign....................................................................................55 4-4 New residential construction followi ng improvements to Atlantic Avenue......................55 4-5 Clematis Street, West Palm Beach, Florida.......................................................................56 4-6 Clematis Street af ter the improvements.............................................................................57 4-7 CityPlace, sparked by the Clematis Street revitalization...................................................57 4-8 Octavia Boulevard in San Francisco, CA..........................................................................58 4-9 Octavia Boulevard cross section........................................................................................58 4-10 The side access road...................................................................................................... .....59 5-1 Cross section of Kennedy Boulevard (existing)................................................................69 5-2 Kennedy Boulevard proposed redesign.............................................................................69 5-3 Kennedy Boulevard proposal overview.............................................................................70 5-4 Transit station and pedestrian crosswalk...........................................................................71 5-5 Intersection designations.................................................................................................. ..72 5-6 Major intersection......................................................................................................... .....73 5-7 Hubert Street before and after............................................................................................74 5-8 Alternative Redesign One..................................................................................................75 5-9 Alternative Redesign Two.................................................................................................75 5-10 Alternative Redesign Three...............................................................................................76 5-11 The Tampa Rail System and three alternative routes through the study area....................77 5-12 Major destinations........................................................................................................ ......78 5-13 I-275 rail alignment a nd half-mile radius..........................................................................79 5-14 Highway median station in Chicago..................................................................................80 5-15 Cypress Street rail alignment and half-mile radius............................................................81 5-16 Kennedy Boulevard rail ali gnment and half-mile radius...................................................82 6-1 Alternative routes for SR 60 designation...........................................................................87

PAGE 10

10 6-2 Intersection traffic control............................................................................................... ...88

PAGE 11

11 Abstract of Thesis Presen ted to the Graduate School of the University of Florida in Partial Fulfillment of the Requirements for the Degree of Master of Arts in Urban and Regional Planning TRANSFORMING AN URBAN ARTERIAL INTO A MULTIWAY BOULEVARD: A DESIGN PROPOSAL FOR KENNEDY B OULEVARD IN TAMPA, FLORIDA By Andrzej Mikulski December 2006 Chair: Joseli Macedo Major Department: Urban and Regional Planning This thesis explores the possibility of tran sforming an urban arterial road in Tampa, Florida, into a multiway boulevard. Multiway boul evards are roadways that combine high speed regional traffic, slower local traffic, and a pedest rian environment, all into a single space. Urban arterials, especially those developed after Worl d War II, are characterized by large parking lots, low-rise strip malls, large signs, fast automobile traffic, and a lack of a pedestrian realm. These kinds of urban arterials were designed so lely for automobiles and function more like expressways than city streets. As a result, th e roads separate neighborhoods from each other and act as a barrier to the free movement of peopl e. There is a growing movement in the United States to improve the quality of the public realm by redesigning urban arterials into pedestrianoriented streets. Public transportation is an im portant element that enhances the pedestrian realm because it reduces the am ount of automobiles. In Tampa, Kennedy Boulevard is an example of an urban arterial that lacks a quality public realm but has the potential to be a great st reet. Kennedy Boulevard was once called Grand Central Boulevard and was Tampas premier str eet. Following World War II, the road was widened, development followed the emerging s trip pattern, and the Kennedy Boulevard

PAGE 12

12 corridor went into decline. Today, the road is characterized by its au tomobile-focused design that makes it difficult to walk. The redesign of Kennedy Boulevard will focus on creating a pedestrian-oriented environment that reconnects neighborhoods. This will be achieved through a multiway boulevard that will include mass transit. Specific design el ements that make a high quality pedestrian realm will be identified based on interviews, questionnaires, and case studies. The site as it exists today will be modeled using a three-dimensi onal computer visualization program and an alternative model that incorporates the sp ecific design elements will be proposed.

PAGE 13

13 CHAPTER 1 INTRODUCTION Kennedy Boulevard History Kennedy Boulevard was once known as Gra nd Central Boulevard. Grand Central Boulevard was the main east to west road thro ugh the city and marked the delineation between the north and south halves of the city and wa s Tampas premier street for shopping and dining. The street was renamed Grand Central Boulev ard in honor of President John F. Kennedy who paraded down Grand Central Boulevard just four days before he was assassinated in Dallas, Texas. Today, Kennedy Boulevard still delineates the nort h half of the city from the south half. However, the boulevard has lost its previous grandeur following its decline as a shopping and dining destination. Today, the main function of th e road is to move vehi cles through the center of the city from downtown to the Westshore Busine ss District. The stretch of road in the study area is lined by low rise strip malls and large park ing lots. The specific section selected for this study starts at Dale Ma bry Highway and goes westward for a pproximately one mile to Westshore Boulevard (Figure 1-1). The road right-of-way is 100 feet; the roadway is characterized by an automobile focused design and large setbacks (Figure 1-2). Thesis Goals The four goals of th is thesis include: A Plan to Restore Kennedy Boulevard Using Kennedy Boulevards histor ical significance as Tampas main street as a guide for the future. Creating a destination for shoppi ng, business, dining, and living. Retaining existing busine sses along the corridor

PAGE 14

14 Creating a diverse use of mixes to encourage interaction between various groups of people and businesses. Aesthetic Improvements Implementation of build-to lines and bulk regulations. Addition of street trees a nd landscaping to improve microclimate and aesthetics. Minimizing curb-cuts and eliminate pa rking lots in front of buildings. Burying overhead utility lines or relocate them to alleyways. Using repeating streetscape elements and street furniture to unify the corridor. Creating a Link Use repeating streetscape elements to re inforce the east-west connection between downtown Tampa and the Westshore business district. Use transit to stre ngthen the downtownWestshore connection. Increasing Alternative Forms of Transportation Adding light rail. Link light rail to an improved bus servi ce that serves surrounding neighborhoods. Improve the pedestrian realm in orde r to make walking a viable option. Design for bicycles. The Need for Improved Public Transportation in Tampa, Florida The city of Tampa is a growing city at the center of the rapi dly growing Tampa Bay metropolitan area. As more people move to the region every day, traffic congestion is worsening. For many years, city leaders of opposite ends of the political spectrum have ignored the consequences of growth and refused to create a viable public transportation system. Business leaders and politicians are starting to come to the realization that a convenient, efficient mass transit system is needed to keep Tampa competitive in the marketplace.

PAGE 15

15 Hillsborough Area Regional Transit Authority Pursuant to the Florida Statutes, the Hillsborough Area Regional Transit Authority (HART) is delegated responsibility for meeti ng the public mass transit needs of its member jurisdictions (HART, 2006). The member juri sdictions are unincorporated Hillsborough County and the cities of Tampa and Temple Terrace (HART, 2006). HART is governed by a 12 member board; six members are appointed by the Hill sborough County Board of County Commissioners, three by the City of Tampa, one by the City of Temple Terrace, and two by the Governor of Florida (HART, 2006). Hillsborough County and the Tampa Bay area have long used a roads-only approach to transportation. The roads-only approach has ma de driving the only viab le transportation option for residents. A recent survey found that the Ta mpa Bay area is the most expensive place in the country for transportation. The survey found th at the average Tampa Bay resident spends 25 % of their income on trans portation (Brill, 2003). The Unstable Future of Oil The era of cheap oil is coming to an end and we must adapt accordingly and retrofit our cities to reduce energy consumption. As of Au gust 13, a gallon of self -serve regular gasoline cost $3.03 (CNN, 2006). Prices are unlikely to d ecrease much because of rising world-wide demand mostly from China and India and a c ontinuing decrease in world-wide supply. Increasing demand and decreasing supply have caused oil prices to become very volatile. Any sign of conflict in the Middle-East causes oil prices to rise. Any tropical system or hurricane that comes within hundreds of miles of o ff-shore oil facilities also driv es up the price of oil. While price hikes are to be expected, in recent years the prices are increasing more often and more drastically, signs of oil as a cheap, plentiful, and reliable source of energy are coming to an end. Sunbelt Cities such as Tampa were developed at the beginning of the cheap oil era; thus the

PAGE 16

16 design and layout focused on the priv ate automobile. When, not if, the era of cheap oil comes to an end, metropolitan areas such as Tampa will be in crisis because their very existence will be threatened. City and metropolitan leaders must act now and change land use and transportation patterns to create a more su stainable city and region. Increasing Population Florida has been one the fastest growing st ates in the nation for decades. Hillsborough County and Tampa are at the center of the ra pidly growing Tampa Bay metropolitan area. A population projection conducted by the researcher shows that Hillsborough County will have 1,273,140 residents by the year 2010, an increase of almost a quarter million people from the year 2000. The population of the entire Ta mpa Bay area (Hillsborough, Pinellas, Pasco, Hernando, Manatee, and Sarasota Counties) will increase from 3,295,687in 2005 to 6,924,989 by the year 2055. While much of the growth will occur in greenfield development on the urban fringe, the City of Tampa will absorb some of that growth. In the last few years, many urban infill projects have been built in inner city Tamp a. There is now a high demand for urban living; trends all around the country re flect this. Massive condominiu m projects are being built in Downtown Tampa and Channelside that will bring thousands of new residents and create entire new neighborhoods and districts in only a few years. Floridas population will conti nue to grow at a rapid rate. Florida growth management laws, high demand for urban living, growing opposition to sprawl from both sides of the political spectrum, and concurrency requirements will ma ke existing urban areas attractive for growth. The population projection done by the researcher found that Fl orida simply does not have enough land to accommodate the expected increase in population at current density levels. As urban areas such as Tampa become denser to accommodate the additional population, alternatives to the automobile mu st be planned for. The citys roads are already clogged with

PAGE 17

17 traffic, and the problem will only grow worse with more people. Most roads in the city are already as wide as the right of way allows so any additional widening is cost prohibitive. The only way to deal with such a la rge increase in population is to construct a mass transit system. Light Rail Transportation A light rail line is an important element of the proposed redesign for Kennedy Boulevard. The Hillsborough Area Regional Transit Authority ( HARTLine) is planning to build a light rail system; part of the system will parallel Kenne dy Boulevard. The exact route has not yet been set, but this thesis calls for locating the light rail line on Kennedy Boulevard. Mass transit systems come in a variety of forms ranging from bicycle powered taxis to high speed bullet trains. Within urbanized areas in developed countries the most common forms of mass transit, ranging from lightest duty to h eaviest duty are: streetcars, light rail, and commuter or heavy rail. Light rail is the most common form of fixed guideway mass transit in urban areas; good examples of rail mass transi t are European countries such as Finland, Denmark, and the Netherlands. In the United Stat es, Portland, Oregon is the best example of a successful light rail system. There is a debate about whether or not ra il is superior to bus transit. Compared to bus transit, rail tends to offer superior service in terms of speed, comfort, and convenience (Henry, 2006). Rail transit is per ceived to be more prestigious and therefore receives more public support. Rail stations al so serve as a catalyst for dense, multi-modal development (Henry, 2006) and attract more di scretionary riders (people who could drive instead) than busses. Light rail lines can opera te in their own dedicated corrido r or be incorporated onto the street and share space with vehicl es and pedestrians. This type of design is common in European cities but can also be found in the United States. In New Orleans, the streetcar system travels in its own separate right-of -way and on other parts of the system it travels on the street. The Saint

PAGE 18

18 Charles line shares downtown stre ets with cars (Figure 1-3), and travels in a central median through the Garden District (F igure 1-3). The median, also called the common ground, is covered with grass and used by pedestrians a nd joggers. The Riverf ront line has its own dedicated right of way as it travels along the Mississippi River (Figure 1-3). When contemplating a new streetcar system in American cities, issues about safety and litigation arise when the design calls for the tracks to share th e same space as vehicles and pedestrians. The New Orleans streetcar system proves that streetcars can safely share the same space with vehicles and pedestrians. Other Amer ican cities such as San Francisco and Portland have similar systems. The use of shared space between vehicular traffic, pedestrian s, and streetcars is a common design practice in Europe. Vehi cles and streetcar speeds are low enough not to endanger the safety of the pedestrian. He lsinki (Figure 1-4), Amsterda m (Figure 1-5), and Copenhagen (Figure 1-6) are European cities that have done an excellent j ob of safely creating a commonly shared street space. Figure 1-1. The study area. 1 2 3

PAGE 19

19 Figure 1-2. Cross section of Kennedy Boulevard (existing). Figure 1-3. Kennedy Boulevard. Existing (left) and after th e proposed redesign (right). Figure 1-4. New Orleans streetcar system. A) Sharing the road in downtown. From http://members.virtualtourist.com B) Common ground in the Garden District. From http://www.civilwaralbum.com. C) Dedi cated right of way al ong the riverfront. From http://www.sullymansion.com 1 = 25 A B C

PAGE 20

20 Figure 1-5. Helsinki, Finland. Source: www.virtualtourist.com Figure 1-6. Amsterdam, Holland. Source: citytransport.info; http://www.flamenet.ca/ Figure 1-7. Copenhagen, Denmark. Source: www.macdesktops.com

PAGE 21

21 CHAPTER 2 LITERATURE REVIEW The Decline of Public Spa ce in the United States There is a general consensus that the United States is experienci ng a withering of the public realm (Banerjee, 2001). The public real m is defined as, publicly owned streets, sidewalks, rights-of-ways, parks and other pub licly accessible open spaces, and public and civic buildings and facilities (City of Burlington, CA, 2006). The decr ease in both the quantity and quality of the public realm raises some warn ing flags because high-quality, plentiful public spaces are crucial to the free flow of people and id eas that are essential to any civilized society. On the other side of the Atlantic Ocean, Eur opean cities such as London, Paris, and Stockholm have a quality of completeness about them. A us er traveling from one attraction to another does so in a continuous urban experience; there is a connectivity that is missi ng in most American cities (Barnett, 1989). A recent survey found Americans have fewer confidants (people that they can discuss important matters with) than 20 years ago (M cPherson, 2006). The same study also found that Americans personal network (people considered very close friends) dropped from 2.94 in 1985 to 2.08 in 2004 (McPherson, 2006). There are seve ral possible explanations for Americans increasing isolation. Some resear chers believe it is longer work ing hours, the increasing use of television and the Internet, the rise of suburban sprawl, or a combination of all of these. One explanation for the increased isolation that is starting to gain acceptance is the form of Americas built environment. Traditional public sp ace is being replaced by privatized space. City squares were replaced with encl osed shopping malls; public grounds found in neighborhoods are now governed by Residential Community Associ ations (RCAs). Already, 47 million Americans live in neighborhoods contro lled by RCAs and fifty percent of new homes

PAGE 22

22 fall under the control of RCAs (Kohn, 2004). Th e privatization of pub lic space undermines the feeling that people of different classes and culture live in the same society and decreases the opportunities for recognizing commonali ties and accepting differences (Kohn, 2004). There is no single identifiable reason for the decline of public space, although some researchers suggest that the de cline of the public realm is co rresponding with a decline in the public spirit, which is the core element of a civilized society (B anerjee, 2001). A public space, whether it is a park, neighborhood tavern, or side walk, allows for the interaction of different members of society. Current planning and zoning laws codify and quantify individual developments without considering the context. Zoni ng groups similar uses and separa tes dissimilar ones, causing local areas of a metropolitan area to become highly sp ecialized. One zone will be for housing, another will contain retail, and a third will be for workplaces. As a resu lt, friends at work are left behind, neighbors rarely see let alone know each other, and shopping ar eas are depersonalized (Popenoe, 1985). On average, Americans spend one-quarter of their time getting to places (Moscovich, 2006). The resulting built environment does not create a high quality public realm and inhibits the creation of tight-kn it social networks. Current zoning standards also se gregate housing by type and cost. The segregation of land uses a nd income levels prevents the intermingling of different people which is vital for a good public sp ace. Current zoning does not address design. Over the years, three-dimensional design has been replaced by tw o-dimensional land use planning (Walters, 2005). Of all regions in the United States, Sunbelt Ci ties have the poorest qua lity public realm. The lack of a quality public realm is the re sult of modern planning and zoning laws which segregates uses (Fink, 1993). Sunbelt Cities gr ew the most rapidly af ter World War II at the

PAGE 23

23 time zoning was becoming a popular way for cities to manage growth. Zoning and planning did not address design as part of the criteria for new projects. Road s designs were based on disaster evacuation models and emergency response times (designed for maximum speed) rather than how the road fit into the context of the nei ghborhood or district. Trav el lanes are wide and plentiful, turning radii allow for minimal breaking when turning, and vehicles can travel as fast as possible. While Sunbelt citi es have many well-engineered ro ads, these roads are the most dangerous for non-motorists. A 2000 survey by the Surface Transportation Policy Project (STPP) found that the Tampa-Saint Petersburg metro area was the most deadly for pedestrians (Mitchell, 2000). Following Tampa were Atlant a, Miami, Orlando, Jacksonville, Phoenix, West Palm Beach, Memphis, Dallas, and New Orleans. It is no coincidence that all these are Sunbelt Cities that were built for the automobile. R oy Kienitz, Executive Director of STPP said, "Building our communities only for cars has de adly consequences. The riskiest places are characterized by spread-out growth and wide, high -speed streets that often lack sidewalks and crosswalks" (Mit chell, 2000). Current Road-Building Standards Most of the hostile environments seen along ro adways are the result of modern day roadbuilding standards. Standardized template s for roadways are favored over good design principles and common sense. Alth ough road-building standards are needed to ensure that roads are built for efficiency and safety, more atte ntion should be focused on the context of the roadway. Road-building standards ar e codified in two important books, A Policy on the Geometric Design of Highways and Street published by the American Association of State Highway and Transportation E ngineers (AASHTO) and the Traffic Engineering Handbooks by the Institute of Transportation E ngineers. State departments of transportation have adopted these books as the standard for roadway design.

PAGE 24

24 For almost 50 years AASHTO has been publishing and updating its roughly 1,000 page book, A Policy on the Geometric Design of Highways and Street (it is more commonly referred to as the Green Book due to its lime-colored cover). The Green Book places a premium on safety. The first principle in the Green Book is that safety trumps all other considerations (AASHTO, 1994) such as histor y, aesthetics, community hab its, community values. The Green Book clearly states, The design valu es given within this text ha ve safety as their primary objective (AASHTO, 1994). The second principle is that for a road to be safe it must accommodate drivers traveling at high speeds, even faster than the legal limit. AASHTO and most stat e highway departments traditionally have used what is known as the "85t h percentile" standard. They calculate how fast the 15th fastest driver out of ev ery 100 on a highway is traveling, and they commit to make that driver's trip free of danger (Sw ope, 2005). To create an efficien t, uniform road design standard across the nation, the Federal Highw ay Administration has made it a policy that for any state or local road project to rece ive federal funds, the project must conform to AASHTO Green Book standards (Ehrenhalt, 1997). The Institute of Transportation Engineers (ITE) publishes the Traffic Engineering Handbook. The book contains guidelines for urban a nd rural roadways and standards for travel lane widths, recovery areas, a nd intersection design. For an urba n street with a speed limit over 40 miles per hour, such as Kennedy Boulevard, the de sirable travel lane wi dth is 13 feet (ITE, 1992). The design of the roadside is also important for safety. The handbook states, Clear Recovery Areas are the portions outside the travel way th at are free of objects or hazards such as trees, barriers, and utility pol es (ITE, 1992 pg 174). Intersection design is based on two

PAGE 25

25 primary objectives: quality and safety. In or der to achieve these objectives, the following principles guide intersection design (ITE 1992): Points of conflict should be minimized Conflict areas should be simplified Conflict frequency should be limited Conflict severity should be minimized New Urbanism, Traditional Neighborhood Design and Transit Oriented Development New Urbanism is a type of development that attempts to revive to wn design practices of the past. The Charter of the New Urbanism se ts design guidelines for the three parts of a metropolis; the region; the neighborhood, the district and the corridor; and the block, the street, and the building (Congress for the New Urbanism, 2006). Design principles for the neighborhood, the district, and the corridor are as follows: The neighborhood, the district, a nd the corridor are the essen tial elements of development and redevelopment in the metropolis. They form identifiable areas that encourage citizens to take responsibility for th eir maintenance and evolution. Neighborhoods should be compact, pedestri an-friendly, and mixed-use. Districts generally emphasize a special single use, and should follow the principles of neighborhood design when possible. Corridors are regional connectors of neighborhoods and districts; they range from boulevards and rail lines to rivers and parkways. Many activities of daily living should o ccur within walking distance, allowing independence to those who do not drive, especially the elderly and the young. Interconnected networks of st reets should be designed to encourage walking, reduce the number and length of automobile trips, and conserve energy. Within neighborhoods, a broad range of housing types and price levels can bring people of diverse ages, races, and incomes into da ily interaction, strengt hening the personal and civic bonds essential to an authentic community. Transit corridors, when properly planned a nd coordinated, can help organize metropolitan structure and revitalize urban centers. In contrast, highway corridors should not displace investment from existing centers.

PAGE 26

26 Appropriate building densities a nd land uses should be within walking distance of transit stops, permitting public transit to become a viable alternative to the automobile. Concentrations of civic, institutional, a nd commercial activity should be embedded in neighborhoods and districts, not isolated in remote, singleuse complexes. Schools should be sized and located to enable children to walk or bicycle to them. The economic health and harmonious evolution of neighborhoods, districts, and corridors can be improved through graphic urban design codes that serve as predictable guides for change. A range of parks, from tot-lots and village greens to ballfields and community gardens, should be distributed within neighborhoods. Conservation areas and open lands should be used to define and connect differe nt neighborhoods and districts. Traditional Neighborhood Development (TND) is a type of New Urbanist development. TND and New Urbanist prin ciples are very similar; both use th e pedestrian as the center for the design process. The major principles of TN D are: mixed uses, walkable neighborhoods, a network of interconnected street s, and priority for public spac es and civic buildings (Gordon, 2005). TND is based on the idea that the needs of the pedestrian should be considered over all other needs. TND still accommodates automobile need s, but not at the expense of the pedestrian. The goal is to create communities that encour age people to walk and minimize the amount of driving within the community. TND is based on the principle that nei ghborhoods should be walkable, affordable, accessible, distinctive, and fit within the historic context of each co mmunity. Costs savings is one of the touted benefits of TND. Infrastruc ture costs less because streets in TNDs are much narrower than conventional suburban developments a nd the destinations are in close proximity to one another, requiring less pavement to connect different areas (Calt horpe, 1993). Even though many New Urbanists claim that th eir developments are actually le ss expensive to build, homes in New Urbanist developments a ll across the country sell for a significantly higher rate than surrounding areas. Understandably so, many people criticize TND and New Urbanism for being

PAGE 27

27 elitist and affordable only for the wealthy. Howeve r, a counterpoint to that argument is that New Urbanist developments are in such hi gh demand that they demand higher prices. Transit Oriented Development (TOD) is anot her branch of New Urbanism. Many of its principles are similar to TND, but TOD places a greater emphasi s on transit uses. Like TND, TOD places the pedestrian at the center of the de sign. According to Peter Calthorpe, considered one the foremost experts in TOD, the followi ng principles summarize TODs (Calthorpe, 1993): Organize growth on a regional level to be compact and transit supportive Place commercial, housing, jobs, parks, and civic uses within walking distance of transit stops Create pedestrian-friendly street networks which directly connect local destinations Provide a mix of housing types, densities, and costs Preserve sensitive habitat, riparian zones, and high quality open space Make public spaces the focus of building orientation and neighborhood activity Encourage infill and redevelopment along transit corridors within existing neighborhoods Transit stops should be no more than one-half a mile apart to ensu re that there is a reasonable distance for someone to walk to the nearest stop. The densest commercial areas should be located immediately ad jacent to the transit stops to provide transit riders with convenient shopping opportunitie s before and after trav el. Another important element to TOD is residential density. According to Calthorpe (1993), in order to support light rail transit in an urban setting, a density of 18 dwelli ng units per acres is needed. Th e type of service and level of service is tied directly to popul ation density; the denser the ar ea, the shorter the headways.

PAGE 28

28 Multiway Boulevards Multiway boulevards are unique streets because they seamlessly combine several disparate uses. According to Jacobs, Multiway boulevards are an urban form that responds to many issues that are central to urban life: livability, mobility, safety interest, economic opportunity, ecology, mass transit, and the need for open space (Jacobs et al., 2002; 9). Multiway boulevards combine high-speed region al traffic, slower local and neighborhood traffic, accommodate heavy pedestrian activity, and are often major shopping and residential streets. Some boulevards accommodate transit in the central median or have access to an underground subway system. True multiway boulevards are really two or three different roads located immediately parallel to one another. American traffic e ngineering standards view multiway boulevards as unsafe because of the complex intersections resulting from multiple roadways, street trees that run all the way to the edge of intersections, and pedestrian realm. Publications of the Association of State Highway and Transportatio n Officials (AASHTO) di scourage key features of boulevards such as side access roads and street trees. Research of 21 boulevards in the United States and Europe compared accide nt rate data on the boulevards to comparable nearby streets in each city. The results showed that multiway boulevard are no less safe than traditional streets nearby (Jacobs et al., 2002). Some of the boulevar ds were less safe, some as safe, and some more safe than the neighboring streets. The study also examined accidents involving pedestrians and found the same conclusion; multiway boulevar ds are no less safe th an other streets. Multiway boulevards are made up of two r ealms (Figure 2-1): a through-going realm and a pedestrian realm (Jacobs et al., 2002). The through-going realm is desi gned to carry regional traffic in multiple lanes at moderate speeds. The pedestrian realm is made up of the building

PAGE 29

29 entrances, sidewalks, a parking lane, an access lane, and the landscaped median separating the through-going realm from the pedestrian realm. In the through-going realm, traffic flows at around 40 miles per hour and access is limited. Entry and exit for the middle roadway only occurs at major intersections. Only major cross streets intersect with the through-going realm; mi nor streets and driveways terminate at the access roads (Figure 2-2). The elimination of driveways and minor intersections greatly enhances traffic flow and lessens the risk of a traffic collision. At intersections, the access roads can continue straight or be diverted into the through going realm to reduce the complexity of the intersection (Figure 2-3). There may or may not be a central median separating the opposite traffic lanes in the through going realm. If there is a median, it should be wide enough to accommodate some landscaping and street trees If transit is needed along the corridor, the central median can be used for Bus Rapid Transit (BRT) lanes, contain tracks for a light rail or streetcar route, or contain access points to a subway sy stem. A central median is optional, but a median separating the through-going realm from the pedestrian rea lm is required. Medians delineate the space, serve as a pedestrian refuge when crossing the street, and accommoda te street trees and landscaping (Figure 2-5). The second and most important realm is the pe destrian realm. This realm includes the landscaped median separating the middle roadwa y from the access roadway, the access roadway and parking, sidewalk, and the bui ldings abutting the sidewalks. The median should be at least eight feet wide to accommodate shade trees. The side roadways accommodate slow-speed local auto traffic and should provide a la ne for parking. Sixteen feet is ideal to provide one travel lane and one parking lane, each eight feet wide. Twenty miles per hour or less is an ideal traffic

PAGE 30

30 speed for the side roadway. Traffic flows one-w ay and the lanes tend to be narrower than the lanes in the middle roadway to slow traffic. Due to the slow traffic of the side roadway, bicyclists and pedestrians also use the access ro adway. The side roadways begin and terminate with the middle roadway at major intersections. Multiway boulevards are common in major Eur opean cities. Paris Champs Elysees was once the most famous multiway boulevard in the world. Although it is no longer a true multiway boulevard (the side access roads were made in to sidewalks to accommodate heavy pedestrian traffic) the Champs Elysees remains an example of what a great street can do for a city (Jacobs et al., 2001). Barcelona, Spain has the largest and pe rhaps best collection of multiway boulevards of any city in the world. Three major multiw ay boulevards slice through Cerdas LEixample: the Passeig de Gracia, the Avenida Diagonal, and the Gran Via de les Cort s Catalans (Jacobs et al., 2002). Multiway boulevards can become a significant ur ban element in American cities. All major cities have large commercial st rips that have a right-of-way or building-to-build ing width large enough to accommodate a multiway boulevard. Boul evards are appropriate where there is a need to carry both through traffi c and local traffic and a need for the through traffic to move faster than the local traffic. Boulevards are appropriate for str eets, by virtue of their size and location, have the potential to become a special place in the city (Jacobs et al., 2002). Boulevards are also appropriate where there is a large number of pedestrians who need to cross the street such as commercial streets or streets with mass transit. Although rarely built today, there are numerous opportuni ties to build multiway boulev ards in the contemporary environment. Opportunities to build multiway boulevards exist in seven distinct contexts (Jacobs et al., 2002):

PAGE 31

31 Existing boulevards from the late nine teenth and early twentieth century. Existing inner-city major streets. Existing strip development streets. Existing expressways and freeways. Existing suburban residential arterials. Existing suburban commercial arterials. Major traffic streets in new ur ban or suburban developments. Kennedy Boulevard is a strip development st reet that can be converted into a multiway boulevard. There is enough space between the buildings to accommodate a boulevard design with a dedicated transit way. Figure 2-1. Boulevard realms. S ource: Jacobs et al., 2002; 212.

PAGE 32

32 Figure 2-2. Boulevard overview. A) Major cross streets intersect with the through going realm. B) Minor streets and driveways terminate at the access roads, improving traffic flow on the through-going lanes. S ource: Jacobs et al., 2002; 264. Figure 2-3. Intersection confi gurations. A) Access road traffic may continue through the intersection; or B) channeled into the thr ough-going realm. Source: Jacobs et al., 2002; 228. A B THROUGH-GOING REALM A B

PAGE 33

33 Figure 2-4. Access Road Exit. The ro ad reenters the throug h-going realm. Source: Jacobs et al., 2002; 30. Figure 2-5. Various functions of a me dian. Source: Jacobs et al., 2002; 219.

PAGE 34

34 CHAPTER 3 METHODOLOGY The objective of this thesis is to study the pr ove that redesigning an urban arterial as a multiway boulevard is the best way to create a public street space, improve the pedestrian realm, improve traffic flow, and incorporate transit. The chosen method to gain an understanding of corridor improvements is exploratory research in th e form of case studies. This research will contribute to the field of knowle dge in urban design by suggesti ng ways to transform existing urban arterials into multiway boulev ards that will improve the quali ty of the built environment. The research will also contribute to the fi eld of urban planning by explaining how multiway boulevards can improve the public realm, make transportation safer and more efficient, and increase economic prospects for the city. To prove that the stretch of Kennedy Boulevar d in the study area would best function as a multiway boulevard, the following steps were taken: Selecting a study area that met a list of criteria. Reviewing literature to st udy the reasons for a decline in public street space. Reviewing case studies of street corridor improvements and construction of new multiway boulevards. Applying questionnaires and visual image surveys to three Tampa neighborhood civic associations to gauge public opinion about Kennedy Boulevard and gain an understanding of the types of built environments people prefer. Creating a digital three-dimensi onal (3D) model of the corridor as it exists currently, and based on the literature review, case study fi ndings, and questionnair e and questionnaire results, creating a digital 3D model of th e site redesigned as a multiway boulevard. Exploratory Research Exploratory research was the main type of soci al science research conduc ted in this thesis. Social science research is a way to examin e and understand the operation of human affairs (Babbie, 1995). Social problems can not be so lved until there is an understanding of the

PAGE 35

35 problems and how they persist (Bab bie, 1995). Exploratory research in the form of case studies were used because urban planners and designers primarily learn by studying other cities and developments. The case studies selected were examples of successful street corridor revitalizations. The first two case studies were roadways in Delray B each, Florida, and West Palm Beach, Florida. Florida cases were se lected because the governmental, political, and economic contexts in Tampa are expected to be si milar to those in Delray Beach and West Palm Beach. The Florida case studies were expected to bring to light th e challenges and problems that would be faced in the implementation of the redesign by showing how the redesign process is handled at local and state agencies. The thir d case study is of Octavia Boulevard in San Francisco, California. This case was selected because the physical design best represents the vision for Kennedy Boulevard. Each cas e study examined the following topics: History and context. Implementing the redesign. Design elements. Impact of the redesign. Selection of the Study Area The study area is Kennedy Boulevard, an urban ar terial in Tampa, Florida. The specific section selected for this study starts at Dale Mabry Highway and goes westward for approximately one mile to Westshore Boulevard. The selection of the stud y area had to meet the following criteria: A distance between property lines wide enough to fit a multiway boulevard (about 130 feet) Primarily commercial and retail st rip development along the road. Dominated by vehicular traffic.

PAGE 36

36 A heavily trafficked road. Containing or connectin g major destinations. Intersections were classified as either ma jor or minor. Major intersections are where Kennedy Boulevard crosses an arte rial road (as classified by FGDL and GIS data.) Minor intersections are where Kennedy B oulevard crosses a local/collector road (as classified by FGDL and GIS data.) The major intersections are where Kennedy Boulevard intersects the following roads: Dale Mabry Highway, Lois Avenue, and Westshore Boulevard. Th e minor intersections are where Kennedy Boulevard intersects the foll owing roads: Church Avenue, Grady Avenue, Hale Avenue, Clark Avenue, Hubert Avenue, Ma nhattan Avenue, Hesperides Avenue, and Trask Street (Figure 3-1). Literature Review The second part of the research process was to identify the reasons why the public realm has declined so significantly in recent decades. The literature review was limited to the United States, as this is where the most severe decl ine of public space occurred. Within the United States, most of the research focused on Sunbelt ci ties. Of all regions in the United States, the greatest lack of public st reet space is in Sunbelt cities. The second topic that was studied was the current road-building principles used by traffic e ngineers. The third topic that was studied was light rail transportation in urban areas. Cities in the United States and Europe were studied; European cities were selected because they e xhibit good urban design prin ciples and have been used as models for other ci ties in the United States. Case Studies Three case studies were selected to unders tand how improvements can be made to urban arterial roadways. Case studies were selected because the primary way planners learn and solve

PAGE 37

37 problems is by studying what other cities do. The case studies examined the history and context, implementation of the design, specific design elemen ts used in the redesign, and the outcome of the redesign. Two of the case studies are in Florid a and the third is in Sa n Francisco, California. Questionnaires The subject population was identified as anyon e who lives in a three mile radius of Kennedy Boulevard. The questionnaire was put onlin e and a link was sent to the presidents of the following Tampa neighborhood associations: Tamp a Heights, North Hyde Park, and Historic Hyde Park. The questionnaire asked general que stions about the built environment of Kennedy Boulevard. The questions gauged peoples perc eption and attitude about the roadway and desired improvements, reasons people come to Kennedy Boulevard, and transit usage. The entire questionnaire is found in Appendix A. Questionnaire Results The questionnaire asked questions pertai ning to the visual character of Kennedy Boulevard and general questions about transit usage. Out of 217 questionnaires given out, 47 were completed. The redesign calls for the roadwa y to become a pedestrian-focused destination with transit as an integral func tion; in order to accomplish this goal, transit usage and the design of Kennedy Boulevard will have to dramatically change. Respondents were asked why they come to Kennedy Boulevard; multiple answers co uld be selected. Results of the questionnaire show that most people come to Kennedy Boulevar d because they are passing through on the way to another location (Figure 3-2) and all the respondents used a private automobile to get to Kennedy Boulevard (Figure 3-3). In order to identify elements that needed to change, the study population was asked to rank the biggest problems along Kennedy Boulevard. The biggest problems were appearance and traffic (Figure 3-4). The four elements that people were S omewhat Dissatisfied or Very

PAGE 38

38 Dissatisfied with were landscaping, aesthetic s/appearance, and open space and parks, and ability to walk/bike (Figure 3-5). The four chan ges that people would most like to see are: less traffic, better aesthetics, cl eaner, and safer (Figure 3-6). Because public transit is an im portant aspect of the proposed redesign, people were asked about their attitudes toward tran sit and what would make them wa nt to use transit. Currently, most people in the study area never use public transit (Figure 3-7). In order to understand people s attitudes about transit, que stionnaire respondents were asked the three most influential factors that in fluence their decision to drive instead of using transit. The factors are: pub lic transportation takes too l ong, public transportation is not convenient to home, work, and shopping, and the stig ma of public transportation (Figure 3-8). Transit service and convenience must improve dramatically to fulfill the vision for Kennedy Boulevard. Questionnaire subjec ts were asked, What three th ings would make you use public transportation along Kennedy Boulevard? The mo st influential factor that would increase ridership is convenience. Surpri singly, the second most influen tial factor to increase transit usage would be the addition of light rail or streetcar service (Figur e 3-9). Light ra il or streetcar service itself may not necessarily be the reason th at people would switch to transit, but rather the higher quality and faster servic e associated with ra il transit. Although it is commonly thought that mode (rail versus bus) is not an important factor, the questi onnaire results show otherwise. As other studies have shown, there tends to be more public support for funding and higher ridership figures for rail versus busses when all other figures such as headway times, and travel times are held constant (Henry, 2006). Summary of Questionnaire Results Questionnaire results clearly show that Tampa residents are dissatisfied with the appearance of Kennedy Boulevard. Elements that the public would like to see improved are the

PAGE 39

39 aesthetics and landscapin g along Kennedy Boulevard; these imp rovements were added into the redesign. The questionnaire also found why pe ople do not use transit an d factors that would make them want to use transit. Because th e redesign includes the removal of a through-going traffic lane, increased transit ridership would have to mitigate some of the traffic effects. Questionnaire results showed that for people to switch from drivi ng to transit, transit service would have to be more convenient and faster. Digital Three-Dimensional Modeling Digital stereoscopic aerial photograph pairs at six inch resolution of the study area and a camera collaboration report were obtained from the Hillsborough County Mapping and Surveying Department. The study area, as it cu rrently exists, was mode led using the computer program Sketchup. The aerial photograph became th e base for the model. The building masses were created by tracing over the rooftops and extruding the buildings to the appropriate height. Next, pictures were taken of the front faade of each building along the corridor. The faade pictures were edited using PhotoShop 7.0. Th e editing consisted of removing miscellaneous objects such as vehicles, signs, and other objects that blocked the view of the faades. Brightness, hue, and angles were also adjusted to give all the photographs a uniform appearance. Finally, a redesign of Kennedy Boulevard was cr eated. The proposed redesign used street, sidewalk, and building dimensions based on the literature review, design elements from the Octavia Boulevard case study, and inco rporated questionnaire results.

PAGE 40

40 Figure 3-1. The study area showing major and minor intersections. Reasons for Coming to Kennedy Blvd20 4 2 0 9 2 42 0 5 10 15 20 25 30 35 40 45 Use shops and services Visit friendsWalk or stroll Use the busWorkLive along Kennedy Boulevard Pass through on the way to another destination ReasonsNumber of Respondents Series1 Figure 3-2. Reasons people come to Kennedy Boulevard.

PAGE 41

41 Getting to Kennedy Blvd: Mode000 47 0 5 10 15 20 25 30 35 40 45 50 On footBicycleBusCar ModeNumber of Respondents Series1 Figure 3-3. Mode of travel peopl e use to get to Kennedy Boulevard. Biggest Problems Along Kennedy Blvd.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9Traffic Appearance Crime Inconvenient (lack of transit/parking) OtherProblemWeighted Response Series1 Figure 3-4. Biggest proble ms along Kennedy Boulevard.

PAGE 42

42 Number of People "Somewhat Dissatisfied" or "Very Dissatisfied" with Elements of Kennedy Blvd.10 36 39 17 6 37 14 13 21 0 5 10 15 20 25 30 35 40 45S a fety (c rime ) Aesthetic/appearance Landsca p ing R etai l sh op s Bus se rvic e Ope n spa ce /par ks P a rking availibility Co m mun ity ser vic es Ab ility to wa lk/b ikeElementsNumber of Respondents Series1 Figure 3-5. Ratings of various elements of Kennedy Boulevard. Preferred Changes Along Kennedy Blvd.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8Safer Better Aesthetics (landscaping street furniture) Cleaner More shops/services More community feeling Wider sidewalks Less traffic Better transit (light rail/streetcar) Different mix of uses More housing Parks/playgroundsPreferred ChangesWeighted Response Series1 Figure 3-6. Changes people would li ke to see along Kennedy Boulevard.

PAGE 43

43 Frequency of Public Transit Usage000 1 13 32 0 5 10 15 20 25 30 35 Every day4-5 days a week 2-3 days a week One day a week A few times per year Never FrequencyNumber of Respondents Series1 Figure 3-7. Frequency of transit usage. Whe People Drive Instead of Using Public Transportation0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 Stigma of public transportation Public transportation fares are too high Public transportation is unreliable Public transportation is not convenient to my home work and shopping Public transportation takes too long FactosWeighted Response Series1 Figure 3-8. Factors that in fluence people to drive instead of using transit.

PAGE 44

44 How to Increase Public Transportation Usage6 0 5 17 0 1 5 13 5 2 7 15 2 4 2 9 4 2 10 8 1 66 7 0 2 4 6 8 10 12 14 16 18 More frequent More stops Faster service Convenient to home work and shopping Cheaper fares Cleaner airCost of driving increases Addition of light rail or streetcar service FactorsNumber of Respondents Most Important Somewhat Important Least Important Figure 3-9. Factors that woul d increase transit ridership.

PAGE 45

45 CHAPTER 4 CASE STUDIES Three case studies were picked to examin e how Kennedy Boulevard can be redesigned as a pedestrian-friendly boulevard. The first two case studies, Atlantic Avenue in Delray Beach and Clematis Street in West Palm Beach, are in Flor ida and the third, Octavia Boulevard, is in San Francisco, California. The Florida cases were chosen because they show how problems were overcome to redesign a street as a pedestrian -friendly destination. The same problems are expected if Kennedy Boulevard is redesigned. Like Kennedy Boul evard, Atlantic Avenue was a State Road and the same problems between th e local and state governments and FDOT might arise. The last California case study was chosen because the physical design is very similar to the vision for Kennedy Boulevard. Although the polit ical process is different in Tampa and San Francisco, Octavia Boulevard shows how ma ny different agencies, jurisdictions, and neighborhood associations at the local and state level can come together and make a vision a reality. Atlantic Avenue: Delray Beach, Florida History and Context Delray Beach experienced seve re decline in the 1980s. It s 100-year-old downtown was 35% vacant. The main street, Atlantic Avenue, was a three-lane high spee d state road that cut through the city (Figure 4-1). In 1988, FDOT plans called for e liminating parking and widening Atlantic Avenue to a four lane road to improve hurricane evacuation (Figure 4-2). City officials had a much different vision fo r Atlantic Avenue than FDOTs. Atlantic Avenue was a serious problem and major reason why Delray Beachs downtown was blighted. The road was unattractive, hostile to pedestrians, and allowed motorists to speed through the downtown. Rather than letting F DOT control the future of their town, city leaders decided to

PAGE 46

46 take control. Under the guise to improve hurricane evacuation, the FDOT proposal would have caused traffic to flow even faster through the city. While the FDOT proposal would have slightly improved traffic flow a nd made hurricane evacuation negligib ly quicker, the city did not want to become a place that cars drove through. C ities should not be designed solely for disaster evacuation or built for maximized traffic flow. City leaders argued a city should be designed as a place that people can enjoy every day of the year, not designed for an evacuation event that is likely once every few years. Delray Beach leaders worked with FDOT to come up with an alternative design for Atlantic Avenue. The alternativ e design included narrow lanes and st reet furniture, elements that went against FDOT design guidelines. Because th e citys and FDOTs plans were so different, a new strategy was needed. FDOT allowed the city to take ownership of the stretch of Atlantic Avenue that cut through the middle of downtown; in return, the city gave FDOT ownership of two roads on either side of Atlantic Avenue to be converted into a pair of one-way roads to meet FDOTs traffic flow goals. Implementing the Redesign The city created a CRA in 1985 (three years be fore the FDOT proposal) with the goals of: Eliminate slum & blighted conditions Revitalize downtown and adjacent neighborhoods Enhance tax base The CRA provides the following financial incentives: County Grant Program CRA provides 50 % match for new jobs created Faade Easement Programpays for renovations to historic properties Site Assistance ProgramPays percentage of improvements up to 25% or $50,000

PAGE 47

47 The city and FDOT had very different plan s for Atlantic Avenue; the CRA viewed the FDOT proposal as a threat to their goal of redeveloping the downtown. The city and the CRA took advantage of the redevelopment opportunity and worked with FDOT to come up with a plan that served FDOTs needs to move traffic and th e citys need to reinvi gorate their downtown. Design Elements The city agreed to take over ownership a nd maintenance of the six block segment of Atlantic Avenue from FDOT. In return FDOT took over ownership of two roads on either side of downtown to create a pair of bypasses. Instead of widening Atlant ic Avenue to four lanes, the city reduced the road from three lanes to two and widened the sidewalks, installed brick paver walkways, added trees and landscaping, and added artistic lighting (Figure 4-2). Despite the empty on-street parking, there was still a perceived shortage of parking in downtown. Instead of adding more parking, the city replaced surf ace parking lots with buildings and moved parking lots to the rear of buildings. To encourage si dewalk cafes, the city allows restaurants to place tables and chairs in the in the right-of-way provided there is adequate space for pedestrians to pass. The downtown allows highe r densities than city code calls for, allows parking lots to be shared by multiple businesses, and waives parking requirements for a fee. Impact of the Redesign Since the road narrowing, sidewalk wideni ng, and aesthetic impr ovements, Atlantic Avenue now has outdoor cafs, shops, and other smaller-scale businesses as well as a new museum, theater, and meeting hall. The tax roll value in the CRA increased from $250,000,000 in 1985 to $1.2 billion in 2005, and vacancy went from 35 % to 5 %. Over 2,000 new residential units (Figure 4-4) are in planning or construction phases (CNU Florida, 2006). Assessed property values rose from approximately $5-$6/square foot to $15-$30/square foot (FHA, 2004.)

PAGE 48

48 The renaissance of Atlantic Avenue was so successful th e city is adopting similar principles for other roads in their master pla n. The new master plan calls for a number of changes to the downtown's roadway system in or der to enhance pedestrian safety and improve traffic circulation. One goal is to convert the conversion of the one-way pair bypass system into two-way traffic; the narrowing of the downtown highway pairs from three to two lanes; the slowing of traffic; widening of sidewalks; and the creation of a "gateway feature" for vehicles that enter the downt own area from I-95. Clematis Street: West Palm Beach, Florida History and Context West Palm Beach has always been a city that stood in the shadow of its glitzy neighbor to the east, Palm Beach. Palm Beach is one of the rich est cities in the country, but its residents very rarely cross the bridge into the less well-to-do co unty seat, West Palm Beach. Clematis Street is the east-west spine of historic West Palm B each and was once a bustling center of commerce and vitality (Figure 4-5). Wealthy residents and northern visitors would arrive by train at the West Palm Beach train station, travel by carriage along Clem atis Street to the waterfront, and then finally board a ferry to the island resort of Palm Beach. Reside nts of West Palm Beach that were employed by wealthy residents of Palm Beach, such as groundsk eepers, house maids, nannies, and cooks, also made the daily trek down Clematis to the ferry. Clematis Street served as the vital connection between the cities of Palm Beach and West Palm Beach and the rest of the world. After the construction of a causeway to Palm Beach and the completion of the interstate system, Clematis Street lost it s vital geographic impor tance. Clematis Street and West Palm Beach declined even further in the 1970s and 1980s and reached a low point when the drug dealers and prostitutes of Clem atis Street were featured in the 1993 PBS documentary Crack

PAGE 49

49 America. Vacancy in downtown was 85 % and prope rty values were as low as $10 per square foot. Clematis Street, the hist oric east-west route through down town, was a one-way, four lane road with signalized turn lanes that cu t through the historic heart of downtown. Implementing the Redesign In 1989, the City of West Pa lm Beach only had $12,000 in the bank and faced a declining tax base (PPS 2006). Facing bankruptcy, city lead ers started a revitalization effort focused on improving the financial situation of the city. Mayor Nancy Graham and transportation planner Ian Lockwood started the ini tial revitalization by focusing on traffic calming and design standards for the downtown and a Tax Increment Fina ncing (TIF) district wa s created to reinvest tax money to improve Clematis Street. In conj unction with the traffic calming and pedestrian amenities, faade improvements financed 50-50 by business owners and the city focused on improving the visual character of the street. One of the first built projects was Centennial Square. The square is built at the intersection of Clematis Street and Narcissus Street and serves as the centerpiece of block parties held every week on Clematis Street. Design Elements Traffic calming, as practiced in West Palm Beach, is about changing behavior, says Lockwood (Pollock, 1998). We dont close any street sthats not part of the equation. We dont do route modifications either, such as prohibiting turns. Rather, the changes improve pedestrian access, safety, and quality of experience. It s about building community, says Lockwood. Clematis Street was converted from a one-way four lane road into a two way road with pocket parking on both sides. At intersections, the side walks bulb out to sl ow traffic, give pedestrians a better view, and reduce the amount of roadway a pedestrian has to cross. Attractive benches, street lights, and deco rative paving patterns were added and sidewalks were widened to 11 feet (Figure 4-6).

PAGE 50

50 Traffic terms such as local, collector, and arterial are no longer used. Since transportation is being planned to serve land use, instead of vice versa, the relevant measures become the distance between buildings, the number of pedestrians using the corridor, and the quality of the trip (Pollock, 1998). Traffic calming islands were added to resi dential neighborhoods. The islands jut out from the side of the road and force cars to slow down to negotiate an S turn. The lanes are as narrow as nine feet, but still accommodate emergency vehicles and garbage trucks. Zoning is no longer designated by use, but ra ther by building type. Four categories are employed to denote overall size, ceiling height, setback, and other parameters. All buildings must be between two to five stories. The new approach is intended to result in more flexible building types that are able to evolve over time and to serve multiple uses. Impact of the Redesign The revitalization of Clematis Street spar ked the creation of the $600 million CityPlace project, a 72 acre mixed-use development w ith 600,000 square feet of retail space and 620 residential units that opened in the mid 1990s (Figure 4-7). New developments in the construction and planning stages will add 8,000 resi dents to downtown in the next four years. The Clematis Street project cost $1.8 million in 1991; by 2001, private-sector reinvestment downtown has reached $500 million (excluding City Place). TIF revenue generation is $5 million annually, giving the City of West Palm Beach the ab ility to reinvest in the central city or to subsidize alternative urban initiatives (Project fo r Public Spaces, 2001). The citys master plan intends to convert each branch of U.S. 1 from one-w ay streets to two-way stre ets. The idea is to slow down traffic and create a liv able city street rather than have cars speed through the city. The weekly block parties at Centennial Square, located at the eastern terminus of Clematis Street, draw between 3,000-5,000 pe ople every Thursday night.

PAGE 51

51 West Palm Beach now takes the upper hand in negotiations with developers and has learned to say No. If a private enterprise will not conform to the design elements of the master plan, it is invited to ta ke its business elsewhere. Octavia Boulevard: San Francisco, California History and Context Octavia Boulevard in San Francisco is the firs t true multiway boulevard to be built in the United States in almost 80 years. Octavia Boulevard has all the elements of a true multiway boulevard--it contains multiple roadways that separate local and regional traffic, it has landscaped medians separating the roadways, a nd it is flanked by wide sidewalks. The boulevard stretches for four blocks through th e center of San Fran cisco (Figure 4-8). Although it is only a few months old, neighborhood and city re sidents are very pleased by the aesthetic quality of the boul evard and its ability to handle large amounts of traffic at relatively quick speeds. Local traffic is acco mmodated by the outer roadways and regional traffic traveling to and from the Central Freewa y is carried on the middle roadway. There is almost unanimous consensus that the boulevard is a remarkable addition to the city, although it came after years of debate about the design. The history of Octavia Boulevard starts in the 1950s when the Central Freeway was built in the Civic Center neighborhood near downtown San Francisco. The freeway was originally built to connect Interstate 80 in the southeastern part of the city to the Golden Gate Bridge in the northwest. The Central Freeway was just one of many highways planned to bisect the city and improve traffic flow; the California Department of Highways plan for San Francisco was modeled after Los Angeles (San Francisco CityScape, 2006). In 1959, the first segment to open was a mile l ong stretch that ran from I-80 to Franklin and Gough Street (San Francisco CityScape, 2006) Before any new segments could be built,

PAGE 52

52 there was a freeway revolt in San Francisco, the fi rst of its kind in the country. The Bayshore Freeway (101) and the Southern Freeway (I-280) were built without much controversy. However, the Central Freeway was met with st rong resistance because it was planned to cut through many of the citys reside ntial neighborhoods. Also in 1959, the San Francisco Board of Supervisors voted 6-5 to cancel the re st of the Central Freeway project. For several decades the freeway spur remain ed an underused eyesore in the middle of a residential neighborhood. Then on 1989, fortune or misfortune, depending on how one perceives events, struck San Francisco. The Loma Prieta earthquake caused extensive damage to the city but was the catalyst in the long process that ultimately created Oc tavia Boulevard. The earthquake damaged the double decked Central Freeway; the section north of Fell Street was so severely damaged that it was torn down. Elsewh ere in the city, the earthquake also damaged the double-decked Embarcadero Freeway along the city s bayfront. The freeway was demolished between 1991 and 1993 and replaced with a six lane boulevard complete with a streetcar line that runs in the median (San Francisco CityScape, 2006). Implementing the Redesign The redesigned Embarcadero proved so popular that residents pushed for a similar design for Octavia Boulevard. In 1995, a city task force began to examine the possibility of replacing the remaining section of the Central Freeway with an at-grade multiway boulevard. In 1997, a measure to rebuild the Central Freeway passed. The measure was repealed in 1998 when voters passed a measure to replace the damaged expressway with an at-grade boulevard (Jacobs et al., 2002). The fight finally ended in 1999 when ye t another pro-freeway me asure lost to a proboulevard counter-measure. Accompanying th e pro-boulevard measure were images and graphics showing what the boul evard would actually look like.

PAGE 53

53 Design Elements Octavia Boulevards right of way is 133 feet significantly smalle r than the freeway it replaced. The western sidewalk is 15 feet wi de; the eastern sidewalk 12 feet wide. The access roads are 18 feet wideone ten-f oot lane for travel and one eight -foot lane for parallel parking (Figure 4-9). Since there was not enough room for a dedicated bike lane, bikers share the access roads with the slow moving local traffic (Figur e 4-10). In a critique of the post construction Octavia Boulevard, Elizabeth MacDonald, one of Octavia Boulevards designers, now says the 18 foot wide access roads are too wide, a narrower access lane would have contributed more to traffic calming (Macdonald, 2006). A nine-foot wide median separa tes the access road from the travel roadway with trees spaced 20 feet apart on center. The center ro adway has two lanes of traffic, each 11-foot wide, in each direction. An eight-foot wide center median separates the two travel roadways. The center median is lined with groupings of trees and landscaping. The extra right of way from the elevated highway is to be used for new housing. Impact of the Redesign The completion of Octavia Boulevard rec onnected the Hayes Valley Neighborhood that was divided by the double-decked Central Freew ay. The new boulevard carries roughly the same amount of traffic as the old Central Freewa y, but it does it in a wa y that does not disrupt the neighborhood. The extra land means that 22 new parcels can be built on. Plans call for over 1,000 new residential units and new retail and co mmercial space (San Francisco Beautiful, 2005; York, 2004). Impacts on surrounding property values are too early to analyze because the road is only several months old at the time of this writing.

PAGE 54

54 Figure 4-1. Atlantic Avenue Delray Beach, Florida.

PAGE 55

55 Figure 4-2. Atlantic Avenue be fore the redesign. Source: Project for Public Spaces http://www.pps.org/great_public_spaces/ Figure 4-3. Atlantic Avenue after the redesign. Source: Photographs by the author. Figure 4-4. New residential c onstruction following improvements to Atlantic Avenue. Source: Photograph by the author.

PAGE 56

56 Figure 4-5. Clematis Street, West Palm Beach, Florida.

PAGE 57

57 Figure 4-6. Clematis Street after the improve ments. Source: Phot ographs by the author. Figure 4-7. CityPlace, sparked by the Clematis St reet revitalization. Source: Congress for New Urbanism, http://www.cnu.org/

PAGE 58

58 Figure 4-8. Octavia Boulevar d in San Francisco, CA. Figure 4-9. Octavia Boulevard cross sect ion. Source: Jacobs et al., 2002; 242. SAN FRANCISCO

PAGE 59

59 Figure 4-10. The side access road. Source: Jacobs et al., 2002; 242.

PAGE 60

60 CHAPTER 5 PROPOSAL This section will discuss th e redesign of Kennedy Boulevard as a multiway boulevard by exploring the literature review in light of the case studies. The first part of this section will examine the type and route of a mass transit sy stem that may be built in Tampa. Special consideration will be given to the overall c ontext of the surrounding area and provide the justification for a mass transit system. The next section will discuss th e digital 3D model and will include schematics and site plans of the redesign. The final section will study how the redesign can be implemented and the obstacles th at may be faced if the project is built. Kennedy Boulevard Redesigned Currently, the Kennedy Boulevard right of way is 100 feet wide. There are three 12-foot wide travel lanes in each direction separated by an 18-foot wide space that contains a six-foot wide median and 12-foot wide al ternating turn lane. Six-foot wi de sidewalks flank each side of the roadway; only in a few places is there a gra ss median that separates the sidewalk from the traffic. Building setbacks range from six feet to over 100 feet; most of the building setbacks are 60 feet (Figure 5-1). To redesign Kennedy Boulevard as a true mu ltiway boulevard, the proposed total width from building to building would be 142 feet. Two 11foot wide travel lanes would travel in each direction and an eight-foot wide median would separate the travel la nes from the pedestrian realm. The access roads would be 16.5 feet and accommodate one lane of parallel parking and one travel lane. Twelve foot sidewalks would line each of the access roads and buildings would be brought up to the sidewalk (Figure 5-2). In order to accommodate the redesign, approxi mately 21 extra feet of right-of-way would have to be bought from private landowners al ong the corridor. Implementation and financing

PAGE 61

61 will be discussed in more detail in another se ction. Because the building setbacks are so great, the only land that would have to be acquired is land that alrea dy is being used for automobile storage and circulation in the form of parking lots. Only a few buildi ngs along the corridor are within the needed 144 feet. The centerpiece of the redesign is the light rail line that r uns in both directions down the center median (Figure 5-3). The dedicated transit-way is 25 feet wide which is the width of the double tracked streetcar tracks that currently run through parts of the Channelside district in Tampa. Tampas current streetcar system would be integrated into the re gional light rail system; vehicles on both systems would be interchangeable. At the light rail stops along Kennedy Boulevard, the dedicated transit-way will be enlarged to create more space to accommodate the platforms and pedestrians (Figure 5-4). The rail line would cross as few roads as possible to improve efficiency. The only intersections the rail line woul d cross would be at Dale Ma bry Highway, Lois Avenue, and Westshore Boulevard. The transitway would be built slightly a bove the road bed and be built with brick pavers or stained conc rete to delineate the realm of the transit-way. Bollards, lights posts, or utility poles for the ove rhead electrical system for the light rail would separate the transit-way from the travel lanes. The travel lanes on Kennedy Boulevard would be reduced from three lanes to two and the lanes narrowed to 11 feet. FDOT is more likely to approve the proj ect if the lanes are at least 11 feet (Roarke, 2006). Minor intersections and dr iveways would be eliminated to improve the traffic flow of the road. The main objective is to channel local traffi c onto the access roads. Local traffic enters the roadway and only drives a few blocks before turning off but in the process slows down traffic when it enters and ex its the roadway. By using the access roads,

PAGE 62

62 local traffic could still flow, but without interrupting the high er speed regional traffic. The elimination of 10 driveways and/or intersections per mile will in crease speed by three miles per hour (Roarke 2006). The elimina tion of minor intersections a nd driveways would mitigate the increased congestion resulting from narrowing of the travel way from three lanes to two lanes in each direction. Eliminating minor intersections a nd driveways will also decrease the chance of rear end vehicle collisions that occur when ve hicles pull out onto a high speed road. The only intersections at which vehicles on the travel way would be able to turn left or right would be major intersections (Lois Avenue, Dale Mabry Highway, and Westshore B oulevard; Figure 5-5). An eight-foot wide median would separate the middle roadway from the access road. An eight-foot median is generally accepted as th e standard minimum wi dth required to support shade trees. It is important that the median be continually lined with trees, preferably native shade trees, to delineate the separa tion of the high speed traffic roadway from the slower, quieter pedestrian realm (Figure 5-6). The pedestrian realm would have 12 foot si dewalks and buildings would be required to front the road and be built with zero setbac k. The access roadway would accommodate local traffic and provide parking for businesses along Kennedy Boulevard. The building height to width ratio is an importa nt element that is needed to create a sense of enclosure of the street space. A building heig ht-to-width ratio of one to three is considered acceptable (Nelessen, 1994) to create a sense of en closure. The total width of the redesigned Kennedy Boulevard corridor is 144 feet; using a ra tio of one to three means the buildings should be 50 feet tall (four to five stories). Alternative Redesigns The first alternative is very similar to Kenne dy Boulevard as it curr ently exists (Figure 58). There are no side access lanes or transit in this alternative. The central median would have

PAGE 63

63 two rows of street trees that gi ve way to turning lanes at inters ections. The sidewalks would be widened to 12 feet and have a row of street trees. The second alternative is simila r to the preferred redesign exce pt that the transit vehicles run on the outside lane of the central roadway (Fi gure 5-9). An advantage to this design is that transit riders do not have to cross the busy central roadway to get to a transit stop. However, the transit vehicles would travel slower because of the potential conflicts where it crosses the access road and central roadway returns. The third alternative (Figure 510) is also a 145 foot wide bo ulevard much like alternative two. Instead of transit ru nning on the outside lane of the middle roadway, the transit is moved to the side access roads. An advantag e to this is that transit riders do not have to cross the middle lanes of high-speed automobile traffic. However, the transit vehicles wi ll move slower because they share the side access road with automobile traffic, bicyclists, and pedestrians. A Rail System for Tampa In order to accommodate a la rge population increase the Tampa Bay area is planning for a regional rail system. The Tampa light rail system will connect the regions major destinations. The first phase of the 26 mile sy stem will connect the University of South Florida (USF), Ybor City, Downtown, the Westshore Business District and Tampa International Airport (TIA). A preliminary route is shown in Figure 5-11. Th e route connecting the USF to Ybor City and Downtown will run along existing freight rail tracks. The segment connecting Downtown Tampa to TIA via the Westshore Business District will run on a newly built rail bed. Long range plans have not identified a defin ite corridor for this segment, but the original light rail plan proposed by HART line call for the ra il line to run along Cypress Street. In order for mass transit to be effective, it mu st link together major destinations. While the Tampa rail system will connect most of the regions major destinations, it does leave out some

PAGE 64

64 destinations such as Westshore Mall, much of the Westshore Business District, and the Kennedy Boulevard retail corridor (Figure 5-12). The three possible alignments for the light rail system as it travels th rough this part of Tampa are: the I-275 alignmen t; the Cypress Street alignm ent; and the Kennedy Boulevard alignment. There are economic, social, and design ramifications for each of the three alignments (Table 5-1). I-275 Alignment The I-275 alignment would start in downtown Tampa and run west out of downtown on existing CSX tracks. Immediately after crossi ng the Hillsborough River, the route would run north on North Boulevard for four-tenths of a m ile to I-275. From there, the route would run west on I-275 in the center median for three and a quarter miles to Trask Street. At Trask Street, the route would turn north and head towa rd International Plaza Mall and TIA. The I-275 alignment takes advantage of the al ready existing public ri ght of way of I-275. No new land would have to be bought because the land is already publicly owned. This type of alignment is what is found in Chicago in which th e El trains run in th e center median of the interstates in the outlying parts of the city. The interstates are built slightly below the surrounding areas, in a sort of larg e ditch. Station entr ances are located above the interstates at the street level, and escalators take passengers down to the plat forms (Figure 5-14). A downside to an alignment like this is higher infrastructure costs (due to complex stations) and the inhospitable pedestrian environment due to the noise and fumes of highway traffic just feet away. In Tampa, the interstates are at the same level of the surrounding landscape. The local streets go under the interstate, so the station configuration would be slightly different. The I-275 alignment would cause minimal disruption to nearby businesses and homes; however,

PAGE 65

65 construction would most likely cau se disruptions on the interstate temporarily affecting regional traffic at a large scale. Cypress Street Alignment The Cypress Street Alignment would follow th e CSX tracks west out of downtown Tampa to North Boulevard. New track would start at the intersection of Nort h Boulevard and the CSX tracks and run north for one-tenth of a mile and turn west on Cypr ess Street. The tracks would run along Cypress Street for three and a quarter m iles to Trask Street where the route would turn north to International Plaza Mall and TIA. The Cypress Street alignment is the route HART line selected in their rail study. This alignment would cut through a re sidential neighborhood and make transit easily available for many people. Disruption during construction would be minimal because the area is not heavily trafficked and has few businesses that would be affected during construction. However, running the route through a residential neighborhood w ould likely be met with opposition from the neighborhood. Currently, the neighb orhood consists primarily of si ngle family residential homes and because transit lines attract commercial deve lopment and denser residential development, the neighborhood would be under pressu re to change. Transit sta tions would induce commercial demand where there currently is none and market forces would also create a demand for high density multi-family resi dential units (Handy, 2005). Kennedy Boulevard Alignment Like the Cypress Street and I-275 alignmen ts, the Kennedy Boulevard alignment would follow the CSX tracks west out of Downtown Ta mpa. From the Hillsborough River, the route would follow the tracks southeast for six-tenths of a mile to Kennedy Boulevard. The new tracks would run west down the center of Kennedy Boulevar d for three miles to Trask Street. Like the

PAGE 66

66 other alignments, the tracks would turn north and Trask Street to the International Plaza Mall and TIA. This alignment is the most di sruptive to businesses of the th ree proposed alignments. The Kennedy Boulevard alignment would also be the most disruptive to tra ffic patterns because Kennedy is one of the busiest eas t-west routes through the city. Also, right-of-way would have to be bought from businesses to accommodate th e additional space the light rail would need. Buying right-of-way along one of Tampas busiest commercial streets would cost a lot of money and make this alignment the most expensive of the three proposed alignments. Although this alignment would be the most disruptive to busin ess and traffic and cost the most, in the long term, residents and businesses would benefit the most from this alignment. Kennedy Boulevard is already lined with offi ce and retail; a light rail line would allo w riders to take advantage of the commercial opportunities along the co rridor. In turn, the commerc ial uses along the road would also provide a large supply of pot ential transit users (Table 5-1). The Kennedy Boulevard alignment would attrac t more commercial and residential uses and improve the economic situation for one of Tamp as busiest streets. The light rail line would create more demand for commercial and retail us es at a higher density. Currently, land along Kennedy Boulevard is underutilized Most of the land is used for parking and almost all the buildings are one story. This alignment would provide workers from Downtown Tampa and the Westshore Business District a c onvenient link to the restaurant s, retail, and offices on Kennedy Boulevard. The Kennedy Boulevard alignment coul d relieve some of the lunch hour traffic by transferring automobile trips to transit. Selecting the Correct Alignment Kennedy Boulevard would be the best option for the rail alignment. Kennedy Boulevard is already a major commercial corridor in Tampa and the addition of light rail would further

PAGE 67

67 reinforce that strength. Bus lin es already operate along the co rridor and the large amount of commercial uses would provide tr ip generation for a light rail line. The redesign will make Kennedy Boulevard a destination and mass transit is a key element that is needed to bring people to the area. Businesses and traffic would be di srupted during constructio n, but the end benefits far outweigh the costs. The Kennedy Boulevar d alignment would allow businesses along the corridor to get high visibility from regional traffic.

PAGE 68

68Table 5-1. Possible Rail Alignments. ALIGNMENT RIGHT-OFWAY COST PEDESTRIAN ACCESS DISRUPTION TO HOMES DISRUPTION TO BUSINESSES DISRUPTION TO TRAFFIC POTENTIAL ECONOMIC RETURN OTHER I-275 Low Poor Minimal Minimal Severe Mi nimal Elevated stations would significantly increase costs Cypress St Moderate Good Severe Mi nimal Moderate Some Rail will induce commercial and high density residential in a neighborhood of single family homes Kennedy Blvd High Good Moderate Severe Severe Mo st Opportunity to create a connector between downtown and Westshore/airport Commercial/retail to support transit already exists

PAGE 69

69 Figure 5-1. Cross section of Kennedy Boulevard (existing). Figure 5-2. Kennedy Boulev ard Proposed Redesign. 1 = 25 1 = 25

PAGE 70

70 Figure 5-3. Kennedy Boulevard Pr oposal Overview. Existing (top) and after the redesign (bottom).

PAGE 71

71 Figure 5-4. Transit station and pedestrian crosswalk.

PAGE 72

72 Figure 5-5. Intersection Designations. Traffic on Kennedy Boulevard will be able to turn left or right only at the major intersections.

PAGE 73

73 Figure 5-6. Major Intersection. The redesigned boulevard at th e intersections of Dale Mabry Highway, Lois Avenue, and Westshore Boulevard.

PAGE 74

74 Figure 5-7. Hubert Street. Mi nor road intersection before (top) and after (bottom).

PAGE 75

75 Figure 5-8. Alternative Rede sign One. No transit. Figure 5-9. Alternative Redesign Two. Trans it is moved to outside travel lanes.

PAGE 76

76 Figure 5-10. Alternative Redesi gn Three. Transit is locate d in the pedestrian realm.

PAGE 77

77 Figure 5-11. The Tampa Rail System and three alternative routes through the study area. Source: The Tampa Tribune.

PAGE 78

78 Figure 5-12. Major destinations. The Kennedy B oulevard alignment connects more destinations.

PAGE 79

79 Figure 5-13. I-275 rail alignm ent and half-mile radius.

PAGE 80

80 Figure 5-14. Highway median station in Chicago. Source: www.utc.uic.edu

PAGE 81

81 Figure 5-15. Cypress Street rail alignment and half-mile radius.

PAGE 82

82 Figure 5-16. Kennedy Boulevard rail alignment and half-mile radius.

PAGE 83

83 CHAPTER 6 DISCUSSION Implementing the Redesign Redesigning Kennedy Boulevard as a true multi way boulevard is a radical proposal. Very few multiway boulevards exist in the United States; there has only been one built in the last 80 years. The redesign goes against traffic engi neering standards and will no doubt face opposition if an effort is made to implement it. However, based on the safety records of existing boulevards and the successful construction of Octavia Boulev ard in San Francisco, there is evidence that multiway boulevards can be made a reality in the modern era. Obstacles to the Redesign The potential obstacles to the redesign are larg e and plentiful. Acco rding to an interview with a traffic engineer at Reynolds, Smith, and Hills, the Florida Department of Transportation (FDOT) would oppose the design for several reas ons. State Road 60 (FDOT designation of Kennedy Boulevard) is part of the Florida Highw ay System. The main objective of the state highway system is to move vehicles from one part of the state to anothe r in the easiest, fastest way possible on high capacity, high speed roads. High speed roads do make sense in rural areas, but they are out of place in urban settings. When a state road ente rs an urban setting, the context of the area must be considered. The first obstacle would be the removal of tr affic and turn lanes (Roarke, 2006) and the reduction of lane width on an already busy road. The travel lanes would be decreased from three lanes to two in each directionalthough a new tr avel lane for local traffic would be built on each side of the roadway. The center medians and turn lanes would be replaced with a light rail line; turn lanes would only be at major intersections. The remaining travel lanes would be reduced from 12 feet to 10 feet. FDOT technically does a llow for 10 foot travel la nes, but they would not

PAGE 84

84 approve a project that made tr avel lanes that narrow (Roarke, 2006). FDOT would be more likely to approve the project if th e lanes were narrowed to 11 feet. Another obstacle would be the ac cess roads and their intersections with the main roadway. The access roads create complex intersections that stand in conflict with design standards that only allow normal four way or T intersections The multiway boulevard design requires trees and street furniture to be placed along the ro adway. FDOT prohibits fixed object hazards within the designated clear z one alongside the roadway which is why state roads lack street trees and street furniture. There is evidence that streets lined with trees and other street furniture may actually be safer because they for ce the driver to slow down (Dumbaugh, 2005). The largest obstacle would come from the us ers of Kennedy Boulevard. The goal of this redesign is to turn Kennedy Boulevard into a destination and bring mo re people to the area by encouraging and designing for pede strians and public transit. Ho wever, to do this would require using eminent domain to acquire right-of-way fr om businesses. The ri ght of way would only take land that is currently used for parking; but some business owners would claim the loss of parking spaces would render their business us eless and demand compensation for the entire property parcel and building (Roarke, 2006). Overcoming the Obstacles Instead of trying to get FDOT approval for the project, the city could take ownership of the road and the State Road 60 designati on could be moved to another road in the area, as the city of Delray Beach, Florida did. The city and FDOT exchanged ownership of two roads. The city received Atlantic Avenue (the main road thr ough downtown) and in exchange gave FDOT a pair of one way roads on either side of downtown. This arrangement allowed the city to implement their road narrowing and traffic calming measures that sparked a downtown renaissance. The

PAGE 85

85 city did not have to worry about meeting FDOT standards or gaining waivers through a lengthy review process. If the city did take ownership of Kennedy B oulevard, an alternative designation for State Road 60 would have to be found. The state high way system must be continuous and the state roads must start and end at another state road. There are three alternative routes for State Road 60: Cypress Street, Columbus Avenue, and I-275 (Figure 6-1). The I-275 designation is the preferred designa tion because it would be the easiest to accomplish and cause the least amount of disruption to the city. The travel lane dimensions and shoulders on the interstate meet or exceed FDOT standards for state roads. One disadvantage would be that FDOT would lose a major surface road through the city of Tampa and additional traffic would be put on I-275. The Cypress Street and Columbus Avenue de signations are the least preferred because they would cause the most disr uption. Lanes and shoulders on both roads would have to be reconfigured and the new design would ruin the character of the surrounding neighborhoods. FDOT has much power and control over state ro ads that run through cities, but the cities themselves are a major influence (Roarke, 2006) on the design and function of state roads that pass through their cities. If th e city wanted to implement the redesign, the city would have to take the lead. The head of the citys transporta tion department would act as the advocate for the citys plans and work with F DOT. FDOT would have to make many exceptions for reducing the number of travel lanes, reducing the lane wi dth, slowing the speed of traffic, building access roads, and placing street trees and street furniture in the clear z ones. The review process would take much time and increase the cost of the project.

PAGE 86

86 The complex intersections on multiway boulevar ds go against todays traffic engineering standards. This does not necessarily make them unsafe; after a short time drivers will learn and adapt to the new intersections. At the intersectio ns, priority is given to traffic in the throughgoing realm, then to the cross streets, and finally to traffic on the access roads. The intersections can be controlled by stop signs, traffic signal s, or a combination of both (Figure 6-2). There is not enough public right-of-way al ong Kennedy Boulevard to construct the redesign. There is currently 100 feet; a 144 foot right-of-way is needed to implement the redesign. Purchasing the additiona l right-of-way would be very costly, and some land owners would object; using eminent domain to obtain the a dditional 21 feet on each side of the roadway would result in delays and lengthy court battles. Instead of buying the right of way, the city could create a design overlay distri ct or a special zoning district to manage development. Since the additional 21 feet would be used for the acce ss roads and sidewalks, the city could create design guidelines that would ensure the crea tion of uniform and connecting access roads and sidewalks. The city already ha s setback requirements and parki ng lot standards; these can be manipulated to create the side access roads and sidewalks without buying additional right-ofway. Effects on Traffic The proposed redesign calls for removing one lane of through-going traffic which will affect the traffic dynamics of Kennedy Boulevard. An access lane on each side of the roadway will alleviate some of the traffic; however, the traffic volume and speed on the access road will be much less than the through-going lane. Tr affic projections obtained by the FDOT shows vehicular traffic growing each year. With th e removal of the through-going lane and the additional vehicles each year, traffic congest ion on Kennedy Boulevard will increase. The removal of roadway capacity on Kennedy Boulevard will disperse traffic on other roads in the

PAGE 87

87 area. The light rail system would absorb some roadway users and mitigate some of the traffic effects. Exactly how many people switch to light ra il is unclear, but the fast er and more efficient the rail system, the more riders it will attract and therefore lessen the traffic impact on Kennedy Boulevard. Figure 6-1. Alternative rout es for SR 60 designation.

PAGE 88

88 Figure 6-2. Intersection tr affic control. Source: Jacobs et al., 2002; 230.

PAGE 89

89 CHAPTER 7 CONCLUSION An urban arterial can be transformed into a multiway boulevard. The construction of Octavia Boulevard in San Francisco is an exampl e of how a multiway boulevard can be built in the contemporary environment. The boulevard was built after years of de bate between the city, neighborhood activists, and the Calif ornia Department of Transpor tation. Octavia Boulevard is less than a year old, so economic and social effect s are not yet clear. Howe ver, area residents are very pleased with the reconstruction and over 2,000 new residential and commercial units are planned along the new four-block boulevard. The questionnaire results clearly show that Tampa residents are dissatisfied with the current aesthetic condition of Kennedy Boulevard. The cases of Clematis Street in West Palm Beach and Atlantic Avenue in Delray Beach prove that traffic calming and pedestrian enhancements can revitalize an area both aesthet ically and economically. In Delray Beach, the revitalization of Atlantic Avenue has spilled over an area se veral blocks on both sides of the road. The redesign would eliminate a travel lane in each direction and the ce nter median and turn lane would be replaced by a light rail system. There would be eight-foot wide medians on each side of the central roadway to separate the thr ough-going realm from the pedestrian realm. The pedestrian realm would be made up of an access road and a lane for parallel parking; the access road would accommodate slow, local traffic as well as pedestrian and bicycle traffic. Sidewalks would be widened to 12 feet and new buildings would be required to front the sidewalk. A multiway boulevard is the best solution to improve the aesthetics and pedestrian realm of Kennedy Boulevard while still accommodating large amounts of automobile traffic.

PAGE 90

90 The removal of a traffic lane in each directi on would impact traffic; how much is unclear. Ideally, the addition of the light rail system would make up for this loss of a lane, but it is unknown if the rail system would gain a signifi cant share of choice riders (those who have a car but opt for transit). Recommendations for Future Research Recommendations for future research are an an alysis of the contextual area; traffic impacts of the redesign; and building typology and dens ity. The redesign of Kennedy Boulevard is a radical change from the existing situation and would affect the surrounding areas. Surrounding building typology and architect ure should be considered wh en designing buildings along Kennedy Boulevard to create a link between the b oulevard and the side streets. As the area becomes denser and more commercialized, land valu es would presumably rise so an analysis of the area is needed to under stand how the surrounding nei ghborhood would be impacted. Research should be conducted to determine the id eal residential and commercial density needed along Kennedy Boulevard to support the light rail line.

PAGE 91

91 APPENDIX A QUESTIONNAIRE Informed Consent Protocol Title: The Design Elements Needed to Cr eate Pedestrian-Friendly Environment Please read this consent document carefully befo re you decide to participate in this study. Purpose of the research study: The purpose of this study is to identify what elements people desire in a pedestrian-oriented environment. What you will be asked to do in the study: You will be asked various questions about Kennedy Boulevard in Tampa, Florida. Time required: 5 minutes Risks and Benefits: There are no risks associated with this survey. We do not anticipate that you will benefit directly by participating in this survey. Compensation: There is no compensation for participation in this survey. Confidentiality: Your identity will be kept confidential to the extent pr ovided by law. Your responses will remain anonymous. Voluntary participation: Your participation in this study is completely voluntary. There is no penalty for not participating. Right to withdraw from the study: You have the right to withdraw from th e study at anytime without consequence. Whom to contact if you have questions about the study: Andy Mikulski, Graduate Student, Department of Urba n and Regional Planning, 431 ARCH Building, Gainesville, FL 32611, (352)-392-3261, amikul3@ufl.edu Whom to contact about your rights as a research participant in the study: UFIRB Office, Box 112250, University of Flor ida, Gainesville, FL 32611-2250; ph 392-0433.

PAGE 92

92 Agreement: I have read the procedure described abov e. I voluntarily agree to participate in the procedure and I have received a copy of this description. Participant: ___________________________________________ Date: _________________ Principal Investigator: ___________________________________ Date: _________________ 1. How often do you come to Kennedy Boulevard? 4-5 days a week 2-3 days a week Once a week Less than once a week 2. Why do you usually come to Kennedy Boulevard? (Circle all that apply.) Use shops/services Dining Visit friends Walk/stroll Use the bus Work Live along Kennedy Boulevard Pass through on the way to another destination 3. How do you usually get to Ke nnedy Boulevard? (Choose one.) On foot Bicycle Bus Car Other 4. Degree of satisfaction of Kennedy Boulevard: On a scale of 1 (Very Satisfied) to 5 (Very Di ssatisfied), rate your sa tisfaction of different elements on Kennedy Boulevard. Very Somewhat Neither Satisfied Somewhat Very Satisfied Satisfied Nor Di ssatisfied Dissatisfied Dissatisfied Safety (crime) 1 2 3 4 5

PAGE 93

93 Very Somewhat Neither Satisfied Somewhat Very Satisfied Satisfied Nor Di ssatisfied Dissatisfied Dissatisfied Aesthetic/ appearance 1 2 3 4 5 Landscaping 1 2 3 4 5 Retail shops 1 2 3 4 5 Bus service 1 2 3 4 5 Open space/ parks 1 2 3 4 5 Parking availability 1 2 3 4 5 Community services 1 2 3 4 5 Ability to walk/bike 1 2 3 4 5 5. What are the three bigge st problems along Kennedy Boulevard? (Please number your answers; 1 being the biggest problem.) _____ Traffic _____ Appearance (ugly buildings /lack of landscaping) _____ Crime _____ Inconvenient (lack of transit/parking) _____ Other 6. What five changes would you like to see along Kennedy Boulevard? (Please number your answers; 1 being the most important.) _____ Safer _____ Better aesthetics (lands caping, street furniture) _____ Cleaner _____ More shops/services _____ More community feeling _____ Wider sidewalks _____ Bicycle lanes _____ Less traffic _____ Better transit (light rail/stree tcar line) _____ Different mix of uses _____ More housing _____ Parks/playgrounds

PAGE 94

94 _____ Other 7. What kinds of shops and services would you like to see along Kennedy Boulevard? (Please number your top five answers; 1 being the most important.) _____ Neighborhood retail _____ Food market _____ Restaurants/cafes _____ Theaters _____ Department stores _____ Hardware store _____ Recreation _____ Community services _____ Discount stores _____ Bookstore _____ Other 8. How often do you use public transportation? Every day 4-5 days a week 2-3 days a week One day a week Never 9. Do you use public transit to: YES NO Go to work ____ ____ Go shopping ____ ____ Visit friends ____ ____ Attend sporting events/leisure activities ____ ____ 10. Why do you drive instead of using public transportation? (Pleas e number your top three answers, 1 being the most important) _____ Stigma of public transportation _____ Public transportation fares are too high _____ Public transportation is unreliable _____ Public transportation is not conve nient to my home, work, and shopping _____ Public transportation takes too long 11. What three things would make you use public transportation along Kennedy Boulevard? (Please number your answers, 1 being the most important.) _____ More frequent

PAGE 95

95 _____ More stops _____ Faster service _____ Convenient to home, work, and shopping _____ Cheaper fares _____ Cleaner air _____ Cost of driving increases _____ Addition of light rail or streetcar service

PAGE 96

96 APPENDIX B VISUAL INVENTORY OF KENNEDY BOULEVARD

PAGE 97

97 APPENDIX C PHOTOSIMULATIONS Figure C-1. Minor road intersection before (top) and after (bottom).

PAGE 98

98 Figure C-2. Parking and Pedestrian realm. Grady Avenue before (top) and after (bottom).

PAGE 99

99 APPENDIX D TRAFFIC COUNTS AND PROJECTIONS

PAGE 100

100

PAGE 101

101

PAGE 102

102 CITED REFERENCES Babbie, E. (1995). The Practice of Social Research. Belmont, CA: Wadsworth Publishing Company. Banerjee, T. (2001). The Future of Public Sp ace: Beyond Invented Streets and Reinvented Places. Journal of the American Planning Association, 67(1), 9-25. Barnett, J. (1989). Redesigning the Metr opolis: The Case for a New Approach. Journal of the American Planning Association, Spring 1989(55), 131-136. Brill, A. (2003, October 1). Same Study, Two View s: Is Tampa Bay a More Expensive Place to Drive than Other Major Cities? Florida Trend 36. Brown, C. (2003). Downtown Redevelopmen t Incentives: Tax Incr ement Financing. Urban Land Institute Retrieved on June 30, 2006 from http://www.seflorida.uli.org/ events/2003finance_r dvlp/powerpoint/Chris%20Brown%20PowerP oint.pdf City of Burlington, California Planning Department (2006). Definitions. Retrieved August 23, 2006 from http://www.burlington.ca/Planning/ Official%20Plan/Part_VII/ Cable News Network (2006, August 13). Gas Prices at Record HighLundberg. Retrieved August 28, 2006 from http://money.cnn.com/2006/08/13/ne ws/economy/oil_lundberg/index.htm Calthorpe, P. (1993). The Next American Metropolis New York: Princeton Architectural Press. Charter for the New Urbanism. (1993). Congress for the New Urbanism. Retrieved September 15, 2006 from http://www.cnu.org/ Colanna, D. (2006). Transportation and New Urbanism Congress for New Urbanism: Florida. Retrieved August 26, 2006 from http://www.cnuflorida.org/events/ps l_cnu_april_2006/col onna_present.pdf Dumbaugh, E. & Gattis, J. (2005). Sa fe Streets, Livable Streets. Journal of the American Planning Association 71(3), 283-301. Ehrenhalt, A. (1997). The Asphalt Rebellion. Florida Sustainable Communities Center. Retrieved July 20, 2006 from http://www.myflorida.com/fdi/edesign/news/9712/asphalt.htm Fink, M. (1993). Toward a Sunbelt Design Manifesto. Journal of the American Planning Association, Summer 1993 (59), 320-334. Gordon, D. & Vipond, S. (2005). Gross Density and New Urbanism: Comparing Conventional and New Urbanist Suburbs in Markham, Ontario. Journal of the Americ an Planning Association, 71(1), 41-56.

PAGE 103

103 Handy, S. (2005). Smart Growth and the Transpor tation-Land Use Connections: What Does the Research Tell Us?. International Regi onal Science Review 28(2), 146 Henry, L. (2006). Evaluating New Start Transit Program Performance: Comparing Rail and Bus. Victoria Transport Policy Institute Retrieved on September 8, 2006 from http://www.vtpi.org/bus_rail.pdf Hillsborough Area Regional Transit Authority (2006). HART Background. Retrieved on August 20, 2006 from http://www.hartline.org/ Institute of Transportation Engineers (1992). Traffic Engineering Handbook Englewood Cliffs, NJ: Prentice Hall. Jacobs, A. (1993). Great Streets Cambridge, MA: MIT Press. Jacobs, A., Macdonald, E., & Rofe, Y. (2001). The Boulevard Book: History, Evolution, Design of Multiway Boulevards. Cambridge, MA: MIT Press. Kohn, M. (2004). Brave New Neighborhoods: The Priv atization of Public Space. New York: Taylor and Francis Books, Inc.. Macdonald, E. (2006). Building a Boulevard. Access. No. 26. Retrieved on July 20, 2006 from http://www.uctc.net/access/ 28/Access%2028%20-%2002%20%20Building%20a%20Boulevard.pdf McPherson, M., Smith-Lovin, L. & Brashers, M. (2006). Social Isolation in America. American Sociological Review 71(3), 353-376. Mitchell, N. & Tiggett, S. (2000). Mean Streets 2000National Press Release. Washington, D.C.: Surface Transportation Policy Project. Retrieved June 14, 2006 from http://www.transact.org/report.asp?id=146 Moscovich, J. (2006, March 23). Designing Transportation Systems for Active Communities Institute of Transportation Engineers. Washington. June 2003. Vol 73, Issue 6. Nellessen, A. (1994). Visions for a New American Dream Chicago: American Planning Association. Pollock, C. (1998). West Palm Beach: The Resurrection. Florida Sustainable Communities Center. Retrieved June 8, 2006 from http://www.myflorida.com/fdi/fscc/news/local/9804/wpalmbch.htm Popenoe, D. (1985). Private Pleasure, Public Plight. New Brunswick, NJ: Transaction, Inc. Project for Public Spaces (2001). Clematis Street. Project for Public Spaces. Retrieved on June 4, 2006 from http://www.pps.org/great_public_spaces/one?public_place_id=195#

PAGE 104

104 Roarke, D. (2006). [Interview with Drew Roar ke, Transportation Engi neer with Reynolds, Smith, and Hills]. Tampa, FL. San Francisco Cityscape (2006). Octavia B oulevard. Retrieved on July 25, 2006 from http://sfcityscape.com/projects/octavia.html San Francisco Beautiful (2005). 2005 San Franci sco Prize: Octavia Boulevard Housing Design Competition. Retrieved on September 12, 2006 from http://www.sfbeautiful.org/civ ic_initiatives/sfprize.shtml Shopes, R. (2006, August 30). Yes, Drivers, Your Bay Area Commute Is Getting Longer. The Tampa Tribune Swope, C. (2005). Rethinking the Urban Speedway. Governing (October 2005). Retrieved on July 22, 2006 from http://www.governing.com/articles/10speed.htm Tsui, B. (2005, September 11). After a Freeway's Collapse, Growth. New York Times Lee E. (2004). Integration of Land Use and Transportation Planning. U.S. Department of Transportation Retrieved on June 5, 2006 from http://www.planning.dot.gov/Documents/DomesticScan/domscan2.htm Walters, D. & Luis-Brown, L. (2005). Design First: Design-based Planning for Communities. Oxford, England: Architect ural PressElsevier. York, T. (2004, December 1). Boulevar d Replacing Sliver of Freeway. California Construction (December 2004), 31.

PAGE 105

105 BIOGRAPHICAL SKETCH Andrzej (Andy) Mikulski was born on March 8, 1982 in Chicago, Illinois. He and his family moved to Florida in 1993 to escape the ha rsh Chicago winters. He graduated high school in 2000 and entered the University of Florida. Andy majored in Political Science and also enrolled in Army ROTC. He graduated with a B.A. in Political Science and was commissioned as a Second Lieutenant in 2004. He stayed in Ga inesville to pursue a Masters Degree in Urban and Regional Planning. Andy believe s that planners and policymakers have a responsibility to the public to provide well-designed communities. Before joining the planning and design field, he will follow another one of his passions and se rve in the United States Army. Andy enjoys running, biking, all kinds of sports, taking the back roads, outdoor adventures, and cooking.


Permanent Link: http://ufdc.ufl.edu/UFE0017945/00001

Material Information

Title: Transforming an urban arterial into a multiway boulevard : a design proposal for Kennedy Boulevard in Tampa Florida
Physical Description: Mixed Material
Language: English
Creator: Mikulski, Andrzej Kris ( Dissertant )
Macedo, Joseli ( Thesis advisor )
Bejleri, Ilir ( Thesis advisor )
Gold, Martin ( Reviewer )
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2006
Copyright Date: 2006

Subjects

Subjects / Keywords: Urban and Regional Planning thesis, M.A.U.R.P
Dissertations, Academic -- UF -- Urban and Regional Planning

Notes

Abstract: This thesis explores the possibility of transforming an urban arterial road in Tampa, Florida, into a multiway boulevard. Multiway boulevards are roadways that combine high speed regional traffic, slower local traffic, and a pedestrian environment, all into a single space. Urban arterials, especially those developed after World War II, are characterized by large parking lots, low-rise strip malls, large signs, fast automobile traffic, and a lack of a pedestrian realm. These kinds of urban arterials were designed solely for automobiles and function more like expressways than city streets. As a result, the roads separate neighborhoods from each other and act as a barrier to the free movement of people. There is a growing movement in the United States to improve the quality of the public realm by redesigning urban arterials into pedestrian-oriented streets. Public transportation is an important element that enhances the pedestrian realm because it reduces the amount of automobiles. In Tampa, Kennedy Boulevard is an example of an urban arterial that lacks a quality public realm but has the potential to be a great street. Kennedy Boulevard was once called Grand Central Boulevard and was Tampa's premier street. Following World War II, the road was widened, development followed the emerging "strip" pattern, and the Kennedy Boulevard corridor went into decline. Today, the road is characterized by its automobile-focused design that makes it difficult to walk. The redesign of Kennedy Boulevard will focus on creating a pedestrian-oriented environment that reconnects neighborhoods. This will be achieved through a multiway boulevard that will include mass transit. Specific design elements that make a high quality pedestrian realm will be identified based on interviews, questionnaires, and case studies. The site as it exists today will be modeled using a three-dimensional computer visualization program and an alternative model that incorporates the specific design elements will be proposed.
Subject: arterials, boulevards, corridor, multiway, redevelopment, Tampa, urban
General Note: Title from title page of source document.
General Note: Document formatted into pages; contains 105 pages.
General Note: Includes vita.
Thesis: Thesis (M.A.U.R.P.)--University of Florida, 2006.
Bibliography: Includes bibliographical references.
General Note: Text (Electronic thesis) in PDF format.

Record Information

Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
System ID: UFE0017945:00001

Permanent Link: http://ufdc.ufl.edu/UFE0017945/00001

Material Information

Title: Transforming an urban arterial into a multiway boulevard : a design proposal for Kennedy Boulevard in Tampa Florida
Physical Description: Mixed Material
Language: English
Creator: Mikulski, Andrzej Kris ( Dissertant )
Macedo, Joseli ( Thesis advisor )
Bejleri, Ilir ( Thesis advisor )
Gold, Martin ( Reviewer )
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2006
Copyright Date: 2006

Subjects

Subjects / Keywords: Urban and Regional Planning thesis, M.A.U.R.P
Dissertations, Academic -- UF -- Urban and Regional Planning

Notes

Abstract: This thesis explores the possibility of transforming an urban arterial road in Tampa, Florida, into a multiway boulevard. Multiway boulevards are roadways that combine high speed regional traffic, slower local traffic, and a pedestrian environment, all into a single space. Urban arterials, especially those developed after World War II, are characterized by large parking lots, low-rise strip malls, large signs, fast automobile traffic, and a lack of a pedestrian realm. These kinds of urban arterials were designed solely for automobiles and function more like expressways than city streets. As a result, the roads separate neighborhoods from each other and act as a barrier to the free movement of people. There is a growing movement in the United States to improve the quality of the public realm by redesigning urban arterials into pedestrian-oriented streets. Public transportation is an important element that enhances the pedestrian realm because it reduces the amount of automobiles. In Tampa, Kennedy Boulevard is an example of an urban arterial that lacks a quality public realm but has the potential to be a great street. Kennedy Boulevard was once called Grand Central Boulevard and was Tampa's premier street. Following World War II, the road was widened, development followed the emerging "strip" pattern, and the Kennedy Boulevard corridor went into decline. Today, the road is characterized by its automobile-focused design that makes it difficult to walk. The redesign of Kennedy Boulevard will focus on creating a pedestrian-oriented environment that reconnects neighborhoods. This will be achieved through a multiway boulevard that will include mass transit. Specific design elements that make a high quality pedestrian realm will be identified based on interviews, questionnaires, and case studies. The site as it exists today will be modeled using a three-dimensional computer visualization program and an alternative model that incorporates the specific design elements will be proposed.
Subject: arterials, boulevards, corridor, multiway, redevelopment, Tampa, urban
General Note: Title from title page of source document.
General Note: Document formatted into pages; contains 105 pages.
General Note: Includes vita.
Thesis: Thesis (M.A.U.R.P.)--University of Florida, 2006.
Bibliography: Includes bibliographical references.
General Note: Text (Electronic thesis) in PDF format.

Record Information

Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
System ID: UFE0017945:00001


This item has the following downloads:


Full Text





TRANSFORMING AN URBAN ARTERIAL INTO A MULTIWAY BOULEVARD: A
DESIGN PROPOSAL FOR KENNEDY BOULEVARD IN TAMPA, FLORIDA




















By

ANDRZEJ KRIS MIKULSKI, JR.


A THESIS PRESENTED TO THE GRADUATE SCHOOL
OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT
OF THE REQUIREMENTS FOR THE DEGREE OF
MASTER OF ARTS IN URBAN AND REGIONAL PLANNING

UNIVERSITY OF FLORIDA

2006

































Copyright 2006

by

Andrzej Kris Mikulski, Jr.

































To my parents, Andrzej Sr. and Christine Mikulski.









ACKNOWLEDGMENTS

First, I thank my parents for the unwavering support in everything I do and always being

there for me. I would also like to thank my committee chair, Dr. Joseli Macedo, and committee

members, Dr. Ilir Bejleri and Dr. Martin Gold. Dr. Gold provided invaluable design knowledge

and opened up my eyes to the smaller details of urban design. A huge thanks goes to Dr. Do

Kim Hyung and Majdi Alkresheh; without them none of the visualizations would be possible.

They witnessed my struggles first hand and gave me all the technical help and knowledge I

needed to complete this thesis. Without them, I would not be able to express my vision and

share it with others. Tim Witsil from Reynolds, Smith, and Hills also provided valuable

guidance on the three-dimensional modeling and photosimulations. I would also like to thank

Matt Wolfe for sharing an interest in urban design and providing valuable input from the earliest

stages of this thesis.









TABLE OF CONTENTS

page

A CK N O W LED G M EN T S ................................................................. ........... ............. .....

L IST O F TA B LE s..................................................................... 7

LIST OF FIGURES .................................. .. ..... ..... ................. .8

A B S T R A C T ................................ ............................................................ 1 1

CHAPTER

1 INTRODUCTION ............... ................. ........... .............................. 13

K ennedy B boulevard H history ......................................................................... ....................13
Thesis Goals......................................................... ......... 13
The Need for Improved Public Transportation in Tampa, Florida......................................14
Hillsborough Area Regional Transit Authority............................. ................. 15
T he U n stable F future of O il ......... ........... .. ...................................... ........... ...... .......... 15
Increasing Population ........ .................. ............ .... ............. ............... 16
L eight R ail T ran sportation ............................................................................ .....................17

2 L ITE R A TU R E R E V IE W ...................... .. .. ......... .. .............................. ..........................2 1

The Decline of Public Space in the United States ........................ ......... .............. 21
Current R oad-B building Standards...................................................... .............................23
New Urbanism, Traditional Neighborhood Design and Transit Oriented Development .......25
Multiway Boulevards........... ..................... .. .... ..... ............ ....28

3 METHODOLOGY ............................. ...................... ........34

Exploratory Research............ ......... ............................ 34
Selection of the Study A rea ................................................................................. .......... 35
L iteratu re R ev iew .......................................................................... 3 6
C a se S tu d ie s ............................................................................3 6
Q u estion n aires ...............................................................3 7
Questionnaire R results ..................................... ............................ .. ...... 37
Sum m ary of Questionnaire Results....................................................... .... ........... 38
D igital Three-D im ensional M odeling.......................................................... ............... 39

4 CA SE STU D IE S .......................................... .... .......... .......................... ... 45

Atlantic Avenue: D elray Beach, Florida ........................................ .......... ............... 45
History and Context................. .................................. 45
Im plem ending the R design .............................................. ........ ............................. 46
D design E lem ents ...................................... ............................... ................. 47









Im pact of the Redesign ............................................................. .. ...... 47
Clem atis Street: W est Palm Beach, Florida....................................... ......................... 48
H history and C ontext........... .................................................................. .......... ....... 48
Im plem ending the R design .......................................................... ..............49
D design E lem ents ................................................................................................... ....... 49
Im pact of the Redesign .................. ...................................... .. ........ .... 50
Octavia Boulevard: San Francisco, California ........................... .................................... 51
H history and C ontext............. ..................................................................... ........... 5 1
Im plem ending the R design ........ .................. ..................................... ............... 52
D e sig n E lem en ts .......... ......................................................................................5 3
Impact of the Redesign ...................................................................... .... ......... .................53

5 PROPOSAL ............. ....... ................... ..........60

K ennedy B boulevard R edesigned....................................................................................... 60
Alternative Redesigns ................. .............................. 62
A R ail Sy stem for T am p a ................................................................................................. 63
1-275 A lignm ent ................................................................... 64
Cypress Street Alignm ent.............................................. 65
Kennedy Boulevard Alignment .................................................................................65
Selecting the Correct Alignm ent ............................................................ ............... 66

6 DISCU SSION ......... ...... .. ....... ......... ....................... ........ 83

Im plem ending the R design ..............................................................83
O obstacles to the R design .......................................... .................................. 83
O vercom ing the O b stacles....................................................................................... ..84
E effects on T traffic .................................................................................................86

7 CONCLUSION ...................................... ......................89

APPENDIX

A Q U E S T IO N N A IR E ................... ... ................. .............................................................9 1

B VISUAL INVENTORY OF KENNEDY BOULEVARD ..................................... 96

C PH O TO SIM U LA TIO N S ............................................................................................97

D TRAFFIC COUNTS AND PROJECTIONS ..................................................................99

C IT E D R E FE R E N C E S ....................................................................................................102

BIOGRAPHICAL SKETCH .................................................................................. 105







6










LIST OF TABLES


Table


5-1 Possible R ail A lignm ents .......................................................................... ...................68


page









LIST OF FIGURES

Figure page

1-1 The study area. ..................................................................18

1-2 Cross section of Kennedy Boulevard (existing). ...............................................................19

1-3 Kennedy Boulevard before and after photosimulation .................................................19

1-4 N ew O rleans streetcar system .......................................... ........ ................................. 19

1-5 Helsinki, Finland .................. ...................... .......... .................. 20

1-6 Amsterdam, Holland ............................... ........... .... .. ..... ......... 20

1-7 C openhagen, D enm ark ............................................................................. ....................20

2-1 Boulevard realm s.. .................................. .. .. ........... .. ............31

2-2 Boulevard overview. ....................................... .. .......... ........ .... 32

2-3 Intersection configurations......................................................................... .................. 32

2-4 Access Road Exit. .............................. ...................... ..........33

2-5 V various functions of a m edian. ........................................ ............................................33

3-1 T he Stu dy A rea .................................................................40

3-2 Reasons people come to Kennedy Boulevard......... ........... ......... ................... .............40

3-3 Mode of travel people use to get to Kennedy Boulevard....................... ...............41

3-4 Biggest problems along Kennedy Boulevard. ...................................... ............... 41

3-5 Ratings of various elements of Kennedy Boulevard......................... ................42

3-6 Changes people would like to see along Kennedy Boulevard ........................................42

3-7 Frequency of transit usage. .......................... ........... ............. .. ......... .................. .. 43

3-8 Factors that influence people to drive instead of using transit ............................... 43

3-9 Factors that would increase transit ridership. ....................................... ............... 44

4-1 Atlantic Avenue, Delray Beach, Florida .......... .... ............................... ............... 54

4-2 Atlantic A venue before the redesign............................................ .......................... 55



8









4-3 Atlantic Avenue after the redesign ............................................................................. 55

4-4 New residential construction following improvements to Atlantic Avenue...................55

4-5 Clematis Street, West Palm Beach, Florida. ............................... ......................... 56

4-6 Clematis Street after the improvements............... ........... .. .....................57

4-7 CityPlace, sparked by the Clematis Street revitalization............................................57

4-8 Octavia Boulevard in San Francisco, CA. .............................................. ............... 58

4-9 O ctavia B boulevard cross section ............................................... ............................. 58

4-10 The side access road.................................. .... .. .. .. .......... .........59

5-1 Cross section of Kennedy Boulevard (existing). ...................................... .............69

5-2 Kennedy Boulevard proposed redesign. ........................................ ........................ 69

5-3 Kennedy Boulevard proposal overview ....................................... .......................... 70

5-4 Transit station and pedestrian crosswalk. ........................................ ...................... 71

5-5 Intersection designations.......................................................................... ....................72

5-6 Major intersection. ................................... .. .... .... ................ .. 73

5-7 H ubert Street before and after ...................... .... ................... ................... ............... 74

5-8 A alternative R design O ne ................................... ................................ ............... 75

5-9 A alternative R design Tw o ....................................................................... ....................75

5-10 A alternative R design T three ....................................................................... ..................76

5-11 The Tampa Rail System and three alternative routes through the study area ..................77

5-12 M major destinations........ .......................................................................... ......... ......78

5-13 1-275 rail alignment and half-mile radius. .............................................. ............... 79

5-14 H ighw ay m edian station in Chicago...................... .... ............................. ............... 80

5-15 Cypress Street rail alignment and half-mile radius........................... ...............81

5-16 Kennedy Boulevard rail alignment and half-mile radius................................................82

6-1 Alternative routes for SR 60 designation ...................... ..................... .............. 87



9









6-2 Intersection traffic control.......................................................................... ...................88









Abstract of Thesis Presented to the Graduate School
of the University of Florida in Partial Fulfillment of the
Requirements for the Degree of Master of Arts in Urban and Regional Planning

TRANSFORMING AN URBAN ARTERIAL INTO A MULTIWAY BOULEVARD: A
DESIGN PROPOSAL FOR KENNEDY BOULEVARD IN TAMPA, FLORIDA

By

Andrzej Mikulski

December 2006

Chair: Joseli Macedo
Major Department: Urban and Regional Planning

This thesis explores the possibility of transforming an urban arterial road in Tampa,

Florida, into a multiway boulevard. Multiway boulevards are roadways that combine high speed

regional traffic, slower local traffic, and a pedestrian environment, all into a single space. Urban

arterials, especially those developed after World War II, are characterized by large parking lots,

low-rise strip malls, large signs, fast automobile traffic, and a lack of a pedestrian realm. These

kinds of urban arterials were designed solely for automobiles and function more like

expressways than city streets. As a result, the roads separate neighborhoods from each other and

act as a barrier to the free movement of people. There is a growing movement in the United

States to improve the quality of the public realm by redesigning urban arterials into pedestrian-

oriented streets. Public transportation is an important element that enhances the pedestrian realm

because it reduces the amount of automobiles.

In Tampa, Kennedy Boulevard is an example of an urban arterial that lacks a quality public

realm but has the potential to be a great street. Kennedy Boulevard was once called Grand

Central Boulevard and was Tampa's premier street. Following World War II, the road was

widened, development followed the emerging "strip" pattern, and the Kennedy Boulevard









corridor went into decline. Today, the road is characterized by its automobile-focused design

that makes it difficult to walk.

The redesign of Kennedy Boulevard will focus on creating a pedestrian-oriented

environment that reconnects neighborhoods. This will be achieved through a multiway boulevard

that will include mass transit. Specific design elements that make a high quality pedestrian realm

will be identified based on interviews, questionnaires, and case studies. The site as it exists

today will be modeled using a three-dimensional computer visualization program and an

alternative model that incorporates the specific design elements will be proposed.









CHAPTER 1
INTRODUCTION

Kennedy Boulevard History

Kennedy Boulevard was once known as Grand Central Boulevard. Grand Central

Boulevard was the main east to west road through the city and marked the delineation between

the north and south halves of the city and was Tampa's premier street for shopping and dining.

The street was renamed Grand Central Boulevard in honor of President John F. Kennedy who

paraded down Grand Central Boulevard just four days before he was assassinated in Dallas,

Texas.

Today, Kennedy Boulevard still delineates the north half of the city from the south half.

However, the boulevard has lost its previous grandeur following its decline as a shopping and

dining destination. Today, the main function of the road is to move vehicles through the center

of the city from downtown to the Westshore Business District. The stretch of road in the study

area is lined by low rise strip malls and large parking lots. The specific section selected for this

study starts at Dale Mabry Highway and goes westward for approximately one mile to Westshore

Boulevard (Figure 1-1). The road right-of-way is 100 feet; the roadway is characterized by an

automobile focused design and large setbacks (Figure 1-2).

Thesis Goals

The four goals of this thesis include:

A Plan to Restore Kennedy Boulevard

* Using Kennedy Boulevard's historical significance as Tampa's main street as a guide for
the future.

* Creating a destination for shopping, business, dining, and living.

* Retaining existing businesses along the corridor









* Creating a diverse use of mixes to encourage interaction between various groups of people
and businesses.


Aesthetic Improvements

* Implementation of build-to lines and bulk regulations.

* Addition of street trees and landscaping to improve microclimate and aesthetics.

* Minimizing curb-cuts and eliminate parking lots in front of buildings.

* Burying overhead utility lines or relocate them to alleyways.

* Using repeating streetscape elements and street furniture to unify the corridor.

Creating a Link

* Use repeating streetscape elements to reinforce the east-west connection between
downtown Tampa and the Westshore business district.

* Use transit to strengthen the downtown-Westshore connection.

Increasing Alternative Forms of Transportation

* Adding light rail.

* Link light rail to an improved bus service that serves surrounding neighborhoods.

* Improve the pedestrian realm in order to make walking a viable option.

* Design for bicycles.

The Need for Improved Public Transportation in Tampa, Florida

The city of Tampa is a growing city at the center of the rapidly growing Tampa Bay

metropolitan area. As more people move to the region every day, traffic congestion is

worsening. For many years, city leaders of opposite ends of the political spectrum have ignored

the consequences of growth and refused to create a viable public transportation system. Business

leaders and politicians are starting to come to the realization that a convenient, efficient mass

transit system is needed to keep Tampa competitive in the marketplace.









Hillsborough Area Regional Transit Authority

Pursuant to the Florida Statutes, the Hillsborough Area Regional Transit Authority

(HART) is delegated responsibility for meeting the public mass transit needs of its member

jurisdictions (HART, 2006). The member jurisdictions are unincorporated Hillsborough County

and the cities of Tampa and Temple Terrace (HART, 2006). HART is governed by a 12 member

board; six members are appointed by the Hillsborough County Board of County Commissioners,

three by the City of Tampa, one by the City of Temple Terrace, and two by the Governor of

Florida (HART, 2006).

Hillsborough County and the Tampa Bay area have long used a 'roads-only' approach to

transportation. The 'roads-only' approach has made driving the only viable transportation option

for residents. A recent survey found that the Tampa Bay area is the most expensive place in the

country for transportation. The survey found that the average Tampa Bay resident spends 25 %

of their income on transportation (Brill, 2003).

The Unstable Future of Oil

The era of cheap oil is coming to an end and we must adapt accordingly and retrofit our

cities to reduce energy consumption. As of August 13, a gallon of self-serve regular gasoline

cost $3.03 (CNN, 2006). Prices are unlikely to decrease much because of rising world-wide

demand mostly from China and India and a continuing decrease in world-wide supply.

Increasing demand and decreasing supply have caused oil prices to become very volatile. Any

sign of conflict in the Middle-East causes oil prices to rise. Any tropical system or hurricane that

comes within hundreds of miles of off-shore oil facilities also drives up the price of oil. While

price hikes are to be expected, in recent years the prices are increasing more often and more

drastically, signs of oil as a cheap, plentiful, and reliable source of energy are coming to an end.

Sunbelt Cities such as Tampa were developed at the beginning of the cheap oil era; thus the









design and layout focused on the private automobile. When, not if, the era of cheap oil comes to

an end, metropolitan areas such as Tampa will be in crisis because their very existence will be

threatened. City and metropolitan leaders must act now and change land use and transportation

patterns to create a more sustainable city and region.

Increasing Population

Florida has been one the fastest growing states in the nation for decades. Hillsborough

County and Tampa are at the center of the rapidly growing Tampa Bay metropolitan area. A

population projection conducted by the researcher shows that Hillsborough County will have

1,273,140 residents by the year 2010, an increase of almost a quarter million people from the

year 2000. The population of the entire Tampa Bay area (Hillsborough, Pinellas, Pasco,

Hernando, Manatee, and Sarasota Counties) will increase from 3,295,687in 2005 to 6,924,989 by

the year 2055. While much of the growth will occur in greenfield development on the urban

fringe, the City of Tampa will absorb some of that growth. In the last few years, many urban

infill projects have been built in inner city Tampa. There is now a high demand for urban living;

trends all around the country reflect this. Massive condominium projects are being built in

Downtown Tampa and Channelside that will bring thousands of new residents and create entire

new neighborhoods and districts in only a few years.

Florida's population will continue to grow at a rapid rate. Florida growth management

laws, high demand for urban living, growing opposition to sprawl from both sides of the political

spectrum, and concurrency requirements will make existing urban areas attractive for growth.

The population projection done by the researcher found that Florida simply does not have

enough land to accommodate the expected increase in population at current density levels. As

urban areas such as Tampa become denser to accommodate the additional population,

alternatives to the automobile must be planned for. The city's roads are already clogged with









traffic, and the problem will only grow worse with more people. Most roads in the city are

already as wide as the right of way allows so any additional widening is cost prohibitive. The

only way to deal with such a large increase in population is to construct a mass transit system.

Light Rail Transportation

A light rail line is an important element of the proposed redesign for Kennedy Boulevard.

The Hillsborough Area Regional Transit Authority (HARTLine) is planning to build a light rail

system; part of the system will parallel Kennedy Boulevard. The exact route has not yet been

set, but this thesis calls for locating the light rail line on Kennedy Boulevard.

Mass transit systems come in a variety of forms ranging from bicycle powered taxis to

high speed bullet trains. Within urbanized areas in developed countries, the most common forms

of mass transit, ranging from lightest duty to heaviest duty are: streetcars, light rail, and

commuter or heavy rail. Light rail is the most common form of fixed guideway mass transit in

urban areas; good examples of rail mass transit are European countries such as Finland,

Denmark, and the Netherlands. In the United States, Portland, Oregon is the best example of a

successful light rail system. There is a debate about whether or not rail is superior to bus transit.

Compared to bus transit, rail tends to offer superior service in terms of speed, comfort, and

convenience (Henry, 2006). Rail transit is perceived to be more prestigious and therefore

receives more public support. Rail stations also serve as a catalyst for dense, multi-modal

development (Henry, 2006) and attract more discretionary riders (people who could drive

instead) than busses.

Light rail lines can operate in their own dedicated corridor or be incorporated onto the

street and share space with vehicles and pedestrians. This type of design is common in European

cities but can also be found in the United States. In New Orleans, the streetcar system travels in

its own separate right-of-way and on other parts of the system it travels on the street. The Saint









Charles line shares downtown streets with cars (Figure 1-3), and travels in a central median

through the Garden District (Figure 1-3). The median, also calledcthe "common ground," is

covered with grass and used by pedestrians and joggers. The Riverfront line has its own

dedicated right of way as it travels along the Mississippi River (Figure 1-3).

When contemplating a new streetcar system in American cities, issues about safety and

litigation arise when the design calls for the tracks to share the same space as vehicles and

pedestrians. The New Orleans streetcar system proves that streetcars can safely share the same

space with vehicles and pedestrians. Other American cities such as San Francisco and Portland

have similar systems.

The use of shared space between vehicular traffic, pedestrians, and streetcars is a common

design practice in Europe. Vehicles and streetcar speeds are low enough not to endanger the

safety of the pedestrian. Helsinki (Figure 1-4), Amsterdam (Figure 1-5), and Copenhagen

(Figure 1-6) are European cities that have done an excellent job of safely creating a commonly

shared street space.


Figure 1-1. The study area.


















1"=25'

Figure 1-2. Cross section of Kennedy Boulevard (existing).


Figure 1-3. Kennedy Boulevard. Existing (left) and after the proposed redesign (right).


Ct L111 .4 Aft IIIi
cS y
g(a teal


Figure 1-4. New Orleans streetcar system. A) Sharing the road in downtown. From
http://members.virtualtourist.com. B) Common ground in the Garden District. From
http://www.civilwaralbum.com. C) Dedicated right of way along the riverfront.
From http://www.sullymansion.com.




















Figure 1-5. Helsinki, Finland. Source: www.virtualtourist.com


Figure 1-6. Amsterdam, Holland. Source: citytransport.info; http://www.flamenet.ca/.


En.!


Figure 1-7. Copenhagen, Denmark. Source: www.macdesktops.com









CHAPTER 2
LITERATURE REVIEW

The Decline of Public Space in the United States

There is a general consensus that the United States is experiencing a withering of the

public realm (Banerjee, 2001). The public realm is defined as, "publicly owned streets,

sidewalks, rights-of-ways, parks and other publicly accessible open spaces, and public and civic

buildings and facilities" (City of Burlington, CA, 2006). The decrease in both the quantity and

quality of the public realm raises some warning flags because high-quality, plentiful public

spaces are crucial to the free flow of people and ideas that are essential to any civilized society.

On the other side of the Atlantic Ocean, European cities such as London, Paris, and Stockholm

have a quality of completeness about them. A user traveling from one attraction to another does

so in a continuous urban experience; there is a connectivity that is missing in most American

cities (Barnett, 1989).

A recent survey found Americans have fewer confidants (people that they can discuss

important matters with) than 20 years ago (McPherson, 2006). The same study also found that

Americans' personal network (people considered very close friends) dropped from 2.94 in 1985

to 2.08 in 2004 (McPherson, 2006). There are several possible explanations for Americans'

increasing isolation. Some researchers believe it is longer working hours, the increasing use of

television and the Internet, the rise of suburban sprawl, or a combination of all of these.

One explanation for the increased isolation that is starting to gain acceptance is the form of

America's built environment. Traditional public space is being replaced by privatized space.

City squares were replaced with enclosed shopping malls; public grounds found in

neighborhoods are now governed by Residential Community Associations (RCA's). Already, 47

million American's live in neighborhoods controlled by RCA's and fifty percent of new homes









fall under the control of RCA's (Kohn, 2004). The privatization of public space undermines the

feeling that people of different classes and culture live in the same society and decreases the

opportunities for recognizing commonalities and accepting differences (Kohn, 2004).

There is no single identifiable reason for the decline of public space, although some

researchers suggest that the decline of the public realm is corresponding with a decline in the

public spirit, which is the core element of a civilized society (Banerjee, 2001). A public space,

whether it is a park, neighborhood tavern, or sidewalk, allows for the interaction of different

members of society.

Current planning and zoning laws codify and quantify individual developments without

considering the context. Zoning groups similar uses and separates dissimilar ones, causing local

areas of a metropolitan area to become highly specialized. One zone will be for housing, another

will contain retail, and a third will be for workplaces. As a result, friends at work are left behind,

neighbors rarely see let alone know each other, and shopping areas are depersonalized (Popenoe,

1985). On average, Americans spend one-quarter of their time getting to places (Moscovich,

2006). The resulting built environment does not create a high quality public realm and inhibits

the creation of tight-knit social networks. Current zoning standards also segregate housing by

type and cost. The segregation of land uses and income levels prevents the intermingling of

different people which is vital for a good public space. Current zoning does not address design.

Over the years, three-dimensional design has been replaced by two-dimensional land use

planning (Walters, 2005).

Of all regions in the United States, Sunbelt Cities have the poorest quality public realm.

The lack of a quality public realm is the result of modern planning and zoning laws which

segregates uses (Fink, 1993). Sunbelt Cities grew the most rapidly after World War II at the









time zoning was becoming a popular way for cities to manage growth. Zoning and planning did

not address design as part of the criteria for new projects. Roads designs were based on disaster

evacuation models and emergency response times (designed for maximum speed) rather than

how the road fit into the context of the neighborhood or district. Travel lanes are wide and

plentiful, turning radii allow for minimal breaking when turning, and vehicles can travel as fast

as possible. While Sunbelt cities have many well-engineered roads, these roads are the most

dangerous for non-motorists. A 2000 survey by the Surface Transportation Policy Project

(STPP) found that the Tampa-Saint Petersburg metro area was the most deadly for pedestrians

(Mitchell, 2000). Following Tampa were Atlanta, Miami, Orlando, Jacksonville, Phoenix, West

Palm Beach, Memphis, Dallas, and New Orleans. It is no coincidence that all these are Sunbelt

Cities that were built for the automobile. Roy Kienitz, Executive Director of STPP said,

"Building our communities only for cars has deadly consequences. The riskiest places are

characterized by spread-out growth and wide, high-speed streets that often lack sidewalks and

crosswalks" (Mitchell, 2000).

Current Road-Building Standards

Most of the hostile environments seen along roadways are the result of modern day road-

building standards. Standardized templates for roadways are favored over good design

principles and common sense. Although road-building standards are needed to ensure that roads

are built for efficiency and safety, more attention should be focused on the context of the

roadway. Road-building standards are codified in two important books, A Policy on the

Geometric Design ofHighways and Street published by the American Association of State

Highway and Transportation Engineers (AASHTO) and the Traffic Engineering Handbooks by

the Institute of Transportation Engineers. State departments of transportation have adopted these

books as the standard for roadway design.









For almost 50 years AASHTO has been publishing and updating its roughly 1,000 page

book, A Policy on the Geometric Design ofHighways and Street (it is more commonly referred

to as the Green Book due to its lime-colored cover). The Green Book places a premium on

safety. The first principle in the Green Book is that safety trumps all other considerations

(AASHTO, 1994) such as history, aesthetics, community habits, community values. The Green

Book clearly states, "The design values given within this text have safety as their primary

objective" (AASHTO, 1994).

The second principle is that for a road to be safe it must accommodate drivers traveling at

high speeds, even faster than the legal limit. AASHTO and most state highway departments

traditionally have used what is known as the "85th percentile" standard. They calculate how fast

the 15th fastest driver out of every 100 on a highway is traveling, and they commit to make that

driver's trip free of danger (Swope, 2005). To create an efficient, uniform road design standard

across the nation, the Federal Highway Administration has made it a policy that for any state or

local road project to receive federal funds, the project must conform to AASHTO Green Book

standards (Ehrenhalt, 1997).

The Institute of Transportation Engineers (ITE) publishes the Traffic Engineering

Handbook. The book contains guidelines for urban and rural roadways and standards for travel

lane widths, recovery areas, and intersection design. For an urban street with a speed limit over

40 miles per hour, such as Kennedy Boulevard, the desirable travel lane width is 13 feet (ITE,

1992). The design of the roadside is also important for safety. The handbook states, "Clear

Recovery Areas are the portions outside the travel way that are free of objects or hazards such as

trees, barriers, and utility poles (ITE, 1992 pg 174)." Intersection design is based on two









primary objectives: quality and safety. In order to achieve these objectives, the following

principles guide intersection design (ITE 1992):

Points of conflict should be minimized
Conflict areas should be simplified
Conflict frequency should be limited
Conflict severity should be minimized


New Urbanism, Traditional Neighborhood Design and Transit Oriented Development

New Urbanism is a type of development that attempts to revive town design practices of

the past. The Charter of the New Urbanism sets design guidelines for the three parts of a

metropolis; the region; the neighborhood, the district, and the corridor; and the block, the street,

and the building (Congress for the New Urbanism, 2006). Design principles for the

neighborhood, the district, and the corridor are as follows:


The neighborhood, the district, and the corridor are the essential elements of development
and redevelopment in the metropolis. They form identifiable areas that encourage citizens
to take responsibility for their maintenance and evolution.

Neighborhoods should be compact, pedestrian-friendly, and mixed-use. Districts
generally emphasize a special single use, and should follow the principles of
neighborhood design when possible. Corridors are regional connectors of neighborhoods
and districts; they range from boulevards and rail lines to rivers and parkways.

Many activities of daily living should occur within walking distance, allowing
independence to those who do not drive, especially the elderly and the young.
Interconnected networks of streets should be designed to encourage walking, reduce the
number and length of automobile trips, and conserve energy.

Within neighborhoods, a broad range of housing types and price levels can bring people
of diverse ages, races, and incomes into daily interaction, strengthening the personal and
civic bonds essential to an authentic community.

Transit corridors, when properly planned and coordinated, can help organize metropolitan
structure and revitalize urban centers. In contrast, highway corridors should not displace
investment from existing centers.









Appropriate building densities and land uses should be within walking distance of transit
stops, permitting public transit to become a viable alternative to the automobile.

Concentrations of civic, institutional, and commercial activity should be embedded in
neighborhoods and districts, not isolated in remote, single-use complexes. Schools should
be sized and located to enable children to walk or bicycle to them.

The economic health and harmonious evolution of neighborhoods, districts, and corridors
can be improved through graphic urban design codes that serve as predictable guides for
change.

A range of parks, from tot-lots and village greens to ballfields and community gardens,
should be distributed within neighborhoods. Conservation areas and open lands should be
used to define and connect different neighborhoods and districts.

Traditional Neighborhood Development (TND) is a type of New Urbanist development.

TND and New Urbanist principles are very similar; both use the pedestrian as the center for the

design process. The major principles of TND are: mixed uses, walkable neighborhoods, a

network of interconnected streets, and priority for public spaces and civic buildings (Gordon,

2005). TND is based on the idea that the needs of the pedestrian should be considered over all

other needs. TND still accommodates automobile needs, but not at the expense of the pedestrian.

The goal is to create communities that encourage people to walk and minimize the amount of

driving within the community.

TND is based on the principle that neighborhoods should be walkable, affordable,

accessible, distinctive, and fit within the historic context of each community. Costs savings is

one of the touted benefits of TND. Infrastructure costs less because streets in TND's are much

narrower than conventional suburban developments and the destinations are in close proximity to

one another, requiring less pavement to connect different areas (Calthorpe, 1993). Even though

many New Urbanists claim that their developments are actually less expensive to build, homes in

New Urbanist developments all across the country sell for a significantly higher rate than

surrounding areas. Understandably so, many people criticize TND and New Urbanism for being









elitist and affordable only for the wealthy. However, a counterpoint to that argument is that New

Urbanist developments are in such high demand that they demand higher prices.

Transit Oriented Development (TOD) is another branch of New Urbanism. Many of its

principles are similar to TND, but TOD places a greater emphasis on transit uses. Like TND,

TOD places the pedestrian at the center of the design. According to Peter Calthorpe, considered

one the foremost experts in TOD, the following principles summarize TODs (Calthorpe, 1993):

Organize growth on a regional level to be compact and transit supportive

Place commercial, housing, jobs, parks, and civic uses within walking distance of
transit stops

Create pedestrian-friendly street networks which directly connect local destinations

Provide a mix of housing types, densities, and costs

Preserve sensitive habitat, riparian zones, and high quality open space

Make public spaces the focus of building orientation and neighborhood activity

Encourage infill and redevelopment along transit corridors within existing
neighborhoods

Transit stops should be no more than one-half a mile apart to ensure that there is a

reasonable distance for someone to walk to the nearest stop. The densest commercial areas

should be located immediately adjacent to the transit stops to provide transit riders with

convenient shopping opportunities before and after travel. Another important element to TOD is

residential density. According to Calthorpe (1993), in order to support light rail transit in an

urban setting, a density of 18 dwelling units per acres is needed. The type of service and level of

service is tied directly to population density; the denser the area, the shorter the headways.









Multiway Boulevards

Multiway boulevards are unique streets because they seamlessly combine several

disparate uses. According to Jacobs,

Multiway boulevards are an urban form that responds to many issues that are central to
urban life: livability, mobility, safety, interest, economic opportunity, ecology, mass
transit, and the need for open space (Jacobs et al., 2002; 9).

Multiway boulevards combine high-speed regional traffic, slower local and neighborhood

traffic, accommodate heavy pedestrian activity, and are often major shopping and residential

streets. Some boulevards accommodate transit in the central median or have access to an

underground subway system.

True multiway boulevards are really two or three different roads located immediately

parallel to one another. American traffic engineering standards view multiway boulevards as

unsafe because of the complex intersections resulting from multiple roadways, street trees that

run all the way to the edge of intersections, and pedestrian realm. Publications of the

Association of State Highway and Transportation Officials (AASHTO) discourage key features

of boulevards such as side access roads and street trees. Research of 21 boulevards in the United

States and Europe compared accident rate data on the boulevards to comparable nearby streets in

each city. The results showed that multiway boulevard are no less safe than traditional streets

nearby (Jacobs et al., 2002). Some of the boulevards were less safe, some as safe, and some

more safe than the neighboring streets. The study also examined accidents involving pedestrians

and found the same conclusion; multiway boulevards are no less safe than other streets.

Multiway boulevards are made up of two realms (Figure 2-1): a through-going realm and

a pedestrian realm (Jacobs et al., 2002). The through-going realm is designed to carry regional

traffic in multiple lanes at moderate speeds. The pedestrian realm is made up of the building









entrances, sidewalks, a parking lane, an access lane, and the landscaped median separating the

through-going realm from the pedestrian realm.

In the through-going realm, traffic flows at around 40 miles per hour and access is

limited. Entry and exit for the middle roadway only occurs at major intersections. Only major

cross streets intersect with the through-going realm; minor streets and driveways terminate at the

access roads (Figure 2-2). The elimination of driveways and minor intersections greatly

enhances traffic flow and lessens the risk of a traffic collision. At intersections, the access roads

can continue straight or be diverted into the through going realm to reduce the complexity of the

intersection (Figure 2-3).

There may or may not be a central median separating the opposite traffic lanes in the

through going realm. If there is a median, it should be wide enough to accommodate some

landscaping and street trees. If transit is needed along the corridor, the central median can be

used for Bus Rapid Transit (BRT) lanes, contain tracks for a light rail or streetcar route, or

contain access points to a subway system. A central median is optional, but a median separating

the through-going realm from the pedestrian realm is required. Medians delineate the space,

serve as a pedestrian refuge when crossing the street, and accommodate street trees and

landscaping (Figure 2-5).

The second and most important realm is the pedestrian realm. This realm includes the

landscaped median separating the middle roadway from the access roadway, the access roadway

and parking, sidewalk, and the buildings abutting the sidewalks. The median should be at least

eight feet wide to accommodate shade trees. The side roadways accommodate slow-speed local

auto traffic and should provide a lane for parking. Sixteen feet is ideal to provide one travel lane

and one parking lane, each eight feet wide. Twenty miles per hour or less is an ideal traffic









speed for the side roadway. Traffic flows one-way and the lanes tend to be narrower than the

lanes in the middle roadway to slow traffic. Due to the slow traffic of the side roadway,

bicyclists and pedestrians also use the access roadway. The side roadways begin and terminate

with the middle roadway at major intersections.

Multiway boulevards are common in major European cities. Paris' Champs Elysees was

once the most famous multiway boulevard in the world. Although it is no longer a true multiway

boulevard (the side access roads were made into sidewalks to accommodate heavy pedestrian

traffic) the Champs Elysees remains an example of what a great street can do for a city (Jacobs et

al., 2001). Barcelona, Spain has the largest and perhaps best collection of multiway boulevards

of any city in the world. Three major multiway boulevards slice through Cerda's L'Eixample:

the Passeig de Gracia, the Avenida Diagonal, and the Gran Via de les Corts Catalans (Jacobs et

al., 2002).

Multiway boulevards can become a significant urban element in American cities. All major

cities have large commercial strips that have a right-of-way or building-to-building width large

enough to accommodate a multiway boulevard. Boulevards are appropriate where there is a

need to carry both through traffic and local traffic and a need for the through traffic to move

faster than the local traffic. Boulevards are appropriate for streets, by virtue of their size and

location, have the potential to become a special place in the city (Jacobs et al., 2002).

Boulevards are also appropriate where there is a large number of pedestrians who need to cross

the street such as commercial streets or streets with mass transit. Although rarely built today,

there are numerous opportunities to build multiway boulevards in the contemporary

environment. Opportunities to build multiway boulevards exist in seven distinct contexts

(Jacobs et al., 2002):









Existing boulevards from the late nineteenth and early twentieth century.

Existing inner-city major streets.

Existing "strip development" streets.

Existing expressways and freeways.

Existing suburban residential arterials.

Existing suburban commercial arterials.

Major traffic streets in new urban or suburban developments.

Kennedy Boulevard is a "strip development" street that can be converted into a multiway

boulevard. There is enough space between the buildings to accommodate a boulevard design

with a dedicated transit way.






I,, V ',
/:' *-- ,, .-% -, .- ,-
,




Pedeestrr, yealm Thu '-goir;g Pedestrian real
rea m

Boulevard realms



Figure 2-1. Boulevard realms. Source: Jacobs et al., 2002; 212.








































Figure 2-2. Boulevard overview. A) Major cross streets intersect with the through going realm.
B) Minor streets and driveways terminate at the access roads, improving traffic flow
on the through-going lanes. Source: Jacobs et al., 2002; 264.


Figure 2-3. Intersection configurations. A) Access road traffic may continue through the
intersection; or B) channeled into the through-going realm. Source: Jacobs et al.,
2002; 228.


:7: A=



Intersecions worth straight medians

rC rC



Intersecdons worth access road rmturns





























Figure 2-4. Access Road Exit. The road renters the through-going realm. Source: Jacobs et al.,
2002; 30.


FITI11111


L _
,HI r ____________ _____
S__ ___
s tOp



K awn~n~l~


Figure 2-5. Various functions of a median. Source: Jacobs et al., 2002; 219.


I I I I









CHAPTER 3
METHODOLOGY

The objective of this thesis is to study the prove that redesigning an urban arterial as a

multiway boulevard is the best way to create a public street space, improve the pedestrian realm,

improve traffic flow, and incorporate transit. The chosen method to gain an understanding of

corridor improvements is exploratory research in the form of case studies. This research will

contribute to the field of knowledge in urban design by suggesting ways to transform existing

urban arterials into multiway boulevards that will improve the quality of the built environment.

The research will also contribute to the field of urban planning by explaining how multiway

boulevards can improve the public realm, make transportation safer and more efficient, and

increase economic prospects for the city.

To prove that the stretch of Kennedy Boulevard in the study area would best function as a

multiway boulevard, the following steps were taken:

* Selecting a study area that met a list of criteria.

* Reviewing literature to study the reasons for a decline in public street space.

* Reviewing case studies of street corridor improvements and construction of new multiway
boulevards.

* Applying questionnaires and visual image surveys to three Tampa neighborhood civic
associations to gauge public opinion about Kennedy Boulevard and gain an understanding
of the types of built environments people prefer.

* Creating a digital three-dimensional (3D) model of the corridor as it exists currently, and
based on the literature review, case study findings, and questionnaire and questionnaire
results, creating a digital 3D model of the site redesigned as a multiway boulevard.

Exploratory Research

Exploratory research was the main type of social science research conducted in this thesis.

Social science research is a way to examine and understand the operation of human affairs

(Babbie, 1995). Social problems can not be solved until there is an understanding of the









problems and how they persist (Babbie, 1995). Exploratory research in the form of case studies

were used because urban planners and designers primarily learn by studying other cities and

developments. The case studies selected were examples of successful street corridor

revitalizations. The first two case studies were roadways in Delray Beach, Florida, and West

Palm Beach, Florida. Florida cases were selected because the governmental, political, and

economic contexts in Tampa are expected to be similar to those in Delray Beach and West Palm

Beach. The Florida case studies were expected to bring to light the challenges and problems that

would be faced in the implementation of the redesign by showing how the redesign process is

handled at local and state agencies. The third case study is of Octavia Boulevard in San

Francisco, California. This case was selected because the physical design best represents the

vision for Kennedy Boulevard. Each case study examined the following topics:

* History and context.

* Implementing the redesign.

* Design elements.

* Impact of the redesign.

Selection of the Study Area

The study area is Kennedy Boulevard, an urban arterial in Tampa, Florida. The specific

section selected for this study starts at Dale Mabry Highway and goes westward for

approximately one mile to Westshore Boulevard. The selection of the study area had to meet the

following criteria:

* A distance between property lines wide enough to fit a multiway boulevard (about 130
feet)

* Primarily commercial and retail strip development along the road.

* Dominated by vehicular traffic.









* A heavily trafficked road.

* Containing or connecting major destinations.


Intersections were classified as either major or minor. Major intersections are where

Kennedy Boulevard crosses an arterial road (as classified by FGDL and GIS data.) Minor

intersections are where Kennedy Boulevard crosses a local/collector road (as classified by FGDL

and GIS data.) The major intersections are where Kennedy Boulevard intersects the following

roads: Dale Mabry Highway, Lois Avenue, and Westshore Boulevard. The minor intersections

are where Kennedy Boulevard intersects the following roads: Church Avenue, Grady Avenue,

Hale Avenue, Clark Avenue, Hubert Avenue, Manhattan Avenue, Hesperides Avenue, and Trask

Street (Figure 3-1).

Literature Review

The second part of the research process was to identify the reasons why the public realm

has declined so significantly in recent decades. The literature review was limited to the United

States, as this is where the most severe decline of public space occurred. Within the United

States, most of the research focused on Sunbelt cities. Of all regions in the United States, the

greatest lack of public street space is in Sunbelt cities. The second topic that was studied was the

current road-building principles used by traffic engineers. The third topic that was studied was

light rail transportation in urban areas. Cities in the United States and Europe were studied;

European cities were selected because they exhibit good urban design principles and have been

used as models for other cities in the United States.

Case Studies

Three case studies were selected to understand how improvements can be made to urban

arterial roadways. Case studies were selected because the primary way planners learn and solve









problems is by studying what other cities do. The case studies examined the history and context,

implementation of the design, specific design elements used in the redesign, and the outcome of

the redesign. Two of the case studies are in Florida and the third is in San Francisco, California.

Questionnaires

The subject population was identified as anyone who lives in a three mile radius of

Kennedy Boulevard. The questionnaire was put online and a link was sent to the presidents of

the following Tampa neighborhood associations: Tampa Heights, North Hyde Park, and Historic

Hyde Park. The questionnaire asked general questions about the built environment of Kennedy

Boulevard. The questions gauged people's perception and attitude about the roadway and

desired improvements, reasons people come to Kennedy Boulevard, and transit usage. The

entire questionnaire is found in Appendix A.

Questionnaire Results

The questionnaire asked questions pertaining to the visual character of Kennedy

Boulevard and general questions about transit usage. Out of 217 questionnaires given out, 47

were completed. The redesign calls for the roadway to become a pedestrian-focused destination

with transit as an integral function; in order to accomplish this goal, transit usage and the design

of Kennedy Boulevard will have to dramatically change. Respondents were asked why they

come to Kennedy Boulevard; multiple answers could be selected. Results of the questionnaire

show that most people come to Kennedy Boulevard because they are passing through on the way

to another location (Figure 3-2) and all the respondents used a private automobile to get to

Kennedy Boulevard (Figure 3-3).

In order to identify elements that needed to change, the study population was asked to rank

the biggest problems along Kennedy Boulevard. The biggest problems were appearance and

traffic (Figure 3-4). The four elements that people were "Somewhat Dissatisfied" or "Very









Dissatisfied" with were landscaping, aesthetics/appearance, and open space and parks, and

ability to walk/bike (Figure 3-5). The four changes that people would most like to see are: less

traffic, better aesthetics, cleaner, and safer (Figure 3-6).

Because public transit is an important aspect of the proposed redesign, people were asked

about their attitudes toward transit and what would make them want to use transit. Currently,

most people in the study area never use public transit (Figure 3-7).

In order to understand people's attitudes about transit, questionnaire respondents were

asked the three most influential factors that influence their decision to drive instead of using

transit. The factors are: public transportation takes too long, public transportation is not

convenient to home, work, and shopping, and the stigma of public transportation (Figure 3-8).

Transit service and convenience must improve dramatically to fulfill the vision for Kennedy

Boulevard. Questionnaire subjects were asked, "What three things would make you use public

transportation along Kennedy Boulevard?" The most influential factor that would increase

ridership is convenience. Surprisingly, the second most influential factor to increase transit

usage would be the addition of light rail or streetcar service (Figure 3-9). Light rail or streetcar

service itself may not necessarily be the reason that people would switch to transit, but rather the

higher quality and faster service associated with rail transit. Although it is commonly thought

that mode (rail versus bus) is not an important factor, the questionnaire results show otherwise.

As other studies have shown, there tends to be more public support for funding and higher

ridership figures for rail versus busses when all other figures such as headway times, and travel

times are held constant (Henry, 2006).

Summary of Questionnaire Results

Questionnaire results clearly show that Tampa residents are dissatisfied with the

appearance of Kennedy Boulevard. Elements that the public would like to see improved are the









aesthetics and landscaping along Kennedy Boulevard; these improvements were added into the

redesign. The questionnaire also found why people do not use transit and factors that would

make them want to use transit. Because the redesign includes the removal of a through-going

traffic lane, increased transit ridership would have to mitigate some of the traffic effects.

Questionnaire results showed that for people to switch from driving to transit, transit service

would have to be more convenient and faster.

Digital Three-Dimensional Modeling

Digital stereoscopic aerial photograph pairs at six inch resolution of the study area and a

camera collaboration report were obtained from the Hillsborough County Mapping and

Surveying Department. The study area, as it currently exists, was modeled using the computer

program Sketchup. The aerial photograph became the base for the model. The building masses

were created by tracing over the rooftops and extruding the buildings to the appropriate height.

Next, pictures were taken of the front facade of each building along the corridor. The facade

pictures were edited using PhotoShop 7.0. The editing consisted of removing miscellaneous

objects such as vehicles, signs, and other objects that blocked the view of the facades.

Brightness, hue, and angles were also adjusted to give all the photographs a uniform appearance.

Finally, a redesign of Kennedy Boulevard was created. The proposed redesign used street,

sidewalk, and building dimensions based on the literature review, design elements from the

Octavia Boulevard case study, and incorporated questionnaire results.














TAMPA, FL: KENNEDY BOULEVARD PROPOSAL































LEGEND
Major Roads Minor Intersectons Map prepared by
Minor Roads r M AndyMikulski
STransit station I ~10/11/D5
SMaor Intersections A Signalized Pedestran Crossing

0 375 750 1 500 2.250 3,000
Feet



Figure 3-1. The study area showing major and minor intersections.



Reasons for Coming to Kennedy Blvd

45
40
35
c 30
0o
25 2

0
S15
E 10-



Use shops Visit friends Walk or Use the bus Work Live along Pass
and stroll Kennedy through on
services Boulevard the way to
another
destination
Reasons



Figure 3-2. Reasons people come to Kennedy Boulevard.














Getting to Kennedy Blvd: Mode


Figure 3-3.


Mode of travel people use to get to Kennedy Boulevard.


Biggest Problems Along Kennedy Blvd.


0.9
0.8
0.7
0.6
0.5
I Series
0.4
S0.3
S0.2
0.1
0






Problem



Figure 3-4. Biggest problems along Kennedy Boulevard.


50

45

40

35

o 30
0.
a 25 -Seriesi

20-

E 15

10

5
0 0 0

On foot Bicycle Bus Car
Mode












































Figure 3-5. Ratings of various elements of Kennedy Boulevard.


Preferred Changes Along Kennedy Blvd.

0.8
0.7
o 0.6
S0.5
0.4 USeriesi
0.3
0.2
0.1
0

E 2


m i 1
g g a_


Preferred Changes



Figure 3-6. Changes people would like to see along Kennedy Boulevard.


Number of People "Somewhat Dissatisfied" or "Very
Dissatisfied" with Elements of Kennedy Blvd.


45
39
40 3
. 35
o 30
C.
25 -1
r Series2
20 1-
1 1:3
15
E 10
z 5
0


Elements











































Frequency of transit usage.


Whe People Drive Instead of Using Public Transportation


* Series


Stigma of public Public
transportation transportation
fares are too


Public
transportation is
unreliable


Public Public
transportation is transportation
not convenient takes too long
to my home
work and
shopping


Factos


Figure 3-8. Factors that influence people to drive instead of using transit.


Frequency of Public Transit Usage


35

30

S25

20
1 Series1
6 15 13



5

0-
Every day 4-5 days 2-3 days One day A few Neer
a week a week a week times per
year
Frequency


Figure 3-7.














How to Increase Public Transportation Usage


18
16 Is
14 I-
r12
10 Im Most Important
SSomewhat Important
,'0. O Least Important
6 S
E '1
44
2 I


More More Faster Conwnient Cheaper Cleaner air Cost of Addition of
frequent stops service to home fares driving light rail or
work and increases streetcar
shopping service
Factors


Figure 3-9. Factors that would increase transit ridership.









CHAPTER 4
CASE STUDIES

Three case studies were picked to examine how Kennedy Boulevard can be redesigned as

a pedestrian-friendly boulevard. The first two case studies, Atlantic Avenue in Delray Beach and

Clematis Street in West Palm Beach, are in Florida and the third, Octavia Boulevard, is in San

Francisco, California. The Florida cases were chosen because they show how problems were

overcome to redesign a street as a pedestrian-friendly destination. The same problems are

expected if Kennedy Boulevard is redesigned. Like Kennedy Boulevard, Atlantic Avenue was a

State Road and the same problems between the local and state governments and FDOT might

arise. The last California case study was chosen because the physical design is very similar to

the vision for Kennedy Boulevard. Although the political process is different in Tampa and San

Francisco, Octavia Boulevard shows how many different agencies, jurisdictions, and

neighborhood associations at the local and state level can come together and make a vision a

reality.

Atlantic Avenue: Delray Beach, Florida

History and Context

Delray Beach experienced severe decline in the 1980s. Its 100-year-old downtown was

35% vacant. The main street, Atlantic Avenue, was a three-lane high speed state road that cut

through the city (Figure 4-1). In 1988, FDOT plans called for eliminating parking and widening

Atlantic Avenue to a four lane road to "improve hurricane evacuation" (Figure 4-2).

City officials had a much different vision for Atlantic Avenue than FDOT's. Atlantic

Avenue was a serious problem and major reason why Delray Beach's downtown was blighted.

The road was unattractive, hostile to pedestrians, and allowed motorists to speed through the

downtown. Rather than letting FDOT control the future of their town, city leaders decided to









take control. Under the guise to "improve hurricane evacuation," the FDOT proposal would

have caused traffic to flow even faster through the city. While the FDOT proposal would have

slightly improved traffic flow and made hurricane evacuation negligibly quicker, the city did not

want to become a place that cars drove through. Cities should not be designed solely for disaster

evacuation or built for maximized traffic flow. City leaders argued a city should be designed as

a place that people can enjoy every day of the year, not designed for an evacuation event that is

likely once every few years.

Delray Beach leaders worked with FDOT to come up with an alternative design for

Atlantic Avenue. The alternative design included narrow lanes and street furniture, elements that

went against FDOT design guidelines. Because the city's and FDOT's plans were so different, a

new strategy was needed.

FDOT allowed the city to take ownership of the stretch of Atlantic Avenue that cut

through the middle of downtown; in return, the city gave FDOT ownership of two roads on

either side of Atlantic Avenue to be converted into a pair of one-way roads to meet FDOT's

traffic flow goals.

Implementing the Redesign

The city created a CRA in 1985 (three years before the FDOT proposal) with the goals of:

* Eliminate slum & blighted conditions
* Revitalize downtown and adjacent neighborhoods
* Enhance tax base

The CRA provides the following financial incentives:


* County Grant Program CRA provides 50 % match for new jobs created
* Facade Easement Program-pays for renovations to historic properties
* Site Assistance Program-Pays percentage of improvements up to 25% or $50,000









The city and FDOT had very different plans for Atlantic Avenue; the CRA viewed the

FDOT proposal as a threat to their goal of redeveloping the downtown. The city and the CRA

took advantage of the redevelopment opportunity and worked with FDOT to come up with a plan

that served FDOT's needs to move traffic and the city's need to reinvigorate their downtown.

Design Elements

The city agreed to take over ownership and maintenance of the six block segment of

Atlantic Avenue from FDOT. In return FDOT took over ownership of two roads on either side

of downtown to create a pair of bypasses. Instead of widening Atlantic Avenue to four lanes, the

city reduced the road from three lanes to two and widened the sidewalks, installed brick paver

walkways, added trees and landscaping, and added artistic lighting (Figure 4-2).

Despite the empty on-street parking, there was still a perceived shortage of parking in

downtown. Instead of adding more parking, the city replaced surface parking lots with buildings

and moved parking lots to the rear of buildings. To encourage sidewalk cafes, the city allows

restaurants to place tables and chairs in the in the right-of-way provided there is adequate space

for pedestrians to pass. The downtown allows higher densities than city code calls for, allows

parking lots to be shared by multiple businesses, and waives parking requirements for a fee.

Impact of the Redesign

Since the road narrowing, sidewalk widening, and aesthetic improvements, Atlantic

Avenue now has outdoor cafes, shops, and other smaller-scale businesses as well as a new

museum, theater, and meeting hall.

The tax roll value in the CRA increased from $250,000,000 in 1985 to $1.2 billion in 2005,

and vacancy went from 35 % to 5 %. Over 2,000 new residential units (Figure 4-4) are in

planning or construction phases (CNU Florida, 2006). Assessed property values rose from

approximately $5-$6/square foot to $15-$30/square foot (FHA, 2004.)









The renaissance of Atlantic Avenue was so successful the city is adopting similar

principles for other roads in their master plan. The new master plan calls for a number of

changes to the downtown's roadway system in order to enhance pedestrian safety and improve

traffic circulation. One goal is to convert the conversion of the one-way pair bypass system into

two-way traffic; the narrowing of the downtown highway pairs from three to two lanes; the

slowing of traffic; widening of sidewalks; and the creation of a "gateway feature" for vehicles

that enter the downtown area from 1-95.

Clematis Street: West Palm Beach, Florida

History and Context

West Palm Beach has always been a city that stood in the shadow of its glitzy neighbor to

the east, Palm Beach. Palm Beach is one of the richest cities in the country, but its residents very

rarely cross the bridge into the less well-to-do county seat, West Palm Beach. Clematis Street is

the east-west spine of historic West Palm Beach and was once a bustling center of commerce and

vitality (Figure 4-5).

Wealthy residents and northern visitors would arrive by train at the West Palm Beach train

station, travel by carriage along Clematis Street to the waterfront, and then finally board a ferry

to the island resort of Palm Beach. Residents of West Palm Beach that were employed by

wealthy residents of Palm Beach, such as groundskeepers, house maids, nannies, and cooks, also

made the daily trek down Clematis to the ferry. Clematis Street served as the vital connection

between the cities of Palm Beach and West Palm Beach and the rest of the world.

After the construction of a causeway to Palm Beach and the completion of the interstate

system, Clematis Street lost its vital geographic importance. Clematis Street and West Palm

Beach declined even further in the 1970s and 1980s and reached a low point when the drug

dealers and prostitutes of Clematis Street were featured in the 1993 PBS documentary "Crack









America." Vacancy in downtown was 85 % and property values were as low as $10 per square

foot. Clematis Street, the historic east-west route through downtown, was a one-way, four lane

road with signalized turn lanes that cut through the historic heart of downtown.

Implementing the Redesign

In 1989, the City of West Palm Beach only had $12,000 in the bank and faced a declining

tax base (PPS 2006). Facing bankruptcy, city leaders started a revitalization effort focused on

improving the financial situation of the city. Mayor Nancy Graham and transportation planner

Ian Lockwood started the initial revitalization by focusing on traffic calming and design

standards for the downtown and a Tax Increment Financing (TIF) district was created to reinvest

tax money to improve Clematis Street. In conjunction with the traffic calming and pedestrian

amenities, facade improvements financed 50-50 by business owners and the city focused on

improving the visual character of the street. One of the first built projects was Centennial

Square. The square is built at the intersection of Clematis Street and Narcissus Street and serves

as the centerpiece of block parties held every week on Clematis Street.

Design Elements

Traffic calming, as practiced in West Palm Beach, is about "changing behavior," says

Lockwood (Pollock, 1998). "We don't close any streets- that's not part of the equation. We don't

do route modifications either, such as prohibiting turns. Rather, the changes improve pedestrian

access, safety, and quality of experience. It's about building community," says Lockwood.

Clematis Street was converted from a one-way four lane road into a two way road with

pocket parking on both sides. At intersections, the sidewalks "bulb out" to slow traffic, give

pedestrians a better view, and reduce the amount of roadway a pedestrian has to cross. Attractive

benches, street lights, and decorative paving patterns were added and sidewalks were widened to

11 feet (Figure 4-6).









Traffic terms such as "local," "collector," and "arterial" are no longer used. Since

transportation is being planned to serve land use, instead of vice versa, the relevant measures

become the distance between buildings, the number of pedestrians using the corridor, and the

quality of the trip (Pollock, 1998).

Traffic calming islands were added to residential neighborhoods. The islands jut out

from the side of the road and force cars to slow down to negotiate an "S" turn. The lanes are as

narrow as nine feet, but still accommodate emergency vehicles and garbage trucks.

Zoning is no longer designated by use, but rather by building type. Four categories are

employed to denote overall size, ceiling height, setback, and other parameters. All buildings

must be between two to five stories. The new approach is intended to result in more flexible

building types that are able to evolve over time and to serve multiple uses.

Impact of the Redesign

The revitalization of Clematis Street sparked the creation of the $600 million CityPlace

project, a 72 acre mixed-use development with 600,000 square feet of retail space and 620

residential units that opened in the mid 1990s (Figure 4-7). New developments in the

construction and planning stages will add 8,000 residents to downtown in the next four years.

The Clematis Street project cost $1.8 million in 1991; by 2001, private-sector reinvestment

downtown has reached $500 million (excluding City Place). TIF revenue generation is $5 million

annually, giving the City of West Palm Beach the ability to reinvest in the central city or to

subsidize alternative urban initiatives (Project for Public Spaces, 2001). The city's master plan

intends to convert each branch of U.S. 1 from one-way streets to two-way streets. The idea is to

slow down traffic and create a "livable" city street rather than have cars speed through the city.

The weekly block parties at Centennial Square, located at the eastern terminus of Clematis

Street, draw between 3,000-5,000 people every Thursday night.









West Palm Beach now takes the upper hand in negotiations with developers and has

learned to say "No." If a private enterprise will not conform to the design elements of the master

plan, it is invited to take its business elsewhere.

Octavia Boulevard: San Francisco, California

History and Context

Octavia Boulevard in San Francisco is the first true multiway boulevard to be built in the

United States in almost 80 years. Octavia Boulevard has all the elements of a true multiway

boulevard--it contains multiple roadways that separate local and regional traffic, it has

landscaped medians separating the roadways, and it is flanked by wide sidewalks. The

boulevard stretches for four blocks through the center of San Francisco (Figure 4-8).

Although it is only a few months old, neighborhood and city residents are very pleased by

the aesthetic quality of the boulevard and its ability to handle large amounts of traffic at

relatively quick speeds. Local traffic is accommodated by the outer roadways and regional

traffic traveling to and from the Central Freeway is carried on the middle roadway. There is

almost unanimous consensus that the boulevard is a remarkable addition to the city, although it

came after years of debate about the design.

The history of Octavia Boulevard starts in the 1950s when the Central Freeway was built

in the Civic Center neighborhood near downtown San Francisco. The freeway was originally

built to connect Interstate 80 in the southeastern part of the city to the Golden Gate Bridge in the

northwest. The Central Freeway was just one of many highways planned to bisect the city and

improve traffic flow; the California Department of Highway's plan for San Francisco was

modeled after Los Angeles (San Francisco CityScape, 2006).

In 1959, the first segment to open was a mile long stretch that ran from 1-80 to Franklin

and Gough Street (San Francisco CityScape, 2006). Before any new segments could be built,









there was a freeway revolt in San Francisco, the first of its kind in the country. The Bayshore

Freeway (101) and the Southern Freeway (1-280) were built without much controversy.

However, the Central Freeway was met with strong resistance because it was planned to cut

through many of the city's residential neighborhoods. Also in 1959, the San Francisco Board of

Supervisors voted 6-5 to cancel the rest of the Central Freeway project.

For several decades the freeway spur remained an underused eyesore in the middle of a

residential neighborhood. Then on 1989, fortune or misfortune, depending on how one perceives

events, struck San Francisco. The Loma Prieta earthquake caused extensive damage to the city

but was the catalyst in the long process that ultimately created Octavia Boulevard. The

earthquake damaged the double decked Central Freeway; the section north of Fell Street was so

severely damaged that it was torn down. Elsewhere in the city, the earthquake also damaged the

double-decked Embarcadero Freeway along the city's bayfront. The freeway was demolished

between 1991 and 1993 and replaced with a six lane boulevard complete with a streetcar line that

runs in the median (San Francisco CityScape, 2006).

Implementing the Redesign

The redesigned Embarcadero proved so popular that residents pushed for a similar design

for Octavia Boulevard. In 1995, a city task force began to examine the possibility of replacing

the remaining section of the Central Freeway with an at-grade multiway boulevard. In 1997, a

measure to rebuild the Central Freeway passed. The measure was repealed in 1998 when voters

passed a measure to replace the damaged expressway with an at-grade boulevard (Jacobs et al.,

2002). The fight finally ended in 1999 when yet another pro-freeway measure lost to a pro-

boulevard counter-measure. Accompanying the pro-boulevard measure were images and

graphics showing what the boulevard would actually look like.









Design Elements

Octavia Boulevard's right of way is 133 feet, significantly smaller than the freeway it

replaced. The western sidewalk is 15 feet wide; the eastern sidewalk 12 feet wide. The access

roads are 18 feet wide- one ten-foot lane for travel and one eight-foot lane for parallel parking

(Figure 4-9). Since there was not enough room for a dedicated bike lane, bikers share the access

roads with the slow moving local traffic (Figure 4-10). In a critique of the post construction

Octavia Boulevard, Elizabeth MacDonald, one of Octavia Boulevard's designers, now says the

18 foot wide access roads are too wide, a narrower access lane would have contributed more to

traffic calming (Macdonald, 2006). A nine-foot wide median separates the access road from the

travel roadway with trees spaced 20 feet apart on center. The center roadway has two lanes of

traffic, each 11-foot wide, in each direction. An eight-foot wide center median separates the two

travel roadways. The center median is lined with groupings of trees and landscaping. The extra

right of way from the elevated highway is to be used for new housing.

Impact of the Redesign

The completion of Octavia Boulevard reconnected the Hayes Valley Neighborhood that

was divided by the double-decked Central Freeway. The new boulevard carries roughly the

same amount of traffic as the old Central Freeway, but it does it in a way that does not disrupt

the neighborhood. The extra land means that 22 new parcels can be built on. Plans call for over

1,000 new residential units and new retail and commercial space (San Francisco Beautiful, 2005;

York, 2004). Impacts on surrounding property values are too early to analyze because the road is

only several months old at the time of this writing.





















+


Figure 4-1. Atlantic Avenue, Delray Beach, Florida.





















Figure 4-2. Atlantic Avenue before the redesign. Source: Project for Public Spaces
http://www.pps.org/great_public_spaces/.


Figure 4-3. Atlantic Avenue after the redesign. Source: Photographs by the author.


Figure 4-4. New residential construction following improvements to Atlantic Avenue. Source:
Photograph by the author.


L111









































I Mlles


Figure 4-5. Clematis Street, West Palm Beach, Florida.




56



























Figure 4-6. Clematis Street after the improvements. Source: Photographs by the author.


Figure 4-7. CityPlace, sparked by the Clematis
Urbanism, http://www.cnu.org/.


Street revitalization. Source: Congress for New


- ... W- -

















SAN FRANCISCO


Figure 4-8. Octavia Boulevard in San Francisco, CA.


I5' r t4 22' 8 22 IB.
133'

Octavia Boulevard: section
Apprncxxt scaje: I"N= 5V or 1MO


Figure 4-9. Octavia Boulevard cross section. Source: Jacobs et al., 2002; 242.























Figure 4-10. The side access road. Source: Jacobs et al., 2002; 242.









CHAPTER 5
PROPOSAL

This section will discuss the redesign of Kennedy Boulevard as a multiway boulevard by

exploring the literature review in light of the case studies. The first part of this section will

examine the type and route of a mass transit system that may be built in Tampa. Special

consideration will be given to the overall context of the surrounding area and provide the

justification for a mass transit system. The next section will discuss the digital 3D model and

will include schematics and site plans of the redesign. The final section will study how the

redesign can be implemented and the obstacles that may be faced if the project is built.

Kennedy Boulevard Redesigned

Currently, the Kennedy Boulevard right of way is 100 feet wide. There are three 12-foot

wide travel lanes in each direction separated by an 18-foot wide space that contains a six-foot

wide median and 12-foot wide alternating turn lane. Six-foot wide sidewalks flank each side of

the roadway; only in a few places is there a grass median that separates the sidewalk from the

traffic. Building setbacks range from six feet to over 100 feet; most of the building setbacks are

60 feet (Figure 5-1).

To redesign Kennedy Boulevard as a true multiway boulevard, the proposed total width

from building to building would be 142 feet. Two 11-foot wide travel lanes would travel in each

direction and an eight-foot wide median would separate the travel lanes from the pedestrian

realm. The access roads would be 16.5 feet and accommodate one lane of parallel parking and

one travel lane. Twelve foot sidewalks would line each of the access roads and buildings would

be brought up to the sidewalk (Figure 5-2).

In order to accommodate the redesign, approximately 21 extra feet of right-of-way would

have to be bought from private landowners along the corridor. Implementation and financing









will be discussed in more detail in another section. Because the building setbacks are so great,

the only land that would have to be acquired is land that already is being used for automobile

storage and circulation in the form of parking lots. Only a few buildings along the corridor are

within the needed 144 feet.

The centerpiece of the redesign is the light rail line that runs in both directions down the

center median (Figure 5-3). The dedicated transit-way is 25 feet wide which is the width of the

double tracked streetcar tracks that currently run through parts of the Channelside district in

Tampa. Tampa's current streetcar system would be integrated into the regional light rail system;

vehicles on both systems would be interchangeable.

At the light rail stops along Kennedy Boulevard, the dedicated transit-way will be enlarged

to create more space to accommodate the platforms and pedestrians (Figure 5-4).

The rail line would cross as few roads as possible to improve efficiency. The only

intersections the rail line would cross would be at Dale Mabry Highway, Lois Avenue, and

Westshore Boulevard. The transit-way would be built slightly above the road bed and be built

with brick pavers or stained concrete to delineate the realm of the transit-way. Bollards, lights

posts, or utility poles for the overhead electrical system for the light rail would separate the

transit-way from the travel lanes.

The travel lanes on Kennedy Boulevard would be reduced from three lanes to two and the

lanes narrowed to 11 feet. FDOT is more likely to approve the project if the lanes are at least 11

feet (Roarke, 2006). Minor intersections and driveways would be eliminated to improve the

traffic flow of the road. The main objective is to channel local traffic onto the access roads.

Local traffic enters the roadway and only drives a few blocks before turning off but in the

process slows down traffic when it enters and exits the roadway. By using the access roads,









local traffic could still flow, but without interrupting the higher speed regional traffic. The

elimination of 10 driveways and/or intersections per mile will increase speed by three miles per

hour (Roarke 2006). The elimination of minor intersections and driveways would mitigate the

increased congestion resulting from narrowing of the travel way from three lanes to two lanes in

each direction. Eliminating minor intersections and driveways will also decrease the chance of

rear end vehicle collisions that occur when vehicles pull out onto a high speed road. The only

intersections at which vehicles on the travel way would be able to turn left or right would be

major intersections (Lois Avenue, Dale Mabry Highway, and Westshore Boulevard; Figure 5-5).

An eight-foot wide median would separate the middle roadway from the access road. An

eight-foot median is generally accepted as the standard minimum width required to support

shade trees. It is important that the median be continually lined with trees, preferably native

shade trees, to delineate the separation of the high speed traffic roadway from the slower, quieter

pedestrian realm (Figure 5-6).

The pedestrian realm would have 12 foot sidewalks and buildings would be required to

front the road and be built with zero setback. The access roadway would accommodate local

traffic and provide parking for businesses along Kennedy Boulevard.

The building height to width ratio is an important element that is needed to create a sense

of enclosure of the street space. A building height-to-width ratio of one to three is considered

acceptable (Nelessen, 1994) to create a sense of enclosure. The total width of the redesigned

Kennedy Boulevard corridor is 144 feet; using a ratio of one to three means the buildings should

be 50 feet tall (four to five stories).

Alternative Redesigns

The first alternative is very similar to Kennedy Boulevard as it currently exists (Figure 5-

8). There are no side access lanes or transit in this alternative. The central median would have









two rows of street trees that give way to turning lanes at intersections. The sidewalks would be

widened to 12 feet and have a row of street trees.

The second alternative is similar to the preferred redesign except that the transit vehicles

run on the outside lane of the central roadway (Figure 5-9). An advantage to this design is that

transit riders do not have to cross the busy central roadway to get to a transit stop. However, the

transit vehicles would travel slower because of the potential conflicts where it crosses the access

road and central roadway returns.

The third alternative (Figure 5-10) is also a 145 foot wide boulevard much like alternative

two. Instead of transit running on the outside lane of the middle roadway, the transit is moved to

the side access roads. An advantage to this is that transit riders do not have to cross the middle

lanes of high-speed automobile traffic. However, the transit vehicles will move slower because

they share the side access road with automobile traffic, bicyclists, and pedestrians.

A Rail System for Tampa

In order to accommodate a large population increase the Tampa Bay area is planning for a

regional rail system. The Tampa light rail system will connect the regions major destinations.

The first phase of the 26 mile system will connect the University of South Florida (USF), Ybor

City, Downtown, the Westshore Business District, and Tampa International Airport (TIA). A

preliminary route is shown in Figure 5-11. The route connecting the USF to Ybor City and

Downtown will run along existing freight rail tracks. The segment connecting Downtown

Tampa to TIA via the Westshore Business District will run on a newly built rail bed. Long range

plans have not identified a definite corridor for this segment, but the original light rail plan

proposed by HART line call for the rail line to run along Cypress Street.

In order for mass transit to be effective, it must link together major destinations. While the

Tampa rail system will connect most of the regions major destinations, it does leave out some









destinations such as Westshore Mall, much of the Westshore Business District, and the Kennedy

Boulevard retail corridor (Figure 5-12).

The three possible alignments for the light rail system as it travels through this part of

Tampa are: the 1-275 alignment; the Cypress Street alignment; and the Kennedy Boulevard

alignment. There are economic, social, and design ramifications for each of the three alignments

(Table 5-1).

1-275 Alignment

The 1-275 alignment would start in downtown Tampa and run west out of downtown on

existing CSX tracks. Immediately after crossing the Hillsborough River, the route would run

north on North Boulevard for four-tenths of a mile to 1-275. From there, the route would run

west on 1-275 in the center median for three and a quarter miles to Trask Street. At Trask Street,

the route would turn north and head toward International Plaza Mall and TIA.

The 1-275 alignment takes advantage of the already existing public right of way of 1-275.

No new land would have to be bought because the land is already publicly owned. This type of

alignment is what is found in Chicago in which the 'El' trains run in the center median of the

interstates in the outlying parts of the city. The interstates are built slightly below the

surrounding areas, in a sort of large ditch. Station entrances are located above the interstates at

the street level, and escalators take passengers down to the platforms (Figure 5-14). A downside

to an alignment like this is higher infrastructure costs (due to complex stations) and the

inhospitable pedestrian environment due to the noise and fumes of highway traffic just feet

away.

In Tampa, the interstates are at the same level of the surrounding landscape. The local

streets go under the interstate, so the station configuration would be slightly different. The 1-275

alignment would cause minimal disruption to nearby businesses and homes; however,









construction would most likely cause disruptions on the interstate temporarily affecting regional

traffic at a large scale.

Cypress Street Alignment

The Cypress Street Alignment would follow the CSX tracks west out of downtown Tampa

to North Boulevard. New track would start at the intersection of North Boulevard and the CSX

tracks and run north for one-tenth of a mile and turn west on Cypress Street. The tracks would

run along Cypress Street for three and a quarter miles to Trask Street where the route would turn

north to International Plaza Mall and TIA.

The Cypress Street alignment is the route HART line selected in their rail study. This

alignment would cut through a residential neighborhood and make transit easily available for

many people. Disruption during construction would be minimal because the area is not heavily

trafficked and has few businesses that would be affected during construction. However, running

the route through a residential neighborhood would likely be met with opposition from the

neighborhood. Currently, the neighborhood consists primarily of single family residential homes

and because transit lines attract commercial development and denser residential development, the

neighborhood would be under pressure to change. Transit stations would induce commercial

demand where there currently is none and market forces would also create a demand for high

density multi-family residential units (Handy, 2005).

Kennedy Boulevard Alignment

Like the Cypress Street and 1-275 alignments, the Kennedy Boulevard alignment would

follow the CSX tracks west out of Downtown Tampa. From the Hillsborough River, the route

would follow the tracks southeast for six-tenths of a mile to Kennedy Boulevard. The new tracks

would run west down the center of Kennedy Boulevard for three miles to Trask Street. Like the









other alignments, the tracks would turn north and Trask Street to the International Plaza Mall and

TIA.

This alignment is the most disruptive to businesses of the three proposed alignments. The

Kennedy Boulevard alignment would also be the most disruptive to traffic patterns because

Kennedy is one of the busiest east-west routes through the city. Also, right-of-way would have

to be bought from businesses to accommodate the additional space the light rail would need.

Buying right-of-way along one of Tampa's busiest commercial streets would cost a lot of money

and make this alignment the most expensive of the three proposed alignments. Although this

alignment would be the most disruptive to business and traffic and cost the most, in the long

term, residents and businesses would benefit the most from this alignment. Kennedy Boulevard

is already lined with office and retail; a light rail line would allow riders to take advantage of the

commercial opportunities along the corridor. In turn, the commercial uses along the road would

also provide a large supply of potential transit users (Table 5-1).

The Kennedy Boulevard alignment would attract more commercial and residential uses

and improve the economic situation for one of Tampa's busiest streets. The light rail line would

create more demand for commercial and retail uses at a higher density. Currently, land along

Kennedy Boulevard is underutilized. Most of the land is used for parking and almost all the

buildings are one story. This alignment would provide workers from Downtown Tampa and the

Westshore Business District a convenient link to the restaurants, retail, and offices on Kennedy

Boulevard. The Kennedy Boulevard alignment could relieve some of the lunch hour traffic by

transferring automobile trips to transit.

Selecting the Correct Alignment

Kennedy Boulevard would be the best option for the rail alignment. Kennedy Boulevard is

already a major commercial corridor in Tampa and the addition of light rail would further









reinforce that strength. Bus lines already operate along the corridor and the large amount of

commercial uses would provide trip generation for a light rail line. The redesign will make

Kennedy Boulevard a destination and mass transit is a key element that is needed to bring people

to the area. Businesses and traffic would be disrupted during construction, but the end benefits

far outweigh the costs. The Kennedy Boulevard alignment would allow businesses along the

corridor to get high visibility from regional traffic.












Table 5-1. Possible Rail Alignments.
ALIGNMENT RIGHT-OF- PEDESTRIAN
WAY COST ACCESS


1-275






Cypress St


Low






Moderate


Kennedy Blvd


DISRUPTION
TO HOMES


Minimal






Severe


Moderate


DISRUPTION
TO
BUSINESSES


Minimal






Minimal


Severe


DISRUPTION
TO TRAFFIC


Severe






Moderate


Severe


POTENTIAL

ECONOMIC


RETURN

Minimal






Some


Most


OTHER


Elevated stations would
significantly increase costs





Rail will induce
commercial and high
density residential in a
neighborhood of single
family homes


Opportunity to create a
connector between
downtown and
Westshore/airport


Commercial/retail to
support transit already
exists





















1"=25'


Figure 5-1. Cross section of Kennedy Boulevard (existing).


I 'z'


Figure 5-2. Kennedy Boulevard Proposed Redesign.


























































Figure 5-3. Kennedy Boulevard Proposal Overview. Existing (top) and after the redesign
(bottom).


.._ ,.. ..



































Figure 5-4. Transit station and pedestrian crosswalk.













TAMPA, FL: KENNEDY BOULEVARD PROPOSAL


LEGEND
Major Roads Minor Intersections
Minor Roads
MinorRoads Transit Station
Major Intersections Signalized Pedestrian Crossing

0 375 750 1,500 2,250 3,000


SF


eet


Figure 5-5. Intersection Designations. Traffic on Kennedy Boulevard will be able to turn left or
right only at the major intersections.


Map prepared by
Andy Mikulski
10/11/06



































Figure 5-6. Major Intersection. The redesigned boulevard at the intersections of Dale Mabry
Highway, Lois Avenue, and Westshore Boulevard.














..............


r.P-,


Figure 5-7. Hubert Street. Minor road intersection before (top) and after (bottom).


WI'.


PIP







































Figure 5-8. Alternative Redesign One. No transit.


.I


Figure 5-9. Alternative Redesign Two. Transit is moved to outside travel lanes.


















75


1

.*C'

























Figure 5-10. Alternative Redesign Three. Transit is located in the pedestrian realm.














POSSIBLE LIGHT RAIL ALIGNMENTS


TAMPA RAIL PROJECT



2U WI nn4


Msfirsam
h~xpwquqnqof w*w-r4-tin 1nfrwt
p~s~ay~Hill ih As




RA %w%Ie'1I SQmrdgm'rO h
C iNec rnr cruaenCI~r; .flf1~.j
b a kuitn SAYG 'ntbnru




Tqt4* $L4RMIa
YOL girillie






EtbAR3hEow dtral kl6
hNA~b rd rqr e0~-rkb





aCF =.ooo nab mS. 5rnw06



_&ti- San UNt m
IIter -A.!t"C~lI IN tirWF WRWICII1S 1jt rjI1b-h ...n=A Ani-a Rro*J..a Itwhiii~ amwiNtrl
I'ceffdnu n 4dmhraurniiiiwi


Figure 5-11. The Tampa Rail System and three alternative routes through the study area. Source: The Tampa Tribune.












MAJOR DESTINATIONS AND RAIL ALIGNMENTS


LEGEND
S 1 TIA 5 Kennedy Blvd Commercial District
2 International Mal ==== 1-275 Rail Alignment
3 Vtstshore Business Distnct ****' Cypress St Rail Alignment
S 4 Vestshore Mall Kennedy Blvd Rail Alignment
0 025 05 1 15 2
i i Miles


Figure 5-12. Major destinations. The Kennedy Boulevard alignment connects more destinations.


N

+L


Map prepared by
Andy Mikulski
10/11/06














1-275 RAIL ALIGNMENT


Major Roads
Rall Route
I- 1-275 Aignment
1/2 Mile Radius
[ Transit Station
0 025 05 1 15 2


Figure 5-13.-275 rail alignment and half-mile radius.

Figure 5-13. 1-275 rail alignment and half-mile radius.


N Map prepared by
Andy Mikulski
S 10/11/06




































Figure 5-14. Highway median station in Chicago. Source: www.utc.uic.edu.












CYPRESS STREET RAILALIGNMENT


--Major Roads
Rail Route
*ii* Cypress StAlignment
1/2 Mile Radius
0 Transit Station
0 025 05 1 15 2



Figure 5-15. Cypress Street rail alignment and half-mile radius.


N

+L


Map prepared by
Andy Mikulski
10/11/06












KENNEDY BOULEVARD RAILALIGNMENT


-- MajorRoads
Rail Route
Kennedy BEdAlgnment
S1/2 Mile Radius
[ Transit Station
0 025 05 1 15 2



Figure 5-16. Kennedy Boulevard rail alignment and half-mile radius.


N

-Si


Map prepared by
Andy Mikulski
10/11/06









CHAPTER 6
DISCUSSION

Implementing the Redesign

Redesigning Kennedy Boulevard as a true multiway boulevard is a radical proposal. Very

few multiway boulevards exist in the United States; there has only been one built in the last 80

years. The redesign goes against traffic engineering standards and will no doubt face opposition

if an effort is made to implement it. However, based on the safety records of existing boulevards

and the successful construction of Octavia Boulevard in San Francisco, there is evidence that

multiway boulevards can be made a reality in the modem era.

Obstacles to the Redesign

The potential obstacles to the redesign are large and plentiful. According to an interview

with a traffic engineer at Reynolds, Smith, and Hills, the Florida Department of Transportation

(FDOT) would oppose the design for several reasons. State Road 60 (FDOT designation of

Kennedy Boulevard) is part of the Florida Highway System. The main objective of the state

highway system is to move vehicles from one part of the state to another in the easiest, fastest

way possible on high capacity, high speed roads. High speed roads do make sense in rural areas,

but they are out of place in urban settings. When a state road enters an urban setting, the context

of the area must be considered.

The first obstacle would be the removal of traffic and turn lanes (Roarke, 2006) and the

reduction of lane width on an already busy road. The travel lanes would be decreased from three

lanes to two in each direction- although a new travel lane for local traffic would be built on each

side of the roadway. The center medians and turn lanes would be replaced with a light rail line;

turn lanes would only be at major intersections. The remaining travel lanes would be reduced

from 12 feet to 10 feet. FDOT technically does allow for 10 foot travel lanes, but they would not









approve a project that made travel lanes that narrow (Roarke, 2006). FDOT would be more

likely to approve the project if the lanes were narrowed to 11 feet.

Another obstacle would be the access roads and their intersections with the main roadway.

The access roads create complex intersections that stand in conflict with design standards that

only allow normal four way or "T" intersections. The multiway boulevard design requires trees

and street furniture to be placed along the roadway. FDOT prohibits "fixed object hazards"

within the designated "clear zone" alongside the roadway which is why state roads lack street

trees and street furniture. There is evidence that streets lined with trees and other street furniture

may actually be safer because they force the driver to slow down (Dumbaugh, 2005).

The largest obstacle would come from the users of Kennedy Boulevard. The goal of this

redesign is to turn Kennedy Boulevard into a destination and bring more people to the area by

encouraging and designing for pedestrians and public transit. However, to do this would require

using eminent domain to acquire right-of-way from businesses. The right of way would only

take land that is currently used for parking; but some business owners would claim the loss of

parking spaces would render their business useless and demand compensation for the entire

property parcel and building (Roarke, 2006).

Overcoming the Obstacles

Instead of trying to get FDOT approval for the project, the city could take ownership of the

road and the State Road 60 designation could be moved to another road in the area, as the city of

Delray Beach, Florida did. The city and FDOT exchanged ownership of two roads. The city

received Atlantic Avenue (the main road through downtown) and in exchange gave FDOT a pair

of one way roads on either side of downtown. This arrangement allowed the city to implement

their road narrowing and traffic calming measures that sparked a downtown renaissance. The









city did not have to worry about meeting FDOT standards or gaining waivers through a lengthy

review process.

If the city did take ownership of Kennedy Boulevard, an alternative designation for State

Road 60 would have to be found. The state highway system must be continuous and the state

roads must start and end at another state road. There are three alternative routes for State Road

60: Cypress Street, Columbus Avenue, and 1-275 (Figure 6-1).

The 1-275 designation is the preferred designation because it would be the easiest to

accomplish and cause the least amount of disruption to the city. The travel lane dimensions and

shoulders on the interstate meet or exceed FDOT standards for state roads. One disadvantage

would be that FDOT would lose a major surface road through the city of Tampa and additional

traffic would be put on 1-275.

The Cypress Street and Columbus Avenue designations are the least preferred because

they would cause the most disruption. Lanes and shoulders on both roads would have to be

reconfigured and the new design would ruin the character of the surrounding neighborhoods.

FDOT has much power and control over state roads that run through cities, but the cities

themselves are a major influence (Roarke, 2006) on the design and function of state roads that

pass through their cities. If the city wanted to implement the redesign, the city would have to

take the lead. The head of the city's transportation department would act as the advocate for the

city's plans and work with FDOT. FDOT would have to make many exceptions for reducing the

number of travel lanes, reducing the lane width, slowing the speed of traffic, building access

roads, and placing street trees and street furniture in the clear zones. The review process would

take much time and increase the cost of the project.









The complex intersections on multiway boulevards go against today's traffic engineering

standards. This does not necessarily make them unsafe; after a short time drivers will learn and

adapt to the new intersections. At the intersections, priority is given to traffic in the through-

going realm, then to the cross streets, and finally to traffic on the access roads. The intersections

can be controlled by stop signs, traffic signals, or a combination of both (Figure 6-2).

There is not enough public right-of-way along Kennedy Boulevard to construct the

redesign. There is currently 100 feet; a 144 foot right-of-way is needed to implement the

redesign. Purchasing the additional right-of-way would be very costly, and some land owners

would object; using eminent domain to obtain the additional 21 feet on each side of the roadway

would result in delays and lengthy court battles. Instead of buying the right of way, the city

could create a design overlay district or a special zoning district to manage development. Since

the additional 21 feet would be used for the access roads and sidewalks, the city could create

design guidelines that would ensure the creation of uniform and connecting access roads and

sidewalks. The city already has setback requirements and parking lot standards; these can be

manipulated to create the side access roads and sidewalks without buying additional right-of-

way.

Effects on Traffic

The proposed redesign calls for removing one lane of through-going traffic which will

affect the traffic dynamics of Kennedy Boulevard. An access lane on each side of the roadway

will alleviate some of the traffic; however, the traffic volume and speed on the access road will

be much less than the through-going lane. Traffic projections obtained by the FDOT shows

vehicular traffic growing each year. With the removal of the through-going lane and the

additional vehicles each year, traffic congestion on Kennedy Boulevard will increase. The

removal of roadway capacity on Kennedy Boulevard will disperse traffic on other roads in the












area. The light rail system would absorb some roadway users and mitigate some of the traffic


effects. Exactly how many people switch to light rail is unclear, but the faster and more efficient


the rail system, the more riders it will attract and therefore lessen the traffic impact on Kennedy


Boulevard.







ALTERNATIVE SR 60 DESIGNATIONS


LEGEND
Current SR 60 Designation
I. 1-275 Designation
-- Cypress St Designation
-c-e ColumbusAve Designation
C 0375 0 75


15 225 3


N


i i Miles


Figure 6-1. Alternative routes for SR 60 designation.


Map prepared by
Andy Mikulski
10/11/06










Narrow medians





Wide medians


Stop sign or signal
Sto ---
Stp sign I
Sor signal


Stop Sign original

V >
.ign ti t n "

-C-





,,n f -:w-" ,s^'^^,
IF,7


Figure 6-2. Intersection traffic control. Source: Jacobs et al., 2002; 230.





















88









CHAPTER 7
CONCLUSION

An urban arterial can be transformed into a multiway boulevard. The construction of

Octavia Boulevard in San Francisco is an example of how a multiway boulevard can be built in

the contemporary environment. The boulevard was built after years of debate between the city,

neighborhood activists, and the California Department of Transportation. Octavia Boulevard is

less than a year old, so economic and social effects are not yet clear. However, area residents are

very pleased with the reconstruction and over 2,000 new residential and commercial units are

planned along the new four-block boulevard.

The questionnaire results clearly show that Tampa residents are dissatisfied with the

current aesthetic condition of Kennedy Boulevard. The cases of Clematis Street in West Palm

Beach and Atlantic Avenue in Delray Beach prove that traffic calming and pedestrian

enhancements can revitalize an area both aesthetically and economically. In Delray Beach, the

revitalization of Atlantic Avenue has spilled over an area several blocks on both sides of the

road.

The redesign would eliminate a travel lane in each direction and the center median and turn

lane would be replaced by a light rail system. There would be eight-foot wide medians on each

side of the central roadway to separate the through-going realm from the pedestrian realm. The

pedestrian realm would be made up of an access road and a lane for parallel parking; the access

road would accommodate slow, local traffic as well as pedestrian and bicycle traffic. Sidewalks

would be widened to 12 feet and new buildings would be required to front the sidewalk. A

multiway boulevard is the best solution to improve the aesthetics and pedestrian realm of

Kennedy Boulevard while still accommodating large amounts of automobile traffic.









The removal of a traffic lane in each direction would impact traffic; how much is unclear.

Ideally, the addition of the light rail system would make up for this loss of a lane, but it is

unknown if the rail system would gain a significant share of "choice riders" (those who have a

car but opt for transit).

Recommendations for Future Research
Recommendations for future research are an analysis of the contextual area; traffic impacts

of the redesign; and building typology and density. The redesign of Kennedy Boulevard is a

radical change from the existing situation and would affect the surrounding areas. Surrounding

building typology and architecture should be considered when designing buildings along

Kennedy Boulevard to create a link between the boulevard and the side streets. As the area

becomes denser and more commercialized, land values would presumably rise so an analysis of

the area is needed to understand how the surrounding neighborhood would be impacted.

Research should be conducted to determine the ideal residential and commercial density needed

along Kennedy Boulevard to support the light rail line.










APPENDIX A
QUESTIONNAIRE

Informed Consent
Protocol Title: The Design Elements Needed to Create Pedestrian-Friendly Environment

Please read this consent document carefully before you decide to participate in this study.

Purpose of the research study:

The purpose of this study is to identify what elements people desire in a pedestrian-oriented environment.

What you will be asked to do in the study:

You will be asked various questions about Kennedy Boulevard in Tampa, Florida.

Time required:

5 minutes

Risks and Benefits:

There are no risks associated with this survey. We do not anticipate that you will benefit directly by participating in
this survey.

Compensation:

There is no compensation for participation in this survey.

Confidentiality:

Your identity will be kept confidential to the extent provided by law. Your responses will remain anonymous.

Voluntary participation:

Your participation in this study is completely voluntary. There is no penalty for not participating.

Right to withdraw from the study:

You have the right to withdraw from the study at anytime without consequence.

Whom to contact if you have questions about the study:

Andy Mikulski, Graduate Student, Department of Urban and Regional Planning, 431 ARCH Building, Gainesville,
FL 32611, (352)-392-3261, amikul3@ufl.edu

Whom to contact about your rights as a research participant in the study:

UFIRB Office, Box 112250, University of Florida, Gainesville, FL 32611-2250; ph 392-0433.









Agreement:

I have read the procedure described above. I voluntarily agree to participate in the procedure and I have received a
copy of this description.

Participant: Date:

Principal Investigator: Date:


1. How often do you come to Kennedy Boulevard?

4-5 days a week
2-3 days a week
Once a week
Less than once a week

2. Why do you usually come to Kennedy Boulevard? (Circle all that apply.)

Use shops/services
Dining
Visit friends
Walk/stroll
Use the bus
Work
Live along Kennedy Boulevard
Pass through on the way to another destination

3. How do you usually get to Kennedy Boulevard? (Choose one.)

On foot
Bicycle
Bus
Car
Other

4. Degree of satisfaction of Kennedy Boulevard:

On a scale of 1 (Very Satisfied) to 5 (Very Dissatisfied), rate your satisfaction of different
elements on Kennedy Boulevard.

Very Somewhat Neither Satisfied Somewhat Very
Satisfied Satisfied Nor Dissatisfied Dissatisfied Dissatisfied

Safety
(crime) 1 2 3 4 5









Very Somewhat Neither Satisfied Somewhat Very
Satisfied Satisfied Nor Dissatisfied Dissatisfied Dissatisfied
Aesthetic/
appearance 1 2 3 4 5

Landscaping 1 2 3 4 5

Retail shops 1 2 3 4 5

Bus service 1 2 3 4 5

Open space/
parks 1 2 3 4 5

Parking
availability 1 2 3 4 5

Community
services 1 2 3 4 5

Ability to
walk/bike 1 2 3 4 5

5. What are the three biggest problems along Kennedy Boulevard? (Please number your
answers; 1 being the biggest problem.)

Traffic
Appearance (ugly buildings/lack of landscaping)
Crime
Inconvenient (lack of transit/parking)
Other

6. What five changes would you like to see along Kennedy Boulevard? (Please number your
answers; 1 being the most important.)

Safer
Better aesthetics (landscaping, street furniture)
Cleaner
More shops/services
More community feeling
Wider sidewalks
Bicycle lanes
Less traffic
Better transit (light rail/streetcar line)
Different mix of uses
More housing
Parks/playgrounds









Other


7. What kinds of shops and services would you like to see along Kennedy Boulevard? (Please
number your top five answers; 1 being the most important.)

Neighborhood retail
Food market
Restaurants/cafes
Theaters
Department stores
Hardware store
Recreation
Community services
Discount stores
Bookstore
Other

8. How often do you use public transportation?

Every day
4-5 days a week
2-3 days a week
One day a week
Never

9. Do you use public transit to:

YES NO
Go to work
Go shopping
Visit friends
Attend sporting events/leisure activities

10. Why do you drive instead of using public transportation? (Please number your top three
answers, 1 being the most important)

Stigma of public transportation
Public transportation fares are too high
Public transportation is unreliable
Public transportation is not convenient to my home, work, and shopping
Public transportation takes too long

11. What three things would make you use public transportation along Kennedy Boulevard?
(Please number your answers, 1 being the most important.)

More frequent









More stops
Faster service
Convenient to home, work, and shopping
Cheaper fares
Cleaner air
Cost of driving increases
Addition of light rail or streetcar service





APPENDIX B
VISUAL INVENTORY OF KENNEDY BOULEVARD
i


L I&.- 12r--









APPENDIX C
PHOTOSIMULATIONS


Figure C-1. Minor road intersection before (top) and after (bottom).































Figure C-2. Parking and Pedestrian realm. Grady Avenue before (top) and after (bottom).













APPENDIX D
TRAFFIC COUNTS AND PROJECTIONS


Print Date: June 30, 2006 Florida Department of Transportation
Transportation Statistics Office
Annual Vehicle Classification Report
Count Year 2004
County: 10 HILLSBOROUGH

Sit: Roadway ID: MilePoint AADT Description:
5141 10270000 1.63 41,000 SR 60/KENNEDY BLVD, EAST OF WESTSHORE BLVD.

Fuae. Class: 14 rrban Other Pnncipal Anenal
Annual Average Dally
SurveyType: P PORTABLE Duranlin(la Days): 2 Volume PAemeata

Class 01 MOTORCYCLES 148 0

Class 02 CARS 36,314 89

Class 03 PICK-UPS AND VANS 3,657 9

Class 04 BUSES 98 0

Class 05 2-AXLE, SINGLE UNIT TRUCKS 439 1

Class 06 3-AXLE, SINGLE UNIT TRUCKS 127 0

Class 07 4-AXLE, SINGLE UNIT TRUCKS 29 0

Class 08 2-AXL TRCTR W/ 1 OR 2-AXL TRLR, 3-AXL TRCTR W/ 1-A 86 0

Class 09 3-AXLE TRACTOR W/ 2-AXLE TRLR 70 0

Class 10 3-AXLE TRACTOR W/ 3-AXLE TRLR 8 0

Class 11 5-AXLE MULTI-TRLR 0 0

Class 12 6-AXLE MULTI-TRLR 0 0

Class 13 ANY 7 OR MORE AXLE 21 0

Class 14 NOT USED 0 0

Class 15 OTHER 0 0

41,000 100











Summary Daily Statisis
Dally Des lg Hour
24T&B = 2.15 DHT = 1.07
24T = 1.90
24H = 0.83 DH3 = 0,42
24M = 1.31 DH2 = 0,66

Class: Passenger Vehlcle 01-03. Truck and busss 14- 3, Trucks 05-13, Medium Trucks 04-05, Heas) Trucki 06-13
* The Totals for Volume and Percentage are rounded, Page: 1













Print Date: June 30, 2006


County: 10-


HILLSBOROUGH


Sit: RoadwayID: MilePoint
5139 10270000 2.75

Fun. Class: 14 Urban Othe

SurveyType: P PORTABLE


Florida Department ofTransportarion
Transportation Statistics Office
Annual Vehicle Classification Report
Count Year 2004


AADT Description:
29,500 SR 60/KENNEDY BLVD.E OF SR600./S92'DALE MABRY BLVD


r Principal Arterial


Annual Average Duil)
Volume Percentage


Duration(In Days): 2


MOTORCYCLES

CARS

PICK-UPS AND VANS

BUSES

2-AXLE, SINGLE UNIT TRUCKS

3-AXLE, SINGLE UNIT TRUCKS

4-AXLE, SINGLE UNIT TRUCKS

2-AXL TRCTR W/ I OR 2-AXL TRLR, 3-AXL TRCTR W/ I-A

3-AXLE TRACTOR W/ 2-AXLE TRLR

3-AXLE TRACTOR W/ 3-AXLE TRLR

5-AXLE MULTI-TRLR

6-AXLE MULTI-TRLR

ANY 7 OR MORE AXLE

NOT USED

OTHER


89

23.638

4,269

189

593

83

41

127

121

80

0

0

50

0

218

29,500


Summary Daily Sutistes
Daih Design Hour
24T&B = 4.36 DHT = 2.18
24T = 3.72
24H = 1.71 DH3 = 0.85
24M = 2.65 DH2 = 1.33


Page: 1


0

80

14

1

2

0

0

0

0

0

0

0

0

0

1

100


Classes: Passenger Vehicles 01-03, Truck and Busses 04-13, Trucks 05-13, Medium Trucks 04-05, Heavy Trucks 06-13
* The Totals for Volume and Percentage are rounded.


-----


- ----- ----- -- ----- -------- --~---~- --- -- -