The Use of computer technology on the implementation and development of project-specific safety programs

University of Florida Institutional Repository
xml version 1.0 encoding UTF-8
REPORT xmlns http:www.fcla.edudlsmddaitss xmlns:xsi http:www.w3.org2001XMLSchema-instance xsi:schemaLocation http:www.fcla.edudlsmddaitssdaitssReport.xsd
INGEST IEID E20110113_AAAABR INGEST_TIME 2011-01-13T13:46:41Z PACKAGE UFE0006280_00001
AGREEMENT_INFO ACCOUNT UF PROJECT UFDC
FILES
FILE SIZE 36370 DFID F20110113_AABENJ ORIGIN DEPOSITOR PATH lewis_c_Page_87.pro GLOBAL false PRESERVATION BIT MESSAGE_DIGEST ALGORITHM MD5
5027309104e885fff865205714777064
SHA-1
41a15981725a7abeb571b13111888c2d9c387ec4
5552 F20110113_AABEMU lewis_c_Page_02.jp2
27b3068a67868f51ea374e46cb6566d2
f50df3f20a1c39c80623eba05d51b0ea764a2019
1053954 F20110113_AABENK lewis_c_Page_38.tif
c9f57f32b8b8db769b28753ff07e7ccd
ac9b108a6eb3cca3acb3fdd56f1f5f0b10ae4cc1
38898 F20110113_AABEMV lewis_c_Page_55.pro
e628d8c04eb7775abf5231cdc90e2069
21b66500fa0cf480c9ee113a4d8436eacc1ea558
F20110113_AABENL lewis_c_Page_02.tif
02309d8baa0322b36b2c63a9a3a023a7
b34f6b2f5ffd12cf451be4fcea90dce742003460
1315 F20110113_AABEMW lewis_c_Page_53.txt
d13888fdbd3aac32fde6ba646bf49b92
d232d1f0220ee03f348b07be4627451c3bd1c391
55504 F20110113_AABENM lewis_c_Page_38.pro
cb55cc30b8aca675bde858dab561ba6c
a1a347f8f01cb8344e5a752095bd7f5375bc1b60
204226 F20110113_AABEMX lewis_c_Page_31.jpg
84ce11490049debd2f8ce854a32a4226
26bbb59cf9cd2b0570b34b101de8904ce5e5ff84
63194 F20110113_AABEOA lewis_c_Page_24.pro
7626148a5c881cde3c98f01fa98e60e4
2c1ed27244a1b46db7c7a8fed93581c764778169
F20110113_AABENN lewis_c_Page_79.tif
99984500c2f2c3f5b49bec9b21832edd
639328711f88e60fcc402291d36e8a2cc56690fe
30501 F20110113_AABEMY lewis_c_Page_54.pro
0c104e8ec0a1d7e4a37fe9f4f767a811
55edeff9b66f1d871c4d2cfc49ea95b2dca6aa5e
103762 F20110113_AABEOB lewis_c_Page_34.jp2
3903a5d1e55e7a9bb590767800a60d40
6feba0923ccdef13bfdab5754ab543eea9e189cb
2609 F20110113_AABENO lewis_c_Page_19.txt
7887ca11e69729bafda7a1d19b9cd355
676665a4a6740bec9447231629c206a1e69836fa
224543 F20110113_AABEMZ lewis_c_Page_37.jpg
0fe34a8c7be70ff1ee7f04a9e9ed8aa6
df0199314749ca8274b61776e662fb8ad1538ec1
25645 F20110113_AABEOC lewis_c_Page_48thm.jpg
973c9918d558f2a30a41b9e44779eacf
38e8865e58123e8a7cdc598030fd9e9ac3c9b047
F20110113_AABENP lewis_c_Page_71.tif
56e3cf279bc1edca2041bdc65ada837c
298dab2024a66c6d4753cdfe8eb84413c699118c
71203 F20110113_AABEOD lewis_c_Page_27.QC.jpg
35711bf4fb8859dbfd31b4d57e6f76de
e2fb71b8aee2fb3093cf222b9f5dea0aa5fbb23b
52129 F20110113_AABENQ lewis_c_Page_13.pro
2bacd90691c0d2ab84bd755d0d0e7e6f
b726e319533ac5dd30301a94958b3e322112d593
65612 F20110113_AABEOE lewis_c_Page_67.QC.jpg
21a294447c61444e1b216e09e32cc176
72ab37ca49c51f49fe0631c24454f1523199725d
38943 F20110113_AABENR lewis_c_Page_06thm.jpg
ef53dbca0a9ce44c897d725443a6dd83
c39dbeb3edb3e709f142c66f02540b83ac197fa1
1910 F20110113_AABEOF lewis_c_Page_31.txt
b98b87f03f069457f35627c9147f2148
7c262071b14ae711049aa81e61d9bceca49746f8
222709 F20110113_AABEOG lewis_c_Page_49.jpg
4293c82ae93a166a6c4c93e61ef70543
53b9c34e3e8c018ef3624d8785307e88e29bb062
25271604 F20110113_AABENS lewis_c_Page_32.tif
4d31c1096812f9423af0034155a13bc7
d0aabce968b8d878d07a8772b939e7c086c2ae78
55549 F20110113_AABEOH lewis_c_Page_30.pro
b56e126fd993ffd90a3bca14b0ce632e
052dab126088224aacdc0cca396ad19457e18530
187347 F20110113_AABENT lewis_c_Page_81.jpg
fe882b15c9e387b1e0b626960f33dd03
f18d4eda085e9d69437c19f9104330df032f8b87
1999 F20110113_AABEOI lewis_c_Page_79.txt
9b453574b6da17e8a6b8a59fe3a86b80
de361bc76fc3e972cf8e14b9ab2797904f491c7f
F20110113_AABENU lewis_c_Page_88.tif
0ba8634caf64d85b35b37100f631c49e
8f6c2fd9f1d4a206955825e7fa5cf942f7205e80
74317 F20110113_AABEOJ lewis_c_Page_89.QC.jpg
5970a2ce9fa23f926abf2207967356d2
cc497a450dd3f69a3313a25f99a6aa1bf34e664a
F20110113_AABENV lewis_c_Page_13.tif
5208b183b3bc5da2c7f02741809fae5a
358e882b6ffa6759b24946a00e1654537edb9e45
25042 F20110113_AABEOK lewis_c_Page_13thm.jpg
6df17c5f376ffabfef9c4c9cfb0c2d8c
20bb4f907bd11c9920db828cc4cbdcd851d0d9e2
1418 F20110113_AABENW lewis_c_Page_64.txt
f11c9a1f780cccc4abc598f7cdc7a558
cd0ee268e5e0744b22fd644aca7caebf2812e74f
46898 F20110113_AABEOL lewis_c_Page_74.jp2
4be39f96007172a49318ad6a8a794452
763b180ffabec017ca521d739b1486d0faa8ec1d
43325 F20110113_AABENX lewis_c_Page_71.pro
bcc6677fdd0d474e404ca1189fee3de9
617158c6c6be0d8e4c03fd53405df26cd3a55847
232126 F20110113_AABEPA lewis_c_Page_30.jpg
491c2cd9670b4b8eb57945ddc80144df
ed4efdf2b16f74992dff5a9d6e45eecb6c9ee47e
F20110113_AABEOM lewis_c_Page_07.tif
756a1e3e0b792708463a007c775fab35
a05387b462aaa3ebe2c2b71cb261b4751eed3eda
54408 F20110113_AABENY lewis_c_Page_44.pro
0a0f12f18e1d46ee7d9c97fa8fbe3469
da1f603ceaada3c3464f2fa8c1586d64ada79963
F20110113_AABEPB lewis_c_Page_22.tif
f0ce604647e62ab9e25812c81110848c
c959fd1a8c720a7fdb946e05631ef1c65a132ea6
21687 F20110113_AABEON lewis_c_Page_74.pro
bd5fc1823e0669aade61612ac0944b6b
eedde4472f755c4e07773742c17b686a5e1f2c25
24445 F20110113_AABENZ lewis_c_Page_44thm.jpg
a20fb1483fd04c819904752839267046
074da226fa718e69755b36d2a71cd5a0f5b05db8
551 F20110113_AABEPC lewis_c_Page_04.txt
33e39364ed42340fe157445ee5cf6af7
8265161109cbd7264b87d1ab169dba65f326b719
25920 F20110113_AABEOO lewis_c_Page_58thm.jpg
1081daf1eeb9a0ebfdfe37ccdcb72399
9772ea7de26ec6d6813998f7d20f49e9e2c648cb
71931 F20110113_AABEPD lewis_c_Page_50.QC.jpg
2adb380754cad768b90e1e390876c218
c26c8ce01cd0ad2dedfa6818ab01e118871f4fac
21866 F20110113_AABEOP lewis_c_Page_20thm.jpg
91e58b05c08b11e377a537ec88448fab
086693f163ae0eb2b0b8a0e1204b097451ff815d
113458 F20110113_AABEPE lewis_c_Page_13.jp2
67915cead32ca113dc0e1a8e510ecc6f
ddbc3c077047488f97233962feb7d2d4b7444f50
56925 F20110113_AABEOQ lewis_c_Page_39.pro
6243ac68b8bae4130c15d701d3f59598
97ccf39a73a2f6a72f2992b285ea7b208e3ba85f
81199 F20110113_AABEPF lewis_c_Page_78.QC.jpg
6b5de0590458846e9ba8be71b726e28a
f27267f337c4644022ac09a9eaeaa0a6c9684262
111127 F20110113_AABEOR lewis_c_Page_08.QC.jpg
5f877f332c023dd40c72aaa99bec15aa
b24e9bbc1f380b1bb102fb20c422d09f389a06f5
196896 F20110113_AABEPG lewis_c_Page_40.jpg
4cb65ccba89a640a6ee51dbb7025fe0b
3b3eb9956c14d4ce3c14c46248f0b8f7e73db29c
1186 F20110113_AABEOS lewis_c_Page_11.txt
a858cb75d4c2460c00635ed9565535bf
381a09718d8c6846be0817602a0fe729240d17af
28552 F20110113_AABEPH lewis_c_Page_11.pro
3ff6b2aa4941741c4743f7eb44962aa0
fb387ca60bfa825c85198437e8ca555e12947465
44430 F20110113_AABEPI lewis_c_Page_73thm.jpg
4e99754db10949b193c4ce3a9b85c96e
5ee8ea1c553480fe13127a3eb644f85d0e86ca15
188201 F20110113_AABEOT lewis_c_Page_15.jpg
57f08dd76f3195f5f4d8eabd7f53ba77
606b0de50c6db822e4a84c88350b320d0c1ed5e7
117363 F20110113_AABEPJ lewis_c_Page_44.jp2
13d7a7373ac6aa2627d193ae1320f7a4
4b1dbdc6414f0a57f91a7895192e63a9d09e9e02
109645 F20110113_AABEOU lewis_c_Page_23.jp2
60a2818618a4d0b7482fdf6fe0002965
5d34c6a7529cb2a3c7f83fcfebd0cd3489075ddf
F20110113_AABEPK lewis_c_Page_28.tif
dabf22758d0150ba9113a4650c0f89e8
a2ac230ef6c0b7b2d2fe23bc93d5238e2bd7a7e2
165766 F20110113_AABEOV lewis_c_Page_61.jpg
3e4125629e5bf8c4d8e6bedfcecea06d
963dd11bd1001b00b56f9b7ce5b945ef006993bb
46788 F20110113_AABEPL lewis_c_Page_20.pro
c720cc4911c4794d42da2637f7c8c766
7271020ef11240297dcb2e5766c5074aac36243a
62254 F20110113_AABEOW lewis_c_Page_75.QC.jpg
605d7f115d1649901d6db3b952d2d1a3
e0d3368069f29ce7d694f67a00a54d8c10ce8a85
273107 F20110113_AABEQA lewis_c_Page_08.jpg
7e81055ba411a25fff1b27e588b6b5e6
e1c47613581db8ccb1034adff04406164621a1e3
33227 F20110113_AABEPM lewis_c_Page_69.pro
5de55e7c1645f47714bb6522973594eb
618e52c0984af8c2b2a018cf1c14e1d2d90aafb0
42998 F20110113_AABEOX lewis_c_Page_06.pro
f07dbcb7d69c14ba7f5c9f81bcec0835
87ecfb0764a554f1b310956ffbcb73152464f93d
119303 F20110113_AABEQB lewis_c_Page_09.jpg
43f8f05d4eb1f40cf46d573bf40c7d25
e5e0efa341b09fa9f57e3028a81fca9cbf972b12
2007 F20110113_AABEPN lewis_c_Page_82.txt
5491044009a5f2e3ea93c612695ed6a6
1e72417259346c0f0723cfb5c9e428e4dbeec7f2
626766 F20110113_AABEOY lewis_c_Page_53.jp2
f93ce2a6bc8993f6532e1684b83224ca
8ae764e91562e81fd755a27dd4829ec1e400f63c
167398 F20110113_AABEQC lewis_c_Page_10.jpg
57a185ab7a72f9e353158cb1e29b6ee5
4bc7ba0e10d1d6cf779fb9e215fc3f01661d4aad
2070 F20110113_AABEPO lewis_c_Page_22.txt
70749cb69caea2b6df474bc75ae6eb7e
22222d2a14038d31c3c23f9e4791d1899fe65be9
198865 F20110113_AABEOZ lewis_c_Page_34.jpg
41879b5486362378eb310a82852385d8
bd3ce4155d10560a310afc293e91878575c30d3f
123916 F20110113_AABEQD lewis_c_Page_11.jpg
7c68ab1b5b64c97fccbd7db0d7cb5e13
390424041effc61a194c186de3a0d3fc643a43a7
1273 F20110113_AABEPP lewis_c_Page_72.txt
6a1cb6b4066a18e4017322c716591dc0
7c6816d84e3a672de2424c793d2a0494ccda8170
179032 F20110113_AABEQE lewis_c_Page_12.jpg
96ddc1848a069d6b98d10db5e1d109e5
f7685b04be0f5e7e1d755f3224b3b29cf033712c
1874 F20110113_AABEPQ lewis_c_Page_20.txt
88903b18dbdb1149e222d423fee80f76
ec7b8a77fe7cf624b1395230c95075f98b1979d8
214525 F20110113_AABEQF lewis_c_Page_14.jpg
1f86c984675510139d0e63e4ca23fc45
fa9f639faf2ef6388fe393dbedd4d68962fde047
1656 F20110113_AABEPR lewis_c_Page_10.txt
5e49b7c92136d4011081049da0e03f8a
0bba6602b99ae8d7fb787fa72b3c594b82e0424f
209722 F20110113_AABEQG lewis_c_Page_16.jpg
40afd25aaa9a8a99324ad77246ffd787
1ec8e48e09253e0f55a5540ff25d8e3fa217d200
111350 F20110113_AABEPS lewis_c_Page_83.jp2
be39c6b576f9b8ca57bb3a7d9ba1b43c
37433bd5c5294a5750e08df105cbd5efe8f8a7e4
209504 F20110113_AABEQH lewis_c_Page_17.jpg
f68569e11cdea9eaa6605002497f5e57
df215be05f17ea37962a6ee9036a2973ef89b3e6
106767 F20110113_AABEPT UFE0006280_00001.mets FULL
6936a268c7e465ee6162cd35c382a6a1
ecee547b02fbce34daee8d87d128af681a3c289d
172767 F20110113_AABEQI lewis_c_Page_18.jpg
6e5aa4c9ae8cb36bb3337067a33b7c9a
048f0ac1dd199315a5d8911bb316589e78e0bb7d
192711 F20110113_AABEQJ lewis_c_Page_19.jpg
61ab973d0fc4c2e9eec654625e13185c
430f48dda09d8dfb940b9f3ea77f1910b323dfc4
189409 F20110113_AABEQK lewis_c_Page_20.jpg
ec8cecd1e97984fc256131571fe3a113
58bf3cd34fa6343dc98ad66ad7da49de7bacfa3c
212573 F20110113_AABEQL lewis_c_Page_21.jpg
00cefea27ca521b5ab03560ede8eb48a
077f189b751ad48d4d0168d27898284655311c93
61826 F20110113_AABEPW lewis_c_Page_01.jpg
a6cb10d7bd35f5cb1d07b7d05f295156
757e3bcf1c8541b03290dae474b0c2b05f592b79
219469 F20110113_AABEQM lewis_c_Page_22.jpg
bd3f6833452ebb2203809bc85642a8a6
3f7652fbe5995955768a0d191327fb4b96b0377b
62300 F20110113_AABEPX lewis_c_Page_04.jpg
7641e7e7acfaa5455bf246f6c61fed9f
37c02ade0a534d981920b0a5409b8edbb647004d
212458 F20110113_AABERA lewis_c_Page_43.jpg
f3c7f5b67776c5a8d42d6b6b34b5e54d
57642b9fc8a4e606510b474c9d6ca43e279495c0
211583 F20110113_AABEQN lewis_c_Page_23.jpg
1514aad86a4a2e1d04caf8f7f36a5ba8
24e0b3b866168d17080a8869ba25f1e29d1c30e6
171016 F20110113_AABEPY lewis_c_Page_06.jpg
11c93604b37ec0d5866615ff1dce225b
455a97088185f721cc8380d68179f3d27bee94f9
228099 F20110113_AABERB lewis_c_Page_44.jpg
e5dc990f4a934fcc7c09b38bdda29038
c48ada5b0a977f20a96ba89080490b3c136d6e36
251661 F20110113_AABEQO lewis_c_Page_24.jpg
699d739e6744a350a510fcbcaa733f51
e78086a348e4e2113d6a5e3907aa8b50514ae5fc
100137 F20110113_AABEPZ lewis_c_Page_07.jpg
9a96e79a65f072151e5b7bef4913c6c3
6e240af70230891e6123ac4c64deb272760c4d27
223753 F20110113_AABERC lewis_c_Page_45.jpg
7c8d3f12685a40cc498d977560c34191
daa22b9959cb9f9a4b555d57734bc4ea3e230bbc
208603 F20110113_AABEQP lewis_c_Page_25.jpg
944965a01e8af9c80b32e32b8e32f8d1
81d98b809ae8d5df2fb22c563d053fcf9dd20c15
32933 F20110113_AABERD lewis_c_Page_46.jpg
eb602915fa3ed37502d391907800f6e5
59c2e0e86be19b96553dbc7fd022f2114f1fab3f
200661 F20110113_AABEQQ lewis_c_Page_27.jpg
8307ebe09594911b7615a775cc144916
e91ad352095ef671f470f43a2e28cd67a3875234
165699 F20110113_AABERE lewis_c_Page_47.jpg
58d81612abf09d5245ed5b036ccc5dd3
c36bb5c26eaee3c83f23fac03afcee2cc9b1003d
213687 F20110113_AABEQR lewis_c_Page_28.jpg
741743b380fce4ea0ca3f5e11e334c3c
c0064c7c9f658a15a22264c1b7748a95868e663f
189365 F20110113_AABERF lewis_c_Page_50.jpg
8e3f337d131b5c1673a7bca693e8d595
a00cfff7aa314579472f7530d7ce423f0447384a
179517 F20110113_AABERG lewis_c_Page_52.jpg
65a203e63a9ec316e0ac3f5c9d4b79b3
e5b60131dba621037eeaaa6e877cdb8f9fdc2551
217537 F20110113_AABEQS lewis_c_Page_29.jpg
9cd414a00154ecb4ea216a1454ce84c5
c5daf0f66963a071cc894656cbe8803a66eb367f
152801 F20110113_AABERH lewis_c_Page_53.jpg
550ac8069f34c280d2f2697df795ab7e
90339b6b99a2e4733d6d9b1d2494cf0b889bb990
196080 F20110113_AABEQT lewis_c_Page_32.jpg
20f97e9738af8f34761a583dbff2cad7
e70655c06149ac929844e04b2b7e91b32dfc51fe
180483 F20110113_AABERI lewis_c_Page_54.jpg
5b620a2de63b7d23391bca93ee4a81f0
da6f43a25133957a1250e42a633192287a69cc45
191338 F20110113_AABEQU lewis_c_Page_33.jpg
c0be7eb4a525f1265420e7e9425d3efb
b7cdda401f3b183dcabae89b03fc5493932a83e4
191162 F20110113_AABERJ lewis_c_Page_55.jpg
c83761b5c668e1c2b41c8459da15ef77
a8fe351f32c3e9cfa38bd4d45deca0f7385640ca
224332 F20110113_AABERK lewis_c_Page_56.jpg
18d72c9b6d2c833f60bb3ca8f338b748
7b6aaa92994e38c071127d212077381adc5015cc
229871 F20110113_AABEQV lewis_c_Page_35.jpg
de56694196c8c81884dade332efacd4c
abdf79c06aaa953c0353e645d8288eb83fed5a8d
158344 F20110113_AABERL lewis_c_Page_57.jpg
3ef0db69092d17877de9365ec3a9a8dd
056cf555bb40f12c792f71eed8fa9168b0bf40be
206502 F20110113_AABEQW lewis_c_Page_36.jpg
e92a653aea9482c1ca8be041c9848bd0
2ab1029c584a5e0184b31cb90fd0a299e1eef5f2
166365 F20110113_AABESA lewis_c_Page_75.jpg
222e832e48f27bca9f0cca9398ff470f
fafc90a95401db016c3841fb503f2bbf9515a51a
239902 F20110113_AABERM lewis_c_Page_58.jpg
f03134222cfc2d8fa2f483ee18c69908
d9025f7edf03fe20f580b4c161ad4f37cb9cfa1a
230934 F20110113_AABEQX lewis_c_Page_38.jpg
6706822a369b03f90960c61bb4dffb1c
f0389b7d459db6637535e0c56b389b0bf5dc3b2a
208362 F20110113_AABESB lewis_c_Page_76.jpg
22ad29e5fcbfd2a760e850c2ab818e7b
5037498cb2ee890a3aa01b16245f72ca1ae0c8b4
220400 F20110113_AABERN lewis_c_Page_59.jpg
d59ba00f99e158e013df2f1ff1001a5a
e47a2656c4561542864c15e1d8ef2d7be6746df6
208848 F20110113_AABEQY lewis_c_Page_41.jpg
9e3ec6d495d9a33bfce8a8227e12066a
6396c637fc6627741a629f89f0b41d0ebdcbdcfe
215122 F20110113_AABESC lewis_c_Page_78.jpg
e19c2ad84cfd3e86c30c71b3d1b679bc
e1a4999e94e1cf6b80f7a2514593cbde73c5bf9b
219438 F20110113_AABERO lewis_c_Page_60.jpg
cd2a8ad1307cf060ddb8fee3efdd825e
54a2bbbd8630a49b789d03273f6b6b0328eada5a
184289 F20110113_AABEQZ lewis_c_Page_42.jpg
6cde36b567af3d59a52b0d553b177fdb
89e4779f13a6f60aa618827e605c7704e9800fe3
214912 F20110113_AABESD lewis_c_Page_79.jpg
5c7594c58bdd057ff1bf64a011510cd3
08cea098ff84d6013d7a1c30b5b0172c2d81825b
212760 F20110113_AABERP lewis_c_Page_62.jpg
3c8de5796a0071cf39b00d26ca32bdc3
4e1aef3bf2971d02baf880fc0084cda994cd88e2
196035 F20110113_AABESE lewis_c_Page_80.jpg
bee1236a542268fc7a3002c6fb97cbba
77a079113347008899e17549e6737d214fef820e
188825 F20110113_AABERQ lewis_c_Page_63.jpg
aafc3c28e9d6d184eaec20baf1957c44
156d2368bb0a93c1f792c761bd2fcb7bc7b2b0fd
212026 F20110113_AABESF lewis_c_Page_82.jpg
ef8b3b89f264bba4a91860c7a4cb16c9
00f663efd853525f707b031e8787f3cab76d3bb0
185624 F20110113_AABERR lewis_c_Page_64.jpg
b7bbb1fadfc03b5ff7256cef8a07c4ac
b733e1763a02008a0830865aa145e9fd076c8d95
210968 F20110113_AABESG lewis_c_Page_83.jpg
0668157d41b959638551479c4490f142
2e8094eb66ff81a4da068994430c5519af2a1fe7
164737 F20110113_AABERS lewis_c_Page_66.jpg
d89a638f569b0436c17dd62b2e0d1ac8
7e0774ef6e8adfedc8909b82e41c32098f653fa0
32104 F20110113_AABESH lewis_c_Page_84.jpg
2cab20fa8c22661e61360e645e903c52
c8a8544e732b513255d74fefd53c760a1cbd36e6
135072 F20110113_AABERT lewis_c_Page_67.jpg
52c0865a955ff4b6623abc55e8d7116b
c5fbfe697f2ebc9785483e483b2ca61d18dde376
184514 F20110113_AABESI lewis_c_Page_87.jpg
6bd05b7262402f6cb3d5bf47a4fd59c1
a55306dad7c8fc1ac98ed86bbb6235225685616b
159034 F20110113_AABERU lewis_c_Page_68.jpg
6cfd8dc1c106337830d5fb60edc07dc1
57314c8b4389ebd0bec90a253f344eaee8085e08
152803 F20110113_AABESJ lewis_c_Page_88.jpg
0105fe92f7de328f9956e42d3e3a9ef5
d71da0fc299f3cf7bf056dee04933c113dbe07b2
182519 F20110113_AABERV lewis_c_Page_69.jpg
02aaec5cae2ed56483fc2a4403bedcad
9ab30fc1f1f951d9eb8be9f6eba96c521ee3c142
236544 F20110113_AABESK lewis_c_Page_89.jpg
0059d42b5fc9863e7dc80228d9461d3a
bcc43d47b7de26739bd813142f348042fc0afb1c
281023 F20110113_AABESL lewis_c_Page_90.jpg
d2818d32ad1ef2e75050b0774676c758
9bb4a4d8b2ee61fb177fc171122f8a24b8637d1f
185103 F20110113_AABERW lewis_c_Page_71.jpg
bc2d3a3f905619f0a6a0561ec2a06a09
faea880e583f8e9809f0d4a7b2d4f688512b0af4
63452 F20110113_AABESM lewis_c_Page_92.jpg
f92a0e44c9466c65f2d35fbf27834ebe
20b10b8cf6ea752d3e1d3b1f004847866fcd8148
172416 F20110113_AABERX lewis_c_Page_72.jpg
770825b53c128e9f0b4d19f1862722cc
7eb3170564244eaa8d08de5eae5b2ca81f8afd59
106464 F20110113_AABETA lewis_c_Page_17.jp2
36e4cf2d763d7cfdbbdf05d091ebfc42
f27a7e41730f476bba5e1f286037c11ac281aa81
26439 F20110113_AABESN lewis_c_Page_01.jp2
ea7d332cc2e5070d57a2575db008bc68
36dfb2c175f9bb83de41b11dd68de2d71002c856
179834 F20110113_AABERY lewis_c_Page_73.jpg
bbcd267dd116d0867416faf4dcb586a4
f71f2b88c792ddfa46f15bbeb949a74c953a1183
759259 F20110113_AABETB lewis_c_Page_18.jp2
b5c09df4669f0f75c3cf1003cf5fd9d3
1c944bf29e4cb4588674b4f0ed9315c8f54b361d
8782 F20110113_AABESO lewis_c_Page_03.jp2
94cd81f4efee49054db6cf72f98e611d
55aff1055858ca726ae3f0741a066af0506feb90
97149 F20110113_AABERZ lewis_c_Page_74.jpg
a38b0ce639d0fea199cdc2c69f5fed0c
c02d673f1e8a270f0008821993949ed1f06a39d9
100129 F20110113_AABETC lewis_c_Page_20.jp2
ad36eb021d47444ab547a312d3aa79f5
a4597ec2b8d45cc7189550c372cbdcf60f11aef8
30404 F20110113_AABESP lewis_c_Page_04.jp2
d191bb48d780a4293775c95e0abe1e30
fccfde1f7712e2535f7f2737073d0af4e9c6175b
108647 F20110113_AABETD lewis_c_Page_21.jp2
51e4ace72d430e6f2dd27882967bd4fe
604c4ad643f55c26dd4a2ec884f8dfa078829e1a
1051984 F20110113_AABESQ lewis_c_Page_05.jp2
3214d90398c3b577ce4db1d0a0bf0ea2
cc24cf1d1f0276cdcde00910f0c90e4f0448836e
112153 F20110113_AABETE lewis_c_Page_22.jp2
16b698b3eadd29b4ccec5d1c6b79e269
5b078b4dce729bbf6f3d15e3c4a3a1a0128b9172
1051975 F20110113_AABESR lewis_c_Page_06.jp2
04fa51a9d49db2a3bc5929d34cc36ac8
c84fa232733cb699029499e059e8a1fe1c875ee6
130992 F20110113_AABETF lewis_c_Page_24.jp2
2dbacad8b2fd69d0875a9ba1ee165963
2b97ada42335f235054510cb91bcd34d8c59bfd3
564948 F20110113_AABESS lewis_c_Page_07.jp2
da407bf025573cea83c16d3a10547fc9
fea63da3e2d3d214a05a1285263a22cac33f0144
107299 F20110113_AABETG lewis_c_Page_25.jp2
d639208113673c487c6772a90e5820c0
6406a2c642e9385fa7642c1977827620685934a2
1051985 F20110113_AABEST lewis_c_Page_08.jp2
a5b0de4d3d3d500d115a3e41e9038af6
f18b0e8a74b2ca1a4a9252d7edb1ba2d1ca15a9a
105603 F20110113_AABETH lewis_c_Page_26.jp2
f348ce34a586d810bea0e48560e44ac3
cd11b324eb7fa6a65570c913dfb2a585236df95e
787297 F20110113_AABESU lewis_c_Page_09.jp2
f222c7c5e597f4e99508bbd2e57a8379
73770602fe0b9d797de2f13c4e236c10cf7a8e1c
104878 F20110113_AABETI lewis_c_Page_27.jp2
bd9e977b04ce684a7b817f601b2e64fd
21b36d59f1e1cb3eb41c49cdbfa65d6e355eddda
84397 F20110113_AABESV lewis_c_Page_10.jp2
e780587eeed899346858ea075200d665
5279c65da2ae4a65052587eb26c4978f5a1abf9c
112850 F20110113_AABETJ lewis_c_Page_29.jp2
2893fcb01afdf8cd24cf0ef64c848654
83f4b4dc018163a5943f5eec372d968b0e5ef6b7
64444 F20110113_AABESW lewis_c_Page_11.jp2
c5addc86a894a1b6a9afc51755bc1971
aa70481be1573025fa0a9e9e56a441999bddcd2f
119199 F20110113_AABETK lewis_c_Page_30.jp2
b867a57790411869a089f7d6414ee6f0
22345c159a393699b723aff28520af62e2a83a9c
106257 F20110113_AABETL lewis_c_Page_31.jp2
3f1f13919dddccac05cb9709b54edfff
7b1df7b6d2a2e1e21b8a4964a7fafa9e85d06465
91649 F20110113_AABESX lewis_c_Page_12.jp2
3489b7a0c45cb702a4b7e68644982152
ec2daac3f7fec6a751f8ade40ad0a0e625f7701e
742458 F20110113_AABEUA lewis_c_Page_54.jp2
29396bb93397dc7141a601dacf8d9a93
f61fe472c710e72f771b90f0bedfe9848a493d43
885031 F20110113_AABETM lewis_c_Page_32.jp2
437927e698457a2723688c7d1ffabc76
40907012d786582cb4ae166a5cfc76f323e946b2
96902 F20110113_AABESY lewis_c_Page_15.jp2
a7830abb9e8c60824c7c87ff47af9138
5574861a89925d146fab10617afdb99c8c559e5f
861914 F20110113_AABEUB lewis_c_Page_55.jp2
d7c0647b42d0fc5a905c6b35541d2b4f
c2458967a202d92bc5dbc4ce55f7980856259e98
98516 F20110113_AABETN lewis_c_Page_33.jp2
afb0181d0987a38ad30048c29c025292
035c80bd8e63e3e8dc3e9e98f454437baca53d83
110483 F20110113_AABESZ lewis_c_Page_16.jp2
8ff65dc8ba255c90628cd345cbb12e10
24cea095c405fd4b431a9b2772322dbc47198571
120370 F20110113_AABEUC lewis_c_Page_56.jp2
898c6b00c376d5fd29858c9e6354e4c1
a71b8bf820e9bd7360832f62c2677cd7005dc556
120042 F20110113_AABETO lewis_c_Page_35.jp2
c5ed533b28625f7479de44ace56e42c2
4c35c15a883bfae3c0e42867220383174363c67a
627376 F20110113_AABEUD lewis_c_Page_57.jp2
f69b0cd76a8177e147130efbe6ca9236
7fabf14d9dd9239229e9b2b026d95a5e89678494
122556 F20110113_AABETP lewis_c_Page_39.jp2
822c9e77535aec2906a33db5c9daf238
b30c018cba1748b410a1df244e66247f50ab4b11
127492 F20110113_AABEUE lewis_c_Page_58.jp2
36931f43a2ee462e76c186356daf7c16
cb8714d9500174b45c607086104604cbfff9cd3d
102972 F20110113_AABETQ lewis_c_Page_40.jp2
9ed4aaa8440af5d8588501a5cef9e227
eedebe137dc10eee7f9ed0496e8e1826d16e5679
111572 F20110113_AABEUF lewis_c_Page_59.jp2
c74d37cc4184a5fd1dc05e1409197fe7
6a10bcafaec5d2dac5dd9b53c82eb3766916c6de
1051976 F20110113_AABETR lewis_c_Page_41.jp2
f43afa10064e6e2fd980f7ed22223549
7d059a985fd2e8e6cc4c1a0e8fb721fb62115e32
50473 F20110113_AABFAA lewis_c_Page_76.pro
92785cb70d2eb89ff927a2fc5d48e69c
ad67e7a9fe734f86a4b597208b48d622db1e84e9
1002111 F20110113_AABEUG lewis_c_Page_60.jp2
c7212afa359872c40c7f6968b02c3af1
09feb1a2a0a8db04be7e6e19cb1e98e663e32d40
95280 F20110113_AABETS lewis_c_Page_42.jp2
c64597bbdeb4828561b48cca951c2b74
676af4e973230e7600929569ceac8fd69f59e53b
49544 F20110113_AABFAB lewis_c_Page_77.pro
a0b4d327a098b6bfbbe31846bcbc9098
761b0e3e256101561fdfcc532e88543606117e97
82694 F20110113_AABEUH lewis_c_Page_61.jp2
11c690ccf214e2aa141caf99b2ef1235
2993213d785cd4a70ee31ec89d406a09b57660da
1000339 F20110113_AABETT lewis_c_Page_43.jp2
a640dbeff24c82bbe66cad35796e84ab
6493cfc1b435db2211444ec29d5d6e491f5fdfcf
51224 F20110113_AABFAC lewis_c_Page_78.pro
9f3ee3e7cd64f161ca5abf89c13b6d8e
f50543f6702fe5d3b19f34c1e329b886bf979402
821182 F20110113_AABEUI lewis_c_Page_64.jp2
12d30b57599eb35565d6586f91eaba4b
d85b29de7df516589732f88995de1aa268d6a05d
1051979 F20110113_AABETU lewis_c_Page_45.jp2
3eed3a2b4fc7cf7b7c79d92970b54d13
e0c32f976ae0cc03b9a157beb86731a77cc99ee5
50856 F20110113_AABFAD lewis_c_Page_79.pro
70b55754aa447f3288a6a047d4dcf2bd
ea6f0d0d384a1d947a37d05a6d354a70d0c985ad
857176 F20110113_AABEUJ lewis_c_Page_65.jp2
e4db26b45ada6982a6c0b62819133bd7
7a1f1f757c229bd257b8575b988f9f1e6791fd96
16909 F20110113_AABETV lewis_c_Page_46.jp2
6b8128f2125014f237965d1ad2e88bc7
d068361183bd31cde7f2d63acf5ee89c80816b2c
690420 F20110113_AABEUK lewis_c_Page_66.jp2
3b33f4d10d9d98562df54921d124864a
8b4d8122ae5a5226f1113485e2106867fcd9289c
88333 F20110113_AABETW lewis_c_Page_47.jp2
edfa9451750990d7c3734decdfaffc05
ba302e46932b8ec8f3cb2474c3e3e99ef9385003
46231 F20110113_AABFAE lewis_c_Page_80.pro
b87f52731e08641e85763f8c5aff5b0e
036705a9837d2b6aa85f0a200657a0189db0f049
494478 F20110113_AABEUL lewis_c_Page_67.jp2
d2e80f5d96fe7e2b172a03b39f6178e0
d439a583f65671f95eab003b91638914ef6c47b9
114966 F20110113_AABETX lewis_c_Page_48.jp2
d178b2b5fedffcc356cd5a01816a9769
d2f357dfc498cf218e084616f99034172641aadd
43677 F20110113_AABFAF lewis_c_Page_81.pro
7d73bcee7c7db836dc53b3a83f4d616c
ee80a71b5de42b2175f9423da64b313352fc1bb9
79888 F20110113_AABEVA lewis_c_Page_88.jp2
738f9691d2edd4852e60d6f98fd11d4f
8a95bc7f147561c3eab9481e8f17342043a705f8
636351 F20110113_AABEUM lewis_c_Page_68.jp2
acdf832abc4b6174145329251b10be6b
afb0214d41450dd1764f5af2cdd396f41515e04d
50684 F20110113_AABFAG lewis_c_Page_83.pro
2737de2dc39fb05a73c7087d7d317d83
c93add1f1347bef46574c3021908d84183a989ba
115210 F20110113_AABEVB lewis_c_Page_89.jp2
a9a3febae01b8509cb5d3efb34967091
b11b1e4975fb82d787c500bbbaed82cd265c6fbf
815394 F20110113_AABEUN lewis_c_Page_69.jp2
85ed9af48e981aa128e4284a2061cda0
cf48bb50c65ce3af8b92cde729f8b044d5c86e75
56759 F20110113_AABETY lewis_c_Page_51.jp2
9e31d89fbec8f544167745351cfad936
3922100e19458e9426a47e82b8f14b9a53d64ebc
5887 F20110113_AABFAH lewis_c_Page_84.pro
49dd55e600d3470bcd9405387cc791a4
5bb80c9915f20be4cfa97f3895ad4d7f399837bc
757807 F20110113_AABEVC lewis_c_Page_91.jp2
8853653f32360aa171d713b03d88502a
a1e4acd2982da19784779adc38b51c56e604f68a
866252 F20110113_AABEUO lewis_c_Page_70.jp2
da2e3bd1d748dd2e5e956f55090ce415
f2a64e4dbe1080742dcdf3174ec8c1fea5c0a47a
91963 F20110113_AABETZ lewis_c_Page_52.jp2
c15f814433bf859f97f25fed2b1135c7
a52c95991b60e59601fb44a87eb12bdccf6d678b
23595 F20110113_AABFAI lewis_c_Page_85.pro
36b5dbe830dc2c01db3e9a0241d7e739
79c6bb65002b2ea8bc977f078f0723fae35c8375
31261 F20110113_AABEVD lewis_c_Page_92.jp2
20122529aefce94e4f85e23912c76f12
72eaa21363b597b07851920ff3752649ba00e446
96646 F20110113_AABEUP lewis_c_Page_71.jp2
446bc70c43bcdeecbec2c1b476cfe40f
5a7fbc4a41eb8fb86a081498856d22617673e056
32408 F20110113_AABFAJ lewis_c_Page_86.pro
930c651f5e25560b8f5edb13e2ef2e96
fd42a720d74d07f1040674bf78f6ff7bb137848a
F20110113_AABEVE lewis_c_Page_01.tif
02b46a83bc4be84d7818fcbc52e406a1
d060596d3ec01017f87a07a64e11734573904546
741476 F20110113_AABEUQ lewis_c_Page_72.jp2
9ac5aa8eca4e6971b73e94749fb4d5cc
02bc49724d63234dcd9df039592f89a6f3882e48
35154 F20110113_AABFAK lewis_c_Page_88.pro
5475451a66e247abdaf342c89cdd7bf1
521b52081e78ea62e493530bf4fab7ee43dbae18
F20110113_AABEVF lewis_c_Page_03.tif
38693d9bfb2636f666989a6c5face333
ab4fd3ca3b98f25204b9ccee0b06874ff1b67eee
87419 F20110113_AABEUR lewis_c_Page_75.jp2
d0d20bba776fc4a33d4e81e36eb92cbe
1bd57f4ba5e2e3032a1c6df89205bd3fe1d0fcc3
1833 F20110113_AABFBA lewis_c_Page_15.txt
601785d1ade822fd0217fcc248ceae15
beb40b79442e54f246bfcdcecb6b73567a4bfdf1
55288 F20110113_AABFAL lewis_c_Page_89.pro
35a8daed62ae0307c080e7dab444eb81
9f1501bddf7d226dddf337cb2e681591ce4e34d1
F20110113_AABEVG lewis_c_Page_04.tif
2eace4554c33c6e718cfc794fe4d76fe
7e06a67fc9411fcd9838e46efe8d37d73be23398
109233 F20110113_AABEUS lewis_c_Page_76.jp2
f8d74b7206dedf9607d42fed6fb3d737
9068fce9ba29203f9e4a9e028669e5a88133b1ff
2032 F20110113_AABFBB lewis_c_Page_16.txt
9ec219d7c44c921782dccd9fea73ebdc
d31737f90cefacb495abcba9b31df1a970e6b2db
66442 F20110113_AABFAM lewis_c_Page_90.pro
7b5265776036c4873be7eeaa40943cdc
69329cdbb0614e8f371a3d6db37354b5f81d6665
F20110113_AABEVH lewis_c_Page_05.tif
d2e16df4456c75d348278934837028f3
bc491c5c8264f228d5ccdffa022be1680ae1d40e
108272 F20110113_AABEUT lewis_c_Page_77.jp2
ac3fc1af0c401d36b08a7ba6d56ea51e
a2757829e70545ed9808751b77ecf0b36b247d46
1423 F20110113_AABFBC lewis_c_Page_18.txt
2cbb025d9eaf641d2333c1f69d75e3d7
506b1beefcbe8b3cc57ce0f20cd22428127d4d38
30794 F20110113_AABFAN lewis_c_Page_91.pro
28fa9abcec7f0746a6f526d0f9555e96
fe02faf16828e721f7873ac61739beb399290e89
F20110113_AABEVI lewis_c_Page_06.tif
607771df7bf59f6e1027844c2d668bac
3b91f371020d3b5c0112ebdecf11599bc949683a
112740 F20110113_AABEUU lewis_c_Page_78.jp2
7c4e61bf7e8cd58eb673720a18fe57ac
2ad37e45d3d39816f74990fae265737b5e0d13bc
2098 F20110113_AABFBD lewis_c_Page_21.txt
d8fc1c98aa687c1bbdd1c90bd2c5a8f2
ab8647a37222d7003dab895a42a89bf0f6fa39f5
12673 F20110113_AABFAO lewis_c_Page_92.pro
49ef233bf989ea439003abc53c405715
71208b480ce0e0eff6304525b37c3857b19d8124
F20110113_AABEVJ lewis_c_Page_09.tif
cdd53be649f8eaa2d2284dc13c542352
e1e9b1b4ab1ac32a638c89df9985e201efbbe774
111039 F20110113_AABEUV lewis_c_Page_79.jp2
0a3672e837f33ac704ee11ab3bb64d39
e036a236f2500c98487efae550b2f6d612527727
1991 F20110113_AABFBE lewis_c_Page_23.txt
145ae23acd1af193fc0e31d40554d45e
372399335e3197c024056cbf7ca830faba4724d6
486 F20110113_AABFAP lewis_c_Page_01.txt
a3f7b5896b4663f75dc4b57e7f11fbf2
aeb749cde39188691ffbfef314ad4d9c6f5bcf73
F20110113_AABEVK lewis_c_Page_10.tif
b7d76ae13a4f145589b94982588850e1
755ce588f3dbdf74fe5cf7de243ad1835b5b0b36
101891 F20110113_AABEUW lewis_c_Page_80.jp2
788f19cd8a15219a01df65d4eda8628a
5673f654f652ef0ea2b2085f35cf803f324f3274
110 F20110113_AABFAQ lewis_c_Page_02.txt
eef92d6c29a1113b4a2d011dcadac977
368f4ac72381dcecb8d72921fa1d26e628f8558f
F20110113_AABEVL lewis_c_Page_11.tif
044a8560459828a868cc456512f0a609
a8ebbf507e03c28d13961bab471bc5504e964849
96222 F20110113_AABEUX lewis_c_Page_81.jp2
cd0cd81afdd6853032bd07b7f5eaadbc
e0205ab6abbde24150fb210c6da8f3a53cd787b1
2576 F20110113_AABFBF lewis_c_Page_24.txt
12251871d52ebca82136db1735f30c67
c5484875338f825ee9f6bffff86a00c1bc417f45
191 F20110113_AABFAR lewis_c_Page_03.txt
712a7ef16d8f2606d8e9de03c8ab5f41
494d557e4c5a7246a66c17ca8bea80b1bc84212f
F20110113_AABEVM lewis_c_Page_12.tif
9869363755da654300c54ce19f9e030f
bcc93cca3a10a82941b3ba632a0b5535cf1ab9d0
741316 F20110113_AABEUY lewis_c_Page_86.jp2
f696efa90032bcdd0b6d8255ae9d30c5
608e7f1dc26a11c25c82520001eb2e69120681eb
2559 F20110113_AABFBG lewis_c_Page_25.txt
1f4a178b2bc835edc8d0bd744f0b2392
cf0b7121277b37a9f36dcb01c8581e04c91bba28
F20110113_AABEWA lewis_c_Page_33.tif
3e164c90ffb1e2f2757636d06a1a38e5
1c06f729d75e8d6b34340d36f7576d4851afc9bd
3120 F20110113_AABFAS lewis_c_Page_05.txt
302f015ab233a8e7c5e3b101a23ca13a
e1cafaf6d06bc305a021b8ff3ff42fd88e93b122
F20110113_AABEVN lewis_c_Page_14.tif
53660c537a562e06c8f1be3e60029419
8726b1857df7b49a3703031651b7068267077194
1920 F20110113_AABFBH lewis_c_Page_26.txt
0e64d67c96fca6969066b39b5acb56e6
ae6f6459c6b33688149b610fa20d559c511ad9f6
F20110113_AABEWB lewis_c_Page_34.tif
28b1d13f4684940173cbc2555714d4aa
99fb4bddbfdf92eecad08a4df9c6032d726ef3cc
1735 F20110113_AABFAT lewis_c_Page_06.txt
201b5b313f683b3db415638c895c78ab
eebd346666e7c55af217c9ea06398d71731a5736
F20110113_AABEVO lewis_c_Page_15.tif
bf2ac258a39c6fbfaee047fe6e34867f
98fa1cf29c49c24bef48b40c4f3bd94ea6d099e6
839272 F20110113_AABEUZ lewis_c_Page_87.jp2
d8cabe2f8165465f148c03046dbd3ae9
1c4d6c5328f3c1cc26e2ee0ded8f80813274fb56
1943 F20110113_AABFBI lewis_c_Page_27.txt
190d9110b2d5a92c68cb09d75f83bc5c
a87d134f2845f2c3ec41fcc46aee9f3eb3ddf933
F20110113_AABEWC lewis_c_Page_35.tif
1214305094c153691437c6374c5b3726
09ebe2172dd2d2d4a6a4f25fc170d3ae0db0d7ef
730 F20110113_AABFAU lewis_c_Page_07.txt
25f69d1f91e4def2f784c6b891fd3bb2
c74bb84bf22aee89d977c5855c92766c9d3445e7
F20110113_AABFBJ lewis_c_Page_28.txt
39723ebf56992010c5b0e2ad587042e8
b25086c610bfac22951ac0a44d945bf7dd80c2c8
F20110113_AABEWD lewis_c_Page_36.tif
deed98dfe89d054ea157b46c5bdf39a9
9a31be1bd6d207d4ecb52896ac129d138ece801f
2372 F20110113_AABFAV lewis_c_Page_08.txt
daa124101846cbe67b58ba6cd7d3ab50
416f9a4a8fe11f436a5858c444bd700d86296f9a
F20110113_AABEVP lewis_c_Page_17.tif
c9d227f14d8c4253e7f8f7ee725eab36
60ca9df5c19ab7bf94d55f2242c4027d654a0d3b
2107 F20110113_AABFBK lewis_c_Page_29.txt
1f296efefbd3df88b911d38a5c124858
a00fb9bae2db249ef9b948162f51a0ebdcac87ee
F20110113_AABEWE lewis_c_Page_40.tif
a85385e6f4ffc7758ee05b3a2f6d8d6f
d71900022561f12183b3992c43bb735297ebb55f
793 F20110113_AABFAW lewis_c_Page_09.txt
f2c3fa09c9161dc0ac3eb92a4f57a053
3746ed55bc1f3165c5c9f2af0d943da72e9767be
F20110113_AABEVQ lewis_c_Page_18.tif
b9ff56af373b99033ba1107e12ad86c1
8f0080c19e2045b9ee7ed3b39c92847b45173eda
2116 F20110113_AABFCA lewis_c_Page_49.txt
2ba9f2dbc08b611dd3ab4e46950d8f9a
1172a896ec2af33c369d235747c01e9358efcdaf
2226 F20110113_AABFBL lewis_c_Page_30.txt
5a1fd3f091740443e3e1240379fc9e78
53ddb3d0850895f1bd7c5039517254a101d6ab0b
F20110113_AABEWF lewis_c_Page_41.tif
d54573daf6841c6281256db8102193ec
95a6e93ed7833d308c538bf43174337d9d16c0af
1765 F20110113_AABFAX lewis_c_Page_12.txt
b9e35a0037abe3514ddf829d495ec12c
eb84e09a18ac1178f2cdffb8f1e508447a42b3ed
F20110113_AABEVR lewis_c_Page_19.tif
c1caacd23e92992403dbdd0fc20fbe0b
71d8996e37e4d9bbd06118d7a0e4c4c054c7c884
1844 F20110113_AABFCB lewis_c_Page_50.txt
2371c00e274e81d5a832a29478941794
c7a81499cdbbe3bf129cebb615862c61edbcaff6
1909 F20110113_AABFBM lewis_c_Page_32.txt
352d75eceb79e9f0dc4b7c564673f0c2
fddb3b404d5a51cf37c02ae50141f953b730e9ed
F20110113_AABEWG lewis_c_Page_42.tif
e66b045f5f3cd034c613512c76a29100
90069367567c1103d1245fe2eb8612210b836327
2080 F20110113_AABFAY lewis_c_Page_13.txt
fd90887b60903bca71702bf3297e73f5
20226dcea29263833a05c52866a82433f5e14b52
F20110113_AABEVS lewis_c_Page_20.tif
4653d30d40fca5e82ce1988d44b96a87
e678ba6d0de407569d9f30d498bba23e92f51907
992 F20110113_AABFCC lewis_c_Page_51.txt
e84a1a0d633480f2ceaddd45213e9649
fc3bbacf7d0eeacb032b69d46d0763d3511be066
1810 F20110113_AABFBN lewis_c_Page_33.txt
6cffad67eb13a8e6e6251260af5766e6
3b7d7ec80ca1ac7926a296078e53ae057c966da2
F20110113_AABEWH lewis_c_Page_43.tif
6c2ca358f8a9c8c6aff59c273a8acfba
3643b3dabd54f7dd82a4afb07a8daff0f3119479
2071 F20110113_AABFAZ lewis_c_Page_14.txt
51879750baa1cdc2d7c7eb3fd40bc06d
083bbf1b69efa552dc4709fa1f391b4e67fac2bc
F20110113_AABEVT lewis_c_Page_21.tif
4554d40078a9a849fe8498725d72c9c6
7a7f747b39004530023309944c50b273ec09489c
1767 F20110113_AABFCD lewis_c_Page_52.txt
85146656bf913c9581cdfb5469feb799
50699d4e480382707c54245c34f905522eaea83c
1927 F20110113_AABFBO lewis_c_Page_34.txt
5528e894bf6e82f8cce10536d0849d0c
2d36a1bcf83bcbe20cdeab2fbf63d21f7cbea2d3
F20110113_AABEWI lewis_c_Page_44.tif
75fd59f737d32de78614506fa744a39e
128971cb8d70b9ca5ff19e9eac65e2df822b7e05
F20110113_AABEVU lewis_c_Page_23.tif
d31a38d4eaa743d37ebf54d0f0af062c
6920b76b86bf1d0cc6213a7e3be24df92bed2edc
1459 F20110113_AABFCE lewis_c_Page_54.txt
4a8837f4a10f137d224889bf034cebba
a70c4c599e096d3ed103e3279c597d531368f808
2208 F20110113_AABFBP lewis_c_Page_35.txt
06e18ef27d2b360a29a7d73179c2ebda
180f3df8f25bcfbe25b4cbc8b7b7394fd626f6d7
F20110113_AABEWJ lewis_c_Page_45.tif
edc140c971d2a3d52d1cd15625e8e67b
75259d6c6391c280d9150cebf6ddfda6df57a8df
F20110113_AABEVV lewis_c_Page_24.tif
46b6d107fa324ba46909015224ab9fdd
e49ed3d21af7cd594aa6b8b99299bab14901e212
1658 F20110113_AABFCF lewis_c_Page_55.txt
4ab02957ad77d1e1361214a5e18b9708
2ba1b0bd54c3ad1c3fbde60a2927068443586242
1939 F20110113_AABFBQ lewis_c_Page_36.txt
9f6afba76a3f1d50bcf4335001e55ed2
57d643eee6f11440ed3ecc2adbfef270e312bafd
F20110113_AABEWK lewis_c_Page_46.tif
e5248847a2791e08d20c5516929aa3e3
78e9f75e5931d9e322da363f988e00f5d4b20836
F20110113_AABEVW lewis_c_Page_26.tif
c2a00fcc1a249dfe2fcb8e6653f9861c
12fec618864ea69699c8342fc63b084733df94aa
2106 F20110113_AABFBR lewis_c_Page_37.txt
a1939d7e41b4e3bc3f3757f23ee9aef9
e02a270d4801521bc79d52030cfd5b7da2727da4
F20110113_AABEWL lewis_c_Page_47.tif
3a91809da73eb5d69ec607b7a5a9e968
3fc4cec10dfc6d70cd38ff42842d5858e7abee39
F20110113_AABEVX lewis_c_Page_29.tif
df3c9cfd9d1ccc68972644b5b1d20ca9
e680b386eb88c22aaba94d6b2c3a47305e08271d
2362 F20110113_AABFCG lewis_c_Page_56.txt
cbc4aafc97d2f7fd64fa637a061a6b91
e01e85d2e6a4911e861e388efdad25d23700ce2f
F20110113_AABEXA lewis_c_Page_67.tif
0cad9d373958926149f3b907c2570a00
dd57e0ecf2ca927e89af07d24f8f34fe02447733
2213 F20110113_AABFBS lewis_c_Page_38.txt
4f983587a40463bc6c6656e39e94c156
49f922b5e5ad908f90c2284fc5f68af1d382d78b
F20110113_AABEWM lewis_c_Page_48.tif
65e6244fe34737d602e965a2af7a7b26
374785d463f598e721c7441628e95b31dd8041c4
F20110113_AABEVY lewis_c_Page_30.tif
226ceea115ffe78462c4c4b869344620
7d34ab4efaa21b4fdf4c2c02b34f595be0849b76
1310 F20110113_AABFCH lewis_c_Page_57.txt
1e7142c54fe9b93dbe908633e0eba5f1
76b45eeeb75e6687cf9a8db1c092294d43eb42a5
F20110113_AABEXB lewis_c_Page_68.tif
f472c211b0e3032d12627b34fe38cafd
43eda4bb8eaa55dd5bb98b4ad7af0146a37370e8
2258 F20110113_AABFBT lewis_c_Page_39.txt
cd0a0def2e3f84e4ffc2642de4e1939e
336dfeedd72439e7ec46741f21f853ea2573fc46
F20110113_AABEWN lewis_c_Page_49.tif
ce40b5f8bd775c457cb56dc22ad48941
985420b3c619397baf82481a9a63560583562270
F20110113_AABEVZ lewis_c_Page_31.tif
4da4a8c759c371952b502b3eaf12ad48
aea5ba2ed3a06810bdedc6ab1d9f783de93d0589
2386 F20110113_AABFCI lewis_c_Page_58.txt
b8a01166ea27aa86916d22a8358dbc5f
35eefe14bc202c82b63bfd4352bcbdd5c31b5ee3
F20110113_AABEXC lewis_c_Page_69.tif
048263c4bbbe6364ddcd96745d743b81
33118bd328c31809b98b403eb2ca80cdf3753e34
F20110113_AABFBU lewis_c_Page_41.txt
d59b5f06f934fded15375b51f69e950d
f295126a9c73b0bb1fe3d9b47c902f17759ab66b
F20110113_AABEWO lewis_c_Page_50.tif
d8cacb11ce8b1773e574656bc8608751
d0290fbebd3a71f4e65aa9d8bb9e242e70945c29
1848 F20110113_AABFCJ lewis_c_Page_60.txt
3c5bfd1ae6b09a37f3dce64770681692
0b4dcc77f166691acd094409185213fbdc983445
F20110113_AABEXD lewis_c_Page_70.tif
10f2c057975b37e02d5a866e8b48e32c
8bd3bd2deaf5f61da5f664c65d2602ac6e92bd8a
1749 F20110113_AABFBV lewis_c_Page_42.txt
a3c658e44f0f41d349536b97499bd0c9
e2e889ca335e538d8f9461d1f4c0b035664edb6b
F20110113_AABEWP lewis_c_Page_51.tif
daecc09ef010bb8a8975653d73a7e32c
edb02cb83d7293470ed8dcc825d716b75f0c2b7f
1724 F20110113_AABFCK lewis_c_Page_61.txt
c3b6a459888d621fed55a0ccf3df35d0
5d00044a6f0f545039840fd91e5f847178e3fc59
F20110113_AABEXE lewis_c_Page_72.tif
62ca55961d14252290c3be5ce379043a
6a321e5628f23bb98b61ffb91b474770cc46967a
1458 F20110113_AABFBW lewis_c_Page_43.txt
fed584df3198a24f47162599b184de37
06d323b6d22318ad0c6f4ad9a8fa7c620a5a66d9
F20110113_AABEWQ lewis_c_Page_53.tif
f8b149ccfbc32167e3aae76122aa2b6c
483db9c7a350143363d4243d808c3ae67cf0a7bb
1995 F20110113_AABFCL lewis_c_Page_62.txt
f7b0d3f8d362c322f903687608728786
8c0ef722bcb730f01bd18a3864f3c5dda24bf943
F20110113_AABEXF lewis_c_Page_73.tif
029c43c802e61c392326159e8ef3ab9e
ddb37aae4b23d7ca0d6082ce1dac83a64253dd60
2160 F20110113_AABFBX lewis_c_Page_44.txt
adef655cddab09e4773976b48965bf03
1d7e707a4be1f0c7be7a57b53a309e8e36d7b040
F20110113_AABEWR lewis_c_Page_54.tif
93bcf484d2956f1aefe38ee630fa3ae1
b7556d2c6a6038d2d8a4b1fc6c9f80583a490b5b
2025 F20110113_AABFDA lewis_c_Page_83.txt
ee76b67310f626861ec9dc7deee82dbe
2ea290ef527a3388fa587b11611754ecfdfbc45b
F20110113_AABEXG lewis_c_Page_75.tif
534cb133772b6d37b502a9abc309b08f
fb9151bbee43e97d0509fb4dbd0c1a41c01ef083
1452 F20110113_AABFBY lewis_c_Page_45.txt
973146820118b7d789f7d5578f74e4d4
a8df0563b8ade9b0555322563c36b75fa4491f12
F20110113_AABEWS lewis_c_Page_55.tif
47111e09e99a1b3caffa84abd726f107
9abc66b9565da6cf16bc79028cee4f5343a1a471
1326 F20110113_AABFDB lewis_c_Page_86.txt
c87032714c81a01cea42711f6bc1391f
00a6b8e72d91e80ca705c5d18be098a18a2abb9f
1546 F20110113_AABFCM lewis_c_Page_63.txt
08e681da132c865657de33dff636a581
26cf7e7130ed0456d212d56a6f8ff3883d38a788
F20110113_AABEXH lewis_c_Page_76.tif
a3be49b99417f5938cfee0277a5666a2
a0b9657aa02bd92675aec9ab0b238148f7fa4495
288 F20110113_AABFBZ lewis_c_Page_46.txt
6989f588be846f8b91ee690680b44d54
02b6fb9f0239650b55835d1f14444d0cd226c9f8
F20110113_AABEWT lewis_c_Page_56.tif
c5b26f5df19a8d67a7a70760bbd345c2
31da84f8687e85f7daba73b8f331f5b8170a50ff
1443 F20110113_AABFDC lewis_c_Page_88.txt
f2f3e701ce2d86dedb46c006d93e57f1
7aaa2b9eb6d371c1cb9703be88bebd95db24475a
1559 F20110113_AABFCN lewis_c_Page_65.txt
11f306478fa12facc3c71a5c1d7d15c0
f97f56a7637a7541e1b3412179356fdb26364c31
F20110113_AABEXI lewis_c_Page_77.tif
e4958016f1c96750585fdca766bdd737
98cbcf59e41d1558f3ea28795e482bfe9649fa81
F20110113_AABEWU lewis_c_Page_57.tif
05d8e196a35f9aaa7714c683077dd564
6a9d011f5b68ad4d60f56202c68dbd15d593fccd
2263 F20110113_AABFDD lewis_c_Page_89.txt
e03bee6d753dd9b601575937332dfe3c
29d334adb605dccacaf0e5c680f6daa29ba44335
1191 F20110113_AABFCO lewis_c_Page_66.txt
1353e5b8a7aa5546fd19cdb34bd6e6d3
88d369178f9d718405e98dc1a9a5d037226f0bc4
F20110113_AABEXJ lewis_c_Page_78.tif
6d30395aa3f858ba61f3084ecc2f82f1
1aeb32dfecd9c32a07cd7d26a2c34915f21711d1
F20110113_AABEWV lewis_c_Page_58.tif
312f65976faedf29c4e871ca84c86b5c
7e11a4580784082471a760c62a3db4b47c1444b1
2688 F20110113_AABFDE lewis_c_Page_90.txt
23ee784e0867ea297ae69d1c05e7392a
df4a2db18071321bf6666fd5c85d16408fa2384c
1253 F20110113_AABFCP lewis_c_Page_67.txt
130dc161ff18347aef52c0e73bfc591f
376470bbded5bb4f471726de7c2fdb5eea73c50f
F20110113_AABEXK lewis_c_Page_80.tif
855399ba74d3a229ba72df1d9389a0e9
4e2401d9ac310f8b0170f5e7429efb1de6bc118c
F20110113_AABEWW lewis_c_Page_59.tif
d8a6b9ab3c6943b5456824ff71d87436
f6028f145e0c27948eeb0d7fbc40fb234459bc2b
F20110113_AABFDF lewis_c_Page_91.txt
66729f82f279cd67ea5785746ed29369
2fa1b2221bd6e62e3029ddb8e42c06883886a706
1213 F20110113_AABFCQ lewis_c_Page_68.txt
43ddd66653c516724c18296cd4ef78f4
23ee1450fdcad26b2a743890fb0a24d73966807e
F20110113_AABEXL lewis_c_Page_81.tif
e5a19650ee53206beb8eb5d3e57a2448
e8e986cb156a95b0bb4f983babfed5e28ad31fef
F20110113_AABEWX lewis_c_Page_61.tif
1d232d74e7a56f167f06c23f21d956b1
86fca6f0431b2a16a71107c1e10b78e1557570e9
552 F20110113_AABFDG lewis_c_Page_92.txt
a389ea56dca9a2920da0f5b7a3abebc8
f8bdd49f88fd2746676a9f8a0c859ab47e1e2170
1659 F20110113_AABFCR lewis_c_Page_70.txt
82972f79a2414e942af49e82ae70366f
bff92c51b0e017cffdedac3422b7a20333862fd8
F20110113_AABEXM lewis_c_Page_82.tif
e82ac88326e00e0d5f044a0e8c81b7da
700fea2ad92ef5647f32d7555c341fdc9fe8e808
F20110113_AABEWY lewis_c_Page_62.tif
9b19465ff9b25398e48d3d2a18b868dd
cfb7026d5ae35b94a3a6a353883cfdd735cbafbe
17179 F20110113_AABEYA lewis_c_Page_07.pro
c2913e33b11b15a9df184907c824d387
8bb37d43f601986d560880c71003534ca92aa899
1720 F20110113_AABFCS lewis_c_Page_71.txt
8ea6e0beea46bb983b546a36252f7c4c
e0214711d33b30e76148539a83bc85c50524efb7
F20110113_AABEXN lewis_c_Page_83.tif
33a432e5ffa59d4f0070511035c0f87a
6f829d9ad147a1e619f1d7235d0ec2150360bea8
F20110113_AABEWZ lewis_c_Page_65.tif
d6f30621143e162e3544d28fdd02f70f
eea51b8426328360066c02fb2b0f41108579a44c
897541 F20110113_AABFDH lewis_c.pdf
14ccaacd7041312fa500296fd1840f1b
05db9f0b6de0333e29eb36cc901596ad3eb813ac
59080 F20110113_AABEYB lewis_c_Page_08.pro
1a4f6ce9356c4a26934b314d6207d17e
b9c224dd022946900c2d6d9ed976855fda6f9476
1277 F20110113_AABFCT lewis_c_Page_73.txt
0ba9e9ebb5e59dbde842aee2b00d9679
e26794176bcb4f0a51838db02d8ee5782ecb43e4
F20110113_AABEXO lewis_c_Page_84.tif
03ae10028099601fdbecd93aef58975a
edabd4745fb1225b3b445caa2c5b0ef34032e5ae
79984 F20110113_AABFDI lewis_c_Page_14.QC.jpg
3d2c2dfd6fdc964d7580a3c558b6970d
ec2a7cccb4750768fe5ccb86b3c54a942592e419
19766 F20110113_AABEYC lewis_c_Page_09.pro
f538f211ff5276aee63d6499d69ac2b6
1434e97f8c19fe1935f7832d45ff84c80a90b03a
1647 F20110113_AABFCU lewis_c_Page_75.txt
21a545b047168b37a8beb5f79ae8bdc4
9e567b319351bb9678a69c19f4789ca06fa05cf0
F20110113_AABEXP lewis_c_Page_85.tif
fd2ab8e746d72a46b74a22f76ed87230
1873cde16f9978f0eb8ef442ce1dbd2540dd1cc8
24450 F20110113_AABFDJ lewis_c_Page_24thm.jpg
50377983eae4ac7c37654b084d1dce1b
803987c4d593b0219ac22db58b136445510010d8
41846 F20110113_AABEYD lewis_c_Page_12.pro
e23d54b2bb85a1b8517104dd18ed74bc
48d4bf68cc480a0b0359f45320bac6420d07dbda
1998 F20110113_AABFCV lewis_c_Page_76.txt
d4ed60bd48caa6be66e4974cf3e4154c
2801f08574c8caf9ba8325387346a793960498d5
F20110113_AABEXQ lewis_c_Page_86.tif
89106528090fe3f4c7a03a8668a74c86
17296135b72f0628b714f733d11c16e671623fb9
46053 F20110113_AABFDK lewis_c_Page_65thm.jpg
c05fee14cf9b7d2be028343f2c65a331
89b214e4ec084ad9362946ec2e9af3d659804132
52054 F20110113_AABEYE lewis_c_Page_14.pro
f71f8d36e7c0479963d671a4649fb699
936eab044d29c5e7bedda3007d561d9a8543a44a
1957 F20110113_AABFCW lewis_c_Page_77.txt
7d42dc4a693b4948f469f070a0af33c4
058ae0976633601ebbc2c814cfe3fbfcb5ae24f3
F20110113_AABEXR lewis_c_Page_87.tif
f549cdcfa3a50e8275961cfdf1447094
11008c43c7d4f83be19ae2ee18b18ee4fef85f29
40279 F20110113_AABFEA lewis_c_Page_85thm.jpg
ce372c8ed770f9fee7378fceb75be3ef
df27c7a53cb98716938f3173f724f090c12166e8
73133 F20110113_AABFDL lewis_c_Page_40.QC.jpg
445bfaf8946f5705dd40e49dbc9bbda3
30453d786c4795c3b388a5043be648bddb8dc76c
44653 F20110113_AABEYF lewis_c_Page_15.pro
b0d2039824ba4f4a4c0ed08dc779760f
c708f5f5004c341894b37559d0d08e1197943197
2016 F20110113_AABFCX lewis_c_Page_78.txt
5bdf3fc3a69582d675dde54542f9d16c
c628d2b1e9989080413e52db1aa86c225abc6517
F20110113_AABEXS lewis_c_Page_89.tif
4e13403fe4a405535086ff99e009b927
99c87623c9ef072e407a8c1c78632d4c1d74f5b5
26322 F20110113_AABFEB lewis_c_Page_39thm.jpg
6db7801bd312c498e2246e14a2710153
0769954034006c7d4099220f3b5b90457a94e92e
46129 F20110113_AABFDM lewis_c_Page_87thm.jpg
d1b1a596ffb21541368423aab0bf45e8
65aff828539339a6e602aeca0fa6bd279740ac25
50864 F20110113_AABEYG lewis_c_Page_16.pro
587570c3c884a3e903d4e10c219e7400
2ec658680dde4571e1541e81a6f3d141cd55f96f
1834 F20110113_AABFCY lewis_c_Page_80.txt
bacc6df65d2e1ff62f5b991ad17e0485
4989cd0fa00d3340718af7308aecc90e57c514f6
F20110113_AABEXT lewis_c_Page_90.tif
b6527b81062f879691b76e88dd45d931
96216daaebb70770469cd2c0717813c4df3044b0
79702 F20110113_AABFEC lewis_c_Page_54.QC.jpg
df878b9b474968e30ad49b061a48c71c
526b4f5604a7290692371d9a2ca57a637e717130
45498 F20110113_AABFDN lewis_c_Page_64thm.jpg
073f2e15d3b0b7c6319da475f1c65f3f
78338dd488ed62529d30f044f7b172f569ed5ffc
51354 F20110113_AABEYH lewis_c_Page_17.pro
f7375d37ef45f6616878fffe432d7dce
afb110e2bc8a39be0cfb7bea076b5569ec04ea86
1821 F20110113_AABFCZ lewis_c_Page_81.txt
1bd66ee515481b45ab339263ac2e251d
62500da6ea85ea89c020ec5cf59879ca93b64707
F20110113_AABEXU lewis_c_Page_91.tif
ebcf78ab44399031a71a68ffb8510c7c
aa2a8d782cbb671b58f3e9c4e919ab5a7ff3bc16
80809 F20110113_AABFED lewis_c_Page_56.QC.jpg
2e5f3d0eebf7b19953ca22db4b4ecc1c
582088bee565fb48e4cdaa0217fc131e46dcb1f0
86210 F20110113_AABFDO lewis_c_Page_19.QC.jpg
f32866807cc9908a2d7f77e31120bcdf
abf93dd56b6c4d50634b289160f13a3a9579db09
32656 F20110113_AABEYI lewis_c_Page_18.pro
8fd9abe295be67bfd0e4c9e8326ebdd2
0304f40e9274a58bbe18c69673947207931f6607
F20110113_AABEXV lewis_c_Page_92.tif
d44a2db33083fc5ae050aa024c74bb91
87d68f2491db5069783f519789106601bc6490a4
83316 F20110113_AABFEE lewis_c_Page_86.QC.jpg
9e998f7efa9b4feb8f5d686d04ffd3f7
1286192c4e272e674f49660c70681377d2adca80
13780 F20110113_AABFDP lewis_c_Page_51thm.jpg
0fe8d98b7de4ab9d129af32e11aeea70
b5540bc48a87f3f208456ea5c579e9f30e5c91e9
41808 F20110113_AABEYJ lewis_c_Page_19.pro
9c0e3bd37c78afa25f9a22e170694045
15956f653095c8358203adbe8fdc7d223dd05b03
1147 F20110113_AABEXW lewis_c_Page_02.pro
6c39ad7757a3083d71c43429298672a7
d3a27a74361bee32b0ae9235a0d65bd9f31e6a47
71140 F20110113_AABFEF lewis_c_Page_71.QC.jpg
eb170dc5ec6d6cd8bf6fa659650d54b3
3c634de916a21fddac0708c4cb2048da3deac778
21409 F20110113_AABFDQ lewis_c_Page_17thm.jpg
176175c6a20ed67b44417510bd3c3f4b
0cde107ee652bef5014d061ab296843a0ac20e4e
50999 F20110113_AABEYK lewis_c_Page_21.pro
9594d2f18f015db0cd3f332c7dd4b1c9
73970d59ceee3dc743efa6c6bb479eabd8047d12
2588 F20110113_AABEXX lewis_c_Page_03.pro
6625be2817c8401518cdb61d551d93c0
744bc495c9a1c5c4c38958f9c59d72678f4ebca2
89908 F20110113_AABFEG lewis_c_Page_90.QC.jpg
a826b0d52451ce27bd8c86d0d10b1fe1
4dbaabf95f51d2c3246efa9b02800eb431bc8a96
22467 F20110113_AABFDR lewis_c_Page_50thm.jpg
c303aec39a8847bb485bebe72dea37eb
d4d47a7e97dcf7b75b6d40f77ca28614a2a254d7
52742 F20110113_AABEYL lewis_c_Page_22.pro
3fd3d39844b87dcbceb0099f973b0796
c588a406771e04d39e1745e7eb4a60d87d7a6a5a
12621 F20110113_AABEXY lewis_c_Page_04.pro
d0587dad510142e9eb13df988f50b4ce
24875b912daccbae6e9029519447534968666e30
79108 F20110113_AABFEH lewis_c_Page_48.QC.jpg
834df262450856618bc9fd2501af4377
6dc52dfa8e9271ceb4f5f6f0cbaf71f9103a0893
34946 F20110113_AABEZA lewis_c_Page_43.pro
90bb7632eceb27d53601adf03ada92fe
914b4d291dff638fc4de122c85858597b378b267
21452 F20110113_AABFDS lewis_c_Page_81thm.jpg
17a72d700072ea6f2e4aea871d817475
64a555c433c92fccd97f553ab81c311619bee08c
50566 F20110113_AABEYM lewis_c_Page_23.pro
36d7d63d5d6fbffd2db0ebe4bf72bea2
c871c0a76ebaa08e3c9a7e73c0cf9cdef2b392b9
73647 F20110113_AABEXZ lewis_c_Page_05.pro
939288352a1705bb623df495fb8dd3d2
9702ccb22b9313b3afb2df09a124ab3832628250
34959 F20110113_AABEZB lewis_c_Page_45.pro
77a17b75656ab14283bf224985cc51d2
3974de68cfc749043a93ac9fb9d9cd2236bcdff1
22288 F20110113_AABFDT lewis_c_Page_15thm.jpg
57e5a97d9c10661153e234444e2c42b6
e37dcd010f344c0a0f65304de42bbb4f1a8b17b2
48615 F20110113_AABEYN lewis_c_Page_26.pro
b3ac298e76ce276277c3332a0b6c6534
ac6e3c4125a61b4b083fce72785a73e67e10c0dc
6776 F20110113_AABFEI lewis_c_Page_03.QC.jpg
903ecd9255067575daef3d6d1c047ece
49e2232a0eb5988de338ad97a56329a4ed80555a
6147 F20110113_AABEZC lewis_c_Page_46.pro
e524117009964523d71386e52fab3874
75cbc8acca2551a9b95da10cfc345651f1290a64
22527 F20110113_AABFDU lewis_c_Page_25thm.jpg
c86ef8bb7df2f522364a1b96df7d023d
2f21502415cf26ecde16ac4e2458bc85fb663adb
48680 F20110113_AABEYO lewis_c_Page_27.pro
a0e8ca9281f948e9227ec80ba6400104
9e1e967fc2382c636b053edeb0b55c091ec6c6c4
78224 F20110113_AABFEJ lewis_c_Page_66.QC.jpg
ee56d15fc05232f574c078e2351b2a39
2addb0c955dd2544ff0c8d0284f622428996b296
38982 F20110113_AABEZD lewis_c_Page_47.pro
18ff5f1f9e33bf5da36a791e45752b2e
5a76feb09dd1b5f91ecf12f0ebd36ee9d8a56c2a
70662 F20110113_AABFDV lewis_c_Page_17.QC.jpg
6a342429b8cccfda7dffbc83e14f849b
054ce8256501074a9f421e031256b5be372851f2
52187 F20110113_AABEYP lewis_c_Page_29.pro
c918791158157ed87c3732826df96f61
fdb70dcc59df0ae6998187d7cf7714117b8caedd
10004 F20110113_AABFEK lewis_c_Page_74thm.jpg
b4d14151a477342017f59ec78f8c61af
4d6d67e91213a6db1d36a1b1c4f2790fa26f5f38
53437 F20110113_AABEZE lewis_c_Page_49.pro
e9adb205bc8c1443c205a45fd4ca4ff1
5074f396ab65e668ebf16b3185620b9d73a2c6ff
90023 F20110113_AABFDW lewis_c_Page_63.QC.jpg
20d627e7a6c9376bd2336c6f6528ccf4
1997d92e945c3bd415d6abac962d5c982ab0b54e
48118 F20110113_AABEYQ lewis_c_Page_31.pro
ee3ed37b2bf89ff858c8de3a6bf51817
aaa6ab98f76bed075baeb688fa24d7c9a7ce9aa1
82275 F20110113_AABFEL lewis_c_Page_38.QC.jpg
7fab4215c796029adc399db0a7eadfdd
da0033ff737d62fad767a7036bf73aeecfd4dc20
44867 F20110113_AABEZF lewis_c_Page_50.pro
5a0cc1b2ca50ba38224acc34ed31b245
84341ec99f8c505dd747cacd7bc4f8b0f02fff0b
43216 F20110113_AABFDX lewis_c_Page_66thm.jpg
d244eca5dbb58b532ac832893d10db8a
061e1272a958231882b7fe38e175588cde46d95b
38699 F20110113_AABEYR lewis_c_Page_32.pro
a0e0e373b3e51c895fedb0dd9bbb87ef
130d5b2b4df243f661262c7794b7021c51f1718d
71385 F20110113_AABFFA lewis_c_Page_20.QC.jpg
1e5e82c666007b4bb27000869dd612a1
e9614d4a7d3e6909ee3ba5b5a895cb33cd4f953f
42103 F20110113_AABFEM lewis_c_Page_57thm.jpg
480c76a2d6eb5815593e6d4d28c8d29d
288cd41554a262a4b69381b2ee1bfa40951158a8
23877 F20110113_AABEZG lewis_c_Page_51.pro
1d3dbf676336bb58fbc91a680902b4f8
62931e5558c1e54f032072d6bf4e15d8084758e1
5462 F20110113_AABFDY lewis_c_Page_46thm.jpg
ac77d2a85cb6fbb4c99888e3702996ff
d1d5b8617c9f42e15931ad4c8f317811dce8843e
44843 F20110113_AABEYS lewis_c_Page_33.pro
9a33bb78b3a9670e2eda02667edd5c9a
1e9774afa1d7d0cd0dd2ee37925f106606807451
44411 F20110113_AABFFB lewis_c_Page_86thm.jpg
de3e645b30df13ac64cb5af98680eb60
55c138b5114df283662da677f39f9132e563cb4d
69621 F20110113_AABFEN lewis_c_Page_85.QC.jpg
8becc1717d8f80a199be375cc74e377e
bb162db4a7e5062d1a0a7fa557e8191f9346ee41
42556 F20110113_AABEZH lewis_c_Page_52.pro
67b4b953f3d7f98a700c5238d44233b5
1a2696b0666a892dfca3764db6ef63b4ff72e049
25131 F20110113_AABFDZ lewis_c_Page_22thm.jpg
743d87f8a34a636905f90c8ac70c7566
0cfdb5605fec939e927358a2539e5eed005e97b2
47742 F20110113_AABEYT lewis_c_Page_34.pro
cc08ce072b268fd0c94fdc17d4538d33
3fdcaf821bfd6c602d61839a0cb327c51fc78eb6
45329 F20110113_AABFFC lewis_c_Page_45thm.jpg
f3877743af7ba412e1a7a64b9191b2d9
a32ed41f0a593aeb58d74ea10b8f215c097e6ac5
91413 F20110113_AABFEO lewis_c_Page_05.QC.jpg
031265f15e2975edd7d3af41c74bc232
d79dd22046376e6af59df49a217483037cc550f5
25579 F20110113_AABEZI lewis_c_Page_53.pro
9ef162f0f664f4bfc9c69fd5ff7789ce
1968ed9f78a020d624c5b34b224471904b38e00d
55077 F20110113_AABEYU lewis_c_Page_35.pro
21de73ea5ee3473798df92ecf7f683b2
565de106cbc0df536c22b4a6c14913e5e7a88a96
39643 F20110113_AABFFD lewis_c_Page_67thm.jpg
86fa730ffdbb7b8734c3c0d881038a53
da355b1c7b7befe6dadfd909ede0b7b1d2d431dd
24268 F20110113_AABFEP lewis_c_Page_59thm.jpg
9562918d69e9287d0023f92b2b96c941
363d84c0af0aeb3432fc568b7668bfd8fe6ba4b2
57717 F20110113_AABEZJ lewis_c_Page_56.pro
270bf096ce768c20c4c1df0ec9a708b6
7d4e7e28b33730ff1fc13f0ceacfd8900453bc81
49020 F20110113_AABEYV lewis_c_Page_36.pro
f20515bc33cacc2c6007f572a94a87d7
18aab4acc8a0cdaad1f039f9653ed3920f855395
46549 F20110113_AABFFE lewis_c_Page_43thm.jpg
2f1fb8765358a3c2f065e1192bab5b57
d25aec1367d2000c1d4b7cf4f324fcb24c28871b
5797 F20110113_AABFEQ lewis_c_Page_02.QC.jpg
56ab309015306bbb94b2be6741cfe0d7
7ba3d7d4bcebd2c3d2e6596111c791fc0a49850d
25834 F20110113_AABEZK lewis_c_Page_57.pro
3d750552f6df0a4c73ab28a6d919a6a5
2e85bd622076f7730f9f71c9a0408cb4a5bc1e66
53365 F20110113_AABEYW lewis_c_Page_37.pro
b29c4e16582a3805bf4484e6e25e129f
f94fc88e8d6e15ac4c6f424087dba278a0c746e4
67689 F20110113_AABFFF lewis_c_Page_52.QC.jpg
376edb5e927509c2ac683c2da31459dc
7c12413c763be80ed72e3c3dee31101144a60d8e
86442 F20110113_AABFER lewis_c_Page_58.QC.jpg
e8cae94cd94a29fd1c41be67522092c7
9d60202f9c43104c662b116444bd880ddb731c83
59462 F20110113_AABEZL lewis_c_Page_58.pro
0bcfb46dfa2530915550df1e6e4e5a9c
36082bec23c61363f79e6b884fc3df427dcecd17
47047 F20110113_AABEYX lewis_c_Page_40.pro
6d414ea959f5ba66d1d79c1e1e52ec8d
397195d4a02342cb4e7eeb976a0514edf2f99819
75761 F20110113_AABFFG lewis_c_Page_26.QC.jpg
e922a113ba53e1ccbfd2a5de90d5e8e4
0fd7cacd14becd6994796328395afb1377732bfe
24863 F20110113_AABFES lewis_c_Page_76thm.jpg
b42c2e106842608fb662831f5cfd5704
1d01233e80833c0d2a21e6694ea3c1d8822663ff
52132 F20110113_AABEZM lewis_c_Page_59.pro
cfc557f8b1e7a04aa49cab2d515bb405
a6de9c5c52c94d2ccb0d714fb786b3a5ea6cf88a
44752 F20110113_AABEYY lewis_c_Page_41.pro
02477d8740d2720ad2bdcf3be159cef0
e8fa56085cda6fdf7a1ca869c78f9f158e85d718
46102 F20110113_AABFFH lewis_c_Page_41thm.jpg
83a36cea9d588b5ca1da32c170f09440
c666e3a09e532f62cf786d41ecfc634842436af4
44565 F20110113_AABFET lewis_c_Page_69thm.jpg
ee9e636fe5ab664992b92caa107f67a8
34e982285a9387b8c3cc05c603ce99becff0c02b
41250 F20110113_AABEZN lewis_c_Page_60.pro
133758125aaf35982bdccdb8fc1e552d
71081ddbc646fa8bb0b0bf1c40e75159934ad914
43953 F20110113_AABEYZ lewis_c_Page_42.pro
ae7d4d3b0b47b96f991644eaf6fd81c4
cd80693936fcb79d7e6fcbcbf61e7dc7719c2cd6
25083 F20110113_AABFFI lewis_c_Page_83thm.jpg
b6d6abd1d15538ffd9b05232d1b3ea24
cc64bcab43e45478f3fba5aedf143d9638a767c8
19790 F20110113_AABFEU lewis_c_Page_75thm.jpg
8a24aaed122d76629534a8d2fce52daa
ab868c7659182623b393651271b0a50dea20bcca
38626 F20110113_AABEZO lewis_c_Page_61.pro
f29878b59de7ae247137226faee8fbd8
586e86ea8320cc4069253ce0dbacc723e0c642c7
25417 F20110113_AABFEV lewis_c_Page_90thm.jpg
6ac8f583f6c586eeb8788de942bfa09a
21ac234cccdf9c2fa8d02583cdd2bf95e9ef5c0d
42734 F20110113_AABEZP lewis_c_Page_62.pro
697ccf03448e7b2b27e6f9d25db069eb
f2e041d72c1f9095631999598521a8613e300706
75746 F20110113_AABFFJ lewis_c_Page_34.QC.jpg
1cf2451104de109bee95519f791bc356
3e59e33939eecf1ff46eb1bf11f45e64d78fda5f
24056 F20110113_AABFEW lewis_c_Page_40thm.jpg
eab7fae24c37abbbb8ee863116d44369
f049d14f2a06306106b97d6d09308d1839c1ebd9
35703 F20110113_AABEZQ lewis_c_Page_63.pro
0e72ecf81991ea293c9e66adc1b2bb1b
e41a9abeb3916fcd7aff7649670fc627c1787d36
23753 F20110113_AABFFK lewis_c_Page_26thm.jpg
2d157c7e290c8bf7bd641b096ba9b19c
cea5ee28cb360358d7948aa12b909bab152661e5
61479 F20110113_AABFEX lewis_c_Page_61.QC.jpg
4e25b8cf5dc053cacf1f4d9ecfc5890f
5ce8dbef534d276ce3e054b29644c59b66d20b8e
32324 F20110113_AABEZR lewis_c_Page_64.pro
35a06817c1de49e9ecc90d5b2cd8f810
fdb4e2b9e42866f82d40f29423f0c6dc52157857
8440 F20110113_AABFGA lewis_c_Page_04thm.jpg
6f0ae92e80ba6a8ac65db75e238a8c87
d3caa3275246c33683a6cf75a0bfa504695e7c0b
25017 F20110113_AABFFL lewis_c_Page_56thm.jpg
14361c06a71f0627827baf8d03611f0c
785931889d8b1002ca6257d24ff481504017a592
25470 F20110113_AABFEY lewis_c_Page_79thm.jpg
f59c80eeb8527e656e9877a95423d7aa
6f5e6b1e9f323db67aedf82c029474b03dfbf7f5
35471 F20110113_AABEZS lewis_c_Page_65.pro
8abf2554a039852ef6897351e6a35502
2de8ea3bc8b1b60b53c5d360b3831744d624d904
80358 F20110113_AABFGB lewis_c_Page_72.QC.jpg
452963ebb10eb39bab0ab4876b31e105
67a40c50fe49ec8b3f79a17cfbe634071d9bdd69
45970 F20110113_AABFFM lewis_c_Page_70thm.jpg
c1f5837e95bc9f470238c29efebb9b14
a9d93bcfe33693059a7e02d3130aa4b3a9b27c15
24189 F20110113_AABFEZ lewis_c_Page_16thm.jpg
8eb663a4a712466ebf5caeac9c5e2c42
c1d3564b41cd2f7d600cd45386e53c748baba528
27747 F20110113_AABEZT lewis_c_Page_66.pro
6e572964b467e7b845efe64077010042
a2e5130cdeae3fa887c3f5a8ac199ca196e821a5
25217 F20110113_AABFGC lewis_c_Page_35thm.jpg
c2c39bc8b229e358ec7e81ee05d9fd69
d7fffdcfbae4a108a2f37b1fea021f07f5981057
24308 F20110113_AABFFN lewis_c_Page_36thm.jpg
6e115abb096e1a548ecb69e63042dc6e
fc63f9504c73f9eca027524ce8b36d4c83cfd430
19011 F20110113_AABEZU lewis_c_Page_67.pro
1049b2fa0be003dfc4729b604b99415f
0df382d5e9e7a8aa117529bb2954ba67b4f93155
21816 F20110113_AABFGD lewis_c_Page_01.QC.jpg
f32d0c7b4649008865db26c9d90bfc49
ed6e62ff612197af5d46d41929bfd445a06c1cd4
65462 F20110113_AABFFO lewis_c_Page_06.QC.jpg
e26c6ba443876423be63b888a1efd704
2ced14561791b90d5a6b70fdf40c13c60d50e08e
24745 F20110113_AABEZV lewis_c_Page_68.pro
a42e6afea2faa06d05bba7d8e627c153
1daca14c42452abbd08266b2641a76f052d5a1e8
79393 F20110113_AABFGE lewis_c_Page_77.QC.jpg
6c1085edfd11883fe2d2f75c24cacdec
73ea9bbe9860c9fb458b5d47da81283570c965ac
22802 F20110113_AABFFP lewis_c_Page_80thm.jpg
b2e00395c3a7385e11d44db3ff32475f
2fad744a05887755e73ec278d9ada1141763f2b0
37355 F20110113_AABEZW lewis_c_Page_70.pro
7ccc7ce263828c6d94986819ba370566
4f2c09fe8ac24c819e900c84895c6d87b8eea9a8
72512 F20110113_AABFGF lewis_c_Page_25.QC.jpg
006c39becf38024daca89bbce3f4ab3c
558658e9996b4d3c35e760304159e2f8768660bc
41355 F20110113_AABFFQ lewis_c_Page_53thm.jpg
29da67d4e80d087cd875e196c3f68e04
249a3c3d02ca36dce62b09f25e8f96783e459e5b
29725 F20110113_AABEZX lewis_c_Page_72.pro
e7e1e4fc52cae37d5684841b18f2c06e
7cf24b35e6170eee3fc6ebafd5bfe059fee4f36b
48702 F20110113_AABFGG lewis_c_Page_60thm.jpg
cf2509b7d125650e1933160da81d190c
df1ab8508696cb451d237949b51777eeff1a60d9
46413 F20110113_AABFFR lewis_c_Page_32thm.jpg
44282152f66ad78179957766198fe0f0
85742e5d515efc2f9f3da7fe8f4d3a34ac9addb1
30884 F20110113_AABEZY lewis_c_Page_73.pro
6e4446ec3b4333fda117a849e5a9e1fa
aef3858f38c730ac29b873fa4e86efd0e131840d
55835 F20110113_AABFGH lewis_c_Page_09.QC.jpg
cd5a214bb4f426be74d38289351ab783
a5c318094dd19fbba0b85e004366ea3f6213dade
83751 F20110113_AABFFS lewis_c_Page_30.QC.jpg
5e8b5b36ada2a89c1802bfe1fa445943
b371faf78cb22886f07b134cf879698221629fbb
39282 F20110113_AABEZZ lewis_c_Page_75.pro
f086c078492634e6416f23e1dbc7dbec
79eef803a44077f8e09a2792bf8f971ac3ece601
53891 F20110113_AABFGI lewis_c_Page_07.QC.jpg
97f4722f42c137b1f1075483d0b2bd9e
afec17f8136498c0a9116017fd327e1966410449
77249 F20110113_AABFFT lewis_c_Page_68.QC.jpg
1087a1b6ac73c3f9de5c8d9ed3a8ad00
e36b20d12d14a3859e16713d1acf790f731e8bc0
79828 F20110113_AABFGJ lewis_c_Page_28.QC.jpg
ba1cdff048a149749d8de47d6b1d8112
000ed384357a2f26569e3ab8062d821643ff5a5e
79113 F20110113_AABFFU lewis_c_Page_59.QC.jpg
5c983cbc822b42dbd7ba8ad0f378b8cb
cb46a5f6a2c5e867f6c994bdf4e852e3243f6648
57776 F20110113_AABFFV lewis_c_Page_88.QC.jpg
6335db71cd7fbff902b0c90e3924402f
3063ba48409820db9550bb77e7a5cd9388541e5a
71531 F20110113_AABFGK lewis_c_Page_53.QC.jpg
0a63df48457d5764586c14ac30122db8
ba5141686b7c4a4bc83d1bc9d6e3e3d93de1e25a
43703 F20110113_AABFFW lewis_c_Page_18thm.jpg
6cad6ac712af2a484339bc3606dd6c6e
1a7b757947a1c9239916208d24a7b92de21d2f9b
14882 F20110113_AABFHA lewis_c_Page_11thm.jpg
c63f47cbbea952b475a7327fc8e144d4
653a07e06a6af113bc712af287055884937a124e
23334 F20110113_AABFGL lewis_c_Page_29thm.jpg
9e63ee00e489012e99deda5863835ad5
d11c6c098802b56cb5dc7ae85b4b2ad68e8b0206
24528 F20110113_AABFFX lewis_c_Page_14thm.jpg
49ab4e88752d83d06647bf4e6dec35ea
aa24cb21e8cfb1339d54950a6cda03ca413a63e6
89149 F20110113_AABFHB lewis_c_Page_55.QC.jpg
317c098681dd45097c4a828f3dd2208a
cf0001964a476ed0b8074f0052e7495ee3f2462a
20221 F20110113_AABFGM lewis_c_Page_12thm.jpg
9ff06cc4e85cca5f16712b4a2f129259
d7229f53884b76e12e45f9bf092000134c08507c
21860 F20110113_AABFFY lewis_c_Page_42thm.jpg
db7f5a70f7f94ba21c95aa5d993ff4bf
2c4fc844f39bc353b28821a84512d8f415111eab
45864 F20110113_AABFHC lewis_c_Page_55thm.jpg
4eb4befbb6dea6307a53baa3d7a14946
da6a3c50fc0246a3a0914d00f824748305107711
36079 F20110113_AABFGN lewis_c_Page_09thm.jpg
42e10ab72238f4a41c04d07a1b757d59
b1f33202b33eeb3ef2f980e545ede22640a87ee0
81072 F20110113_AABFFZ lewis_c_Page_22.QC.jpg
690a944ae7596ac13ee84c838a352ca9
5d65d0ff7c866a4e26ea7125499705cbd1041599
77428 F20110113_AABFHD lewis_c_Page_36.QC.jpg
3935428a07c508872ffb1c8b8e61a9bb
2814b865b1e6ee5560f125bf5263a5c30cfb67d5
85255 F20110113_AABFGO lewis_c_Page_87.QC.jpg
aebb3ca6d4c7f34df45e1a489478ba63
3c5b785efc63d6648f0391de2f0eb21d3da9afbb
86842 F20110113_AABFHE lewis_c_Page_24.QC.jpg
06eaefd14de514f6a14e726176b059ae
3c301c5c8449d35cba65dd1126b1e0fda5c3526a
90780 F20110113_AABFGP lewis_c_Page_43.QC.jpg
b04b03a546d6e094611660f2d89b66d0
1dc20ce0992504202c2b543cdaf6660aef0e1603
42366 F20110113_AABFHF lewis_c_Page_68thm.jpg
7766a14496faf6c926ed4ffb7e571056
4c22f2b38fe3a44e46bd27c5f277530996410119
25493 F20110113_AABFGQ lewis_c_Page_78thm.jpg
dabd13c927eb853f19972b1715d4de76
f561ffdfa1661709291a74e93e2b257a56ee143b
30792 F20110113_AABFHG lewis_c_Page_74.QC.jpg
4f055eae43d4abf6b2612a47f8366fbf
2a8f4fc2756e127366f41f164b49bbcbe7518347
21405 F20110113_AABFGR lewis_c_Page_71thm.jpg
8e71a62d297b462ec05935be9b916d95
a30c3d4ff4d46dfe1fb5a0fc62fa1ee68b4f83c5
71393 F20110113_AABFHH lewis_c_Page_21.QC.jpg
eec40da48cb89fc9f548ef8b8ab20a25
9b0388e53eb19287521128355175b5f31f334a80
61894 F20110113_AABFGS lewis_c_Page_47.QC.jpg
c59d4ac6e25d5b849043f6aee9bc19f1
65681b31a972fd2b6033e8c85e224c18e94840d3
5398 F20110113_AABFHI lewis_c_Page_84thm.jpg
4ff6c767c6a34da0053d8f04be7f4ca6
f9bbbf155953b8407166b13f9577c113b99040f6
25803 F20110113_AABFGT lewis_c_Page_38thm.jpg
867a452416bba6cdb13f011152717c1b
74758df4577bf0fbd11091a9d9a00a4ff5554ef9
79103 F20110113_AABFHJ lewis_c_Page_29.QC.jpg
f019a8f1fa033d9473810f63948e7c3b
851c2ccc44f9c243a7e45ca6af3f7e9704eed44b
23379 F20110113_AABFGU lewis_c_Page_21thm.jpg
df850e04a0644d9115d49fc1a8a76d08
4601ce8d06e5846389870d37f57051d5c47912e0
42452 F20110113_AABFGV lewis_c_Page_54thm.jpg
8469516551ebccb6377a4555faf1b471
7134a09b5746813ec5971453e94a896a1f8e4f6b
22347 F20110113_AABFHK lewis_c_Page_27thm.jpg
288aff5eec9c8e8e4d2a91e6a40111d6
d2f06175c379e9ae19d7124b0e1c551b02d59192
19124 F20110113_AABFGW lewis_c_Page_47thm.jpg
b66d4cec158227c0d857a26617f32413
f70fd1ff6709f586c2d0265779d73334da9227b4
23848 F20110113_AABFGX lewis_c_Page_33thm.jpg
d9ac38b6addc7960b826e22d7db81414
e94ca09dbdfe731dc96b9b4cf73328a0e9f88d13
80054 F20110113_AABFIA lewis_c_Page_16.QC.jpg
dec73461b4a889e85e48389c35d36d0f
f273ef180561e938102db8ac54d92071c12e9e6f
87235 F20110113_AABFHL lewis_c_Page_45.QC.jpg
526c604313561f7188d621d59119322e
689df51412b18a1f0d67ec30fb26173c42f5f422
25433 F20110113_AABFGY lewis_c_Page_23thm.jpg
fe5dbf3f5979700eb27d50e27fd65405
496b0c5f930aa173969036a74077a7fa86124860
81887 F20110113_AABFIB lewis_c_Page_44.QC.jpg
c722a7ead2f60502071d037de70f0744
506b2a340b9a670f3ded16fc5a41305d51fec1e5
23261 F20110113_AABFHM lewis_c_Page_31thm.jpg
975ea0840b1e7a20bc3d506d7464d80b
67bad6d7bdc8bc0b89fbfe5c3c60e02f86dd550a
86245 F20110113_AABFGZ lewis_c_Page_39.QC.jpg
bcb14d95383558f32609b6beba0491f3
15a5953b4284ad52300c252c94e6c2ad7894632c
19060 F20110113_AABFIC lewis_c_Page_10thm.jpg
e7c3f7730fb2d39b17311ae758e043be
db7689ec28830d011ca7e262806335bf8aceae73
78084 F20110113_AABFHN lewis_c_Page_23.QC.jpg
43bdbc456715bd124f78d75cf0ef140d
f57a35ec3994e39169c901e3cc364ea655c4a79f
45086 F20110113_AABFID lewis_c_Page_11.QC.jpg
40e88791322bae4cf2b3c27ab74bca92
44186ec7aaa3e5004dfec6af445426b79cbf8d55
19500 F20110113_AABFHO lewis_c_Page_61thm.jpg
177d70dee6e9c32c9e8fa879238d675c
02377b37e45b0687fe21258ce1aefe2d42f2cb3c
72956 F20110113_AABFIE lewis_c_Page_80.QC.jpg
c0f850d9f69fdaa44de4061cf9b60fcf
172a941aea5d8b2e4ce10d7741f0760feef2d07f
66878 F20110113_AABFHP lewis_c_Page_81.QC.jpg
6d43f693c8a72f770171f694660ff94b
0cc9f10720e293e87b3205041886a68260f256fc
83947 F20110113_AABFIF lewis_c_Page_64.QC.jpg
084f17e144da6e895b0a11e8602c83c3
3687bd995e6e307958358575bea9bbbda5a00153
42782 F20110113_AABFHQ lewis_c_Page_72thm.jpg
2258a4bc17c169a38695cb9444434b94
00dc35015d057297bed4604d6634c51d673b409a
19292 F20110113_AABFIG lewis_c_Page_88thm.jpg
087a0f64f49a0559c29a698ca686f1fe
98eab92f306c7a92e957f838d8fb23410ee42084
74845 F20110113_AABFHR lewis_c_Page_31.QC.jpg
4a17cda7ec1d1979adccaf44cb40e273
9326d60308614e87be0702f1d34bb9251e1734b2
89388 F20110113_AABFIH lewis_c_Page_65.QC.jpg
952590662027b447e5b29be5f783afa7
cd1809921327163e8449e033459d3b78bf32a1a7
87883 F20110113_AABFHS lewis_c_Page_32.QC.jpg
c711be9547bfe9634fa4dc758eb3a127
017cc41e7c31f15499a1cb4c18744834873e8b19
21506 F20110113_AABFII lewis_c_Page_89thm.jpg
f6ec1dc891467fc6aa7b676ade25ddbf
2da3f31cc56db95f4122db90c8dc833b9c3f0c7d
25231 F20110113_AABFHT lewis_c_Page_82thm.jpg
2b2feb9423bbafb146e60bbb522aafe2
510d2ba4b745b6e07d07ea0bf168a0a487202945
78731 F20110113_AABFIJ lewis_c_Page_76.QC.jpg
86a781bb9c8418f677ea0ca1a57d0de4
7bfdf250875e9f73b8200d21fa2bc28770a554d0
3115 F20110113_AABFHU lewis_c_Page_02thm.jpg
e5fa26db2fbd32491b9902674717dc26
50457fa6e140e3a78c1184c691198ebb5b16c397
81295 F20110113_AABFIK lewis_c_Page_73.QC.jpg
1df79a32d994532db4e1e1f48b7a7cb4
860ec140b08142aaa435052f1e25a68f4de104c7
24424 F20110113_AABFHV lewis_c_Page_30thm.jpg
f77c67ea4000e78e94cfe491eaa364ad
2cd6998ee00deb80fb1dcbbac86bf19da3db3167
25135 F20110113_AABFIL lewis_c_Page_28thm.jpg
941fc358aa26438c0e13f9336602a207
5bbcc58aa634e66db39c4bcd84f56657bad6eff4
80344 F20110113_AABFHW lewis_c_Page_35.QC.jpg
7fbc144c565b3e4e64d18de16abb86b5
3e42a38cf9c8e39cb009d6ce3746dc882634730b
90358 F20110113_AABFJA lewis_c_Page_70.QC.jpg
bd302d1f44f9a485cd125dd1e0f73953
2b752fb5159d705c6246d06b0c4575fafc04e718
95607 F20110113_AABFHX lewis_c_Page_60.QC.jpg
31f5a9b872841f081436e2524911de71
fdee76a828a14ae01f0749f1bc00ad0033709468
77416 F20110113_AABFJB lewis_c_Page_83.QC.jpg
5cf8234b106f232b7c64d5ba918324bb
b11f2054f2981f85a8b134209087cb3e0d151236
77870 F20110113_AABFIM lewis_c_Page_18.QC.jpg
2bff37fd657aa2f9d82fd5f4dee8ebd3
0b3d3bc8996169ed9d503d0cbb4185bb1698dc0d
24083 F20110113_AABFHY lewis_c_Page_34thm.jpg
55c08d30e37e80ccc53db57176a6f330
516350aede856777177304bdd61ff23f44f48e7c
40035 F20110113_AABFJC lewis_c_Page_91thm.jpg
52150a64afe655db55c997b1d74c432f
6c9249c321cc8c03c7321b76efad626cf5365949
138022 F20110113_AABFIN UFE0006280_00001.xml
40f19885fa6cba8d06a884b5dcd61633
7a9af1647b7881685901d4f07f90080158ceac1e
83271 F20110113_AABFHZ lewis_c_Page_37.QC.jpg
5b81b310fc2541712c00330041f9eb80
484de73b75d1d4e64f70e8ae35b47f733d4af9a1
70569 F20110113_AABFJD lewis_c_Page_91.QC.jpg
69e1fe1e745dfe1bc98300a6856f15d1
a3c59079d993bfb8bd63361135b757e2137d9615
3688 F20110113_AABFIO lewis_c_Page_03thm.jpg
11158750607283adb69cd95548d881db
6ef40aa6c442c9e9c56dc2188d4e6ec33c5fdbd4
44880 F20110113_AABFIP lewis_c_Page_05thm.jpg
77c34214c61414c0138c2427da700a23
15f7881299bfa9bc1523ef74d02e0aad65f64167
34161 F20110113_AABFIQ lewis_c_Page_07thm.jpg
1cd424a42f649cb6b10f5d1a6c7e5784
103b63a54457b58d394590e24b7912c760b6e07b
58788 F20110113_AABFIR lewis_c_Page_10.QC.jpg
4903d3c04763117d29d00db51eedc033
4a1fdf94ff0c8f961e5dffb0a9ad6e7947d355de
80110 F20110113_AABFIS lewis_c_Page_13.QC.jpg
f6180b6bf1397e4176d60853b6adb2e7
50bc9e694f78561de4c5a78008c09408ff0d0ada
68333 F20110113_AABFIT lewis_c_Page_15.QC.jpg
e47d2c539ac5a55adde4b157573087cb
c8e3ba194de94b6860283525356e9538be78f181
72467 F20110113_AABFIU lewis_c_Page_33.QC.jpg
c8465a98b459e6b8d4967e7527e61e73
1282cbf87805cfbf5ac16ce38933a0b4e5e6a6f7
25379 F20110113_AABFIV lewis_c_Page_37thm.jpg
748d5bf65da7301a376230fc75a07c19
48c6ef779db9372ab9ca8f7edc0d7a72e529edbc
25341 F20110113_AABFIW lewis_c_Page_49thm.jpg
6a99e90c26a59de5863f4459070aa5bd
2684c9463f22b95ceecf8213740bea50a57e3218
84108 F20110113_AABFIX lewis_c_Page_49.QC.jpg
103ef3637b6eeab8fc4c2dcbefea4bdb
6eac4722030a1b48317aec238e2f29e09ed369f9
46416 F20110113_AABFIY lewis_c_Page_62thm.jpg
3218ddfe4c76c65b075906a73a643a21
4def12604e4c6f7ea1d11c89e64229d65bed12e2
94217 F20110113_AABFIZ lewis_c_Page_62.QC.jpg
5428a0738ac16fbf72beef3eaf2e881e
da193c33837e9a88ea43985056962c0779febc9e
1477 F20110113_AABEKF lewis_c_Page_69.txt
18a0d28ac7378f816a5740356b181dfd
af04d17518d523574c95e549b011b127665402bd
20985 F20110113_AABEKG lewis_c_Page_03.jpg
5966f0d5dc17852697e1f6f4685912e3
8babbe3a06aa1e4336c2194736dca56e2042a85e
777470 F20110113_AABEKH lewis_c_Page_73.jp2
742a5f7018b268fcb0ec1ee5e9e6f3c7
0d141d6949a2505e1613f04abd5ec0d56f364547
948 F20110113_AABEKI lewis_c_Page_74.txt
02d926421f31296c63361f7e2d756ea5
7617517fcf9c91d08c7e1ecd54c91e46cecde4e6
F20110113_AABEKJ lewis_c_Page_41.QC.jpg
600363b9e2b1d15a6207b002377fa2a6
45ff36676a5083913bd446ec398668ee1a51bfdf
F20110113_AABEKK lewis_c_Page_27.tif
7dbc24d12bae3beb68ced3ea06ececda
95526d85ab77e70d8f082210ae87a6c65a49ab49
171277 F20110113_AABEKL lewis_c_Page_86.jpg
1fbf08fd17d6ba8afeecf59f149f498a
f2047ca2d0653e413470a006e72b02c25355ecc0
72959 F20110113_AABELA lewis_c_Page_57.QC.jpg
2269b575a1e4c85dbf7b4afad18aac62
8823bd1542ab180f8269c32ea06788509ea78433
236130 F20110113_AABEKM lewis_c_Page_39.jpg
466a0115596d68a3149ccc72ea913bb1
25816f854df3091da66c8bca07ebdf2551607ab4
114789 F20110113_AABELB lewis_c_Page_49.jp2
0c5f5cdb372634d70e250b2c93513382
90930ef6c05fe2359a8c840524be06415f33b69e
51685 F20110113_AABEKN lewis_c_Page_28.pro
63d5f18735999f2e53847eb67f6f37e3
267a1abbf47140f1619fb3fbda8b8c33bce1a433
166659 F20110113_AABELC lewis_c_Page_91.jpg
15a1d1fee4acdd4ff06328fdd78f8d71
b285ffe1482701ecaaf133a9a147c8f2d5399c41
206205 F20110113_AABEKO lewis_c_Page_26.jpg
9c347b185bc9849840fde2f26839f709
0be2014617bc96ab47c36692e4baac14cd6dfe01
7550 F20110113_AABELD lewis_c_Page_01thm.jpg
98d9c9ff920ed7a330cf936ea441de6e
10f8c70fba19700a9f131dd626c04728bb118307
F20110113_AABELE lewis_c_Page_63.tif
3c00f78a0219ccd2adc14c1b6d744a35
fee8769bfcea81ef010c92a87c980e17a717c56c
F20110113_AABEKP lewis_c_Page_74.tif
6d7e8759c4db096d3e59d5bb84ca727e
2e37d6997c1b3cbb7ac6ae9e182ca74cfc4c0a5c
F20110113_AABELF lewis_c_Page_37.tif
3dd7d5a397367805778e36ceb88f5129
e998286b234e7d18ebc96d17201fc5a4dd4e4621
119393 F20110113_AABEKQ lewis_c_Page_38.jp2
c2e6503b6527f05b5e8773da627a4af1
7c4a33e9eac13e9a652dc52f41546641cfb274cd
F20110113_AABELG lewis_c_Page_39.tif
0283e8a5e14f8ee489f042db0422b0ee
19847eeb529b067f2d0b3654745e760cb9fb1562
904305 F20110113_AABEKR lewis_c_Page_19.jp2
f1d145846bf0d90feb9d3b39e9fb0c3b
dd6a612aaac70153d9411479867b4d15b0631d90
F20110113_AABELH lewis_c_Page_66.tif
ba86a55fa26d1c4ed6418b221297586c
f578bf4c0112cf835ecc4bf73d17e6415297ce2f
278 F20110113_AABEKS lewis_c_Page_84.txt
5c3d07345a0ec6910e3cccd3baa2be57
2b6c6a6ef1234a2fe008f66afe6951cb3909bb9e
220417 F20110113_AABELI lewis_c_Page_48.jpg
6186d89bd69cdb830404c8f8866a3dde
f5045f9cda736b04664fda5258cdac85c38fdbd9
47434 F20110113_AABEKT lewis_c_Page_63thm.jpg
0d8820b78ed2f9f7d5d05877f6866782
4684dbea60744f3a2c4f5697a432138b77735806
F20110113_AABELJ lewis_c_Page_64.tif
a02cce2bba7a8d52706a384da199f27c
9e326c8e12cbb8f6370b9d4174fd1bb0a68dd816
1859 F20110113_AABEKU lewis_c_Page_40.txt
319615d6ec008b7cc269ac003c0751f9
e65709236702122bb1de489ca34c017802df4ac5
107043 F20110113_AABELK lewis_c_Page_51.jpg
01952d78749a7260f19e5c502a69f8ff
e8ee34dabf53f4c4df242ae2fa94c09c87dcb04e
1677 F20110113_AABEKV lewis_c_Page_47.txt
cec5181d8a3694954c4b2bacd9675c1c
c2383d5af2f5d037eac908afb0bf84a68d9541e2
2086 F20110113_AABELL lewis_c_Page_17.txt
1eecfc6c34159ca02dbcdc50c6935646
8c68892bb307e37f26def66aee92c89501775cde
136519 F20110113_AABEKW lewis_c_Page_85.jpg
9f35d67fb40e683ee709012969476cca
0db2e29675e2be5e3529dd045f2575b235866757
F20110113_AABELM lewis_c_Page_60.tif
0b1978ccd839704597eb645b11f64646
160180528eaeb4119a1281c0f4677a53533bb998
8310 F20110113_AABEKX lewis_c_Page_92thm.jpg
14314068f9cd88e2bf00d93199f95735
a4a85c1c597ab06f4d881981084529423caf73ef
37619 F20110113_AABEMA lewis_c_Page_10.pro
072fddd028157db40cff4999d61c7ece
3b03ee150fd3405e383161666a06364e6c57b30a
13709 F20110113_AABELN lewis_c_Page_84.QC.jpg
6cc08d0fba1fa242aee277a5d3996e43
f5d509436d8f3f0b48a1892d5f2d3f99ebbdd8a6
111850 F20110113_AABEKY lewis_c_Page_14.jp2
f78b6c5f513cdc7aa2db8fd6bff60db1
84fbd042561c79ed3468f11f1ead83b0ce0b2932
49696 F20110113_AABEMB lewis_c_Page_08thm.jpg
5e8677870cbba0a01ee0647c4a31600f
4cad13592aaf5ce1b94a2a79e843482b353cc4f0
F20110113_AABELO lewis_c_Page_25.tif
455931d39135cb3b26e0e1281a0f5246
4d9748ca38f1577ab1eca7b14b09317f71772773
F20110113_AABEKZ lewis_c_Page_48.txt
a5424999d1cd3ae64ac55439e4bc8e58
5d1ba781baf4de5ddc709286c0b225920defc5c2
108011 F20110113_AABEMC lewis_c_Page_36.jp2
f6c54892fe56261edcca8349c80e4dee
9c37bad83ed02f5209904e0d172ad53a1c5b9d2f
52013 F20110113_AABELP lewis_c_Page_25.pro
51b76616ebe6b4bc1cf1d2ae55d28c35
350db1d82f9cb7dd1a31f8b9316b77ba1f4831ec
86704 F20110113_AABEMD lewis_c_Page_69.QC.jpg
b58f2e3ada8271970fe41f950e53a59c
b738ce0f2e6e65dd64ded9d3bab058b51a7078bd
13722 F20110113_AABEME lewis_c_Page_46.QC.jpg
224816fd94079cba111e85589f6ac554
1d9f056ceca9d60173c025940257d757dbf9013c
860350 F20110113_AABELQ lewis_c_Page_63.jp2
b3fb880380180d4372b85de80809f222
11efaebbdec94f6b3b2004e98814a18c504dd6fc
562530 F20110113_AABEMF lewis_c_Page_85.jp2
695ed963ad281dcab971e5e45eeb1107
f44a951e77e9db1e8f312a32678aa8ac904a3b2e
1463 F20110113_AABELR lewis_c_Page_87.txt
74d3c74ad5bda55767de6fa12e6b2cba
27194f4a442bf228a035a68f86aa289efa2445db
15961 F20110113_AABEMG lewis_c_Page_84.jp2
3bc5273f1342c4d1e370bc53e9d0a6b6
0db36519f13b2c8fd0811099b45fe5c04dc24b21
116552 F20110113_AABELS lewis_c_Page_37.jp2
ba46d9f8d968f2f19cef059b22b85f70
6e79aa05504ee5d42f85f9b11635700c57ef06ce
44704 F20110113_AABEMH lewis_c_Page_19thm.jpg
5640486843e0a076bdfd43a136f8c424
1a184cddbf3483dfbc525e1a510e390b3eada12e
111933 F20110113_AABELT lewis_c_Page_28.jp2
1ed65dc49be8f908119730a0dd715f7c
d22155f4377e0c48f65ded6f662daaead5125cba
63376 F20110113_AABEMI lewis_c_Page_12.QC.jpg
0d55341eb4940e2b1f3bf67ac435d57a
20254b4ab84c83fe2d37056af8f7b0903312444e
941659 F20110113_AABEMJ lewis_c_Page_62.jp2
b9a99c60a4715bb890b13fa368edd88e
eb6683495d863758f82b9ad8449f3efdfd997405
195216 F20110113_AABELU lewis_c_Page_65.jpg
47719bb91ca47aa6aff6553e4108e4d4
7b42faf0fd968c0e10ab8b703072609c6243a699
40615 F20110113_AABEMK lewis_c_Page_51.QC.jpg
a749eabd6c4d73b87f0717c70f1e30c1
dcf01b4ecb190f4ea30916e3400dc0465be58a5f
51154 F20110113_AABELV lewis_c_Page_82.pro
6795aa8edcd9277b294ea6268a0f9b51
6bbff7111d63e2bde01ee9b47616f3e7a8c06535
9344 F20110113_AABEML lewis_c_Page_01.pro
58deaa8797b1679e7fa75f50d01c8b72
28c9b0d43e58b03086457af4e7b87ce55416a6ad
1034 F20110113_AABELW lewis_c_Page_85.txt
6d028563e028bd26158d135ea363206a
a5e39f3f08e7dd275a023b6b86a9b9a8b9d1d765
112663 F20110113_AABENA lewis_c_Page_82.jp2
694e00e0888cc53ebf38ebfecf8656f1
00f68ca49060fe4fdc4859d1a3858e1e90197929
79165 F20110113_AABEMM lewis_c_Page_82.QC.jpg
2ab6842115bb40b60523682455e4f9ea
ccf64496785c976ae806ccc0f73dfa49a8dac363
20958 F20110113_AABELX lewis_c_Page_52thm.jpg
9e1b052522c44cf3c1774feaf782701b
88c2b66d90e4923cb0f079a36e5d310490050a6a
51950 F20110113_AABENB lewis_c_Page_48.pro
df7987453d8405609a031d9569d4ff10
a9b26939b7ccc11e474997ae5e24ed0ed8fe81c6
68956 F20110113_AABEMN lewis_c_Page_42.QC.jpg
a3b7237c2c6b7d28155ece47371a8e08
ec684dbd09feeca59590b652c8381e7abe4f9dfe
24904 F20110113_AABELY lewis_c_Page_92.QC.jpg
44c81863e4c3b28059f747ba5c9cfb3b
8954e6742c4b8c7807240cb4d55065dee7a98c0f
F20110113_AABENC lewis_c_Page_52.tif
d58b505e1b0b0a41244a6eaa3bc014a2
1e11375d6d4e3df05e63d0a765d121f48b134969
139605 F20110113_AABEMO lewis_c_Page_90.jp2
7227d904fabc8927029bdfe4615e056c
63f9ea6a662f2c508a38642abe05d7ae0a6217ed
216746 F20110113_AABELZ lewis_c_Page_13.jpg
0a08cbcedff2791299d2d85e11f17970
7d764613ec97bb31938e01105f8256aabdcf7e1a
F20110113_AABEND lewis_c_Page_16.tif
52d3fcace58a6e4ec2751619fcc3ce76
97095da38053f5dd6f1ea20e9c46ae4068a77850
247654 F20110113_AABEMP lewis_c_Page_05.jpg
ad747acfcae4b0f6cfe4e3b364869beb
5df505e4d09832793c400cb7db75fbde72d439d8
195251 F20110113_AABENE lewis_c_Page_70.jpg
680850552da1ed7e27d0505fd03345ea
3fd8c976364178d96e12899adf1d2ebb86f0759e
208357 F20110113_AABEMQ lewis_c_Page_77.jpg
963f2d1f9b594634ad54384b8797b317
9444fd37249aa486356f7b9f516af125187de349
F20110113_AABENF lewis_c_Page_08.tif
b85044cbf6b4868d08efb61bb535faca
596de5d1321dafe2e794049c57678fbd9265e783
14619 F20110113_AABENG lewis_c_Page_02.jpg
f119e37c402b3275a9995e8c64ebe506
f8b7cfc4e9ea1f2f7c0999cb4b0e47ed64974479
2095 F20110113_AABEMR lewis_c_Page_59.txt
5ead26eb1a4fa2fdeff5b20314563995
e33a2876f9f57bbae772df0a3302ee2c83dc2882
77424 F20110113_AABENH lewis_c_Page_79.QC.jpg
e17ef65dc4a3cefa33229060f33bb2a1
a5a211f653696b7a41127d1f406c9130ff8fd949
24566 F20110113_AABEMS lewis_c_Page_04.QC.jpg
5ed16adab95f400df2b8d0f08f35a39a
5b91284cfcb4782f0d1ece864e291ac698819243
23588 F20110113_AABENI lewis_c_Page_77thm.jpg
aad5530c9fb837f2af49df7ce4404164
0c4f119a9a83c2cf025947a5c7bcc861496956c7
99007 F20110113_AABEMT lewis_c_Page_50.jp2
356d7d8a370b9be31657c67551fe8e50
faa75fc0c74189737d57c00fd0b6405f3a01e3c5



PAGE 1

THE USE OF COMPUTER TECHNOLOG Y ON THE IMPLEMENTATION AND DEVELOPMENT OF PROJECT-SPECIFIC SAFETY PROGRAMS By CASEY R. LEWIS A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLOR IDA IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE IN BUILDING CONSTRUCTION UNIVERSITY OF FLORIDA 2004

PAGE 2

Copyright 2004 by Casey R. Lewis

PAGE 3

This document is dedicated to my parent s for their continuous encouragement and support.

PAGE 4

ACKNOWLEDGMENTS I would like to thank my parents for their encouragement and support of my educational pursuits. I would like to thank Dr. Jimmie Hinze of the M.E. Rinker Sr. School of Building Construction at the University of Florida for his insight and guidance during my graduate studies. I would like to thank Brent Anderson, MSBC, for his assistance during the completion of this research. Finally, I would like to thank Katie Cantrell for her patience and support. iv

PAGE 5

TABLE OF CONTENTS page ACKNOWLEDGMENTS.................................................................................................iv LIST OF TABLES............................................................................................................vii LIST OF FIGURES.........................................................................................................viii ABSTRACT.........................................................................................................................x CHAPTER 1 INTRODUCTION........................................................................................................1 Background...................................................................................................................1 Technology and Safety.................................................................................................2 Research Objectives......................................................................................................3 2 LITERATURE REVIEW.............................................................................................4 Costs of Safety..............................................................................................................5 Cost of Injuries vs Investment in Safety...............................................................6 True Costs of Accidents........................................................................................8 The Safety Program....................................................................................................10 Purpose of the Safety Program............................................................................10 Development of the Safety Program...................................................................11 Safety Plan Content and Organization................................................................14 Job Safety Assessment (JSA)..............................................................................17 Total Quality Management/ Safety Quality Management..........................................18 Total Quality Management..................................................................................18 Safety Quality Management................................................................................19 Technology and safety................................................................................................23 Training...............................................................................................................24 Identification and documentation of hazards......................................................25 Communication of safety....................................................................................32 3 RESEARCH METHODOLOGY...............................................................................36 Introduction.................................................................................................................36 Geographic Focus of Research...................................................................................36 v

PAGE 6

Questionnaire Development.......................................................................................37 Identifying Research Participants...............................................................................38 Questionnaire Distribution..........................................................................................39 Sample Size................................................................................................................39 Data Analysis..............................................................................................................40 4 RESULTS...................................................................................................................41 5 SUMMARY................................................................................................................64 Development of Project-Specific Safety Plans....................................................64 Computers and Safety Related Tasks..................................................................66 Computer Usage..................................................................................................68 Software Development and Organization...........................................................68 6 CONCLUSIONS AND RECCOMENDATIONS......................................................70 Conclusions.................................................................................................................70 Recommendations.......................................................................................................72 APPENDIX SURVEY QUESTIONNAIRE.....................................................................74 LIST OF REFERENCES...................................................................................................78 BIOGRAPHICAL SKETCH.............................................................................................81 vi

PAGE 7

LIST OF TABLES Table page 2-1 Items to be included in the Safety and Health Plan..................................................14 4-1 Annual company volume.........................................................................................42 4-2 Cross tabulation of annual volume and use of project specific safety plans............43 4-3 Annual volume and extent of the scope of the safety plan.......................................46 4-4 Annual volume and the extent of computer use for the development of project safety plans...............................................................................................................50 vii

PAGE 8

LIST OF FIGURES Figure page 2-1 The relationship of the cost of injuries and the investment in safety.........................7 2-2 Relationship of the emphasis on safety to injury occurrence.....................................8 2-3 Competing pressures causing change in the integration of QS&E systems.............21 2-4 Construction inspection guide: concrete checklist...................................................30 2-5 Safety checklist linked to SureTrak schedule..........................................................32 2-6 HAZCOM Interactive: Screen for accessing information on Hydrazine.................34 4-1 Do firms require project-specific safety programs (n=10)?.....................................42 4-2 Who develops the safety plan?.................................................................................43 4-3 When is the project safety plan developed?.............................................................44 4-4 How extensive is the scope of a typical safety plan?...............................................46 4-5 Extent of computer use in the development of project safety plans.........................49 4-6 With exception of the safety plan, are computers used for other safety-related functions?.................................................................................................................51 4-7 Are computer programs used to record and track information obtained for other aspects of safety?......................................................................................................52 4-8 How are computers used in the development of large-scale project-specific activities?..................................................................................................................53 4-9 Do field personnel use mobile technology devices to perform their job?................54 4-10 In your company, do you see the use of computers as a tool for making your job easier?.......................................................................................................................55 4-11 How much time do you spend on a computer at home?..........................................56 4-12 Average amount of time spent on computers at home.............................................56 viii

PAGE 9

4-13 Frequency of respondents that use a computer for any job related functions?........57 4-14 What type of tasks do you perform on the computer?.............................................58 4-15 Have you ever decided not to use software because it was not user friendly?.........58 4-16 How much effort will you put into learning new software?.....................................59 4-17 Is the software user interface important for the development or facilitation of procedures that address safety?................................................................................61 4-18 Would job specific safety software help in developing safety plans for your companys projects?.................................................................................................62 ix

PAGE 10

Abstract of Thesis Presented to the Graduate School of the University of Florida in Partial Fulfillment of the Requirements for the Degree of Master of Science in Building Construction THE USE OF COMPUTER TECHNOLOGY ON THE IMPLEMENTATION AND DEVELOPMENT OF PROJECT-SPECIFIC SAFETY PROGRAMS By Casey R. Lewis August 2004 Chair: Jimmie Hinze Major Department: Building Construction In recent decades, the concern for worker safety has been on the rise in the construction industry. The development of project-specific safety plans has become increasingly common among construction firms as an effective tool to address the impacts of injuries and establishing proactive safety policies on their jobsites. There has also been a rise in the use of computers as a tool for the efficient management of construction projects. The management of safety, however, is not typically addressed through many project management software programs. Currently, software applications available in various formats and stages of development are attempting to address this issue. In this study, the role of computers for the development and implementation of project-specific safety plans was addressed through a review of literature, an examination of prototype safety management software, and a survey questionnaire of construction professionals. The survey questionnaire and review of current literature were used to x

PAGE 11

determine general trends among contractors regarding their use of computer technology for developing and implementing job specific safety programs. The following trends and conclusions were identified: Management-level personnel such as the project manager or safety director were typically responsible for the development of project safety plans. The application and extent of project safety programs within the participating companies vary. The use of computers and mobile technology to develop project safety plans is currently performed at a minimal to moderate level. Computer technology has had a greater impact on larger companies. Computer literacy exists within construction management personnel. There is no comprehensive project-specific safety management software application currently utilized for developing and implementing safety plans. Most companies are receptive to new software applications for addressing safety on their projects. There are good opportunities for the use of safety related software in the construction industry. xi

PAGE 12

CHAPTER 1 INTRODUCTION Safety in the workplace has become a growing concern for many industries in recent decades, especially the construction industry. Construction workers are exposed to unique risks inherent in the performance of their work that exposes them to many potentially hazardous conditions on the jobsite. As a result, the construction industry has experienced a disproportionate number of injuries and fatalities when compared with most other industries. Construction firms are beginning to realize the human and economic benefits to their organizations when there is an increased and active awareness of workplace safety. It is appropriate to consider construction work as inherently dangerous if no proactive steps are taken to improve the work conditions and to ensure that the work is undertaken in a safe manner (Hinze, 1997). Proactive approaches to safety management and hazard awareness can benefit construction companies through decreased costs associated with injuries and the contribution to the overall productivity of projects. Background The role of safety management to support other project management tasks is becoming more significant as the costs, schedule, and human impacts of injuries on jobsites impact the overall success of projects. In addition to construction companies, many owners are also making an increased effort to ensure that work performed by contractors on their projects is performed safely. The influences of schedule, cost, and other project related issues can be easily managed through documentation and 1

PAGE 13

2 management of information and processes. In contrast, impacts associated with safety and injury occurrence can often be difficult to categorize. Because many of the costs and influences resulting from injuries can be indirect or hidden, the difficulty can lie in justifying the expenditure of company resources on safety. In spite of the fact that the construction industry employers, insurers, labor groups, and regulators generally agree that improved safety benefits everyone, the perceived dilemma is how to balance the daily trade-off between true costs of losses due to accidents and health ailments and the costs and inconveniences involved in delivering effective safety programs (Jones, 2000). The incorporation of safety into the management of other project related tasks allows for an increased ability to prevent the occurrence of jobsite injuries. Technology and Safety In the construction industry, the management of projects is strongly influenced by costs and schedule. To facilitate management related activities, many construction firms utilize computer technology for documenting, expediting, and communicating project related data. Computer technology has led to the development of better field management systems, and such systems have enabled construction contractors and managers to monitor field operations more effectively (Elliot, 2000). The ability of the computer to efficiently process, store, and retrieve information has increased both the amount of data produced and the overall productivity of management tasks on the construction site. The use of computer technology can assist project management to effectively develop and control project-specific safety issues. The development of a project specific safety plan establishes the safety procedures on a particular project and communicates the companys commitment to safety. The project safety program is a comprehensive written accident prevention program covering

PAGE 14

3 all aspects of on-site construction operations and activities associated with a particular contract (Hinze, 1997). The use of computer technology to develop and implement project specific safety programs facilitates the efficient access to safety related information. In addition, the electronic format of material within the safety management program allows for the integration of safety information with other electronically formatted material such as the construction schedule. The effective management of safety and health on the jobsite can contribute to overall success of the company and individual projects. Computers can assist project staff in planning, organizing and controlling safety within the overall construction process. Promising advances in the field of computer technology continue to develop various programs to perform various job-related tasks with increased efficiency. It addition to the function provided by computer programs, computer literacy of the intended users plays an important role in both the usefulness and effectiveness of the program. Research Objectives The objective of this study was to explore the means by which Florida commercial contractors use technology to develop and implement project specific safety plans on their job sites. The use of computer software for the creation and implementation of safety and health objectives on the job site is a relatively new development when compared to other project specific applications available to the construction industry. Increased awareness of the benefits of safety and health related practices within the construction environment have created demands for more comprehensive and ubiquitous tools to effectively manage their application. This study is intended to establish general trends in the use of computers by commercial contractors and to determine the extent to which they are utilized for the management of safety and health on the job site.

PAGE 15

CHAPTER 2 LITERATURE REVIEW Concern for worker safety in the construction industry has gained increasing awareness in recent decades. Since the 1970s, the construction industrys incidence of injuries and illnesses resulting in lost work time typically has exceeded the national rates by a wide margin usually by more than 60 percent (U.S Department of Labor, 2003). During the 1990s a dramatic reduction in injuries and illnesses involving lost work time occurred. In 1993 the rate gap [of lost worktime incidents per 100 full-time workers] nearly closed between construction and certain other hazardous industries (U.S Department of Labor, 2003). Although the number of injuries has decreased in recent years, the frequency of injuries remains disproportionately high compared to other industries. The statistics have remained reasonably constant over the past several years: the construction industry employs approximately 5% of the industrial work force, but has generally accounted for nearly 20% of all industrial worker fatalities (Hinze, 1997). Rising premiums for liability insurance and workers compensation have impacted construction overhead costs and attracted the interests of both the construction industry and facility owners. As contractors [are] sought for projects, it [becomes] common to consider only those firms with a demonstrated history of good safety performance (Hinze, 1997). The increasing awareness of the impact of safety and health of workers to the construction process has contributed to the increased presence of safety management practices as an essential and necessary role in the successful performance and control of 4

PAGE 16

5 projects. Today a firm must be effective in terms of cost control, schedule control, financial management, quality control, owner relations, personnel management, and safety management just to survive (Eubanks, 1994). By effectively managing safety and health, dramatic improvements can be accomplished within the construction industry. Project managers can plan, organize and control safety and health objectives on construction sites. Thus safety is proactively integrated along with cost, production, quality, and the schedule of the project (Kartam, 1995). Costs of Safety Beyond the measures taken by the individual construction worker, it is accepted that accident prevention is the responsibility of management (Hinze, 1997). To improve the effectiveness of their safety program, it is important that companies utilize the support and commitment of financial and human resources to guide safety policies, and practices. Jobsite managers who treat productivity and safety as two related parts of job performance generally have been shown to be the better producers in terms of job cost and schedule. Based on the jobsite managers actions, workers on the job know what the real priorities are. Workers will reflect those priorities in their own decisions affecting safety (Eubanks, 1994). The process of managing the costs associated with construction tasks can contribute to the application of procedures and their subsequent effectiveness when utilized in the management of projects. Safety must be cost effective. And safety management is cost effective. But, to see that clearly, we must be able to evaluate our cost of accidents in much the same way we evaluate results of our (direct) cost control program (Eubanks, 1994). Costs are incurred on a project whenever an accident occurs on a project. Those costs can be quite dramatic when the accident involves an injury (Hinze, 2000).

PAGE 17

6 Cost of Injuries vs. Investment in Safety The difficulty in establishing cost information regarding safety lies in accurately accounting for money involved in the prevention of and/or the consequences of injury occurrences. A distinction must be made between the costs of safety and the costs of injuries (Hinze, 2000). These costs can be distinguished by the degree of certainty in which they occur. Additionally they can be further quantified by direct or indirect costs as a result of the activity in question. By categorizing the types of costs incurred on a construction project, the relationship between the cost of injuries and the cost of safety can be more easily distinguished and quantified. The costs associated with injuries consist of direct and indirect costs of injuries. . .[T]hese are the costs that are incurred as a consequence or result of the occurrence of accidents in which injuries are sustained. In other words, in the absence of injuries, there are no injury costs. This is a certainty. What is not certain is whether or not there will be an injury. On the other hand, the costs of safety are those which are incurred as a result of an emphasis being placed on safety, whether it be in the form of training, drug testing, safety incentives, staffing for safety, personal protective equipment, safety programs, etc. These are costs that are a certainty for any implementation of some facet of the safety program. (Hinze, 2000) The relationship of the costs of injuries and the investment in safety is affected by probability of occurrence. The hypothesis is that injury occurrence (consequently injury cost) will be high when there is a low emphasis on safety and that injury occurrence will be low when the emphasis on safety is high (Hinze, 2000). This hypothesis suggests that a certain point exists in which the relative cost of injuries and level of effort and emphasis on safety will cross as shown in Figure 2-1.

PAGE 18

7 Figure. 2-1. The relationship of the cost of injuries and the investment in safety. (Hinze, 2000) From an economic perspective there seems to be an optimal level of emphasis to be placed on safety. From a practical point of view, this level is rarely achieved with the emphasis generally being far below the optimal (Hinze, 2000). In the comparison shown in Figure 2-1, a certain probability in determining cost and injury occurrence is assumed Actual costs applied to injuries can only take into account those that have occurred or are expected to occur. The dollars spent on safety cannot be directly measured against the injuries that did not occur. [T]remendous or gross approximations will need to be made to estimate the costs of injuries that might have occurred. These are all uncertainties that make it difficult to sell the need to make expenditures on safety on a purely economic basis (Hinze, 2000). An alternative method for analyzing the relationship between the cost of injuries and the investment in safety takes into account the probability of future uncertainties by the use of a decision tree as shown in Figure 2-2.

PAGE 19

8 Figure 2-2. Relationship of the emphasis on safety to injury occurrence. (Hinze, 2000) The diagram (Figure 2-2) incorporates expenditures and safety record to derive four general outcomes; two likely and two unlikely. The decision tree conceptualizes a path that can assist managers and project supervisors in allocating resources for optimal safety performance. The factor that is most influential when safety emphasis is low is the assumption that no injuries will occur. The reality of the process is quite simple: if safety is emphasized, the occurrence of injuries can be expected to be low and, conversely, if no emphasis is placed on safety, the occurrence of injuries can be expected to be high (Hinze, 2000). True Costs of Accidents Accurate accounting of the costs of safety, injuries, and the effects of injuries on a jobsite is a difficult task for many construction companies. The quest for objective and accurate costing of accidents in construction continues, and to date it still remains the subject of much debate and research. At the heat of this debate there is however a general

PAGE 20

9 consensus among engineers that measurement remains the backbone of any objective and scientific approach to defining this problem and finding a solution (Al-Mufti, 1999). To quantify and track the true costs of injuries, costs are generally divided into two main categories, direct and indirect. The direct costs are those directly attributed to or associated with injuries. [D]irect costs tend to be those associated with the treatment of the injury and any unique compensation offered as a result of being injured (Hinze, 1997). In terms of investing in safety, direct costs include: Insurance (workers compensation, premiums, etc.) Substance abuse testing Staffing for safety (project safety representative, on-site medical aid, etc.) Training Personal protective equipment Safety committees Investigations Safety Programs Safety Incentives (Hinze, 2000) Indirect costs of injuries are more elusive in identification and quantification. The indirect costs are all other costs resulting from the injury that are not recovered through insurance coverage. Most of the indirect costs can be categorized as being related to the cost of lost productivity, damaged materials/equipment, and added administrative effort (Hinze, 2000). Because of their association with other work and delayed or immeasurable impact, indirect costs can be difficult to track within many accounting systems. Most cost control systems typically mask these as production costs or absorb them as overhead rather than recording them as costs attributable to accidents (Eubanks, 1994). Indirect or hidden costs include costs and/or productivity impacts of the following: Productivity of injured worker Worker assisting injured worker

PAGE 21

10 Crew productivity Workers idled by watching Damaged materials/equipment Productivity of replacement worker Supervisory assistance Other impacts: OSHA and media. (Hinze, 2000) Traditionally, indirect costs are calculated as a function of the direct cost of the incident. Over 50 years ago, the indirect costs of injuries were determined to be four times the magnitude of the direct costs by H.W. Heinrich (1941), an employee of Travelers Insurance (Hinze, 2000). With the escalating expenses associated with healthcare in the United States beginning in the 1980s, it might be reasonable to expect the 1:4 ratio to be lower now (Hinze 1997). In the early 1990s, the Construction Industry Institute (CII) culminated a study that examined the true costs of injuries. That study examined 834 injuries that were reported by 185 projects, constructed by more than one hundred firms in 34 states. This was a broad based detailed study that determined the indirect costs of medical case injuries were about the same as the direct costs and that the indirect costs of restricted activity/lost workday injuries were approximately twice the magnitude of the direct costs. (Hinze, 2000) Understanding the costs associated with injuries can help managers promote a stronger emphasis on safety. If the true costs of injuries were well defined, management would be in a better position to make informed decisions concerning safety. Rather than addressing safety from an altruistic point of view, construction managers should also consider safety from a more purely economic perspective (Hinze, 1997). The Safety Program Purpose of the Safety Program The development of a program for the management of safety on the jobsite is critical. The project safety program is a comprehensive written accident prevention program covering all aspects of on-site construction operations and activities associated

PAGE 22

11 with a particular project. . .All of the strategies and tasks to be performed to achieve safety success on the project will be included in the safety program (Hinze,1997). The scope, organization, and development of the safety program reflect the commitment of management to safety and the characterization of the safety culture within the company. [S]afety is not a concept to be thought of as additional to the work itself; safety is to be considered an integral part of the work (Hinze ,1997). The safety program is a tool that can be utilized in the coordination of project activities to manage the risks associated with the tasks to be performed. Effective management of worker safety and health protection is a decisive factor in reducing the extent and severity of work-related injuries and illnesses and related costs (U.S. Department of Labor, 1998). Development of the Safety Program The development of the safety program reflects the safety philosophy of the company. A statement of purpose or position developed by management is indicative of the attitude towards safety and assists in guiding the direction and goals to be set forth by the project safety manual. Once the company managers have established a clear safety philosophy (preferably to minimize injuries), diligent efforts can then be expended to draft an effective safety program. The safety philosophy is very important, as it is at the core of the safety program (Hinze, 1997). The scope of the safety plan should encompass all activities that will occur on a particular construction project. General requirements may include company or governmental regulations that are designated for a specific project. The safety plan for the construction site must be filled in with a set of information of a general nature on the characteristics of the building in context and with a list of minimum safety and health requisites that the Contractor must meet at the moment of organizing the work

PAGE 23

12 (Gottfried and Trani, 1999). The overall scope and content of the plan is dependent upon the nature, size, complexity, and location of the project being constructed. The scope analysis in many cases will be developed by a safety and health coordinator beginning with the acceptance of the general design of the project and concluding at final acceptance/ completion of construction (Alves Dias, 1996). The elimination of potential hazards and unsafe conditions begins prior to the start of the construction process. Planned activities to be performed during the construction of the project should be examined and reviewed to ensure that necessary safety precautions have been taken to ensure a safe environment. In many cases the construction schedule may provide a good source for this review and can serve as a starting point for a safety checklist (Hinze, 1997). In addition to the construction schedule, the continuous involvement and participation of employees and subcontractors is a resource that can assist in developing a comprehensive scope for the project safety plan. This resource provides not only physical content for the plan but can contribute to the communication of the safety philosophy as well. By involving the employee in the safety process, more commitment is gained from the employee. This additional commitment may be attributable to the employees desire to execute something which he or she has developed or assisted in developing (Harper and Koehn, 1998). Support, commitment and involvement by the various parties involved in the performance of the safety plan is important to its successful application on the jobsite. The establishment of the safety plans is indicative of the safety philosophy communicated on a jobsite. Safety practices on the jobsite should not be considered separate from other tasks performed on the job. Cooperation and coordination of the

PAGE 24

13 safety plan is a mutual obligation of all employees on the job site (Hinze, 1997). Commitment and support of the safety plan to all parties involved on the project can be provided by several different methods. In an effective program, management regards worker safety and health as a fundamental value of the organization and applies its commitment to safety and health protection with as much vigor as to other organizational goals (U.S. Department of Labor, 1998). In implementing a safety and health program, there are various ways to provide commitment and support by management and employees. Some recommended actions are described briefly as follows: State clearly a worksite policy on safe and healthful work and working conditions so that all personnel with a responsibility at the site (and personnel at other locations with responsibility for the site) fully understand the priority and importance of safety and health protection in the organization. Establish and communicate a clear goal for the safety and health program and define objectives for meeting that goal so that all members of the organization understand the results desired and the measures planned for achieving them. Provide visible top management involvement in implementing the program so that all employees understand that managements commitment is serious. Arrange for and encourage employee involvement in the structure and operation of the program and in decisions that affect their safety and health so that they will commit their insight and energy to achieving the safety and health programs goals and objectives. Assign and communicate responsibly for all aspects of the program so that managers, supervisors, and employees in all parts of the organization know what performance is expected of them. Provide adequate authority and resources to responsible parties so that assigned responsibilities can be met. Hold managers, supervisors and employees accountable for meeting their responsibilities so that essential tasks will be performed. Review program operations at least annually to evaluate their success in meeting the goals and objectives, so that deficiencies can be identified and the program and/or the objectives can be revised when they do not meet the goal of effective safety and health protection. (U.S. Department of Labor, 1998)

PAGE 25

14 Safety Plan Content and Organization The content and organization of the safety plan should be project specific. Because of this, the exact organization and content will vary from project to project based on the nature, size and complexity of the job (Diaz, 1996). An effective occupational safety and health program will include the following four main elements: management commitment and employee involvement, worksite analysis, hazard prevention and control, and safety and health training (U.S. Department of Labor, 1998). Within these general guidelines, specific aspects relative to both the project and the safety goals of the company and the program participants can be developed. An example of a safety plan format by Alves Dias (1996) suggests a three-part composition consisting of a plan resume, the project characterization, and hazard prevention measures. Each component in this proposed system contains items that are to be developed by the various project team participants within a particular time frame of the contract/construction process. Table 2-1. Items to be included in the Safety and Health Plan. (Alves Dias, 1996) Plan Resume Project Characterization Hazard Prevention Measures Definition of Objectives General Characteristics Plans of Action With Regard to Site Conditions Advance Information Labor Quantities Table Site Warning Sign and Traffic Plan Applicable Regulations Works Plan Collective Protection Plan Functional Organizational Chart Work Time Chart Individual Protection Plan Working Hours Site Project Inspection and Safety Plan Industrial Accident and Other Insurance List of Especially Hazardous Works Plan for the Use and Control of Site Equipment Execution Stages List of Especially Hazardous Materials Workers Health Plan Construction Methods Accident Records and Statistics Plan Workers Training and Information Plan Visitors Plan Emergency Plan

PAGE 26

15 The three phases comprising the above health and safety plan (HSP) are indicative of the phases in which the plan is to be implemented. The plan resume should define the objectives of the safety plan and the extent to which the safety and health plan will be implemented. The resume will additionally specify the general parameters by which the project will operate. During the design/bidding phase of the project, it is intended that the contractors take into consideration their proposed construction methods in relation to the requirements defined by the safety objectives (Alves Dias, 1996). The project characterization phase of the safety program development process occurs during the contracting stage. During the tender award phase, the successful contractor should submit all the details required to complete the safety and health plan presented during the previous phase to the Safety and Health Coordinator for his approval within a specified time period. Once these details have been incorporated into the Plan, the site can be set up and the works can commence (Alves Dias, 1996). This phase of the safety plan development incorporates specific project attributes into the general requirements defined in the plan resume. The hazard prevention phase of the plan will commence after the project specific details provided by the contractors in the project characterization phase have been approved by the safety coordinator and incorporated into the Plan (Alves Dias, 1996). During the physical execution of the works and otherwise whenever necessary, the HSP shall be adapted to the actual construction conditions. Alterations to the project should be particularly subjected to prior analysis by the Safety and Health Coordinator in order to foresee any potential hazards associated therewith (Alves Dias, 1996).

PAGE 27

16 For a safety program to be effective, it must be clear in communicating the intent of the company and be applicable to all company projects and personnel (Hinze, 1997). In addition to the general safety plan developed by the company to define the safety philosophy/ position and other standard safety requirements and regulations, additional project-specific requirements are becoming more prevalent in contract requirements. Many owners now require contractors to submit project-specific safety programs for approval (to be discussed at the preconstruction conference). Until the project safety program is approved, it is common for such an owner to refuse to process progress payments (Hinze, 1997). The following items are generally not contained in the generic company safety program and are recommended for inclusion in the project-specific plan: Job number Job-site safety representative OSHA standards applicable to the work Description of safety orientation and training for all employees Days and times of regular weekly and monthly safety meetings First-aid facilities and procedures Outline of phases of work, potential hazards, and recommended safety precautions Emergency plans Written hazard communication program Schedule of regular job-site safety inspections Requirement of frequent safety inspections Procedures for reporting, investigating, and documenting injuries Signage for public safety MSDS information Safety committees Warning devices Subcontractor compliance (Hinze, 1997) The project-specific requirement of the safety plan allows for the identification of potential hazards not identified by a generic plan. Although compliance with the law, including specific OSHA standards, is an important objective, an effective program looks

PAGE 28

17 beyond specific requirements of law to address all hazards. It seeks to prevent injuries and illnesses, whether or not compliance is an issue (U.S. Department of Labor, 1998). Job Safety Assessment (JSA) An important element in the development of the project-specific safety plan is the job hazard analysis (JHA), more recently referred to as the job-site safety assessment or JSA. To accomplish good safety performance, it is important to examine work procedures before they are used. That is, hazards and dangerous work methods must be anticipated (Hinze, 1997). The process of identifying unsafe conditions on a job-site through a worksite analysis system such as a JSA identifies potential risks and assists in the success of the project safety plan. Unawareness of a hazard stemming from failure to examine the worksite is a sign that safety and health policies are ineffective. Effective management actively analyzes the work and worksite to anticipate and prevent harmful occurrences (U.S. Department of Labor, 1998). Job safety assessments are typically performed prior to the commencement of construction. A comprehensive JHA is performed in a teambased environment. It includes an assessment of safety hazards, including occupational health issues, and environmental impacts and aspects, and an assessment of associated risk; it then provides an organized listing of appropriate control measures to mitigate the risk (Geronsin, 2001). A JSA interchangeably used instead of JHA, can be utilized at any point during the construction process to identify potential hazards associated with a particular task. It is ideal to conduct job hazard analyses on projects to be constructed. It is possible, often advisable, to conduct subsequent job hazard analyses on a project that is well underway. Projects warranting such attention are those in which work to be performed is of an unusual or untried nature (Hinze, 1997).

PAGE 29

18 The development of the job safety analysis for a specific project can be derived using several methods depending on the specific nature of the tasks. In some cases, the general nature of the tasks will be apparent. In other cases, the construction schedule can provide a comprehensive resource to begin a JSA (Hinze, 1997). Information gathered from the JSA can be useful in planning activities, and educating and training workers involved in potentially hazardous tasks. The outcome of this process can be used to train new or transferred employees or to retain current staff after an inspection. The comprehensive JHA process quickly and efficiently shows workers the hazards present and the effect of control measures. The team should meet with the affected employees to develop a level of understanding, acceptance, and agreement. Risk assessment should be analyzed and recommended control measures scrutinized until a consensus document is produced. (Geronsin, 2001) Total Quality Management/ Safety Quality Management Total Quality Management Total Quality Management (TQM) in the construction industry has emerged as the latest and most comprehensive vision of quality management (Rwelamila and Smallwood, 1994). TQM is being utilized in the construction industry to align management practices with quality standards to reach a common goal. The process is designed to be a cyclical, proactive program for continuous improvement of both product quality and management practices through a central company goal or vision. Total Quality Management (TQM) is an organization wide philosophy that links product and service quality to customer satisfaction by institutionalizing planned and continuous quality improvement. The purpose of TQM is to provide a common focus for all employees, so that individuals with different tasks, abilities and priorities are able to communicate in pursuit of a common organizational goal (Cooper and Phillips, 1994).

PAGE 30

19 In analyzing the complete management and quality process model, TQM focuses on the physical structure and organization as well as the attitudes and motivators affecting workers. The establishment of the TQM process within a company or management system involves hard and soft performance measurements. Within TQM, hard aspects typically involve a range of production techniques such as statistical process control, Just in time inventory control, changes in the lay out of work stations, design processes and procedures of the organization. These production techniques are generally analyzed by process flow-charting, tally charts, pareto analysis, scatter diagrams, histograms, control charts, and cause and effect analysis. The soft aspects of both TQM and safety management are largely concerned with attitudes, commitment and culture change within an organization. (Cooper and Phillips, 1994) A central aspect to the successful performance of a TQM system is the development of clearly defined objectives and key performance indicators relative to those goals. In addition to defining objectives, communication and feedback must be provided. Communication and feedback offers immediate indicators of performance and direction in relation to the goals, results, and quality objectives defined during the previous stages of the TQM process (Cooper and Phillips, 1994). Safety Quality Management Integrating safety into the management and quality process using the principles defined by TQM can effectively relate management, quality, and safety into related attainable objectives. Implementing a safety initiative in a company is no different than implementing a quality initiative. They are both aimed at changing the same thing, that is the behavior of people (Sommerkamp and Lew, 1994). The fundamental difference between the TQM approach to safety versus the traditional approach is the following. TQM approach is proactive as compared to the reactive nature of the traditional approach. In a production setting, it involves solving production problems upstream

PAGE 31

20 rather than inspecting for defects downstream (Adrian, et al, 1994). To incorporate a safety quality management (SQM) policy effectively, regulatory-based compliance programs form the building blocks but a comprehensive safety process allows companies to better assess areas that require more attention (Geronsin, 2001). Regulations are structured to control material, activities, and equipment that have, in the past, caused or been suspected to cause injuries. The key element of this statement is in the past. Few companies will succeed by focusing efforts on what has already occurred (Geronsin, 2001). In a study conducted by the European Construction Institute, driving factors were identified from contractors as affecting the development of their safety programs. The derived list was as follows (in descending order of significance). Changes in Safety Legislation Total Project Management concepts Pressure from clients Better information available Increased insurance premiums Pressure from employees Pressure from employee Trade unions or Employee Organizations Pressure from the general public (Ayoade and Gibb, 1996). Ayoade and Gibb describe a basic model for the integration of safety management into the quality management system. The quality, safety, and environment system (QS&E) is an SQM model that illustrates the integration of key processes within project management. The single integrated QS&E model promotes effective management by more closely representing the way companies do business, reducing administrative tasks, and promoting coordination (Ayoade and Gibb, 1996). Within this particular SQM model, factors such as costs, legislation, total project management (TPM), and clients can promote integration. Perceived incompatibility of

PAGE 32

21 standards, efforts aimed at pleasing pressure groups, project-specific requirements, and lack of commitment or understanding are potential influences inhibiting the integration of the QS&E system. These relationships of the QS&E model are illustrated in Figure 2-3. Figure 2-3. Competing pressures causing change in the integration of QS&E systems. (Ayoade and Gibb, 1996) This model illustrates the impacts of an integrated safety management system and some of the impacts affecting its application. Ayoade and Gibb note that the ideal QS&E model facilitates a balance of the influences illustrated in Figure 2-3. Increased integration within the QS&E system is clearly beneficial. Total integration is both impossible and undesirable (Ayoade and Gibb, 1996). Avoiding potential pitfalls associated with addressing safety, quality, and performance within the context of the SQM system involves understanding the system and its function in accomplishing the objectives defined by management. Cooper and Phillips (1994) identified five common failures of SQM systems resulting from both individual and cumulative factors.

PAGE 33

22 A failure to appreciate the time scale involved Not recognizing the full implications of TQM and the impact upon the business as a whole Lack of senior management commitment to the quality process Resistance to change, which may be overt or covert in nature, at both the individual and organizational level Uncertainty about how to implement a quality improvement programme (Cooper and Phillips, 1994) Addressing safety management from a TQM perspective encourages the incorporation of safety, management, and quality within the defined performance objectives of the company. The integration of safety dimensions with quality management systems can empower the capabilities of TQM and help enhance the performance with regard to safety concerns, and strengthen safe operation practices in an organization (Pun and Hui, 2002). In construction companies safety management can be included in the sphere of quality management, if a TQM approach is adopted, comprising requirements from all the relevant stakeholders, not only the customers. Specific project requirements, as well as regulatory impositions, may in some cases preclude the realisation of the full potential of such integration (Alves Dias and Curado, 1996). Within the context of TQM, in the long run, there is a necessity for the introduction of both quality systems and a quality culture to facilitate the quality process (Cooper and Phillips, 1994). An effective system should balance the requirements of both the internal and external project clients by approaching the implementation of the SQM program in a systematic manner. These requirements include the following: Set project mission

PAGE 34

23 Develop project plans to meet clients requirements Carry out an analysis of the objectives of the project Define initial strategies to introduce TQM Carry out training and education (when necessary). (Rwelamila and Smallwood, 1994) A formal organization structure, clearly defined responsibility and authorization, effective communication, people training, education, involvement and job satisfaction all contribute to the success of SQM implementation (Pun and Hui, 2002). Technology and Safety The increased role of computers and computer-based technologies has greatly impacted the construction industry. Starting in the 1970s, computer scientists have learned to program computers with experts knowledge to match patterns and draw inferences for diagnosis, planning, and other intelligent tasks. This expert system technology which is already widely used in the financial sector (e.g., for approving charge card expenditures or loan requests) is now finding its way into engineering and construction management applications (Levitt and Samelson, 1993). The influence of increased use of technology in the construction field is becoming increasingly evident at even the field level of the building process. In a study by Elliot (2000), on-site trade foremen were surveyed to determine their usage of technology in the scheduling communication process. It was determined that the majority (84%) of the foremen did not use a computer to perform any part of their job tasks. However, it was found that general attitudes towards computers were positive. The computer literacy rate of the foremen in this study is higher than initially expected. Computer use on the job (16%) is also higher than expected for foremen. Experience with computerized devices is

PAGE 35

24 common as well; about one-third use some type of electronic organizer, typically for phone numbers and addresses (Elliot, 2000). Training Project specific training and new worker orientation is good practice and in some cases required for the communication of safety and hazard awareness on a jobsite. Training is an essential component of an effective safety and health program. Training helps identify the safety and health responsibilities of both management and employees at the site. Training is often most effective when incorporated into other education or performance requirements and job practices (U.S. DEPARTMENT OF LABOR, 1998). To increase its impact on safety performance, training should be specific to the project or task and be cost effective. Technology currently available in the construction field can be utilized to create and implement custom training modules and bring safety management to a new level (Coble and Elliot, 2000). The use of computer technology can assist management to increase hazard awareness and improve safety planning among both staff and workers. Additionally, computers can assist by facilitating access, expediting, and organizing extensive amounts of safety related information. To improve safety management, a more proactive approach that integrates safety with other project management functions is needed. Such approach would involve more people in the safety management process, would ensure timely availability of safety information and would utilize safety knowledge in design and in the selection of construction methods. For this proactive approach to be effective, computer-based systems that effectively manage safety information are needed. (Elzarka, Minkarah, and Pulikal, 1999) Employee training programs should be designed to ensure that all employees understand and are aware of the hazards to which they may be exposed and the proper methods for avoiding such hazards (U.S. Department of Labor, 1998). The use of computers and technology can be utilized in a variety of ways to assist management in

PAGE 36

25 efficiently communicating safety hazards and best practices to employees. Multimedia courseware authoring technologies being developedwill allow employers to easily assemble diagrams, pictures, sound, video clips, and interactive computer programs into multimedia training modulesappropriate for use in construction safety orientation and training (Levitt and Samelson, 1993). Identification and Documentation of Hazards Hazard exposure may occur at the beginning, middle, or end of a job. It is imperative to have training in place before exposure occurs. Well before exposure, management must prepare a plan to deal with the exposure (Coble and Elliot, 2000). Some hazards will be readily apparent from an understanding of the general nature of the projects to be undertaken. Others may be identified only after consideration has been given to the specific methods to be employed in accomplishing the work. A schedule of activities that accurately reflects the activities to be undertaken can serve as a good resource for this analysis (Hinze, 1997). Once potential hazards have been identified, project specific worker training can be implemented. Common safety concerns are applicable to many tasks. Training, hazard recognition, and personal protective equipment, for example, would be appropriate safety concerns for many activities. In order to be useful for field supervisors, however, information must be provided that is specific for individual work tasks (Coble and Elliot, 2000). Computer technology can be utilized to assist in identifying hazards and safety concerns. Several prototype programs have been developed to accomplish this task using various means of obtaining and organizing safety-related information. One such prototype is a set of integrated programs known as Safety Base and Safety Net. The

PAGE 37

26 purpose of this specific software application is to create a knowledge-intensive database system that can be used as a stand alone system or in conjunction with current CPM programs by construction mangers, superintendents, and foremen (Kartam, 1995). Safety Base and Safety Net uses computer technology to expedite the processes for accessing safety related information and applying that information to specific tasks occurring on a particular project. The goal is to have a dynamic, proactive, interactive tool for identifying safety requirements according to OSHA, ANSI, ACI, etc. and safety recommendations according to safe work practices during the early planning phase as well as the construction phase of a project (Kartam, 1995). An important aspect in the development of Safety Base and Safety Net is the ability to transfer and integrate information with other software applications. This relates not only to the technical aspect of compatibility in the programming language, but also the type, categorization, and format of the information to be integrated. The use of a common coding system improves consistency and information flow between Safety Base and other computer-based construction systems allowing for better integration of organizational efforts. With such standard coding system, basic computer operations such as information storage and retrieval are much more efficient (Kartam, 1995). SuperBase is a safety-oriented database program designed to organize and access large amounts of information. The user interface is important in both inputing and retrieving information. The technical or information aspect of the program is designed such that information within the system coordinates with data fields common to other construction related programs for easier integration with common database information. Knowledge that has been represented by CSI classification is implemented into the system using the SuperBase database system running on IBM-PC or compatible

PAGE 38

27 computers. SuperBase allows alternative means of accessing information as well as a potential for integration with other computer-based construction systems. Also, SuperBase can be linked to scheduling software such as Primavera and MSProject making it possible for automatic transferring of safety information to project specific activities in a CPM schedule based on the MASTERFORMAT coding system [CSI divisions 1-16]. (Kartam, 1995). The visual user interface is developed to easily obtain both general and specific data from the user based on the required output desired. Input of required information is obtained through user-friendly pop-up menu selections. Although menu selection has greater flexibility in the base program the proper use of data selection allows for structuring the program to be downloaded into the CPM system (Kartam, 1995). The ability to link safety database information to CPM project schedules allows for the identification of relevant safety information to identified hazards within the schedule. This application utilizes computer technology to more efficiently manage specific safety requirements. Project mangers can use the system to identify and delegate appropriate safety performance standards during project execution. The system can also help identifying unanticipated requirements when conditions and/or methods change (Kartam, 1995). This researchers review of the SafetyBase and Safety Net prototype revealed that while the aims and objectives were quite progressive, the actual development of the software was never completed. Thus, this software was never implemented or tested on an actual project site. Another method for identifying and addressing safety issues on a jobsite is through the use of checklists. Checklists can be used to provide basic guidance on identified safety concerns during a job hazard analysis. The benefits gained from utilizing checklists to perform jobsite safety inspections have led to an increase in their use. Users of checklists have begun to examine both the content of the checklists and their

PAGE 39

28 implementation (Gambatese and Hinze, 1996). The development of safety checklists during the assembly of the job specific safety program can be helpful in assisting project management or safety personnel in both safety planning and safety inspections. The checklists should be customized for the types of projects typically undertaken by a firm. Some of the checklists may be sufficiently generic to need little or no modification from one project to another: For example, the checklist for sanitation and the checklist for personal protective and lifesaving equipment may have such general utility. Other checklists may vary considerably between projects (Hinze, 1997). Use of both applicable generic and customized checklists in a consistent format additionally provide documentation for addressing and responding to safety concerns. Preprinted checklists can simplify record keeping. They may also help ensure that a predetermined set of jobsite conditions are examined in each inspection. If the same type of report is used consistently over a period of time, a baseline measure can be established. From that, management can quickly ascertain whether the safety conditions on a project are below par for the firms projects. (Hinze, 1997) The development of safety checklists can play a beneficial role for project management and safety personnel in identifying, implementing, and documenting project-specific elements of safety programs. Computer technology can additionally assist project management in the application of checklists to address safety issues within the scope of project tasks and requirements. Specifically, checklists can be useful as a guide in the completion of weekly or monthly safety inspections performed by project management or an appointed safety committee. Jobsite safety committees are usually comprised of workers from various trades on the project. The objective of the safety committee is to serve as a second pair of eyes for management in identifying areas of safety that warrant attention (Hinze, 1997). The committee members offer a valuable perspective in addressing hazards yet may have

PAGE 40

29 inconsistent levels of formal training in safety. Safety inspectors and committees using generic checklists can have difficulty in efficiently performing a thorough safety inspection. Perhaps one way to alleviate these problems is to create a tool which produces project-specific safety checklists applicable to the work at hand (Gambatese and Hinze, 1996). To assist in communicating task specific safety issues and increasing awareness of hazard identification, a computer program called Construction Inspection Guide has been developed. The Construction Safety Guide incorporates OSHAs safety and health regulations for the Construction Industry into a format designed for performing customized job site safety inspections (Coble and Elliot, 2000). The program takes advantage of the computers ability to store, access, and retrieve large amounts of information and present this information in an organized format easily navigated by the user. Safety related regulations and guidelines are divided into four main categories: general requirements, work phases, temporary structures, and construction materials. Within each category group, information is further subdivided into a more focused group of activities. When selecting a topic from this list, specific checklist titles are displayed in the view window (Figure 2-4). Figure 2-4 illustrates the selection process to locate a checklist for requirements for cast in place concrete. The user first selects construction materials. The construction materials category contains a more focused group of activities including concrete, masonry, steel, wood, and toxic and hazardous substances. Upon selection of concrete from the list, a series of checklist topics are displayed relating to the use of concrete.

PAGE 41

30 Figure 2-4. Construction inspection guide: concrete checklist. (Gambatese and Hinze, 1996) The ability of the program to efficiently direct users to specific safety-related information can be an invaluable tool for the identification of potential hazards on the jobsite. The ability to focus on various project characteristics and to create project specific checklists provides a powerful tool in addressing safety hazards. The checklists provide safety inspectors and committees with a valuable resource in a concise, easy-to-read format which allows safety inspections to be conducted in a reliable, efficient manner (Gambatese and Hinze, 1996). A prototype program containing similarities to Safety Base, Safety Net, and Construction Inspection Guide is a program currently in development and funded by NIOSH through The Center To Protect Workers Rights. Salus CPM, like Safety Base and Safety Net integrates safety with the construction project schedule. Utilizing a database of safety-based information, an integrator plug-in is used to insert safety checklists directly into the project schedule and link checklists to specified tasks. The

PAGE 42

31 result is a project schedule that incorporates specific links to task-specific checklists within the environment of the scheduling software. The integration of these checklists into the project assists project management in addressing safety guidelines and requirements for the development of a project-specific safety plan. If safety items are associated with scheduled activities, it is more likely that the activity will be performed without injuries (Nelson and Hinze, 2001). Salus CPM is comprised of two parts: a database and a safety integrator. The database program organizes information obtained from safety experts and construction firms into a list of guidelines. For ease in application and accessibility, these guidelines are organized into a series of checklists related to a certain type of construction activity (Nelson and Hinze, 2001). The safety integrator is set up as a plug-in to existing scheduling software platforms such as Primavera SureTrak (to include P3 and Microsoft Project in further development). The integrator utilizes a floating toolbar to the SureTrak menu that allows the user to add safety checklists to the construction schedule or view checklists that have already been added (Nelson and Hinze, 2001). Checklists added using the safety integrator are shown as a line item beneath the relevant schedule activity in the activity description column. The visual notation of an added safety checklist within the schedule bar chart is an orange diamond. A relationship arrow connected to the start of the linked activity to the orange diamond indicates that the checklist is to precede the start of the activity (Figure 2-5).

PAGE 43

32 Figure 2-5. Safety checklist linked to SureTrak schedule. (Nelson and Hinze, 2001) After being successfully linked to the schedule, it is then possible to view and print the safety checklist from the Salus CPM viewer located in the floating toolbox. Because the project schedule lists the sequential tasks to be performed to complete a project, it drives and influences the management decisions regarding construction activities (Nelson and Hinze, 2001). The construction schedule specifically addresses the tasks to be performed during the construction process. Research results show striking evidence that project coordination and safety performance are closely related. This coordination applies to schedules related to the overall project duration and also to the short interval schedules which typically focus on a two or three week period (Hinze, 1994). Using the construction schedule to link safety checklists and guidelines can help project management to anticipate safety problems and play a central role in developing a site-specific safety plan (Nelson and Hinze, 2001). Communication of Safety One of the many advantages of computer-based training modules is the ability to communicate a wide variety of information in an interactive, accessible, and visually

PAGE 44

33 comprehensive format. A prototype program, HAZCOM Interactive, has been developed as a tool to interactively communicate safety-related information and training modules based on an electronic hazardous chemical database. The database was developed from information contained in the International Chemical Safety Card (ICSC) to assist in the communication and training of the hazard communication standard (HCS) (Jones, 2000). Project-specific safety hazard communication can be a difficult to communicate on a construction site because of the amount of information required, literacy issues, and language barriers present within much of the workforce. Construction foremen have different needs than management. In addition, construction foremen usually have different education levels than management. Obviously this requires training software to be needs sensitive. As a result, software may need to be designed for some semiliterate or illiterate users. In addition, it must be enjoyable. (Coble and Elliot, 2000) To simplify the communication of chemical hazard information, the program utilizes various media formats linked through a visual user interface. The interface was designed to quickly and easily communicate ICSC information in a way that addresses the language and literacy requirements of its users (specifically through a combination of graphics, multi-language audio and multi-language text). It is a simple point and click interface with a variety of supplemental navigational features (Jones, 2000). The user interface system uses pictographs to link both supplemental information and hazard training modules in various formats (Figure 2-6). As illustrated in figure 2-6, links to subsequent information is linked through standard universal symbols representative of the linked data. Because HAZCOM Interactive relies heavily on graphics as a source of information and as a link between the database and targeted training modules, the meanings of the symbols is an important aspect of communication and navigation (Jones,

PAGE 45

34 2000). Games are also utilized within the software to reinforce graphic symbols and presented information. Figure 2-6. HAZCOM Interactive: Screen for accessing information on Hydrazine. (Jones, 2000) HAZCOM Interactive utilizes a database of chemical safety information that can be used interactively for information or to assist in worker training. The program utilizes the ability of the computer to store, access and present large amounts of information in various formats to assist in the communication of safety hazards associated with chemical hazards. The systems navigational schemes are intended to allow users to find specific information quickly (and in a non-linear fashion). The use of graphics and audio files is targeted to expanding access to semi-literate users. The print-on-demand capabilities are intended to expand the impact into the physical workplace. The system also creates a broad foundation on which training programs can be developed in an environment where a critical mass of information can be found. (Jones, 2000) The use of a database program to store and access information creates advantages for field personnel. By conceptually recreating Hazard Communications Standard (HCS) programs as integrated electronic databases of information for use on field office PCs,

PAGE 46

35 many of the inconveniences and inefficiencies of the current system could be greatly reduced. In addition to compact storage, an electronic database makes loading and retrieving specific information easier (Jones, 2000).

PAGE 47

CHAPTER 3 RESEARCH METHODOLOGY Introduction The purpose of this research study was to identify general trends within the construction industry concerning the use of technology and technology-based applications in the development and implementation of project-specific safety plans. Software and computer-based applications for project management, scheduling, cost control and analysis have been available in some form and to various degrees of implementation for many years. The application and functionality of their use have become more complex as the development, use, and reliance of technology in the construction environment has increased. Computer-based applications directed specifically towards the creation and performance of job specific safety programs is a relatively new concept. Some prototype applications have been developed, however research on their application within the contracting environment has not been extensively conducted. This study was designed to obtain information from general contractors and construction managers of various sizes within the commercial construction market. Geographic Focus of Research Florida contains a wide variety of commercial contractors in regards to market specialty, size, and management practices. To research general trends regarding the use of technology-based safety applications, the geographical focus of the study was limited to commercial contractors operating within the state of Florida. 36

PAGE 48

37 Questionnaire Development To obtain information from Florida contractors, a questionnaire was developed to determine the current uses of technology and the use of computer-based applications in developing and implementing project-specific safety programs. Because of the varying degrees of familiarity and exposure of construction personnel to technology-based applications and their use within the construction environment, a survey was developed to be applicable to all respondents regardless of their knowledge of computer programs. The questionnaire was designed to obtain information from knowledgeable respondents by allowing for expanded comments and feedback. Some of the questions were open ended to allow the respondents to elaborate in their answers regardless of their experiences concerning the use of technology. The survey was set up in two parts; the development of project specific safety plans within the respondents company and personal preferences in computer related technology applications. Respondents were also presented with a self-running demonstration of Salus CPM as a precursor to the questions included in the second part of the survey. The demonstration CD-ROM was provided to serve as a specific example of a particular application of technology for the development of project-specific safety programs. The demonstration was not intended as a wholistic solution to integrating technology into safety management, but rather as an example of one approach to the subject addressed in this research. The format of the questionnaire was designed to allow respondents to provide information concerning project-specific safety plans within their company and personal experiences regarding the use of computer technology for the performance of their work. The questionnaire was developed by the researcher following a thorough literature study to gain a base of knowledge concerning issues relating to technology and the

PAGE 49

38 development of project-specific safety plans. A pilot study was performed through an initial questionnaire developed and presented to several practitioners in the form of an interview and software demonstration on a laptop computer. Based on the comments from three individuals, a revised questionnaire format was developed to eliminate ambiguities and to better focus the overall scope. The content and format of the survey was modified during subsequent revisions to facilitate a postal questionnaire. The revised and final format of the questionnaire contained both qualitative and quantitative questions divided into two parts. Additionally, a self-running software demonstration was included with the questionnaire. The respondents were instructed to view the demonstration CD prior to answering the questions in part two. The questionnaire contained twenty-six questions. Sixteen of the questions were open-ended (short answer), five that asked for a yes or no response, and five solicited a multiple choice reply. Identifying Research Participants The focus of this study was to collect information on the use of technology in the development and implementation of safety programs within the commercial construction environment. The questionnaire asked for information related to the procedures and tools involved with developing job-specific safety programs. It is most likely that knowledge regarding the development and application of job-specific safety plans would be more thorough at the management level. The respondents were therefore intended to be at a management level with experience relating to jobsite safety practices within the company. The researcher intended to develop a sample that was both diverse and broad. Because of their responsibility for the overall safety techniques to be implemented for the entire project, research was limited to commercial general contractors. The contacts for the questionnaire were generated from the directory of the Florida members of the

PAGE 50

39 Associated Builders and Contractors filtered for general contractors. Potential questionnaire respondents were chosen by selecting every fourth company from the list. It was assumed by the researcher that the respondents were familiar in varying degrees with both computer-based technology and project specific safety planning. Additionally, it was assumed that the respondents were familiar with safety planning within their company and able to respond to the questions with regard to the applications within their company. Questionnaire Distribution The distribution of the questionnaire was conducted by mailing or hand-delivering 105 questionnaires and CD ROMs to project managers, superintendents, and safety personnel from the companies identified during the selection process. The questionnaire included a cover letter explaining the background of the study as well as instructions regarding the completion of the survey and the start-up procedure of the CD ROM demonstration. Additionally, the objectives of the research were noted and respondents were instructed to only respond to questions they felt comfortable in answering. Respondents were instructed to return the questionnaire to the researcher via facsimile or mail. Sample Size The desired sample size was determined to be a minimum of ten respondents. Ten companies completed and returned the questionnaire. The response rate for this study was determined to be 9.5%. The intent of this study was to obtain general trends of companies in the use of technology and its implications for the use and development of project specific safety plans, i.e., insights as opposed to statistical rigor were sought in this

PAGE 51

40 research. Individual detailed responses to the questions were deemed to be indicative of possible broad trends within the industry. Data Analysis The data collected from the survey questionnaire were analyzed with emphasis on the role of computer technology for the development and implementation of job specific safety programs within the participants companies. The data were examined to determine general trends in the use of computer-based safety functions among Florida commercial contractors and the preferences of individual respondents towards software applications. Questions that solicited multiple choice and yes-no responses were organized to summarize the information provided. Open-ended responses were examined to understand further comments by the survey participants. Where applicable, open-ended responses were stratified or otherwise grouped to show any trends among the responses.

PAGE 52

CHAPTER 4 RESULTS A total of ten construction management professionals in the commercial construction field participated in the research survey. Information provided by the participants was analyzed to identify general trends in project-specific safety plan development and technology. The companies participating in the survey consisted of a broad range consisting of small, medium, and large companies. For the purpose of comparison, participating companies were identified by the letters A through J from smallest to largest, based on annual volume. When the results are presented, the data will represent the responses of the ten participants unless this is specifically noted as otherwise, i.e., it will be noted if results are based on only some of the respondents. Nine of the ten respondents provided information on total annual volume. The combined total annual volume of eight of the research participants (excluding the firm with the highest volume) was approximately $700 million. The annual volume of the companies ranged in size from $3 million to over $10 billion dollars (see Table 4-1). The median total annual volume of the research participants was $40 Million. Respondents were asked if project-specific safety plans were currently developed for their company. Most (70%) of the respondents indicated that project specific safety plans were required by their company (Figure 4-1). Company I, indicating that project specific plans are not currently developed, provided additional comments stating a generic safety plan is used with the job specific [plan] if required. 41

PAGE 53

42 Table 4-1. Annual company volume. Company Annual Volume FY 2002 A N/A B $3 Million C $6 Million D $8 Million E $30 Million F $40 Million G $120 Million H $160 Million I $300 Million J Over 10 Billion 7 3 01234567 YesNo Figure 4-1. Do firms require project-specific safety programs (n=10)? A cross tabulation was then performed to compare company volume and the use of project specific safety plans (Table 4-2). Participants were asked who prepares the project safety plan. Five possible selections were provided: safety representative, superintendent, project manager, outside consultant, and other. Respondents were to select all of the categories that were applicable. Fourteen total responses were given. Of the total responses, the safety representative and project manager were represented four times in each category, three respondents indicated other. Two participants indicated

PAGE 54

43 that the superintendent was responsible for the development of the safety plan. One company did not respond to this question. There were no selections of outside consultant for safety program development (Figure 4-2). Additional information was provided for the three other responses. The additional comments indicated that the following personnel were responsible for developing project safety plans: project staff, a quality control officer, and a company-wide safety plan developed only by a safety director. Table 4-2. Cross tabulation of annual volume and use of project specific safety plans. Company Annual Volume Project Specific Safety Plan Developed? A N/A Yes B $3 Million Yes C $6 Million Yes D $8 Million No E $30 Million Yes F $40 Million Yes G $120 Million No H $160 Million Yes I $300 Million No J Over $10 Billion Yes 4 4 3 2 1 0 01234 Safety RepresentativeProject ManagerOtherSuperintendentNo AnswerOutside Consultant Figure 4-2. Who develops the safety plan?

PAGE 55

44 Respondents were asked when the safety plan is developed. Three selections were provided: after contract execution (before construction), after contract execution (after construction begins, and other. There were ten responses (including two n/a responses). Half (five) of the respondents indicated that safety plans were developed after the contract execution (before construction begins), three indicated other, and two did not respond. Other responses (three) provided additional information on when safety plans were developed. The responses specified that safety plans were developed during the pre-bid phase, as part of the proposal, and generic plans are used with a job specific [plan] developed if required. 5 3 2 0 012345 After contract execution (before construction)OtherNo AnswerAfter contract execution (after constructionbegins) Figure 4-3. When is the project safety plan developed? Next, the participants were asked how they determined what was to be included in a project specific safety plan. A brief description of the steps involved was also requested. The question requested as an open-ended response to allow for more detailed and or varied responses. Procedures noted by the respondents included the following: The contents of the safety plan were derived through an ongoing checklist that is developed from previous and current construction projects.

PAGE 56

45 The safety plan is developed with the use of general safety guidelines as a base, and then the specifics of the individual project are added. Generally, the project manager thinks through the construction process and tries to identify specific tasks. Each new plan is a modification of the previous adjusted to fit the new project. Review project documents before bidding, during project scheduling, and during the preconstruction meeting. The safety plan for a specific project begins in preconstruction and is based upon the scope of work. The plan is developed by performing a review of the project specifications. Safety plans are based on the potential hazards at the site (i.e. chemical, biological, physical, etc.). It employs or includes a generic outline coupled with unique or specific area or trade requirements especially unique safety applications. The main focus is on unusual and/or rare safety concerns. Content requirements of the project specific safety plan and steps of development are pre-determined by company policy. The content requirements of the site-specific safety plan are identified within the company Safety Management Manual. During the preconstruction phase, a Risk Register is created to establish key performance indicators. This document provides a measurement tool for initial and subsequent safety reviews during the construction phases of the project. The plan is reviewed on a monthly basis by the on-site project team to ensure any necessary revisions are documented Participants were asked to describe the extent of the scope within the typical safety plan. Two participants did not answer this question. The question was open-ended to allow for more detailed responses by research participants. The researcher divided the information given by the respondents into four categories: basic, moderate, extensive, and no answer. Three participants had moderate safety plans, three participants had extensive safety plans, and two had basic plans (see Figure 4-4). A cross tabulation was performed to compare annual volume of the company and the extent of the of the project safety plan (Table 4-3).

PAGE 57

46 3 3 2 2 00.511.522.53 ExtensiveModerateBasicNo Answer Figure 4-4. How extensive is the scope of a typical safety plan? Table 4-3. Annual volume and extent of the scope of the safety plan. Company Annual Volume Scope of Safety Plan A N/A N/A B $3 Million Moderate C $6 Million Moderate D $8 Million Basic E $30 Million Extensive F $40 Million Moderate G $120 Million N/A H $160 Million Basic I $300 Million Extensive J Over $10 Billion Extensive Detailed responses were given by each of the participants. The scope of the project safety plan is based upon the project. The range is within 30 to 60 pages. The extent of the safety plan is moderate; we identify as many specific tasks as possible but do not break them down to a minute detail. Basic Very extensive includes software, policies, checklists, etc.

PAGE 58

47 A hazard analysis and safe work practice guide is developed for all hazardous operations. The scope of the safety plan is designed to meet minimum standards; OSHA 29CFR 1910.120, haz waste site operations. The scope includes management participation down through field operations, inclusive of monitoring safety of operations/subcontractor activities. Plan includes development and implementation of emergency procedures, accident investigations, safety training and direct employee involvement. Site-specific project requirements designated by pre-set company policies are established prior to the start of construction. Every trade is reviewed by scope of work and hazards are documented and incorporated into the project specific safety plan. The plan establishes safe work practices for work to be performed on the job, safety orientation for all new personnel on the project (including subcontractors) and weekly project safety meetings. Next, respondents were asked what is involved in implementing a project-specific safety program on a project (how does the written information get put into action). Company A stated that safety plans are implemented during the preconstruction meetings. Implementation of the safety plan by company B is performed by providing safety manuals to subcontractors who sign that they have received, read, and agree to comply. Weekly tailgate meetings with sign-in required are held after the start of the project. Company C stated, it is the responsibility of each project superintendent to implement the plan. Company D responded that the project superintendent and/or general superintendent is responsible for the implementation of the safety plan. The safety plan is implemented in company E by the company safety manager. The company safety manager then directs the plan to two regional safety coordinators. The plan is then directed to the project managers, followed by the project superintendents and subcontractors. Company F stated that safety plans are implemented through weekly meetings held on general safety. Preparatory meetings are held prior to the start of each activity, when specific safety issues are reviewed. Company G did not answer this

PAGE 59

48 question. Company H stated that the safety plan is prepared by a manager or staff member. It is then reviewed by the project staff who sign off and acknowledge with a signature. Company I responded the basic responsibility falls on the director of safety to publish and follow up on requirements. Follow-up is accomplished via field audits and/or directly reporting safety requirements and training. Company J implements the safety plan through pre-construction meetings and weekly safety audits. Safety meetings are held once a week. The modification of project-specific safety plans allows the plan to adapt to the changes or new hazards identified during construction. Participants were asked what kind of changes might be made to the project safety plan during construction (after the plan has been put into effect). Changes addressed by the respondents included the following: Changes made to the plans included emergency action and egress plans. Specific changes or additions to the safety plan (if required) are made at weekly tailgate meetings. Once the plan is in place, it is generally not revisited unless there is a problem (i.e. an accident). Unforeseen conditions are reviewed during project meetings. Plans for these changes are then developed and implemented. Changes made to the project safety plan are made due to modifications in the scope of the project and/or project site conditions. Plans for specific work activities are developed as needed. Lifting plans and fall protection is usually amended on the site. When a plan is added, it is reviewed and signed off with applicable crews. Changes to the project safety plan are addressed during the weekly safety meetings. Project safety plans can and almost always do change. Changes are implemented to accommodate new or revised operations on the project. Most changes are affected via directives such as safety manual changes or

PAGE 60

49 company safety grams. Some modifications are difficult to implement if they involve changes to a long-time procedure, e.g. old habits being hard to break. Changes are made to the implemented project safety plan as changes occur or are identified on the job site. Computers are a tool that can be used for the efficient storage, retrieval, and presentation of large amounts of information. As computer literacy has increased within the construction industry, their role in the performance of job-related tasks has become more common. Respondents were asked the extent to which computers are used to develop their project safety plans. The question was open ended to allow the participants to provide detailed responses. The researcher divided the information provided by the participants on the use of computers for the development of project safety plans into four main categories: basic, moderate, extensive, and no answer. The replies show that 50% of the participating companies use computers on a basic level for the development of their project safety programs (Figure 4-5). Moderate and extensive use of computers for safety plan development was indicated by two respondents. One company did not respond. A cross tabulation was performed to compare annual volume of the participants and the extent that computers are used for the development of project safety plans (Table 4-4). 5 2 2 1 00.511.522.533.544.55 BasicModerateExtensiveNo Answer Figure 4-5. Extent of computer use in the development of project safety plans.

PAGE 61

50 Table 4-4. Annual volume and the extent of computer use for the development of project safety plans. Company Annual Volume Computer Use for Developing Safety Plans A N/A Basic B $3 Million Basic C $6 Million Basic D $8 Million Basic E $30 Million Moderate F $40 Million Moderate G $120 Million N/A H $160 Million Extensive I $300 Million Basic J Over $10 Billion Extensive Detailed responses were provided by the survey participants describing the extent that computers are used to develop their project safety plans. Computers were used for the following purposes: To record data. For the formulation of plans only. Only in the development. Very Little. All corporate documents are issued from our CPM software. All text is on the computer; drawings and diagrams are copied and added. Computers are used for training and tracking, generation of written plans, e.g., word processing. Currently, used only by the director of safety. It would be very beneficial to have on-site computers. Word processing and excel spreadsheets, the entire plan is generated via a computer. In addition to the development of project specific safety plans, many safety-related tasks have the potential of being streamlined through the use of computer technology. Respondents were asked if computers were used in the performance of safety-related

PAGE 62

51 functions other than the safety plan. Eight choices were provided: safety audit, job safety analysis, accident investigation, tracking injury rates, safety training, safety meetings, pretask planning, and other. Respondents were to select all applicable categories. Twenty-five selections were marked from seven respondents (Figure 4-6). Three companies did not respond to this question. Four respondents selected training, safety audits, accident investigations, and safety meetings. Tracking injury rates was selected by three respondents. Pretask analysis, job safety analysis, and other were selected by two respondents. 4 4 4 4 3 2 2 2 00.511.522.533.54Number of Selections Safety AuditsAccident InvestigationSafety TrainingSafety MeetingsTracking Injury RatesJob Safety AnalysisPretask PlanningOtherSafety Functions Figure 4-6. With exception of the safety plan, are computers used for other safety-related functions? Both respondents that selected other provided additional information. One respondent stated that computers are not used for additional safety-related functions. The second comment reported that computers were used to develop quality control reports. Respondents were asked if computer programs used to record and track information obtained through monitoring efforts and to track different aspects of safety. The question was open-ended to allow for a more detailed response. Half of the respondents stated they

PAGE 63

52 do not use computers to record and track information related to other aspects of safety (Figure 4-7). Four respondents stated that their company does use computers to record and track information to monitor other aspects of safety. One company did not respond. 5 4 1 012345 NoYesNo Answer Figure 4-7. Are computer programs used to record and track information obtained for other aspects of safety? Three participants provided detailed responses. Company C stated that the use computer programs to record and track other aspects of safety were not used at this time. It was additionally noted if there was a comprehensive program that incorporated the OSHA requirements as they applied to a small contractor, we would be interested. Company F stated that a QC report tracks safe workdays and any incident or directive given regarding safety. Company I indicated that they utilize computer programs to establish trends and survey information. Participants were asked if computers were used for the development of large-scale project-specific applications. Five choices were provided: detailed safety investigations, project safety training, accident investigation, pretask planning, and other. Respondents were to mark all applicable selections. Twenty-two selections were given by ten

PAGE 64

53 respondents. Five selected project safety training and five selected other (Figure 4-8). Detailed safety audits, accident investigations, and pretask planning were each selected by four respondents. 5 5 4 4 4 012345Number of Selections OtherProject Safety TrainingAccident InvestigationPretask PlanningDetailed Safty investigationsSafety Activities Figure 4-8. How are computers used in the development of large-scale project-specific activities? The four respondents selecting other provided additional detailed information. Company B stated that Microsoft Project was used for scheduling, Company C used computer applications for the development of the job safety analysis, Company E utilized computers to develop drug and alcohol policies, and Company G did not use computers to track large-scale project-specific activities. The increase in computer use and applications in the construction industry has helped to contribute to the rise in computer literacy and computer related technologies. Participants were asked if any on-site personnel, such as the field engineer, superintendent, or foreman, used mobile technology devices (palm pilots or PDAs) to perform their jobs? Four of the respondents stated that mobile technology devices (palm

PAGE 65

54 pilots, PDAs) were used in varying capacities on their projects to perform job-related tasks (see Figure 4-9). 4 6 0123456 YesNo Figure 4-9. Do field personnel use mobile technology devices to perform their job? Additional comments were provided by four of the ten respondents. Company C stated that although they do not currently use mobile technology devices, we have discussed bringing them into use at a later date providing that the company will benefit by increased production, better record keeping or other similar needs. Company E stated some use their own equipment. Superintendents receive laptops. Company H used mobile technology devices to a limited extent only. Company I did not use PDAs, but there are plans to adapt the use of hand held devices. Participants were asked if they see the use of computers as a tool for making their job easier within their company? Eight of the respondents viewed computers as making their jobs easier within their company (Figure 4-10). One respondent disagreed, and one company did not answer this question. Company E noted additionally that computers are seen as a tool for office use but not in the field. For the purpose of the comparison illustrated in Figure 4-10, the researcher categorized this response as yes.

PAGE 66

55 8 1 1 012345678 YesNoNo Answer Figure 4-10. In your company, do you see the use of computers as a tool for making your job easier? The level of literacy and exposure to computers and computer programs can affect their acceptance and use to perform job-related tasks. Participants were asked if they had a personal computer at home. All of the participants stated yes. They were then asked how much time they spent using computers at home. The researcher stratified the responses into four categories based on weekly usage: less than one hour, one to five hours, five to ten hours, and greater than ten hours per week. Six respondents spent one to five hours per week using a home computer (Figure 4-11) Two respondents used home computers less than one hour per week. One respondent used a home computer from five to ten hours a week, and another used a home computer more than ten hours per week. The average amount of time spent by the respondents using home computers was hours per week (Figure 4-12).

PAGE 67

56 6 2 1 1 0123456 1-5hrs/weekLess than1hr/week5-10hrs/weekMore than 10hrs/Week Figure 4-11. How much time do you spend on a computer at home? 15 2 0.5 2 4 1.5 0.5 2 6.5 4 0246810121416Hours per Week ABCDEFGHIJCompany Average 3.8 hrs/week Figure 4-12. Average amount of time spent on computers at home. Participants were asked if they personally used a computer to perform job-related tasks. Eight of the respondents indicated that they personally used a computer at work to perform job related tasks (Figure 4-13).

PAGE 68

57 8 2 012345678 YesNo Figure 4-13. Frequency of respondents that use a computer for any job related functions? Respondents were asked what tasks they performed on their computers. Five choices were provided: email, spreadsheets, word processing, letters/correspondence, and scheduling. All categories that applied were to be selected. A total of thirty-five selections were made by nine participants. One respondent did not answer this question. Of the thirty-five total selections, eight included e-mail and letters/correspondence (Figure 4-14). Seven respondents used them with spreadsheets and word-processing. Scheduling was selected by five respondents. 8 8 7 7 5 012345678Number of Responses E-mailLetters/ CorrespondenceSpreadsheetsWord-ProcessingSchedulingTasks

PAGE 69

58 Figure 4-14. What type of tasks do you perform on the computer? Today, many companies employ staff to assist in technology and computer related issues within the organization. Respondents were asked if their company had a designated technology person to assist with computer technology and software related issues. All participating companies stated that technology/computer personnel were available within their company. Two respondents noted additional comments. One company has an IT division to perform computer assistance. The second stated that IT assistance functions were outsourced to a consultant. Participants were asked if they had ever acquired software that looked good but later decided not to use it because it was not user friendly. Six respondents stated they had stopped using software because it was not easy to use (Figure 4-15). 6 4 0123456 YesNo Figure 4-15. Have you ever decided not to use software because it was not user friendly? Participants were asked how much time they would put into a software program to learn it. The researcher stratified the data into three categories: minimal, moderate, and extensive. Five respondents would put an extensive amount of effort into learning new

PAGE 70

59 software (Figure 4-16). Three would invest a minimal effort, and two would expend a moderate effort to learn new software. 5 2 3 012345 ExtensiveModerateMinimal Figure 4-16. How much effort will you put into learning new software? The respondents that would expend extensive time in learning new software added comments such as as long as it takes, as needed to train all users, as much time as needed to get the desired output, and as much time as required, noting that I, personally, am not as computer literate as I might like. Respondents that stated that moderate time was spent in learning new software included forty hours per year, and basic knowledge within a week, continued training based on the usefulness of the program. Respondents stating that a minimal effort would be invested to learn new software stated that minimal efforts were made, initially one day of immersion-type training, thereafter, minimal; mostly to look up information on as-needed basis. Respondents were asked if the familiarity of the visual organization (or basic navigation) of a new software package affects the potential usage. Eight of the participants indicated that that the visual organization affects potential usage. One added absolutely and another said I believe it is critical for those with limited computer

PAGE 71

60 knowledge. One noted that it did not affect their usage and one participant had no opinion. Additional comments noted by two of the respondents. Many business computer systems and software packages utilize a Microsoft Windows operating system. The respondents were asked if they preferred a Windows-based or another standard system format. Of the respondents, nine preferred Windows-based formats. One indicated that another system was preferred and one respondent indicating a preference to a Windows-based format noted, I have no other experience. Many programs operate with the parameters of other software packages, e.g., MS Word, Primavera P3, Microsoft Excel, etc.. Respondents were asked if consideration were given to a new software package, would the interface (visual organization) be important for the development or facilitation of procedures that address safety practices. The researcher organized the responses into four categories: yes, no, other, and no answer. Of the respondents, seven indicated the interface of the software was important for the development of procedures that address safety. One of the respondents did not find the software user interface to be important (Figure 4-17). One respondent stated the user interface of the software could be important. One company did not respond to this question. Additional notation stated any safety input would be secondary to the prime program objective (schedule, budget, etc.) since safety is normally addressed separately. Another additional comment noted that it is much easier to work with applications that are similar to ones that you are familiar with.

PAGE 72

61 7 1 1 1 01234567 YesNoOtherNo Answer Figure 4-17. Is the software user interface important for the development or facilitation of procedures that address safety? Respondents were asked if job-specific safety software would help in the development of safety plans for company projects. The responses were divided into three categories by the researcher: yes, no, and other. Seven of the respondents indicated that job-specific safety software would help in developing safety plans within their company (Figure 4-18).Two respondents indicated job-specific safety software would not benefit their company for the development of safety plans. One response, categorized as other stated there are currently several on the market, however relatively expensive. Additional comment s noted by participants included the following: An additional application should be adopted to permit some development of a job hazard analysis through the same software. A JHA is an excellent guide for field personnel. MSDS Currently, we utilize MS Word and develop each plan on an as-needed basis.

PAGE 73

62 7 2 1 01234567 Yes NoOther Figure 4-18. Would job specific safety software help in developing safety plans for your companys projects? Participants were asked if software to create project specific safety programs had the ability to work within the current procedures for safety plan development. Of the responses, nine indicated that project-specific safety programs could work within the current safety plan development procedures of their company. One company indicated that project-specific safety software would not assist current safety plan development procedures. Respondents indicating that project-specific safety software applications had the ability to work within the current program development within their company were asked to identify features or parameters that would benefit this procedure. Comments provided by the respondents include the following: Scheduling I believe it would save time in developing site-specific safety plans. A feature that allows a selection from multiple choices would be advantageous! Additionally, a reference to the corresponding paragraph in the CFRs would be a plus. Plan Development

PAGE 74

63 The idea that [a site specific safety program] will be compatible with Microsoft project will enable the project manager and/or superintendent to take a more active role in our safety plan. The addition of checklists would help in the precon phase. Our typical CPM [program] tracks submittals. The checklists would fit in after submittal approval and prior to the start of a work activity. Include other relevant topics associated with construction management, e.g., materials testing. Each/many phases of construction require materials to be tested, adding a prompt for soil density and concrete testing would be as nice as the safety topics. Ability to thoroughly develop, modify, and incorporate unique checklists and training facilities for both my company (the GC) as well as the subcontractor.

PAGE 75

CHAPTER 5 SUMMARY The second phase of this study was designed to identify general trends among participating construction firms regarding the role of technology for developing project-specific safety programs. Additionally, the survey attempted to determine the extent to which companies utilize computer technology and software to improve safety performance on their job sites. Development of Project-Specific Safety Plans The overall findings of the survey indicated that safety programs are developed within all of the participating companies in varying degrees. Of the respondents seven indicated the safety programs used on their job-sites were required to be project-specific. Furthermore, there seems to be no relationship evident in the requirement of project-specific safety plans and annual volume of the company (Table 4-2). Survey results indicated that the responsibility of preparing the project safety plan was typically performed by management-level personnel. In many cases, safety plans were developed by the project manager or a company safety director within the firm. In other cases, the development of the safety plan was performed by either the project staff or a quality control officer, followed by project superintendents. Four respondents indicated that this task was performed by multiple positions as listed above. In these cases the selections were recorded by the researcher as an individual response and included in the listed percentages. 64

PAGE 76

65 The scope and specific content of the safety program for a project can be affected by safety planning in relation to the construction schedule. Companies seem to recognize the importance of implementing safety policies prior to the start of construction activities. The development of safety procedures in conjunction with other project specific planning activities, such as scheduling which can assist in integrating safety into the total quality management process. Five respondents indicated the safety plan was developed between contract execution and the beginning of construction. Three respondents indicated that the project safety plan was developed prior to the execution of the contract (during the pre-bid period or during the project proposal phase). Defining the scope and content is an important element in the overall application and performance of the safety program on a jobsite. The identification of potential jobsite hazards prior to the performance of work has been identified in recent articles as an important element of a safe jobsite. This pretask analysis is partially indicative of an industry-wide trend towards a more proactive approach towards project safety. Nine of the respondents indicated that some type of pretask analysis was performed to develop the content of their safety programs. Some of the pretask activities noted in the survey results included the use of checklists from other projects, scope of work, and project specifications review, and pre-set company content requirements. In general, survey results indicated that the scope of the safety plans was more extensive in larger companies (Table 4-4). Following the development of the safety plan, the implementation process allows for the communication of the hazards identified during the development phase. Putting the written information into action on the jobsite is important for communicating

PAGE 77

66 practices for the safe completion of activities to be performed and establishing the companys commitment to safety on the project. The majority of the respondents address the communication of the safety plan on the jobsite. In most cases, the superintendent or the on-site project staff was responsible in varying degrees for the initial execution of the safety plan. Four respondents stated specifically that jobsite meetings were used to communicate safety policies and information to workers. Two companies noted that a review and sign procedure was used to ensure that project staff had read the project safety plan. The ability of the safety plan to adjust to changing conditions during the construction phase of the project can impact safety performance on the jobsite. The increasing awareness of the impacts of injuries on personnel, costs, and schedule has made many construction companies more proactive in response to safety issues on the jobsite. Survey findings indicate that seven of the participating companies reviewed safety concerns during weekly safety or tailgate meetings to determine if changes to the jobsite safety plan were necessary. One company addressed specific safety changes through specific safety directives. Other changes in the safety plan were implemented through mandatory project specific safety requirements such as fall protection and lifting plans to be developed on the jobsite. Of the ten respondents, one company indicated that the project safety plan was usually not revisited unless there is an accident. Findings seem to indicate that changes to the project safety plans are more extensive in larger companies. Computers and Safety Related Tasks In recent decades, technology in the workplace has substantially increased. Because of their ability to efficiently store, process, and retrieve large amounts of

PAGE 78

67 information, computers have become an indispensable tool for the performance of business related tasks. Computer usage and literacy in the construction industry can vary between the office and field activities. Many construction companies now use computer technology for estimating, scheduling, and project management activities. In many instances specific software applications are used to perform these tasks. The majority of the respondents indicated that computers are used only on a basic level to develop and implement project-specific safety plans. Survey findings indicate that larger companies utilize computers more extensively for this purpose. Safety-related activities on the jobsite require clear communications, training, and documentation. Information gathered during the performance of these activities can assist in the continuous development of the project safety plan. The survey indicates that half of the participants do not use a dedicated computer program to record or track safety information. In more basic software applications however, eight of the respondents used other general-purpose programs for safety related tasks. Results indicate that computer use for safety activities is more common among larger companies. Of the participants, the majority of computer usage for safety related tasks is to document accident investigations, safety meetings, and safety audits. Minimal computer use was indicated for the performance of job safety analyses and pretask planning. As computer technology has developed over the past few decades, there has been a growing trend towards mobility. The increase in mobile technology has progressed from the personal computer to laptop computers. Most recently, handheld technology devices have been developed with increasing sophistication. Many of these devices utilize graphics, touch screen input, and information synchronization capabilities to mimic PC

PAGE 79

68 formats and applications. Handheld technology has the ability to influence the way technology is used to perform designated tasks. Personal digital assistants (PDAs) such as 3COMs Palm Pilot and Hewlett Packards IPAQ offer a operating platform and program availability that mimics many standard programs available on standard PCs including Microsoft Word, Excel, and Meridians Prolog. On construction sites, the potential exists for the use of this technology by field personnel for the performance of project tasks. Of the survey respondents, six did not use PDAs on the jobsite. Additional comments indicate that among companies that do not use PDAs, there is moderate interest for implementing their use in the future. Computer Usage Construction projects involve a range of workers with varying skills and job functions. Exposure to computers at home and in the performance of job-related tasks can affect the literacy and acceptance of computer applications for both new and experienced users. Survey results show that home computer usage between one to five hours per week for most participants. For work related functions, eight of the survey participants use a computer. The majority of this use is for e-mail and letters/correspondence. Results seem to indicate that the majority of computer use is for communication purposes. Software Development and Organization Computer literacy within a company can vary based on the type of work, level of training, and exposure to technology of its employees. It is important that new software communicate information effectively and efficiently to its intended users. The design and user interface of a software package can influence its use. Survey results indicate that user interface affected software use. Of those surveyed, six respondents had stopped using a software program because it was not user friendly. The amount of time dedicated

PAGE 80

69 to learning new software, however was high. Five respondents indicated that extensive efforts are put into learning new software, especially in larger companies. The familiarity of new software to other common program formats can contribute to its acceptance and use. Time, effort, and resources dedicated to implementation can potentially be reduced. Eight participants indicated that familiarity with the visual interface or navigation was a factor in its use. The majority of business and home computers are PCs (IBM Compatible). In addition, many of these machines utilize a Microsoft Windows operating system. Other operating systems such as Mac X, and Linux are also available. Nine participants preferred a Microsoft Windows format for new software packages. One respondent noted, I have no other experience. Some applications are designed to operate within existing software rather than as an independent program. The extensiveness and function of these piggyback programs can vary depending on its intended use. Additionally, the visual format and user interface of the piggyback program in relationship to the parent program, e.g., Primavera P3, MS Word, etc., can affect its use. For the purpose of developing and facilitating procedures that address safety, eight respondents indicated that the interface/visual organization of this type of software is important. Two respondents noted that similarities in the programs would make the applications easier to work with and reduce the learning curve. Nine respondents were receptive to safety-based software applications to assist in the existing company procedures for safety plan development. One respondent, however, noted cost as a deterrent for utilizing safety software.

PAGE 81

CHAPTER 6 CONCLUSIONS AND RECCOMENDATIONS Conclusions The purpose of this research was to identify general trends in the use of computers and computer-related technology for the development and implementation of project-specific safety programs in the construction industry. The conclusions of this study are based on responses of ten participants. Because of the small sample size, the findings of this research cannot be regarded as being supported by statistical rigor. As a result, the conclusions are related to general trends that appear to exist in the construction industry. It was intended that the results of this study would provide valued information for those considering the development of software and computer applications for project specific safety programs. Software applications specifically designed for safety management on construction sites have the ability to contribute to the overall total quality management process. Integrating computer-based safety management tools both in the field and in the office can assist in communication, documentation, and integration of the safety program to all aspects of the construction process. Computers have become a necessity in many business environments over the past decade. Because of the hands-on nature of their work, many construction companies do not fully utilize computer technology equally in both field and office environments. The current and future role of computers in the construction industry for project management functions creates a potential for computer-based safety plan integration. Computer-based job-specific safety software could assist 70

PAGE 82

71 project staff in addressing the changing safety requirements necessary to maintain a safe project. Developing software programs such as HAZCOM Interactive utilize the storage, retrieval, and communication benefits of computer technology. The generation and documentation of safety functions such as job hazard analyses, pre-task checklists, and safety audits/inspections could be performed with greater efficiency and contribute to a more proactive project safety program. This study determined the extent to which computers are used to develop and implement job-specific safety plans. Safety-specific software is a relatively new application compared to other project management software. As safety becomes a larger factor in the overall total quality management process on construction sites it is expected that software that contributes to this purpose will be more prevalent. Project-specific safety plans are prevalent for the performance of construction projects at the site level. In most cases, management-level personnel are responsible for the development of these plans. In the past decade, computers have taken a more prevalent role in the performance of construction management tasks with the greatest impacts evident in larger companies. The familiarity with the software format and user interface strongly influences the acceptance of new programs. Microsoft windows-based software formats are predominant on most computers and are preferred for new software. Various levels of computer literacy, however, have affected the type and amount of use of computer software and technology for safety-related tasks. The development and implementation of project-specific safety plans on both computers and portable electronic devices is performed only to a limited extent. While various aspects of safety related information are created, tracked, and communicated through the use of computers, no comprehensive

PAGE 83

72 computer-based safety program is currently utilized. Despite limited computer use, basic computer literacy within the industry presents the potential for the introduction of various safety-related software applications. In addition, construction firms are receptive to computer-based applications for assisting in the development of their project safety programs. Recommendations The widespread use of computer technology is relatively new to the construction industry. As computers have become more common in the management of projects, their applications and use for daily activities has increased. Computer technology is developing continuously. Specific software packages are currently utilized by many construction companies that assist in establishing a comprehensive approach to the management of project related information. The prototype software noted in this research explores both independent and integrated approaches to computer-based project specific safety applications. This research study identified preferences in format and user interface in the introduction of new software. Additionally, further exploration into the applications of safety software based on popular or familiar platforms such as Microsoft Windows, Primaveras SureTrak, Timberline, etc. could assist in the acceptance of new programs. It is recommended that software developers consider these research findings when developing computer applications in the area of construction safety. The development of software for computer safety applications should consider these factors. A recommendation for future research would be to conduct a comprehensive study that would reflect the views of a larger population within the construction industry. Computer technology and applications are changing constantly. It is recommended that software developers address the safety needs of contractors and understand the

PAGE 84

73 specific roles of their application. Additionally, it is recommended that contractors take proactive measures to identify and research computer software and their applications for improve safety on their jobsite.

PAGE 85

APPENDIX A SURVEY QUESTIONNAIRE Survey on Technology and the Implementation of Project-Specific Safety Programs Part 1 1. What is the approximate annual volume of your company? ______________ 2. Are project specific safety plans currently developed for your companies projects? Yes No 3. Who prepares the safety plan? Safety Rep Superintendent Project Manager Outside Consultant Other ____________________________________________________ 4. When is the safety plan developed for a project? After contract execution (before construction) After contract execution (after construction begins) Other 5. How do you decide what needs to be included in a project specific safety plan? Can you describe the steps of the development? 6. How extensive is the scope of a typical safety plan? 7. What is involved in implementing a project specific safety program on a project? (How does the written material get put into action?) 74

PAGE 86

75 8. During construction (after the plan has been put into effect), what kind of changes might be made to project specific safety plans? How easy is it to make these kinds of changes? 9. To what extent are computers used to develop these plans? 10. In other aspects of safety (safety audits, job safety analysis, accident investigations, tracking injury rates, safety training, safety meetings), are computers used for any of these functions? Safety audit Job safety analysis Accident Tracking injury rates Safety Training Safety meetings Pretask planning Other ________________________ 11. To monitor the different aspects of safety, is a computer program used to record and track the information? 12. Are Computers used in the development of large-scale project specific applications (i.e. job safety analysis, pretask planning, safety training, detailed inspections, etc)? Detailed safety Project safety training Accident Pretask planning Other ________________________ 13. Do any site personnel such as the field engineer, superintendent, or foreman use mobile technology devices (like Palm Pilots / PDAs) to perform their job? 14. In your company, do you see the use of computers as a tool for making your job easier? Yes No

PAGE 87

76 At this time, please insert the Salus CPM demonstration CD provided. The demonstration is selfstarting/ running. If the Salus CPM demonstration does not start, please follow this path to begin: Salus_CPM(CD Rom drive)/bin/clickme. (From the desktop, double click on My Computer, double click on the CD drive, open the bin folder, and double click on clickme) The Salus CPM demonstration is provided to you for two purposes; to present information regarding current and potential developments in technology-based safety applications, and as a precursor to the questions contained in part 2 of this study. The Salus CPM demonstration is intended as an example of a developing technology-based application for project-specific safety management. It is not presented as wholistic solution to incorporating technology into safety management, but rather an example of one particular approach related to the subject addressed in this research. Part 2 15. Do you have a computer at home? Yes No 16. How much time do you spend on a computer at home? _____________hrs/ wk 17. Do you personally use the computer for any job related functions? Yes No 18. What tasks do you do on the computer? E-Mail Spreadsheets Word Processing Letters/ correspondance Scheduling 19. Does your company have a technology person to help you with computer and software problems?

PAGE 88

77 20. Have you ever acquired software that looked good but then decided not to use it because it was not user friendly? Yes No 21. How much time/ effort will you put into a software program to learn it? 22. Does the familiarity of the visual organization (or basic navigation) of a new software package affect the potential usage? 23. Do you prefer a windows-based (or other standard program) based format? 24.Many programs work within the parameters of other software packages (MS word, P3, excel, etc.). If you were to consider a software package, is the interface (visual organization) important for the development or facilitation of procedures that address safety practices? 25. Would job specific safety software help in developing safety plans for your companys projects? 25. Do you think that software that helps to create project specific safety programs has the ability to work with your current safety plan development procedures? What features or parameters would be most beneficial to your company? Optional: A summary of this research will be compiled and presented in a report. If you would like a complimentary copy, include your name and address below. Your company identity be used only to deliver a report to you. Thank you for your participation. Name:________________________________________________ Firm:_________________________________________________ Address:_______________________________________________ City:______________________ State:______________ Zip:_____________

PAGE 89

LIST OF REFERENCES Adrian, James J., Farzad Schahbodaghlou, Douglas J. Adrian. Reducing Accidents on Construction Sites: Safety Using TQM Alternative, Proceedings of the Fifth Annual Rinker International Conference Focusing on Construction Safety and Loss Control ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida: Gainesville: 1994, 443-460. Al-Mufti, M. A.. Promotion of Health and Safety Culture Through Accident Cost Awareness, Implementation of Safety and Health on Construction Sites, ed. Amarjit Singh, Jimmie Hinze, and Richard Coble. A.A. Balkema, Rotterdam: 1999. Alves Dias, Luis M.. The Safety and Health Plan in the Construction Industry. Implementation of Safety and Health on Construction Sites, ed. Luis M. Alves Dias and Richard J. Coble. A.A. Balkema, Rotterdam: 1996. Alves Dias, Luis M. and Miguel Torres Curado. Integration of Quality and Safety in Construction Companies. Implementation of Safety and Health on Construction Sites, ed. Luis M. Alves Dias and Richard J. Coble. A.A. Balkema, Rotterdam: 1996. Ayoade, Aubrey I., Alistair G. F. Gibb. Integration of Quality, Safety and Environmental Systems. Implementation of Safety and Health on Construction Sites, ed. Luis M. Alves Dias and Richard J. Coble. A.A. Balkema, Rotterdam: 1996. Coble, Richard J. and Brent R. Elliot. Scheduling for Construction Safety. Construction Safety and Health Management ed. Richard Coble, Jimmie Hinze, and Theo C. Haupt. Prentice Hall, Upper Saddle River; 2000, 43-57. Cooper, M.D., R.A. Phillips. Achieving the Objectives of Total Quality Management by Focusing Upon Safety Management. Proceedings of the Fifth Annual Rinker International Conference Focusing on Construction Safety and Loss Control ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida: Gainesville: 1994, 371-381. Elliot, Brent R.. Investigation of the Construction Scheduling Communication Process: Problems, Foremans Role, Means of Improvement, and Use of Information Technology. Ph.D dissertation, University of Florida, 2000. 78

PAGE 90

79 Elzarka, H. M., I. A. Minkarah, and R. Pulikal. A Knowledge-Based Approach For Automating Construction Safety Management. Implementation of Safety and Health on Construction Sites, ed. Amarjit Singh, Jimmie Hinze, and Richard Coble. A.A. Balkema, Rotterdam: 1999. Eubanks, Francis M.. Elements Of a Construction Safety Management Program. Proceedings of the Fifth Annual Rinker International Conference Focusing on Construction Safety and Loss Control ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida: Gainesville: 1994, 325-338. Gambatese, John A., and Jimmie Hinze. A Guide for Safety Inspections. Implementation of Safety and Health on Construction Sites, ed. Luis M. Alves Dias and Richard J. Coble. A.A. Balkema, Rotterdam: 1996. Geronsin, Rolin. Job Hazard Assessment: A Comprehensive Approach. Professional Safety December, 2001. 23-31. Gottfried, Arie and Marco L. Trani. Safety and Health Design Management on the Construction Site: Guidelines for Roles and Application Tools. Implementation of Safety and Health on Construction Sites, ed. Amarjit Singh, Jimmie Hinze, and Richard Coble. A.A. Balkema, Rotterdam: 1999. Harper, Randall S. and Enno Koehn. Managing Industrial Safety in Southwest Texas, Journal of Construction Engineering and Management November/ December 1998. Hinze, Jimmie. Construction Safety Prentice Hall, Upper Saddle River: 1997. Hinze, Jimmie. Incurring the Costs of Injuries Versus Investing in Safety. Construction Safety and Health Management ed. Richard Coble, Jimmie Hinze, and Theo C. Haupt. Prentice Hall, Upper Saddle River: 2000, 23-42. Hinze, Jimmie. The Role of Project Coordination in Construction Safety. Proceedings of the Fifth Annual Rinker International Conference Focusing on Construction Safety and Loss Control ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida, Gainesville: 1994, 357-370. Jones, Pierce. Hazard Communications Using Interactive Computer Based Training Techniques. The Management of Construction Safety and Health ed. Richard J. Coble, Theo C. Haupt, and Jimmie Hinze. A.A. Balkema, Rotterdam: 2000. Kartam, Nabil. Integrating Construction Safety and Health Performance Into CPM. Construction Congress: Proceedings from the 1995 Conference ed. C. William Ibbs. American Society of Civil Engineers, New York: 1995, 456-462. Levitt, Raymond Elliot and Nancy Morse Samelson. Construction Safety Management. John Wiley and Sons, Inc., New York: 1993.

PAGE 91

80 Nelson, Jeff, and Jimmie Hinze. Salus CPM: An Introduction [CD ROM].Conceptual Arts, 2001. Pun, Kit-Fai and Ip Kee Hui. Integrating the Safety Dimension into Quality Management Systems: A Process Model. Total Quality Management May 2002, 373-391. Rwelamila, P. D. and J. J. Smallwood. Total Quality Management (TQM) Without Safety Management? Proceedings of the Fifth Annual Rinker International Conference Focusing on Construction Safety and Loss Control ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida, Gainesville: 1994, 391-408. Sommerkamp, John and Jeffrey J. Yew. Safety Quality Management. Proceedings of the Fifth Annual Rinker International Conference Focusing on Construction Safety and Loss Control ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida, Gainesville: 1994, 349-355. U.S Department of Labor. Safer Construction Workplaces Evident During the Early 1990s Summary 95-3 Bureau of Labor Statistics. http://stats.bls.gov/iif/oshwc/ossm0004.pdf August 17, 2003. U.S. Department of Labor. Construction Industry Digest Occupational Safety and Health Administration. OSHA 2202: 1998.

PAGE 92

BIOGRAPHICAL SKETCH Casey R. Lewis was born outside of Atlanta, GA. He received a bachelors degree in interior design from the University of Georgia. Prior to entering the graduate school at the University of Florida, he worked in commercial interior design in Atlanta, GA, and Jacksonville, FL. Casey will have completed the requirements for his Master of Science in Building Construction degree in August 2004 and will be employed as a project engineer in Charlotte, NC. 81


Permanent Link: http://ufdc.ufl.edu/UFE0006280/00001

Material Information

Title: The Use of computer technology on the implementation and development of project-specific safety programs
Physical Description: xi, 81 p. ; ill.
Language: English
Creator: Lewis, Casey R. ( Dissertant )
Hinze, Jimmie W. ( Thesis advisor )
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2004
Copyright Date: 2004

Subjects

Subjects / Keywords: Building Construction thesis, M.S.B.C
Dissertations, Academic -- UF -- Building Construction

Notes

Abstract: In recent decades, the concern for worker safety has been on the rise in the construction industry. The development of project-specific safety plans has become increasingly common among construction firms as an effective tool to address the impacts of injuries and establishing proactive safety policies on their jobsites. There has also been a rise in the use of computers as a tool for the efficient management of construction projects. The management of safety, however, is not typically addressed through many project management software programs. Currently, software applications available in various formats and stages of development are attempting to address this issue.In this study, the role of computers for the development and implementation of project-specific safety plans was addressed through a review of literature, an examination of prototype safety management software, and a survey questionnaire of construction professionals. The survey questionnaire and review of current literature were used to determine general trends among contractors regarding their use of computer technology for developing and implementing job specific safety programs. The following trends and conclusions were identified: 1) Management-level personnel such as the project manager or safety director were typically responsible for the development of project safety plans. 2) The application and extent of project safety programs within the participating companies vary. 3) The use of computers and mobile technology to develop project safety plans is currently performed at a minimal to moderate level. 4) Computer technology has had a greater impact on larger companies. 5) Computer literacy exists within construction management personnel. 6) There is no comprehensive project-specific safety management software application currently utilized for developing and implementing safety plans. 7) Most companies are receptive to new software applications for addressing safety on their projects. 8) There are good opportunities for the use of safety related software in the construction industry.
Subject: construction, safety
General Note: Title from title page of source document.
General Note: Document formatted into pages; contains 92 pages.
General Note: Includes vita.
Thesis: Thesis (M.S.B.C.)--University of Florida, 2004.
Bibliography: Includes bibliographical references.
Original Version: Text (Electronic thesis) in PDF format.

Record Information

Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
System ID: UFE0006280:00001

Permanent Link: http://ufdc.ufl.edu/UFE0006280/00001

Material Information

Title: The Use of computer technology on the implementation and development of project-specific safety programs
Physical Description: xi, 81 p. ; ill.
Language: English
Creator: Lewis, Casey R. ( Dissertant )
Hinze, Jimmie W. ( Thesis advisor )
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 2004
Copyright Date: 2004

Subjects

Subjects / Keywords: Building Construction thesis, M.S.B.C
Dissertations, Academic -- UF -- Building Construction

Notes

Abstract: In recent decades, the concern for worker safety has been on the rise in the construction industry. The development of project-specific safety plans has become increasingly common among construction firms as an effective tool to address the impacts of injuries and establishing proactive safety policies on their jobsites. There has also been a rise in the use of computers as a tool for the efficient management of construction projects. The management of safety, however, is not typically addressed through many project management software programs. Currently, software applications available in various formats and stages of development are attempting to address this issue.In this study, the role of computers for the development and implementation of project-specific safety plans was addressed through a review of literature, an examination of prototype safety management software, and a survey questionnaire of construction professionals. The survey questionnaire and review of current literature were used to determine general trends among contractors regarding their use of computer technology for developing and implementing job specific safety programs. The following trends and conclusions were identified: 1) Management-level personnel such as the project manager or safety director were typically responsible for the development of project safety plans. 2) The application and extent of project safety programs within the participating companies vary. 3) The use of computers and mobile technology to develop project safety plans is currently performed at a minimal to moderate level. 4) Computer technology has had a greater impact on larger companies. 5) Computer literacy exists within construction management personnel. 6) There is no comprehensive project-specific safety management software application currently utilized for developing and implementing safety plans. 7) Most companies are receptive to new software applications for addressing safety on their projects. 8) There are good opportunities for the use of safety related software in the construction industry.
Subject: construction, safety
General Note: Title from title page of source document.
General Note: Document formatted into pages; contains 92 pages.
General Note: Includes vita.
Thesis: Thesis (M.S.B.C.)--University of Florida, 2004.
Bibliography: Includes bibliographical references.
Original Version: Text (Electronic thesis) in PDF format.

Record Information

Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
System ID: UFE0006280:00001


This item has the following downloads:


Full Text












THE USE OF COMPUTER TECHNOLOGY ON THE IMPLEMENTATION AND
DEVELOPMENT OF PROJECT-SPECIFIC SAFETY PROGRAMS
















By

CASEY R. LEWIS


A THESIS PRESENTED TO THE GRADUATE SCHOOL
OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT
OF THE REQUIREMENTS FOR THE DEGREE OF
MASTER OF SCIENCE IN BUILDING CONSTRUCTION

UNIVERSITY OF FLORIDA


2004


































Copyright 2004

by

Casey R. Lewis



































This document is dedicated to my parents for their continuous encouragement and
support.















ACKNOWLEDGMENTS

I would like to thank my parents for their encouragement and support of my

educational pursuits. I would like to thank Dr. Jimmie Hinze of the M.E. Rinker Sr.

School of Building Construction at the University of Florida for his insight and guidance

during my graduate studies. I would like to thank Brent Anderson, MSBC, for his

assistance during the completion of this research. Finally, I would like to thank Katie

Cantrell for her patience and support.
















TABLE OF CONTENTS

page

A C K N O W L E D G M E N T S ................................................................................................. iv

LIST OF TA BLE S .............................. ....... ...... .. .............. .. vii

LIST OF FIGURES ............................................................. ......... viii

A B ST R A C T .......... ..... ...................................................................................... x

CHAPTER

1 IN TR OD U CTION ............................................... .. ......................... ..

B background .......................................... .......... .................. .......... ...
Technology and Safety .................................................................. ....
R research Objectives.............................................. 3

2 LITER A TU R E REV IEW ............................................................. ....................... 4

Costs of Safety ................ .............................................................. ............ 5
Cost of Injuries vs. Investment in Safety............... .............................................6
True C osts of A accidents ................................................................... ............... 8
The Safety Program .................. .................................... ................. 10
Purpose of the Safety Program ................................ ......................... ........ 10
Development of the Safety Program .... ........... .................... .................11
Safety Plan Content and Organization ..................................... ............... ..14
Job Safety A ssessm ent (JSA ) .................. ........... ................................. ....... 17
Total Quality Management/ Safety Quality Management.........................................18
Total Q quality M anagem ent............................................ ........... ............... 18
Safety Q quality M anagem ent.......... ................. ................................ .......... 19
Technology and safety ........... .................. ............ .. ...... .................. 23
Training .............................. ..... ..... ..................24
Identification and documentation of hazards ..................................................25
Com m unication of safety ............................................................................. 32

3 RESEARCH M ETHODOLOGY ........................................ .......................... 36

Introduction ................................ ........................ 36
Geographic Focus of Research ................... ........ ................... 36


v










Q questionnaire D evelopm ent ............................................... ............................ 37
Identifying Research Participants .................................................... ...... ......... 38
Q u estionnaire D distribution ............................................................... .....................39
Sam ple Size ............................................................ .39
D ata A nalysis................................................... 40

4 R E S U L T S .............................................................................4 1

5 S U M M A R Y ..............................................................................................6 4

Development of Project-Specific Safety Plans...................................64
Computers and Safety Related Tasks .........................................................66
Com puter U sage ........................................68
Software Development and Organization ........................................ ....68

6 CONCLUSIONS AND RECCOMENDATIONS ................................................70

C o n c lu sio n s ........................................................................................................... 7 0
Recommendations........................................................72

APPENDIX SURVEY QUESTIONNAIRE.............................. ......... 74

LIST OF REFERENCES ..................................... .............. ....................78

B IO G R A PH IC A L SK E T C H ....................................................................................... 81
















LIST OF TABLES


Table pge

2-1 Items to be included in the Safety and Health Plan...................................... 14

4-1 A annual com pany volum e. ............................................................. .....................42

4-2 Cross tabulation of annual volume and use of project specific safety plans............43

4-3 Annual volume and extent of the scope of the safety plan.................. ..........46

4-4 Annual volume and the extent of computer use for the development of project
safety plans ............................................. ............................ 50
















LIST OF FIGURES


Figure pge

2-1 The relationship of the cost of injuries and the investment in safety......................

2-2 Relationship of the emphasis on safety to injury occurrence ...............................8

2-3 Competing pressures causing change in the integration of QS&E systems.............21

2-4 Construction inspection guide: concrete checklist. ...............................................30

2-5 Safety checklist linked to SureTrak schedule. ................................. ............... 32

2-6 HAZCOM Interactive: Screen for accessing information on Hydrazine................34

4-1 Do firms require project-specific safety programs (n=10)?...............................42

4-2 W ho develops the safety plan? ........................................................................ .. ...43

4-3 W hen is the project safety plan developed? ........................................................ 44

4-4 How extensive is the scope of a typical safety plan? ............................................46

4-5 Extent of computer use in the development of project safety plans.........................49

4-6 With exception of the safety plan, are computers used for other safety-related
fu n ctio n s? ......................................................................... 5 1

4-7 Are computer programs used to record and track information obtained for other
aspects of safety? .................................... ............................... ........52

4-8 How are computers used in the development of large-scale project-specific
activities? ............................................................... ..... .... ......... 53

4-9 Do field personnel use mobile technology devices to perform their job? ..............54

4-10 In your company, do you see the use of computers as a tool for making your job
e a sie r? ...................................... ................................................... 5 5

4-11 How much time do you spend on a computer at home? .......................................56

4-12 Average amount of time spent on computers at home....................... ................56









4-13 Frequency of respondents that use a computer for any job related functions? ........57

4-14 What type of tasks do you perform on the computer? ...........................................58

4-15 Have you ever decided not to use software because it was not user friendly?.........58

4-16 How much effort will you put into learning new software?................................59

4-17 Is the software user interface important for the development or facilitation of
procedures that address safety? ........................................... ......................... 61

4-18 Would job specific safety software help in developing safety plans for your
com pany' s projects? .................................................................62















Abstract of Thesis Presented to the Graduate School
of the University of Florida in Partial Fulfillment of the
Requirements for the Degree of Master of Science in Building Construction

THE USE OF COMPUTER TECHNOLOGY ON THE IMPLEMENTATION AND
DEVELOPMENT OF PROJECT-SPECIFIC SAFETY PROGRAMS

By

Casey R. Lewis

August 2004

Chair: Jimmie Hinze
Major Department: Building Construction

In recent decades, the concern for worker safety has been on the rise in the

construction industry. The development of project-specific safety plans has become

increasingly common among construction firms as an effective tool to address the

impacts of injuries and establishing proactive safety policies on their jobsites.

There has also been a rise in the use of computers as a tool for the efficient

management of construction projects. The management of safety, however, is not

typically addressed through many project management software programs. Currently,

software applications available in various formats and stages of development are

attempting to address this issue.

In this study, the role of computers for the development and implementation of

project-specific safety plans was addressed through a review of literature, an examination

of prototype safety management software, and a survey questionnaire of construction

professionals. The survey questionnaire and review of current literature were used to









determine general trends among contractors regarding their use of computer technology

for developing and implementing job specific safety programs. The following trends and

conclusions were identified:

* Management-level personnel such as the project manager or safety director were
typically responsible for the development of project safety plans.

* The application and extent of project safety programs within the participating
companies vary.

* The use of computers and mobile technology to develop project safety plans is
currently performed at a minimal to moderate level.

* Computer technology has had a greater impact on larger companies.

* Computer literacy exists within construction management personnel.

* There is no comprehensive project-specific safety management software
application currently utilized for developing and implementing safety plans.

* Most companies are receptive to new software applications for addressing safety on
their projects.

* There are good opportunities for the use of safety related software in the
construction industry.














CHAPTER 1
INTRODUCTION

Safety in the workplace has become a growing concern for many industries in

recent decades, especially the construction industry. Construction workers are exposed to

unique risks inherent in the performance of their work that exposes them to many

potentially hazardous conditions on the jobsite. As a result, the construction industry has

experienced a disproportionate number of injuries and fatalities when compared with

most other industries. Construction firms are beginning to realize the human and

economic benefits to their organizations when there is an increased and active awareness

of workplace safety. "It is appropriate to consider construction work as inherently

dangerous if no proactive steps are taken to improve the work conditions and to ensure

that the work is undertaken in a safe manner" (Hinze, 1997). Proactive approaches to

safety management and hazard awareness can benefit construction companies through

decreased costs associated with injuries and the contribution to the overall productivity of

projects.

Background

The role of safety management to support other project management tasks is

becoming more significant as the costs, schedule, and human impacts of injuries on

jobsites impact the overall success of projects. In addition to construction companies,

many owners are also making an increased effort to ensure that work performed by

contractors on their projects is performed safely. The influences of schedule, cost, and

other project related issues can be easily managed through documentation and









management of information and processes. In contrast, impacts associated with safety

and injury occurrence can often be difficult to categorize. Because many of the costs and

influences resulting from injuries can be indirect or hidden, the difficulty can lie in

justifying the expenditure of company resources on safety. In spite of the fact that the

construction industry employers, insurers, labor groups, and regulators generally agree

that improved safety benefits everyone, the perceived dilemma is how to balance the

daily trade-off between true costs of losses due to accidents and health ailments and the

costs and inconveniences involved in delivering effective safety programs (Jones, 2000).

The incorporation of safety into the management of other project related tasks allows for

an increased ability to prevent the occurrence ofjobsite injuries.

Technology and Safety

In the construction industry, the management of projects is strongly influenced by

costs and schedule. To facilitate management related activities, many construction firms

utilize computer technology for documenting, expediting, and communicating project

related data. "Computer technology has led to the development of better field

management systems, and such systems have enabled construction contractors and

managers to monitor field operations more effectively" (Elliot, 2000). The ability of the

computer to efficiently process, store, and retrieve information has increased both the

amount of data produced and the overall productivity of management tasks on the

construction site. The use of computer technology can assist project management to

effectively develop and control project-specific safety issues.

The development of a project specific safety plan establishes the safety procedures

on a particular project and communicates the company's commitment to safety. "The

project safety program is a comprehensive written accident prevention program covering









all aspects of on-site construction operations and activities associated with a particular

contract" (Hinze, 1997). The use of computer technology to develop and implement

project specific safety programs facilitates the efficient access to safety related

information. In addition, the electronic format of material within the safety management

program allows for the integration of safety information with other electronically

formatted material such as the construction schedule. The effective management of safety

and health on the jobsite can contribute to overall success of the company and individual

projects. Computers can assist project staff in planning, organizing and controlling safety

within the overall construction process. Promising advances in the field of computer

technology continue to develop various programs to perform various job-related tasks

with increased efficiency. It addition to the function provided by computer programs,

computer literacy of the intended users plays an important role in both the usefulness and

effectiveness of the program.

Research Objectives

The objective of this study was to explore the means by which Florida commercial

contractors use technology to develop and implement project specific safety plans on

their job sites. The use of computer software for the creation and implementation of

safety and health objectives on the job site is a relatively new development when

compared to other project specific applications available to the construction industry.

Increased awareness of the benefits of safety and health related practices within the

construction environment have created demands for more comprehensive and ubiquitous

tools to effectively manage their application. This study is intended to establish general

trends in the use of computers by commercial contractors and to determine the extent to

which they are utilized for the management of safety and health on the job site.















CHAPTER 2
LITERATURE REVIEW

Concern for worker safety in the construction industry has gained increasing

awareness in recent decades. "Since the 1970's, the construction industry's incidence of

injuries and illnesses resulting in lost work time typically has exceeded the national rates

by a wide margin usually by more than 60 percent" (U.S Department of Labor, 2003).

During the 1990's a dramatic reduction in injuries and illnesses involving lost work time

occurred. "In 1993 the rate gap [of lost worktime incidents per 100 full-time workers]

nearly closed between construction and certain other hazardous industries" (U.S

Department of Labor, 2003). Although the number of injuries has decreased in recent

years, the frequency of injuries remains disproportionately high compared to other

industries. "The statistics have remained reasonably constant over the past several years:

the construction industry employs approximately 5% of the industrial work force, but has

generally accounted for nearly 20% of all industrial worker fatalities" (Hinze, 1997).

Rising premiums for liability insurance and workers' compensation have impacted

construction overhead costs and attracted the interests of both the construction industry

and facility owners. "As contractors [are] sought for projects, it [becomes] common to

consider only those firms with a demonstrated history of good safety performance"

(Hinze, 1997). The increasing awareness of the impact of safety and health of workers to

the construction process has contributed to the increased presence of safety management

practices as an essential and necessary role in the successful performance and control of









projects. "Today a firm must be effective in terms of cost control, schedule control,

financial management, quality control, owner relations, personnel management, and

safety management -just to survive" (Eubanks, 1994). "By effectively managing safety

and health, dramatic improvements can be accomplished within the construction industry.

Project managers can plan, organize and control safety and health objectives on

construction sites. Thus safety is proactively integrated along with cost, production,

quality, and the schedule of the project" (Kartam, 1995).

Costs of Safety

Beyond the measures taken by the individual construction worker, it is accepted

that accident prevention is the responsibility of management (Hinze, 1997). To improve

the effectiveness of their safety program, it is important that companies utilize the support

and commitment of financial and human resources to guide safety policies, and practices.

"Jobsite managers who treat productivity and safety as two related parts of job

performance generally have been shown to be the better producers in terms of job cost

and schedule. Based on the jobsite managers' actions, workers on the job know what the

real priorities are. Workers will reflect those priorities in their own decisions affecting

safety" (Eubanks, 1994). The process of managing the costs associated with construction

tasks can contribute to the application of procedures and their subsequent effectiveness

when utilized in the management of projects. "Safety must be cost effective. And safety

management is cost effective. But, to see that clearly, we must be able to evaluate our

cost of accidents in much the same way we evaluate results of our (direct) cost control

program" (Eubanks, 1994). "Costs are incurred on a project whenever an accident occurs

on a project. Those costs can be quite dramatic when the accident involves an injury"

(Hinze, 2000).









Cost of Injuries vs. Investment in Safety

The difficulty in establishing cost information regarding safety lies in accurately

accounting for money involved in the prevention of and/or the consequences of injury

occurrences. "A distinction must be made between the costs of safety and the costs of

injuries" (Hinze, 2000). These costs can be distinguished by the degree of certainty in

which they occur. Additionally they can be further quantified by direct or indirect costs

as a result of the activity in question. By categorizing the types of costs incurred on a

construction project, the relationship between the cost of injuries and the cost of safety

can be more easily distinguished and quantified.

The costs associated with injuries consist of direct and indirect costs of injuries. .
.[T]hese are the costs that are incurred as a consequence or result of the occurrence
of accidents in which injuries are sustained. In other words, in the absence of
injuries, there are no injury costs. This is a certainty. What is not certain is whether
or not there will be an injury. On the other hand, the costs of safety are those which
are incurred as a result of an emphasis being placed on safety, whether it be in the
form of training, drug testing, safety incentives, staffing for safety, personal
protective equipment, safety programs, etc. These are costs that are a certainty for
any implementation of some facet of the safety program. (Hinze, 2000)

The relationship of the costs of injuries and the investment in safety is affected by

probability of occurrence. "The hypothesis is that injury occurrence (consequently injury

cost) will be high when there is a low emphasis on safety and that injury occurrence will

be low when the emphasis on safety is high" (Hinze, 2000). This hypothesis suggests that

a certain point exists in which the relative cost of injuries and level of effort and emphasis

on safety will cross as shown in Figure 2-1.
















S\ Cost of Injuries








Low High
Level of Effort and Emphasis on Safety

Figure. 2-1. The relationship of the cost of injuries and the investment in safety. (Hinze,
2000)

"From an economic perspective there seems to be an optimal level of emphasis to be

placed on safety. From a practical point of view, this level is rarely achieved with the

emphasis generally being far below the optimal" (Hinze, 2000). In the comparison shown

in Figure 2-1, a certain probability in determining cost and injury occurrence is assumed

Actual costs applied to injuries can only take into account those that have occurred or are

expected to occur. "The dollars spent on safety cannot be directly measured against the

injuries that did not occur. [T]remendous or gross approximations will need to be made to

estimate the costs of injuries that might have occurred. These are all uncertainties that

make it difficult to sell the need to make expenditures on safety on a purely economic

basis" (Hinze, 2000).

An alternative method for analyzing the relationship between the cost of injuries

and the investment in safety takes into account the probability of future uncertainties by

the use of a decision tree as shown in Figure 2-2.











Most likely to occur
High cost of safety
Low injury cost
No es
Safety
Record
High expend, es Injuries
on safety High cost of safety
High injury cost

management Least likely to occur
decision on
spending on Least likely to occur
ey Low safety cost
Low e nditurs Low injury cost
onsafety\ No *s
Safety
Record
Injuries e
Low safety cost
High injury cost
Most likely to occur


Figure 2-2. Relationship of the emphasis on safety to injury occurrence. (Hinze, 2000)

The diagram (Figure 2-2) incorporates expenditures and safety record to derive four

general outcomes; two likely and two unlikely. The decision tree conceptualizes a path

that can assist managers and project supervisors in allocating resources for optimal safety

performance. "The factor that is most influential when safety emphasis is low is the

assumption that no injuries will occur. The reality of the process is quite simple: if safety

is emphasized, the occurrence of injuries can be expected to be low and, conversely, if no

emphasis is placed on safety, the occurrence of injuries can be expected to be high"

(Hinze, 2000).

True Costs of Accidents

Accurate accounting of the costs of safety, injuries, and the effects of injuries on a

jobsite is a difficult task for many construction companies. "The quest for objective and

accurate costing of accidents in construction continues, and to date it still remains the

subject of much debate and research. At the heat of this debate there is however a general









consensus among engineers that measurement remains the backbone of any objective and

scientific approach to defining this problem and finding a solution" (Al-Mufti, 1999).

To quantify and track the true costs of injuries, costs are generally divided into

two main categories, direct and indirect. "The direct costs are those directly attributed to

or associated with injuries. ... [D]irect costs tend to be those associated with the treatment

of the injury and any unique compensation offered as a result of being injured" (Hinze,

1997). In terms of investing in safety, direct costs include:

* Insurance (workers compensation, premiums, etc.)
* Substance abuse testing
* Staffing for safety (project safety representative, on-site medical aid, etc.)
* Training
* Personal protective equipment
* Safety committees
* Investigations
* Safety Programs
* Safety Incentives (Hinze, 2000)

Indirect costs of injuries are more elusive in identification and quantification.

"The indirect costs are all other costs resulting from the injury that are not recovered

through insurance coverage. Most of the indirect costs can be categorized as being related

to the cost of lost productivity, damaged materials/equipment, and added administrative

effort" (Hinze, 2000). Because of their association with other work and delayed or

immeasurable impact, indirect costs can be difficult to track within many accounting

systems. "Most cost control systems typically mask these as production costs or absorb

them as overhead rather than recording them as costs attributable to accidents" (Eubanks,

1994). Indirect or hidden costs include costs and/or productivity impacts of the

following:

* Productivity of injured worker
* Worker assisting injured worker









* Crew productivity
* Workers idled by watching
* Damaged materials/equipment
* Productivity of replacement worker
* Supervisory assistance
* Other impacts: OSHA and media. (Hinze, 2000)

Traditionally, indirect costs are calculated as a function of the direct cost of the

incident. "Over 50 years ago, the indirect costs of injuries were determined to be four

times the magnitude of the direct costs by H.W. Heinrich (1941), an employee of

Traveler's Insurance" (Hinze, 2000). With the escalating expenses associated with

healthcare in the United States beginning in the 1980's, it might be reasonable to expect

the 1:4 ratio to be lower now (Hinze 1997).

In the early 1990's, the Construction Industry Institute (CII) culminated a study that
examined the true costs of injuries. That study examined 834 injuries that were
reported by 185 projects, constructed by more than one hundred firms in 34 states.
This was a broad based detailed study that determined the indirect costs of medical
case injuries were about the same as the direct costs and that the indirect costs of
restricted activity/lost workday injuries were approximately twice the magnitude of
the direct costs. (Hinze, 2000)

Understanding the costs associated with injuries can help managers promote a

stronger emphasis on safety. "If the true costs of injuries were well defined, management

would be in a better position to make informed decisions concerning safety. Rather than

addressing safety from an altruistic point of view, construction managers should also

consider safety from a more purely economic perspective" (Hinze, 1997).

The Safety Program

Purpose of the Safety Program

The development of a program for the management of safety on the jobsite is

critical. "The project safety program is a comprehensive written accident prevention

program covering all aspects of on-site construction operations and activities associated









with a particular project. All of the strategies and tasks to be performed to achieve

safety success on the project will be included in the safety program" (Hinze, 1997). The

scope, organization, and development of the safety program reflect the commitment of

management to safety and the characterization of the safety culture within the company.

"[S]afety is not a concept to be thought of as additional to the work itself; safety is to be

considered an integral part of the work" (Hinze ,1997). The safety program is a tool that

can be utilized in the coordination of project activities to manage the risks associated with

the tasks to be performed. "Effective management of worker safety and health protection

is a decisive factor in reducing the extent and severity of work-related injuries and

illnesses and related costs" (U.S. Department of Labor, 1998).

Development of the Safety Program

The development of the safety program reflects the safety philosophy of the

company. A statement of purpose or position developed by management is indicative of

the attitude towards safety and assists in guiding the direction and goals to be set forth by

the project safety manual. "Once the company managers have established a clear safety

philosophy (preferably to minimize injuries), diligent efforts can then be expended to

draft an effective safety program. The safety philosophy is very important, as it is at the

core of the safety program" (Hinze, 1997).

The scope of the safety plan should encompass all activities that will occur on a

particular construction project. General requirements may include company or

governmental regulations that are designated for a specific project. "The safety plan for

the construction site must be filled in with a set of information of a general nature on the

characteristics of the building in context and with a list of minimum safety and health

requisites that the Contractor must meet at the moment of organizing the work"









(Gottfried and Trani, 1999). The overall scope and content of the plan is dependent upon

the nature, size, complexity, and location of the project being constructed. The scope

analysis in many cases will be developed by a safety and health coordinator beginning

with the acceptance of the general design of the project and concluding at final

acceptance/ completion of construction (Alves Dias, 1996).

The elimination of potential hazards and unsafe conditions begins prior to the start

of the construction process. Planned activities to be performed during the construction of

the project should be examined and reviewed to ensure that necessary safety precautions

have been taken to ensure a safe environment. In many cases the construction schedule

may provide a good source for this review and can serve as a starting point for a safety

checklist (Hinze, 1997).

In addition to the construction schedule, the continuous involvement and

participation of employees and subcontractors is a resource that can assist in developing a

comprehensive scope for the project safety plan. This resource provides not only physical

content for the plan but can contribute to the communication of the safety philosophy as

well. "By involving the employee in the safety process, more commitment is gained from

the employee. This additional commitment may be attributable to the employee's desire

to execute something which he or she has developed or assisted in developing" (Harper

and Koehn, 1998). Support, commitment and involvement by the various parties

involved in the performance of the safety plan is important to its successful application

on the jobsite. The establishment of the safety plans is indicative of the safety philosophy

communicated on ajobsite. Safety practices on the jobsite should not be considered

separate from other tasks performed on the job. Cooperation and coordination of the









safety plan is a mutual obligation of all employees on the job site (Hinze, 1997).

Commitment and support of the safety plan to all parties involved on the project can be

provided by several different methods. "In an effective program, management regards

worker safety and health as a fundamental value of the organization and applies its

commitment to safety and health protection with as much vigor as to other organizational

goals" (U.S. Department of Labor, 1998).

In implementing a safety and health program, there are various ways to provide
commitment and support by management and employees. Some recommended
actions are described briefly as follows:

* State clearly a worksite policy on safe and healthful work and working conditions
so that all personnel with a responsibility at the site (and personnel at other
locations with responsibility for the site) fully understand the priority and
importance of safety and health protection in the organization.

* Establish and communicate a clear goal for the safety and health program and
define objectives for meeting that goal so that all members of the organization
understand the results desired and the measures planned for achieving them.

* Provide visible top management involvement in implementing the program so that
all employees understand that management's commitment is serious.

* Arrange for and encourage employee involvement in the structure and operation of
the program and in decisions that affect their safety and health so that they will
commit their insight and energy to achieving the safety and health program's goals
and objectives.

* Assign and communicate responsibly for all aspects of the program so that
managers, supervisors, and employees in all parts of the organization know what
performance is expected of them.

* Provide adequate authority and resources to responsible parties so that assigned
responsibilities can be met.

* Hold managers, supervisors and employees accountable for meeting their
responsibilities so that essential tasks will be performed.

* Review program operations at least annually to evaluate their success in meeting
the goals and objectives, so that deficiencies can be identified and the program
and/or the objectives can be revised when they do not meet the goal of effective
safety and health protection. (U.S. Department of Labor, 1998)









Safety Plan Content and Organization

The content and organization of the safety plan should be project specific. Because

of this, the exact organization and content will vary from project to project based on the

nature, size and complexity of the job (Diaz, 1996). "An effective occupational safety and

health program will include the following four main elements: management commitment

and employee involvement, worksite analysis, hazard prevention and control, and safety

and health training" (U.S. Department of Labor, 1998). Within these general guidelines,

specific aspects relative to both the project and the safety goals of the company and the

program participants can be developed. An example of a safety plan format by Alves

Dias (1996) suggests a three-part composition consisting of a plan resume, the project

characterization, and hazard prevention measures. Each component in this proposed

system contains items that are to be developed by the various project team participants

within a particular time frame of the contract/construction process.

Table 2-1. Items to be included in the Safety and Health Plan. (Alves Dias, 1996)
Plan Resume Project Characterization Hazard Prevention Measures
Definition of Objectives General Characteristics Plans of Action With Regard
to Site Conditions
Advance Information Labor Quantities Table Site Warning Sign and Traffic
Plan
Applicable Regulations Works Plan Collective Protection Plan
Functional Organizational Work Time Chart Individual Protection Plan
Chart
Working Hours Site Project Inspection and Safety Plan
Industrial Accident and List of Especially Plan for the Use and Control of
Other Insurance Hazardous Works Site Equipment
Execution Stages List of Especially Workers' Health Plan
Hazardous Materials
Construction Methods Accident Records and
Statistics Plan
Workers Training and
Information Plan
Visitors Plan
Emergency Plan









The three phases comprising the above health and safety plan (HSP) are indicative of the

phases in which the plan is to be implemented. The plan resume should define the

objectives of the safety plan and the extent to which the safety and health plan will be

implemented. The resume will additionally specify the general parameters by which the

project will operate. During the design/bidding phase of the project, it is intended that the

contractors take into consideration their proposed construction methods in relation to the

requirements defined by the safety objectives (Alves Dias, 1996).

The project characterization phase of the safety program development process

occurs during the contracting stage. "During the tender award phase, the successful

contractor should submit all the details required to complete the safety and health plan

presented during the previous phase to the Safety and Health Coordinator for his approval

within a specified time period. Once these details have been incorporated into the Plan,

the site can be set up and the works can commence" (Alves Dias, 1996). This phase of

the safety plan development incorporates specific project attributes into the general

requirements defined in the plan resume.

The hazard prevention phase of the plan will commence after the project specific

details provided by the contractors in the project characterization phase have been

approved by the safety coordinator and incorporated into the Plan (Alves Dias, 1996).

"During the physical execution of the works and otherwise whenever necessary, the HSP

shall be adapted to the actual construction conditions. Alterations to the project should be

particularly subjected to prior analysis by the Safety and Health Coordinator in order to

foresee any potential hazards associated therewith" (Alves Dias, 1996).









For a safety program to be effective, it must be clear in communicating the intent of

the company and be applicable to all company projects and personnel (Hinze, 1997). In

addition to the general safety plan developed by the company to define the safety

philosophy/ position and other standard safety requirements and regulations, additional

project-specific requirements are becoming more prevalent in contract requirements.

"Many owners now require contractors to submit project-specific safety programs for

approval (to be discussed at the preconstruction conference). Until the project safety

program is approved, it is common for such an owner to refuse to process progress

payments" (Hinze, 1997). The following items are generally not contained in the generic

company safety program and are recommended for inclusion in the project-specific plan:

* Job number
* Job-site safety representative
* OSHA standards applicable to the work
* Description of safety orientation and training for all employees
* Days and times of regular weekly and monthly safety meetings
* First-aid facilities and procedures
* Outline of phases of work, potential hazards, and recommended safety precautions
* Emergency plans
* Written hazard communication program
* Schedule of regular job-site safety inspections
* Requirement of frequent safety inspections
* Procedures for reporting, investigating, and documenting injuries
* Signage for public safety
* MSDS information
* Safety committees
* Warning devices
* Subcontractor compliance (Hinze, 1997)

The project-specific requirement of the safety plan allows for the identification of

potential hazards not identified by a generic plan. "Although compliance with the law,

including specific OSHA standards, is an important objective, an effective program looks









beyond specific requirements of law to address all hazards. It seeks to prevent injuries

and illnesses, whether or not compliance is an issue" (U.S. Department of Labor, 1998).

Job Safety Assessment (JSA)

An important element in the development of the project-specific safety plan is the

job hazard analysis (JHA), more recently referred to as the job-site safety assessment or

JSA. "To accomplish good safety performance, it is important to examine work

procedures before they are used. That is, hazards and dangerous work methods must be

anticipated" (Hinze, 1997). The process of identifying unsafe conditions on a job-site

through a worksite analysis system such as a JSA identifies potential risks and assists in

the success of the project safety plan. "Unawareness of a hazard stemming from failure to

examine the worksite is a sign that safety and health policies are ineffective. Effective

management actively analyzes the work and worksite to anticipate and prevent harmful

occurrences" (U.S. Department of Labor, 1998).

Job safety assessments are typically performed prior to the commencement of

construction. "A comprehensive JHA is performed in a team- based environment. It

includes an assessment of safety hazards, including occupational health issues, and

environmental impacts and aspects, and an assessment of associated risk; it then provides

an organized listing of appropriate control measures to mitigate the risk" (Geronsin,

2001). A JSA interchangeably used instead of JHA, can be utilized at any point during

the construction process to identify potential hazards associated with a particular task. "It

is ideal to conduct job hazard analyses on projects to be constructed. It is possible, often

advisable, to conduct subsequent job hazard analyses on a project that is well underway.

Projects warranting such attention are those in which work to be performed is of an

unusual or untried nature" (Hinze, 1997).









The development of the job safety analysis for a specific project can be derived

using several methods depending on the specific nature of the tasks. In some cases, the

general nature of the tasks will be apparent. In other cases, the construction schedule can

provide a comprehensive resource to begin a JSA (Hinze, 1997). Information gathered

from the JSA can be useful in planning activities, and educating and training workers

involved in potentially hazardous tasks.

The outcome of this process can be used to train new or transferred employees or to
retain current staff after an inspection. The comprehensive JHA process quickly
and efficiently shows workers the hazards present and the effect of control
measures. ... The team should meet with the affected employees to develop a level
of understanding, acceptance, and agreement. Risk assessment should be analyzed
and recommended control measures scrutinized until a consensus document is
produced. (Geronsin, 2001)

Total Quality Management/ Safety Quality Management

Total Quality Management

"Total Quality Management (TQM) in the construction industry has emerged as the

latest and most comprehensive vision of quality management" (Rwelamila and

Smallwood, 1994). TQM is being utilized in the construction industry to align

management practices with quality standards to reach a common goal. The process is

designed to be a cyclical, proactive program for continuous improvement of both product

quality and management practices through a central company goal or vision. "Total

Quality Management (TQM) is an organization wide philosophy that links product and

service quality to customer satisfaction by institutionalizing planned and continuous

quality improvement. The purpose of TQM is to provide a common focus for all

employees, so that individuals with different tasks, abilities and priorities are able to

communicate in pursuit of a common organizational goal" (Cooper and Phillips, 1994).









In analyzing the complete management and quality process model, TQM focuses

on the physical structure and organization as well as the attitudes and motivators

affecting workers. The establishment of the TQM process within a company or

management system involves 'hard' and 'soft' performance measurements.

Within TQM, 'hard' aspects typically involve a range of production techniques
such as statistical process control, Just in -time' inventory control, changes in the
lay out of work stations, design processes and procedures of the organization.
These production techniques are generally analyzed by process flow-charting, tally
charts, pareto analysis, scatter diagrams, histograms, control charts, and cause and
effect analysis. ...The 'soft' aspects of both TQM and safety management are
largely concerned with attitudes, commitment and culture change within an
organization. (Cooper and Phillips, 1994)

A central aspect to the successful performance of a TQM system is the development of

clearly defined objectives and key performance indicators relative to those goals. In

addition to defining objectives, communication and feedback must be provided.

Communication and feedback offers immediate indicators of performance and direction

in relation to the goals, results, and quality objectives defined during the previous stages

of the TQM process (Cooper and Phillips, 1994).

Safety Quality Management

Integrating safety into the management and quality process using the principles

defined by TQM can effectively relate management, quality, and safety into related

attainable objectives. "Implementing a safety initiative in a company is no different than

implementing a quality initiative. They are both aimed at changing the same thing, that is

the behavior of people" (Sommerkamp and Lew, 1994). "The fundamental difference

between the TQM approach to safety versus the traditional approach is the following.

TQM approach is 'proactive' as compared to the reactive nature of the traditional

approach. In a production setting, it involves solving production problems upstream









rather than inspecting for defects downstream" (Adrian, et al, 1994). To incorporate a

safety quality management (SQM) policy effectively, regulatory-based compliance

programs form the building blocks but a comprehensive safety process allows companies

to better assess areas that require more attention (Geronsin, 2001). "Regulations are

structured to control material, activities, and equipment that have, in the past, caused or

been suspected to cause injuries. The key element of this statement is 'in the past.' Few

companies will succeed by focusing efforts on what has already occurred" (Geronsin,

2001).

In a study conducted by the European Construction Institute, driving factors were

identified from contractors as affecting the development of their safety programs. The

derived list was as follows (in descending order of significance).

* Changes in Safety Legislation
* Total Project Management concepts
* Pressure from clients
* Better information available
* Increased insurance premiums
* Pressure from employees
* Pressure from employee Trade unions or Employee Organizations
* Pressure from the general public (Ayoade and Gibb, 1996).

Ayoade and Gibb describe a basic model for the integration of safety management into

the quality management system. The quality, safety, and environment system (QS&E) is

an SQM model that illustrates the integration of key processes within project

management. The single integrated QS&E model promotes effective management by

more closely representing the way companies do business, reducing administrative tasks,

and promoting coordination (Ayoade and Gibb, 1996).

Within this particular SQM model, factors such as costs, legislation, total project

management (TPM), and clients can promote integration. Perceived incompatibility of










standards, efforts aimed at pleasing pressure groups, project-specific requirements, and

lack of commitment or understanding are potential influences inhibiting the integration of

the QS&E system. These relationships of the QS&E model are illustrated in Figure 2-3.

Le 'iil rion Costs Costs Legislation
lTPM TPM
Clients Ar
/Clients
Quality Safety 4_-


Lack of commitment Perceived incompatibility of
or understanding standards
Proiect-specific Aiming to please
requirements pressure groups





Clients Costs
TPM Legi lion

Figure 2-3. Competing pressures causing change in the integration of QS&E systems.
(Ayoade and Gibb, 1996)

This model illustrates the impacts of an integrated safety management system and some

of the impacts affecting its application. Ayoade and Gibb note that the ideal QS&E model

facilitates a balance of the influences illustrated in Figure 2-3. Increased integration

within the QS&E system is clearly beneficial. Total integration is both impossible and

undesirable (Ayoade and Gibb, 1996).

Avoiding potential pitfalls associated with addressing safety, quality, and

performance within the context of the SQM system involves understanding the system

and its function in accomplishing the objectives defined by management. Cooper and

Phillips (1994) identified five common failures of SQM systems resulting from both

individual and cumulative factors.









* A failure to appreciate the time scale involved

* Not recognizing the full implications of TQM and the impact upon the business as
a whole

* Lack of senior management commitment to the quality process

* Resistance to change, which may be overt or covert in nature, at both the individual
and organizational level

* Uncertainty about how to implement a quality improvement programme (Cooper
and Phillips, 1994)

Addressing safety management from a TQM perspective encourages the

incorporation of safety, management, and quality within the defined performance

objectives of the company. "The integration of safety dimensions with quality

management systems can empower the capabilities of TQM and help enhance the

performance with regard to safety concerns, and strengthen safe operation practices in an

organization" (Pun and Hui, 2002).

In construction companies safety management can be included in the sphere of

quality management, if a TQM approach is adopted, comprising requirements from all

the relevant stakeholders, not only the customers. Specific project requirements, as well

as regulatory impositions, may in some cases preclude the realisation of the full potential

of such integration" (Alves Dias and Curado, 1996). "Within the context of TQM, in the

long run, there is a necessity for the introduction of both quality systems and a quality

culture to facilitate the quality process" (Cooper and Phillips, 1994). An effective system

should balance the requirements of both the internal and external project clients by

approaching the implementation of the SQM program in a systematic manner. These

requirements include the following:

* Set project mission









* Develop project plans to meet clients requirements

* Carry out an analysis of the objectives of the project

* Define initial strategies to introduce TQM

* Carry out training and education (when necessary). (Rwelamila and Smallwood,
1994)

"A formal organization structure, clearly defined responsibility and authorization,

effective communication, people training, education, involvement and job satisfaction all

contribute to the success of SQM implementation" (Pun and Hui, 2002).

Technology and Safety

The increased role of computers and computer-based technologies has greatly

impacted the construction industry. "Starting in the 1970's, computer scientists have

learned to program computers with experts' knowledge to match patterns and draw

inferences for diagnosis, planning, and other 'intelligent tasks.' This 'expert system'

technology which is already widely used in the financial sector (e.g., for approving

charge card expenditures or loan requests) is now finding its way into engineering and

construction management applications" (Levitt and Samelson, 1993).

The influence of increased use of technology in the construction field is becoming

increasingly evident at even the field level of the building process. In a study by Elliot

(2000), on-site trade foremen were surveyed to determine their usage of technology in the

scheduling communication process. It was determined that the majority (84%) of the

foremen did not use a computer to perform any part of their job tasks. However, it was

found that general attitudes towards computers were positive. "The computer literacy rate

of the foremen in this study is higher than initially expected. ... Computer use on the job

(16%) is also higher than expected for foremen. Experience with computerized devices is









common as well; about one-third use some type of electronic organizer, typically for

phone numbers and addresses" (Elliot, 2000).

Training

Project specific training and new worker orientation is good practice and in some

cases required for the communication of safety and hazard awareness on ajobsite.

"Training is an essential component of an effective safety and health program. Training

helps identify the safety and health responsibilities of both management and employees at

the site. Training is often most effective when incorporated into other education or

performance requirements and job practices" (U.S. DEPARTMENT OF LABOR, 1998).

To increase its impact on safety performance, training should be specific to the

project or task and be cost effective. Technology currently available in the construction

field can be utilized to create and implement custom training modules and bring safety

management to a new level (Coble and Elliot, 2000). The use of computer technology can

assist management to increase hazard awareness and improve safety planning among

both staff and workers. Additionally, computers can assist by facilitating access,

expediting, and organizing extensive amounts of safety related information.

To improve safety management, a more proactive approach that integrates safety
with other project management functions is needed. Such approach would involve
more people in the safety management process, would ensure timely availability of
safety information and would utilize safety knowledge in design and in the
selection of construction methods. For this proactive approach to be effective,
computer-based systems that effectively manage safety information are needed.
(Elzarka, Minkarah, and Pulikal, 1999)

"Employee training programs should be designed to ensure that all employees

understand and are aware of the hazards to which they may be exposed and the proper

methods for avoiding such hazards" (U.S. Department of Labor, 1998). The use of

computers and technology can be utilized in a variety of ways to assist management in









efficiently communicating safety hazards and best practices to employees. "Multimedia

courseware authoring technologies being developed...will allow employers to easily

assemble diagrams, pictures, sound, video clips, and interactive computer programs into

multimedia training modules... appropriate for use in construction safety orientation and

training" (Levitt and Samelson, 1993).

Identification and Documentation of Hazards

"Hazard exposure may occur at the beginning, middle, or end of a job. It is

imperative to have training in place before exposure occurs. Well before exposure,

management must prepare a plan to deal with the exposure" (Coble and Elliot, 2000).

"Some hazards will be readily apparent from an understanding of the general nature of

the projects to be undertaken. Others may be identified only after consideration has been

given to the specific methods to be employed in accomplishing the work. A schedule of

activities that accurately reflects the activities to be undertaken can serve as a good

resource for this analysis" (Hinze, 1997). Once potential hazards have been identified,

project specific worker training can be implemented.

"Common safety concerns are applicable to many tasks. Training, hazard

recognition, and personal protective equipment, for example, would be appropriate safety

concerns for many activities. In order to be useful for field supervisors, however,

information must be provided that is specific for individual work tasks" (Coble and

Elliot, 2000).

Computer technology can be utilized to assist in identifying hazards and safety

concerns. Several prototype programs have been developed to accomplish this task using

various means of obtaining and organizing safety-related information. One such

prototype is a set of integrated programs known as Safety Base and Safety Net. The









purpose of this specific software application is to create a "knowledge-intensive database

system that can be used as a stand alone system or in conjunction with current CPM

programs by construction mangers, superintendents, and foremen" (Kartam, 1995).

Safety Base and Safety Net uses computer technology to expedite the processes for

accessing safety related information and applying that information to specific tasks

occurring on a particular project. "The goal is to have a dynamic, proactive, interactive

tool for identifying safety requirements according to OSHA, ANSI, ACI, etc. and safety

recommendations according to safe work practices during the early planning phase as

well as the construction phase of a project" (Kartam, 1995).

An important aspect in the development of Safety Base and Safety Net is the ability

to transfer and integrate information with other software applications. This relates not

only to the technical aspect of compatibility in the programming language, but also the

type, categorization, and format of the information to be integrated. "The use of a

common coding system improves consistency and information flow between Safety Base

and other computer-based construction systems allowing for better integration of

organizational efforts. With such standard coding system, basic computer operations such

as information storage and retrieval are much more efficient" (Kartam, 1995).

SuperBase is a safety-oriented database program designed to organize and access

large amounts of information. The user interface is important in both inputing and

retrieving information. The technical or information aspect of the program is designed

such that information within the system coordinates with data fields common to other

construction related programs for easier integration with common database information.

Knowledge that has been represented by CSI classification is implemented into the
system using the SuperBase database system running on IBM-PC or compatible









computers. SuperBase allows alternative means of accessing information as well as
a potential for integration with other computer-based construction systems. Also,
SuperBase can be linked to scheduling software such as Primavera and MS- Project
making it possible for automatic transferring of safety information to project
specific activities in a CPM schedule based on the MASTERFORMAT coding
system [CSI divisions 1-16]. (Kartam, 1995).

The visual user interface is developed to easily obtain both general and specific

data from the user based on the required output desired. Input of required information is

obtained through user-friendly pop-up menu selections. "Although menu selection has

greater flexibility in the base program the proper use of data selection allows for

structuring the program to be downloaded into the CPM system" (Kartam, 1995). The

ability to link safety database information to CPM project schedules allows for the

identification of relevant safety information to identified hazards within the schedule.

This application utilizes computer technology to more efficiently manage specific safety

requirements. "Project mangers can use the system to identify and delegate appropriate

safety performance standards during project execution. The system can also help

identifying unanticipated requirements when conditions and/or methods change"

(Kartam, 1995). This researchers review of the SafetyBase and Safety Net prototype

revealed that while the aims and objectives were quite progressive, the actual

development of the software was never completed. Thus, this software was never

implemented or tested on an actual project site.

Another method for identifying and addressing safety issues on ajobsite is through

the use of checklists. Checklists can be used to provide basic guidance on identified

safety concerns during a job hazard analysis. "The benefits gained from utilizing

checklists to perform jobsite safety inspections have led to an increase in their use. Users

of checklists have begun to examine both the content of the checklists and their









implementation" (Gambatese and Hinze, 1996). The development of safety checklists

during the assembly of the job specific safety program can be helpful in assisting project

management or safety personnel in both safety planning and safety inspections. "The

checklists should be customized for the types of projects typically undertaken by a firm.

Some of the checklists may be sufficiently generic to need little or no modification from

one project to another: For example, the checklist for sanitation and the checklist for

personal protective and lifesaving equipment may have such general utility. Other

checklists may vary considerably between projects" (Hinze, 1997). Use of both

applicable generic and customized checklists in a consistent format additionally provide

documentation for addressing and responding to safety concerns.

Preprinted checklists can simplify record keeping. They may also help ensure that a
predetermined set ofjobsite conditions are examined in each inspection. If the same
type of report is used consistently over a period of time, a baseline measure can be
established. From that, management can quickly ascertain whether the safety
conditions on a project are below par for the firm's projects. (Hinze, 1997)

The development of safety checklists can play a beneficial role for project

management and safety personnel in identifying, implementing, and documenting

project-specific elements of safety programs.

Computer technology can additionally assist project management in the application

of checklists to address safety issues within the scope of project tasks and requirements.

Specifically, checklists can be useful as a guide in the completion of weekly or monthly

safety inspections performed by project management or an appointed safety committee.

Jobsite safety committees are usually comprised of workers from various trades on the

project. "The objective of the safety committee is to serve as a second pair of eyes for

management in identifying areas of safety that warrant attention" (Hinze, 1997). The

committee members offer a valuable perspective in addressing hazards yet may have









inconsistent levels of formal training in safety. "Safety inspectors and committees using

generic checklists can have difficulty in efficiently performing a thorough safety

inspection. Perhaps one way to alleviate these problems is to create a tool which produces

project-specific safety checklists applicable to the work at hand" (Gambatese and Hinze,

1996). To assist in communicating task specific safety issues and increasing awareness of

hazard identification, a computer program called Construction Inspection Guide has been

developed.

The Construction Safety Guide "incorporates OSHA's safety and health regulations

for the Construction Industry into a format designed for performing customized job site

safety inspections" (Coble and Elliot, 2000). The program takes advantage of the

computers ability to store, access, and retrieve large amounts of information and present

this information in an organized format easily navigated by the user. Safety related

regulations and guidelines are divided into four main categories: general requirements,

work phases, temporary structures, and construction materials. Within each category

group, information is further subdivided into a more focused group of activities. When

selecting a topic from this list, specific checklist titles are displayed in the view window

(Figure 2-4).

Figure 2-4 illustrates the selection process to locate a checklist for requirements for

cast in place concrete. The user first selects construction materials. The construction

materials category contains a more focused group of activities including concrete,

masonry, steel, wood, and toxic and hazardous substances. Upon selection of concrete

from the list, a series of checklist topics are displayed relating to the use of concrete.














I0A v.- L o j?> 'PIa Da 3

LGwiniM !queg r If i Wok Phdases eiFra i SfuCdm IU|


CArnral rcqiuiremcnfr
r, I rlplr lUl:i irlr iijfjpnr I T iria I .j


Moniri__
Ybioo!


W ood i L.I II,'-.en Is hir H r[ ia'r ', .'trr'fr
1 i e aod H sdoQio .d S bI i R iii.r.i :. i ""r U-I if -l .i3 ',Ir, fqI,'l :lp 1o I L n I




S e o-ne or more checklists rrim ithe lis aboDe
Dnuble-click on a checklisl to v'ew ana edil it
or -
ChJOss ln3lh[r Topic Irom Lt hsl In thie left
Cti, 'e another Iopic caleqory



Figure 2-4. Construction inspection guide: concrete checklist. (Gambatese and Hinze,
1996)

The ability of the program to efficiently direct users to specific safety-related

information can be an invaluable tool for the identification of potential hazards on the

jobsite. "The ability to focus on various project characteristics and to create project

specific checklists provides a powerful tool in addressing safety hazards. The checklists

provide safety inspectors and committees with a valuable resource in a concise, easy-to-

read format which allows safety inspections to be conducted in a reliable, efficient

manner" (Gambatese and Hinze, 1996).

A prototype program containing similarities to Safety Base, Safety Net, and

Construction Inspection Guide is a program currently in development and funded by

NIOSH through The Center To Protect Workers' Rights. Salus CPM, like Safety Base

and Safety Net integrates safety with the construction project schedule. Utilizing a

database of safety-based information, an integrator plug-in is used to insert safety

checklists directly into the project schedule and link checklists to specified tasks. The









result is a project schedule that incorporates specific links to task-specific checklists

within the environment of the scheduling software. The integration of these checklists

into the project assists project management in addressing safety guidelines and

requirements for the development of a project-specific safety plan. If safety items are

associated with scheduled activities, it is more likely that the activity will be performed

without injuries (Nelson and Hinze, 2001).

Salus CPM is comprised of two parts: a database and a safety integrator. The

database program organizes information obtained from safety experts and construction

firms into a list of guidelines. For ease in application and accessibility, these guidelines

are organized into a series of checklists related to a certain type of construction activity

(Nelson and Hinze, 2001).

The safety integrator is set up as a plug-in to existing scheduling software platforms

such as Primavera SureTrak (to include P3 and Microsoft Project in further

development). The integrator utilizes a floating toolbar to the SureTrak menu that allows

the user to add safety checklists to the construction schedule or view checklists that have

already been added (Nelson and Hinze, 2001). Checklists added using the safety

integrator are shown as a line item beneath the relevant schedule activity in the activity

description column. The visual notation of an added safety checklist within the schedule

bar chart is an orange diamond. A relationship arrow connected to the start of the linked

activity to the orange diamond indicates that the checklist is to precede the start of the

activity (Figure 2-5).











IIl
i L













Figure 2-5. Safety checklist linked to SureTrak schedule. (Nelson and Hinze, 2001)

After being successfully linked to the schedule, it is then possible to view and print the

safety checklist from the Salus CPM viewer located in the floating toolbox.

Because the project schedule lists the sequential tasks to be performed to complete

a project, it drives and influences the management decisions regarding construction

activities (Nelson and Hinze, 2001). The construction schedule specifically addresses the

tasks to be performed during the construction process. "Research results show striking

evidence that project coordination and safety performance are closely related. ...This

coordination applies to schedules related to the overall project duration and also to the

short interval schedules which typically focus on a two or three week period" (Hinze,

1994). Using the construction schedule to link safety checklists and guidelines can help

project management to anticipate safety problems and play a central role in developing a

site-specific safety plan (Nelson and Hinze, 2001).

Communication of Safety

One of the many advantages of computer-based training modules is the ability to

communicate a wide variety of information in an interactive, accessible, and visually









comprehensive format. A prototype program, HAZCOM Interactive, has been developed

as a tool to interactively communicate safety-related information and training modules

based on an electronic hazardous chemical database. The database was developed from

information contained in the International Chemical Safety Card (ICSC) to assist in the

communication and training of the hazard communication standard (HCS) (Jones, 2000).

Project-specific safety hazard communication can be a difficult to communicate on

a construction site because of the amount of information required, literacy issues, and

language barriers present within much of the workforce.

Construction foremen have different needs than management. In addition,
construction foremen usually have different education levels than management.
Obviously this requires training software to be needs sensitive. As a result,
software may need to be designed for some semiliterate or illiterate users. In
addition, it must be enjoyable. (Coble and Elliot, 2000)

To simplify the communication of chemical hazard information, the program utilizes

various media formats linked through a visual user interface. "The interface was designed

to quickly and easily communicate ICSC information in a way that addresses the

language and literacy requirements of its users (specifically through a combination of

graphics, multi-language audio and multi-language text). It is a simple point and click

interface with a variety of supplemental navigational features" (Jones, 2000). The user

interface system uses pictographs to link both supplemental information and hazard

training modules in various formats (Figure 2-6). As illustrated in figure 2-6, links to

subsequent information is linked through standard universal symbols representative of the

linked data. Because HAZCOM Interactive relies heavily on graphics as a source of

information and as a link between the database and targeted training modules, the

meanings of the symbols is an important aspect of communication and navigation (Jones,









2000). Games are also utilized within the software to reinforce graphic symbols and

presented information.


















Figure 2-6. HAZCOM Interactive: Screen for accessing information on Hydrazine.
(Jones, 2000)

HAZCOM Interactive utilizes a database of chemical safety information that can be

used interactively for information or to assist in worker training. The program utilizes the

ability of the computer to store, access and present large amounts of information in

various formats to assist in the communication of safety hazards associated with chemical

hazards.

The system's navigational schemes are intended to allow users to find specific
information quickly (and in a non-linear fashion). The use of graphics and audio
files is targeted to expanding access to semi-literate users. The print-on-demand
capabilities are intended to expand the impact into the physical workplace. The
system also creates a broad foundation on which training programs can be
developed in an environment where a critical mass of information can be found.
(Jones, 2000)

The use of a database program to store and access information creates advantages for

field personnel. "By conceptually recreating Hazard Communications Standard (HCS)

programs as integrated electronic databases of information for use on field office PC's,






35


many of the inconveniences and inefficiencies of the current system could be greatly

reduced. In addition to compact storage, an electronic database makes loading and

retrieving specific information easier" (Jones, 2000).














CHAPTER 3
RESEARCH METHODOLOGY

Introduction

The purpose of this research study was to identify general trends within the

construction industry concerning the use of technology and technology-based

applications in the development and implementation of project-specific safety plans.

Software and computer-based applications for project management, scheduling, cost

control and analysis have been available in some form and to various degrees of

implementation for many years. The application and functionality of their use have

become more complex as the development, use, and reliance of technology in the

construction environment has increased. Computer-based applications directed

specifically towards the creation and performance of job specific safety programs is a

relatively new concept. Some prototype applications have been developed, however

research on their application within the contracting environment has not been extensively

conducted. This study was designed to obtain information from general contractors and

construction managers of various sizes within the commercial construction market.

Geographic Focus of Research

Florida contains a wide variety of commercial contractors in regards to market

specialty, size, and management practices. To research general trends regarding the use

of technology-based safety applications, the geographical focus of the study was limited

to commercial contractors operating within the state of Florida.









Questionnaire Development

To obtain information from Florida contractors, a questionnaire was developed to

determine the current uses of technology and the use of computer-based applications in

developing and implementing project-specific safety programs. Because of the varying

degrees of familiarity and exposure of construction personnel to technology-based

applications and their use within the construction environment, a survey was developed

to be applicable to all respondents regardless of their knowledge of computer programs.

The questionnaire was designed to obtain information from knowledgeable respondents

by allowing for expanded comments and feedback. Some of the questions were open

ended to allow the respondents to elaborate in their answers regardless of their

experiences concerning the use of technology. The survey was set up in two parts; the

development of project specific safety plans within the respondent's company and

personal preferences in computer related technology applications. Respondents were also

presented with a self-running demonstration of Salus CPM as a precursor to the questions

included in the second part of the survey. The demonstration CD-ROM was provided to

serve as a specific example of a particular application of technology for the development

of project-specific safety programs. The demonstration was not intended as a wholistic

solution to integrating technology into safety management, but rather as an example of

one approach to the subject addressed in this research. The format of the questionnaire

was designed to allow respondents to provide information concerning project-specific

safety plans within their company and personal experiences regarding the use of

computer technology for the performance of their work.

The questionnaire was developed by the researcher following a thorough literature

study to gain a base of knowledge concerning issues relating to technology and the









development of project-specific safety plans. A pilot study was performed through an

initial questionnaire developed and presented to several practitioners in the form of an

interview and software demonstration on a laptop computer. Based on the comments

from three individuals, a revised questionnaire format was developed to eliminate

ambiguities and to better focus the overall scope. The content and format of the survey

was modified during subsequent revisions to facilitate a postal questionnaire. The revised

and final format of the questionnaire contained both qualitative and quantitative questions

divided into two parts. Additionally, a self-running software demonstration was included

with the questionnaire. The respondents were instructed to view the demonstration CD

prior to answering the questions in part two. The questionnaire contained twenty-six

questions. Sixteen of the questions were open-ended (short answer), five that asked for a

yes or no response, and five solicited a multiple choice reply.

Identifying Research Participants

The focus of this study was to collect information on the use of technology in the

development and implementation of safety programs within the commercial construction

environment. The questionnaire asked for information related to the procedures and tools

involved with developing job-specific safety programs. It is most likely that knowledge

regarding the development and application ofj ob-specific safety plans would be more

thorough at the management level. The respondents were therefore intended to be at a

management level with experience relating to jobsite safety practices within the

company. The researcher intended to develop a sample that was both diverse and broad.

Because of their responsibility for the overall safety techniques to be implemented for the

entire project, research was limited to commercial general contractors. The contacts for

the questionnaire were generated from the directory of the Florida members of the









Associated Builders and Contractors filtered for general contractors. Potential

questionnaire respondents were chosen by selecting every fourth company from the list.

It was assumed by the researcher that the respondents were familiar in varying

degrees with both computer-based technology and project specific safety planning.

Additionally, it was assumed that the respondents were familiar with safety planning

within their company and able to respond to the questions with regard to the applications

within their company.

Questionnaire Distribution

The distribution of the questionnaire was conducted by mailing or hand-delivering

105 questionnaires and CD ROM's to project managers, superintendents, and safety

personnel from the companies identified during the selection process. The questionnaire

included a cover letter explaining the background of the study as well as instructions

regarding the completion of the survey and the start-up procedure of the CD ROM

demonstration. Additionally, the objectives of the research were noted and respondents

were instructed to only respond to questions they felt comfortable in answering.

Respondents were instructed to return the questionnaire to the researcher via facsimile or

mail.

Sample Size

The desired sample size was determined to be a minimum often respondents. Ten

companies completed and returned the questionnaire. The response rate for this study was

determined to be 9.5%. The intent of this study was to obtain general trends of companies

in the use of technology and its implications for the use and development of project

specific safety plans, i.e., insights as opposed to statistical rigor were sought in this









research. Individual detailed responses to the questions were deemed to be indicative of

possible broad trends within the industry.

Data Analysis

The data collected from the survey questionnaire were analyzed with emphasis on

the role of computer technology for the development and implementation of job specific

safety programs within the participants' companies. The data were examined to

determine general trends in the use of computer-based safety functions among Florida

commercial contractors and the preferences of individual respondents towards software

applications. Questions that solicited multiple choice and yes-no responses were

organized to summarize the information provided. Open-ended responses were examined

to understand further comments by the survey participants. Where applicable, open-ended

responses were stratified or otherwise grouped to show any trends among the responses.














CHAPTER 4
RESULTS

A total of ten construction management professionals in the commercial

construction field participated in the research survey. Information provided by the

participants was analyzed to identify general trends in project-specific safety plan

development and technology. The companies participating in the survey consisted of a

broad range consisting of small, medium, and large companies. For the purpose of

comparison, participating companies were identified by the letters A through J from

smallest to largest, based on annual volume. When the results are presented, the data will

represent the responses of the ten participants unless this is specifically noted as

otherwise, i.e., it will be noted if results are based on only some of the respondents.

Nine of the ten respondents provided information on total annual volume. The

combined total annual volume of eight of the research participants (excluding the firm

with the highest volume) was approximately $700 million. The annual volume of the

companies ranged in size from $3 million to over $10 billion dollars (see Table 4-1). The

median total annual volume of the research participants was $40 Million.

Respondents were asked if project-specific safety plans were currently developed

for their company. Most (70%) of the respondents indicated that project specific safety

plans were required by their company (Figure 4-1). Company "I," indicating that project

specific plans are not currently developed, provided additional comments stating "a

generic safety plan is used with the job specific [plan] if required."









Table 4-1. Annual company volume.
Company Annual Volume FY 2002
A N/A
B $3 Million
C $6 Million
D $8 Million
E $30 Million
F $40 Million
G $120 Million
H $160 Million
I $300 Million
J Over 10 Billion


Yes No


Figure 4-1. Do firms require project-specific safety programs (n=10)?

A cross tabulation was then performed to compare company volume and the use of

project specific safety plans (Table 4-2). Participants were asked who prepares the

project safety plan. Five possible selections were provided: safety representative,

superintendent, project manager, outside consultant, and other. Respondents were to

select all of the categories that were applicable. Fourteen total responses were given. Of

the total responses, the safety representative and project manager were represented four

times in each category, three respondents indicated "other." Two participants indicated









that the superintendent was responsible for the development of the safety plan. One

company did not respond to this question. There were no selections of "outside

consultant" for safety program development (Figure 4-2). Additional information was

provided for the three "other" responses. The additional comments indicated that the

following personnel were responsible for developing project safety plans: project staff, a

quality control officer, and "a company-wide safety plan developed only by a safety

director."

Table 4-2. Cross tabulation of annual volume and use of project specific safety plans.
Company Annual Volume Project Specific Safety Plan Developed?
A N/A Yes
B $3 Million Yes
C $6 Million Yes
D $8 Million No
E $30 Million Yes
F $40 Million Yes
G $120 Million No
H $160 Million Yes
I $300 Million No
J Over $10 Billion Yes


Figure 4-2. Who develops the safety plan?


Outside Consultant

No Answer

Superintendent 2

Other 3

Project Manager 4

Safety Representative


0 1 2 3 4










Respondents were asked when the safety plan is developed. Three selections were

provided: after contract execution (before construction), after contract execution (after

construction begins, and "other." There were ten responses (including two "n/a"

responses). Half (five) of the respondents indicated that safety plans were developed after

the contract execution (before construction begins), three indicated "other," and two did

not respond. "Other" responses (three) provided additional information on when safety

plans were developed. The responses specified that safety plans were developed during

the pre-bid phase, as part of the proposal, and "generic plans are used with a job specific

[plan] developed if required."


Figure 4-3. When is the project safety plan developed?

Next, the participants were asked how they determined what was to be included in

a project specific safety plan. A brief description of the steps involved was also

requested. The question requested as an open-ended response to allow for more detailed

and or varied responses. Procedures noted by the respondents included the following:

* The contents of the safety plan were derived through an ongoing checklist that is
developed from previous and current construction projects.


After contract execution (after construction 0
begins)
No Answ er 2

Other 3

After contract execution (before construction)

0 1 2 3 4 5









* The safety plan is developed with the use of general safety guidelines as a base, and
then the specifics of the individual project are added.

* Generally, the project manager thinks through the construction process and tries to
identify specific tasks. Each new plan is a modification of the previous adjusted
to fit the new project.

* Review project documents before bidding, during project scheduling, and during
the preconstruction meeting.

* The safety plan for a specific project begins in preconstruction and is based upon
the scope of work.

* The plan is developed by performing a review of the project specifications.

* Safety plans are based on the potential hazards at the site (i.e. chemical, biological,
physical, etc.).

* It employs or includes a generic outline coupled with unique or specific area or
trade requirements especially unique safety applications. The main focus is on
unusual and/or rare safety concerns.

* Content requirements of the project specific safety plan and steps of development
are pre-determined by company policy. The content requirements of the site-
specific safety plan are identified within the company Safety Management Manual.
During the preconstruction phase, a Risk Register is created to establish key
performance indicators. This document provides a measurement tool for initial and
subsequent safety reviews during the construction phases of the project. The plan is
reviewed on a monthly basis by the on-site project team to ensure any necessary
revisions are documented

Participants were asked to describe the extent of the scope within the typical safety

plan. Two participants did not answer this question. The question was open-ended to

allow for more detailed responses by research participants. The researcher divided the

information given by the respondents into four categories: basic, moderate, extensive, and

no answer. Three participants had moderate safety plans, three participants had extensive

safety plans, and two had basic plans (see Figure 4-4). A cross tabulation was performed

to compare annual volume of the company and the extent of the of the project safety plan

(Table 4-3).











3 I\


2.5 2 2

2

1.5

1

0.5
oIIl


Extensive Moderate


Basic


No Answer


Figure 4-4. How extensive is the scope of a typical safety plan?

Table 4-3. Annual volume and extent of the scope of the safety plan.
Company Annual Volume Scope of Safety Plan
A N/A N/A
B $3 Million Moderate
C $6 Million Moderate
D $8 Million Basic
E $30 Million Extensive
F $40 Million Moderate
G $120 Million N/A
H $160 Million Basic
I $300 Million Extensive
J Over $10 Billion Extensive


Detailed responses were given by each of the participants.

* The scope of the project safety plan is based upon the project.

* The range is within 30 to 60 pages.

* The extent of the safety plan is moderate; we identify as many specific tasks as
possible but do not break them down to a minute detail.

* Basic


* Very extensive includes software, policies, checklists, etc.









* A hazard analysis and safe work practice guide is developed for all hazardous
operations.

* The scope of the safety plan is "designed to meet minimum standards; OSHA
29CFR 1910.120, haz waste site operations.

* The scope includes management participation down through field operations,
inclusive of monitoring safety of operations/subcontractor activities. Plan includes
development and implementation of emergency procedures, accident
investigations, safety training and direct employee involvement.

* Site-specific project requirements designated by pre-set company policies are
established prior to the start of construction. Every trade is reviewed by scope of
work and hazards are documented and incorporated into the project specific safety
plan. The plan establishes safe work practices for work to be performed on the job,
safety orientation for all new personnel on the project (including subcontractors)
and weekly project safety meetings.

Next, respondents were asked what is involved in implementing a project-specific

safety program on a project (how does the written information get put into action).

Company "A" stated that safety plans are implemented during the preconstruction

meetings. Implementation of the safety plan by company "B" is performed by providing

safety manuals to subcontractors who sign that they have received, read, and agree to

comply. Weekly tailgate meetings with sign-in required are held after the start of the

project. Company "C" stated, "it is the responsibility of each project superintendent to

implement the plan." Company "D" responded that the project superintendent and/or

general superintendent is responsible for the implementation of the safety plan. The

safety plan is implemented in company "E" by the company safety manager. The

company safety manager then directs the plan to two regional safety coordinators. The

plan is then directed to the project managers, followed by the project superintendents and

subcontractors. Company "F" stated that safety plans are implemented through "weekly

meetings held on general safety. Preparatory meetings are held prior to the start of each

activity, when specific safety issues are reviewed. Company "G" did not answer this









question. Company "H" stated that the safety plan "is prepared by a manager or staff

member. It is then reviewed by the project staff who sign off and acknowledge with a

signature." Company "I" responded "the basic responsibility falls on the director of

safety to publish and follow up on requirements. Follow-up is accomplished via field

audits and/or directly reporting safety requirements and training." Company "J"

implements the safety plan through "pre-construction meetings and weekly safety audits.

Safety meetings are held once a week."

The modification of project-specific safety plans allows the plan to adapt to the

changes or new hazards identified during construction. Participants were asked what

kind of changes might be made to the project safety plan during construction (after the

plan has been put into effect). Changes addressed by the respondents included the

following:

* Changes made to the plans included emergency action and egress plans.

* Specific changes or additions to the safety plan (if required) are made at weekly
tailgate meetings.

* Once the plan is in place, it is generally not revisited unless there is a problem (i.e.
an accident).

* Unforeseen conditions are reviewed during project meetings. Plans for these
changes are then developed and implemented.

* Changes made to the project safety plan are made due to modifications in the scope
of the project and/or project site conditions.

* Plans for specific work activities are developed as needed. Lifting plans and fall
protection is usually amended on the site. When a plan is added, it is reviewed and
signed off with applicable crews.

* Changes to the project safety plan are addressed during the weekly safety meetings.
Project safety plans "can and almost always do change."

* Changes are implemented to accommodate new or revised operations on the
project. "Most changes are affected via directives such as safety manual changes or










company 'safety grams.' Some modifications are difficult to implement if they
involve changes to a "long-time" procedure, e.g. "old habits being hard to break."

S Changes are made to the implemented project safety plan as changes occur or are
identified on the job site.

Computers are a tool that can be used for the efficient storage, retrieval, and

presentation of large amounts of information. As computer literacy has increased within

the construction industry, their role in the performance of job-related tasks has become

more common. Respondents were asked the extent to which computers are used to

develop their project safety plans. The question was open ended to allow the participants

to provide detailed responses. The researcher divided the information provided by the

participants on the use of computers for the development of project safety plans into four

main categories: basic, moderate, extensive, and no answer. The replies show that 50% of

the participating companies use computers on a basic level for the development of their

project safety programs (Figure 4-5). Moderate and extensive use of computers for safety

plan development was indicated by two respondents. One company did not respond. A

cross tabulation was performed to compare annual volume of the participants and the

extent that computers are used for the development of project safety plans (Table 4-4).



5
4.5
4
3.5
2 2
2.5

1.5
1
0.5
0
Basic Moderate Extensive No Answer

Figure 4-5. Extent of computer use in the development of project safety plans.









Table 4-4. Annual volume and the extent of computer use for the development of project
safety plans.
Company Annual Volume Computer Use for Developing Safety Plans
A N/A Basic
B $3 Million Basic
C $6 Million Basic
D $8 Million Basic
E $30 Million Moderate
F $40 Million Moderate
G $120 Million N/A
H $160 Million Extensive
I $300 Million Basic
J Over $10 Billion Extensive

Detailed responses were provided by the survey participants describing the extent

that computers are used to develop their project safety plans. Computers were used for

the following purposes:

* To record data.

* For the formulation of plans only.

* Only in the development.

* Very Little.

* All corporate documents are issued from our CPM software.

* All text is on the computer; drawings and diagrams are copied and added.

* Computers are used for training and tracking, generation of written plans, e.g.,
word processing.

* Currently, used only by the director of safety. It would be very beneficial to have
on-site computers.

* Word processing and excel spreadsheets, the entire plan is generated via a
computer.

In addition to the development of project specific safety plans, many safety-related

tasks have the potential of being streamlined through the use of computer technology.

Respondents were asked if computers were used in the performance of safety-related










functions other than the safety plan. Eight choices were provided: safety audit, job safety

analysis, accident investigation, tracking injury rates, safety training, safety meetings,

pretask planning, and other. Respondents were to select all applicable categories.

Twenty-five selections were marked from seven respondents (Figure 4-6). Three

companies did not respond to this question. Four respondents selected training, safety

audits, accident investigations, and safety meetings. Tracking injury rates was selected by

three respondents. Pretask analysis, job safety analysis, and other were selected by two

respondents.



Other 2
Pretask Panning 2
0 Job Safety Analysis 2
c Tracking Injury Rates
LL Safety Meetings 4
Safety Training 4
Accident Investigation 4
Safety Audits 4
0 0.5 1 1.5 2 2.5 3 3.5 4
Number of Selections



Figure 4-6. With exception of the safety plan, are computers used for other safety-related
functions?

Both respondents that selected "other" provided additional information. One respondent

stated that computers are not used for additional safety-related functions. The second

comment reported that computers were used to develop quality control reports.

Respondents were asked if computer programs used to record and track information

obtained through monitoring efforts and to track different aspects of safety. The question

was open-ended to allow for a more detailed response. Half of the respondents stated they









do not use computers to record and track information related to other aspects of safety

(Figure 4-7). Four respondents stated that their company does use computers to record

and track information to monitor other aspects of safety. One company did not respond.



5 4

4

3

2

1

0
No Yes No Answer


Figure 4-7. Are computer programs used to record and track information obtained for
other aspects of safety?

Three participants provided detailed responses. Company "C" stated that the use

computer programs to record and track other aspects of safety were not used at this time.

It was additionally noted "if there was a comprehensive program that incorporated the

OSHA requirements as they applied to a small contractor, we would be interested."

Company "F" stated that a QC report tracks safe workdays and any incident or directive

given regarding safety. Company "I" indicated that they utilize computer programs to

establish trends and survey information.

Participants were asked if computers were used for the development of large-scale

project-specific applications. Five choices were provided: detailed safety investigations,

project safety training, accident investigation, pretask planning, and other. Respondents

were to mark all applicable selections. Twenty-two selections were given by ten









respondents. Five selected project safety training and five selected "other" (Figure 4-8).

Detailed safety audits, accident investigations, and pretask planning were each selected

by four respondents.




Detailed Safty investigations 4







0 1 2 3 4 5
Number of Selections



Figure 4-8. How are computers used in the development oflarge-scale project-specific
activities?
The four respondents selecting "other" provided additional detailed information.

Company "B" stated that Microsoft Project was used for scheduling, Company "C" used

computer applications for the development of the job safety analysis, Company "E"

utilized computers to develop drug and alcohol policies, and Company "G" did not use

computers to track large-scale project-specific activities.

The increase in computer use and applications in the construction industry has

helped to contribute to the rise in computer literacy and computer related technologies.

Participants were asked if any on-site personnel, such as the field engineer,

superintendent, or foreman, used mobile technology devices (palm pilots or PDA's) to

perform their jobs? Four of the respondents stated that mobile technology devices (palm









pilots, PDA's) were used in varying capacities on their projects to perform job-related

tasks (see Figure 4-9).




6
4
5

4

3

2

1

0
Yes No


Figure 4-9. Do field personnel use mobile technology devices to perform their job?

Additional comments were provided by four of the ten respondents. Company "C" stated

that although they do not currently use mobile technology devices, "we have discussed

bringing them into use at a later date providing that the company will benefit by

increased production, better record keeping or other similar needs." Company "E" stated

"some use their own equipment. Superintendents receive laptops." Company "H" used

mobile technology devices to a limited extent only. Company "I" did not use PDA's, but

"there are plans to adapt the use of hand held devices."

Participants were asked if they see the use of computers as a tool for making their

job easier within their company? Eight of the respondents viewed computers as making

their jobs easier within their company (Figure 4-10). One respondent disagreed, and one

company did not answer this question. Company "E" noted additionally that computers

are seen as a tool for office use but not in the field. For the purpose of the comparison

illustrated in Figure 4-10, the researcher categorized this response as "yes."





























Figure 4-10. In your company, do you see the use of computers as a tool for making your
job easier?

The level of literacy and exposure to computers and computer programs can affect

their acceptance and use to perform job-related tasks. Participants were asked if they had

a personal computer at home. All of the participants stated yes. They were then asked

how much time they spent using computers at home. The researcher stratified the

responses into four categories based on weekly usage: less than one hour, one to five

hours, five to ten hours, and greater than ten hours per week. Six respondents spent one to

five hours per week using a home computer (Figure 4-11) Two respondents used home

computers less than one hour per week. One respondent used a home computer from five

to ten hours a week, and another used a home computer more than ten hours per week.

The average amount of time spent by the respondents using home computers was hours

per week (Figure 4-12).


--------------8

8
7
6
5
4
3
2
1
0
Yes No No Answer






56





More than 10 1
hrs/Week

5-10hrs/week

Less than 2
1hr/week

1-5hrs/week

0 1 2 3 4 5 6



Figure 4-11. How much time do you spend on a computer at home?


16
14

12 Average
10 3.8 hrs/week
Hours per 8 6.5
Week
6 4 4

4 / 2 1.5 2
2 0.5 0.5
0
A B C D E F G H I J
Company



Figure 4-12. Average amount of time spent on computers at home.

Participants were asked if they personally used a computer to perform j ob-related

tasks. Eight of the respondents indicated that they personally used a computer at work to

perform job related tasks (Figure 4-13).













8
7
6
5
4
3
2
1
0


Yes No


Figure 4-13. Frequency of respondents that use a computer for any job related functions?

Respondents were asked what tasks they performed on their computers. Five

choices were provided: email, spreadsheets, word processing, letters/correspondence, and

scheduling. All categories that applied were to be selected. A total of thirty-five

selections were made by nine participants. One respondent did not answer this question.

Of the thirty-five total selections, eight included e-mail and letters/correspondence

(Figure 4-14). Seven respondents used them with spreadsheets and word-processing.

Scheduling was selected by five respondents.




Scheduling 5

Word-Processing

I-
Letters/ Correspondence 8

E-mail 8
r ... i i i i /


0 1 2 3 4 5 6

Number of Responses


7 8









Figure 4-14. What type of tasks do you perform on the computer?

Today, many companies employ staff to assist in technology and computer related

issues within the organization. Respondents were asked if their company had a

designated technology person to assist with computer technology and software related

issues. All participating companies stated that technology/computer personnel were

available within their company. Two respondents noted additional comments. One

company has an IT division to perform computer assistance. The second stated that IT

assistance functions were outsourced to a consultant.

Participants were asked if they had ever acquired software that looked good but

later decided not to use it because it was not user friendly. Six respondents stated they

had stopped using software because it was not easy to use (Figure 4-15).


6



5

4

3

2

1

0
Yes No


Figure 4-15. Have you ever decided not to use software because it was not user friendly?

Participants were asked how much time they would put into a software program to

learn it. The researcher stratified the data into three categories: minimal, moderate, and

extensive. Five respondents would put an extensive amount of effort into learning new









software (Figure 4-16). Three would invest a minimal effort, and two would expend a

moderate effort to learn new software.



5

4 3

3 2

2

1

0
0 I ----










Extensive Moderate Minimal


Figure 4-16. How much effort will you put into learning new software?

The respondents that would expend extensive time in learning new software added

comments such as "as long as it takes," "as needed to train all users," "as much time as

needed to get the desired output," and "as much time as required, noting that I,

personally, am not as computer literate as I might like." Respondents that stated that

moderate time was spent in learning new software included "forty hours per year," and

"basic knowledge within a week, continued training based on the usefulness of the

program." Respondents stating that a minimal effort would be invested to learn new

software stated that minimal efforts were made, "initially one day of immersion-type

training, thereafter, minimal; mostly to look up information on as-needed basis."

Respondents were asked if the familiarity of the visual organization (or basic

navigation) of a new software package affects the potential usage. Eight of the

participants indicated that that the visual organization affects potential usage. One added

"absolutely" and another said I believe it is critical for those with limited computer









knowledge." One noted that it did not affect their usage and one participant had no

opinion. Additional comments noted by two of the respondents. Many business computer

systems and software packages utilize a Microsoft Windows operating system. The

respondents were asked if they preferred a Windows-based or another standard system

format. Of the respondents, nine preferred Windows-based formats. One indicated that

another system was preferred and one respondent indicating a preference to a Windows-

based format noted, "I have no other experience."

Many programs operate with the parameters of other software packages, e.g., MS

Word, Primavera P3, Microsoft Excel, etc.. Respondents were asked if consideration

were given to a new software package, would the interface (visual organization) be

important for the development or facilitation of procedures that address safety practices.

The researcher organized the responses into four categories: yes, no, other, and no

answer. Of the respondents, seven indicated the interface of the software was important

for the development of procedures that address safety. One of the respondents did not

find the software user interface to be important (Figure 4-17). One respondent stated the

user interface of the software "could be" important. One company did not respond to this

question. Additional notation stated "any safety input would be secondary to the prime

program objective (schedule, budget, etc.) since safety is normally addressed separately."

Another additional comment noted that it is "much easier to work with applications that

are similar to ones that you are familiar with."




























Figure 4-17. Is the software user interface important for the development or facilitation of
procedures that address safety?

Respondents were asked if job-specific safety software would help in the

development of safety plans for company projects. The responses were divided into three

categories by the researcher: yes, no, and other. Seven of the respondents indicated that

job-specific safety software would help in developing safety plans within their company

(Figure 4-18).Two respondents indicated job-specific safety software would not benefit

their company for the development of safety plans. One response, categorized as "other"

stated "there are currently several on the market, however relatively expensive."

Additional comment s noted by participants included the following:

* An additional application should be adopted to permit some development of a "job
hazard analysis" through the same software. A JHA is an excellent guide for field
personnel.

* MSDS

* Currently, we utilize MS Word and develop each plan on an as-needed basis.


7

6
5

4
3
2

1 Y
0
Yes No Other No Answer























Yes No


Figure 4-18. Would job specific safety software help in developing safety plans for your
company's projects?

Participants were asked if software to create project specific safety programs had

the ability to work within the current procedures for safety plan development. Of the

responses, nine indicated that project-specific safety programs could work within the

current safety plan development procedures of their company. One company indicated

that project-specific safety software would not assist current safety plan development

procedures. Respondents indicating that project-specific safety software applications had

the ability to work within the current program development within their company were

asked to identify features or parameters that would benefit this procedure. Comments

provided by the respondents include the following:

* Scheduling

* I believe it would save time in developing site-specific safety plans. A feature that
allows a selection from multiple choices would be advantageous! Additionally, a
reference to the corresponding paragraph in the CFR's would be a plus.

* Plan Development


Other






63


* The idea that [a site specific safety program] will be compatible with Microsoft
project will enable the project manager and/or superintendent to take a more active
role in our safety plan.

* The addition of checklists would help in the precon phase. Our typical CPM
[program] tracks submittals. The checklists would fit in after submittal approval
and prior to the start of a work activity.

* Include other relevant topics associated with construction management, e.g.,
materials testing. Each/many phases of construction require materials to be tested,
adding a prompt for soil density and concrete testing would be as nice as the safety
topics.

* Ability to thoroughly develop, modify, and incorporate unique checklists and
training facilities for both my company (the GC) as well as the subcontractor.














CHAPTER 5
SUMMARY

The second phase of this study was designed to identify general trends among

participating construction firms regarding the role of technology for developing project-

specific safety programs. Additionally, the survey attempted to determine the extent to

which companies utilize computer technology and software to improve safety

performance on theirjob sites.

Development of Project-Specific Safety Plans

The overall findings of the survey indicated that safety programs are developed

within all of the participating companies in varying degrees. Of the respondents seven

indicated the safety programs used on their job-sites were required to be project-specific.

Furthermore, there seems to be no relationship evident in the requirement of project-

specific safety plans and annual volume of the company (Table 4-2).

Survey results indicated that the responsibility of preparing the project safety plan

was typically performed by management-level personnel. In many cases, safety plans

were developed by the project manager or a company safety director within the firm. In

other cases, the development of the safety plan was performed by either the project staff

or a quality control officer, followed by project superintendents. Four respondents

indicated that this task was performed by multiple positions as listed above. In these

cases the selections were recorded by the researcher as an individual response and

included in the listed percentages.









The scope and specific content of the safety program for a project can be affected

by safety planning in relation to the construction schedule. Companies seem to recognize

the importance of implementing safety policies prior to the start of construction activities.

The development of safety procedures in conjunction with other project -specific

planning activities, such as scheduling which can assist in integrating safety into the total

quality management process. Five respondents indicated the safety plan was developed

between contract execution and the beginning of construction. Three respondents

indicated that the project safety plan was developed prior to the execution of the contract

(during the pre-bid period or during the project proposal phase).

Defining the scope and content is an important element in the overall application

and performance of the safety program on a jobsite. The identification of potential jobsite

hazards prior to the performance of work has been identified in recent articles as an

important element of a safe jobsite. This pretask analysis is partially indicative of an

industry-wide trend towards a more proactive approach towards project safety. Nine of

the respondents indicated that some type of pretask analysis was performed to develop

the content of their safety programs. Some of the pretask activities noted in the survey

results included the use of checklists from other projects, scope of work, and project

specifications review, and pre-set company content requirements. In general, survey

results indicated that the scope of the safety plans was more extensive in larger

companies (Table 4-4).

Following the development of the safety plan, the implementation process allows

for the communication of the hazards identified during the development phase. Putting

the written information into action on the jobsite is important for communicating









practices for the safe completion of activities to be performed and establishing the

company's commitment to safety on the project. The majority of the respondents address

the communication of the safety plan on the jobsite. In most cases, the superintendent or

the on-site project staff was responsible in varying degrees for the initial execution of the

safety plan. Four respondents stated specifically that jobsite meetings were used to

communicate safety policies and information to workers. Two companies noted that a

"review and sign" procedure was used to ensure that project staff had read the project

safety plan.

The ability of the safety plan to adjust to changing conditions during the

construction phase of the project can impact safety performance on the jobsite. The

increasing awareness of the impacts of injuries on personnel, costs, and schedule has

made many construction companies more proactive in response to safety issues on the

jobsite. Survey findings indicate that seven of the participating companies reviewed

safety concerns during weekly safety or tailgate meetings to determine if changes to the

jobsite safety plan were necessary. One company addressed specific safety changes

through specific safety directives. Other changes in the safety plan were implemented

through mandatory project specific safety requirements such as fall protection and lifting

plans to be developed on the jobsite. Of the ten respondents, one company indicated that

the project safety plan was "usually not revisited unless there is an accident." Findings

seem to indicate that changes to the project safety plans are more extensive in larger

companies.

Computers and Safety Related Tasks

In recent decades, technology in the workplace has substantially increased.

Because of their ability to efficiently store, process, and retrieve large amounts of









information, computers have become an indispensable tool for the performance of

business related tasks. Computer usage and literacy in the construction industry can vary

between the office and field activities. Many construction companies now use computer

technology for estimating, scheduling, and project management activities. In many

instances specific software applications are used to perform these tasks. The majority of

the respondents indicated that computers are used only on a basic level to develop and

implement project-specific safety plans. Survey findings indicate that larger companies

utilize computers more extensively for this purpose.

Safety-related activities on the jobsite require clear communications, training, and

documentation. Information gathered during the performance of these activities can assist

in the continuous development of the project safety plan. The survey indicates that half of

the participants do not use a dedicated computer program to record or track safety

information. In more basic software applications however, eight of the respondents used

other general-purpose programs for safety related tasks. Results indicate that computer

use for safety activities is more common among larger companies. Of the participants, the

majority of computer usage for safety related tasks is to document accident

investigations, safety meetings, and safety audits. Minimal computer use was indicated

for the performance of job safety analyses and pretask planning.

As computer technology has developed over the past few decades, there has been a

growing trend towards mobility. The increase in mobile technology has progressed from

the personal computer to laptop computers. Most recently, handheld technology devices

have been developed with increasing sophistication. Many of these devices utilize

graphics, touch screen input, and information synchronization capabilities to mimic PC









formats and applications. Handheld technology has the ability to influence the way

technology is used to perform designated tasks. Personal digital assistants (PDA's) such

as 3COM's Palm Pilot and Hewlett Packard's IPAQ offer a operating platform and

program availability that mimics many standard programs available on standard PC's

including Microsoft Word, Excel, and Meridian's Prolog. On construction sites, the

potential exists for the use of this technology by field personnel for the performance of

project tasks. Of the survey respondents, six did not use PDA's on the jobsite. Additional

comments indicate that among companies that do not use PDA's, there is moderate

interest for implementing their use in the future.

Computer Usage

Construction projects involve a range of workers with varying skills and job

functions. Exposure to computers at home and in the performance of job-related tasks can

affect the literacy and acceptance of computer applications for both new and experienced

users. Survey results show that home computer usage between one to five hours per week

for most participants. For work related functions, eight of the survey participants use a

computer. The majority of this use is for e-mail and letters/correspondence. Results seem

to indicate that the majority of computer use is for communication purposes.

Software Development and Organization

Computer literacy within a company can vary based on the type of work, level of

training, and exposure to technology of its employees. It is important that new software

communicate information effectively and efficiently to its intended users. The design and

user interface of a software package can influence its use. Survey results indicate that

user interface affected software use. Of those surveyed, six respondents had stopped

using a software program because it was not user friendly. The amount of time dedicated









to learning new software, however was high. Five respondents indicated that extensive

efforts are put into learning new software, especially in larger companies.

The familiarity of new software to other common program formats can contribute

to its acceptance and use. Time, effort, and resources dedicated to implementation can

potentially be reduced. Eight participants indicated that familiarity with the visual

interface or navigation was a factor in its use. The majority of business and home

computers are PC's (IBM Compatible). In addition, many of these machines utilize a

Microsoft Windows operating system. Other operating systems such as Mac X, and

Linux are also available. Nine participants preferred a Microsoft Windows format for

new software packages. One respondent noted, "I have no other experience."

Some applications are designed to operate within existing software rather than as

an independent program. The extensiveness and function of these "piggyback" programs

can vary depending on its intended use. Additionally, the visual format and user interface

of the piggyback program in relationship to the parent program, e.g., Primavera P3, MS

Word, etc., can affect its use. For the purpose of developing and facilitating procedures

that address safety, eight respondents indicated that the interface/visual organization of

this type of software is important. Two respondents noted that similarities in the

programs would make the applications "easier to work with" and "reduce the learning

curve." Nine respondents were receptive to safety-based software applications to assist in

the existing company procedures for safety plan development. One respondent, however,

noted cost as a deterrent for utilizing safety software.














CHAPTER 6
CONCLUSIONS AND RECCOMENDATIONS

Conclusions

The purpose of this research was to identify general trends in the use of computers

and computer-related technology for the development and implementation of project-

specific safety programs in the construction industry. The conclusions of this study are

based on responses often participants. Because of the small sample size, the findings of

this research cannot be regarded as being supported by statistical rigor. As a result, the

conclusions are related to general trends that appear to exist in the construction industry.

It was intended that the results of this study would provide valued information for those

considering the development of software and computer applications for project specific

safety programs.

Software applications specifically designed for safety management on construction

sites have the ability to contribute to the overall total quality management process.

Integrating computer-based safety management tools both in the field and in the office

can assist in communication, documentation, and integration of the safety program to all

aspects of the construction process. Computers have become a necessity in many

business environments over the past decade. Because of the hands-on nature of their

work, many construction companies do not fully utilize computer technology equally in

both field and office environments. The current and future role of computers in the

construction industry for project management functions creates a potential for computer-

based safety plan integration. Computer-based job-specific safety software could assist









project staff in addressing the changing safety requirements necessary to maintain a safe

project. Developing software programs such as HAZCOM Interactive utilize the storage,

retrieval, and communication benefits of computer technology. The generation and

documentation of safety functions such as job hazard analyses, pre-task checklists, and

safety audits/inspections could be performed with greater efficiency and contribute to a

more proactive project safety program.

This study determined the extent to which computers are used to develop and

implement job-specific safety plans. Safety-specific software is a relatively new

application compared to other project management software. As safety becomes a larger

factor in the overall total quality management process on construction sites it is expected

that software that contributes to this purpose will be more prevalent. Project-specific

safety plans are prevalent for the performance of construction projects at the site level. In

most cases, management-level personnel are responsible for the development of these

plans. In the past decade, computers have taken a more prevalent role in the performance

of construction management tasks with the greatest impacts evident in larger companies.

The familiarity with the software format and user interface strongly influences the

acceptance of new programs. Microsoft windows-based software formats are

predominant on most computers and are preferred for new software. Various levels of

computer literacy, however, have affected the type and amount of use of computer

software and technology for safety-related tasks. The development and implementation of

project-specific safety plans on both computers and portable electronic devices is

performed only to a limited extent. While various aspects of safety related information

are created, tracked, and communicated through the use of computers, no comprehensive









computer-based safety program is currently utilized. Despite limited computer use, basic

computer literacy within the industry presents the potential for the introduction of various

safety-related software applications. In addition, construction firms are receptive to

computer-based applications for assisting in the development of their project safety

programs.

Recommendations

The widespread use of computer technology is relatively new to the construction

industry. As computers have become more common in the management of projects, their

applications and use for daily activities has increased. Computer technology is

developing continuously. Specific software packages are currently utilized by many

construction companies that assist in establishing a comprehensive approach to the

management of project related information. The prototype software noted in this research

explores both independent and integrated approaches to computer-based project specific

safety applications. This research study identified preferences in format and user interface

in the introduction of new software. Additionally, further exploration into the

applications of safety software based on popular or familiar platforms such as Microsoft

Windows, Primavera's SureTrak, Timberline, etc. could assist in the acceptance of new

programs. It is recommended that software developers consider these research findings

when developing computer applications in the area of construction safety. The

development of software for computer safety applications should consider these factors.

A recommendation for future research would be to conduct a comprehensive study that

would reflect the views of a larger population within the construction industry.

Computer technology and applications are changing constantly. It is recommended

that software developers address the safety needs of contractors and understand the






73


specific roles of their application. Additionally, it is recommended that contractors take

proactive measures to identify and research computer software and their applications for

improve safety on theirjobsite.














APPENDIX A
SURVEY QUESTIONNAIRE

Survey on Technology and the Implementation of Project-Specific Safety Programs

Part 1

1. What is the approximate annual volume of your company?

2. Are project specific safety plans currently developed for your companies' projects?

SYes No

3. Who prepares the safety plan?

[ Safety Rep [ Superintendent E Project Manager E Outside Consultant


[ Other


4. When is the safety plan developed for a project?

O7 After contract execution (before construction)


O After contract execution (after construction begins)


O Other

5. How do you decide what needs to be included in a project specific safety plan? Can

you describe the steps of the development?

6. How extensive is the scope of a typical safety plan?

7. What is involved in implementing a project specific safety program on a project? (How

does the written material get put into action?)









8. During construction (after the plan has been put into effect), what kind of changes

might be made to project specific safety plans? How easy is it to make these kinds of

changes?

9. To what extent are computers used to develop these plans?

10. In other aspects of safety (safety audits, job safety analysis, accident investigations,

tracking injury rates, safety training, safety meetings), are computers used for any of

these functions?

O Safety audit 7 Job safety analysis O Accident


0 Tracking injury rates O Safety Training O Safety meetings


O Pretask planning O Other

11. To monitor the different aspects of safety, is a computer program used to record and

track the information?

12. Are Computers used in the development of large-scale project specific applications

(i.e. job safety analysis, pretask planning, safety training, detailed inspections, etc)?

[ Detailed safety O Proj ect safety training [ Accident


E Pretask planning O Other

13. Do any site personnel such as the field engineer, superintendent, or foreman use

mobile technology devices (like Palm Pilots / PDA's) to perform their job?

14. In your company, do you see the use of computers as a tool for making your job

easier?

SYes No









At this time, please insert the Salus CPM demonstration CD provided. The demonstration

is self- starting/ running. If the Salus CPM demonstration does not start, please follow

this path to begin: Salus_CPM(CD Rom drive)/bin/clickme. (From the desktop, double

click on "My Computer," double click on the CD drive, open the "bin" folder, and double

click on "clickme")

The Salus CPM demonstration is provided to you for two purposes; to present

information regarding current and potential developments in technology-based safety

applications, and as a precursor to the questions contained in part 2 of this study. The

Salus CPM demonstration is intended as an example of a developing technology-based

application for project-specific safety management. It is not presented as wholistic

solution to incorporating technology into safety management, but rather an example of

one particular approach related to the subject addressed in this research.

Part 2

15. Do you have a computer at home? DYes D-No

16. How much time do you spend on a computer at home? hrs/ wk

17. Do you personally use the computer for any job related functions?

DYes DNo

18. What tasks do you do on the computer?

O E-Mail E Spreadsheets E Word Processing E Letters/ correspondence
O Scheduling

19. Does your company have a technology person to help you with computer and

software problems?









20. Have you ever acquired software that looked good but then decided not to use it

because it was not user friendly?

DYes DNo

21. How much time/ effort will you put into a software program to learn it?

22. Does the familiarity of the visual organization (or basic navigation) of a new software

package affect the potential usage?

23. Do you prefer a windows-based (or other standard program) based format?

24.Many programs work within the parameters of other software packages (MS word, P3,

excel, etc.). If you were to consider a software package, is the interface (visual

organization) important for the development or facilitation of procedures that address

safety practices?

25. Would job specific safety software help in developing safety plans for your

company's projects?

25. Do you think that software that helps to create project specific safety programs has

the ability to work with your current safety plan development procedures? What features

or parameters would be most beneficial to your company?

Optional: A summary of this research will be compiled and presented in a report. If you

would like a complimentary copy, include your name and address below. Your company

identity be used only to deliver a report to you. Thank you for your participation.

Name:
Firm:
Address:
City: State: Zip:















LIST OF REFERENCES


Adrian, James J., Farzad Schahbodaghlou, Douglas J. Adrian. "Reducing Accidents on
Construction Sites: Safety Using TQM Alternative," Proceedings of the Fifth
Annual Rinker International Conference Focusing on Construction Safety and Loss
Control, ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida:
Gainesville: 1994, 443-460.

Al-Mufti, M. A.. "Promotion of Health and Safety Culture Through Accident Cost
Awareness," Implementation of Safety and Health on Construction Sites, ed.
Amarjit Singh, Jimmie Hinze, and Richard Coble. A.A. Balkema, Rotterdam: 1999.

Alves Dias, Luis M.. "The Safety and Health Plan in the Construction Industry."
Implementation of Safety and Health on Construction Sites, ed. Luis M. Alves Dias
and Richard J. Coble. A.A. Balkema, Rotterdam: 1996.

Alves Dias, Luis M. and Miguel Torres Curado. "Integration of Quality and Safety in
Construction Companies." Implementation of Safety and Health on Construction
Sites, ed. Luis M. Alves Dias and Richard J. Coble. A.A. Balkema, Rotterdam:
1996.

Ayoade, Aubrey I., Alistair G. F. Gibb. "Integration of Quality, Safety and
Environmental Systems." Implementation of Safety and Health on Construction
Sites, ed. Luis M. Alves Dias and Richard J. Coble. A.A. Balkema, Rotterdam:
1996.

Coble, Richard J. and Brent R. Elliot. "Scheduling for Construction Safety." Construction
Safety and Health Management, ed. Richard Coble, Jimmie Hinze, and Theo C.
Haupt. Prentice Hall, Upper Saddle River; 2000, 43-57.

Cooper, M.D., R.A. Phillips. "Achieving the Objectives of Total Quality Management by
Focusing Upon Safety Management." Proceedings of the Fifth Annual Rinker
International Conference Focusing on Construction Safety and Loss Control, ed.
Raymond Issa, Richard J. Coble, Brent R. Elliot. University of Florida: Gainesville:
1994, 371-381.

Elliot, Brent R.. "Investigation of the Construction Scheduling Communication Process:
Problems, Foreman's Role, Means of Improvement, and Use of Information
Technology." Ph.D dissertation, University of Florida, 2000.









Elzarka, H. M., I. A. Minkarah, and R. Pulikal. "A Knowledge-Based Approach For
Automating Construction Safety Management." Implementation of Safety and
Health on Construction Sites, ed. Amarjit Singh, Jimmie Hinze, and Richard Coble.
A.A. Balkema, Rotterdam: 1999.

Eubanks, Francis M.. "Elements Of a Construction Safety Management Program."
Proceedings of the Fifth Annual Rinker International Conference Focusing on
Construction Safety and Loss Control, ed. Raymond Issa, Richard J. Coble, Brent
R. Elliot. University of Florida: Gainesville: 1994, 325-338.

Gambatese, John A., and Jimmie Hinze. "A Guide for Safety Inspections."
Implementation of Safety and Health on Construction Sites, ed. Luis M. Alves Dias
and Richard J. Coble. A.A. Balkema, Rotterdam: 1996.

Geronsin, Rolin. "Job Hazard Assessment: A Comprehensive Approach." Professional
Safety. December, 2001. 23-31.

Gottfried, Arie and Marco L. Trani. "Safety and Health Design Management on the
Construction Site: Guidelines for Roles and Application Tools." Implementation of
Safety and Health on Construction Sites, ed. Amarjit Singh, Jimmie Hinze, and
Richard Coble. A.A. Balkema, Rotterdam: 1999.

Harper, Randall S. and Enno Koehn. "Managing Industrial Safety in Southwest Texas,"
Journal of Construction Engineering and Management. November/ December
1998.

Hinze, Jimmie. Construction Safety. Prentice Hall, Upper Saddle River: 1997.

Hinze, Jimmie. "Incurring the Costs of Injuries Versus Investing in Safety." Construction
Safety and Health Management, ed. Richard Coble, Jimmie Hinze, and Theo C.
Haupt. Prentice Hall, Upper Saddle River: 2000, 23-42.

Hinze, Jimmie. "The Role of Project Coordination in Construction Safety." Proceedings
of the Fifth Annual Rinker International Conference Focusing on Construction
Safety and Loss Control, ed. Raymond Issa, Richard J. Coble, Brent R. Elliot.
University of Florida, Gainesville: 1994, 357-370.

Jones, Pierce. "Hazard Communications Using Interactive Computer Based Training
Techniques." The Management of Construction Safety and Health, ed. Richard J.
Coble, Theo C. Haupt, and Jimmie Hinze. A.A. Balkema, Rotterdam: 2000.

Kartam, Nabil. "Integrating Construction Safety and Health Performance Into CPM."
Construction Congress: Proceedings from the 1995 Conference, ed. C. William
Ibbs. American Society of Civil Engineers, New York: 1995, 456-462.

Levitt, Raymond Elliot and Nancy Morse Samelson. Construction Safety Management.
John Wiley and Sons, Inc., New York: 1993.









Nelson, Jeff, and Jimmie Hinze. Salus CPM: An Introduction. [CD ROM].Conceptual
Arts, 2001.

Pun, Kit-Fai and Ip Kee Hui. "Integrating the Safety Dimension into Quality
Management Systems: A Process Model." Total Quality Management. May 2002,
373-391.

Rwelamila, P. D. and J. J. Smallwood. "Total Quality Management (TQM) Without
Safety Management?" Proceedings of the Fifth Annual Rinker International
Conference Focusing on Construction Safety and Loss Control, ed. Raymond Issa,
Richard J. Coble, Brent R. Elliot. University of Florida, Gainesville: 1994, 391-
408.

Sommerkamp, John and Jeffrey J. Yew. "Safety Quality Management." Proceedings of
the Fifth Annual Rinker International Conference Focusing on Construction Safety
and Loss Control, ed. Raymond Issa, Richard J. Coble, Brent R. Elliot. University
of Florida, Gainesville: 1994, 349-355.

U.S Department of Labor. "Safer Construction Workplaces Evident During the Early
1990's" Summary 95-3, Bureau of Labor Statistics.
http://stats.bls.gov/iif/oshwc/ossm0004.pdf August 17, 2003.

U.S. Department of Labor. Construction Industry Digest. Occupational Safety and Health
Administration. OSHA 2202: 1998.















BIOGRAPHICAL SKETCH

Casey R. Lewis was born outside of Atlanta, GA. He received a bachelor's degree

in interior design from the University of Georgia. Prior to entering the graduate school at

the University of Florida, he worked in commercial interior design in Atlanta, GA, and

Jacksonville, FL. Casey will have completed the requirements for his Master of Science

in Building Construction degree in August 2004 and will be employed as a project

engineer in Charlotte, NC.