Group Title: Documentation
Title: Maintenance assay
ALL VOLUMES CITATION THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00103204/00002
 Material Information
Title: Maintenance assay
Physical Description: Archival
Language: English
Creator: University of Florida Department of Architecture
Publisher: University of Florida
Place of Publication: Gainesville, Fla.
 Record Information
Bibliographic ID: UF00103204
Volume ID: VID00002
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text








EAST JACKSONVILLE SCHOOL .NO- 3


DOCUMENTATION. BUILDING ASSAY. ADAPTIVE .USES.


VOLUME TWO:


MAINTENANCE ASSAY


Prepared for the City of Jacksonville, Florida by
Graduate Students in the Department of Architec:ture,
University of Florida;,during the Academic year 1979-80


Ward DuPree
Oslec Fernandez
Diane Gigon
Lester Gonzalez
Mike Johnson


Brent Lane
Bob Mather
Keith Soto
Jim Golden
F. Blair Reeves, Professor
Phillip P. Wisley, Professor























SUMMARY:
FIRST FLOOR


PUBLIC S(


Maintenance


.HOOL


The first floor is basically in good condition but neglect and vandalism has taken its toll. Most of the
doors, chalkboards, electrical, heating and plumbing systems have been removed with no care taken to
avoid damaging the surrounding areas. Also, much of the glass has been broken in many of the windows
and dpors.
The most serious damage has occurred in areas where there has been a high degree of water intrusion which
occur mainly in rooms located under the outdoor classrooms or adjacent to these areas. The damage can more
readily be seen in the restrooms and the old bandroom. In the water damaged areas there is severe spelling
and efflorescence of the plaster.
There is evidence of occasional human occupancy: trash is strewn throughout the building and the restrooms
areas show evidence of recent human use. Generally, even though the overall floor condition is good, the
interior finishes are in disrepair.


NO. 3


Report



















108c 108ci


-IF1I


05 107 108b 108 109 110

1109c
106o |0 4 \ IO 9a 9b109C
(upper) n = m-- 109b 109d
115 116


103 102 113 112
101 1 17 114



103a 102 lOla I 11Ga 113a 112a


FIRST FLOOR

FIRST FLOOR












































































~r K


II
( :


-.I
~r
'-
: , r pi

















Page 0002 __ PUBLIC SCHOOL NO. 3

Floor 7


Room 1 l-' Maintenance Report
101


Element Description Condition

Ceiling
Paint on plaster Paint-mildewed and peeling; plaster-hairline
cracks.


Paint on plaster




Paint on plaster




Paint on plaster





Paint on plaster

Painted wood baseboard and shoe, painted wood
picture molding all walls.


Paint-mildewed and peeling; plaster-water
damaged, chaulking below windows.


Paint-mildewed and
cracks.


peeling; plaster-hairline


Paint-mildewed and peeling; plaster-water
damaged near ceiling, hairline cracks, plumbing
holes to west of door.



Paint-mildewed, checked and peeling; plaster-
hairline cracks.


Walls:


north


east





south




west























Page 0003


Element Description Condition

Floor
Vinyl asbestos tile, pipe holes along south Cracked and peeling
wall and one under each window north wall.


North wall two bays, painted wood triple
awning windows, 9/9/9, t-bar latch, hand pull
and eye pull, painted wood frame and casing,
painted concrete sill.


Rusted and painted hardware, hand pulls
and t-bar latch missing both bays.
4 lites broken.


Windows


























Element Description Condition

Doors South wall 2 panel, painted wood door, 3 butt Door paint mildewed and peeling, hinge
hinges, mortice latch and lock, dead bolt. pins missing.
Escutcheon lock and knots missing
West wall door opening at center framed in
wood, painted wood sidelights, painted
wood transoms above.


Ceiling exposed conduit, 2-6 tube inoperable
rows of flourescent fixtures.
North wall exposed steam pipes and
evidence of radiator under windows.
East wall exposed conduit and outlet.
South wall exposed conduit/telephone jacks,
evidence of sink.
West wall wall switch/telephone jack.


Inoperable

Radiator missing


Torn out of wall
missing
Torn out of metal box


wT5---


Page


0004


Systems

















Page 0005 _- hI~ PUBLIC SCHOOL NO. 3

Floor 1 t ----- '.


Room 101A Maintenance Report



Element Description Condition

Ceiling
Paint on plaster Paint-mildewed, plaster-patched at southeast
corner.


Paint on plaster




Paint on plaster





Paint on plaster




Paint on plaster


Painted wood baseboard and shoe all walls.


Paint-mildewed at southeast corner near ceiling


Walls:


north


east




south




west
























Page 0006


Element Description Condition


Vinyl asbestos tile


Floor


Windows


None























Page 0007


Element Description Condition

Doors
North wall description same as that for door
on south wall of room 101.
















Systems
Ceiling exposed conduit, 1 bare bulb in-
candescent light.
North wall exposed conduit and 1 double
receptical outlet.

















Page 0008 r PUBLIC SCHOOL NO. 3

Floor 1 t -I- ^-


Room 102 L_-i Maintenance Report



Element Description Condition

Ceiling Paint on plaster Paint-mildewed, plaster hairline cracks,
patched at midpoint of east end.


Paint on plaster



Paint on plaster
Evidence of chaulkboard




Paint on plaster
Evidence of chaulkboard




Paint on plaster
Evidence of chaulkboard


Painted wood baseboard and shoe, painted wood


Paint-checked; plaster-chipped at window
pilaster divisions.


Paint-checked;plaster-hairline cracks, patched
at ceiling line, scratch coat where chaulk-
board once existed.



Paint-checked and peeling; plaster-patch
above door, scratch coat where chaulkboard
once existed.



Paint-checked; plaster-hairline cracks,
hole in plaster with wood lath exposed.


Walls:


north


east





south




west























age 0009


Element Description Condition

Floor
Vinyl asbestos tile. Cracked and peeling, water stained


Windows


North wall 5 bays, painted wood triple
awning, 9/9/9, t-bar latch, hand pull and eye
pull, painted wood frame and casing, painted
concrete sill.
South wall 2 painted center pivot wood
transom, 6 lites each, eye pull latch.


One t-bar latch missing second bay from west






















Page 0010


Element Description Condition


South wall painted wood door frame and casing,
painted center pivot wood transom, 6 lites,
eye pull latch.
West wall painted wood door frame and casing.


Systems


Ceiling 2-14 tube rows of flourescent fixture.
North wall evidence of radiator with 2 steam
pipes each side of total window bay.
East wall exposed conduit and outlet.
South wall wall switch west side of door.
West wall exposed conduit along ceiling, also
along south side of door opening to junction
box, evidence of wall clock.


Door missing


Radiator missing

Face plate missing

Clock missing


Doors


































































t tr IA -


~

















Floor


Room 102A


PUBLIC


SCHOOL


Maintenance


Report


Paint on plaster


Paint on plaster


east Paint on plaster
Metal coat rack


south Paint on plaster


Paint on plaster
Metal coat rack


Painted wood baseboard and shoe all walls.


Plaster-hairline cracks


Plaster-hairline cracks


Paint-mildewed and checked; plaster-cracked
and spelling.


Paint-mildewed; plaster-cracked and spelling,
patched near ceiling and floor.


Paint-checked


Ceiling


NO. 3


Walls:


north


west



























Element Description Condition


Vinyl asbestos tile.


Windows I I


North wall single bay, painted wood double
awning, 3/3, hand pull and t-bar latch,
paint concrete sill.


Hand pull and t-bar latch missing.


Floor




























Element Description Condition

Doors Paint on plaster passage.




















Systems
Ceiling 1 bare bulb incandescent light
fixture at midpoint; conduit running east/
west 1 foot below ceiling and just south of
light fixture.


I






































iJi/~

''' :~ . ~t~



U?









r




cl -
.I ,,
























;




































C :
u

































-











--i--











- -;-


















Page 0014


Floor 1


Room 103


PUBLIC SCHOOL NO. 3




Maintenance Report


Element Description Condition

Ceiling P
Paint on plaster Plaster-hairline cracks


Same as 102


Paint on plaster,
Chaulkboard frame



Paint on plaster,
Chaulkboard frame




Paint on plaster,
Chaulkboard frame


painted wood




painted wood





painted wood


Painted wood baseboard and shoe, painted wood


Plaster-water damage below windows




Paint-mildewed at ceiling line; plaster-
cracked, patched at ceiling line, scratch
coat where chaulkboard once existed.


Paint-mildewed and peeling; plaster-cracked,
scratch coat where chaulkboard once existed.




Paint-mildewed, checked, and peeling;
plaster-cracking, patched at ceiling line,
holes near base at south end, scratch coat
where chaulkboard once existed.


Walls:


north


east





south





west


__































Cracked and peeling


North wall same as room 102
South wall same as room 102


Completely intact
1 broken lite


Windows


Floor


Vinyl asbestos tile






















Page 0016


Element Description Condition

Doors South wall painted wood door frame and Door missing
casing, painted center pivot wood transom,
6 lite, eye pull latch.

East wall paint on plasterpassage.















Systems


Ceiling 2 flourescent fixture tracks.

North wall evidence of radiator with 2 steam
pipes one each side of total window bay.
East wall evidence of conduit
South wall junction box by door west end
West wall exposed conduit, evidence of wall
clock


Fixtures missing

Radiator missing

Conduit missing
Switch missing
Clock missing
























-e 1


I .


~,
;-- -ek=
`1








~i~' ~1'
~ .-

iL~

















Page 0017 1 PUBLIC SCHOOL NO. 3

Floor 1-


Room 103A Maintenance Report



Element Description Condition

Ceiling
Cing Paint on plaster Paint-peeling; plaster spalled at several
points to exposed concrete ceiling.


Paint on plaster




Paint on plaster




Paint on plaster





Paint on plaster


Painted wood baseboard and shoe all walls.


Paint-checked; plaster-hairline cracks.




Paint-checked; plaster-hairline cracks.




Paint-checked; plaster-cracked at ceiling
line and at juncture of east wall.




Paint-mildewed and peeling; plaster-cracked


Walls:


north


east




south




west






























Floor


Windows


Vinyl asbestos tile


East wall painted wood double awning, 9/9,
hand pull and t-bar latch, painted concrete
sill.























Page 0019
0019

Element Description Condition

Doors
West wall painted wood door frame and casing.

















Systems
Ceiling 1 bare bulb incandescent light
fixture at midpoint.

East wall 2 exposed pipes north of windows.
















Page 0020 PUBLIC SCHOOL NO. 3

Floor -
------------- ------------jLj3

Room 104 Maintenance Report



Element Description Condition

Ceiling
Paint on plaster Plaster-cracked


Paint on plaster




Painton plaster




Paint on plaster





Paint on plaster


Painted clay tile baseboard with wood shoe on
north and east al1 wrall


Paint-checked; plaster-cracked top of door
opening on west side, chipped along door
opening.


Paint-mildewed and
hairline cracks.



Paint-mildewed and
cracks.


checked; plaster-




checked; plaster-hairline


Paint-mildewed, checked and peeling;
plaster-hairline cracks.


Walls:


north




east


south




west






















Page 0021


Element Description Condition

Floor
Vinyl asbestos tile Cracked and peeling


East wall painted wood double awning,
9/9, hand pull and t-bar latch, painted concrete
sill.

West wall 2 painted center pivot wood transoms,
6 lites, painted wood frame and casing.


4 broken lites


Windows
























Page 0022


Element Description Condition

Doors North wall paint on plaster passage.

West wall leading to room 105 is a painted Door missing
wood door frame and casing

Leading to room 106 is a 5 panel painted wood Paint is peeling, locks and handles missing.
door, butt hinges, painted wood frame and
casing.


Ceiling evidence
posed conduit.


of 3 electric fixtures, ex-


North wall light switch to east of door
opening.
East wall 2 steam pipes south of window,
evidence of radiator under window.


Fixtures missing




Radiator missing


Systems







































































-; i






















H i









*' --- -- -;
im m ....r



















Floor 1


Room 105


LILZ~~PLILJ


Element Description Condition

Ceiling
Paint on plaster Paint-mildewed and peeling; plaster-water
damage and hole at southwest corner to
reveal structural clay tile.


Paint on plaster
Evidence of mirrors


Paint on plaster, some areas behind the stalls
are exposed brick.


Paint on plaster





Paint on plaster


Painted clay tile baseboard all walls.


Paint-mildewed and peeling mirrors missing.




Paint-mildewed and peeling; plaster-cracked,
holes for pipes at midpoint of wall.



Paint-mildewed, checked, and peeling.





Paint-mildewed and peeling; plaster-water
damaged at south corner.


PUBLIC SCHOOL NO. 3




Maintenance Report


Walls:


north




east


south


west


if























Page 0078


Element Description Condition

Floor Vinyl asbestos tile


















Windows


Wood frame double awning window 9/9, t-latch
(lower), hand pull (upper).
Painted wood frame and casing;
Painted concrete sill


Paint weathered and peeling























Page 0024


Element Description Condition

Floor Clay tile

West wall raised ceramic tile platform with Tile chipped at midpoint of platform, holes
ceramic tile baseboard. through tile for urinal drains.
















Windows


South wall two bays, painted wood triple
awning, 1/1/16 and 1/1/1, painted wood frame
and casing, painted concrete sill
Single pane sections are abscure wire
glass and 6 pane sections are a mixture of obscur
wire glass and clear glass.


Some broken glass

Eye pull, hand pull and t-bar latch missing.






















Description


I I


East wall same as description of door to 105
from 104

South wall door is of painted vertical tongue
and groove planks, dead bolt with pull by
lock, evidence of pull below loc, metal kick
plate, painted wood frame and casing, painted
wood fixed transom, one pane clear glass.


Ceiling exposed conduit to
incandescent fixtures.


2-1 bare bulb


North wall evidence of two sinks with drain
and supply, water pipe east of sinks, and at
west end.
East wall light switch north of door, water
pipe at midpoint of wall, evidence of 6 water
closets with supply behind.
South wall exposed conduit to light switch
east of door opening, water pipe west of window
evidence of radiator below window.
West wall evidence of slop sink at south end.
Two urinals with supply stub over each urinal.


Floor floor drain at center.


Condition


Pull below lock missing


Sinks removed or damaged beyond repair.


Water closets
broken.


missing, plumbing removed or


Radiator missing


Sink missing, supply and drain intact.
Drains missing, urinals cracked or missing.


Page 0025


Element


Doors


t


Systems


1






































Iii.c


ha


C~- -.


r=


:li


ij







- I'-


) :
- '- - f -
Li I
II '


Ed.


. -


itt~


51


*. w















PUBLIC


SCHOOL


Maintenance


Report


Exposed joist and wood planks.


Unpainted plaster


east Unpainted plaster


Unpainted plaster
Wood stairs to 106B


Unpainted plaster
Varnished wood baseboard all walls.


Minimal signs of decay in wood


Mildewed, small holes


Cracked at midpoint


Holes north of door


Room


106


NO. 3


Ceiling


north


south


west































2" tongue and groove boards


Windows


None


Floor


Normal wear
























Page 0028


Element Description Condition

Doors East wall same as room 104, west wall,
north end
Varnished wood surround

West wall varnished wood door frame and Door missing
casing














Systems


Ceiling evidence of lighting,
running east/west

South wall exposed conduit
West wall evidence of exposed
wall switch.


exposed conduit


conduit and


Fixture missing


Conduit and switch missing
















PUBLIC


SCHOOL


Maintenance


Report


Unpainted plaster


Unpainted plaster


Cracked, spalled revealing rebar


Cracked


Cracked, spalled exposing scratch doat


Floor

Room


106A


Ceiling


NO. 3


Walls:


north


east ( Unpainted plaster


south Unpainted plaster


west


Unfinished plaster




























Element Description Condition

Floor
Unfinished wood planks.



















Windows
East wall same as transom description of west
wall Room 104, instead of painted transoms
and frames are varnished.

West wall varnished wood transom and frame
located over door to 107, center pivot, 6 lites.

































Doors


None


Ceiling 2 bulb incandescent light at mid-
point.


Shade missing


Systems



































































*~i~?lp*~l
14t: sM***-: ~ ;I

i-i.--















Page 0032 .r-0 PUBLIC SCHOOL NO. 3

Floor 1 -----

Room 107 '---' Maintenance Report


Element Description Condition
Ceiling Paint on plaster Paint mildewed and peeling; plaster-hairline
cracks, water damaged and spelling at south-
east corner, structural clay tile missing.


Paint on plaster



Paint on plaster, tack board with frame south
of door.



Paint on plaster.


plaster, painted wood chaulkboard


Painted wood baseboard and sboe, painted wood
picture mTlinl I 11 ,-1 1-


Checked



Paint mildewed and peeling; plaster-cracked
water damage at south end.


Plaster is water damaged at east end,
chipped at windows, spelling below windows.


Paint-peeling; plaster-scratch coat where
chaulkboard once existed.

South wall baseboard rn1-t4, "n- .


Walls:


north


east




south




west


Paint on
frame-


Il

























Element Description Condition

Floor
Vinyl asbestos tile Chipped and peeling



















Windows


2-2 section 10 lite painted wood frame windows
with 10 lite painted wood center pivot transom
above each, eye pull latch each side of
door.
South wall 2 bays, painted wood triple awning
windows, 1/1/1 at east end and 6/6/6 at west
end, t-bar latch, hand pull and eye pull,
painted wood frame and casing, painted concrete
sill.


43 lites broken



All hand pulls missing, from east first and
fourth t-bar missing, water to some sashes.


-1


























Element Description Condition

Doors North wall evidence of pair of French type Doors missing
doors, painted wood door frame and casing, center
pivot wood transom, 30 lites.

East wall same as doorway west wall 106,
except that wood is painted.


Ceiling 2 flourescent fixture tracks.

East wall evidence of removed sink at south
end.
South wall exposed conduit at midpoint,
evidence of radiator under window.
West wall exposed conduit at midpoint,
circuit box at midpoint.


Sink missing

Radiator missing


Systems




























.PUT














IE'*


4J


ow:


r Ai
,i [


LV

















Page 0035 - PUBLIC SCHOOL NO. 3

Floor 1


Room 108 I'' Maintenance Report



Element Description Condition

Ceiling
2 x 4 suspended acoustical tile Water damage at southeast corner, some
tiles missing.


Paint on plaster, 6 structural bays between
ornamented pilasters.



Paint on plaster, procenium arch centered, arch
centered, arch is plaster with recessed panel at
sides and top and square panels at corner, painted
wood apron on stage.


Paint on plaster, 6 structural bays between
ornamented pilasters.



Paint on plaster, projection booth in relief mid-
wall at 2nd level.

Painted wood baseboard and shoe all walls.


Paint-checked, plaster-hairline cracks,
chipped at pilaster corners



Paint-chipped and peeling; plaster-chipped at
pilaster corners,
Wood relief panels broken out on stage apron.



Plaster cracked and chipped, spelling east
end, water damage at mid-wall.



Paint-peeling; plaster-cracked


Walls:


north


east





south




west





















Page 0036


Element Description Condition

Floor Vinyl asbestos tile Stained and peeling


South wall at the 4 central bays each bay has
2 vertically arranged sets of painted wood
triple awning windows, 6/6/6, t-bar latch,
metal screen on lower half of bottom sets,
painted wood frame and casing, painted concrete
sill.
Metal hand crank device for opening upper window.
West wall rectangular projection port on
booth, rectangular serving window at north end.


60 lites broken





Mechanisms rusted


Windows























Page 0037


Element Description Condition

Doors North wall 6 doors each centrally located 9 lites broken
between pilasters, 4-2 panel painted wood frame
screened doors, painted wood door frame and Wood on screen doors is cracked and split,
casing, painted centerpivot wood transom, 6 pane screens are rusted.
each, eye pull latch.
East wall painted wood door frame and casing
leading to each room that flanks the stage.
South wall at each end bay is a painted wood Glass is broken, wood is warped and rotting.
door with 4 panes upper section and 3 horizontal
fielded panel below, painted wood door frame,
and casing, painted center pivot wood transom,
15 lites.
West wall 3 painted wood frame door openings.


Ceiling 2 rows, 6 incandescent fixtures each
set symetrically in structural bays 1 bulb.
North wall evidence of exit signs over doors.
South wall evidence of radiators below
windows, evidence of exposed conduit at ends
of wall by the doors
West wall evidence of wall clock


2 signs missing.
Radiators missing
Conduits missing


Clock missing


Systems












r4


*. *; I


ii


liA
1314,


-e ~























r,
1-3vl .



'b



~:~ ??;,






..
L-. 'I .'

'"'



















;-...'1


i
[Ir
I

t _

~ r,

'ii %1\,

'l~rl

..

'''
Pi ~~~G~1
Y -j ~"'

.. I





:"I~

















Floor


Room 108A


PUBLIC


SCHOOL


Maintenance


Report


Unfinished gypsum wallboard.


Unfinished gypsum wallboard.


Paint on plaster
Evidence of removed stairs to stage


south Paint on
Evidence
Concrete


plaster
of window patched in red brick infill
sill below


west Paint on plaster
IDoor midway on wall


Painted wood baseboard and shoe.


Paint peeling


Paint peeling
Door removed


Ceiling


NO. 3


Walls:


north


east

























Page 0039


Element


Floor


Windows


Description


Vinyl asbestos tile


I S


Evidence of window (see description of south
wall)


Condition


Cracked and peeling
Tiles near door are stained with oil
based liquid.























Page 0040


Element


Doors


Description


i -t


Painted wood door frame and casing


Systems
Ceiling 2 tube flourescent fixtures

East wall exposed conduit
South wall exposed conduit; wall fan in
the bricked-in window portion of south wall


Condition


Door missing, frame dry rotted



















Floor
1

Room 108B


Element


PUBLIC


Maintenance


Report


1- 1


Description


Condition


Ceiling
2' x 4' suspended metal grid with lay-in Tile broken along north wall
acoustical tile.
4' long chains hanging from ceiling.


Walls:


north


east




south




west


Paint on plaster



Paint on plaster
2 vertical wood nailers (floor to ceiling)
at wall ends


Paint on plaster



Stage opening


Painted wood baseboard and shoe


Paint-mildewed and peeling



Paint peeling
Plaster-hairline cracks
3 evenly-spaced, round plaster patches
at ceiling


Paint peeling
Plaster-hairline cracks


SCHOOL


NO. 3


~_





























Floor


Windows


Tongue and groove wood deck painted


None






















Page 0044


Element Description Condition

Doors None



















Systems
Ceiling 4 equally-spaced incandescent
lighting
Fixtures with glass shades

North wall exposed conduit
East wall exposed conduit
South wall exposed conduit
West wall exposed conduit













I i


Page 0044

Floor 1


Room 108C


PUBLIC SC



Maintenance


HOOL


Report


Element Description Condition
Ceiling
Unfinished gypsum wallboard


Paint on plaster
Apparent door and transom sealed and partially
covered with sheet plywood.

Paint on plaster
Evidence of removed stair to stage


Unfinished gypsum wallboard




Paint on plaster
Door opening with door removed

Painted wood baseboard and shoe on all but
south wall.


Paint peeling
Plaster-hairline cracks


Paint peeling


NO. 3


Walls:


north


east




south




west




























Element Description Condition

Floor Vinyl asbestos tile Cracked and peeling



















Windows


North wall center pivot, 6 lite transom
window above door.
Eye pull latch at top center of window.


Window permanently fixed in place.
Paint an window framing around
lites peeling
Latch inoperable






















Page 0046


Element Description Condition

Doors 10 lite paneled wood door. Paint peeling
Upper 2/3 of door covered with sheet Door hardware removed
plywood.

















Systems
Ceiling exposed conduit

North metal junction box with exposed
conduit west of door
South metal junction box
West metal switch box north of door with
exposed conduit
















PUBLIC


SCHOOL


Maintenance


Report


Element Description Condition

Ceiling
Paint on plaster Paint peeling
Plaster spelling to expose structural
clay tile


Paint on plaster
Clay tile baseboard
Wood picture molding


Paint on plaster
Clay tile baseboard
Wood picture molding
3 painted, metal door jambs


Paint on plaster
Clay tile baseboard
Wood picture molding


Paint on plaster
Clay tile baseboard
Wood picture molding


Plaster hairline cracks at east end.



Paint mildewed and peeling
Plaster hairline cracks


Paint peeling
Plaster cracked with spelling exposing
brick structure
Severe water damage

Paint peeling
Plaster cracked


NO. 3


Walls:


north


east




south




west


-I

























Page 0048


Element Description Condition

Floor Clay tile sloped to floor drains. Some chipping of tiles at drains.

Recessed pit at southwest corner.

















Windows


South 2 bay, 3 section each
6/6 single-hung aluminum sash with aluminum
screen.


Window operable
2 screens missing



















Page 0049


Element Description Condition

Doors
Painted metal jambs Doors missing


Ceiling 8 electrical fixtures with surface
conduit
Stainless steel vent hood, alarm bell
(plumbing pipes below hood)
North recessed junction box and switch bay
East evidence of recessed junction box
and surface conduit
South evidence of recessed junction box
and water supply
West surface conduit with switch at 4'-0"
level
Evidence of plumbing drain from upper floor


Operable



Removed
Removed

Inoperable

Inoperable

Inoperable


Systems











~I


F 1.
I''
/'
"*

I

l, 'b-
!V.
,-,/ i

p"


14


L ,

















page 0050 PUBLIC SCHOOL NO. 3

Floor 1


Room 109A Maintenance Report



Element Description Condition

Ceiling
Paint on plaster Paint peeling
Plaster hairline cracks


Paint on plaster
Clay tile baseboard
Wood picture molding


Paint on plaster
Clay tile base
Wood picture molding
"pass thru" to room 109


Paint on plaster
Clay tile baseboard
Wood picture molding
Wood shelves

Paint on plaster
Clay tile baseboard wood picture mold


Paint peeling
Plaster hairline cracks
Sections of picture molding missing


Paint peeling





Paint mildewed




Paint peeling


Walls:


north


east


south




west



























Element Description Condition

Floor
Clay tile with floor drain Tile chipped near drains
Two recessed basins


Windows


North wall 2 section 10 lite painted wood
frame windows with 10 lite painted wood center
pivot transom above each, eye pull latch -
west of door
















Page 0139

Floor 2


Room 210


-- I 1


PUBLIC


SCHOOL


Maintenance


Report


Element


Description


Condition


Ceiling
Acoustic tiles on suspended metal grid, original Severe water damage in portions,tiles cracked
ceiling missing, and disintegrating.


Walls:


north


east





south




west


Paint on plaster, two cork bulletin boards.




Paint on plaster, painted wood chalkboard
frame.




Paint on plaster, painted wood chalkboard
frame.



Paint on plaster, painted wood chalkboard
frame.

Painted wood baseboard and shoe, painted
wood picture molding.


Paint mildewed, checked, peeling
Plaster efflorescence and spelling due
to water damage.


Paint mildewed, checked, peeling
Plaster cracked, large holes exposing
wooden lath.
Chalkboard frame intact, no board, scratch
coat plaster exposed.

Paint mildewed, checked, peeling
Plaster efflorescence due to water damage
cracked. Chalkboard frame pulled away partial
leaving holes thru plaster to brick, chalk-
board missing, scratch coat plaster exposed.
Paint mildewed, checked, peeling.
Plaster efflorescence, cracked
Chalkboard frame intact, no board, scratch
coat plaster exposed.
North wall baseboard rotted.


NO. 3


----"
I I


~~

















Page 0052


Element Description Condition

Doors North wall evidence of pair of French type French doors missing
doors, painted wood door frame and casing, One remaining screen door is ripped and
center pivot wood transom, 30 lites, screened had broken frame.
doors.
















Systems
Ceiling exposed conduit, 2-1 bulb incandescent
fixtures, metal shades, exhaust pipe near north
west corner.

North evidence of conduit northwest corner;
evidence of conduit and plumbing at north-
east corner.
Remains of dishwasher
East stainless stell utility counter
plumbing remains
South stainless steel utility counters

















Floor 1

Room 109B


PUBLIC


SCHOOL


Maintenance


Report


Element Description Condition
Ceiling Paint on plaster Paint mildewed and peeling
Plaster hairline cracks


Paint on plaster
Clay tile baseboard (4" x 4")


Paint on plaster
Clay tile baseboard



Paint on plaster
Clay tile baseboard



Paint on plaster
Clay tile baseboard


Paint mildewed and peeling
Plaster hairline cracks


Paint mildewed and peeling
Plaster hairline cracks



Paint mildewed and cracked




Paint mildewed and peeling
Plaster hairline cracks


NO. 3


Walls:


north


east




south




west




























Floor I Clay tile (4" x 4")


Windows


None





















Page 0055


Element Description Condition

Doors
Painted wood jamb Door missing


















Systems


Ceiling one electrical
conduit


fixture with surface


North wall outlet with surface conduit
East none
South wall outlet with surface conduit,
two water supply pipes, evidence of sink
with supply and waste lines.
West none
Floor drain with metal grate















PUBLIC


SCHOOL


Maintenance


Report


Paint on plaster


Paint on plaster
Clay tile baseboard


Paint on plaster
Clay tile base


south Paint on plaster
Clay tile base


west Paint on plaster
Clay tile base


Paint peeling
Plaster patched


Paint peeling
Plaster patched, evidence of removed wall


Paint peeling


Paint peeling
Plaster bolt holes for sink


Paint peeling


Floor

Room


109C


Ceiling


NO. 3


Walls:


north


east




























Clay tile (4" x 4")


Windows


None


Floor


























Element Description Condition

Doors Painted wood door jamb Door missing





















Systems
Ceiling one electrical fixture with
surface conduit


North none
East none
South sink drain in wall, water supply
to sink and toilet
West none
Floor drain openings in floor


Piping present

Piping removed


I
















Page 0059

Floor i

Room 109D


PUBLIC SC



Maintenance


HOOL


Element Description Condition
Ceiling Paint on plaster


Walls:


north


east




south




west


Paint on plaster
Clay tile baseboard (4" x 4")


Paint on plaster
Clay tile baseboard



Paint on plaster
Clay tile baseboard


Paint on plaster
Clay tile baseboard


Paint mildew and peeling
Wall hairline cracks


NO. 3


Report






























Clay tile (4" x 4")


Windows


None


Floor





















Page 0061


Element Description Condition

Doors Painted wood door jamb Door removed


Systems


Ceiling alarm system @ south end, expansion
tanks @ north end

North wall none
East wall exhaust and vent
South incandescent fixture above door
jamb, light switch
West electrical outlet
Floor floor drain in southeast corner,
water or steam supply pipe north and east
side.

















Page 0062 PUBLIC SCHOOL NO. 3

Floor
1

Room 110 Maintenance Report



Element Description Condition

Ceiling Paint on plaster Paint mildewed and peeling; plaster -
hairline cracks


Paint on plaster




Paint on plaster





Paint on plaster




Paint on plaster


Painted clay tile baseboard all walls


Paint mildewed and peeling
Plaster cracked and spelling



Paint mildewed and peeling
Plaster checked and cracked




Paint mildewed checked and peeling
Plaster cracked



Paint mildewed, checked, and peeling
Plaster cracked


Walls:


north


east





south




west























Page 0063


Element Description Condition

Floor
Clay tile


Windows I I


South wall 1 bay, 2 section, painted wood
triple awning, 1/1/1, with obscure wire glass,
t-bar latch, hand pull and eye pull latch,
painted wooden frame and casing, painted
concrete sill.


Hand pulls on middle sashes missing
1 lite broken
1 t-bar latch missing

























Element Description Condition

Doors South wall painted vertical tongue and groove Pulls and locks removed, paint is mildewed.
planks with self closer, painted fixed wood
transom, obscure wire glass.

West wall leading to room 111 is a painted Door missing
wood door frame and casing.


Ceiling exposed conduit to 4-2 bulb
incandescent fixtures.

North wall evidence of two sinks
East wall water pipe at midpoint of wall
and at north end, evidence of 7 water
closets.
South wall exposed conduit, evidence of
radiator under window
West wall wall switch north of door,
evidence of 5 water closets


Sinks missing


Water closets missing

Radiator missing

Water closets missing


Systems

































": 111~






















rc~


'


~1




:i











Fl









i:



















r










s~


ii




j s



















IFloor


Room 111


PUBLIC SCHOOL NO. 3




Maintenance Report


Element Description Condition

Ceiling Paint on plaster Paint peeling
Plaster patched at northwest corner


Paint on plaster


Paint on plaster with evidence of stud wall
with drywall under the plaster.
Wood baseboard up to door.


Paint on plaster


Paint on plaster


Painted clay tile baseboard all walls


Paint peeling and mildewed
Plaster hairline cracks
Baseboard painted

Paint peeling and mildewed
Plaster hairline cracks
Wood baseboard painted



Paint peeling and mildewed
Plaster hairline cracks




Paint peeling and mildewed
Plaster hairline cracks
Baseboard painted black


Walls:


north


east


south


west


"M9
.=-_ -- _F --- '-^ -- r-*6'



,,,,,_t
























Page 0066


Element Description Condition

Floor


Windows


Vinyl asbestos tile


West wall 1 bay, 2 section pained wood
awnings 9/9
Eye pull and latch-type lock, painted concrete
sill


Peeling


k Ill
Page 0066





















Page 0067


Element


Doors


7


Description


I 7


North wall evidence of door, painted wood
door frame and casing.
East wall evidence of door, painted wood
door frame and casing.


_ _ _ _ _ _It


Systems


Ceiling 2 incandescent fixtures (2 bulbs
each) with exposed conduit, drainpipe hanging
at southeast corner 2 pipe penetrated ceiling
south of windows.

North light switch with exposed conduit
west of door.
East drain thru wall north of door, square
screen covered vent near ceiling.
South -
West evidence of radiator below window.
Two water supply lines south of window.


Condition


Door missing


















Page 0068

Floor -
hifH1-^


Room 112


PUBLIC SCHOOL NO. 3




Maintenance Report


Element Description Condition

Ceiling
Paint on plaster Paint mildewed and peeling


Paint on plaster




Paint on plaster




Paint on plaster





Paint on plaster

Paint wood baseboard and shoe, painted
picture molding all walls.


Paint peeling and mildewed
Plaster hairline cracks and
near ceiling.


Paint peeling and mildewed
Plaster cracks and spelling
near ceiling.


some spelling




with patch


Paint peeling
Plaster patched at regular intervals over
entire wall.



Paint peeling
Plaster spelling and patched at regular
intervals at south end.


Walls:


north


east





south





west


--~--------
























Page 0069


Element Description Condition

Floor
Vinyl asbestos tile Chipped and peeling


Windows


North wall 5 bays, painted tripl awning, 9/9/9
t-bar latch, hand pull and eye pull, painted
wood frame and casing, painted concrete sill.

South wall 2 painted center pivot wood
transom, 6 lites, eye pull latch.


Paint peeling on all frames, hand pulls
and t-bars missing, 15 broken lites.


Paint peeling
2 lites broken































South wall painted wood door frame and casing,
painted center pivot transom, 6 lites, eye
pull latch.


Ceiling 2-14 tube rows of
fixtures.


flourescent


North steam pipes at east and west end.
Evidence of radiator under windows.


Door missing
Paint peeling
Wood on frame splintered.



























~~ tl...



















.4.







P.














Lkfl
: ri~ ~ ~l~C~Z~ a i~ a ~ T

















Page 0071

Floor 1


Room 112A



Element


Ceiling


Description


PUBLIC SCHOOL NO. 3

Maintenance Report


r *Maintenance Report
;I ,,,_.'


I


Paint on plaster


-I I


Walls:


north


east




south




west


Paint on plaster




Paint on plaster
Metal coat rack at 4' height




Paint on plaster




Paint on plaster, window at south end, metal
cast rack below
Steam pipes (2) midwall at floor.


Condition


Paint peeling
Plaster spelling
Water damage northeast corner


Paint peeling
Plaster spelling
Water damage at ceiling


Paint peeling
Plaster severe spelling at base




Paint peeling
Plaster evidence of patching at both
base and ceiling.


Paint peeling
Plaster spelling






















Page 0072


Element Description Condition

Floor Vinyl asbestos tile Tile chipped and peeling



















Windows


West wall painted wood double awning type,
9/9, two in single bay. T-bar latch, hand
pull (lower) and eye pull (upper). Painted
wood frame and casing; painted concrete sill.


Windows are operable.
Paint chipped and peeling
















Page 0073


I I


Description


None


Systems
Ceiling sintle incandescent fixture (1 bulb)
in center.

West wall steam pipes (2) midwall at floor.


Condition


Element


Doors


I ----I



















Page 0074 PUBLIC SCHOOL NO. 3


Floor 1


Room 113 I Maintenance Report



Element Description Condition

Ceiling
Paint on plaster Paint peeling
Plaster cracking
Mildew


Paint on plaster
(refer to north wall


room 102)


Paint on plaster
Evidence of chalkboard and frame with plaster
scratch coat beneath opening 5' from north-
east corner exposed conduit and 2 junction
boxes to right of opening.

Paint on Plaster
Wood door with transom (2 lights with pull-eye
latches), Evidence of chalkboard and frame
with plaster scratch coat beneath.

Paint on plaster
Evidence of chalkboard and frame with plaster
scratch coat beneath.


Paint -
Plaster
Mildew


peeling
- spelling


Paint peeling
Plaster spelling
Mildew
Patch at ceiling line


Paint -
Plaster
Mildew
Transom


peeling
- spelling

operable, door removed.


Paint peeling
Plaster spelling
Lath exposed in scratch coat; mildew


Walls:


north


east





south





west























Vinyl asbestos tile


Windows


(Refer to Room 102)


Windows operable; intact except for mid-
sash hand pulls.


Floor


Peeling




















page 0076


Element


Doors


Systems


Description


Condition


I- t


Door closer and hardware


Ceiling 2 rows of 6
fixtures.


two-tube flourescent


North wall evidence of radiator
East wall exposed conduit with 2 junction
boxes.
South wall junction box to right of door.
West wall exposed conduit from floor to
scratch coat (behind removed chalkboard)
at mid-point. Exposed conduit at ceiling
from corner to mid-point, then down to
scratch coat at clock backing plate.


Door missing


Removed




Clock removed







































: 11


1.

























:. ; -:' ":
1::
:






i



i
9











r

;-















































i








j
i






"'
;"'

















Page 0077 PUBLIC SCHOOL NO. 3


Floor ___


Room 113A LMaintenance Report



Element Description Condition

Ceiling
Paint on plaster Paint peeling
Plaster spelling; some plaster fallen
to expose structure above.
Mildew


Paint on plaster
Double awning window at midpoint


Paint on plaster
Metal coat rack running
4' height.


length of wall at


Paint on plaster
Acess hatch into mechanical shaft midwall
at floor



Paint on plaster
Metal coat rack south of opening


Paint peeling
Mildew


Paint peeling
Mildew
Coat rack peeling and rusting



Paint peeling
Plaster spelling worst around hatch
opening. Evidence of patching near ceiling
Water damage near ceiling; mildew.


Paint peeling
Plaster spelling
Patching in southwest corner near ceiling
Mildew


Walls:


north


east





south





west


















Page 0079


Element Description Condition

Doors None


















Systems
Ceiling single-bulb incandescent fixture
at mid-ceiling.

Exposed conduit southeast corner.
















Page 0080 PUBLIC SCHOOL NO. 3

Floor 1 ------

Room 114 I Maintenance Report


Element Description Condition
Ceiling
Paint on plaster Paint peeling
Plaster spelling


Paint on plaster
Two bays triple awning windows at midwall


Paint on plaster
Door opening at midwall with evidence of
previous side lights and transom (now boarded)


Paint on plaster
Evidence of previous wall clock at midwall


Paint on plaster


Paint peeling
Plaster spelling
Mildew
Substantial water damage below windows.


Paint -
Plaster
Mildew


Paint -
Plaster
Mildew

Paint -
Plaster
Mildew


peeling
- spelling



peeling
- spelling


peeling
- spelling


Walls:


north



east




south




west


j

















Page 0081
Page


Element Description Condition

Floor Vinyl asbestos tile Peeling


Windows


2 bays, wood frame triple awning windows,
9/9/9. t-latch lower, pull handle center
(missing), eye pull upper, painted frame and
casing; painted concrete sill.


Considerable water damage and dry rot.




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - Version 2.9.7 - mvs