Title: Line Item Budget, Plaza Projects for City of St. Augustine, Florida
ALL VOLUMES CITATION MAP IT! PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00095532/00001
 Material Information
Title: Line Item Budget, Plaza Projects for City of St. Augustine, Florida Flagstaff Monument
Series Title: Historic St. Augustine: Flagstaff Monument
Physical Description: Maintenance record
Language: English
Publication Date: 1988
Physical Location:
Box: 8
Divider: Historic Resources (Condition & Recommendation Reports)
Folder: Flagstaff Monument
 Subjects
Subject: Saint Augustine (Fla.)
48 King Street (Saint Augustine, Fla.)
Government House (Saint Augustine, Fla.)
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 48 King Street
Coordinates: 29.892465 x -81.313142
 Record Information
Bibliographic ID: UF00095532
Volume ID: VID00001
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text





LINE ITEM BUDGET

PLAZA PROJECTS FOR CITY OF ST.AUGUSINE, FLORIDA

July 13, 1988


FLAGSTAFF MONUMENT

1.0 Inspect flagstaff base.
1.1 Crane service to lift........................
1.2 Inspection time (RHS 8 hr)...................
1.3 Photographic documentation...................
1.4 Write report, est. costs (RHS 8 hr)..........
1.5 Overhead & Profit............................
TOTAL ........................................

2.0 Non-destructive testing, if determined necessary after
visual inspection.

2.1 Engineering calculations.....................
2.2 Testing equipment............................
2.3 Bucket truck rental (6 hr.)..................
2.4 Testing time (RHS 8 hr.)......................
2.5 Write report, est. costs (RHS 8 hr.) .........
2.6 Overhead & Profit.............................
TOTAL ........................................

3.0 Conduct historic research.

3.1 Archival research ............................
3.2 Write report...................................
3.3 Overhead & Profit.............................
TOTAL.........................................

4.0 Repair and/or replace stucco on steps & drum.

4.1 Field trials to determine mix (RHS 16 hr)....
4.2 Demolition...................................
4.3 Masonry materials............................
4.4 Mason labor..................................
4.5 Documentation of work (RHS)..................
4.6 Preparation of final report..................
4.6 Overhead & Profit............................
TOTAL ........................................

NOTE: This estimate assumes that neither the flagstaff nor its
associated base will have to be removed or replaced.

5.0 Clean & wax bronze cylinder.

5.1 Contract with conservator....................
5.2 Overhead & Profit.............................
5.3 TOTAL ........................................




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs