 Material Information
Title: Communications from the Department of General Services
Series Title: Historic St. Augustine: PROJ: Gov't House - Correction of Fire Code Def. & other imp.
Physical Description: Correspondence
Language: English
Publication Date: 1985
Physical Location:
Box: 8
Divider: DOC-8449 G.H.-Corrections of Fire Code Def.
Folder: PROJ: Gov't House - Correction of Fire Code Def. & other imp.
 Subjects
Subject: Saint Augustine (Fla.)
48 King Street (Saint Augustine, Fla.)
Government House (Saint Augustine, Fla.)
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 48 King Street
Coordinates: 29.892465 x -81.313142
 Record Information
Bibliographic ID: UF00095501
Volume ID: VID00018
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text

STATE OF FLORIDA
DEPARTMENT OF

GENERAL SERVICES
Larson Building, Tallahassee 32301
Ronald W. Thomas, Executive Director


CORRECTED COPY 7/25/85


DIVISIONS
* ADMINISTRATION
* BOND FINANCE
* BUILDING CONSTRUCTION
AND PROPERTY MANAGEMENT
* COMMUNICATIONS
* INFORMATION
SERVICES


* MOTOR POOL
* PURCHASING
* SAFETY AND
CRIME
PREVENTION
* SURPLUS
PROPERTY


Please address reply to:
Bureau of Construction
512 Larson Building


July 23, 1985


Boyer & Boyer Architects
1614 Mayfair Road
Jacksonville, Florida 32207


Re: Correction of Life Safety Violations
Government House
St. Augustine, Florida
State Project No. DOS-8449

BIDDING DOCUMENTS ADVERTISING AND BIDDING APPROVAL

Approved Construction Budget $63,735
Approved Construction Time 120 Calendar Days
Professional Estimate Base Bid $61,650


pEGE1IVA,11 E
o6p, ,TAMW"tr W STrA1M
a^ 6/





}4 2


Gentlemen:

The bidding documents and supporting data for this project have been
reviewed and are approved for release for bidding subject to the
remarks or exceptions attached. This approval is based upon your
assurance that an acceptable base bid will be received within the
approved construction budget. The approval does not imply respon-
sibility for nor attest to compliance with the applicable provisions
of the Fire Safety Standards of the State Building Code, accessibility
standards, applicable codes, rules, regulations, laws and ordinances,
and program requirements and does not relieve the design professional
or his consultants of any of their responsibilities.

The remarks and exceptions are to be responded to, item by item, in
writing within one week.

You are authorized to release the project for bid. The bidding date,
time and location is shown in the attached advertisement. Please
ensure this advertisement is placed in appropriate local newspapers
and inserted in each project manual as it is distributed.

Personally solicit bidder participation by telephone and by use of
individually addressed Invitations to Bid. Each invitation shall be
typed on your letterhead in the prescribed format.


Bob Graham
Governor


'Jim Sr Ge
A'"OrlO. Genera


George Firestone
Secretary of State


Gerald A Lews
ComDlrrc!er


RalDh D Trlh-c!cn
I ~ ~ _1 1 7 1


9 r" G.- C
















Boyer & Boyer Architects
July 23, 1985
Page Two


Be sure to transmit to the Project Director all addenda as they
are issued. Please prepare bid tabulation forms in the prescribed
format for distribution to bidding officials and bidders at the
bid opening. A sample form is attached for your information.

If you have any questions, please contact me.

Sincerely,



than Nadler
Project Director
Project Development Section
Bureau of Construction

NN/ejs

Attachments


cc: -fector Miron
Robert L. Woodward
Thomas A. Sechler
MIS
Ray Lambert
Joe Johnston


ENDORSEMENT:




AdTeinistrator
Technical Evaluation Section


EN RSE ENT:




Desin\-d Construction Manager
Project Development Section





STATE OF FLORIDA


DEPARTMENT OF

GENERAL SERVICES
Larson Building, Tallahassee 32301

Ronald W. Thomas, Executive Director




July 23, 1985





Boyer & Boyer Architects
1614 Mayfair Road
Jacksonville, Florida 32207


DIVISIONS
* ADMINISTRATION
* BOND FINANCE
* BUILDING CONSTRUCTION
AND PROPERTY MANAGEMENT
* COMMUNICATIONS
* INFORMATION
SERVICES


* MOTOR POOL
* PURCHASING
* SAFETY AND
CRIME
PREVENTION
* SURPLUS
PROPERTY


Please address reply to:
Bureau of Construction
512 Larson Buildin -...-






t 9000


S Fg snM
~i~alPC~ hpawCATE


Re: Correction of Life Safety Violations
Government House
St. Augustine, Florida
State Project No. DOS-8449


BIDDING DOCUMENTS ADVERTISING AND BIDDING APPROVAL

Approved Construction Budget $75,000
Approved Construction Time 120 Calendar Days
Professional Estimate Base Bid $72,000


I


Gentlemen:

The bidding documents and supporting data for this project have been
reviewed and are approved for release for bidding subject to the
remarks'or exceptions attached. This approval is based upon your
assurance that an acceptable base bid will be received within the
approved construction budget. The approval does not imply respon-
sibility for nor attest to compliance with the applicable provisions
of the Fire Safety Standards of the State Building Code, accessibility
standards, applicable codes, rules, regulations, laws and ordinances,
and program requirements and does not relieve the design professional
or his consultants of any of their responsibilities.

The remarks and exceptions are to be responded to, item by item, in
writing within one week.

You are authorized to release the project for bid. The bidding date,
time and location is shown in the attached advertisement. Please
ensure this advertisement is placed in appropriate local newspapers
and inserted in each project manual as it is distributed.

Personally solicit bidder participation by telephone and by use of
individually addressed Invitations to Bid. Each invitation shall be
typed on your letterhead in the prescribed format.


George Firestone
Secretary of State


Gerald A Lewis
ComDpro!ler
Ralph D Turlinglon
f' -' f^- qeior-r -) Flud -w cr


Bob Graham
Governor


Jim S'rl'l
A!!ornev Ge-era


Bif! Gunter
- a' P. Tr3,J.














Boyer & Boyer Architects
July 23, 1985
Page Two

Be sure to transmit to the Project Director all addenda as they
are issued. Please prepare bid tabulation forms in the prescribed
format for distribution to bidding officials and bidders at the
bid opening. A sample form is attached for your information.

If you have any questions, please contact me.

Sincerely,


Nathan Nadler
Project Director
Project Development Section
Bureau of Construction

NN/ejs

Attachments


cc:'-Hector Miron
Robert L. Woodward
Thomas A. Sechler
MIS
Ray Lambert
Joe Johnston

ENDORSEMENT:



Administrator
Technical Evaluation Section


ENE RE ENT:



esl n\n6d Construction Manager
Project Development Section





DIVISIONS


STATE OF FLORIDA


ADMINISTRATION MOTOR POOL
DEPARTMENT OF o E BOND FINANCE PURCHASING
BUILDING CONSTRUCTION SAFETY AND
GENERAL SERVICES IAND PROPERTY MANAGEMENT CRIME
i f e* COMMUNICATIONS PREVENTION
Larson Building, Tallahassee 32301 INFORMATION *SURPLUS
Ronald W. Thomas, Executive Director SERVICES PROPERTY
Please address reply to:
July 23, 1985

RE: Correction of Life Safety Violations
Government House
St. Augustine, Florida
State Project DOS-8449


Project Director's Comments and Questions of 100% Construction Documents
Refer to Drawings.

DRAWINGS

A. Drawing 1, Plans No. 1, 2 and 3 "Cross in a circle", symbol is
presumed to be exit light. If so, the symbol is not explained nor is
it clear whether it is new or existing.

B. Drawing 1, Plan 1 Should there be a lighting fixture on the exterior
above the new exit door? If you agree, show fixture and required
electric wiring.

C. Drawing 1, Plan 4 Should there be an exit light in stairwell above
door No. 15?

D. Drawing 1, Section C/l, D/l, Dwg. 2, Section F-2 and G-2 Describe
stair railing in more detail.

E. Drawing 1, Section B-l Instructions are given to contractor to
connect new floor drain to existing sewer. Indicate location of
existing sewer.
Indicate thickness of new areaway block wall and show block reinforc-
ing (if any).

F. Drawing 1, Item 3 I see no purpose in retaining a full height
partition in the corridor at head of stair. The visibility of the
stair is impaired by this partition and notwithstanding the separation,
it is possible to go by the stair without seeing it.

I suggest cut partition down to 3'a6" from 4'-0" rail height or remove
entirely and install more typical metal railing.

G. Drawing 2, Section 1/2, 2/2, 3/2 Is there such a product called
"urethane caulk"?

H. Drawing 2, Section 2/2 Is there no wood trim on interior of door
casing?




Bob Graham Jim Smith George Firestone Gerald A Lewri
Governor Attorney General Secretary of State Comptroller


Doyle Conner
Cornmissioner of A r culture


Ralph D Turlington
Commissioner of Education


Bill Gunter
Slate Treasurer














P.D. Comments & Questions
100% Construction Documents
DOS-8449
July 23, 1985
Page Two


I. Drawing 2, Exterior Door No. 1 Are you sure you mean 3/4" lag
screws? That is the size of the shank of the lag, not the head!
Seems excessively large.

J. Drawing 2, Section 12/2 Show height of treads and risers and
landing.

SPECIFICATIONS

K. Change the title of the project, thruout to "Correction of Life
Safety Violations".

L. Change the number of the project to DOS-8449 wherever it appears.

M. Page 5 Paragraph B-2, in blank space reserved for contractor
designation, insert, "Building/General".

N. Page 15, Paragraph B-25, Insert 120 days in blank space reserved
for substantial completion and 30 days for final completion. Insert
$75 for liquidated damages amount.

O. Page 67 Paragraph 8.4.2 Insert 4.3 in blank space.

P. Page 03010 Paragraph Termite Control, delete this paragraph.

Q. Add specification for sealants and caulking. Can't find any
specification on this.





Nathan Nadler
Project Director

NN/ejs








ADVERTISEMENT FOR BIDS

PROPOSALS ARE REQUESTED FROM QUALIFIED BUILDING/GENERAL

CONTRACTORS BY THE STATE OF FLORIDA DEPARTMENT OF GENERAL

SERVICES DIVISION OF BUILDING CONSTRUCTION FOR THE CONSTRUCTION

OF

PROJECT: CORRECTION OF LIFE SAFETY VIOLATIONS, GOVERNMENT HOUSE

PROJECT NO: DOS-8449

FOR: ST. AUGUSTINE PRESERVATION BOARD

PREQUALIFICATION: All bidders must submit prequalification data

of their eligibility to submit proposals five (5) calendar days

prior to the bid opening date if not previously qualified by the

Division for the current biennium (July 1 thru June 30) of odd

number years. Sealed bids will be received, publicly opened and

read aloud on:

DATE AND TIME: August 20, 1985, Until 2:00 P.M. local time

PLACE: Conference Room, Government House, St. Augustine

Preservation Board 48 King Street, St. Augustine, Florida

PROPOSAL: Bids must be submitted in full in accordance with the

requirements of the Drawings, Specifications, Bidding Conditions

and Contractual Conditions, which may be examined and obtained

from the:

ARCHITECT-ENGINEER: Boyer & Boyer, Architects, 1614 Mayfair Road,

Jacksonville, Florida 32207

TELEPHONE: 904-398-3922

CONTRACT AWARD: The recommendation for contract award will be

posted in Room 512, Larson Building, Tallahassee, Florida. The

contract will be awarded by the Executive Director, Department

of General Services.

APPROPRIATION NO: 1-725-8449





DIVISIONS
STATE OF FLORIDA DIVISIONS
ADMINISTRATION MOTOR POOL
DEPARTMENT OF ESp. BOND FINANCE PURCHASING
BUILDING CONSTRUCTION SAFETY AND
GENERAL SERVICES AND PROPERTY MANAGEMENT CRIME
COMMUNICATIONS PREVENTION
Larson Building, Tallahassee 32301 INFORMATION SURPLUS
9 Wu *ll *INFORMATION *SURPLUS
Ronald W. Thomas, Executive Director SERVICES PROPERTY
Please address reply to:
July 23, 1985

RE: Correction of Life Safety Violations
Government House
St. Augustine, Florida
State Project DOS-8449


Project Director's Comments and Questions of 100% Construction Documents
Refer to Drawings.

DRAWINGS

A. Drawing 1, Plans No. 1, 2 and 3 "Cross in a circle", symbol is
presumed to be exit light. If so, the symbol is not explained nor is
it clear whether it is new or existing.

B. Drawing 1, Plan 1 Should there be a lighting fixture on the exterior
above the new exit door? If you agree, show fixture and required
electric wiring.

C. Drawing 1, Plan 4 Should there be an exit light in stairwell above
door No. 15?

D. Drawing 1, Section C/l, D/l, Dwg. 2, Section F-2 and G-2 Describe
stair railing in more detail.

E. Drawing 1, Section B-l Instructions are given to contractor to
connect new floor drain to existing sewer. Indicate location of
existing sewer.
Indicate thickness of new areaway block wall and show block reinforc-
ing (if any).

F. Drawing 1, Item 3 I see no purpose in retaining a full height
partition in the corridor at head of stair. The visibility of the
stair is impaired by this partition and notwithstanding the separation,
it is possible to go by the stair without seeing it.

I suggest cut partition down to 3'-6" from 4'-0" rail height or remove
entirely and install more typical metal railing.

G. Drawing 2, Section 1/2, 2/2, 3/2 Is there such a product called
"urethane caulk"?

H. Drawing 2, Section 2/2 Is there no wood trim on interior of door
casing?




Bob Graham Jim Smith George Firestone Gerald A Lewis
Governor Attorney General Secretary of State Comptroller


Doyle Conner
Commissioner of Aoriculture


Ralph D Turlington
Commissioner of Education


Bill Gunter
State Treasurer














P.D. Comments & Questions
100% Construction Documents
DOS-8449
July 23, 1985
Page Two


I. Drawing 2, Exterior Door No. 1 Are you sure you mean 3/4" lag
screws? That is the size of the shank of the lag, not the head!
Seems excessively large.

J. Drawing 2, Section 12/2 Show height of treads and risers and
landing.

SPECIFICATIONS

K. Change the title of the project, thruout to "Correction of Life
Safety Violations".

L. Change the number of the project to DOS-8449 wherever it appears.

M. Page 5 Paragraph B-2, in blank space reserved for contractor
designation, insert, "Building/General".

N. Page 15, Paragraph B-25, Insert 120 days in blank space reserved
for substantial completion and 30 days for final completion. Insert
$75 for liquidated damages amount.

O. Page 67 Paragraph 8.4.2 Insert 4.3 in blank space.

P. Page 03010 Paragraph Termite Control, delete this paragraph.

Q. Add specification for sealants and caulking. Can't find any
specification on this.





Nathan Nadler
Project Director

NN/ejs








ADVERTISEMENT FOR BIDS

PROPOSALS ARE REQUESTED FROM QUALIFIED BUILDING/GENERAL

CONTRACTORS BY THE STATE OF FLORIDA DEPARTMENT OF GENERAL

SERVICES DIVISION OF BUILDING CONSTRUCTION FOR THE CONSTRUCTION

OF

PROJECT: CORRECTION OF LIFE SAFETY VIOLATIONS, GOVERNMENT HOUSE

PROJECT NO: DOS-8449

FOR: ST. AUGUSTINE PRESERVATION BOARD

PREQUALIFICATION: All bidders must submit prequalification data

of their eligibility to submit proposals five (5) calendar days

prior to the bid opening date if not previously qualified by the

Division for the current biennium (July 1 thru June 30) of odd

number years. Sealed bids will be received, publicly opened and

read aloud on:

DATE AND TIME: August 20, 1985, Until 2:00 P.M. local time

PLACE: Conference Room, Government House, St. Augustine

Preservation Board 48 King Street, St. Augustine, Florida

PROPOSAL: Bids must be submitted in full in accordance with the

requirements of the Drawings, Specifications, Bidding Conditions

and Contractual Conditions, which may be examined and obtained

from the:

ARCHITECT-ENGINEER: Boyer & Boyer, Architects, 1614 Mayfair Road,

Jacksonville, Florida 32207

TELEPHONE: 904-398-3922

CONTRACT AWARD: The recommendation for contract award will be

posted in Room 512, Larson Building, Tallahassee, Florida. The

contract will be awarded by the Executive Director, Department

of General Services.

APPROPRIATION NO: 1-725-8449




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs