Group Title: Historic St. Augustine: Block 12 – Lot 19
Title: Paredes/Dodge Restoration, Preliminary Cost Estimate
ALL VOLUMES CITATION MAP IT! THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00094126/00060
 Material Information
Title: Paredes/Dodge Restoration, Preliminary Cost Estimate San Agustin Antiquo Foundation
Series Title: Historic St. Augustine: Block 12 – Lot 19
Physical Description: Maintenance record
Language: English
Publication Date: 1988
Copyright Date: Public Domain
Physical Location:
Box: 4
Divider: Parades-Dedge House, Lot 19 Block 12
Folder: Parades-Dodge Painting
 Subjects
Subject: Saint Augustine (Fla.)
54 Saint George Street (Saint Augustine, Fla.)
Parades-Dodge House
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 54 Saint George Street
Coordinates: 29.896092 x -81.313202
 Record Information
Bibliographic ID: UF00094126
Volume ID: VID00060
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
Resource Identifier: B12-L19

Full Text



r`.~-


PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE

SAN AGUSTIN ANTIQUO FOUNDATION

JULY 5, 1988


1. PRELIMINARY RESEARCH ALLOWANCES

1. Historic/ Architectural Research

A. Staff labor

2. Archeological Research

A. Staff labor

3. Paint analysis, $75 first,$50 each after

4. Record architectural details
Qez^ tYw^-


2. SITE WORK

1. Landscape rear garden (hist oric)

A. Staff labor

2. Remove second story 1949 partitions

A. Staff labor

3. Remove second. story floor, 1949 addition

A. Staff labor

4. Remove building in rear yard

A. Staff labor


3.& 4. CONCRETE AND MASONRY

1. Grind and repair tabby flocr.

VkCO eg, ^^.^ a^ S7^ -yl^


200 hrs.


9/ -
(150) hrs.

$575

$1,000

k " I


$3, 500

100 hrs.



40 hrs.



40 hrs.



45 hrs.


$1, 800 ) L
Iool


L-7














5. METALS

1. Remove later iron grates on windows

A. Staff labor


6. ROUGH AND FINISH CARPENTRY

1. Rebuild roof rafters, replace inappropriate I1

material with accurate reproductions

2. Remove shingles and replace with hand split

shakes. 11 squares at $127 each. Material cost:

3. Labor to ra-~cs-e and correct later overhang &

front facade work.

4. Re-build rear room and stairs

S, -~ !, A F


'-N.. '


7. DOORS AND WINDOWS

1. Replace front windows, first story

2. Repair, restore second story windows



8. FINISHES

1. Repair or replaster interior

2. Repair plaster on front exterior

3. Paint exter ior Mater ials.

A. jS* labor

4. Paint interior Materials

A. Sta-ff iabor


/aY


water

$4,300 '



$1,397 53



$4, 10 0

A $5,400,









$3,600

$2,0 (00

/



$2,600 Lt( '

$1,000

$200 500

90 hrs.12

$350 r E

175 hrs.1


7i


15 hrs.
















8. FINISHES, CONT.

5. Repair, restore, or replace interior details. o

Remove later inappropriate additions.Materials: $2 .X0 q,~C)

A. Staff labor 220 hrs.

tA)j.' LA -k lc>J \v


9. MECHANICAL

1. Remove existing plumbing
Z. f ,lj v \cA\\ tA a. -


10. ELECTRICAL

1. Remove and reconfigure electrical service

2. Rewire electrical S .r i__ s\^^ \C



11. CONTINGENCY COSTS (10%)



TOTAL CONSTRUCTION COSTS


/ 3tuk4


$1, 200 2.. -

-, $1,000 \/l -



$3,692



$40,614


NOTE: This estimate represents the minimum restoration costs for

the Paredes/Dodge House. If special load testing analyses are

required an additional $3,000 would be spent.

This estimate also includes a minimum of 1,100 Staff hours and

that figure could double depending upon unexpected expenses.







* A fllflH TT HU0 9 fl SET (TflL .ORfSt IflC.

83 ORANGE STREET P. O. BOX 67
TELEPHONE (904) 829-3071/824-9022
ST. AUGUSTINE, FLORIDA 32085

ESTIMATE CONTRACT


TO Historic St. Augustine Preservation Board JOB NAME
P.O. Box 1987 ADDRESS 54
St. Aug., Fl. 32085 ARCHITECT

DA'tt: Hector Miron DATE OF PLANS
June 25, 1987


St. George St.


We are pleased to submit an estimate on above named job for the following:

We propose to remove all asbestos shingles and flat roofing and install a new roof
of hand-split fire-retardant wood shakes with copper flashings and 30# felt under-
layment.

Any deteriorated wood will be an extra cost and replaced at a cost-plus rate.

Clean up and haul away all debris.

Total Cost------------$7,400.00.


option #1:


Install 300# fiberglass dimensional shingles in lieu of wood shakes
$3,800.00.


All of the above labor, material and services to be performed for the sum of $ a. abonvP


As further conditions to this estimate, it is understood that we will not be responsible for delays caused by conditions beyond our
control; that this proposal may be withdrawn by us if not accepted within -30- days from this date; that any
alteration or deviation from the above named items or either of them will become an extra charge over and above the sum quoted above, which charge
you will pay within ten (10) days after same has accrued; that this estimate when signed by us and accepted and signed by you constitutes an entire
and binding contract between us; and that if any obligation hereunder is enforced by action at law or in equity then the party against whom such is
enforced agrees to pay all costs including reasonable attorney's fees.


Respectfully submitted,


ARNETT


ACCEPTANCE OF ESTIMATE
The foregoing terms, conditions and specifications are hereby accepted and agreed to as a valid and binding contract and
hereby authorize you to execute same.


Dated this day of A.D. 19--

ORIGINAL To Be Returned to ARNETT ROOFING & SHEET METAL WORKS, INC.
DUPLICATE To Be Retained by Customer
Sand.rd Prifntin & Offic Supply, Imc.


.. .. ---------------


- V.Y.


--**R as follows:


Ir r !v O







--/j - ----.'--*- -- / --/----- ,9- /i -
----- '-4 S- 2'-6 -(- ^414 9-- -i-31/09-t9' -----'"-------t---- 71//


^/ -//' /// /// // /////

//







-. a '
". // / / ///





od ;L 1 / //
__*/ // //








'//









'-I

/ ,^L-

-fA_
4'6t ++





S'-4"


Garden


5'-/ -L/0 '-/0 --


Dec
Deck


Ne&w Dormer


BATH /

0Vp


K THEN


5'-//" gead room


T


S

-'Cl
N


- i

SI-
T








T.


.i


6'0-" Head room





rD a


S i




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs