Title: Memo to Dr. Robert Gold re: Paredes/Dodge Restoration
Series Title: Historic St. Augustine: Block 12 – Lot 19
Physical Description: Correspondence
Language: English
Creator: Scott, David
Publication Date: 1988
Copyright Date: Public Domain
Physical Location:
Box: 4
Divider: Parades-Dedge House, Lot 19 Block 12
Folder: Parades-Dodge Façade
 Subjects
Subject: Saint Augustine (Fla.)
54 Saint George Street (Saint Augustine, Fla.)
Parades-Dodge House
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 54 Saint George Street
Coordinates: 29.896092 x -81.313202
 Record Information
Bibliographic ID: UF00094126
Volume ID: VID00043
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
Resource Identifier: B12-L19

Full Text





/





MEMO

TO: DR. ROBERT GOLD

FROM: DAVID SCOTT t I

DATE: 06/29/88

SUBJECT: PAREDES/DODGE RESTORATION



Here is the preliminary proposed budget for restoration of the

Paredes/Dodge house at 54 St. George St. Please note that it

includes 1,050 hours of in house labor, in both research and

construction. It is through extensive in house labor that an

economical restoration is possible.



A benefit, other than just saving money, of in house labor is it

would allow us a great deal of control over the outcome of the

project. I would hope that such control would assure us of a

quality product that would reflect positively on the Foundation

and the Revolving Fund Restoration Program.



I have had Herschel Shepard take a look at the budget proposal

and he thought it was reasonable, though he did not have time to

visit the house. I hope to have Ted Clark take a look at the

electrical elements in the budget to make sure that we are within

the ball park-.F 2-$i- H 2


Will this be enough for you to take to the Board of Trustees? If

you need more, please let me know.















e Replace front windows, 1st. story $3,600

7 O Repair, restore 2nd story windows $2,000

S, \ Paint exterior, materials $200

L Labo, r, .- e 90 hrs.

Paint interior, materials $350

L abor, 4 aouE 175 hrs.

SRepair all interior details, materials $2,000

A abor, i uu=se 220 hrs.

Landscape rear garden (historic), 1 -- Ih. .n- -- $3,500
A. rrA:Ff (A&o1. J40o /4S


I Contingency. 10.% Ots 9S ^ PI- ez z'raO r $3,692

TOTAL $40,614















PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE


TASK UNIT $

iL' f"'_ -Hist'oric/Architectural Research 200 hrs.

S Record Architectural Details

Paint analysis $75 first,$50 each after

Archeological search 150 hrs.
yl-P" ^" A


CONSTRUCTION

Remove 1949 additions;


rear window 30 hrs.


/ j, plumbing contract

/ 2., electrical contract

m 3, -rd story floor 40 hrs.

9 2Lt 2 story int. partitions 40 h

-Lnc buildings in yard 45 hrs.

Bui i di ng:

S-- / Rebuild roof rafters,replace inappropriate later

A material with accurate reproductions.

A_ ,Remove shingles and replace with hand split

shakes. 11 squares at $127.par. materialC r

( --^j Labor to re-roof and correct later

Soverhang & front facade work.

Re-configured electrical, contract

SRe-build rear room and stairs

Repair or replaster interior

3 I b Grind and repair tabby floor

q &* Repair plaster on front exterior


$900

$1,200

irs.n in house

rs. in house

in-houSe- Sr&VrYr


$4,300



$1,397



$4,100

$1,000

$5,400

$2,600

$1,800

$1,000:


BALANCE

in hWiiair gTM

$1,000

$575

4ie-hour SJTA-PX-










SHEPARD
ASSOCIATES

ARCHITECTS
& PLANNERS
SNCORPO ATLE





PRELIMINARY COST ESTIMATE
MINIMUM RESTORATION AND ADAPTIVE USE
THE TOVAR HOUSE AS A FLORIDA NATIONAL GUARD MUSEUM

OWNER: ST. AUGUSTINE HISTORICAL SOCIETY
LESSEE: FLORIDA NATIONAL GUARD


1. BASE BID, ALTERNATES, ALLOWANCES $5,000

All work to be Included In base bid.
Provide $5000 contingency for unknowns.

2. SITE WORK 1,000

Remove rejas and repair sidewalk.
Remove unwanted material from Interior.
Demolish and remove existing rear exterior stair,
enclosing walls, first floor slab
Remove exhaust fan construction at opening on north
elevation.

3. CONCRETE 1,000

Provide new footings, pedestals and landing at
7 grade for new rear exterior stair.
Patch concrete floors as required for new electrical
and plumbing.

4. MASONRY

Repair damaged coquina. 1,000

5. METALS

^ None.







HERSCHEL E. SHEPARD FAIA
2111 CORPORATE SQUARE BOULEVARD (904) 721-2111 JACKSONVILLE, FLORIDA 32216


--- -








6. ROUGH AND FINISH CARPENTRY


Revise partition and floor a+ ups+tars toilet room-
Restore windows, shutters, and doors to operable condition.
(Assume 28 openings at $500 per opening)
Provide new fireplace frontispieces where required.
Restore balcony, using existing configuration (not to be
accessible to public or restored to code).
Provide new exterior wooden stair.
Restore and patch miscellaneous Items.


7. MOISTURE AND THERMAL CONTROL 2,000

Provide new roofing at restored balcony.

8. DOORS AND WINDOWS 7,000

Provide one new reconstructed 6/9 window at exhaust fan
opening on north elevation.
Restore existing windows, shutters, and doors under
Carpentry.
Provide new hardware as required at all openings;
supplement existing where possible.

9. FINISHES 20,000

Assume new plaster is provided throughout (550 sq. yds.)
Patch existing stucco as required.
Refinish all exposed new and existing wood on the
exterior and Interior, including new exterior
stair, restored balcony, existing Interior
stair, fireplace frontispieces, wood floors,
exposed beams and ceilings, windows, shutters,
doors, millwork, and trim.
Paint selected areas of stucco; do not paint plaster.
Prevido shoot vinyl flooring In upstairs toilet room-


10. 14. NOT USED.

15. MECHANICAL

-Rer outer house drain and vont on Intorior of building.
Reactivate and recertify fire sprinkler system. f oA~
^.Revlso plumbing at upstairs toilet room

16. ELECTRICAL

Provide new underground service and subpanel from
existing panel and service.
Provide new baseboard circuits for exhibit lighting
and general Illumination by floor lamps.
Provide emergency alarm circuits.
Provide emergency lighting and exit lighting
(self-contained except at exterior stair).
Provide lighting at upstairs toilet room
Provide power circuits for portable quartz heaters
and maintenance equipment.


5,000





7,000


50,000










TOTAL CONSTRUCTION COSTS:


OR ASSUME $100,000

NOTE: The estimate above represents the approximate market value
of minimum construction work assumed to be required. If special
load testing and historic paint analyses are required, allow an
additional $8,000. Allow an additional $10,000 to $15,000 for
standard architectural and engineering fees.

Therefore, a preliminary budget which Includes all anticipated
design and construction costs at market value should equal
approximately $125,000 for the scope of work indicated above.



May 7, 1983


Herschel E. Shepard FAIA
Architect


GRAND TOTAL


99,000















PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE


TASK UNIT $

Historic/Architectural Research 200 hrs.

Record Architectural Details

Paint analysis $75 first,$50 each after

Archeological search 150 hrs.


CONSTRUCTION

Remove 1949 additions;


BALANCE

in house

$1,000

$575

in house


rear window 30 hrs. in house

plumbing contract $900

electrical contract $1,200

2nd story floor 40 hrs. in house

2nd story int. partitions 40 hrs. in house

buildings in yard 45 hrs. in house


Building:

Rebuild roof rafters,replace inappropriate later

material with accurate reproductions.

Remove shingles and replace with hand split

shakes. 11 squares at $127 per. material

Labor to re-roof and correct later

overhang & front facade work.

Re-configured electrical, contract

Re-build rear room and stairs

Repair or replaster interior

Grind and repair tabby floor

Repair plaster on front exterior


$4,300



$1,397



$4,100

$1,000

$5,400

$2,600

$ 1,800

$1,000
















Replace front windows, 1st. story $3,600

Repair, restore 2nd story windows $2,000

Paint exterior, materials $200

Labor, in house 90 hrs.

Paint interior, materials $350

Labor, in house 175 hrs.

Repair all interior details, materials $2,000

Labor, in house, 220 hrs.

Landscape rear garden (historic), 100 hrs.in house $3,500



Contingency, 10% $3,692

TOTAL $40E614










SHEPARD
ASSOCIATES

ARCHITECTS
& PLANNERS
INcor PO .RAT





PRELIMINARY COST ESTIMATE
MINIMUM RESTORATION AND ADAPTIVE USE
THE TOVAR HOUSE AS A FLORIDA NATIONAL GUARD MUSEUM

OWNER: ST. AUGUSTINE HISTORICAL SOCIETY
LESSEE: FLORIDA NATIONAL GUARD


1. BASE BID, ALTERNATES, ALLOWANCES $5,000

All work to be Included In base bid.
Provide $5000 contingency for unknowns.

2. SITE WORK 1,000

Remove rejas and repair sidewalk.
Remove unwanted material from Interior.
Demolish and remove existing rear exterior stair,
enclosing walls, first floor slab
Remove exhaust fan construction at opening on north
elevation.

3. CONCRETE 1,000

Provide new footings, pedestals and landing at
grade for new rear exterior stair.
Patch concrete floors as required for new electrical
and plumbing.

4. MASONRY

Repair damaged coquina. 1,000

5. METALS

None.







HERSCHEL E. SHEPARD FAIA
2111 CORPORATE SQUARE BOULEVARD (904) 721-2111 JACKSONVILLE, FLORIDA 32216


CC--i~i~ir~I- --~=~-"------~i---R~Y:~- ilLIY-IPL-'----~-^I ---11~-1I-I1-------~.- 1_1____ I








6. ROUGH AND FINISH CARPENTRY


Roevras partition and floor at upstair +toilet room
Restore windows, shutters, and doors to operable condition.
(Assume 28 openings at $500 per opening)
Provide new fireplace frontispieces where required.
Restore balcony, using existing configuration (not to be
accessible to public or restored to code).
Provide new exterior wooden stair.
Restore and patch miscellaneous Items.


7. MOISTURE AND THERMAL CONTROL 2,000

Provide new roofing at restored balcony.

8. DOORS AND WINDOWS 7,000

Provide one new reconstructed 6/9 window at exhaust fan
opening on north elevation.
Restore existing windows, shutters, and doors under
Carpentry.
Provide new hardware as required at all openings;
supplement existing where possible.

9. FINISHES 20,000

Assume new plaster Is provided throughout (550 sq. yds.)
Patch existing stucco as required.
Refinish all exposed new and existing wood on the
exterior and Interior, Including new exterior
stair, restored balcony, existing Interior
stair, fireplace frontispieces, wood floors,
exposed beams and ceilings, windows, shutters,
doors, millwork, and trim.
Paint selected areas of stucco;-do not paint plaster.
Pr.vide shoot vinyl flooring In upstairs toilet room-

10. 14. NOT USED.

15. MECHANICAL 5,000

Reroutto house drain and ven* on Interior of building.
Reactivate and recertify fire sprinkler system. /4 oX.
Rovylso plumbing at upstairs toilet room.

16. ELECTRICAL 7,000

Provide new underground service and subpanel from
existing panel and service.
Provide new baseboard circuits for exhibit lighting
and general Illumination by floor lamps.
Provide emergency alarm circuits.
Provide emergency lighting and exit lighting
(self-contained except at exterior stair).
Provide lighting at upstaIrs toillet r-oo--
Provide power circuits for portable quartz heaters
and maintenance equipment.


50,000










TOTAL CONSTRUCTION COSTS:
"6


OR ASSUME $100,000

NOTE: The estimate above represents the approximate market value
of minimum construction work assumed to be required. If special
load testing and historic paint analyses are required, allow an
additional $8,000. Allow an additional $10,000 to $15,000 for
standard architectural and engineering fees.

Therefore, a preliminary budget which includes all anticipated
design and construction costs at market value should equal
approximately $125,000 for the scope of work Indicated above.



May 7, 1983


Herschel E. Shepard FAIA
Architect


GRAND TOTAL


99,000
















MEMO


TO: DR. ROBERT GOLD

FROM: DAVID SCOTT

DATE: 06/29/88

SUBJECT: PAREDES/DODGE RESTORATION



Here is the preliminary proposed budget for restoration of the

Paredes/Dodge house at 54 St. George St. Please note that it

includes 1,050 hours of in house labor, in both research and

construction. It is through extensive in house labor that an

economical restoration is possible.



A benefit, other than just saving money, of in house labor is it

would allow us a great deal of control over the outcome of the

project. I would hope that such control would assure us of'a

quality product that would reflect positively on the Foundation

and the Revolving Fund Rest oration Program.



I have had Herschel Shepard take a look at the budget proposal

and he thought it was reasonable, though he did not have time to

visit the house. I hope to have Ted Clark take a look at the

electrical elements in the budget to make sure that we are within

the ball park.



Will this be enough for you to take to the Board of Trustees? If

you need more, please let me know.


_ I _~__ I
















PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE


TASK UNIT $

Historic/Architectural Research 200 hrs.

Record Architectural Details

Paint analysis $75 first,$50 each after

Archeological search 150 hrs.


CONSTRUCTION

Remove 1949 additions;


BALANCE

in house

$1,000

$575

in house


rear window 30 hrs. in house

plumbing contract $900

electrical contract $1,200

2nd story floor 40 hrs. in house

2nd story int. partitions 40 hrs. in house

buildings in yard 45 hrs. in house


Building:

Rebuild roof rafters,replace inappropriate later

material with accurate reproductions.

Remove shingles and replace with hand split

shakes. 11 squares at $127 per. material

Labor to re-roof and correct later

overhang & front facade work.

Re-configured electrical, contract

Re-build rear room and stairs

Repair or replaster interior

Grind and repair tabby floor

Repair plaster on front exterior


$4,300



$1,397



$4,100

$1, 000

$5,400

$2,600

$1,800

$ 1, 000















Replace front windows, 1st. story $3,600

Repair, restore 2nd story windows $2,000

Paint exterior, materials $200

Labor, in house 90 hrs.

Paint interior, materials $350

Labor, in house 175 hrs.

Repair all interior details, materials $2,000

Labor, in house, 220 hrs.

Landscape rear garden (historic), 100 hrs.in house $3,500



Contingency, 10. $3,692

TOTAL $40,A14

d O01/1
















PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE


TASK UNIT $

History ic /Architectural Research 200 hrs.

Record Architectural Details

Paint analysis $75 first,$50 each after

Archel ogi cal search 150 hrs.


CONSTRUCTION

Remove 1949 additions;


BALANCE

in house

$1,000

$575

in house


rear window 30 hrs. in house

plumbing contract $900

electrical contract $1,200

2nd story floor 40 hrs. in house

2nd story int. partitions 40 hrs. in house

buildings in yard 45 hrs. in house


Building:

Rebuild roof rafters,replace inappropriate later

material with accurate reproductions.

Remove shingles and replace with hand split

shakes. 11 squares at $127 per. material

Labor to re-roof and correct later

overhang & front facade work.

Re-configured electrical, contract

Re-build rear room and stairs

Repair or replaster interior

Grind and repair tabby floor

Repair plaster on front exterior


$4,300



$1,397



$4, 100

$1,000

$5,400

$2,600

$1,800

$1., 000
















Replace front windows, 1st. story $3,600

Repair, restore 2nd story windows $2,000

Paint exterior, materials $200

Labor, in house 90 hrs.

Paint interior, materials $350

Labor, in house 175 hrs.

Repair all interior details, materials $2,000

Labor, in house, 220 hrs.

Landscape rear garden (historic), /o /vD ,A k-U $3,500



Contingency, 10. $3,692

TOTAL $40 114











Q sm


PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE


TASK

Historic/Architectural Research

Architectural VDrawings)

Paint analysis $7

Archeological search


UNIT EB

200 hrs.



5 first,$50 each after
0 hs.
150 hrs.


BALANCEE

in house

$1,000

575

in house


CONSTRUCTION

Remove 1949 additions;


rear window 30 hrs. in house

plumbing contract $900

electrical contract $1,200

2nd story floor 40 hrs. in house

2nd story int. partitions 40 hrs. in house

buildings in yard 45 hrs. in house


Building:

Rebuild roof rafters,replace inappropriate later

material with accurate reproductions.

Remove shingles and replace with hand split

shakes. 11 squares at $127 per. material

Labor to re-roof

Re-configured electrical, contract

Re-build rear room and stairs

Repair or replaster interior

Grind and repair tabby floor

Repair plaster on front exterior

Replace front windows


$4,300



$1,397

$1,100

$1,000

$5,400

$2,600

$1,800

$ 1, 000

$3,600














Paint exterior, materials

Labor, in house 90 hrs.

Paint interior, materials

Labor, in house 175 hrs.

Repair all interior details, materials

Labor, in house, 220 hrs.

Landscape rear garden, contract



Contingency, 10%


$200



$350



$2,000



$3,500







4 3;t,2


~GjdL








j
* -
' -


c
i": 7, a~


.. ..,.. .-?<...._. ..'-^ ^ ^ ,. ^ ^ ^ ,,__ ;!. 1- .. - ^











. . ....." ,.,. .. ,., ,:. .











HISTORIC ST. AUGUSTINE PRESERVATION BOARD/SAN AGUSTIN ANTIGUO FOUNDATION, INC.

n to June 22, 1988


0 David Scott


Department


Robert Gold


Department


Paredes-Dodge House


Please examine the Paredes-Dodge House to determine the potential and cost

of restoration. I want to give the Board some approximate cost figures which

can be considered when the house-sale/use is discussed at the next meeting

on July 27. Thank you.


HSAPB Form No. 20


Frrm


Subject.


urii


.4 -


:~:r
1
J
ic-


I Il




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs