Group Title: Historic St. Augustine: Block 12 – Lot 19
Title: Paredes/Dodge Restoration, Preliminary Cost Estimate
ALL VOLUMES CITATION MAP IT! THUMBNAILS PAGE IMAGE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00094126/00042
 Material Information
Title: Paredes/Dodge Restoration, Preliminary Cost Estimate San Augustin Antiquo Foundation, July 5, 1988
Series Title: Historic St. Augustine: Block 12 – Lot 19
Physical Description: Maintenance record
Language: English
Publication Date: 1988
Copyright Date: Public Domain
Physical Location:
Box: 4
Divider: Parades-Dedge House, Lot 19 Block 12
Folder: Parades-Dodge Façade
 Subjects
Subject: Saint Augustine (Fla.)
54 Saint George Street (Saint Augustine, Fla.)
Parades-Dodge House
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 54 Saint George Street
Coordinates: 29.896092 x -81.313202
 Record Information
Bibliographic ID: UF00094126
Volume ID: VID00042
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
Resource Identifier: B12-L19

Full Text












PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE

SAN AGUSTIN ANTIQUO FOUNDATION

JULY 5, 1988


1. PRELIMINARY RESEARCH ALLOWANCES

1. Historic/ Architectural Research

A. Staff labor

2. Archeological Research

A. Staff labor

3. Paint analysis, $75 first,$50 each after

4. Record architectural details


2. SITE WORK

1. Landscape rear garden (historic)

A. Staff labor

2. Remove second story 1949 partitions

A. Staff labor

3. Remove second, story floor, 1949 addition

A. Staff labor

4. Remove building in rear yard

A. Staff labor


3.& 4. CONCRETE AND MASONRY

1. Grind and repair tabby floor.


200 hrs.



150 hrs.

$575

1, 000


3,500

100 hrs.



40 hrs.



40 hrs.



45 hrs.


1,800

















5. METALS

1. Remove later iron grates on windows

A. Staff labor


15 hrs.


6. ROUGH AND FINISH CARPENTRY

1. Rebuild roof rafters, replace inappropriate later

material with accurate reproductions $4,300

2. Remove shingles and replace with hand split

shakes. 11 squares at $127 each. Material cost 1,397

3. Labor to re-roof and correct later overhang &

front facade work. 4,100

4. Re-build rear room and stairs 5,400







7. DOORS AND WINDOWS

1. Replace front windows, first story 3,600

2. Repair, restore second story windows 2,000



8. FINISHES

1. Repair or replaster interior 2,600

2. Repair plaster on front exterior ,-- 1,000

3. Paint exterior Materials 200

A. Staff labor 90 hrs.

4. Paint interior Materials 350

A. Staff labor 175 hrs.
















8. FINISHES, CONT.

5. Repair, restore, or replace interior details.

Remove later inappropriate additions. Materials $2,000

A. Staff labor 220 hrs.



9. MECHANICAL

1. Remove existing plumbing $900



10. ELECTRICAL

1. Remove and reconfigure electrical service 1,200

2. Rewire electrical 1,000



11. CONTINGENCY COSTS (10%)

3,

TOTAL CONSTRUCTION COSTS **&-,4 404



NOTE: This estimate represents the minimum restoration costs for

the Paredes/Dodge House. If special load testing analyses are

required an additional $3,000 would be spent.

This estimate also includes a minimum of 1,100 Staff hours and

that figure could double depending upon unexpected expenses.







'I,


PAREDES/DODGE RESTORATION, PRELIMINARY COST ESTIMATE

SAN AGUSTIN ANTIQUO FOUNDATION

JULY 5, 1988


1. BASE BID, ALTERNATES, ALLOWANCES

ALLOWANCES:

1. Historic/ Architectural Research Staff

Paint analysis, $75 first,$50 each after

Record architectural details

S Archeological Research Staff



BASE BID/ ALTERNATES

1. Contingency Costs 10% of total costs


2. SITE WORK

1. Landscape rear garden (historic)

A. Staff labor

2. Remove second story 1949 partitions

A. Staff labor

3. Remove second. story floor, 1949 addition

A. Staff labor

4. Remove building in rear yard

A. Staff labor


3.& 4. CONCRETE AND MASONRY

1. Grind and repair tabby floor.


200 hrs.

$575

1,000

150 hrs.





3,962


3,500

100 hrs.



40 hrs.



40 hrs.



45 hrs.


1,800















5. METALS

1. Remove later iron grates on windows

A. Staff labor


6. ROUGH AND FINISH CARPENTRY

1. Rebuild roof rafters, replace inappropriate

-material with accurate reproductions

2. Remove shingles and replace with hand split

shakes. 11 squares at $127 each. Material cost

3. Labor to re-roof and correct later overhang

front facade work.

4. Re-build rear room and stairs


later

$4,300



1,397



4,100

5,400


7. NOT USED


8. DOORS AND WINDOWS

1. Replace front windows, first story

2. Repair, restore second story windows



9. FINISHES

1. Repair or replaster interior

2. Repair plaster on front exterior

3. Paint exterior Materials

A. Staff labor

4. Paint interior Materials

A. Staff labor


3,600

2,000





2,600

1,000

200

90 hrs.

350

175 hrs.


15 hrs.















9. FINISHES, CONT.

5. Repair, restore, or replace interior details.

Remove later inappropriate additions. Materials $2,000

A. Staff labor 220 hrs.



10-14. NOT USED



15. MECHANICAL

1. Remove existing plumbing $900



16. ELECTRICAL

1. Remove and reconfigure electrical service 1,200

2. Rewire electrical 1,000



TOTAL CONSTRUCTION COSTS $40,884



NOTE: This estimate represents the minimum restoration costs for

the Paredes/Dodge House. If special load-testing analyses are
LAoGO b& IA *;rr*
required adan additional $3,000. If 4-.h._rn t r-chitet' 1 ira l o





This estimate also includes a, minimum of 1,100 Staff hours and

that figure could doubled ) #ur *o O4d-- S




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs