Group Title: Historic St. Augustine: B8-L4 Hispanic Garden
Title: Preliminary cost estimates
ALL VOLUMES CITATION MAP IT! PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00091358/00056
 Material Information
Title: Preliminary cost estimates
Series Title: Historic St. Augustine: B8-L4 Hispanic Garden
Physical Description: Financial/tax record
Language: English
 Subjects
Subject: Saint Augustine (Fla.)
97 Saint George Street (Saint Augustine, Fla.)
Hispanic Garden (Saint Augustine, Fla.)
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 97 Saint George Street
Coordinates: 29.894996 x -81.312832
 Record Information
Bibliographic ID: UF00091358
Volume ID: VID00056
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution.
Resource Identifier: B8-L4

Full Text








PRELIMINARY COST ESTIMATE


HISPANIC GARDEN ST. AUGUSTINE,



No. Item


FLORIDA


Cost


Arbor using donated railroad ties $ 486.00
Concrete benches with tiles 210.00
Resetting statue with new base 55.00
-Octagonal coquina rock planter 70.00
-Pebble mosaic pattern & border 1,260.00
-Coquina block paving & edging 1,528.00
Crushed shell paving 290.00
Palms (10'-0" to 12'-0O) 280.00
Holly trees " heights 171.00
trees donated (labor; topsoil, only) 135.00
Groundcover 12.00
Flowering Plants 207.00
Vines 67.00
Hedge 92.00
Topsoil 120.00
Sod 32.00
total . . . 01.00


Not in Contract:

Iron Gates
Iron Fence
Heavy Wood Door


The above amount is a total without landscape design fee, expenses,
& contingencies. Greater study than this preliminary would be required
in order to reduce the cost of this work.

We would prefer to use coquina block paving in the area within the pebble
mosaic border as indicated on the plan, however a shell surface could be
used as a substitute. The preliminary estimate of the project with shell
paving would be $3,825, plus $725 for the Landscape design fee and $U50
allowed for contingencies of project and expenses not covered.

The shell surface could be included in the basic bid with the coquina
block paving as an alternate. This would allow you to follow the design
plan if the project were to attract a low bid.




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs