Midtown Beach nourishment program: sedimentation monitoring

Material Information

Title:
Midtown Beach nourishment program: sedimentation monitoring
Creator:
Dean, Robert G.
Publisher:
Coastal and Oceanographic Engineering Department, University of Florida
Publication Date:

Subjects

Subjects / Keywords:
Coastal Engineering
Spatial Coverage:
North America -- United States of America -- Florida

Notes

Funding:
This publication is being made available as part of the report series written by the faculty, staff, and students of the Coastal and Oceanographic Program of the Department of Civil and Coastal Engineering.

Record Information

Source Institution:
University of Florida
Holding Location:
University of Florida
Rights Management:
All applicable rights reserved by the source institution and holding location.

Full Text
UFL/COEL-96/005

MIDTOWN BEACH NOURISHMENT PROGRAM: SEDIMENTATION MONITORING October 1995 to February 1996 By
Robert G. Dean

May 10, 1996
Sponsored by: Florida Department of Environmental Protection Town of Palm Beach




MIDTOWN BEACH NOURISHMENT PROGRAM:
SEDIMENTATION MONITORING
October 1995 to February 1996
May 10, 1996
Robert G. Dean
Sponsored by: Florida Department of Environmental Protection Town of Palm Beach
University of Florida Coastal and Oceanographic Engineering Department Gainesville, Florida




TABLE OF CONTENTS
IN TR OD U CTION .......................................................... I
DESCRIPTION OF THE OVERALL PROJECT ................................... I
FIELD TRIPS, SEDIMENTATION APPARATUS, FIELD PROCEDURES
AN D AN ALY SIS ..................................................... 3
F ield T rip s ...... ......................................... ....... ..... 3
Description of Sedimentation Apparatus ..................................... 3
Field Procedures ...................................................... 3
A nalysis Procedures .................................................... 3
D ISC U S SIO N .............................................................. 6
APPENDICES
A DESCRIPTION OF FIELD TRIPS ...................................... A-I
B PLOTS OF VARIATION WITH TIME OF COARSE FRACTION OF
SEDIMENT COLLECTED ...................................... B-1
C PLOTS OF VARIATION WITH TIME OF FINE FRACTION OF
SEDIMENT COLLECTED ...................................... C-1
D TABLES OF SEDIMENTATION DATA ................................. D-1




MIDTOWN BEACH NOURISHMENT PROGRAM: SEDIMENTATION MONITORING
October 1995 to February 1996
INTRODUCTION
This report describes the methods, schedule and results obtained from the Sedimentation Monitoring program associated with the beach nourishment project at Midtown Beach in the Town of Palm Beach. The overall purpose of the project is to document suspended sediment rates in the vicinity of the project and in areas distant from the project, the comparison of which allows identification of the sedimentation attributable to the nourishment project. This project commenced on October 18, 1995 with the installation of seven sediment collectors and is still underway with completion of field data collection scheduled for mid-October 1996. Thus this document is a progress report from commencement of the project to February 14, 1996.
DESCRIPTION OF THE OVERALL PROJECT
The beach nourishment project at Midtown Beach entailed the placement of approximately 800,000 cubic yards along 5,400 feet of shorefront. The sand was removed from a borrow area extending in the north south direction from approximately 2, 000 feet south of the south jetty to approximately 4,800 feet south of the south jetty. In the east west direction, the borrow area extended from approximately 1,600 feet from the shoreline to a distance of 2,500 feet from the shoreline, see Figure I for the relative locations of the borrow and project areas. The material dredged was transported the approximately 4.0 miles by pipeline from the borrow area to the nourishment site.
The permit conditions required that sedimentation monitoring be conducted to document any potential adverse effects to the natural reef that runs nearly parallel to the shoreline and is located approximately 1,000 feet seaward of the shoreline in the vicinity of the beach nourishment. In addition to concerns of the natural reef, a so-called "pile of rocks" is present and aligned perpendicular to the shoreline at a location near the south end of the Breakers Hotel. This pile of rocks is the debris from a pier that was once located at this site. The permit conditions called for a total of seven sedimentation stations, including two on the rock pile and two at a sufficient distance north and south from the nourishment area to represent ambient conditions.




SITE

Borrow Site

ATLANTIC OCEAN

Project Site

tI P17-1 - 0 5000
Lo e -r02 ee!
Scc e ir Feet

Figure 1. Locations of Borrow and Project Sites (Based on ATM Figure).




FIELD TRIPS, SEDIMENTATION APPARATUS, FIELD PROCEDURES AND ANALYSIS
FieldlLips
As noted, the sediment traps were installed on October 18, 1995. A description of the field activities from that time to February 14, 1996 is presented in Appendix A. As noted in Appendix A, during the nourishment operations, an attempt was made to monitor the traps on a weekly basis throughout the nourishment period and biweekly thereafter; however, on several occasions, this schedule was precluded by energetic wave conditions. Dredging commenced on October 18, 1995 and was completed on December 2, 1995.
Description of Sedimentation Apparatus
The locations of the seven sedimentation stations are shown in Figure 2. Each of these stations consists of three settling tubes of a schedule 40 PVC with inside diameter of 5 cm. The three settling tubes are arranged in a triangular platform with the centers spaced 16.5 cm apart, Each settling tube consists of two parts: the settling tube which is approximately 46 cm long and the collection canister which is approximately 15 cm long and connected to the base of the settling tube. The sedimentation stations include a weighted stand and a vertical pipe to which the three settling tubes are attached. Figure 3 shows the sediment collection apparatus.
Field Procedures
During field collection of the samples and replacement of the settling tube and canister assembly, the assembly is removed from the stand and capped to prevent loss of sediment and an empty collection tube and canister assembly is affixed to the stand.
Analysis Procedures
After the collection tubes have been brought back to the laboratory in Gainesville and the sediment has had ample time to settle, the water above the collection canister is decanted and the canister is separated from the collection tube. The contents of the canister are washed onto a # 200 sieve for wet sieving with the sieve seated over a container to retain any fine particles washed through the sieve. To facilitate this separation process, the sample is brushed gently as it rests on the #200 sieve. The container is then set aside for 24 hours to allow settling of the fine particles.
The coarse sand particles (ie, of a diameter not passing the # 200 sieve) remaining in the sieve are washed into a labeled and tared drying tin. This coarse fraction is then oven dried at 1000 C overnight and later weighed and recorded. To determine the weight of the fine sediments, the excess water is first removed using a vacuum pump and then the sample is transferred to a tared and labeled




O F (Control Station)
3000 m North of R-94

N
0 2500
Scole in eet

'i\ i
S E (BREAKER'S ROCK PILE)
-NORTH PROJECT
. LIMIT
--. -If.tI
D
SOUTH PROJECT .. LIMIT
"L T
LEGEND
B- - EQUILIBRIUM
---------- CONSTRUCT
0O SEDIMENTA MONITORIN '-

M TOE
ION TOE TION G STATION

-O A (Control Station)
3000 m South of R-100

Figure 2. Approximate Locations of Sampling Stations. Note: There are Two Sampling Stations
at Location E for a Total of Seven.




6.35 cm

top view

PVC tube
PVC canister mounting post

aluminum stand set bolt

concrete weight

ILA-,

Figure 3. Sediment Collection Apparatus




tin for 24 hours of drying at 1000 C. The sample is later weighed.

The total, fine and coarse sample results were each then analyzed as follows. For each of these sample representations, the mean of the three settling tube results and their associated standard deviations, (j, were determined as
n=3
Z [(X x)2]
G n~l
where x represents the average of the three samples and the two in the denominator is standard for three samples in a group.
The mean sample results for the coarse and fine fractions are presented in Figures 4 and 5, respectively. As noted in Appendices A and D, on eleven occasions, individual collection devices were found laying on their sides or tilting excessively due to either large waves or dragging by boat anchors. In these cases, the results were not included in Figures 4 and 5.
Appendix A provides a description of each of the twelve field trips made between October 18, 1995 and February 14, 1996. Appendix B presents the coarse fraction individual plots for each of the monitoring sites. Appendix C presents the same information for the fine fraction. Finally, Appendix D presents tabulations of all the detailed data forming the basis for this report.
DISCUSSION
As can be seen from Figures 4 and 5, it is evident that the coarse sediment fraction was much greater quantitatively than the fine fraction. The maximum depositional rate for the coarse fraction was 5345 mg/hour whereas the value for the fine fraction was 102 mg/hour. Also, it is clear that the sedimentation rate at the shallow water site on the Rock Pile, Station E- 1 is much greater than the stations farther seaward. The maximum coarse and fine rates at Station E-1 are 5345 and 102 mg/hour, respectively. The largest corresponding rates of the other collectors in deeper water are 1586 and 43 mg/hour, respectively. Finally, the deposition rates are somewhat greater for the collectors in the vicinity of the nourishment than at the two reference sites (Sites A and F). The maximum coarse and fine deposition rates at the reference sites are 1241 and 27 mg/hour whereas the values in the vicinity of the nourishment (not considering the nearshore site, E- 1) are 1586 and 43 mg/hour, respectively.




All Sites Coarse Fraction

40 60 80 100
Days After Installation

Figure 4. Variation with Time of Average Coarse Fraction Collected for all Seven Sites.

0
,
E
a)
-a-'

C
0
a)
U)

6000 5000 4000 3000 2000 1000
0

20

120

140




All Sites Fine Fraction

II I

I I II

0
-a) (5,
OO
0
(
a) E
V
UL)
Cl)

100
90 80 70 60 50 40 30 20 10

40

60

80

-- i

100

Days After Installation

Figure 5. Variation with Time of Average Fine Fraction Collected for all Seven Sites.

......... :
- - --- : - -

..3

I I I

I
. ........... l
- I

20

120

140

I I I I

-- - - - - - . . . . .

V

. . . . . . ,

..........

. ... ; .: ....




APPENDIX A
DESCRIPTION OF FIELD TRIPS




APPENDIX A

DESCRIPTION OF FIELD TRIPS
The sections below describe briefly the field trips that were conducted in the time frame corresponding to this report: October 18, 1995 to February 14, 1996.
Trip 1: Installation
10-18-95 Travel to Palm Beach in preparation for sand trap installation.
10-19-95 Installation of sand traps at 5 sites (A,B,C,D, and El). Site A was installed on
sandy bottom, since there was no hard bottom in the area.
10-20-95 Installed remaining two sites (E2 and F). Site F installed on sandy bottom.
Very poor visibility during installation due to excessive rainfall.
Trip 2: Servicing of Traps
10-26-95 Recovered sites El and F the first day. On the second day sites E2 and D were
recovered. Site C could not be located. Transects were established adjacent to R-98 and R-96 for biological monitoring. Sites A, B, and C were retrieved the third day.
The sand trap at site C had moved and was on its side. Installed screw anchors and
sub-surface buoys to mark transects (R-98 and R-96).
Trip 3: Servicing of Traps
11-07-95 Serviced all seven sites, and assisted in biological monitoring. Sand trap at site E-1I
was on its side.
Trip 4: Servicing of Traps
11-15-95 Serviced all sites and assisted in biological monitoring. Site C was over on its side.
11-21-95 Seas 4'-6' all week could not get out to recover traps.

A-1




Trio 5: Servicing of Trans

11-28-95 Traveled to Palm Beach, seas were again too rough to go out. Small craft
warnings.
Trip 6: Servicing of Traps
12-05-96 Serviced all seven sites. Assisted in Biological monitoring.
Trip 7: Servicing of Traps
12-18-95 Serviced traps A, B, C, D, E-1I and E-2 on first day. Finished trap F on second day.
Assisted in biological monitoring second day. Sand trap at site C was on its side.
One tube on site ElI was broken. Marker buoys from four sites missing.
Trip 8: Servicing of Traps
1-10-96 Serviced all seven sites. Replaced marker buoys that were missing. Tried to
stabilize sand trap at site C which was on its side.
Trip 9: Servicing of Traps
1-31-96 Serviced all seven sites. Station B was on its side, and we had to replace the
marker buoy. Station D was setting at tilt of about 700 off of the horizontal.
The support pipe was bent and could not be corrected. E-1 was tilted about 600 off horizontal. E-1 position was corrected. F had scour about the bottom and
the marker buoy was replaced.
Trip 10: Servicirng of Traps
2-14-96 Stations B, D and E-i were on their side when recovered. Station D had been
displaced from its original location by about 50-100 feet. It was repositioned on a transect line. B was repositioned and three bags of concrete were added to
provide stability.

A-2




Scheduled Future Servicing of Sediment Collectors

The scheduled service intervals for the duration of the project will be every two weeks until October 18, 1996. The possibility of the occurrence of high wind, waves and rain during the coming months may cause the collection interval to vary during this time period. Also adverse weather conditions in September and October may affect the nominal two week retrieval intervals.
The sand traps and supporting structures are scheduled to be completely removed during the last retrieval, around the 18th of October, 1996.




APPENDIX B
PLOTS OF VARIATION WITH TIME
OF COARSE FRACTION OF SEDIMENT COLLECTED




APPENDIX B

PLOTS OF VARIATION WITH TIME OF COARSE FRACTION OF SEDIMENT COLLECTED
The following seven plots present the time variation of the coarse sediment fraction collected at the seven monitoring sites. The vertical bars at each time for which data were collected represent the standard deviation of the sample. Results are presented from October 18, 1995 to February 14, 1996.




Site A Coarse Fraction

20

40

60 80

100

120

140

Days After Installation

Figure B-i1. Variation with Time of Coarse Fraction of Sediment Collected at Site A. October 18, 1995 to February 14, 1996.

0
a) CU
E
a) Cl)

3000
2000 1000
0




Site B Coarse Fraction 800
0 ~ 7 0 0 - - - - - . . . ... . . . - -
C
40 .. .. ... ..................... .... .............
E 300 ------4 00 ------
E
~ 10
0 20 40 60 80 100 120 140
Days After Installation
Figure B-2. Variation with Time of Coarse Fraction of Sediment Collected at Site B. October 18, 1995 to February 14, 1996.




Site C Coarse Fraction

0
a)
-
CU
0
4a
E
U)

Figure B-3. Variation with Time of Coarse Fraction of Sediment Collected at Site C. October 18, 1995 to February 14, 1996.

2000 1800 1600 1400 1200 1000 800 600 400 200
0

40 60 80 100
Days After Installation

20

120

140




Site D Coarse Fraction

0
E
-a)
M
0
C
0
U!)
E a) Cl)

4000 3000
2000 1000
0
0

' I

I I

20

1~'

40

' I

' I

' I

60

80

100

120

140

Days After Installation

Figure B-4. Variation with Time of Coarse Fraction of Sediment Collected at Site D. October 18, 1995 to February 14, 1996.

.........................
.......................
---------------------

I I




Site El Coarse Fraction

8000
o 7000 0)
E 6000
5000
CU
c 4000
0
- 3000
C
2000
E
) 1000 C)

' I

I I I

I I I

20

40

I I I

60

80

100

120

----------------

140

Days After Installation

Figure B-5. Variation with Time of Coarse Fraction of Sediment Collected at Site El. October 18, 1995 to February 14, 1996.

I

. . . . . . . .
-------------

.................

- - - - - - - - - - -
- - -- -- - - - - - - - -




Site E2

- Coarse Fraction

I I

0 0)
E
V
()
CU)
0

20

- - - -

300 200 100

' I

' I

. .

40

60

80

100

Days After Installation
Figure B-6. Variation with Time of Coarse Fraction of Sediment Collected at Site E2. October 18, 1995 to February 14, 1996.

I I

I I

120

140

' I




Site F Coarse Fraction

0
..c
E
a)
-
C
E
-a
a) C)
=m

. . . ..I

20

40

60

80

100

' I

120

140

Days After Installation

Figure B-7. Variation with Time of Coarse Fraction of Sediment Collected at Site F. October 18, 1995 to February 14, 1996.

70 60 50
40 30
20 10
0

...............
...........
----------

------------.............
T

. . . .. . - - - - . . . .

. . . . . . . . . .
--------------------. . . . . . . . . . .

. . . . . . . .
. . . . . . - - - -.

. . . . . .




APPENDIX C
PLOTS OF VARIATION WITH TIME
OF FINE FRACTION OF SEDIMENT COLLECTED




APPENDIX C

PLOTS OF VARIATION WITH TIME OF FlINE FRACTION OF SEDIENT COLLECTED
The following seven plots present the time variation of the fine sediment fraction collected at the seven monitoring sites. The vertical bars at each time for which data were collected represent the standard deviation of the sample. Results are presented from October 18, 1995 to February 14, 1996.




Site A Fine Fraction
30

5
Eo
a)20
-4-0
4-0
4- 1 0 . .. . . . . . . . . ...........................
0
0 ,
0 20 40 60 80 100 120 140
Days After Installation
Figure C-I. Variation with Time of Fine Fraction of Sediment Collected at Site A. October 18, 1995 to February 14, 1996.




Site B Fine Fraction

I I

I

~40
0
E 30
a)
w
S20
0
a) 10
E

. . . . . . . . . . .

20

. . .

40

60

80

100

120

140

Days After Installation
Figure C-2. Variation with Time of Fine Fraction of Sediment Collected at Site B. October 18, 1995 to February 14, 1996.

- - -

. . . . . . .
.. ..I .

. .




Site C Fine Fraction

0
a) 4-0
0
C
(0
-
CU
E
U1)
Cl

40 30
20 10

40

60

4

I I

80

I I

100

Days After Installation
Figure C-3. Variation with Time of Fine Fraction of Sediment Collected at Site C. October 18, 1995 to February 14, 1996.

- - - - - - - - - - -

- - - - - -

- I - - -

I I I I

I I . . .

20

I I

120

140




Site D Fine Fraction
20
. . . . . ... . . . . . . ... . . . . . . ... . . . . . ... . . . . . . . . . . . .
6 18
1 6 .............. .............. --------------- ------------- ..... ...... .
E
14 - -- -- -- -- -- -- -- -- ---- -- ---- - ---- .... .. .. .. .. .. .. .. .. .. .. .. .. -- -- -- ... ... .. .. .. . .. .
a)
. . . . . . . - - - - -
- - - - - - -- - - - - - - - - - - - -- - - - - - -
ry
cu 12 --- ------- :
1 0 ----- ------------- : ....................... ..... ....... ....................... ............
8 - - - - - -- - - - - - - - - - - - - -- - - - - - - - - --- - - -- - -- - - - - -
cu
. . . . . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 ----- -------a)
E .............
4 - --------- -------------- ----------- ---------------- ------------- --- ------
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 ------0
0 20 40 60 80 100 120 140
Days After Installation
Figure C-4. Variation with Time of Fine Fraction of Sediment Collected at Site D. October 18, 1995 to February 14, 1996.




Site El Fine Fraction

,-420 I
a 80 ---
c 60 ------40
60
U)
0
- 40 .....
0 20 40 60 80 100 120 140
Days After Installation
Figure C-5. Variation with Time of Fine Fraction of Sediment Collected at Site El. October 18, 1995 to February 14, 1996.




Site E2 Fine Fraction

0
a) C:
0
CU C)

50 40 30 20 10

I I

60

I I i I

80

100

Days After Installation

Figure C-6. Variation with Time of Fine Fraction of Sediment Collected at Site E2. October 18, 1995 to February 14, 1996.

7 -- ----

I I

20

40

Ii

120

140

I

- - - -

. ... .. .. .. .. -- - -- - -- - - - - -
- - - - - - - -
- - -- - - - - - -

.............
-----------------------------------------.....................
AIL




Site F Fine Fraction

20

40

60 80

100

120

140

Days After Installation

Figure C-7. Variation with Time of Fine Fraction of Sediment Collected at Site F. October 18, 1995 to February 14, 1996.

0 a)
C
0
E
U)

40 30
20 10




APPENDIX D
TABLES OF SEDMlENTATION DATA




APPENDIX D

TABLES OF SEDIMENTATION DATA
The following tables present the sedimentation data at the seven sites for the period October 18, 1995 through February 14, 1996. For each monitoring station, the quantities of coarse and fine sediment (as defined in the main text of this report) are listed as well as the mean and standard deviation.

D-1




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 1

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. TOTAL WT. SAMPLE IPCT IMEAN ISTD. DEV. m/HOURI
SITE A LOCATION Ri 10 LAT
AIC 10/19/95 14:30 10/28/95 11:30 213 15.70 32.90 17.20
AlF 15.90 20.20 4.30
A2C 15.60 39.80 24.20
A2F 15.60 20.00 4.40
A3C 15.50 36.60 21.10
A3F 15.70 21.20 5.50
COARSE 81.49 20.83 2.86 97.81
FINE 18.51 4.73 0.54 22.22
SITE B LOCATION R103 LAT
B1C 10/19/95 16:15 10/28/95 10:55 210.67 15.70 71.20 55.50
B1F 15.50 20.90 5.40
B2C 15.60 67.30 51.70
B2F 15.70 18.40 2.70
B3C 15.80 80.90 65.10
B3F 15.40 18.40 3.00
COARSE 93.95 57.43 5.64 272.63
FINE 6.05 3.70 1.21 17.56
SITE C LOCATION GULF STREAM ROAD LAT
CIC 10/19/95 13:00 10/28/95 10:20 213.33 16.00 276.20 260.20
C1F 15.60 18.60 3.00
C2C 15.90 321.20 305.30
C2F ON 15.80 18.00 2.20
C3C SIDE 15.60 277.80 262.20
C3F 15.80 19.50 3.70
COARSE 98.94 275.90 20.80 1293.28
FINE 1.06 2.97 0.61 13.91




LOCATION DATE IN TIME IN DATE OUT TIME OUT IRS. IN IPAN WT. TOTAL WT. SAMPLE PCT MEAN ISTD. DEV. mg/HOUR
SITE D LOCATION PERUVIAN AVE LAT
D1C 10/19/95 11:45 10/27/95 14:55 195.17 15.60 64.30 48.70
DlF 15.60 18.20 2.60
D2C 15.60 59.10 43.50
D2F 15.60 17.80 2.20
D3C 15.50 70.30 54.80
D3F 15.60 17.70 2.10 L
COARSE 95.52 49.00 4.62 251.07
FINE 4.48 2.30 0.22 11.78
SITE El LOCATION BREAKERS "ROCK PILE" LAT
E11C 10/19/95 18:20 10/26/95 18:45 168.42 16.00 405.80 389.80
E11F 16.30 17.20 0.90
E12C 15.60 370.50 354.90
E12F 16.40 17.70 1.30
El 3C 16.00 388.90 372.90
El 3F 15.60 16.70 1.10
COARSE 99.71 372.53 14.25 2211.97
FINE 0.29 1.10 0.16 6.53
SITE E2 LOCATION BREAKERS "REEF" LAT
E21C 10/20/95 10:05 10/27/95 14:05 172.00 15.60 23.80 8.20
E21 F 15.90 22.80 6.90
E22C 15.60 23.50 7.90
E22F 15.80 23.90 8.10
E23C 15.60 22.20 6.60
E23F 15.9 23.30 7.40
COARSE 50.33 7.57 0.69 43.99
FINE 49.67 7.47 0.49 43.41




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTALWT. SAMPLE PCT MEAN STD.DEV. mg/HOUR
SITE F LOCATION R84 LAT
F1C 10/20/95 12:00 10/26/95 17:45 149.75 15.60 17.50 1.90
F1F 15.80 19.50 3.70
F2C 15.60 18.60 3.00
F2F 15.70 20.20 4.50
F3C 15.80 17.90 2.10
F3F 15.90 20.10 4.20
COARSE 36.08 2.33 0.48 15.58
FINE 63.92 4.13 0.33 27.60




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 2

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTALWT. SAMPLE PCT MEAN STD. DEV. mg/HOUR
SITE A LOCATION R1 10 LAT
AIC 10/28/95 11:35 11/08/95 10:20 262.75 15.80 83.00 67.20
AIF 15.70 19.20 3.50
A2C 15.70 91.10 75.40
A2F 15.70 18.40 2.70
A3C 15.80 79.20 63.40
A3F 15.80 19.20 3.40
COARSE 95.55 68.67 5.01 261.34
FINE 4.45 3.20 0.36 12.18
SITE B LOCATION R103 LAT
B1C 10/28/95 11:00 11/08/95 10:45 263.75 15.80 123.20 107.40
BIF 15.70 23.50 7.80
B2C 15.80 109.45 93.65
B2F 15.80 24.30 8.50
B3C 15.80 104.60 88.80
B3F 15.70 21.90 6.20
COARSE 92.80 96.62 7.88 366.32
FINE 7.20 7.50 0.96 28.44
SITE C LOCATION GULF STREAM ROAD LAT
CIC 10/28/95 10:25 11/08/95 11:05 264.67 16.00 172.40 156.40
C1F 15.80 21.90 6.10
C2C 15.70 160.40 144.70
C2F 15.90 20.40 4.50
C3C 15.60 148.60 133.00
C3F 15.80 20.10 4.30
COARSE 96.68 144.70 9.55 546.73
FINE 3.32 4.97 0.81 18.77




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. ITOTALWT. SAMPLE IPCT MEAN ISTD. DEV. mg/HOUR
SITE D LOCATAION PERUVIAN ROAD LAT
D1C 10/27/95 15:00 11/08/95 11:15 284.25 15.70 275.40 259.70
D1F 15.70 19.40 3.70
D2C 15.70 221.40 205.70
D2F PIPE 15.70 20.25 4.55
D3C BENT 15.80 272.00 256.20
D3F 15.80 20.00 4.20
COARSE 98.30 240.53 24.67 846.20
FINE 1.70 4.15 0.35 14.60
SITE El LOCATION BREAKERS "ROCK PILE" LAT
E11C 10/26/95 07:00 11/08/95 09:50 314.83 15.70 1160.70 1145.00
E11F 15.60 17.90 2.30
E12C 15.70 969.40 953.70
E12F ON 15.60 20.00 4.40
E13C SIDE 15.70 1021.50 1005.80
El 3F 15.60 17.70 2.10
COARSE + 99.72 1034.83 80.75 3286.92
FINE 0.28 2.93 1.04 9.32
SITE E2 LOCATION BREAKERS "REEF" LAT
E21C 10/27/95 14:10 11/08/95 09:35 283.42 15.60 42.20 26.60
E21 F 15.70 18.50 2.80
E22C 15.60 49.50 33.90
E22F 15.70 18.40 2.70
E23C 15.50 45.15 29.65
E23F 15.5 17.80 2.30
COARSE 92.04 30.05 2.99 106.03
FINE 7.96 2.60 0.22 9.17




LOCATION DATE IN TIME IN DATE OUT TIME OUT IHRS. IN PAN WT. ITOTALWT SAMPLEIPCT IMFAN ISTnlnFv Imn/H~hlR I

I LO A I N D T I ITM IN ID OU I IM .. .. I ......... I PAN..... IT A .. .. ... IS....... I" PCT I MEAN.. I .. ... "E I'l"--l" ISITE F LOCATION R84 LAT
F1C 10/26/95 17:55 11/08/95 09:05 303.17 15.60 23.00 7.40
F1F 15.70 18.00 2.30
F2C 15.60 22.85 7.25
F2F 15.60 18.50 2.90
F3C 15.70 22.90 7.20
F3F 15.70 19.20 3.50
COARSE 71.52 7.28 0.08 24.02
FINE 28.48 2.90 0.49 9.57




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 3

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. TOTAL WT. ISAMPLE1 PCT MEAN ISTD. DEV. lmg/HOUR I
SITE A LOCATION RI 10 LAT
A1C 11/08/95 09:25 11/16/95 09:40 192.25 15.80 283.50 267.70
A1F 16.00 19.70 3.70
A2C 15.60 245.20 229.60
A2F 15.70 18.90 3.20
A3C 15.80 234.50 218.70
A3F 16.00 19.00 3.00
COARSE 98.64 238.67 21.01 1241.44
FINE 1.36 3.30 0.29 17.17
SITE B LOCATION R 103 LAT
BiC 11/08/95 09:50 11/16/95 10:45 192.92 15.80 119.70 103.90
B1F 15.60 21.60 6.00
B2C 15.90 101.20 85.30
B2F 15.80 21.80 6.00
B3C 16.00 117.60 101.60
B3F 15.50 22.80 7.30
COARSE 93.78 96.93 8.28 502.46
FINE 6.22 6.43 0.61 33.35
SITE C LOCATION GULF STREAM ROAD LAT
CiC 11/08/95 10:05 11/16/95 11:55 193.83 16.00 556.10 540.10
ClF 15.60 19.00 3.40
C2C 15.90 440.10 424.20
C2F ON 15.70 18.90 3.20
C3C SIDE 15.60 488.25 472.65
C3F 15.80 19.80 4.00
COARSE 99.27 478.98 47.53 2471.11
FINE 0.73 3.53 0.34 18.23




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. ITOTALWT. ISAMPLEI PCT MEAN ISTD. DEV. mg/HOUR
SITE D LOCATION PERUVIAN AVE LAT
D1C 11/08/95 10:20 11/16/95 11:45 193.42 15.60 268.10 252.50
DlF 15.70 18.60 2.90
D2C 15.75 264.90 249.15
D2F 16.00 18.60 2.60
D3C 15.60 320.40 304.80
D3F 15.60 18.60 3.00
COARSE 98.96 268.82 25.48 1389.83
FINE 1.04 2.83 0.17 14.65
SITE El LOCATION BREAKERS "ROCK PILE" LAT E11C 11/08/95 08:55 11/16/95 13:50 196.92 16.40 980.70
E11F 15.60 19.60
E12C 15.90 1044.00
E12F 15.90 19.70
El 3C 15.80 1133.10
El 3F 15.70 20.70
COARSE 98.14 1052.60 62.51 5345.41
FINE 1.86 20.00 0.50 101.57
SITE E2 LOCATION BREAKERS "REEF"
E21C 11/08/95 08:40 11/16/95 13:20 196.67 15.60 55.80 40.20
E21 F 15.90 19.40 3.50
E22C 15.60 49.50 33.90
E22F 15.90 18.85 2.95
E23C 15.50 57.50 42.00
E23F 15.70 19.50 3.80
COARSE 91.89 38.70 3.47 196.78
FINE 8.11 3.42 0.35 17.37




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTALWT. SAMPLE PCT MEAN STD. DEV. mg/HOUR
SITE F LOCATION R84 LAT
FIC 11/08/95 08:10 11/16/95 14:50 198.67 15.70 23.50 7.80
F1F 15.60 22.70 7.10
F2C 15.60 23.00 7.40
F2F 15.90 19.10 3.20
F3C 15.90 23.60 7.70
F3F 16.00 19.30 3.30
COURSE 62.74 7.63 0.17 38.42
FINE 37.26 4.53 1.82 22.82




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 4

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. ITOTALWT. ISAMPLE1 PCT MEAN ISTD. DEV. jmglHOUR
SITE A LOCATION Rl10 LAT
A1C 11/16/95 09:45 12/05/95 08:50 455.08 16.10 66.30 50.20
Al F 16.10 19.50 3.40
A2C 15.80 57.90 42.10
A2F 15.80 19.10 3.30
A3C 15.90 60.00 44.10
A3F 15.90 19.80 3.90
COARSE 92.79 45.47 3.45 99.91
FINE 7.21 3.53 0.26 7.76
SITE B LOCATION R 103 LAT
BIC 11/16/95 09:50 12/05/95 09:25 455.58 16.00 89.30 73.30
BIF 15.90 30.50 14.60
B2C 16.30 84.80 68.50
B2F 15.70 30.00 14.30
B3C 15.90 78.36 62.46
B3F 15.60 28.90 13.30
COARSE 82.88 68.09 4.44 149.45
FINE 17.12 14.07 0.56 30.88
SITE C LOCATION GULF STREAM ROAD LAT
CIC 11/16/95 10:05 12/05/95 09:50 455.75 16.10 112.80 96.70
Cl F 15.80 21.80 6.00
C2C 16.10 127.40 111.30
C2F 15.90 21.20 5.30
C3C 16.10 142.50 126.40
C3F 15.90 21.50 5.60
COARSE 95.19 111.47 12.13 244.58
FINE 4.81 5.63 0.29 12.36




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. JTOTALWT. ISAMPLE1 PCT MEAN ISTD. DEV. Jmg/HOUR
SITE D LOCATION PERUVIAN AVE LAT
D1C 11/16/95 10:20 12/05/95 10:15 455.92 15.70 103.60 87.90
DlF 15.80 22.10 6.30
D2C 15.80 121.20 105.40
D2F 16.00 22.00 6.00
D3C 15.70 100.70 85.00
D3F 15.70 22.20 6.50
COARSE 93.67 92.77 9.01 203.47
FINE 6.33 6.27 0.21 13.75
SITE El LOCATION BREAKERS "ROCK PILE" LAT E11C 11/16/95 08:55 12/05/95 10:40 457.75 31.50 1675.60 1644.10
E11F 15.60 18.60 3.00
E12C 31.20 1610.60 1579.40
E12F 15.90 19.60 3.70
El 3C 17.40 1548.60 1531.20
El 3F 15.70 18.90 3.20
COARSE 99.79 1584.90 46.26 3462.37
FINE 0.21 3.30 0.29 7.21
SITE E2 LOCATION BREAKERS "REEF"
E21C 11/16/95 08:40 12/05/95 11:00 458.33 15.60 47.50 31.90
E21 F 16.00 19.70 3.70
E22C 16.10 52.40 36.30
E22F 16.10 19.70 3.60
E23C 15.80 45.20 29.40
E23F 15.80 19.60 3.80
COARSE 89.79 32.53 2.85 70.98
FINE 10.21 3.70 0.08 8.07




LOCATION | DATE IN |TIME IN DATE OUT TIME OUT IHRS. IN PAN WT. ITOTALWT SAMPLE PCT IM=AN ISTn nl:V Imn/hlR I

LOATO I DAT IITMEIIDTOU I TIM OUT I H...... PA WT.... I .......... IS....... I PCT- I MEAN.. ISM DEV" I'' 'v' m
SITE F LOCATION R84 LAT
F1C 11/16/95 02:55 12/05/95 11:35 464.67 15.70 23.90 8.20
FIF 15.80 20.30 4.50
F2C 15.70 23.60 7.90
F2F 15.90 19.60 3.70
F3C 16.00 22.80 6.80
F3F 15.80 19.70 3.90
COARSE 65.43 7.63 0.60 16.43
FINE 34.57 4.03 0.34 8.68




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 5

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. JTOTALWT. ISAMPLE1 PCT MEAN ISTD. DEV. lmg/HOUR
SITE A LOCATION RI 10 LAT
AIC 12/05/95 08:55 12/20/95 15:00 366.08 16.00 81.00 65.00
AIF 17.10 19.70 2.60
A2C 15.70 97.50 81.80
A2F 17.10 19.90 2.80
A3C 15.80 83.70 67.90
A3F 16.40 19.50 3.10
COARSE 96.19 71.57 7.33 195.49
FINE 3.81 2.83 0.21 7.74
SITE B LOCATION R 103 LAT
BIC 12/05/95 09:30 12/20/95 15:25 365.92 15.90 195.50 179.60
BIF 17.50 23.40 5.90
B2C 16.10 175.00 158.90
B2F 15.80 23.10 7.30
B3C 15.90 155.60 139.70
B3F 15.70 22.30 6.60
COARSE 96.02 159.40 16.29 435.62
FINE 3.98 6.60 0.57 18.04
SITE C LOCATION GULF STREAM ROAD LAT
ClC 12/05/95 09:55 12/20/95 15:50 365.92 16.10 227.40 211.30
ClF 17.10 20.40 3.30
C2C 16.00 227.30 211.30
C2F ON 17.10 20.70 3.60
C3C SIDE 15.90 191.00 175.10
C3F 17.20 20.20 3.00
COARSE 98.37 199.23 17.06 544.48
FINE 1.63 3.30 0.24 9.02




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. JTOTALWT. ISAMPLEI PCT MEAN JSTD. DEV. jmg/HOUR
SITE D LOCATION PERUVIAN AVE LAT
DIC 12/05/95 10:20 12/20/95 16:10 365.83 15.70 290.10 274.40
DlF 15.90 20.50 4.60
D2C 15.80 252.20 236.40
D2F 16.00 20.60 4.60
D3C 15.60 321.70 306.10
D3F 16.60 22.10 5.50
COARSE 98.23 272.30 28.49 744.33
FINE 1.77 4.90 0.42 13.39
SITE El LOCATION BREAKERS "ROCK PILE" LAT E11C 12/05/95 10:45 12/20/95 16:25 365.67 No Sample
E11F Broken Tu
E12C 17.80 1591.10 1573.30
E12F 17.70 22.70 5.00
El 3C 17.30 1555.80 1538.50
El 3F 15.90 21.00 5.10
COARSE 99.68 1555.90 17.40 4254.97
FINE 0.32 5.05 0.05 13.81
SITE E2 LOCATION BREAKERS "REEF"
E21C 12/05/95 11:05 12/20/95 16:45 365.67 15.60 62.10 46.50
E21 F 16.70 19.10 2.40
E22C 17.30 72.80 55.50
E22F 17.30 20.30 3.00
E23C 15.80 75.10 59.30
E23F 16.80 19.20 2.40
COARSE 95.39 53.77 5.37 147.04
FINE 4.61 2.60 0.28 7.11




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTALWT. SAMPLE PCT MEAN STD. DEV. mg/HOURI
SITE F LOCATION R84 LAT
FIC 12/05/95 11:40 12/21/95 08:40 381.00 15.60 29.20 13.60
F1F 15.80 19.20 3.40
F2C Tube Occupied Not Included 15.80 20.30 4.50
F2F By Octopuss In Statistics 15.90 16.90 1.00
F3C 15.90 28.10 12.20
F3F 16.10 19.40 3.30
COARSE 79.38 12.90 0.70 33.86
FINE 20.62 3.35 0.05 8.79




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 6

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTAL WT. SAMPLE PCT MEAN STD. DEV. mg/HOUR
SITE A LOCATION Rl 10 LAT
AIC 12/20/95 15:05 01/10/96 15:30 504.42 Station on
A1F side and
A2C burried.
A2F
A3C OA/ >/1O 15.90 335.30 319.40
A3F 13.60 16.20 2.60
COARSE 99.19 319.40 633.21
FINE 0.81 2.60 5.15
SITE B LOCATION R 103 LAT
BlC 12/20/95 15:30 01/10/96 16:00 504.50 15.90 185.60 169.70
BIF 17.70 20.50 2.80
B2C 16.20 163.20 147.00
B2F 15.80 18.60 2.80
B3C 16.00 178.30 162.30
B3F 15.70 19.00 3.30
COARSE 98.18 159.67 9.45 316.48
FINE 1.82 2.97 0.24 5.88
SITE C LOCATION GULF STREAM ROAD LAT
C1C 12/20/95 15:55 01/10/96 14:45 502.83 16.20 401.30 385.10
CIF 17.30 19.30 2.00
C2C 17.30 347.40 330.10
C2F ON 15.90 18.10 2.20
C3C SIDE 15.70 385.70 370.00
C3F 17.30 19.30 2.00
COARSE 99.43 361.73 23.20 719.39
FINE 0.57 2.07 0.09 4.11




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. JTOTALWT. ISAMPLE1 PCT MEAN JSTD. DEV. mg/HOUR
SITE D LOCATION PERUVIAN AVE LAT
D1C 12/20/95 16:15 01/10/96 16:22 504.12 15.70 938.20 922.5
DIF 15.90 20.00 4.10
D2C 15.80 779.60 763.80
D2F 16.10 20.80 4.70
D3C 17.30 948.90 931.60
D3F 16.80 20.80 4.00
COARSE 99.51 872.63 77.05 1731.01
FINE 0.49 4.27 0.31 8.46
SITE El LOCATION BREAKERS "ROCK PILE" LAT E11C 12/20/95 16:30 01/10/96 17:08 504.63 17.90 1885.30 1867.40
E11F 18.40 22.10 3.70
E12C 17.40 1897.10 1879.70
El 2F 13.60 17.40 3.80
El 3C 13.70 1977.10 1963.40
El 3F 13.50 17.62 4.12
COARSE 99.80 1903.50 42.65 3772.05
FINE 0.20 3.87 0.18 7.68
SITE E2 LOCATION BREAKERS "REEF"
E21C 12/20/95 16:50 01/10/96 17:27 504.62 15.80 113.80 98.00
E21 F 17.30 20.20 2.90
E22C 15.90 120.80 104.90
E22F 17.40 19.70 2.30
E23C 15.70 98.20 82.50
E23F 15.80 18.50 2.70
COARSE 97.31 95.13 9.37 188.53
FINE 2.69 2.63 0.25 5.22




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTALWT. SAMPLE PCT MEAN STD. DEV. |mg/HOURI
SITE F LOCATION R84 LAT
F1C 12/21/95 08:45 01/10/96 17:52 489.12 15.70 34.00 18.30
FIF 15.80 17.30 1.50
F2C 15.80 34.40 18.60
F2F 15.90 17.60 1.70
F3C 15.90 37.00 21.10
F3F 17.50 19.10 1.60
COARSE 92.36 19.33 1.26 39.53
FINE 7.64 1.60 0.08 3.27




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 7

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTAL WT. SAMPLE PCT MEAN STD. DEV. mg/HOUR I
SITE A LOCATION R1 10 LAT
A1C 01/10/96 15:35 01/31/96 09:00 497.42 16.00 151.70 135.70
A1F 13.60 16.40 2.80
A2C 15.80 178.90 163.10
A2F 13.60 15.90 2.30
A3C 15.60 177.20 161.60
A3F 13.70 16.40 2.70
COARSE 98.33 153.47 12.58 308.53
FINE 1.67 2.60 0.22 5.23
SITE B LOCATION R 103 LAT
B1C 01/10/96 16:05 01/31/96 09:30 497.42 15.80 797.80 782.00
Bl F 17.80 20.10 2.30
B2C 16.20 841.60 825.40
B2F 13.50 15.80 2.30
B3C ON 510 E 15.90 763.00 747.10
B3F 13.70 15.90 2.20
COARSE 99.71 784.83 32.03 1577.82
FINE 0.29 2.27 0.05 4.56
SITE C LOCATION GULF STREAM ROAD LAT
C1C 01/10/96 14:50 01/31/96 09:50 499.00 16.20 688.80 672.60
C1F 17.30 19.60 2.30
C2C 16.10 599.20 583.10
C2F 13.50 15.40 1.90
C3C 15.80 667.10 651.30
C3F 17.30 19.20 1.90
COARSE 99.68 635.67 38.17 1273.88
FINE 0.32 2.03 0.19 4.07




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTALWT. SAMPLE PCT MEAN STD. DEV. mg/HOUR
SITE D LOCATION PERUVIAN AVE LAT
D1C 01/10/96 16:30 01/31/96 10:00 497.50 15.90 1614.70 1598.80
D1F 15.80 20.80 5.00
D2C 15.80 1566.40 1550.60
D2F 13.60 17.90 4.30
D3C TI-1L T/" v ( 70 _15.70 1325.60 1309.90
D3F 15.80 19.90 4.10
COARSE 99.70 1486.43 126.37 2987.81
FINE 0.30 4.47 0.39 8.98
SITE El LOCATION BREAKERS "ROCK PILE" LAT E11C 01/10/96 17:10 01/31/96 10:10 497.00 17.50 2097.60 2080.10
E11lF 17.70 20.40 2.70
E12C 18.20 2143.30 2125.10
E12F 18.00 21.00 3.00
E13C "T/L/77 7V (_on 17.60 2119.00 2101.40
El 3F 13.70 17.00 3.30
COARSE 99.86 2102.20 18.38 4229.78
FINE 0.14 3.00 0.24 6.04
SITE E2 LOCATION BREAKERS "REEF"
E21C 01/10/96 17:30 01/31/96 10:25 496.92 15.70 44.70 29.00
E21F 18.00 19.90 1.90
E22C 15.80 48.20 32.40
E22F 17.30 19.70 2.40
E23C 15.70 47.20 31.50
E23F 16.00 18.00 2.00
COARSE 93.65 30.97 1.44 62.32
FINE 6.35 2.10 0.22 4.23




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTAL WT. SAMPLE| PCT MEAN ISTD. DEV. mg/HOUR
SITE F LOCATION R84 LAT
FIC 01/10/96 17:55 01/31/96 10:55 497.00 15.60 47.40 31.80
F1F 13.50 15.70 2.20
F2C 15.70 45.50 29.80
F2F 16.00 17.90 1.90
F3C 15.90 46.10 30.20
F3F 13.50 15.20 1.70
COARSE 94.06 30.60 0.86 61.57
FINE 5.94 1.93 0.21 3.89




PALM BEACH SAND TRAP ANALYSIS DEPLOYMENT 8

LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. ITOTALWT. ISAMPLE1 PCT MEAN JSTD. DEV. mg/HOUR
SITE A LOCATION Rl10 LAT
A1C 01/31/96 09:00 02/14/96 14:50 341.83 16.10 184.80 168.70
AlF 13.80 15.30 1.50
A2C 15.80 227.50 211.70
A2F 14.00 15.70 1.70
A3C 15.70 211.90 196.20
A3F 13.80 15.20 1.40
COARSE 99.21 192.20 17.78 562.26
FINE 0.79 1.53 0.12 4.49
SITE B LOCATION R 103 LAT
BIC 01/31/96 09:35 02/14/96 15:00 341.42 15.90 457.40 441.50
BIF 17.80 19.20 1.40
B2C 16.10 404.20 388.10
B2F 13.50 15.00 1.50
B3C 07T 51DE 15.90 438.30 422.40
B3F 13.80 15.00 1.20
COARSE 99.67 417.33 22.09 1222.36
FINE 0.33 1.37 0.12 4.00
SITE C LOCATION GULF STREAM ROAD LAT
CIC 01/31/96 09:50 02/14/96 14:30 340.67 16.20 578.80 562.60
Cl F 13.50 14.90 1.40
C2C 17.40 536.50 519.10
C2F 15.40 16.70 1.30
C3C 15.80 555.10 539.30
C3F 15.60 16.80 1.20
COARSE 99.76 540.33 17.77 1586.11
FINE 0.24 1.30 0.08 3.82




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN IPAN WT. JTOTALWT. ISAMPLEI PCT MEAN ISTD. DEV. jmg/HOUR
SITE D LOCATION PERUVIAN AVE LAT
DIC 01/31/96 10:00 02/14/96 14:00 340.00 15.70 605.50 589.80
DlF 15.60 17.10 1.50
D2C 15.90 542.80 526.90
D2F 15.30 16.80 1.50
D3C 1f ) E, 15.80 483.20 467.40
D3F 15.50 16.80 1.30
COARSE 99.73 528.03 49.98 1553.04
FINE 0.27 1.43 0.09 4.22
SITE El LOCATION BREAKERS "ROCK PILE" LAT E11C 01/31/96 10:15 02/14/96 13:35 339.33 17.50 2126.30 2108.80
E11F 15.30 17.90 2.60
E12C 18.10 1823.90 1805.80
E12F 15.80 18.50 2.70
E13C ___ BIDE _17.70 1954.70 1937.00
El 3F 13.70 16.50 2.80
COARSE 99.86 1950.53 124.07 5748.13
FINE 0.14 2.70 0.08 7.96
SITE E2 LOCATION BREAKERS "REEF"
E21C 01/31/96 10:25 02/14/96 13:25 339.00 15.70 97.10 81.40
E21 F 17.40 18.40 1.00
E22C 15.90 95.20 79.30
E22F 17.70 18.70 1.00
E23C 15.70 90.80 75.10
E23F 17.80 18.90 1.10
COARSE 98.70 78.60 2.62 231.86
FINE 1.30 1.03 0.05 3.05




LOCATION DATE IN TIME IN DATE OUT TIME OUT HRS. IN PAN WT. TOTALWT. SAMPLE PCT MEAN STD. DEV. mg/HOUR
SITE F LOCATION R84 LAT
FIC 01/31/96 11:00 02/14/96 13:10 338.17 15.70 28.30 12.60
FlF 13.90 14.50 0.60
F2C 15.70 30.80 15.10
F2F 15.90 16.50 0.60
F3C 15.90 29.40 13.50
F3F 13.50 14.00 0.50
COARSE 96.04 13.73 1.03 40.61
FINE 3.96 0.57 0.05 1.68