• TABLE OF CONTENTS
HIDE
 Fax Cover Sheet
 Main














Title: Fax of schedule for Arrivas House repair
CITATION MAP IT! THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00086537/00001
 Material Information
Title: Fax of schedule for Arrivas House repair
Physical Description: Archival
Language: English
Creator: Horvath, Roxanne
Publication Date: 2000
 Subjects
Subject: Saint Augustine (Fla.)
46 Saint George Street (Saint Augustine, Fla.)
Arrivas House (Saint Augustine, Fla)
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 46 Saint George Street
Coordinates: 29.896311 x -81.313236
 Record Information
Bibliographic ID: UF00086537
Volume ID: VID00001
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: Public Domain
Resource Identifier: B12-L21

Table of Contents
    Fax Cover Sheet
        Page 1
    Main
        Page 2
Full Text
904 725-4080 P.01


May-)8-00 10:43A Crg Architech


Fax


Name:
Organization:
Fax:
Phone:
From:
Date:
Subject:
Pages:


MAY 8 2000


HPHT
CITY OF ST. AUGUSTINE


Bill Adams &Keith Hunt
City of St. Augustine
825-5096
825-5034
Roxanne Horvath
5/8/00
Arrivas House Schedule
2


Attached is the current schedule for The Arrivas House Repair




904 725-4080


May-'08-00 10:43A Crg Architech


Sent by: RIVER CITY CONT.


904 384 8601;


05/05/00 10:17; a&B..#425;Page 2/2


M SITf SSWTSTIA. IMS.

4517-6 AWpln AvWmo
JAck1nvilk. Floid 32210
n~eM~6 J-- -- rr" --- '" m-"-'' ---
Fax3I4A891 6
wFa 3$4-6016


Arrives House Schedule


Apdl 24-M4ay



May S-Myl9




May 22-May 29







May 30-Jluoe9


Order all cuosn milled lumber, period nails,.and other materials.
Field verify all dimensions job condition, eablish scho ule with tenant.


Deliver matenaos o RCC shop
Segi shapia~ anc d*ailing of timbers
$ ack other new wood coiopMenn for drying

Secure job sic and uarage afty pr caulions
St scaffoldin, sharing, and bamicade as = ded fo public safety.
RaOmwJ of all exiacior carmpofants to be .reinssald or Mepaid.
Removal fRii premiss of all debris.
Storage of prs to be riwnsalled.
Compotion of RCC shop wrk.
Prmne an possibly first coa new wood at RCC sbop.

Reove ceiling at ground floor entrance.
Reatove aid replace beams.
Dril, bol, and plug beami,
All interior painntg complete.


June 12-23 Re-insaall all exterior componseas
Repace any additional itets needed. (handrails, balustes, fascia, freiz.)
Begin palming exterior


Jae 26.
July 7


Compleion of all paining,
Rcm~al of baricadms scafflds, detis.


P.02




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs