Title: SWFWMD General Status of Land Acquisition Through June 1, 1982. Chart for 29 projects with data in 10 columns. June 6, 1982. 1p.
CITATION PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00052576/00001
 Material Information
Title: SWFWMD General Status of Land Acquisition Through June 1, 1982. Chart for 29 projects with data in 10 columns. June 6, 1982. 1p.
Physical Description: Book
 Subjects
Spatial Coverage: North America -- United States of America -- Florida
 Notes
Funding: Digitized by the Legal Technology Institute in the Levin College of Law at the University of Florida.
 Record Information
Bibliographic ID: UF00052576
Volume ID: VID00001
Source Institution: University of Florida
Holding Location: Levin College of Law, University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text
L



SOUTHWEST FLORIDA WATER MANAGEMENT DIS KiCT
GENERAL STATUS OF LAND ACQUISITION THROUGH JUNE 1, 1982
Acres Acres Acres Acres Total Approximate Appro imate Total
Acquired Acquired Acquired to be Project Cost to Date Rema ning Estimat
SProject Basin Fee Simple Easements Total Acquired Acres Fee Simple Cost Cost
1. Green Swamp Project
a. Green Swamp FDA Green Swamp 45,713 -0- 45,713 12,795 58,508 $ 9,146,005 $16,375,000 $25,521,..
b. Upper Hills. FDA Withlacoochee, 6,110 -0- 6,110 8,056 14,166 2,096,866 9,063,000 11,159,86E
Green Swamp,
Hillsborough
c. Little Withlacoochee FDA Withlacoochee 4,446 19,040 23,486 800 24,286 696,310 -0- 69,31
2. Medard Reservoir Alafia 1,260 -0- 1,260 140 1,400 62,390 787,500 849,1l
(Pleasant Grove)
3. Lower Hillsborough FDA Hillsborough 14,818 38 14,856 160 15,016 10,808,950 1,620,300 12,429,250
State Park (not included 1,863 1,863
In cost)
4. Flint Creek Structure Hillsborough 1 -0- 1 -40 1 23,550 -0- 23,5
5. Cypress Creek FDA Hillsborough, 3,737. -O- 3,737 7,243 10,980 3,403,574 13,581,000 16,984,574
Pinellas-
Anclote

6. Tampa Bypass Canal (C-135) Hillsborough 1,144 4 1,148 -0- 1,148 5,252,150 -0- 5,252,150
7. Harney Canal (C-136) Hillsborough 93 -0- 93 -0- 93 264,550 -0- 264,5S
8. Channel "A' and "S" Northwest 4 1 5 -0- 5 25,170 -0- 25,17"
Structure Areas Hillsborough
9. Island Ford Lake Northwest 1 -0- 1 -0- 1 11,550 -0- 11550
Hillsborough

10. Largo Water Management Area Pinellas- 70 -0- 70 -0- 70 373,295 -0- 373,295
Anclote

11. Sawgrass Lake Pinellas- 384 6 390 -0- 390 2,042,332 2,042,332
Anclote

.. Lake Tarpon Outfall Canal Pinellas- 161 54 215 -0- 215 255,561 -0- 255,561
Anclote

13. Lake Tarpon Sink Enclosures Pinellas- 4 6 10 -0- 10 25,000 -0- 25,OL
Anclote

14. Alligator Creek (Pinellas) Pinellas- 44 -0- 44 -0- 44 756,950 -0- 756,9E
Anclote

15. Anclote Water Storage Lands Coastal, 5,398 -0- 5,398 2,922 8,323 2,692,736 4,171.050 6,863,7'
(Starkey Project) Pinellas-
Anclote

16. Masaryktown Canal (C-534) Coastal 170 3 173 -0-.- 173 141,039 -0- 141,,
17. Peck Sink Coastal -0- 13 13 -0- 13 -0- -0- -0-
18. Tsala Apopka Outfall Canal Withlacoochee 3 230 233 -0- 233 7,600 -0- 7,6u

19. Brogden Bridge Withlacoochee 1 -0 1 -0- 1 -0- -0- 0-
20. Wysong Lock and Dam Withlacoochee 5 -0- 5 -0- 5 7,500 -0- 7,5Cc
.1. Alligator Creek Structure Peace 2 -0- 2 -0- 2 -0- -0- -0-
(Charlotte)
2. Banana Lake Structure Area Peace -0- 2 2 -0- 2 -0- -0- -0-
13. Jack Creek Structure Peace 1 -0- 1 -0- 1 -0- -0- -0-
14. Lake Crescent Structure Area Northwest 1 0- 1 -0- 1 -0- -0- -0-
Hill sborough
?5. P-3 Canal Peace 3 -0- 3 -0- 3 3,048 -0- 3,04
26. P-5 Canal Peace 17 1 18 -0- 18 22,580 -0- 22,58C
r/ P-11 Canal' Peace 2 -0- 2 -0- 2 -0- -0- -0-
18. Peace Basin Office Peace 2 -0- 2 -0- 2 8,200 -0- 8,2C
!9. ROMP Monitor Well Sites All 0.08 6.5 6.58 3 9.58 5,900 -0- 5,90C
TOTALS 83,595.08 19,404.50 102,999.58 33,982.00 136,984.58 $38,132,806 $45,597,850 $83,730,55
"-M:cm:wp3/5
5/06/82
)6/04/82-R _





University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs