Title: Eldridge-Wilde Well Field in Pinellas and Hillsborough Counties
CITATION PAGE IMAGE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00051871/00001
 Material Information
Title: Eldridge-Wilde Well Field in Pinellas and Hillsborough Counties
Alternate Title: Eldridge-Wilde Well Field in Pinellas and Hillsborough Counties, Order No. 73-2R (Amending Order No. 72-4, Dec. 13, 1972).
Physical Description: 2p.
Language: English
Publication Date: July 11, 1973
 Subjects
Spatial Coverage: North America -- United States of America -- Florida
 Notes
General Note: Box 3, Folder 7 ( WELL FIELD HISTORIES ), Item 11
Funding: Digitized by the Legal Technology Institute in the Levin College of Law at the University of Florida.
 Record Information
Bibliographic ID: UF00051871
Volume ID: VID00001
Source Institution: University of Florida
Holding Location: Levin College of Law, University of Florida
Rights Management: All rights reserved by the source institution and holding location.

Full Text



j i/







SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT (REGULATORY)


IN RE:

THE OPERATION BY )
PINELLAS COUNTY OF THE ) ORDER NUMBER 73-2R
ELDRIDGE-WILDE WELL FIELD ) (AMENDING
IN PINELLAS COUNTY AND ) ORDER NUMBER 72-4
HILLSBOROUGH COUNTY, ) DATED
FLORIDA ) DECEMBER 13, 1972)


This matter came before the Board of Governors of the

6l Southwest Florida Water Management District (Regulatory), herein-

"after referred to as "Board", at a public hearing duly and properly

held before the Board on July 11, 1973 notice having been duly

given, to Pinellas County, a political subdivision of the State

of Florida, hereinafter referred to as "County", for the purpose

of promulgating further orders dealing with that certain well

field operated by Pinellas County in Pinellas County and

Hillsborough County, Florida known as the Eldridge-Wilde Well

Field, relating to implementation and enforcement of provisions

O contained in Order 72-4 entered by this Board on December 13, 1972,

including modifications thereto, and the County having been

present and represented by its counsel at said hearing, and the

Board having carefully considered the testimony presented

throughout the day long hearing, does find as follows:

A. That the County, although failing to comply with some

of the provisions of said Order 72-4 within the times prescribed,

has contracted for the construction of the observation and

monitor wells required by paragraph 2 of said order and desires

f, the time extended to October 10, 1973 within which to complete

construction of same.










B. That the County desires additional time in which to

prepare and present testimony to the Board relating to the

Eldridge-Wilde well field.

C. That additional time is needed in which to allow other

interested parties to present testimony.

IT IS, THEREUPON, ORDERED AS FOLLOWS:

1. That Order Number 72-4 heretofore entered by the Board

on December 13, 1972 be and the same is hereby amended insofar

as it relates to the time within which construction of each of

the observation and monitor wells referred to in paragraph 2

thereof is to be completed by providing that all such construc-

tion shall be completed not later than October 10, 1973 and that

the County shall forthwith notify the Board upon such completion.

2. That this hearing be and the same is hereby continued

until 10:00 a.m., September 12, 1973.

DONE and ORDERED this llth day of July 1973

SOUTHWEST FLORIDA WATER
MANAGEMENT DISTRICT
(REGULATORY), BY ITS
SEAL GOVERNING BOARD



A Chairman


Attest: ..



Assistant Secretary /





University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs