|
![]() |
|
| UFDC Home |
myUFDC Home | Help | RSS
|
|
ALL VOLUMES
CITATION
SEARCH
THUMBNAILS
PAGE IMAGE
ZOOMABLE
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Full Citation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STANDARD VIEW
MARC VIEW
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Full Text | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Lago Oil & Transport Co., Ltd. W Aruba, Netherlands Antilles W VOL. 30, No. 12 June 20, 1969 New Vice President/General Manager LeRoy Johnston Jr. Comes to Lago With 18 Years' LeRoy Johnston Jr. (46) joined Lago June 1 as vice president and general mana- ger. He brings to Lago more than 18 years' experience in the petroleum industry in Ve- nezuela, where he worked in Maracaibo, Amuay, Caripito, La Salina and Caracas. Mr. Johnston, who speaks Spanish fluently, comes from Creole-Caracas, where he had been assistant manager of the Refining Department. With a BS degree in Me- chanical Engineering from the University of Kansas, Mr. Johnston was originally em- ployed June, 1948 with Creole- Maracaibo as mechanical en- gineer. He transferred to the Amuay Refinery Sept. 27, '48. Most of his career with Creole Mr. Johnston spent at Creole Experience the Amuay Refinery where he became assistant refinery ma- nager on September 1, 1965. He was named acting refine- ry manager on February 1, 1967 and manager on August 1, 1967. He held that post un- til July 1, 1968 when he trans- ferred to Creole-Caracas. During the Second World War, Mr. Johnston served as a pilot in the U.S. Naval Air Corps and served in the At- lantic Fleet. His hobbies include flying, sailing and fishing. He owns a gyrocopter at his farm in Kansas. Mr. Johnston is married and has a son, LeRoy III (14), who is attending Phillips Exe- ter Academy in the U.S., and a daughter, Jan (11), who is attending grade school. J. Croes, R. van Heeswijk Advance To New Posts Effective June 1st. Two promotions were an- nounced effective June 1 in the Process and Technical Departments. Joaquin Croes of Process-Refining Division advanced to Operations Su- pervisor, while in Technical- Economics & Planning Divi- sion Ronald van Heeswijk moved up to Senior Engineer. Joaquin's first job at Lago was as Messenger "B" in the Industrial Relations Depart- ment in December 1943. He later transferred to Process Department where he pro- gressed to Levelman in the Catalytic & Light Ends area in 1952. He became Assistant Operator in 1954 and Oper- Jeanette Geerman, Miss Aruba 1969, with other contestants. (See Page 7). New Vice President and General Manager LeRoy Johnston. Vice Presidente/Gerente General Nobo LeRoy Johnston Ta Bin na Lago Cu 18 Anja Experiencia cu Creole LeRoy Johnston Jr. (46 an. ja di edad) a bin traha na La- go Juni 1 como vice-presiden- te y gerente general. E ta trece pa Lago mas cu 18 anja di experiencia den industrial petrolera na Venezuela, ca- minda el a traha na Maracai- bo, Amuay, Caripito, La Sa- lina y Caracas. Sr. Johnston, kende ta pa. pia Spai6 cu facilidad, ta bi- ni di Creole-Caracas, caminda e tabata gerente asistente di Departamento di Refinacion. Cu grado di bachiller den ator three years later. In 1962 Joaquin moved up to the position of Assistant Shift Foreman-Cat. & Light Ends. A 1964 promotion made him Shift Foreman in Proc- ess-Refining, where he subse- quently worked as Mainten- ance Foreman and Mainten- ance Coordinator. Before this recent promotion, Joaquin had been Process Foreman since November 1, 1967. In his new capacity as Operations Supervisor, Joa- quin has operations responsi- bility for all units presently on DDC control in the Light Ends area, the entire Refin- ing Central Control House (Continued on page 3) ingenieria mecAnica cu el a recibi di Universidad di Kan- sas, Sr. Johnston a bai traha originalmente dia 7 di Juni 1948 cu Creole como ingenie- ro mecanico na Maracaibo. Pronto el a pasa pa refineria di Amuay Sept. 27, 1948. Majoria di su carera cu Creole, Sr. Johnston a pasa den refineria di Amuay, ca- minda el a bira gerente asis- tente di refineria dia 1 Sep- tember 1965. El a word nombrA Gerente interino di refineria dia 1 Februari 1967 y gerente dia 1 Augustus 1967. E tabata ocupa tal puesto ey te dia 1 Juli 1968 tempu cu el a traslada pa oficina di Creole na Caracas. Durante segundo gera mun- dial Sr. Johnston a sirbi como piloto den cuerpo aereo naval di Merca, den Flota Atlan- tico. Den su tempu liber e ta gusta bula avion, nabega y piscamento. Na su hacienda na Kansas e tin un giroc6p- tero. Sr. Johnston ta cast y e tin un yiu bomber, LeRoy III cu tin 14 anja y actual- mente ta studia na Phillips Exeter Academy na Merca, y un yiu muher Jan di 11 anja cu ta bai MULO. ARUBA ESSO NEWS arwasm asso" 1J. Croes, R. van Heeswijk Promovi Lago Oil &Transport Co., Ltd. M WIN Pa Puesto Nobo Efectivo Juni 1 A. Werleman Editor; Miss L.I. de Lange Assoc. Editor; J. M. de Cuba Photographer Printed by: Verenigde Antilliaanse Drukkerijen N.V. J. R. Buchanan Returns to Lago After 6 -Year Creole Assignment James R. Buchanan Jr. re- joined Lago June 1, 1969 as Operations Coordinator in Pro- cess-Operations Coordination Division. He returns to Lago after more than 6-1/2 years with Creole-Caracas. On November 8, 1962, Mr. Buchanan transferred from La- go to Creole as Sr. Coordina- tion Supply Analyst I. When he left the Caracas office May 31, 1969, he held the position of Supervising Coordination Supply Analyst. Mr. Buchanan, who has a BS degree in chemical engin- eering from North Carolina State College and an MS de- gree in chemical engineering from the Massachusetts Insti- tute of Technology, started at Buchanan Ta Regresa Na Lago Despues di 6 V2 Anja na Creole James R. Buchanan Jr. a bolbe bin traha na Lago dia 1 Juni 1969 como Coordinador di Operacion den Division di Process cu ta coordina ope- racionnan di refineria. E ta bini bek aki despues di a tra- ha mas cu 6% anja cu Creole na Caracas. Dia 8 November 1962 Sr. Buchanan a traslada di Lago pa Creole como Sr. Coordi- nation Supply Analyst I. Dia cu el a laga su oficina na Caracas dia 31 Mei 1969 e tabata ocupa puesto di Su- pervising Coordination Supply Analyst. Sr. Buchanan, cu tin grado di bachiller di ciencia den in- genieria quimica, cual el a haya di North Carolina State College, y grado di Maestro den ingenieria quimica di In- stituto Technologico di Esta- do Massachusetts, a principia na Lago dia 13 Januari 1957 como ingeniero quimico den TSD-Process. L Lago January 13, 1957 as a chemical engineer in TSD-Pro- cess. He was transferred to Exe- cutive Operations Coordina- tion on December 5, 1960 as Coordination Assistant A and was promoted to Sr. Coordina- tion Assistant effective April 1, 1962. Before joining Lago, Mr. Buchanan served for two years (1954-1956) in the U.S. Army in Germany where he held the rank of first lieute- nant. J. R. Buchanan Mr. Buchanan, who is con- versant in Spanish, is mar- ried and has three daughters, Michal Ann, Jessica and Mo- nica. El a traslada pa Executive- Operations Coordination dia 5 December 1960 como Coordi- nation Assistant A, y a recibi promocion pa puesto di Sr. Coordination Assistant dia 1 April 1962. Promer cu el a bin traha na Lago, Sr. Buchanan a sir- bi dos anja (1954-1956) den Eheroito Amerioano na Ale- mania, cu range di promer teniente. Sr. Buchanan, cu ta papia Spafl6, ta casA y tin tres yiu muher, Michal Ann, Jessica y Monica. Dos promocion a uncia cu efecto 1 Departamentonan Pr Technical. Joaquin Process, Division di cion, a bal dilanti y na puesto di Operat pervisor, mientras d nical-Economics & Ronald van Heeswijk promocion pa Senior eer. Joaquin su prome na Lago tabata M 'B' den Departamento keda an- Juni den ocess y rante su proximo vacacion e tin idea di bishita Venezuela y Colombia. rcea m Ron a cuminza su carera Refina- como ingeniero den Technical. a yega Process su Division di Inge- ions Su- nieria na 1963. El a gradua en Tech. n Tech- como bachiller di ingenieria Planning quimica na HTS di Groningen, a recibi Hulanda. El a worde encargA Engin- cu trabao di ingeniero di con- tacto pa unidadnan di Isome- r trabao risacion y Alkylacion te 1964, messengerr ora cu compania a fid duran- di Re- te tres luna na Aruba Chem- S %* ical Industries. lacion Industrial na Decem- ber 1943. Despues el a pasa pa Process Department, ca- minda el a progress y a bira Levelman den plant Cataly- tic & Light Ends na 1952. El a bira Assistant Operator na 1954 y Operator tres anja des- pues. Na 1962 Joaquin a hanja mas promotion, biran- do Assistant Shift Foreman di Catalytic & Light Ends. Un promotion na 1964 a hacid Shift Foreman den Pro- cess-Refining, caminda des- pues el a traha como Main- tenance Foreman y Mainten- ance Coordinator. Promer cu su reciente promotion, Joa- quin tabata Process Foreman desde 1 November 1967. Den su puesto nobo como Operations Supervisor, Joa- quin ta responsabel pa tur unidadnan actualmente conec- tA na control DDC den distri- to di Light Ends, henter Re- fining Central Control House, cual ta inclui sistemanan di control di plant di craqueo y sistemanan di control di Ca- talytic & Light ends. Joaquin a tuma un curso di turbina di gas na Filadelfia algun anja pasA. E ta casA y tin cincu yiu, di edadnan en- tre diezcincu y seis anja. Du- El a bolbe na Lago su Di- vision di Ingenieria den Pro- cess na Januari 1965. Na Oc- tober di e anja ey compania a mand4 na e centro di Esso pa investigation cientifica y ingenieria na Florham Park, Merca, cu un otro encargo temporal. Poco despues di a bolbe na Aruba el a sali pa refineria di Esso na Rotter- dam, Hulanda, pasobra Lago a fid pa traha eynan un anja. Na 1967 el a bolbe na Lago y el a bai traha den Division Economics & Planning. R. van Heeswijk Recientemente el a worde nombrA Coordinador di Bud- get pa 1970. Durante su em- pleo cu compania Ron a tuma hopi curso, entire nan curso di diseflo di Proceso na Lima, Peri; diseflo y aplicacion pa control automatic na Geneva, New York; y programacion linear na Florham Park, New Jersey. Ron ta miembro di comision cu ta dirigi Lago su Feria Cientifica, tambe director di actividadnan di Esso Club. Den su tempu liber e ta gusta hunga tenis. E ta casA y tin dos yiu muher, di cincu y tres anja. June 20, 1969 June 20, 1969 Participants in the Lago-Creole sponp- ored Process Economics Course held at the Aruba Sheraton Hotel from May 27-June 12 included: (Participantes der Curso di Economia di Proceso teni na Aruba Sheraton Hotel di Mei 27-Juni 12 a inclui:) First row, left to right: C. Forte, H. Sifontes, F. Kock, F. Kock, W. L. Duke, J. R. Carroll; 2nd row, I to r: M. Borstelmann, W. Matthews, H. Bislip, R. E. Haack, L. D. Rossi, C. Mager, R. Reyes, J. E. Yeamans, W. F. Ratcliff, instructor; 3rd row, I to r: C. Redhead, H. J. Fenton, R. Sierra, R. Johnson, instructor, J. Noguera, J. Bo- lich, G. Sorli, R. Strauss, D. Castillo. ARUBA ESSO NEWS 3 I I J. Croes, R. van Heeswijk Promoted I r ws Vice President LeRoy Johnston presents certificate of achievement for completing Process Economics Course to C. Redhead from Creole-Amuay. Vice President LeRoy Johnston ta present certificado pa Curso di Economia di Proceso na C. Redhead di Creole- Amuay. Diezcuater Empleado Ta Gana Total F. 680 den Premio Inicial di CYI (Continued from page 1) which includes the Cracking Plant control systems and the Catalytic & Light Ends con- trol systems. Joaquin followed a Gas Turbine Course in Philadel- phia a couple of years ago. Married, he has five children, ranging in age from fifteen to six years. On his next vaca. tion he plans to visit Vene- zuela and Colombia. Ron began as an engineer with the Technical-Process Engineering Division in 1963. A B.S. graduate in Chemical Engineering of the HTS in Groningen, Holland, he was assigned as contact engineer for the Isomerization and Al- kylation units until 1964 when he went on a three-month loan assignment to Aruba Chemical Industries. He returned to Lago's Pro- cess Engineering Division in January, 19i5. In October that year he was sent to Esso Research & Engineering Cen- ter in Florham Park on an- other loan assignment. Short. ly after returning to Aruba he left on a one-year loan as- signment to the Esso Rotter- dam Refinery in Holland. In 1967 he returned to Lago and was assigned to the Econom- ics & Planning Division. Recently he was named 1970 Budget Coordinator. Du- ring his employment Ron has followed many courses, among others, the Process Design Course in Lima, Peru; Design and Application for Auto- matic Control in Geneva, New York, and Linear Program- ming at Florham Park, New Jersey. A Lago Science Fair Com- mittee member, Ron is also Director of Activities of the Esso Club. In his spare time he enjoys playing tennis. Married, he has two daugh- ters, five and three years old. Entre diezcuater ganador- nan di premio inicial CYI pa lunanan di Mei y Juni, Guil- lermo Arendsz di Mechanical- Shop Zone; F. R. Lo-Fo-Sang di Mechanical-Oil Movements zone; y B. F. Semeleer di Mechanical-Shop Zone, cada un a mira dos di nan ideanan aceptA. Nan a gana f. 40.- pa cada un di e ideanan cu nan a manda aden. U n sugerencia di S r Arendsz tabata pa instala un buracu di desague pabao di tanki 423. E otro a sugeri pa conecta e sistema di jama hende na telefon pa via di code, na e circuit di emer- gencia di 110 Volt den kam- ber di switch na central di telefon. Sr. Lo-Fo-Sang su promer idea tabata pa instala un slot dobbel na substacion di Load- ing Pumphouse, pa operador- nan por drenta den e substa- cion den caso di emergencia. Su otro idea tabata pa pro- teha esnan cu bishita Lago su Feria Cientifica contra des- gracia. Sr. Semeleer a sugeri pa pone sostenedor riba tur tred- nan di trapi den Control House nobo di Division di Re- finacion. Su di dos idea taba- (Continud n pagina 8) 25-Year Service Watch Recipients for June Bertrando Geerman Mech.-Proj. Eng. Sect. Marcelo Croes Process-Refining Paul Trimon Technical-Lab/lnsp. Agustin Maduro Mechanical-Metal Section Francisco Arrindell Technical-Lab/lnsp. James E. Arrindell Mech.-Metal Section Maximo Maduro Mechanical-C. O./Yard ir, i ARUBA ESSO NEWS --.6 *;. 3d -*.* i Dredge "Georgia" cutting through reef in lagoon. Draga "Georgia" cortando door di rif den lagoen. Engineer B. L. Williamson Project Supt. J. Wilkerson Enginiero B. L. Williamson. explains dredging map. Entrance in Reef, Turning Basin Dredged, Land Reclaimed in Lagoon The first and important part of the preparatory work for the Fla. 150,000,000 Hy- drodesulphurization P r o ject was completed May 26, 1969 by the dredge "Georgia" of Great Lakes Dredge & Dock Company. This company car- ried out the project as sub- contractor for the Royal Netherlands Harbour Works. Since the time dredging oper- ations started in the lagoon at Lago on April 2, a huge amount of material has been removed. The dredge cut a new en- trance through the reef, 500 feet wide on the surface and sloping down to 300 feet at the bottom with a depth of 37 feet. Within the lagoon, a turning basin was dredged to 34 feet. The material dredged filled up an area extending from Powerhouse No. 1 to the General Office Building (see map). Part of the reclaimed area, rising some 10 feet above mean sea water level, will be used to erect the HDS facilities. At present a 325 feet pier is being built at the new re- claimed site by the Royal Netherlands Harbor Works. The pier will be used for landing heavy equipment and later for dry cargo shipment. The total cost of the dredg- ing project is valued at ap- proximately Fls. 1,400,000. The dredge "Georgia", with Billy P. Coleman as captain, Jim Lane as chief engineer and Chief Mate E. W. Pier- son, came from Tampa, Flo- rida, after dredging a harbor there. The project at Lago is their third job. Field engineer for the project was L. Mal- oney, while J. Wilkerson was Project Superintendent. The dredge (160 feet long, 48 feet wide, with a draft of (Continued on page 8) This is the control room of dredge "Georgia", with Operat Kennedy at the "joy stick". Behind him is Field Engineer L. I while Captain Billy P. Coleman is in background. The other i is Alton Abbott. Esaki ta e sala di control di drag "Georgia", cu John Ken control. Tras di dje ta Field Engineer L. Maloney, mientras C; Coleman ta mas patras. E otro operator ta Alton Abbott. o. A- .t t"*' 21 ' This is the 84-foot shaft with cutter of dredge "Georgia" with depth scale. Esaki ta e boor di 84 pia di e draga "Georgia" cu e marcador di hundura. vb-- L II June ARUBA ESSO NEWS S -- -"' I -'r " Here "Georgia" is cutting a passage through shallow area to get to the lagoon dredging site, while area southeast of Powerhouse No. 1 is being filled with dredged material. Aki "Georgia" ta corta un pasada door di un part secu pa yega den lagoen na e sitio di draga, mientras e lugar zuidoost di Powerhouse No. 1 ta ser yena cu santu. Chief Engineer Jim Lane Entrada den Rif, Lugar di Draai Cobd, Tereno Gedempel den Lagoen E part promer y in tante di obranan prepare pa project di desulfurisa cual lo costa 150 miljon rin, a word complete di Mei 1969 door di e d "Georgia", propiedad di C Lakes Dredge & Dock C compania aki a haci e tr ey como sub-contratist compania Hulandes HR werken. Desde cu drag tu a cuminza den lagoei Lago April 2, un can enorme di tera a word E draga a corta un ent nobo door di rif, 500 pia chu na superfice di lama rando menos te 300 pia w -- 'E por- torio cion, flo- a 26 Iraga greatt !o. E sabao a di even- men- a na tidad fondo di laman, cu profundi- dad di 37 pia. Den lagoen mes nan a coba un lugar pa bar- cunan bira rond di 34 pia hundu. E santu cu a keda dragA a cubri un tereno for di Powerhouse No. 1 te na General Office Building, ma- nera e mapa ta mustra. Parti di e tereno gedempel, cu tin un haltura di 10 pla riba su- perficie di lama, lo worde usa pa construction di plantanan di desulfurisacion. coba. Actualmente compania Ha- Svenwerken ta trahando un rada Swaf di 325 pia largu na e te- han- Sreno gedempel. Compania lo den usa e waf pa descarga pieza- nan pist for di bapor, y des- pues pa carganan general. Costo total di e project di 1. dragamenttr a keda valut na Sf. 1,400,006. Draga "Georgia", cu Billy P. Coleman como captain, Jim Lane como hefe maquinista, y promer ofieial E. W. Pier- son, a bini for di Tampa, Flo- rida, despues di a coba un haf aya. E project na Lago ta nan di trees obra. Ingeniero na e sitio di trabao tabata L Maloney, huntu cu J. Wilker- (Continued a pagine 8) ARUBA ESSO NEWS Employees' Identification Badges in The Course of Years .... 1939 1939 1941 1942 1950 1950 1958 1958 1968 In the course of years, employee identifications have changed in size, shape and content. Until 1939, the oval metal badge contained only a number as identification. However, during the war years it became necessary to have better and more personalized identification badges. Since that time all badges have been provided with the em- ployee's picture. The first picture badge was rectangular and a later type was round, all in metal frames. In 1950, the era of plastic badges started. The first plastic badge was square, followed by the oval type. The new badge is since 1968. Fichanan Usa Den Curso di Anjas EARER Den curso di anjas, identificacionnan pa empleadonan a S S cambia den tamanjo, forma y contenido. Te 1939, e ficha oval di metal tabata contene solamente un number pa iden- i- tificacion. MAIN rJmNr ~InUI CATVC Durante anjanan di 2do guera, sinembargo, a bira nece- sario pa usa ficha mehor y mas personal. Desde e tempo tur ficha a ser saki cu e empleado su portret aden. E pro- mer ficha cu portret tabata di forma rectangular y un tipo despues tabata rond6, pero tur tabata den lijsji di metal. Na 1950, e period di ficha di plastic a cuminza. E pro- mer ficha di plastic tabata mas o menos vierkant y despues a bini e ficha oval. E mas reciente renobacion di ficha di identification a tuma lugar na 1968. E a tIICt~~ INCL UJ eLa XV FIREV ZONEL I S INCLUDING ;FlRP ZONE -- ."- -, .,q Here is one of the passes (No. 183) used before 1930 when Lago operated under the name Pan-American Petrol- eum Corporation. The first group of Americans who worked for the company also received a Pan-Am gold button (shown at left). The pictures above and at left were ob- tained through the courtesy of Mr. E. Thomas Wilburn, who worked for Pan-Am-Lago from 1928-1930 as an audi- tor. He is now president of the First Federal Savings and Loan Association of Broward County, Fort Lauderdale. Aki ta uno di e promer pasnan (No. 183) usa promer cu 1930 tempu cu Lago tabata opera bao di number di Pan- American Petroleum Corporation. E promer grupo di Ame- ricano cu a traha pa compania tambe a recibi un boton Pan- Am di oro (munstra na robez). E portretnan aki riba y na banda robez a ser obteni pa cortesia di Sr. E. Thomas Wil- burn, kende a traha pa Pan-Am y Lago di 1928 pa 1930 como un auditor. Awor el ta president di First Federal Sav- ings and Loan Association di BrQward County, Florida. us CuBs 16736 1968 .... ft r June 20, 1969 1 laine 0 169A A * Jeanette Geerman Is MISS ARUBA 1969 * tS - Marjorie Luydens, Miss Tweka 1st Runner-up I- Jeanette Geerman, Miss Aruba 1969 tra K Evelyn Croes, Miss Press 2nd Runner-up Jeatette cjeermatn, Mlliss rliuba f100) Sandra Croes, Miss 1968 (left), and Guest Queens mu a w u *. -w' .' 4 S Eight young ladies competed for the Miss Aruba title this year. The winner, Miss Jeanette Geerman, will represent Aruba in the Miss Universe Contest in Miami. Ocho hoben damitas a competi pa titulo di Miss Aruba e anja aki. E ganador, Srta. Jeanette Geerman, lo represent Aruba den Concurso Miss Universe na Miami. mr, ARUBA ESSO NEWS e nuJ 20 196g ARUBA ESSO NEWS B. Dredging in Lagoon irConlmrfd frow, p..'-I 6 1 9 reell i; equip ,-,i war. ItA- 26.cPi)areir CeM i trigmns &nj one generator which provide power for a huge centrifugal pump and the 84 feet long cutter. Its discharge line is 26 inches in diameter. It is capable of cutting over a width of 300 feet and up to 65 feet deep while swinging from port to starboard an- chors attached to booms. In addition to its 16-man original crew, some 40 men were engaged locally. Resident Engineer for this project and also for all con- struction work for Lago's HDS project is R. L. Thonus. He is assisted by Field En- gineer R. L. Plambeck. Both are from Esso Research & Engineering Company. From Aruba, the "Georgia" left for Curacao June 11. The "Boulevard Esso Servicenter" will be opened Saturda) June 28, at 9 a.m. The new Esso Servicenter will offer serve ice 24 hours a day, including top quality Esso and Atla products. It will be the first station to have diesel moto fuel available. Customers can participate in a special con test from June 28 to July 26, with a portable TV, a bicycle and 12 top quality transistor radios as prizes. Come an bring along the children at the grand opening. There wi be balloons, soft drinks and giveaways for everyone. Y, I- C- is r i- e A II 4 Joe CYI di Mei/Juni (Continud di pagina 3) ta pa cambia lugar di e ac- tual tubo di awa pa nord di edificio caminda central di telefon ta, pa un lugar nobo. Otro ganadornan di un pre- mio inicial di f. 40 tabata: John G. Richardson, Theodoor W. Lattig, tur dos di Mech- anical-Shops; Angel Henri- quez, Mechanical-Oil Move- ments Zone; Robert J. van Balen, Mechanical-M&C; Pe- dro Geerman, Mechanical- Shops (Instr.); Pieter J. Beaujon, Mechanical Engin- eering; Julio Kelly, Albino Martin, tur dos di Process- Oil Movements y Paul L. Samy, Felies F. Wanga, Lu- cario J. Maduro, tur di Proc- es-Refintng. r- -, Some modern ballet dancers gave special performances dur- ing the election of Miss Aruba 1969 at the Aruba Sheraton Hotel May 31. In the top picture at right, one of the dancers is Diana, daughter of PR Administrator O. V. Antonette. Algun bailarinas di ballet modern a duna actuacion special durante election di Miss Aruba 1969 na Aruba Sheraton Hotel Mei 31. Den e portret ariba banda drechi, uno di e bailarinas ta Diana, yiu muher di PR Administrator O. V. Antonette. son como superintendent di project. E drag, cu ta midi 160 pia largu. 48 pia hanchu cu un calado di 9 pia, ta equipt cu dos motor diesel di 26 cilin- dro, y un generador cu ta produce coriente pa un enor- me pomp centrifugal y e boor cu ta corta tera y ta 84 pia largu. Su tubo cu ta descarga santu tin un diametro di 26 duim. E por corta un hanchu- ra di 300 pia te 65 pia hundu, mientras e ta move pa medio di ankernan banda drechi y banda robez cu ta pegA na e drag su boomnan. Fuera di tripulacion di 16 homber di e draga, nan a du- na 40 hende trabao aki na Aruba. Ingeniero Residente pa hen- ter e project aki y tambe pa tur obranan di construction pa Lago su project di desul- furisacion ta R. L. Thonus. R. L. Plambeck ta asistie como ingenlero na lugar di trabao. Tur dos ta empleado di Esso Research & Engineering Company. Draga "Georgia" a sali for di Aruba Diarazon merdia. 11 di Juni pa Corsow, pa su si- guiente tarea. a June 20, 1969 "Boulevard Esso Servicen- ter" lo habri Diasabra, Juni 28, pa 9 a.m. E EssQ Servi- center nobo lo ofrece servi- cio 24 ora pa dia, incluyen- do products Esso y Atlas di supremo calidad. Esaki lo ta e promer stacion cu lo tin combustible diesel dis- ponibel. Clientes por partici- pa den un concurso special di Juni 28 te Juli 26, mien- tras tin un television porta- til, un bicicleta y 12 radio transistor di top calidad co- mo premios. Bini y trece e muchanan na e inauguracion grandiose. Lo tin balon, re- fresco y regalos pa tur. [ Dragamento ..... . (Continud di pagina 5) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| MILLISECOND | CLASS.METHOD | MESSAGE |
|---|---|---|
| 0 | sobekcm_page_globals.constructor | |
| 0 | sobekcm_page_globals.constructor | Application State validated or built |
| 0 | sobekcm_database.verify_item_lookup_object | |
| 0 | sobekcm_page_globals.constructor | Navigation Object created from URI query string |
| 0 | sobekcm_database.verify_item_lookup_object | |
| 0 | sobekcm_page_globals.display_item | Retrieving item or group information |
| 0 | sobekcm_page_globals.get_entire_collection_hierarchy | Retrieving hierarchy information |
| 0 | sobekcm_assistant.get_entire_collection_hierarchy | |
| 0 | cached_data_manager.retrieve_item_aggregation | |
| 0 | cached_data_manager.retrieve_item_aggregation | Found item aggregation on local cache |
| 0 | item_aggregation_builder.get_item_aggregation | Found 'all' item aggregation in cache |
| 0 | system.web.ui.page.page_load (ufdc.page_load) | |
| 0 | sobekcm_page_globals.constructor.on_page_load | |
| 0 | html_echo_mainwriter.add_style_references | Adding style references to HTML |
| 0 | html_echo_mainwriter.add_text_to_page | Reading the text from the file and echoing back to the output stream |
| 26 | html_echo_mainwriter.add_text_to_page | Finished reading and writing the file |