Slide 15: Canal Official Opening by the Ancon

Material Information

Title:
Slide 15: Canal Official Opening by the Ancon
Physical Description:
2.0" X 2.0"
Donor:
Metinturff, Kathryne M. ( donor )

Notes

Abstract:
The fifteenth slide of the Panama Canal Commission booklet depicts the first vessel, the Ancon, making its way through the finished canal. Due to the outbreak of WWI, the opening of the canal did not make headlines. The Panama Canal was finished ahead of schedule and under budget. Total costs were around $375 million.
General Note:
made in the memory of Vikki Borell Edwards (BHS '74)
Original Location:
Envelope File 2013

Record Information

Source Institution:
Panama Canal Museum
Holding Location:
University of Florida
Rights Management:
All rights reserved by the source institution.
Resource Identifier:
accession number - 2013.23.4O
System ID:
AA00019293:00001