<%BANNER%>
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/AA00016094/00001
 Material Information
Title: Fuel and power statistics of class I steam railways in the United States
Series Title: Statement ;
Physical Description: v. : ; 28-41 cm.
Language: English
Creator: United States -- Interstate Commerce Commission. -- Bureau of Transport Economics and Statistics
Publisher: U.S. G.P.O.
Place of Publication: Washington, D.C.
 Subjects
Subjects / Keywords: Locomotives -- Fuel consumption -- Periodicals   ( lcsh )
Genre: serial   ( sobekcm )
federal government publication   ( marcgt )
statistics   ( marcgt )
periodical   ( marcgt )
 Notes
Statement of Responsibility: Interstate Commerce Commission, Bureau of Transport Economics and Statistics.
Dates or Sequential Designation: Jan. 1949-Nov. 1956.
Numbering Peculiarities: Compares the monthly statistics of the current year with that of the preceding year.
General Note: "Compiled from ... reports representing ... steam railways (class I switching and terminal companies included)."
General Note: Title from caption.
 Record Information
Source Institution: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
Resource Identifier: oclc - 18539703
lccn - sn 88029183
ocm18539703
Classification: lcc - HE2713 .Un333
ddc - 385.0973 fU56fu
System ID: AA00016094:00028
 Related Items
Preceded by: Fuel and power for locomotives and rail motor cars of class I steam railways in the United States
Succeeded by: Fuel and power statistics of class I railways in the United States

Full Text
UNIVERSITY OF FLORIDA


3 1262 08584 0428


Subject to revision


UNIV. OF FL LUI.





U.S DE0 P- TO
U.S. DEPG'.TOCMY


INTERSTATE COMMERCE COMMISSION
BUREAU OF TRANSPORT ECONOMICS AND STATISTICS


FUEL AND POWER STATISTICS OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 160 reports representing 169 steam railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF APRIL 1951 AND 1950


SOUTHERN DISTRICT ITEM
ITEM UNITED STATES EASTERN DISTRICT SOUTHERN DISTRICT WESTERN DISTRICT ITNOM
POCAHONTAS REGION SOUTHERN REGION

1951 1950 1951 1950 1951 1950 1951 1950 1951 1950


$22 391076
8 096 620
18 225 729
1923 893
55 351
48 785
50 741454

583264
17 712 291
21671502
7 103 78 9
20984
3 058 108
127 500569
111639 451
72 573 25 9
27 474
57116 2
35 839 570
50 592 73 7
62 167 32 6
439 657
50 404 957
296 25 3
4 828 253
100762
5 295060
198 542 911
3 935 510
$22 095 102
764 666
9 655 485
18 723 446
687 331


AGGREGATES
1. Cost of fuel and power charged to yard and train services Total charge for,
1-01. Coal for steam locomotives (Accounts 382 and 394) . .
1-02. Fuel oil for steam locomotives (Accounts 382 and 394) .
1-03. Diesel fuel (Accounts 382 and 394). . .......
1-04. Electric current (Accounts 383, 384, 395, and 396). .
1-05. Gasoline (Accounts 382 and 394) ............
1-06. Other fuels (Accounts 382 and 394) .... . . .
1-07. Total . . . . . . . . . . . ....
2. Quantities of fuel and power charged to yard and train accounts:
Quantities consumed in yard switching service (Accounts 382, 383, and 384),
2-01. Coal by steam locomotives (net tons). . . . ..
2-02. Fuel oil by steam locomotives (gallons) . . . .
2-03. Diesel fuel (gallons) . . . . . . . . .
2-04. Electric current (kilowatt-hours) . . . . . .
2-05. Gasoline (gallons) . . . . . . . . .
Quanttli onsuaed ino road freight service (Account 394, 395, and 396),
-06. Coal by steam locomotives net ton) .
2-07. Fuel oil by steam locomotives (gallons) . . . .
2-08. Diesel fuel (gallons) ..... . ...........
2-09. Electric current (kilowatt-hours) . . . . . .
2-10. Gasoline (gallons) . . . . . . . . .
Quantities consumed in road passenger service (Accounts 394. 395, and 396),
2-11. Coal by steam locomotives (net tons) . . . . .
2-12. Fuel oil by steam locomotives (gallons) . . . .
2-13. Diesel fuel by locomotives (gallons) .. . .. . ..
2-14. Electric current by locomotives (kilowatt-hours) . .
2-15. Diesel fuel by motorcar trains (gallons) . . . .
2-16. Electric current by motorcar trains (kilowatt-hours). .
2-17. Gasoline by motorcar trains (gallons) 1/ . . . .
3. Quantities of all fuel and power purchased and produced: 2/
3-01. Coal purchased f.o.b. mines (net tons) . . . .
3-02. Coal purchased f.o.b. points other than mines (net tons)
3-03. Fuel oil purchased (barrels) . . . . . . .
3-04. Diesel fuel purchased (gallons) . . . . . .
3-05. Electrio current purchased and produced (kilowatt-hourse)
3-06. Gasoline purchased (gallons)# ............. .
4. Total cost of all fuel and power at point of parchase and production:
4-01. Coal purchased f.o.b. mines . . . . . . .
4-02. Coal purchased f.o.b. points other than mines . . .
4-03. Fuel oil purchased ................. .
4-04. Diesel fuel purchased .................
4-05. Electric current purchased and produced. . . . .
4-06. Gasoline purchased# . . . . . . . . .
AVERAGES
5. Average cost of all fuel and power at point of purchase and production: /
5-01. Coal per net ton (mine purchases) ...........
5-02. Coal per net ton (other purchases) . . . . .
5-03. Fuel oil per barrel (42 gallons) . . . . .
5-04. Diesel fuel per gallon . . . . . . . ......
5-05. Eleotrio current per kilowatt-hour . . . . ...
5-06. Gasoline per gallon . . . . . . . . .....
6. Unit costs of yard and train fuel and power (inol. freight and
handling expenses): !/
6-01. Coal per net ton . . . . . . . . . .
6-02. Fuel oil per barrel . . . . . . . . .
6-03. Diesel fuel per gallon . . . . . . . .
6-04. Electric current per kilowatt-hour . . . . .
6-05. Gasoline per gallon . . . . . . . . .
7. Fuel and power consumed per yard-switching locomotive-hour:
7-01. Pounds of coal (steam locomotives) . . . . .
7-02. Gallons of fuel oil (steam locomotives) . . . .
7-03. Gallons of diesel fuel (diesel locomotives) . . .
7-04. Kilowatt-hours (electric locomotives) / . . ..
7-05. Gallons of gasoline (gasoline and gas-electric looootives) /g .
8. Fuel and power consumed per 1,000 gross ton-miles (including
locomotives and tenders) road freight service:
8-01. Pounds of coal (steam locomotives) . . . . .
8-02. Gallons of fuel oil (steam locomotives) . . . .
8-03. Gallons of diesel fuel (diesel locomotives) . . .
8-04. Kilowatt-hours (electric locomotives) . . . . .
9. fuel and power consumed per passenger-train car-mile road passenger service:
9-01. Pounds of coal (steam locomotives) . . . . .
9-02. Gallons of fuel oil (steam locomotives) . . . .
9-03. Gallons of diesel fuel (diesel locomotives) . . .
9-04. Kilowatt-hours (electric locomotives) . . . . .


$25 532 110
5 797 10 5
13429 177
2 033 501
86 767
49 226
46 927 886

693 626
14575 373
17410 050
6 982 12 5
18 064
3 470 245
112 076 411,
86142 012
75 511 140
39 683
657 247
36 713 380
44692 986
63 535 201
444 235
48 202 921
518 362
5 836 358
116 480
4121057
149 721233
3 928 458
$26 268 645
888 360
6208 932
12857 093
637028


(L0 732 35 4
49 520
5 912 651
1652 863
16 86 7
17 431
18 381 68 6

282 794
113 017
10456 402
6 610440
12 919
1276 963
351273
30710042
46 991295
1543
347 261
196 973
14 269 16 8
58 248 234
90718
45 650601
82 280
2 292 434
46 73 3
178 969
61421699
1477295
*LO 837 291
342 841
488 854
5 971 27 8
279 561


$13 255 166
59 4 84
4035 596
1697 453
21 862
16 519
19086080

368 023
126 49 8
8135 237
6608 339
8848
1625 962
525 017
22 31817 9
48 365 534
1698
364 055
248 792
12 880749
59 975 876
57 206
43 636 921
125 831
2 970 882
61 207
184 85 9
43432 218
1338 713
$13 671 101
462 914
462 985
3684 377
239 518


$2 524 99 6
333 001
36 621
1215
2 895 833

50877
741 29 2


342 3 12
1 885 64 9
10146 882

49 022
453 153
6 114


518 13 8
5051
4001
3 595 134
170891
$2 80175 2
47 325
13 273
36118 4
25 847


$2 635 683
177 226
120 495
479
2 933 883

54 638
568 318


374 355
815 127
14 520 967

51 938
460 197
110 521
8 551


620 080
5 662
3 863
1878793
162 908
3 161 335
48 481
11 965
177 353
22 507


$3 629 490
145 710
3 212 962
69 595
3 551
7 061308

91 017
915 786
2 792101


540763
1 867 762
18 699 944


70097
149 295
10 852 26 3
80142
4 754356

764 102
1795
76 276
33 854 622
455 280:
$3 448 854
9265
195 813
3 284 73 6
101 818


$4 875 520
133 03 9
2 267 094
70 549
421
6 196
7 352 819

124 335
763 141
1 971 424


708 095
1462 412
13178728


111 914
704 171
9376752
95 964
4 566 000
3 164
1049 568
2139
87 599
26067 660
438 256
$4822 070
13 345
182 73 9
2 260 087
96 438


86 504 23 6
7 901390
8 767 115
164 814
38 484
26 588
2i 402 627

158 576
16 683 488
7 68170 7
493349
8065
898 070
125 281 b34
60 343 816
15 435 082
25 931
104 782
35 493302
25 018 153
3 919 092
262 68 3
213 973
1 253 579
47 183
5 035 814
99 671 45 6
1832 044
$5 007 20 5
365 235
8 957 54
9106 248
280105


$4 765
5 604
6 949
145
64
26
17 555


146 632
13685734
6 735 071
373 786
9 216
761 833
110 088 982
49829 978
12 624 635S
37 985
129 340
35 760 417
21 975 288
3 448 804
282 514
389 367
1 195 828
47 472
3844736
78 342 562
1 988 581
$4 614 139
363 620
5 551243
6 735 276
278 565


1-01
1-02
1-03
1-04

1-07

2-01
2-02
2-o0
2-04
2-05
2-06
2-07
2-08
2-09
2-10
2-11
2-12
2-1
2 L




- J-03 JU"







4-o6
4-05


i + I 4 1 4 I


$4.50
$7.63
1.51
8.59%
16.22;1



9.03%
1.047#
15.o6O
921
66.61
6.66
108
10.2

123
9.10
1.6
29.03
21.1
1.10
0.30
3.6


$2.73
9.720
18.920

$5.63
93.15
10.65%
1.0490
17.44%
858
44.25
6.87
107
17.2

120
1.5
25.24
20.7
3.08
0.30
3.6


'4.60
7.56
$2.50
8.48%

17.890

5.62
2.77,
9.30%
1.070%
16.o30

895
44.05
6.52
107
11.8

127
1.6
25.09
20.0
3.98
0.28
3.6


$5.41
9.37
53.32
10.05%
15.120

$5.71
10.79%
0.361%
0-3W

914
8.70



76
1.5
39.35
17.9
0.26


$5.10
$8.56
$3.10
9.44
13.820

$5.48

9.570
0.824%

989
6.94



82
1.6
51.88
18.5
0.28


4.51
5.16
r2.57
9.704
22.36%

$5.17
$2.09
9.91%
1.4640

938
79.65
7.44



127
9.10
1.7

19.6
1.51
0.29


4.59
6.24
$2.09
8.67%
22.000

$5.16
$1.91
9.21%
1.545%
13.31V

939
78.63
7.24



134
11.39
1.7

20.9
1.35
0.29


.99
.74
$1.78
9.140
15.29,

(4.74
9.40%
0.830%
15.52%

985
67.77
6.67
162
8.5

138
8.46
1.7
33.52
27.6
1.10
0.32
3.9


3.86
7.66
$1.44
8.600
14.01%

$4.59
$1.48
8.82%
0.882%
14.770

951
66.36
6.65
133
9.1

135
9.05
1.6
32.07
26.5
1.09
0.31
3.8


J _I__ _IJ I__ __ _I I___ __ _I I__ _ I_ _ _ _JI _ __I ..1


/ Includes the equivalent for quantities of distillate consumed by gas-electrio motorcar trains. These
quantities are included with diesel fuel in computing item 6-03.
SIncludes all quantities purchased and produced, whether for locomotive, station, shop, or other use.
Based on total cost of all fuel and power purchased and produced during the period of report.
Excludes small quantities of gasoline purchased which are individually billed.


SBased on total cost of fuel and power consumed regardless of when purchased.
Includes kilowatt-hours consumed per yard-switching hour by electric rail motor cars.
Includes gasoline consumed per yard-switching hour by gasoline rail motor oars.
Effective January 1, 1951 carriers are not required to report electric current, purchased and produced.
* Average not computed. Oil burning steam locomotives used primarily as helpers.


~~L cl~L 6


Statement No. M-230 (OS-E)

APRIL 1951


I I I r


r.58
7.59
1.82
9.43%
17.460

:5.32
1.88
9.890
1.0010
16.06O

907
68.06
6.91
110
12.4

118
8.49
1.6
28.13
21.2
1.10
0.31
3.6


t--- -






Pae 2


INTERSTATE COMMERCE COMMISSION
BUREAU OF TRANSPORT ECONOMICS AND STATIUrICS


FUEL AND POWER STATISTICS OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 160 reports representing 169 steam railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)


Statemmet No. M-230 (OS-E)


FOR FOUR MONTHS ENDED WITH APRIL 1951 AND 1950

SOUTHERN DISTRICT I
ITEM UNITED STATES EASTERN DISTRICT I WESTERN DISTRICT NO.
POCAHONTAS REGION SOUTHERN REGION

1951 1950 1951 1950 1951 1950 1951 1950 1951 1950


AGGREGATES
1. Cost of fuel and power charged to yard and train serel Total charge for,
1-01. Coal for steam locomotives (Accounts 382 and 394) . .
1-02. Fuel oil for steam locomotives (Accounts 382 and 394) .
1-03. Diesel fuel (Accounts 382 and 394). ..........
1-04. Electric current (Accounts 383 384, 395, and 396). .
1-05. Gasoline (Accounts 382 and 394 . . . . . .
1-06. Other fuels (Accounts 382 and 394) . . . .
1-07. Total ...... ..................
2. Quantities of fuel and power charged to yard and train accounts:
Quantities conusmed in yard switching service (Accounts 382, 383, and 384),
2-01. Coal by steam locomotives (net tons). . . . . .
2-02. Fuel oil by steam locomotives (gallons) . . . .
2-03. Diesel fuel (gallons) ..... ...........
2-04. Electric current (kilowatt-hours) . . . . . .
2-05. Gasoline (gallons) . . . . . . . . .
a nt.tle sonumed in road freight service (Amcots 394, 395, and 396),
2-06. Coal by steam locomotives (net tons) . . ..
2-07. Fuel oil by steam locomotives (gallons) . . . ......
2-08. Diesel fuel (gallons) . . . . . . . .....
2-09. Electric current (kilowatt-hours) . . . . .....
2-10. Gasoline (gallons) . . . . . . .
Quantities consumed in road passenger service (Accounts 394, 395, and 396),
2-11. Coal by steam locomotives (net tons) . .
2-12. Fuel oil by steam locomotives (gallons) . . . ......
2-13. Diesel fuel by locomotives (gallons) .. . .. . .
2-14. Electric current by locomotives (kilowatt-hours) . .
2-15. Diesel fuel by motorcar trains (gallons) . . . .
2-16. Electric current by motorcar trains (kilowatt-hours). .
2-17. Gasoline by motorcar trains (gallons) I/ . . . .
3. Quantities of all fuel and power purchased and produced: 2/
3-01. Coal purchased f.o.b. mines (net tons) . . . .
3-02. Coal purchased f.o.b. points other than mines (net tons)
3-03. Fuel oil purchased (barrels)# . . . . . . .
3-04. Diesel fuel purchased (gallons) . . . . . .
3-05. Electric current purchased and produced (kilowatt-hours)
3-06. Gasoline purchased (gallons)# . . . . . . .
4. Total cost of all fuel and power at point of purchase and production:
4-01. Coal purchased f.o.b. mines . . . . . . .
4-02. Coal purchased f.o.b. points other than mines .....
4-03. Fuel oil purchased . . . . . . . . .
4-04. Diesel fuel purchased . . . . . . . ....
4-05. Electric current purchased and produced;. . . . .
4-06. Gasoline purchased # . . . . . . . . .
AVERAGES
5. Average cost of all fuel and power at point of purchase and production: 3/
5-01. Coal per net ton (mine purchases) . . . . . .
5-02. Coal per net ton (other purchases) . . .
5-03. Fuel oil per barrel (42 gallons) . . . . ......
5-04. Diesel fuel per gallon . . . . . . . .
5-05. Electric current per kilowatt-hour . . . ...
5-06. Gasoline per gallon . . . . . . . . .....
6. Unit costs of yard and train fuel and power (incl. freight and
handling expenses): /
6-01. Coal per net ton . . . . . . . . . .
6-02. Fuel oil per barrel . . . . . . . . .
6-03. Diesel fuel per gallon . . . . . . . .
6-04. Electric current per kilowatt-hour . . . . .
6-05. Gasoline per gallon . . . . . . . ... .
7. Fuel and power consumed per yard-switching locomotive-hour:
7-01. Pounds of coal (steam locomotives) . . . . .
7-02. Gallons of fuel oil (steam locomotives) . . . .
7-03. Gallons of diesel fuel (diesel locomotives) . . .
7-04. Kilowatt-hours (electric locomotives) / . . . .
7-05. Gallons of gasoline (gasoline and gas-electric locomotives)
8. Fuel and power consumed per 1,000 gross ton-miles (including
locomotives and tenders) road freight service:
8-01. Pounds of coal (steam locomotives) . . . . .
8-02. Gallons of fuel oil (steam locomotives) . . . .
8-03. Gallons of diesel fuel (diesel locomotives) . . .
8-04. Kilowatt-hours electrico locomotives) . . . . .
9. Fuel and power consumed per passenger-train car-mile road passenger service:
9-01. Pounds of coal (steam locomotives) . . . . .
9-02. Gallons of fuel oil (steam locomotives) . . . .
9-03. Gallons of diesel fuel (diesel locomotives) . . .
9-04. Kilowatt-hours (electric locomotives) . . . . .


$96 940 23 1
32 622 686
70 763 26 3
7 950 11 8
231 660
224 59 8
208 732 556

2 581 570
73 551 58
87 425 236
29 134 62 8
87 521
13 310 025
515 237 934
429 563 517
286 904 369
126 291
2 550 905
154 273 655
204 645 860
257 581096
1 808 591
218 945 639
1 211449
21 664475
556 94 5
21 019427
787 423 774
15 908 836
$97 442 204
4 336 919
38 265 207
74 288 967
2 772 280


4.50
97.79
.82
9.43%
17.43%

$5.26
$1.84
9.780
1.003%
16.251

932
70.67
7.05
112
9.5

127
9.15
1.7
29.06

21.7
1.15
0.31
3.7


$98 719 556
24 315 25 8
53 227 770
8 216 309
366 836
202 510
185048239

2 737046
62 940 11 2
69 123 744
29 219 334
68129
12 690 131
484 148 833
332123693
274 333 848
164 325
2 465 904
162 748 941
180 318 263
255 475 97 9
1 554 718
211 989 468
2 250 730
20 563 773
631 761
17 877 362
605 677 29 7
14 818106
$96 896 609
4 993542
26 256478
52 621352
2 412 316


14.71
7.90
1.47
8.69%
16.2801

$5.52
$1.44
9.13
1.o66%
14.770
947
68.00
6.85
113
9.8

131
9.56
1.7
29.76
21.9
1.18
0.30
3.7


$48 399 922
207 890
22 740469
6 877 665
75 215
80 581
78 381742

1 306 240
437 674
42 104 620
27 401 104
52 34 1
5 872069
1 526 187
119 316 866
190 782 951
8754
1 507 022
846 731
56 185 618
241 724 823
333 84 1
197 736 675
372 768
10 651 314
212 569
807 096
246 369 515
5 842035
$49 247 37 1
1 595 29 8
2 246 253
24 046 711
1 096 695


94.62
7.50
2.78
9.76%
18.771

$5.57
$3.11
10. 43%
1.0416
17.340
897
42.31
6.95
111
10.7

130
1.6
25.99
21.1
3.35
0.31
3.7


$50 146 409
30154 8
16 551 78 7
6 902 962
9207 8
71552
74 066 336

1404 901
467 440
32 524 94 8
27 550 182
33 497
5 742285
2 561583
88478 926
180 248 533
7 104
1 359 787
1 309 016
52 600069
240 534 685
242 19 3
191 729 594
525 263
10 066 387
269 01 8
793 882
177 625 81 2
4 988049
$50 449 73 7
2 105 27 7
1 959798
15 610630
883 951


5.01
7.83
2.47
8.790
17.72%

$5.89
$2.92
9.520
1.0780
16.270
912
40.70
6.80
112
10.5

134
1.7
25.76
20.7
3.05
0.29
3.6


$10 503 476
1 240 04 2
154 737
2 921
11 901176

212 352

2 825 505


1 460632
6 906 143
41 711 985

208006
1 903532
24 172


2 241 26 3
22 876
16 235
12 859 14 8
658 989
11 87904 1
209196
53 602
1 349 353
98 907


5.30
9.140
3.30
10., o
15.01o

*5.58

10.64 6
0.3710

928
8.25



82
1.6
41.29
18.4
0.26


$9 094 391
672 0 63
446 501
2 051
10 215 006

189 706
2 036 79 5
-

1 25414 8
3019 497
48 925 796

187 829
1 765 45 7
438 301
26 764


1 831751
20 006
16 954
7 124 868
559388
$9 469 295
183342
56111
686 61 2
79 905


5.17
9.16
3.31
9.61
14.28%

- $5.57

9.81%
0.9050

1,019
6.99



88
1.7
54.29
18.6
0.27


$16 222 09 8
495 106
12 584850
308 375
21 841
29 632 270

407 543
3 230 886
11026674


2 414 785
5 861 994
72 799485


351 508
870 310
43 967 651
380 169
21 208 964

3 560 522
8962
320 285
137 416 01 8
1 970 084
$ 5 922 87 8
51364
827 429
13 237 395
442 237


.47
5.73
9.638
22.450

$5.11
$2.09
9.82!
1.4549

938
78.14
7.52



136
9.70
1.7

19.5
1.35
0.29


$18 990 338
614 348
9 074 717
306 014
4339
24 87 7
29 014633

492070
2 979 940
7 636 404


2 689 22 7
6 932 875
50 360 62 7


411 120
3 531 55 7
38 466 528
341010
20 259 874
31 486
4034071
9 014
333 564
101 598 787
1 685144
$18 472579
61689
709 18 3
9 008 525
364 969


4.58
6.84
2.13
8.87:4
21.660

$5.29
$1.92
9.370
1.510
13.78%

77?6
7.31



137
10.85
1.7

21.1
1.26
0.29


$21 814 735
31 919 690
34 197 902
609 34 1
156 44 5
119 255
88 817 36 8

655435
69 883 02 8
31 468437
1 733 524
35 180
3 562 53 9
507 849753
230 541 023
54 409433
117 537
484 369
152 556 614
102 589o059
15 856 27 3
1 070409
838 681i
5 211376
312 53 8
19 875 811
390 779093
7 437 728
$20 392 914
2 481061
35 137 923
35 655 508
1 1344412


"3.91
7.94
1.77
9.12%
15.250

*$4.64
$1.84

15.78
1,011
70.65
6.94
143
8.1

148
9.12

35.74
28.5
1.14
0.33
3.9


$20 488 418
23 399 362
26929 203
560 832
270 419
104 030
71 752264

650369
59 492732
26 925597
1 669152
34632
3 004 471
474 654 375
190 264643
45 159 519
157 221
507 168
157 908 368
87 486 209
14 502 993
944 751
1 693 981
4 631564
333 723
16 732 962
319 327 830
7 585 52 5
$18 504 998
2 643234
23 531386
27 315 585
1083493


.Z2



14.28%

$4.92
$1.42
8.81%
0.9140
14.340
1,020
67.95
6.78
128
9.2

153
9.51
1.7
34.18
29.6
1.17
0.32
4.0


I L I.


/ Includes the equivalent for quantities of distillate consumed by gas-electric motorcar trains. These
quantities are included with diesel fuel in computing item 6-03.
Includes all quantities purchased and produced, whether for locomotive, station, shop, or other use.
Based on total cost of all fuel and power purchased and produced during the period of report.
Excludes small quantities of gasoline purchased which are individually billed.


4 Based on total cost of fuel and power consumed regardless of when purchased.
Includes kilowatt-hours consumed per yard-switching hour by electric rail motor cars.
Includes gasoline consumed per yard-switching hour by gasoline rail motor oars.
Effective January 1, 1951, carriers are not required to report electric current, purchased and produced.
Average not computed. Oil burning steam locomotives used primarily as helpers.
U. S. GOVERNMENT PRINTING OFFICE: 1951 0 900188


1-01
1-02
1-0
1-0O
1-o0
1-07

2-01
2-02
2-03
2-05
2-06
2-07
2-08
2-09
2-10
2-11
2-12
2-13
2-14
2-1
2-16
2-17
3-01
3-02
3-01
3--O
3-0o


4-02
4-0o
4-04
4-05
4-06