<%BANNER%>
DeMesa-Sanchez House - Memo July 19, 1979 (2 pages)
ALL VOLUMES CITATION THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/AA00011621/00076
 Material Information
Title: DeMesa-Sanchez House - Memo July 19, 1979 (2 pages)
Series Title: Herschel Shepard Project Files
Physical Description: Unknown
Language: English
Donor: Shepard, Herschel ( donor )
Publication Date: 1979
Physical Location:
Folder: 7813 DeMesa-Sanchez House
 Subjects
Spatial Coverage: North America -- United States of America -- Florida -- St. Johns -- St. Augustine
 Record Information
Source Institution: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
System ID: AA00011621:00076

Full Text








PROJECT: Restoration of DeMesa-Sanchez House
St. George Street
St. Augustine, Florida
State Project No. DOS-3200

OWNER: Historic St. Augustine Preservation Board

ARCHITECT: Shepard Associates, Architects & Planners, Inc.

DATE: July 19, 1979



ADDENDUM NO. 1

The Contract Documents dated 5 February 1979 or as revised 20 April 1979
for the project noted above are hereby amended as indicated in this Adden-
dum No. 1. This addendum shall become a part of the Contract Documents.

CHANGE THE PROJECT MANUAL AS FOLLOWS:
ITEM NO. 1
PROPOSAL FORM

Below Alternate No. 1, add spaces for Alternate No. 2 and Alternate No. 3.

CHANGE THE SPECIFICATIONS AS FOLLOWS:

ITEM NO. 2

SECTION 1A BASE BID AND ALTERNATES

Paragraph 1A-3 Alternates:
Add:

"Alternate No. 2: Revise Panel P to 150 Amp main breaker and reduce ser-
vice entrance to 1" C. with 3 #1/0.

Alternate No. 3: Mechanical Contractor shall connect 1" piping to valved
connection at well head. Well and valved connection shall be by Owner."

ITEM NO. 3

SECTION 15A HEATING, VENTILATION AND AIR CONDITIONING

Add:
"15A-3I(8) Option: The Contractor may elect to use concrete encased round
sheetmetal ducts below the first floor slab and round sheetmetal or fiber-
glass above the first floor slab. All ductwork construction and installa-
tion shall be in accordance with S.M.A.C.N.A."


Al-l










ADDENDUM NO. 1 (Continued)

CHANGE THE DRAWINGS AS FOLLOWS:


ITEM NO. 4:

SHEET NO. M-2/SECOND FLOOR MECHANICAL PLAN

AtControls Note No. 1, change last sentence to read as follows:

"Space temperature shall be controlled by standard room-type thermostats
located as directed by the Owner."


(END OF ADDENDUM NO. 1)


Al-2