Yard service performance of class I railroads in the United States - 1936

MISSING IMAGE

Material Information

Title:
Yard service performance of class I railroads in the United States - 1936
Series Title:
Statement ;
Physical Description:
v. : ; 28-42 cm.
Language:
English
Creator:
United States -- Interstate Commerce Commission. -- Bureau of Transport Economics and Statistics
Publisher:
U.S. G.P.O.
Place of Publication:
Washington, D.C
Publication Date:
Frequency:
quarterly[1961-1963]
monthly[ former jan. 1957-dec. 1960]

Subjects

Subjects / Keywords:
Railroads -- Statistics -- Periodicals -- United States   ( lcsh )

Notes

Dates or Sequential Designation:
Jan. 1957-4th quarter 1963.
General Note:
"Compiled from ... reports of yard service performance representing ... railroads (class I switching and terminal companies included)."
General Note:
Title from caption.
Statement of Responsibility:
Interstate Commerce Commission, Bureau of Transport Economics and Statistics.

Record Information

Source Institution:
University of Florida
Rights Management:
All applicable rights reserved by the source institution and holding location.
Resource Identifier:
oclc - 18598278
lccn - sn 88029194
ocm18598278
Classification:
lcc - HE2713 .Un342
ddc - 385.0973 fU56y
System ID:
AA00010244:00008

Related Items

Preceded by:
Yard service performance of class I railways in the United States
Succeeded by:
Train and yard service of class I railroads in the United States


This item is only available as the following downloads:


Full Text


















SOUTHERN DISTRICT
UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGION I ITEM No.
19431942 1943~ 1942 .19435 1942 1943 1942 1943 1942
AGGREGATES
1. Yard switching locomotive-hours-Freight :
1-01. Coal-burning steam locomotives. .. .. .. 497 366 3 363 394 2 092 915 2 030 470 145 180 137 698 473 264 441 754 786 007 753 472 1-01
1-02. Oil-burning steam locomotives. ........... 5 66 318 49 9 91 92 90 1i 4 10 0- 8 5 0 7 5 10 5 55 17 4 90 71 8 1-02
1.-03. Electric locomotive units. .............28 80 31 516 27 166 29 371 654 2 145 1-03
1-04. Gasoline and $as-electric locomotives. .........2 9 6 5 51 92 33 0 6 39- 6 3 S8 8 O 1-04
1-05. Diesellocotnotivees................. 744 849 590 643 514 645 254 834 1 488 871 694 63 839 341022 272 569 1-05
1-06. Total. ................ ... 4 840 382 4 488 990 2 439 957 2 321i 414 146 66 8 137 6 981 569 265 510 094 1 684 4921 519 784` 1-06
2. Yard switching locomrotive-h~ours-Passenger :
2-01. Coal-burning steam locomotives. .. ... 2 12 OO 4 18 9 5 51 1 34 68 6 118 17 51 6 32 1 5 6 5 2 3 5 2 5 21 O 4 7 47 24 4 5 1 82-01
2-02. Oil-burning steam locomotives. ..... 00 1 3 o 97 3 30 7 7 O i 4 6 ? 6 0 3 1 29 1 9 82;2
2-03. Electric locomotive units. .5 ............5593 53057 55 90 93026 *3 2-08
2-04. Gasoline and gas-electric locomotives. 2-04
2-05. Diesel locomotives. ................ 84 6001 68 827 34 118 28 6$2 10 262 8 974 40 280 31 179 2-05
2-06. Total. .................... 370 198 322 435 204 394 180 158 6 321 5 674 35 71571 31 6481 123 726 104 953) 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .....1.3 10.8 12.2 11,9 11.7 11.IC 9.8 9.2 10. :* 3-01
3-02. Oil-burning steam locomotives. ...........14.2 12.3 8.5 .5 15.1 9.2 .21* 30
3-03. Electric locomotive units. .............12.8 12.5 1 1 .8- .6 7.8 3-03
3-04. Gasoline, gas-electric, and diesel locomotives.' ..1.1 18.8 .7r 18.8 12,6 .0 18.8F 1.6 1* 30
3-05. Serviceable locomotives. ..............131.7 134. 431. 251. 101. 33-05
3-06. All locomotives (serviceable, unservieable, an'd stored).... 12.5 11.7 12.8 12.4C 11.8 11. 10.7 9.9 12.7 11.4 g0g
4. Yard switching: and train switching locomotive-miles per 100 loaded freight 30
car-mile F-reight service. ...............1,93 1.96 2.59 2.68 1.22 1.23 1.51 1.62 1.59 1.3 4
5. Yard switching and triin switching locomotive-miles p~er 100 passenger-trin
car-miles (with locomotives)-Passenger service. .........70 .75 1.o6 1.o6 .42 .49 .39 .Ic3 .53 .59 5

NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Chicago, Rock Island & Pacific Ry.;. Illinois Central R. R.; Pennsylvania System; Pennsyrlvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: January 194) .. ..4, 852 hours a*U. s. GOVERNMEIP PRDFTWOl OFFICI: 1943 O 476224
January 1942.....$j,16 hour


L~Ste 38 **


Subject to revision


11111111 1||| 1|||| 11111l I llll 1ll 11l II 111lli 1 Illilll1l


INTERSTATE COM #ERCE COMMISSION
BUREAU OF TRANSPORT NOIC AND STATISTICS


Statement No. M-215 (os-o)

JANUARY 1943


UI. 'r FL I.


U.S. DEdPOSiTORY


YARD SERVICE PERFORMANCE OF CI.ASS it STEAM. RALW ~AYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR TIE MONTH OF JANUARY, 1943 ANR 1942





' "if-'1C-L-Lll-ll -i(-


I I I I 1


I I I I I I I I


I I I I I 1 1--~-1---~-1-~---1---


FOR TWO MONTHS ENDED WITH FEBRUARY, 1943 AND 1943


AGGREGATES
1. Yard switching locomotive-hours-Frcight :
1-01. Coal-burning steam locomotives. .. .. 6 766 607 6 456 122 4 061 906 3 922 689 281 900 2631 279 909 857 846 788 1 512 944 1 423 366 1-01
1-02. Oil-bur~ning steam locomotives. ...... 1087 738 965 353 5 604 7 752 16 292 9 969 1065 842 947 632 1-4)2
1-03. Electric locomnotive units..... ... 5 6 3 6 2 58 70 5 53 174 5 4 9 07 .- 3 188 3 7 98 1-03
1-04. Gasoline and gas-electrie locomotives. 5 813 67891 4 55 5 090 1 25 1 69 1-04
1-0.5. Diesel locomotives. ....... 1 422 291 1 146 18 9 600 902 495 814 2 832 168 138 123 309 650 419 527 066 1-05
1-06. Total. ................ 9 338 811 8 633 158 4 726 140 4 486 252 284 738Y 263 27 9 1 094 2871 98 0 06 6 3 23 3 65 2 2 903 561 1-06
2. Yard switching locomotive-hours--Passenger :
2-01. Coal-burning steam locomotives. .. 400 445 351 985 256 578 219 422 18 167 10 738 45 322 40 179 86 378 81 646 2-01
2-02. Oil-burning steam locomotives. .. ...7 1 5 2 7 57 7 4 2.3 6 9-3 8 2 6 4 7 67 688 5 4 7 2 6 2-02
2-03. Electric locomotive units. ........ ...67 695 62515 67 67 62 463- -- 18 5 2-03
2-04. Gasoline and gas-electric locomotives.. .-51 51 2-04
2-05. Diesellocomotives.. ............. 168043 130 947 6368 54 818 3 19 15 16730 79210 59 61 2-05
2-06. Total. .................... 701 710 603 240 387 938 337 072 12 167 10 776 68 311 59 5561 233 2941 195 8361 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........11.5 10.9 12.5 12.o 11.8 11.4 9.9 9.4 to.4 9.4 3-ol
3-02. Oil-burning steam locomotives. ...........14.2 12.5 9.5 9*2- 15.5 9.3 14.2 12.6 a-o2
3-013. Electric locomotive units. .. 12.8 12.3 13.1 12.6-- 6,8 7.3 3-03
3-04. Gsoline, gas-electric, and diesel locomoiveks. ... 19.0 181.7 18.6 18.5 41. 17.5 19.6 19.3 3-04
3-05. Serviceable locomotives. 3913. 1 4l.4 14.4 12.8 12. 11.5 1 1*133 -0
3-06. All locomotives (serviceable, un~selrvieab~le, and stored). ...12.6 11.d 13.0 12611.9 11. to.i 10.0 12*$ 11.5 3-06
4. Yard switching. and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ........ .. ...1.88 19 2.54 2.661 1*21 1.25) 1.49 1.60 1.52 1.52 4
r.~ Yar~d switching and train switching locomotive-mniles per 100 passenger-train
car-miles (with locomotives)-Passeng~er service..... .69 .74 1.06 1.051 *42 EoI .39 .421 .52 .58 5

NOTE.--Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: February 1943 ... 4.514 hour ... 2 months 1943 9,396 hour
February 1942 ...... 4,688 hour .... 2 months 1942 ...... 9,657 hour U.S.GOVERNMENT PRINTINGOFFrICE:194SO 475224


Subject to revision


SOUTHERN DISTRICT


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


1942


1943


1943


1947


1942


1942


1943


1942


1943


1942


AGGREGATES
1. Yard switching locomotive-hours-Freight :
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1-03. Electric locomotive umts. .............
1-04. Gasoline andgqas-electric locomotives. .........
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locom~otive-hoursl-Passenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burming steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesellocomotives.. .. .. .
2-06. Total. .........
AVERAGES
.3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-0)3. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomotives. ......
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, un~serviceabile, an'd stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-Freight service. ...............
5. Yard switching. and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Passenger service. ........


3 2 67 17 3
521 356
27 542
2 848
677 442
4 496 361
188 441
33 526
32 102
77 443
331 512


3 0 9 7 8 8
465 434
27 189
3 270
555 547
4 144 168
162 4J4
26 769
29 458
S4
62 120
280 805


7 aG 9 37
510 668
1534
624
309 397
1 549 160

38 906
31 657
15

38 990
109 568


1 9 66
2
26
2
286
8 284
121
32

29
183


1 8 92
3
25
2
240
2 164
101
29
26
156


13 6 7 20


1 544
138 064
5 846



5 846


12 5 5 81



125 581

5 084


16
5 100


4 36 59 3
7 985

80 444
525 022
21 797
1869

8 888
32 554


4 o5 3 4
4 868

60 070
469 972
18 973
1179
73

27 908


6 69 8 94
456 914
1 653
819
254 497
1 383 777

37 128
25 528
21
2 4
28 182
90 883


1-01
1-02
1-03
1-04
1--05
1-06
2-01
2-02
2-03
2-04
2-05
2-06


11.7
14.3
13.1
14.1
12.8

1.83


11.0
12*7
12.2
19.1
13.7
11.9

1.93
.73


12.7
9*7

14.6
13.3

2*50
1.06


21C.0
13.1
12.2
1.20
.42


11.5


12.8
11.5
1.27

*51


16.0

11.6 Z
10.9

1.47
*38


lo.5
14.3
6.9
19.7
14.j
12.9


.51


UNIVERSITY OF FLORIDA

31111111 H1262 011885211111 294011111 INTERSTATE COMMERCE COMMISSION Statement No. M-215 (os-o)
BURAUv OF TRANSPORT ECONOMICS AND sTATISTCS EIUR sl

YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF FEBRUARY, 1943 AND 1942


UNIV. OFL FL. LIB.






Ll.$. iEPO ITORY


IITEM No.











YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161l railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF MARCH, 1943 AND 1942


UNIV. O Fb FL UB



C~s Ees PT7CT


I





~~*Ua(~lWdlldllllI1611111111111


SOUTHERN DISTRICT


SI I I


1-----~---~-1 ---- I- I I I


I I I I I I I I ----I----------I --


_


I I I ;1 I I I


I I


I


I


----~--1 1-------1-~--1--~-1~1-----1------1-


NOTE.-Switching locomotive-miles are based on 6 miles per ocomotive-hour. Yard switching hours of electric and ga-lcrc rail motorcars relsre by the Chicago, Rock Island & Pacifle Ry.; Illinois Central R. R.; Pernnylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not inchided in above figures, as follows: Marah 19 }****** 5,166 hour ...* 3 months l' ...... 14,562 h ah~
March 19 2..*** 5,166 hour ...* 3 months 24 ...... 15,023 8ol U. S. GOVERNMdENT1 PRINTING OFFICE:1943 O- 475134


Subject to revision


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


LTEM No.


194)


1942


194)


1942


194)


194)


1942


194)


1942


AGGREGATES
1. Yard switching locomotive-hours-Freight :
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-03. Electric locomotive units. .............
1-04. Gasoline and gas-electric locomotives. .........
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locomotive-hours-Passenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-041. Gasoline and gas-electric locomotives. .........
2-05. Diesel locomotives. .......
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. .......
3-0)3. Electric locomotive umits. .............
3-04. Gasoline, gas-electric, and diese~l locomotives. ..-
3-05. Serviceable locomotives. .............*
3-06. All locomotives (serviceable, un~serviceable, andn' stored). ...
4. Yard switching and tramn switching locomotive-miles per 100 loaded freight
car-miles--Freight service. .............
5. Yard switching and tramn switching locomotive-miles per 100 p'ass~enger-tram
cart-miles (with locomotives)-Passenger service. ........


3 640 980
575 114
31 879
3 3 2 7
761 822
5 013 12-2

2-10 212
37 4 6 8
34 844
86 505
369 029


3 409 24'3
518 657
29 554
'3 4 O ?
622 725
4 583 586

176 826
2 9 5 6 4
31 233
2 6
70 051
307 700


2 206 565
3 064

382 296
2 564 593

134 945
34 853

33 098
202 876


2 106 436
4 509
27 804
2 70 2
269 673
2 410 924
111 438
31 205

28 975
172 050


158 166


1 432
159 598

6 621



6 621


141 244


736
141 980
5 549


20
5 569


493 513
8 973

89 244
591 790
23 651
2 17 6

10 654
36 481


445 891
6 898

70 350
523 139

21 529


8 075
21 103


782 676
563 077
1836
6 8 2
348 870
1 697 141
44 995
3 5 2 92
11

42 753
123 051


715 672
507 450
1750
7 0 5
281 966
1 507 543
38 310
2 7 6 3 3
28
2 6
32 981
98 978


1-01
1-02
1-03
1-04
1-05
1-06
2-01
2-02
2-03
2-04
2-05
2-06


11.8
14.4
1).1
19.2
141.1
12.8
1.82
.67


10.9
12.7
11.7





.72


12.8
9.9

14.8
13.4
2*42
1.04


12.2
10.2
12.0
18.9
14.5
12.7
2.50
1.05


12.5


1.6 1

1.19
*42


11.6

24.4
12.8
11.6

1*23
*So


10.1
15.6

11.8
11.0

r*49
.39


9.4

18.1
11.2
10.1

1.52
.42


10.

7.4
1 .7
1 .2
12.8

1.47
.49


9.0
12.8
6.4



1.45
.56


8-01
3-02
3-03
3-04
3-05
3-06
4
5


FOR THREE MONTHS ENDED WITH MARCH, 1943S AND 1942


AGGREGATES
1. Yard switching locomotive-hour -Freight :
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1-03. Electric locomotive units. .............
1-04. Gasoline and gas-electric locomotives. .....
1-05. Diesellocomotives.. .... .
1-06. Total. . . .
2. Yard switching. locom~otive-hours--Passen~ger :
2-01. Coal-burning steam locomotives... ........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units............ .
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesellocomotives. .... .... .. ...
2-06. Total. . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomotivets. ......
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, unserviceable, and stored). .-.
4. Yard switching and train switching loeomotive-miles per 100 loaded freight
car-miles--Freight service. ............. .
5. Yard switching and tramn switching locomotive-miles p~er'd 100 assengertramn
car-miles (with locomotives)-Passenger service. ........


10 407
1668
88
9
2 184
14 351

610
10 8
102
248
1 070


9 865 365
1484 010
8 825 9
10 196
1768 914
13 216 744

528 811
8 7 3 06
93 748
7 7
200 998
910 940


6 268 471
86s8
83 217
7 199
923)17 8
7 290 733
391 523
102 510

96 781
590 8144


6 029 125
12 061
82 711
7792
765 487
6897176

330 860
93 668

85 793
509 122


440 066


4264
444 30

18 788



18 788


404 523


736
405 259
16 287


58
16 545


1 403 430
25 265

257 382
1 686 07 7

68 973
6 01 5

29 804
104 792


1 292 67 9
16 867

193 659
1503 205

61708


24 805
90 659


2 295 620
1628 919
5 024
1941
999 289
1315 793
10 2 9 8 0
29

121 963
356 34 5


2 139 038
1 455 08 2
5 548
2 404
809 032
4411104
119 956
6 2 359
80
S7
92 314
894 814


11.6
14.3


12.7


.68


12.6
12.1
18.7
13.5
11.8

1.91


12.$
9.6

14. ~
ly. ~
2*5C
1.06


9.4
10.2

17.6
11.2

1.57


1P.

18.7
14.4
12.6
2.60

1.05


12.1


23.7
13.o
12.3
1.21
*42


11.5

8.8
12.7
11.5
1.24

*So


lo.o
15.1

18.9
11.6
10.8
1.49
.39


14*3
7.0
19.6
12.8
1.51
.51


12*7
6.9
19.1


1.49
.57


UNIVERSITY OF FLORIDA

11111111HIIIII111111IIHIIII INTERSTATE COMMERCE COMMISSION
3 1262 08852 3468 BUReAU OF TRANSPORT ECONOMICS AND STATISTICS


Statement No. M-215 (os-c)

MARCH 1943






Subject to revision

UNIV. OFC FL USI.




U.S. DTEPOSITORY


SOUTHERN DISTRICT
ITEM UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
POCAHONTAS REGION SOUTHERN REGION TMo
19h) 1942 1941 1 1919)2 19 19 191942 1943 r1942
AGGREGATES
1. Yard switching locomotive-hour -Freight:
1-01. Coal-burning steam locomotives. ........... 3 393 899 3 325 661 2 049 606 2 041 930 153 077 144 008 459 244 441 768 731 972 697 955 1--01
1-02. Oil-burning steam locomotives. ....... ... 550 168 510 642 2 886 3 938 8 348 6 972 538 934 499 738 1-02
1-03. Electric locomotive units. 0 620 27 757 28 702 26 015 1 918 1 74210
1-04. Gasoline and gas-electric locomotives. 134 3 868 2476 299 65 870 1-03
1-05. Diesellocomotives. ................ 739 082 607 546 j10 087 258 315 1 440 1 432 84 519 69 669 342 976 278 130 1-0
2Ya1-0 .k otal.ocoiv-ousPsegr..... .... 4 716 845 4 475 474 2 393 757 2 333 196 154 517 145 440 552 111 518 409 1 616 458 1 478 42 9 1-06
2-01. Coal-burning steam locomotives. ........... 199 536 173 831 128 154 110 510 6 TOO 5 490 22 784 20 936 41 898 316 895 2-01
2-2 i~l-bth!"Eg "eam oosmoies.. :5 : :9 : :0 : i'! l i s-a o! 906 1 352 33 76 27 46 2-02
2-04. Gasoline and gas-electric locomotives. .........-2 6* 2 6 2-03
2-05. Diesellocomotives. ................ 85188 68 038 33 599 87 814 19 10 82 7 998 40 760 32 215 22-06
2-06. Total. 54 134 SOS168 195 481 169 755 6 700 5 509 35 519 30 878 116 43 4 96 62 6 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .1. .e. .2. .2 .% ..113 10
3-02. Oil-burning steam locomotives. 4 23 221. 21* 991 3-01
3-03. Electric locomotive units. ... ..... 13111*99-*1.21 11.12-0
33-0-0 Geaslnvi enau-elect ec and diesel locomot~ives.' 13 g4g *9 24o4. 1.6 18.6 8* 18. b3-
3-06. All locomotives (senriceable, unservieable, and stored). .c .s 1.* 1 1 2.6 13.3 110. 1.1.9 3-05
4. Yard switching and train switching locomotive-miles per 100 loaded freight *919121.71 0.0 1 1 -6
5 acr mlsiFeih n dr itc oootvstla r10pssnrt i 1.7 .1 2.}} 2.40 1.19 1.17 1.06 1.47 1.38 1.47 4
car-miles ( ith locomotives) Passenger service. ........ 66 .70 1.01 1.01 .45 .46 .39 .40 .49 .5 5

FOR FOUR MONHIfS ENDED WIHR APRIL, 19g8 AND 1942

AGGREGATES
1. Yard switching locomotive-hour Freight:
1-01. Coal-burning steam locomotives.. 13 801486 13 191 02 8 318 07 8 071055 593 143 548 531 1 862 67 1 734 447 3027 592 2 856993 1-01
1-02. Oil-burning steam locomotives. ........... 2 213 020 1 994 658 11 554 15 999 33 613 23 839 2 167 853 1 954 814 1-02
1-08. Electric locomotive units. ...... ...... 118 861 116 016 111 919 108 726 6 942 7 290 1-08
1-04. Gasoline and gas-electric locomotives. 12 274 1 064 9675 10 790 2599 3874 1-04
1-05. Diesellocomotives.. .. .......... 923 135 2 376460 1 23326 1 023802 5704 2 168 41 90 263 3.2 1 342 26 5 1087162 1-05
2. Yard1 ktal.onoieior-Pseer ....... 1 9 068 776 17 692 218 9 684 490 9 230 372 598 847 550 699 2 238 188 2 021 614 6 547 251 5 88 9 5331 1-06
2-01. Coal-burning steam locomotives. 10 193 702 642 519 677 441 37 0 25 468 21 77 7 91 757 82 644 17 3 271 156 851 2-01
2-02. Oil-burning steam locomotives. ......... 14 4 6 6 1 116 6 2 5* 1 3 O2 7 9 2 1 5 4 9 8 13 6 74 0 10 9 8 2 2-02
2-03. Electrkclocomotive units. .......... .. 136 28 184 702 116 23 124 598 -* 45 104 2-08
2-04. Gasoline and gas-electric locomotives. ........* 10 30 20
2-05. Diesellocomotives. ................ 333 736 269 036 130 360 111 60 7 40 633 32 795 162 723 184 553 2 05
2-06. Total. ..........*** 1 424 873 1 813 108 786 295 678 877 25 488 21 854 1410 311 120 937 472 77 91 591 4401 2-06
AVERAGES
3. Hours pr yard locomotive-day:
3-04. Goasl-bineb s-eectia nddee locomotivess. ... 191 18.8 1 18.6 23.8 18.7 18.8 1 9 1 ,2 1 3-
3-2.Ol:1-motnio. sea ablmtie, rse/iebe and stor Il). N 11.7 3-06
4. Yard sw ctching and mtrin e sw itchn oooie-ie e 0 oae rih

5. Yard smicn Nand drai itching locomotive-fliles per 100 l asseno strain 1.3 .6 12.55 1.20 1.22 10.4 10.5 12.7 1.49
car-miles (with locomotives)- a~senger service. *** 68 *3 1.041.0 .1C2 *Bo .39 *41 .51 .57 6

NOTE.--8witch.ing locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and ga-lectric rail motoreas rqported by the Chicago, Rock leland & Pacific Ry.; Illinois Central R. R.; Pennsrylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: ALpril 1943 .... 5,002 hours ... 4 onthe 1 )J ..... 19,54~ hbrs
ALpril 1942 .**** 5,358 hourrs .... 4C month. 1 ...... 2o,38 I.I...OVERNMENT PRDINGO OFFICE:19U0O- 052M


~e I ste, 3 R: iii yg


UNIVERSITY OF FLORIDA
11111IUI8 IsIUIUHIIII~ll INTERSTATE COMhlMERCE COMMISSION Statement No. M-215 (os-c)
3 1262 08852 3310 BUREAU OF TRANSPORT ECONOMICS AND STATISTICS
APRIL IN13
YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard servie ~petarmnance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)
FOR THE MHOafrH OF APRH., r194 AND 1942











__


1.I


__1~1


SOUTHERN DISTRICT


- I I I I I


I ----- ---- I I I I -


I I I I I I I I I I --------I


I


I ~---c~----I--~--I----~~~-----I 1--~--1------~--1------


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives............
1-02. Oil-burnmngsteam locomotives. ...........
1-03. Electric locomotive units. .............
1-04. Gasoline and gas-electrie locomotives. ....
1-05. Diesel locomotives. ...............
1-06. Total. . . .
2. Yard switching locom;otive-houis--Passenger:
2-01. Coal-burning steam locomotives........ ..
2-02. Oil-burnmng steam locomotives. ...........
2-08. Electric locomotive units. .............
2-04. Gasoline andgas-electricloeomotives.. ........
2-05. Diesellocomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline. gas-electric, and diesel locomnotives. ......
3-05. Serviceable locomotives. ..............
8-06. All locomotives (serviceable, unservieable, and stored). ..
4. Yard switching and train switching locomotive-miles per 100 loaded freight
ear-miles--Freight service. ...............
5. Yard switching an~d train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-P~assenger service. .. .. .. I


I I I I I I I I I I 1


IC/s-te, S S: 'q 3;>


Subject to revision


YARD SERVICE PERFORMANCE OF CLAS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 15) reports of yard service performance representingl61 riwy
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MdOl OF MAY,1943 ANYD 198


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


194)


1942


1941


1942


19k2


194)


19)3


1942


194'


1942


AGGREGATES
1. Yard switching l.ocomotive-hour -Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-03. Electric locomotive units. .............
1-04. Gasoline and gas-electric loomotives.... ...
1-05. Diesel locomotives. ...............
1-06. Total. . . .
2. Yard switching locom~otive-hours-Passenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-041. Gasoline and gas-electric locomotives. .......**
2-05. Diesellocomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. .........**
3-03. Electric locomotive units. ............*
3-04. Gasoline, gas-electric, and diesel locomotives. ......
3-0. Al: loabl tilom& (evcable, ur se -viceable, and' stored). ...
4. Yard switching and tramn switching locomotive-miles per 100 loaded freight
car-miles-Freight service. ...............
5. Yard switching and tramn switching locomotive-miles per 100 p~ass~enger-train
car-miles (with locomotives)-Passenger service. ........


3 410
5 6 3
10
2
760
4 768
204
3 4
14

87
361


3 365 718
5 25 O 1 9
28 431
31 5 6 8
630 075
4 552 811
177 353
3 0 187
31 958
2 6
71 686
311 210


2 037
2
28
2
315
2 386

1132
34
S34
;201


2 032 882
3 5 97
26 714
2 6 97
266 335
2 332 225

112 121
51 8 9

30 343
174 911


154 599


1 488
156 087
6 986



6 986


150 059


1 488
151 547
5 558


2
5 57


464 40


89 072
561 973
85 083


11 285
35 728


754 147
5 52 7 5 8
1768
3154 472
1 663 791
42 319
3 3 4 36
13
42 071
117 839


461 193


73 099
540 761
21 517


8 250
30 597


721 584
5 14 9 5 3
1717
8 71
289 153
1 Saa 278
38 163
8 8 8 39
29
2 6
33 078
100 129


1-01
1-02
1-08
1-04
1-05
1-06
2-01
2-02
2-03
2-04
2-05
2-06


11.1
14.1
12.6
18.9


1.66
.67


10.9
12.7
11*7
18.6


1*75
.70


12.9



2.22
1.00


11.9
8.8
12.0
18.3

12.91

1.00


12.5

24.0


1.17
.44


24. 1


1.1)
.c7


9*5
13.2
18.8




.40


9*9
10.7
18.


1.45
.42


*9
1 .1
7.2
19.4

5


9.o
12.8
7.0
18.8


3--ol
3-02
3-03
3-04
306
4
5


FOR FIVE MONTHS ENDED WITH MbAY, 1983 AND 1982


2 19 564 0
30 308

336 427
2 562 37 5
104 16
6 3 a

41 04
151 53


17 211 904
2 776 941
149 140
15 169
3 683 75$4
23 836 908
1 014 60 0
17 9 4 5 7
170 784

421 681
1 786 522


16 556 744
2519 673
144 44']
17 632
3 006 538
22 245 025
879 99~
14 6 8 1 2
156 66C
129
340 782
1524 318


10 355 344
14 221
140 430
11 924
1 548 852
12 070 771

k51 819
170 726
164 969
987 514


10103
19
1355
13
1 290
11 562
553
1
156
141
853


747 74 2


7 192
754 934
32 47 4

32 1


698 590


3 654
702 844
87 929


98
27 427


2352707 9
42 109

430 973
2 800 161
114 717
9 a 8 1

51 918
175 916


3 781 73 9
8 720 611
8 710
3 24 5
1 696 737
8 211 04 2
215 590
17 0 17 6
58
204 794
590 618


3 558 57 7
2 469 767
9 007
4 145
1 376 315
7 417 812
195 014
13 8 6 6 4
133
129
157 629
491 569


1-01
1-02
1-08
1-04
1-05
1-06
2-01
2-02
2-03
2-04
2-05
2-06


12.9
13**
12.6
1.79
.68


10.9
;'12*7

16.7


1.86

,72


12.4
9.i
13.2
18*5
14*3
13.0
2.40
1.04


12.3


13 .2
12.4
1.2o


11.8

24*9
13.o



.49


18*7
11*5
10.7
1.45
.39


9.6

17*9
11*4

1*52

.44


3-01
3-02
3-08
3-04
305
3-06
4
5


12.1
9.5
12.2
18.6
11.4*
12.6
2*50

1.0)


10.2
14.3
J.)
19*5
14*1
12.7
1.45

*So


9.2
12*T I


11.4
1*47

.56


NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Cineago, Rock Island &r Pacific Ry.; Illinois Central R. R.; Pennsylvania Systern; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: MayI 194) ...... 4,951 hour **** 5 months 1943 ****** 24, 45 hours
MLay 191C2 ****** 5,116 hours ...* 5 months 1942 ****** 25:, 7 hound e U. S GOVERNMENT PRINTING OFFICE 1943--0-540166


UNIVERb1TY OF FLORIDA

UIIIIII~HIIIIIU IIIIIIUUINTERSTATE CdM MERCER COMMISS IO N
3 1262 08852 3161 BUREAU OF TRANJSfERT ECONOMICS AND STATISTICSI


Statement No. MI-215 (os-c)
MAY 1943


UNIV. OFb FL B.





U.S. DEPOS~ITO~Y


I1TEMNo.





I aI I i


- I I I I I I I I I I


-- -I I~ -I-~ I I I 1 1 1 :---1 -- -


FOR SIX MONTHS ENDED WITH JUNE, 1948 AND 1948


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives. 20 471 612 19 821 08 0 12 286 506 12 054 9621 886 752 845 4901 2 765 42 9 2 641 311 4 532 9251 4 27 9 3171 1-01
1-02. Oil-burning steam locomotives. .. ... .. .. 3 325 6421 3 031 112 16 9316 23 1691 -1 49 3471 35 7801 3 259 3591 2 97 2 16 3 1-02
1-03. Electric locomotive units. .. ... ...... 179 70 172 617 16i9308 161 934-- 10395 10 683 1-08
1-04. Gasoline and gas-electric locomotives. .e .......120 9 21 183 14 257 16 1661 -1 -1 3 952 5 O171 1-04
1-05i. Diesellocomotives. ................ 4 433 21 93 635 988 1 861 254 1 551 203 8 599 5 096 517 338 410 924 2 046 028 1 666 765 1-05
1-06. Total. 28 428 3851 26 681 980 14 348 2611 13 809 4341 895 551 850 5861 3 533 1141 5 088 015 9 852 6591 8 933 9451 1-06
2. Yard switching locom~otive-hour 3Passen~ger: :
2-01. Coal-burning steam locomotives. ... .. .. 1 212 741 1 051 757 778 718 662 05 3 39 22 7 32 78 0 136 684 125 151 258 112 231 773 2-01
2-02. Oil-burning steam locomotives. ........... 212 602 176 27 2 2 06 5 -I 10 542 7 098 202 060 167 1091 2-02
2-03. Electric locomotive units. ......... 204 12 8 18 8131/ 20405~i81 187971 70 16 0 2-03
2-04. Gasoline and gas-electrie locomotives.. .-154 1541 2-04
2-05. Diesellocomotives. .. .... .. .. 508 9881 411 5461 200 24 9 17 2 46 71 114j 62 87 4 48 62 9 245 865 190 336 2-05
2-06.Total.. .. .. .. ... .. 138 45 9 1827 86 0 1 183 05 1 024 5561 39 22 7 32 8941 210 10 0 180 87 8 706 10 7 589 532 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........11.0 10.9 12.12.0 12.2 118 .7 9.6Z 10.2 92. 301)
3-02. Oil-burning steam locomotives. .......... 14.2 12.7 9.4 9.3 --1. 031. 28 30
3-03. Electric locomotive units. 2912.0 13.2 12.2 .7.2 7.5 a-os
3-04. Gasoline, gas-electric, and diesel locomotive~s. .. ...19.0 18.7 18.5 18.6 23.8 28.8 18.7 18.1 19.5 19.o 8--04
3-05. Serviceable locomotives. 13.a 13.5 14.5 1431. 3111.5 11414.1 1 -os
3-06. All locomotives (serviceable, un~selrviceable, and stored).. 12.5 1.12912.5 12.3 11.9 10.5 0. 12.7 11.4 3-06
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. .. .... ...... 1.78 1.814 2.38 2.47 1.21 1.20 1.45 1.52 1.43 1.47 4
5. Yard switching and train switching locomotive-mhiles per 100 passenger-train
car-miles (with locomotives)-P~assenger service. .........67 .71 1.02 1.03 .43 .48 .39 .42 .50 .55 5

NOTE. -Switcing locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Chicago, Rock Island & Pacifle Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines: and Reading
Company not included in above figures, as follows: June 1943 .. .. 4, 941 hour 6 months 194) .. .. 29, 436 hour
June 1942 ...... 5,o52 hour .... 6 months 1942 ...... 30)549 hOurs U. S GOVERNMENT PRINTING OFFICE :1943--0-540166


'Subject to revision


SOUTHERN DISTRICT


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


1943


1942


1943


1942


1943


1942


1943


1942


1943


1942


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-03. Electric locomotive units.... .........
1-04. Gasoline andg$as-electric locomotiv~es. .. ..
1-05. Diesel locomotives. ...............
1-06. Total. . . .
2. Yard switching locom~otive-hoursl-Passen~ger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline andgas-electric locomotives. .........
2-05. Diesel locomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomo'tives. ......
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, unserviceable, an'd stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-- right service.
5. Yard switching and train switch ag ioeomotive-z xiles per 100 pass enger train
car-miles (with locomotives)-Passenger service. ........


139 010


1 407
140 417
6 7 5 3



6 75 1


146 900


1 440
148 340
5 4 5 1


1 6
5 467


440 350
7 238

86 36 5
533 953
2 1 84 4
1261

10 9 56
34 061


720 740
502 396
1676
872
290 450
1 516 134
3 6 7 5 9
28 445
27
2 5
3 2 7 O7
97 965 1


3 261 708
548 701
30 563
3 040
749 46 5
4 59)3 477
19 8 0 31
533145
3334 4
8 7 3 07
351 827


3 264
511
28
3
629
4 436
17 1
29
31

7 0
303


1 931 162
2 715
28 878
2 333
3512 402
2 277 490
1 26 91 2


3 5 2 8 0
195 524


1 951 029
3 573
26 494
2 679
263 066
2! 246 841
10 8 5 6 2
245
31 444

170 768


445 671
5 472

74 497
525 640

2 0 9 9 0
770

7 5 84
29 344


751 186
538 748
1685
707
349 291
1 641 617
4 2 5 2 2
31 88 4
12

4 107 1
115 489


1-01
1-02
1-03
1-04
1-05
1-06
2-01
2-02
2-03
2-041
2-05
2-06


12.4

24.3


1.17
.45


9.4


11.1



.40


11.0
14.2


12.2

1.70
.64


10.9
12.9
12.1



1.77
.69


11.7
9.1
13.5
18.7
13.8
12.4
2.28

.97


11.8
8.5
12.4
18.6
14.1
12.3
2.jl
1.00


11.8


212.5
11.8


. 4


9.9
9.5
18.6
11.6
10.7


.42


7.1
14.1
12.7
1.35
.47


9.3
13.o
7.1



1.43
.52


UNIVERSITY OF FLORIDA

IllIIIYIIIIIllillllilll~lll|lllllIIIlllll III IIT R T T O M R E C M I S O
3 1262 08852 3013IN ESAEC M RC CO ISON
BUREAU OF TRANSPORT ECONOMICS AND STATISTICS


Statement No. MW-215 (os-o)
JUNE 1943


YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF JUNE, 1943 AND 1962


U.S. DE PMTRY


ITEM~o











YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TE ZMINAL COMPANIES INCLUDED)

WIFOR TIEONT~H F JULY, I19 AND 1942

SOUTHERN DISTRICT
UNITED STATES EAS EN DISTRICT WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGIONITMo
1943 1942 194 1942 194) 1942 1943 1942 1943 1942
AGGREGATES
1. Yard switching locomotive-hours-Freight: 2 8 1 160 69 41 5LI 0 7 1 -1
1-02. Oil-burning steam locomotives............ 5 59 6 3 554 1 8 66 2 6 7 7 2 84 6 5 02 5 7 3 4 5 50 4 56 5 32 8 48 1-02
1.-03. Electric locomotive units. ...... 31 57 3 29 8 7 8 29 6 3 8 28 1 53 1 9 35 1 7 25 1-03
1-04. Gasoline and gas-electric locomotives. 3 2 3 0 3 5 2' 5 30 2 6 O2 .7 O0 90 4 1-04
1-05. Diesellocomotives. ................ 783 922 659 834 322 972 276 076 1 440 821 87 831 79 716 371 679 303 221 1-05
1-06. Total. 798 97 4967 669 2 381 681 2 287 271 157 449 147 763 534 4721 536 52 0 1 725 369g 1 596 115 1-06
2. Yard switching locomotive-hours-Passenger:
2-01. Coal-burning steam locomotives. .. .. .. 209 515 180 966 134 974 115 383 6 936 5 853 22 796 31 686 44 807 38 10 2-01
2-02. Oil-burming steam locomotives. ........... 33 848 30648 304 73 32544 29910 2-02
2-03. Electric locomotive units. .... ..... 35 039 12 454 35 027 32 424 --- 1 30 2-08
2-04. Gasoline and gas-electric locomotives. .........-2 4 -2 4 2-04
2-05. Diesel locomotives. ......... 8 9 71 5 7 5 5 51 3 5 51 5 3 2 7 5 9-2 1 1 1 5 3 8 2 3 O 4 2 6 6 1 3 4 5 41 2-05
2-06. Total........... 368115 319 643 20 5516 180 506 6 96 5 874 35 6391 30654) 120 02 4 102 609 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-0 Coal-burning steam locomotives. .. .. .. 11.2 10.8 11.g 11.6 12.7 11.,4 9.0 9.6 1049*5 3-01
3-02 Oil-burming steam locomotives. 631. .6 7.6 10.5 9.5 14.4 13.5
3-03 Electric locomotive units. 3312.3 13.6 12.5 7.9 7.1 3-02
3-04. Gasoline, gas-electric, and diesel locomotives. ..1.0 18.7 18.I 18.S 23.2 13.6 18.7 18.4 19.96 18.9 3-03
3-05. Serviceable locomotives. ............. 1.1.314.0 13.4 13.7 13210.8 11.3 143 135 8-05
8-0. All locomotives (serviceable, unlservieab~le, and stoed. .. 12.4 11.8 12.6 12.2 12.7 11.9 9.9 10.3 13.0 114 &06
.4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-F~reight service. ...............1.66 1.75 2.19 2.30 1.12 1.20 1.40 1.52 1.36 1.41 4
5. Yard switching and train switching locomotive-miles per 100 p~assenger-train
car-miles (with locomotives)-Pas~senger service. .. .. .. .63 .69- .96 .98 .'L3 .46 .11 .42 .45 .53 5

FOR SEVEN MONTHS ENDED WITH JULY, 1945 AND 1942

AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives.. 23 894223 2311531 65 143510570 14 032118 1042 761 992 432 3 207 56 3 092381 5 333 524 5 036 734 1-01
1-02. Oil-burning steam locomotives. 885 277 3 572 978 19 613 26 453 55 849 41 514 3 809 815 3 505 011 1-02
1-03. Electric locomotive units. ........***** 211 276 202 495 198 946 190 087 12 330 12 408 1-03
1-04. Gasoline and gas-electric locomotives. ... ... 2 1 4 2 4 6 89 1 6 7 8 7 18 7 6 8- 4 6 5 5 9 21 1-04
1-05. Diesellocomotives. ................ 5 217 141 4 295 832 2 184 226 1 829 279 10 039 5 917 605 169 490 640 2 417 707 1 969 986 1-05
1-06. Total. .? ................ 3229356 31249 649 16 729942 16 096 705 1052 800 998 349 3 868 5861 3 624 5351 11578 028 10 530 060 1-06
2. Yard switching locomotive-hour--Pseer
2-01. Coal-burning steam locomotives............ 1 422254 1832 723 913 692 77737 6 46 163 38 6331 159 480 146 8-7 302 919 269 87 2-01
2-02. Oil-burming steam locomotives. .... ..... 246 450 206 920 2 065 11 84 6 7 836 234 604 197 019 2-02
2-03. Electric locomotive units. ............. 239 167 220 585 239 085 220 395 82 190 2-03
2-04. Gasoline and gas-electric locomotives. ......... 17 a. 17 8 2-04
2-05. Diesellocomotives. ..... ......* 598 703 487 097 235 764 205 ass 135 74 413 56 859 288 526 224 87? 2-05
2-06. Total. ..............* 2 50 6 57 4 147 503 1 388 541 1 205 062 46 163 38 768 245 73 9 211 5331 826 1311 692 141 2-06
AVERAGES
3. Hours per yard locomotive-day:
8-01. Coal-burning steam locmotives. 1310.9 12.3 1.9 12. 19 .6 10.2 9.3 8-01
3-02. Oil-burning steam locomotives. ...........1. 289390--1. 061. 29 80
3-03. Electric locomotive units. .......... 13.0 12.0 1 .3 12.1 -8. -8 -8. 7.1 7 .4 3-03
3-04. Gasoline, gas-electrie, and diesel locomotives.' 901. 51. 372. 8 821.3 1.o 3-04
3-05. Serviceable locomotives. 3713.4 1 1.2 13.2 13111.4 11.4 14.1 13.2 8-05
3-06. All locomotives (serviceable, ~unservieable, an'd stored). ...12.5 11.8 12.9 12.5 12311.9 10.5 10.3 12.7 11.5 8-06
4. Yard switching and tramn switching locomotive-miles per 100 loaded freight
car-mile -Freight service. .....**176 18 2.35 2.44 1.20 1.2o 1.44 1.52 1.421.6 4
5. Yard switching and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-P~assenger service. .........66 .71 1.01 1.02 .48 .40 .42 .49 .55 5

NOT~Ec-Switching locomotive-miles are based on 6 miles e locomotive-hour. Yard switching hours of electric an a-lectric ralmoto~prears reported by the Chicago, Rock Island & Pacific Ry.; Ilinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company notincluded inabovefigures,asfollows: July 1 '3 ****** 5,o22 hour .... 7 months 19 3 ...... 34,458 hours
July 19 42 ...... 5,233 hour .... 7 months 19 2 ...... 35,782 hours U. S GOVERNMENT PRINTING OFFICE :1943--0-540166


Subject to revision


J O

O~ W


-3 _!I


DIVERSITY OF FLORIDA

11111111111111111111111111111111111111
3 1262 08852 3476 I N TER STAT E C OM M~E R CE COMMISSION
BUREAU OF TRANSPORTilCONOMICS AND STATISH1CS


Statement No. MI-215 (os-c)

JULY 1943

















SOUTHERN DISTRICT
ITEM UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
POCAHONTAS REGION SOUTHERN REGION I ITEM No.
1943 1942 1943 1942 1943 1942 1943 1942 1943 1942
AGGREGATES
1. Yard switching locomotive-hours--Freight:
10. o l-urin un s m .oootvs. 3 5 9 78 3 59 57 2 035 6 1 999 028 156 997 1.51 277 439 6 1 451 590 8 8 062 538 57 1 21
1.3 D ead a-lectric locomotive s .nts .2 ,**4 2 9 6 31 0 27 27 4 2 9. 1 9 O 1 8 1 01--3
1-06. Tisloootal es. ...*********.... 798 011 685 618 329 976 285 282 1 488 821 88 872 84 427 577 675 3515 082 1-05
2. Yar switchnlocmtv-or-asner 4 8 77 0 0 74 6 59 6 5 22 4 41 57 9 s 17 5 1 2 1 58 4 8 5 1 52 0 98 5 34 6 0 4 5 42 0 5 01 74 2 939 1 6 47 9 92 1-06
20. olabbung gt amo o ooie. 08 582 183 276 133 980 116 278 6 899 5 838 23 226 21 686 44 417 39 480 2-01
2-08. Electric locomotive units.............. 34 694 zzyz 79 4 zzy 32 5389 24 320
2-04. Gasoline and gas-electric locomotives. .... .. *- 8 2 9 2-03
2-06. Tisiota. ** ** ** ** ** 90 365 75 858 35 732 32 965 15 11 864 8 458 42 769 34 42620
*-6 T *... .... 367 254 322 576 204 400 182 OO4 6 899 5 847 36 613 31 033 119 34 2 103 692 2-06
AVERAGES
3. Hours per yard locomiotive-day:
3-01 Colab rn g steam lcmp ies. 118 11. 12*2l~ 25 12.0 8.9 9.6 10.7 to0o 3-01
8-03. Electric locomotive units. ..... 13.4 12.4 13.2 12.6 --0.1.214.2 13 3-02
3-o0i: Gaoie, t !""as-lcr and diesel locomotives.' lg9 gb~ 18. .6 16.0 13.5 18.8 18.7 19. 1g 3-
3-06. All locomotives (serviceable, unservieable, and stored). 251.1. 01. 31* 3-05
4. Yar wthnad ri wthn lcmtv-ie per 100 loaded freight 991. )30
5. Yar s ichng nd tran switching iocomotive-r ailes per 100 I/asscenger-trdrn1.6122.0.6117.11.1.01. .04
car-miles ( ith locomotives)-P~assenger service. 62 .611 19). ,96 *39 .401 .40 .451 *51 5

FOR EIGHT MlONTHS ENDED WITH AUGUST, 1948 AND 1.943

AGGREGATES
1. Yard switching loeomotive-hours-Freight:
1 21. 1oa-b nng tam ml mmotivs s* 27 384 OO 26 547 235 16 385 446 16 031 146 1 199 758 1 143 709 3 647 219 3 543 971 .6 151 586 5 828 411 1--01
1-08. Electric locomotive units. 244 225 231 825 229 987 21 57 -* 6 3 554 14 353 83 4 0435 1--02
1-04. Gasoline and gas-electric locomotives. ....*- 24 865 27 93 19 54 21 197 *2 6 8 131 1-08
1-05 De Illocomotives. .........****... 6 015 158 4 981 434 2 514 200 2 114 561 11 527 6 738 694 041 575 067 2 795 382 2 28 5 068 1-0
2.Yardswith loooieiors-asne: 38 106 363 35 909 50 19 171 52 18 414 217 1811285 1150 447 4403 19 4166 585 13 320 367 12178 0521 1-06
2-0. COil-bbrnin st ao lo ooie. 680 77 6 1 435 9 8 1 047 673 893 654 53 052 44 465 182 706 168 523 347 336 309 357 2-01
2-03. Electric locomotive units. ......**-* 273 863 253 375 273 773 252 065 3 6 71 26 5 226 7 2-02
2-04. Gasolineando s-lectriclocomotives.. .* -182 08920
22 Dies Houn s. 2 57 3 1 69 14Z5 70 53 062 44 615 286 25 2625 6 935 3 9 3 20
AVERAGES
3. Hours per y rd locomotive-day:
3-1 oil-ung st ama ocomoties 11. : ::: ::: 1P.iZ 11.9 12.3 11.8 9.5 9.6 11.3 9.4 a-ol
3--08. Electronic gst locomotive ui s. ********-*14.1 12.9 19. 4 *7 13.5 10.1 4 13.0 3-42
s-o-o: Se~r bi ea -e locmi addee oootives....... 19.0 18,6 18.5 2371.21. 1. 5
3-06. All locomotives (serviceable, unservieable, and str d)' **7 1341. 421.13.1 11.3 11.j 1.1 1 -05
4. Yard switchn and tanswitching locomotzve-miles per 100 loa led f *eight 191. 251.1. 0 0 281, ao
5. Yaerd smtching axnd trai stch ng locomotive-71iles p~er 100 I assenger tr sin175112. .4119111. 151. .54
car-miles (with locomotives) Passenger service. ..** 6 .71 1.00l 1.01 .2.47 .40 .42 *~ 9 5)r 5

Compn no icueu il abv mius as fo lw :n ml s 9pr1cooie-or YM rs O .. Ig hor oftel ad lectr.~ic rai mo geog by the Chicago, Rock Island & Pacifie Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
at1 ...... 5 r3 hour .... 8 monthll 194 ..***3 hour
U. S GOVERNMENT PRINTING OFFICE : 1943--0-54016(


Subject to revision

UNy~. or FL us.




U e.S. DEPOS1TORY


snlli~~ii'Lrl INTERSTATE C OM MrER CE COMMISSION
3 1262 08852 3328 BUREAU OP TRANSPORT BiNOMICS AND STATISTICS Statement No. M-215 (os-o)
AUGUST 1943
YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 rail as
(CLASS I SWITCHING AND TER~IVAIINAL COMPANIES INCLUDED)
FOR THE MOlfrH OF A CGUST, 1943 AND 1942



















SOUTHERN DISTRICT
UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGION ITEMNo.

1943 1942 1943 1942 1943 1942 1943 1942 1943 1942
AGGREGATES
1. Yard switching locomotive-hours--Freight :
1-01. Coal-burning steam locomotives. ........... 3 9 8 2 6 9 3 3 47 5 4 4 2 00 7 8 31 1 9 5 8 41 1 53 4 7 31 146 l 919 4 30 7 0 91 4 46 9 8 61 8 O 6 5 O 41 8 O3 4 98 1-01
1-02. Oil-burning steam locomotives. .. .. 5 3 3 5 31 5 41 3 91 2 7 4 4 3 1 O81 -1 5 7 4 1 4 8 5 25 4 6 5 33 4 62 1-02
1.-03. Electric locomotive units.... .. ...... 32234 29726 30040 27 376 2 194 2?350 1-03
1-04. Gasoline and gas-electric locomotives. 3 48 81 6 9 3 71 2 80 6 2 2 3 8 -1 -I 6 82 6 99 1-04
1-05. Diesel locomotives. ................ 789 238 691 019 326 545 287 722 2 877 1 440 87 809 81 966 372 007 319 891 1-05
1-06. Total................... 4 756 76 0 4 612 6171 2 369 71 8 2 271 2851 156 350 147 659 524 25 9 5335 7731 1 706 4353 1 659 9001 1-06
2. Yard switching locom~otive-hoursl-Passenger :
2-01. Coal-burning steam locomotives. ......... 202 222 182 1651 129 8251 116 2781 6 6251 5 850( 21~ 85 9 21 4431 43 913 38 5941 2-01
2-02. Oil-burning steam locomotives............ 3 3 8181 32 0 671 -1 -I 1 4 3 8 84 7 32 8 0 31 2 2 2-02
2-03. Electric locomotive units. .. .. .. ... 3369 4 32 5091 53 6851 32484( -1 -I 9 2 2-03
2-04. Gasoline and gas-electric locomotives. .... .... 2-04
2-05. Diesellocomotives.. .. ... .. .. .. 86 7031 75325 33 845 1141 -1 15 12650 8 697 40 208 35 470 2-05
2-06. Total. .. .. ... ... .. .. 356 4317 3522 0661 197 3551 179 90 5 6 62 5 5 865 35 947 30 987 116 510 105 309 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .. .. .. .. 11.4 11.2 12.2 11.9 12.4 12.0 9.1 9.8 10.9 10.6 3-01
3-02. Oil-burning steam locomotives. .........14.0 14.3 9.1 8.g 10.4 8.6 14.1 14.4 3-02
3-03S. Electrie locomotive units. ...... 35 12.7 13812.9 9.2 9.9 3-03
3-04. Gasoline, gas-electric, and diesel locomotivets. ... 19.2 19.1 187 18624.0 24.31 18.8 18*5 19.7 19.6 3-04
3-05. Sevieal locomotives. ~useifabe.an .. .. %. 13.8 1$.3 14.0 13.7 13.4 11.0 11.5 14(.5 14.4~ 3-05
3-6.Al ocmoies(sricabe useviebl, n sord. ..126 24 12.9 12*5 12.5 12.0 10.0 10.6 13.1 12.9 3-06
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ...............1.66 1.72 2.26 2.289 1.17 1.18 1.4) 1.51 51 1 .j8 4
5. Yard switching and train switching locomotive-mhiles p~er 100 passenger-train
car-miles (with locomotives)-Passenger service. 6j .66 *95 *95 *39. 43 .40 .40 .46 .49~ 5

FOR NINE MONTHS ENDED WITH SEPTEMBER, 19413 AND 1942


AGGREGATES
1. Yard switching locomotive-hours--Freight :
1-01. Coal-burning steam locomotives. .. .. .0 782 27 8 2 9 894 781 18 393 0291 17 981 987( 1 353 2'3 1 1 289 9288 4 077 9281 3 990 9571 6 958 0901 6 631 909) 1-01
1-02. Oil-burning steam locomotives. ........... 4 971 64 3 4 662 266 25 081 32 9141 -1 67 6711 52 3681 4 878 8851 4 576 98 4 1-02
1-03. Electric locomotive units. ...... ...... 2 7 6 4 5 9 2 61 5 5 1 2 6 02 2 44 8 8 3- 1 6 4 3 2 16 6 6 8 1-03
1-04. Gasoline and gas-electric locomotives. 2 8 35 1 3 O 8 6 71 2 2 34 9] 23 4 351 -I -I 6 OO 41 7 4 3 2 1-04
1-05. Diesellocomotives. ................ 6 804 390 5 673 120 2 840 747 2 402 883 14 404 8 845 781 850 657 033 3 167 389 2 604 959 1-05
1-06. Total. ....................42 863 123 40 5225851 21541259] 20 685 502 1 367 63 5 1 298 77 3 4 92744 9 4 700 35 8 15 026 8001 13J817 95 2 1-06
2. Yard switching locom~otive-hours--Passeger:
2-01. Coal-burning steam locomotives. .. .. .. 1 832 9981 1 5 98 16 4 1 177 497 1 009 932 59 6871 50 3151 204 5651 18 9 96 6 391 24 91 47 95 1 2-01
2-02. Oil-burning steam locomotives. 1 3 9 3 91 2 69 6 3 5 2 6 5 14 80 7 9 57 8 2 99 13 21 2 57 9 9 2 2-02
2-08. Electric locomotive units. 307 557 285 8841 307 4581 285 6401 -1 -I 991 244 2-03
2-04. Gasoline and gas-electrie locomotives.. B 18 -I -I -I 18 2 2-04
2-05. Diesellocomotives. .. .. ... 775 77 1 638 28 0 305 34 1 269 ?3 41 -1 16 5 98 927 74 00 81 71 5035 294 77 3 2-05
2-06.Total. .. .. ... .. .. .. .. 3 230265 2 792 145) 1790 2961 1566 9711 59 6871 50 4801 318 299) 273 5521 1061 983) 901 142? 2-06
AVERAGES
3. Hours per yard locomotive-day:
8-01. Coal-burning steam locomotives. .......... 11.4 11.0 12.2 11.9 12.3 11.9 9.5 9.7 10.4e 9*5 3-01
3-02. Oil-burning steam locomotives. ...........14.2 1319.2 9.2 13.1 9.9 14. 3 13.2 3-02
3-08. Electric locomotive units. ............ 13.11.2l.1.4- .6.7 30
8-04. Gasoline, gas-electric, and diesel locomo'tives.' ..1.0 18.6 18. 18.26.7 651. 801.6 16: 7 3-o4
3-0. Serieeable locohmotives. ............. 13.s 13.5 1S:9 l4.r 13.4 3 16.. 11.4 8 14.5 134 -o
8-06. All locomotives (serviceable, un~serviceable, and stored). 125 11.9 12.9 12.5 12*3 11*9 to.5 10.4 12.8 11.7 3-06
4. Yard switching and train switching loeomotive-miles per 100 loaded: freight
car-miles--Freight service. ...............1.74 1.80 2.}} 2.40 1.19 1.19 1.44 1*52 1.39 1.44 4
5. Yard switching and train switching locomotive-mniles per 100 passenger-train
car-miles (with locomotives)-Passenger service......... .66 .70 10 1.00 .42 .47 .40 .41 .48 .94 5

NOTE."--Swichi locomotive-miles are based on 6 miles per 1 ymtie-hour. Yord switching hours of electric and gas-eeti rail motoas rebprted by the Chicago, Rock Island & Pacific Ry.; Ilinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore ,Lines; and Reading
Company not included in above figures, as follows: BaPtembe9 191) ...... 4,835 hours .... 9 months 19rC ***** 4,284 hours
September 1 ~2 ...... 4,68)j hours .... 9 months 194 ****** L5,44 hours U.S5GOVERNMENT PRINTING OFFICE :1943--0-540166


Subject to revision




u vs a~of L


"""~ 01** """" "'"'*" '"


FOR THE MONTH OF SEFFEM~BER, 1943 AND 1942


1III IIII illiIIlIII III1llilll||111 li | INTERSTATE COMM E~RCE COMMISSION
3 1262 08852 3179BUAUOTANOT ON ICADSTITI


'Statement No. MI-215 (os-c)
SEPTEMBER 1943


YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)



















SOUTHERN DISTRICT
UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGION TENo.
1943 1942 1943j 1942 1943 1942 1943 1942 1943 19 2
AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives. ... .. 3 517 990 3 578 3091 2 067 5251 2 075 207 163 829 157 7801 443 7191 478 9061 842 9171 866 416 1-01
1-02. Oil-burning. steam locomotives. .......... 557 581 577 157 2 82 3 568 6 060 5 006 548 694 568 583 1-02
1-03. Electric locomotive units. ............. 33 917 29 415 31 576 27 388 2 341 2 027 1-08
1-04. Gasoline and gas-electric locomotives. 597 3860 2 978 2 5a1 .I 619 738 1-04
1-05. Diesellocomotives. ................ 838 231 740 140 346 538 306 762 2 638 1 48 91 517 86 976 397 538 344 914 1-05
1-06. Total................ ... 4 951 316] 4 928 281 E 451.4441 2 415 4471 166 4671 159 8681 541296 570888 1792109 1782 678 1-06
2. Yard switching loeom~otive-hours-LPssege:
2-01. Coal-burning steam locomotives. ........... 207 650 186 175 134 477 118 299 6 904 6 1131 21 503. 21 6241 44 766 40 139 2-01
2-02. Oil-burning steam locomotives. .. .. 35 17 2 3 4 9 5 5- 1 4 39 8 8 9 3 7 3 3 4 O 66 2-02
2-03. Electric locomotive units. ..... ..... 34 563 33759 34543 33 752 20 72-08
2-04. Gasoline and gas-electric locomotives. .. ..... 2-04
2-05. Diesel locomotives........ ....... 9 3 17 1 7 8 8 3 3 613 3 2 2 48 -7 1 4 8 5 9 4 8 7 4 2 9 4 8 37 O 9 2-05
2-06. Total. .. .. .. .. .. 370 55 6 333 724~ 20 5 15 8 184 299 6 9041 6 120 37 027 32 000 121 467 111 505 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .. .. .. .. 1 11.4 11.6 12.2 12.1 12.5 12*5 9.1 10.2 11.o 11.1 3-01
3-02. Oil-burning steam locomotives. ..... .... 14.1 14.6 9.1 9.6 10.5 8.6 14.2 148 -02
3-03. Electric locomotive units. 3412.4 13 .6 12. 6 -- 90 .2 &08-04
3-04. Gasoline, gas-electric, and diesel locomotives. ......1.1,T1. 862. 411* 9o1. oo 80
3-05. Serviceable locomotives. .......... 1.1.1. 14.2 14.0 13.7 10.9 11.9 1 14.8 8-05
3-06. All locomotives (senriceable, un~servieable,an~d stored). .i 1.127 9 12.7 21.6 12.1 10.0 11.01. 1 80
4. Yard switching and train switching locomotive-miles per 100 loadd freight 1. eg1. 261. ool~ 33 30
ear-miles-F~reight service. .......... 1.51 1 .4.2 .0111.9*01* *3 4
5. Yard switching and train switching locomotive-miles per 100 passenger-train 16 .1p2 .711 -915 .1rf
car-miles withh locomotives)-P~assenger service. .........64 .66 .97 .98 .40 .41 .41 .41 .46 .50 5

FOR TEN MHONflHS ENDED EEEEEEEEEEEEEEE OCTOBER 1943 AND 1942

AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives.. 34 300 26 33 473090 20460,554 20057 1941 1517 06 0 1447 7081 4 521 647) 4 4698631 7 801 007~ 7 498 9251 1-01
1-02. Oil-burning steam locomotives. ........... 5 529 224 5 239 423 27914 36 482 73 731 57 374 5 427 579 5 145 567 1-02
1-03. Electric locomotive units. ..... 1037 6 290 966 2 91603 272 271 18 773 18 695 1-03
1-04. Gasoline and gas-electric locomotives. 1 9 50 34 1 2 7 2 5, 127 25 9 5 7. 6 6 2 38 17 01-04
1-05. Diesellocomotives.. ............. 7 642 621 6413927 1871285 2709045 17 04 11000 873 367 744 00 9 564 927 2949 875 1-05
1-06. Total. .. .. .. .. .. . 47 814 4391 45 451 5535 23 992 683q 23 100 9491 1 534 1021 1 458 7081 5 468 745 5 271 246 16 818 909 15 620 630 1-06
2. Yard switching locomotive-hours-Passenger:
2-01. Coal-burning steam locomotives........... 2 040 648 1 764339j 1 3119741 1 128 231i 66 5911 56 4281 226 06 8 211590~ 436 015 388 0901 2-01
2-02. Oil-burning steam locomotives. 49 111 304 590 2 065 16 246 10 467 332 865 292 058 202
2-08. Electric locomotive units. .. ....... .. 3 4 2 1 2 51 9 6 4 3 4 0~ 0 _1 31 9 3 9 2i 195 12-08
2-04. Gasoline and gas-electric locomotives.. .-182 182 2-04
2-05. Diesellocomotives. .............. 868 948 717 115 341 479 501 582 172 113 012 83 495 414 451 331 866 2-05
2-06.Total.. .. ... .. . 3 600 821 3 125 8691 1 995"45 41 1751 27 0 66 591 56600 355526 505 552 1183 450 1012 447 06
AVERAGES
3. Hours per yard locomotive-day:
8-01. Coal-burning steam locomotives. ...........11.4 11.0 i12.2 11.9 1t.3 12.0 9.5 9.6 10.4 9.6 a-ol
3-02. Oil-burning steam locmotives. ....1. 3.3. *1* 4 80
3-03. Electric locomotive units. ..............1 1, 12.4 -~ -1. -08
3-04. Gasoline, gas-electric, and diesel locomotives ....' 1.0 18.7 6 1891. 18. 18.9 18.0 1.3 19.1 8-04
3-05i. Serviceable locomotives. ..............1. 354r1. 341. s1. 35 ao
-06. Alllocomotives (serviceable, unservieable~andsatored)... 12 1.0 12.8 "12. 12.31420 10.41. 1. 11.9 8-06
4. Ya r- sein rand tr in switching locomotive-miles per 100 loaded freight 1.7 1.9 2e.2 12.39 1.191, 10.4) 1.5 1.39 11.4 4-0
5. Yard switching and rain switching locmobtive-mie per 100 passenge-train 0l 1,04 640 1 1r .kl8 *5 5
car-miles (with loeomotives)-P~assenger service. 65 *70 *99 1

NorE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electri rail motoreads reported by the Chicago, Rock Island & Padi~c Ry.; Illinois Central R. R.; Pennsylvania System: Pennsylvania-Reading Seashore Lines; and Reading
Company notincludedin above Aguores,saafidlows: October 191C) ...... 4.979 hour .... to month 1943 ****** 49,863
October 1942 ...... 5,010 hour .... 10 mronths 1942 ...... 50,628J U. S. GOVERNMENT PR'NTING OFFICE 1P43--0-540165


Subject to revision
UNIk. of FL UI.

c sp


Uf.S. DErPO91TORY


UINIVERSITY OF FLORIDA C

3126208852302lll 1ii INTERSTATE COMMERCE COMMISSION
3 122 0852 021BUREAU OF TRANSPORT BiCONOMICS AND STATISTICS


Statement No. M-215 (os-c)
OCTOBER 1943


YARD SERVICE PERFORMANCE OF CLASS I~ STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance repregenting 163,1 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES `INCfliJDED)
FOR TIE MONTH OF ~COBER, 1943 AND 1943





P I r


SOUTHERN DISTRICT


I~~


j


Si I I I


I I------- 1~ -- I I I I I I I


I 1 1-. -- -- -- I I


FOR ELEVEN M~ONT~HS ENDED W~ITH NOVEMBER, 1943 AND 1942


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burningsteam locomotives. .. .. .., 37 637 62 5 36 83098 5 22 428 936 2 2011 65 0 1 670503 1 598610 4 957 73 4 928 866 8580 648 8291 859 1-01
1-02. Oil-burning steam locomotives. ......... 6 066 371 5 804 901 310 803 39 829 80 545 63 037 5 955 023 5 702 035 1-02
1-08. Electric locomotive units. ............. 3435032 318284 321971 298 045 21 06 20239 1-03
1-04. Gasoline and gas-electric locomotives. 35430 37 15 28 16 28 377 7 26 8 773 1-04
1-05. Diesel locomotives. ................ 8 4 81 2 3 7 1 29 2 61 3 5 31 155 3 0 08 6 4 5 1 61 0 i 4 4 0 9 62 6 1 882 6 9 6 1 9 67 8 48 3 2 81 2 15 1-05
1-06. Total. ................. 52 563 689 50 120 581 86 341o28 25 386 546 1 689 9131 1 611 0501 6 000 9011 5 818 8641 18 531 8471 17 304 1211 1-06
2. Yard switching locomotive-hours-Passenger:
2-01. Coal-burning steam locomotives. ... .. 2 2 46 9 2 5 1 96 6 6 2 3 1 4 44 5 3 1 1 24 2 4 6 1 7 3 47 5 6 2 2 O 2 48 6 5 9 2 3 3 1 4 8 2 6 0 4 29 4 2 2-01
2-02. Oil-burning steam locomotives. ..... ..... 3 83 1 37 ?3 39 20 8-2 0 6 5- 17 6 1 9 1 1 5 4 6 36 5 51 8 3 2 5 5 9 7 2-02
2-08. Electric locomotive units. 76 065 352 58 375 92 352 275 *- 1 252 2-08
2-04. Gasoline and gas-electric locomotives.. .-18 .- 182 2-04
2-05. Diesellocomotives. ................ 959 862 794 869 377 226 533 494 176 127 203 93 201 455 433 367 998 2-05
2-06. Total. 965 989 3 453 409 2 197 686 1 930 295 731 475 62 381 3 93 48 1 337 27 8 1 301 34 7 1 123 4551 2-06
AVERAGES
8. Hours per yard locomotive-day:
8-01. Coal-burning steam locomotives. .. ... .. 11.9 12. 11.9 12.3 12.0 .: .8~ 14i 3-01
3-02. Oil-burning steam locomotives. ............13.4 9.2 9.9 1 .2 13-02
3-08. Electric locomotive units. 3112.2 13.4 12.4 7,9 7. 8-03
8-04. Gasoline, gas-electric, and diesel locomotives. ... 19.1 18.8 18.6 18.6 19.4 18.9 18.g 18.0 19.5 19.1 8-04
3-05. Serviceable locomotives. 3813.5 14.2 14.1 13313.2 1.11.5 14.2 1f.6 8-05
8-06. All locomotives (serviceable, unservieable, and s~tored).... 12.5 12.o 12.6 12.5 12.3 12.o lo.4 10.5 12.9 12,0 3-06
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-F~reight service. .o ~snert~i .2172.32 2.39 1.20 1.20 14 1.52 1.3814e 4
5. Yard switching and train switching locomotive-miles per10pasne-ri
car-miles (with locomotives)-Passenger service. .. ... 65 .69 .99 1.oo .41 .4C6 .40 .4C1 **8 .53 5

NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included mn above figures, as follows: NOVembetr 1941 ..4 716 hour a .. 11 mont he 194j .. .. 53, 979 hour a
November 1942 ...... 4 453 hours .... 11 months 1942 ...... 55,081 hour scvn.v..vomes-.


~LCISkc jr ir : ~~Lca


Subject to revision


UNIVERSITY OF FLORIDA

IIIIIIIII111l1llllllillilllll~llllllli llIIIIIIlll II I T R T T 'M R E C M I S O
3 1262 08852 3039 ITRTT O MREC M ISO
BUREAU OF TRANSPORT ECONOMICS AND sTATISTICS Statement No. M-215 (os-c)
NOVEMBER 1943

YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF NOVEMBER, 1943 AND s142 m --.


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


1943


1942


19'3


1942


1943


1943


1942


19431


1942


AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-03. Electric locomotive units. .............
1-0. Gasoline and $as-electric locomortives. ...**
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locomotive-houre--Passenger:
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burnmng steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives. .....****
2-05. Diesel locomotives. ...........****
2-06. Total. . . *
AVERAGES
8. Hours per yard locomotive-day:
3-01. Coal-burnmng steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electrie, and diesel locomotivets. ......
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, un~servieabjle, an'd stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ...............
5. Yard switching and train switehmng locomotive-miles per 100 p'asenger-train
car-miles (with locomotives)-Passenger service. ........


3 3 37 3 87
5 37 14 7
32 656
3 4 8 0
838 610
4 749 280
206 277
3 4 O 2 6
33 945

365 168


3 3 57 8 9 5
5 65 4 7 8
27 318
3 O 2 3
715 334
4 669 048
182 284
3 4 6 1 8
32 884
7 7 7 54
327 540


1 96 8
2
30
2
343
2 348
132
933
3 5
202


1 9 54 4 5 6
25 774
2 4 2 O
299 600
2 285 597
114 230
32 883

179 025


2 568
155 811
6 884



6 884


15 0 9 O2


1 440
152 342
5 777


4
5 781


1-01
1-02
1-03
1-04
1-05
1-06
2-01
2-02
2-03
2-04
2-05
2-06


4 36 O 91
6 81 4

89 251
532 156
22 591
1 37 3

1 4 19 1
38 155


4 59 OO 3
5 6 6 3

82 952
547 618

20 941


9 7 06
31 726


7 79 6 4 1
5 27 4 4 4
2288
6 44
402 921
1 712 938
44 245
3 2 6 5 3
17
4 0 9 82
117 897


7 93 5 34
5 56 4 6 8
1544
331 342
1 683 491
41 336
3 3 5 3 9


111 003 1


14.1
13.5
13.7
12.5
1.69
.65


11.2
14.7
12.2
19.o


1.81

.65


12.0
9.6
1 7
19 o
14.1
12.8

2.)1
.98


11.8
9.3


1123.

2.41

.98


21.4
13.2
12.o
1.28


12.3

24.1
13.4
12.4

1.25
.41


10.6
14.2
9.6
19.7
14.2



.47


9.3


11.1

1.4o
.42


9.9
10.2
18.6
11.6
10.7
1.54


10.6
14.8
6.4
19.7


1.48


UNIV1. OF FL bLIB.





Ul.S. D9EPO@'TORY


IITEMNo.












YARD SERVICE PERFORMANCE OF CLASS I STEAM~ RALWAYS IN THE UNITED STATES
Compiled from 153 reports of yard setrifie performatioe representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MdOKIF OF DECEMBER. 1983 AND 19831


SOUTHERN DISTRICT~


I I I I


I I _1 1-~--1------1-----1-~--I f I


I I .,. I I I I i


FOR TWELVE MlOfflHS END WITH DECEMIUBER, 1988 AND 1982


AGGREGATES
1. Yard switching loeomotive-hour -Freight :
1-01. Coal-burning steam locomotives. ........... 41 090 2561 40 521 4381 24 497 797 24 076 010 1 832 321 1 746 9281 5 423 7881 5 .405 724 9 336 350 9 092 780( 1-01
1-02. Oil-burning steam locomotives............ 6 5 99 23 6. 6 SS 5 8 6 4 3 64O 42 ag -8 8 11 4 6 9 7 O 6 4 77 4 8 6 8 7 177 1-02
1-08. Electric locomotive units. 78 366 346 687 354 686 324 936-- 23 680 21 751 1-08
1-04. Gasoline and gas-electric locomotives. ....38 8 5 1 4 O 35 3 3b 8 5 9 8 6- 7 9 97 9 3 6 7 1-04
1-05. Diesellocomotaves. 9 360 658 7 874 000 5 884 848 3 322 137 21 525 13 928 1 056 954 914 388 4 398 731 3 623 547 1-05
1-06. Total. .. ... .. .. .. ... .. 57 467 3671 54 968 342 28 80P 225 27 797 053~ 1 855 646 1 760 8561 6 568 2561 6 989 8111 20 244 240o 19 020 682 1-06
2. Yard switching locomotive-hours--Passenger:
2-0.Calbunigsealoomties. .. .. .. 24744 1928 19 951386 851 80 785 68 473 273 757 256 012 527 819 480 947 2-01
2-02. Oil-burningsateam locomotives. ........... 42O 189 378 788- 05 1 3 1 67 0066 6 56 22
2-08. Electric locomotive units. ...... ...... 413 201 589 335 41 05 8983 146 252 2-08
2,-04. Gasoline andgas-electrie locomotives.. 190 182 2-04
2-05. Diesellocomotives. ... ...* 1 063 591 888 553 41; 438 568 383 7 142 9371 104 159 504( 216 409 835 2-05
2-06.Total. .. .. ... ... ... 4 374 43 5 3843149 2 42f 588~ 2 14639901 80 78 5 68 649 436 017 373 83 1 433 0471 1 254 278 2-06
AVERAGES
8. Hours per yard locomotive-day:
8-o1. Coal-burning steam locomotives. ...........11.3 11.1 .211.9 12.2 12.0 9.51. 0498 80
8-02. Oil-burning steam locomotives. .......... 14.2 13*5 9.2 8.8 1.8 10.9 142 13.6 3-02
8-08. Electric locomotive units. 3312.2 J.6 12*5 --'*2 7*5 3-os
8-04. Gasoline, gas-electric, and diesel locomotives.' ...19o.g I.5185 19*5 19.3 18* 18*1 10.5 19.2 ~04
8-05. Serviceable locomotive. ........ 13.er 13.6 14.1 13313.2 11.3 11.5 1$.2 13.7 a-os
8-06. All locomotives (serviceable, ~unservieable, and. stored).. 12*5 12*1 12*9 12*5 12*3 lao 10.4 to*5 12*9 12*1 8-06
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. .............. 1.73 1.81 12.33 2.41 1.20 1.21 1.1CJ 1*52 1*38 1*45g 4
5. Yard switching and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Paassenger service. .........65 .69 1.oo 1.01 .41 .45 1 .Ao .41 .4 53 5

Norr.--8itchms locomotive-miles are based on 8 miles per locomotive-hour. Yardpithn hours of electric and gas-electrie rail motorctra ~pprby the Chiecago,Rock Island &t Paciite Ry.; Ilinois Central R. R.; Pennslania Syrstem; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above 8gures, as follows: Deceaber 1943 ..... 9,0q hour .... 12 months 194) ...... gprO hour
Decemiber 191C2 ..... 4,$~ hour~a .... 12 mPonthe 191C2 ****** 59,91 hour s U Oo~NMENT PRINTINGoFFICe -s


30 rs re ~ g/= ~Qec Ir rC f


Subject to revision




UNIV,. OF FL g,



c P ~rrr


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM No.


ITEM


POCAHONTAS REGION


SOUTHERN REGION


1943


193


1942


1943


19c2


1943


1942


1942


AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-08. Electric locomotive units. .............
1-04. Gasoline and gas-electric loobmotives. .........
'1-05. Diesel locomotives. ...............
1-06. Total. . . .
2, Yard switching locom~otivre-hour ;Passenger:
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-08. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesellocomotives. ...............
2-06. Total. . . .
AVERAGES
8. Hours per yard locomotive-day:
8-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomo'tives. ......
3-05. Serviceable locomotives. ..............
8-06. All locomotives (serviceable, unserviceableand stored)i....
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ...............
5. Yard switching and train switching locomotive-iles per 100 passnger-traiin
ear-miles (with locomotives)--Passenger service. ........


'2 064 360
3 155
86 891

2 410 507
144 590

|6 801
2 034 88p


148 318


1 488
149 806
6 268



6 268


466 050
7 569

95 736
567 355
25 098
1704

15 734
42 536


3 452 601
532 86 5
315 334
3 4 a1
879 427
4 903 648
230 529
17 052
37 136
103 729
408 446


3 490 455
580 969
28 405
3 so $
744 739
4 847 761
225 660
39 580
36 808
8
87 684
389 740


162 018


1 715
165 733
7 SOS



7 308


476 854
6 666

87 427
570 947
23 481
2121

10 958
316 560


755 702
522 459
2 619
7 3 0
430 883
1 712 593
47 559
353 48
10
48 783
131 700


800 921
571142
1 518
342 338
1 716 501
51 521
37 459

41 837
130 817


1-01
1-02
1-08
1-04
1-05
1-06
2-01
2-02
2-08
2-04
2-05
2-06


2.3




.45
.~I04


11.4
14.7
13.0
19.2
13.8
12.6
1.94
.70


11.3
13.7
19.2
13.8
12.6
1.77
.68


12.1
8*5
13.3
18s.7
S 14.1
12.8
2.64
1.07


12.2


131
12.2
1.25
.39


12.0

24.o
12.8
12.0

132
.38


9.e
13.o

11.6
10.8
1.46
.44


9.9
12.9




1.6o
.41


10.0

19.7
13.9
12.7
1*39
.48


lo*5
14.iJ
6.1
19*8
14.4

1*56
*53


UNIVERSITY OF FLORIDA

111111111111111111111111111111811111111111111111I INTER S'tATE COMMERCE COM(MISSION
3 1262 08852 3187 BUREAU OF TRANSPORT ECONOMICS AND STATISTICS


Statement No. M-215 (os-c)
DECEMBER 9193


2 06i3 831
,t0:837
e 691
35?1 093
2 460 167

15~ 56_4
3b 126

22 902




Full Text
xml version 1.0 encoding UTF-8
REPORT xmlns http:www.fcla.edudlsmddaitss xmlns:xsi http:www.w3.org2001XMLSchema-instance xsi:schemaLocation http:www.fcla.edudlsmddaitssdaitssReport.xsd
INGEST IEID EYUYJF91V_JDEGGL INGEST_TIME 2012-04-06T14:02:15Z PACKAGE AA00010244_00008
AGREEMENT_INFO ACCOUNT UF PROJECT UFDC
FILES