Yard service performance of class I railroads in the United States - 1936

MISSING IMAGE

Material Information

Title:
Yard service performance of class I railroads in the United States - 1936
Series Title:
Statement ;
Physical Description:
v. : ; 28-42 cm.
Language:
English
Creator:
United States -- Interstate Commerce Commission. -- Bureau of Transport Economics and Statistics
Publisher:
U.S. G.P.O.
Place of Publication:
Washington, D.C
Publication Date:
Frequency:
quarterly[1961-1963]
monthly[ former jan. 1957-dec. 1960]

Subjects

Subjects / Keywords:
Railroads -- Statistics -- Periodicals -- United States   ( lcsh )

Notes

Dates or Sequential Designation:
Jan. 1957-4th quarter 1963.
General Note:
"Compiled from ... reports of yard service performance representing ... railroads (class I switching and terminal companies included)."
General Note:
Title from caption.
Statement of Responsibility:
Interstate Commerce Commission, Bureau of Transport Economics and Statistics.

Record Information

Source Institution:
University of Florida
Rights Management:
All applicable rights reserved by the source institution and holding location.
Resource Identifier:
oclc - 18598278
lccn - sn 88029194
ocm18598278
Classification:
lcc - HE2713 .Un342
ddc - 385.0973 fU56y
System ID:
AA00010244:00007

Related Items

Preceded by:
Yard service performance of class I railways in the United States
Succeeded by:
Train and yard service of class I railroads in the United States

Full Text





UNIV. OF- FL bLB.


U.S. DIEP~O~tTRY


UNITED STATES EASTERN DISTRICT SUHR ITC WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGION ITEM No.

1942 1941 1942 19 1 1942 1911942 1941 1942 1941
AGGREGATES
1. Yard switching locomotive-hours--Freight :
1-01. Coal-burning steam locomotives. ........... 3 3 49 5 42 2 8 98 5 8 2 01 6 61 8 1 7 39 8 46 1 37 6 98j 11 8 6 8 4 41 7 54 4 00 0 7 7 53 4 72 6 39 4 62 1-01
1-02. Oil-burning steam locomotives. ........... 4 99 91 9 39 7 22 4 10 0 31 7 48 5 10 1 5 5 51 4 9 7 18 3 81 4 23 1-02
1.-03. Electric locomotive units. .............31 516 27 727 29 371 25 085 -*68 5 2 145 1 957 1-03
1-04. Gasoline and gas-electric locomotives. 5 19 3 7 74 2 6 39 2 8 75 8 8 8 99 1-04
1-05. Diesel locomotives. ..... .......... 5 9 6 42 3 88 2 OO 2 54 8 34 18 O 7 77 -* 6 3 2 9 3 1 2 3 2 72 5 69 17 6 4 00 1-05
1-06. Total. .................... 4 475 138 3 708 481 2 307 462 1 952 331 137 698 118 680 510 094 437 329 1 519 784 1 200 141 1-06
2. Yard switching locom~otive-hours~-P;assenger :
2-01. Coal-burning steam locomotives. .. ... 1 89 5 51 17 7 2 81 11 8 173 10 8 1 54 5 6 54 4 8 37 2 1 2 O6 2 2 7 78 4 4 5 1 8 4 1 5 12 2-01
2-02. Oil-burning steam locomotives. .....30 973 2 9 7 43 3 O7 5 6 -*1 6 8 1 8 20 2 9 19 8 2 7 5 67 2-02
2-03. Electric locomotive units. ... ...... .. 1 39 3 57 3 1 8 5 6 3 3 2 6 1. 8 25 *1 3 1 2-03
2-04. Gasoline and gas-electric locomotives. .........2 7 2 6 2 7 2 6 2-04
2-05. Diesellocomotives. ................ 68 827 54 968 28 di52 24 508 22 14 8 974 5 902 31 179 24 544 2-05
2-06. Total. ...... .. .. ... 1 22 435 293 874 180 158 164 843 5 676 4 851 31 648 30 500 104 953 93 680 20
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .......... 10.8 9.4 11.8 10.4C 11.4C 10.3 9.2 8.4 9. 1,7.8 3-02-1
3-02. Oil-burning steam locomotives. ...........12.3 10.0 9.5 8.30 .28. 12.4 10.0 3-02
3-03. Electric locomotive units. .............12.5 11.4 1 12120-- 7** 5*8 3-03
3-04. Gasoline, gas-electric, and diesel locomotives.' ... 19. 18~.f 19.0 17.61. 1.202 34
3-05. Serviceable locomotives. ..............1. 2 421. 261. 10991. 1930
3-06. All locomotives serviceablel, un~serviceable,' an'd stored). .2. .4. 1. 1 12.6 10911410.4 91.9 87 11.4 9 .g 3-06
4. Yard switching and tramn switching locomotive-miles per 100 loaded freight 0 l. Q 14 9 36
car-nkiiles--Freight service. .1*95 2.ol1 2.67 2.70 1,23 1.16 1.62 1.65 1*53 1.62 4
5. Yard switching and train switching locomotive-miles per 100 passenger-tramn
car-miles (with locomotives)-Passenger service. .........75 .7'e 1.06 1.05 .49 .47 .4)3 .42 .9. 5

NOTE.--Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading .
Company not included in above figures, as follows: an ry1 2 .... 519hourse U S. GOVERNMENT PRINTING OFFICE: 1942--0-200931
January 1941 ..,.**** 5,70 hours


~-~2 57L~ : 5 S i 9//2


Subject to revision


UNIVERSITY OF FLORIDA
||l111|1|1IIIIIIIIII lllllII|1|lliilllllll||ll11
3 1262 08852 3005


INTERSTATE COMMERCE COMMISSION
BUREAU OF~ STATISTICS


Statement No. M-215 (os-o)
JANUARY 1942


YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWVAYS` IN THE UNITED STATES
Compiled from 152 reports of yard service performance representing 160 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)
FOR THE MONTH OF JANUARY, 1942 AND 1941





















I I I SOUTHERN DISTRICT


.


I I I I I I 1


1 I I --- --- ----- I I I I


I 1 -1----~-1------1-----1------1---~-1--~-- 1


1 I I I I I I I -


I t I I-------~--I 1- 1-~------1----------1


NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electrie rail motorcars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania Systeml Pennsyrlvania-Reading Seashore Lines: and Reading
Company not included in above figures, as follows: Ferbruary 194)2 ...... 4,688 hours 2 months I1942 ..... 8 or I.GViNETPRNIGOFC:920203
Pebrluary 11 ...... 5.303 hours 2 months 1941 ..... 1, hoorhu~r


_C C af CL. 3 gb :&4$ L

Subject to revision


L U.S. BEPO91TORY


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


ITEM No.


1942


19c2


1942


1941


19C2


1942


1941


1941


AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ......
1.-03. Electric locomotive units. .............
1-04. Gasoline and gas-electrie locomotives. .........
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locomotive-h~ours--Passnenger
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesel locomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-08. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomotives. ......
3-05. Senaiceable locomotives. ..............
3-06. All locomotives (serviceable, ~unservieable, an'd stored). ...
4. Yard switching.and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ...............
5. Yard switching and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Pas~senger service. ........


3 8 1 6 9 8
4 65 4 34
27 189
3 270
555 547
4 133 138

1 62 4 3 4
2 6 7 6 9
2 9 4 5 8
2 4
6 2 12 0
280 805


1 8 81
3
85
2
240
2 153
10 1

S9
2 6
156


1 6 59 O 94
3 3 4 1
23 223
2 554
168 046
1 856 258
9 4 20 3

as 4 8 9

2 2 0 2 2
145 166


2 7 26
35 9
25
3
363
3 477

1 54
S6
as

5 0
260


4 O5 O 3 4
4 8 68

60 070
469 972

18 9 7 3
1 17 9

7 7 5 6
27 908


4 6 6 2
442
31 216
406 339




5 5 9 1
27 535


6 69 8 94
4 56 91 4
1653
819
254 497
1 383 777

37 12 8
2 5 5 2 8
2 1
2 4
2 8 1 8 2
90 883


5 83 6 6 9
3 51 3 4 6
1710
787
164 251
1 101 763

3 5 9 O6
2 4 7 63
2 8
2 4
2 2 6 9 2
83 413


1 25 5 8 1



125 581
5 O 8 4


1 6
5 100


1 13 2 1 8



113 218
4 4 31


1 8
4 449


1-01
1-02
1-03
1-04
1-05
1-06
2-01
2-02
2-03
2-04
2-05
2-06


11.o
12.7
12.1
19.1
13.6

1.92


9.7
10.2
11.4
19.4
12.
10.

1.99
.74


12.1
8.8
12.9
190 b
14.6

2.62

1.ok


12.0



2.68

1.o5


9.4

17.7
11.2
lo*1

1*57
.41


8.6
7.8
17.1
10.1
81.9

1.63
.42


11.5


12.8
11.5

1.27
.51


10.8





1.15
.49


9.3


19.5


1.5o
*58


7.8
10.2

12.2
9*5

1*57
.Go


3-01
3-02
3-03
a-o4
3-05
3-06
4
5


FOR TWO MONTHS ENDED WI~TH FEBRUARY, 1942 AND 1941


AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1-03. Electric locomotive umits. .............
1-04. Gasoline and gas-electriclocomotives. .....
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locom~otive-h~oure-Passenger:
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesellocomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard loeomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomotives. ......
3-05. Servriceable locomotives. ..............
8-06. All locomotives (serviceable, un~servieable, and stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded: freight
car-miles--Freight service. ...............
5. Yard switching~ and train switching loobmotive-miles per 100 passenger-train
car-miles (with locomotives)-P~assenger service. ........


6 431 24 0
9 65 35 3
58 705
6789
1 146 189
8 608 276

S5 1 9 85
5 7 7 4 2
62 515
5 1
130 947
603 24 0


3 897 807
7 7 5 2
54 907
495 81.4
4 461370
S1 9 4 as
62 463

54 818
337 07 2


3 398 940
7 OS 9
48 308
5 429
348 823
3 808 58 9


60 314
46 530
310 009


5 624 058
7 50 07 1
53 10a
7 115
751 713
7 186 059

3 3 0 6 6
5 6 6 5 7
60 373
5 0
105 291
554 437


1 421 366
9 47 6 3 2
3 798
1699
527 066
2 903 561
8 1 64 6
5 4 7 26
52
5 1
59 361
195 836


263 27 9



263 27 9




38
10 77 6


231 898



231 898
9 6 8


32
9 300


646 788
9 9 69

123 309
980 066

4 O 17 9
2 6 4 7

16 730
59 556


77 0 08 9
1 0 21 3
1 127

62 239
843 668

3 5 1 9
51

11 493
58 035


1.0 23 131
7 32 7 6 9
3 667
1686
340 651
2 301 904
7 7 4 1 8
5 2 3 3 O
59
5 O
47 236
177 093


1-01
1-02
1-03
1-04
1-05
1-06
2-01
2-02
2-08
2-04
2-05
2-06


b.5
6.o
4.8
16.0
9.9

8.8


10.6

11.9



2.69

1.05


9*4
9.3
17.2
11.1
10.0


.42


12.3




1.7 r


9.5

10.1


2.00

.74


11 9
9
12 6
18.5
14.4
12.I

2.65

1.05


11.4


12.
11.


1.25


10.5


12.0
10.5

1.15


9.4
12.6
7*3

19.)

1.52

.58


7.8
10*1
5.7
19.8

1*59

.59


3-01
3-02
3-08
3-04
8-05
3-06
4
5


UNIVERSITY OF FLORIDA


3 1262 08852 2841 llll~~!u~!n~?llrINTRTT COMMERCE COM ISSION Statement No. MI-215 (os-c)
BUREAU OF, STATISTICS FEBRUARY 1942

YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 152 reports of yard service performance representing 160 railways

(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF FEBRUARY, 1942 AND 1941
















UNIV. oFL FL, LIB.




U..ii ETM


YARD SERVICE PERFORMANCE OF CLASS I .STEAMV .RAILWAYS IN THE UNITED STATES
Compiled from 152 reports of yard servio)s performance representing 160 railways

(CLASS I SWITCHING AND TECIlIINAL COMPANIES INCLUDED)

FORTHEMONH O MC, 1942 AND 1941


SSOUTHERN REGION


.... I I


I I I I I I I I


10.#
12
18.

12.
B.*


I I I 1 1---------1-----~---1 1---


I I


FOR THREE MONHnS ENDED MT ~ARCH, 1942 AND 1941

I I I I, I I I


----------~--l-----------cl I I I


NOTE.--Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcare rporlted by the Chicago, Rock. Island & Pacifle Ry.; Illinofs Central R. R.; Pennsylvania Syrstem; Peunnslvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: March 1942 ..... 5,16tr hourE j months 1942 ...... .1808 heatrs .S OENETPITIGOFt;1~-0P0
March 194)1 ****** 5,667 hours 3 months 1941 ...... 1p67 M U5GERMTPITNOFC:9-0203


Subject to revision


SOUTHERN DISTRICT


UNITED STATES


EASE tN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


ITEM No.


1942


19C1


1942


1942


1~41


1942


1041


lalp


AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burnmng steam locomotives. ...........
1-08. Electric locomotive units..... .. ..
1-04. Gasoline and gas-electric locomotives. .....
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locom~otive-hour P-~assenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burmang steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasolineandgas-electriclocomotives.. ........
2-05. Diesel locomotives. ...............
2-06. Total. .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. 0il-burning steam locomotives. ...........
3-03. Electric locomotive umits. .............
3-04. Gasoline, gas-erectrie, and diesel locomnotives. ......
".-88: Brima Ioc m mtvs (eiable,' ul serviic~eable n slotle;;d)..
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-F~reight service. .............
5. Yard switching and tramn switehn locomotivemiles per 100 pass~ener-tram
car-miles (with locomotives) Passenger service. ........


647 965
392 201
1891
8 6 1
188 431
1 231 349
40 031
2 7 9 89
31
26
2 5 4 65
93 542


3 396 341
518 657
29 554
3 4 07
622 725
4 570 684
176 826
2 9 5 64
31 233
a6
70 OO5 1
307 700


3 119 438
401 683
29 489
3 8 4 1
409 939
3 964 390
173 576
3 O 5 4 O
31 143
26
5 511 0
290 395


1 922 534
4 437
27 120
2 98 O
188 165
2 145 236
106 034
3 9 3
31 112
2 3 6 6 3
161 208


141 24 4


131 390



1131 390
4 883


2 7
4 910


445 891
6 898

70 350
523 139

21 529
1 4 99

8 07 5
31103


417 549
5 045
478
331 343
456 415

32 628
2 15 8

5 9 5 5
30 741


715 503
507 450
1750
7 O5
281 966
1 507 374

38 310
2 7 6 3 3
28
26
3 2 9 8 1
98 97 8


1-01
1-02
1-03
1-04
1-05
1-06

2-02
2--08
2-04
2-05
2-06


141
5


2 0
5 569


10.9
12.7
11.7
19.0


1.85
.72


11.4
9.7
12.o
12
2d"

2.59
1.05


10.0
10.2
11.5
19.1


1.92


11.6

24.4


1.23
.Bo


11.2

- ~
- .
- o

1.09


9.4


18.1

1.52
.C2


8.7

16.3


g.41


9.0
12.8
6.4
19.8




.56


7.9
5.
19.8
12.



.599


3-01
3-02
3-S
3-04


4
5


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives............
1-02. Oil-burnmng steam locomotives. ...........
1-03. Electric locomotive units. ............*
1-04. Gasoline and gas-electric locomotives...... .
1-05. Diesellocomotives.. ..... ......
2. Yard1- otalnglocon~otive-h~ours -Passlenger: -***-....
2-01. Co l-burning steam locomotives............
2-02. Oil-burnmngsteam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesel locomotives.. .............
2-06. Total. .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives.. ........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive umits. .............
3-04. Gasoline gas-electric, and diesel locomotives. ......
3-05. Service le locomotives. .........***-*
3-06. All locomotives (serviceable, unlservieab~le, and stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-milese-Freigdht service ...........-*
5. Yard switching ana tramn swite ig locomotive-miles per 100 p'asenger-train
car-miles (with locomotives) Passenger service. ........


1292 679
16 867

193 659
1 503 20 5
61 70 8
4 14 6

24 805
90 659


~@" ).127 581
1 484 010
88 259
10 196
1768 914
13 178 960
528 811
873506
93 748
7 7
200 998
910 94 0


8 743
1 151
82
10
1161
11 150
505
87
91
160
844


5 521
11
75
8
536
5 953
308
1
9-1
70
471


563 88 8



356 28 8
14 151


1 18 7 68
15 258
1 605

95 58 2
1 300 083
65 651
5 677

17 448
88 776


2 138869
1 455 008
5 54 8
2404
809 038
4 410 935
119 956
82 35 9
80
7 7
92 34 2
294 814


1871096
1 124 970
5 558
2 547
529 08 2
3 533 253
117 449
80 319
90
7 6
73 701
270 635


404 523


736
405 259
16 287


58
16 54 5


12.
9,
12.
18.
14.
12.

2. 5

1.0 i


12.1





.73


9.7





1.97
.74


8.8
12.0



2.66

1.e5


11.5

1.24
i.lo


1.

12.3
10.8

1.13
.46


9.4


11.2
to.o

1*57
.42


8*
IC5
16.3
10.0
l.9


.42


6.9
19.1




*57


9.1

1*56
.59


UNIVERSITY OF FLORIDA


3 1262 08852 2999 INTERSTATE COM1I~ERCE COMMISSION

BUREAU OF ~STATISTICS


Statement No. MI-215 (os-c)
MARCH 1942


2 093 7 3
2764
2 7 2
269 673
2 398 1)1
111 4$8
4 $2
31 SQ5
2 8 9 5
1720~0


5 99151:a
18 Od&
88 711

6 059 5811

330 8650
804
993 6618

50912p :















_ I


I i _


I I I I .


LI L


I I1---- ~-- I 1- 1- ~ 1 ~1- -1- -1------1


I I I 1 1 I I -1-- -1-


FOR FOUR MONTH ENDED W APRIL, 1942 AND 1941


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives. .... 19 1 0 2 11 5 90 20 4 8 7 1 0 5 5 7 6 O 7 6 5 4 5 31 4 57 6 39 1 7 34 4 47 1 5 71 10 4 2 3 6 9 9 2 50 0 6 991 1-01
1-02. Oil-burning steam locomotives. .... ...... 1 994 ess 1 556 600 15 9 /9 15 8841 .l as 839 19 898 1 954 814 1 520 8181 1-02
1-03. Electric locomotive units. ... ......... 116 016 111 072 108 7 6 102 045 605 7 290 7 422 1-03
1-04. Gasoline and gas-electric locomotives. 14 064 14 694 10 7 P0 11 251 -1 ,I 327 4 3 436 1-04
1-05. Diesel locomotives. ................ 2 376 648 1 570 102 1 Oa3 8012 722 291 2 168 263 516 128 501 1 087 162 719 310 1-05
1-06. Total. 17 692 406 14 842 6572 9 230 37'2 7 912 240 550 699 457 639 2 021 802 1721 108 5 a69 533 4 751 685 1-06
2. Yard switching loeom'otive-h~ours-Passen~ger:
2-01. Coal-burningsteam locomotives. .. .. .. ., 70 64 2 67 367 5 441 370 411 912 21 777 19011i 82 64 4 8 727 5 156 851 155 4771 2-01
2-02. Oil-burning steam locomotives. ..... 11 6 6 2 5 11 5 8 22 1 30 2 1 6 6 91 .1 5 4 98 7 4 59 10 9 8 25 10 6 6 94 2-02
2-03. Electric locomotive units. ........ 124 702 120 966 124 59~8 120 846 *-104 1201 2-03
2-04. Gasoline and gas-electric locomotives. ........ 10 3 10 8--* 10 3 10 2 2-04
2-05. Diesellocomotives. ................ 269 036 214 488 -111 60~7 93 462 77 85 32 795 23 395 124 557 97 546 2-05
2-06.Total. ... .. .. .. .. ... 1 213108 1125 053 678 877 627 889 21 854 19 096 120 937 1181Z9 391440 359 939 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........10.Si 9.6 12 1 10.8 11.6 10.2 95 i.5 1.9.2 7. -ol
3-02. Oil-burnizig steam locomotives. 2510.3 6 9.1 10.7912 0. 3-02
3-03. Electric loEomotive units.............. 12.0 1* 1 2 12*1 .5775 3-os
3-04. Gasoline, gas-electric, and diesel locomotives.' 8.8 19.0 1 6 18.9 1. 17.9 1641.1 195 3
3-05. Serviceable locomotives. ..............1 5 .5 371.91.1.20.1.g12.0 3-05
3-06. All locomotives(serviceable, unservieable,' and stored). 11.8 10. 1 6 11.9 11.71.2 10.1 11. 19*5 3
4. Yard switching and train switching loeomotive-miles per 100 loaded freight
car-mile -Freight service. .............1.919 261.2.11. 1 414 *5
5. Yard switchmg~ and train switching locomotive-miles per 100 passenger-train 1gglg .526 .212 ~ lbe15
car-miles (with locomotives)-Passenger service. .. .. .. .73 .74 1. .04 .Bo .46 .k1 .42 .51 .599

NOTE.Switching loeomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania Syrstem; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: April 1942 ****** 5.358 hours 4C months 194C2 ,..... 20,381 hour.
April 1941 ...... 5r170 hours it months 194C1 .....4 21,81C7 hours U.S5.GOVERNMENT PRINTING OFFICE: 1941--0-200931

d Inoluaes Lakea Erie and Eastern Railroad reolassified as 01ase I railway, effootive January 1, 1i942.


IC I sCe 3 g;'~92


Subject to revision


SOUTHERN DISTRICT


EASTEIA DISTRICT


UNITED STATES


WESTERN DISTRICT


ITEM No.


ITEM


POCAHONTAS REGION


SOUTHERN REGION


1942


1941


1942


1941


1942


1941


1942


1941


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1-03. Electric locomotive units. .............
1-04. Gasoline and gas-electric locomotives. .........
1-05. Diesellocomotives. ...............
1-06. Total. . .
2. Yard switching locom~otive-h~ours-Passen~ger:
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesellocomotives.. .. ..... ....
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ..........-
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electrie, and diesel loeomotives. ..,...
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, unselrvieable, and1 stored).. .
4. Yard switching and train switching locomotive-miles per 100 loaded freight
ear-mile -Freight service. ...............
5. Yard switching and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Passenger service. ........


9 4 35 1



94 351
4 8 6 O


26
4 886


3 32 5 6 61
5 1 6 4 2
2 7 7 5 7
3 868
607 734
4 475 662
17 3 8 31
2 9 31 9
30 954
2 6
68 038
302 168


2 8 16 5 4 6
4 O4 8 4 6
2 8 4 8
3 738
408 450
3 662 061
16 8 O 3
2 8 6 2
29 450
54 087
280 221


2 O 4 1
3
2 6
2
258
2 333

11 O
30
27
169


1 7 O912 6
4 3 5 8
2 6 6 1 7
2 849
185 303
1928 253
10 3 5 21

29 420
23 269
156 678


1 44 OO 8


1 432
145 440
5 4 9 0


19
5 509


4 41 7 6 8
6 9 7 2

69 857
518 597
2 0 9 36
1 35 2

7 990
30 27 8


32 919
421 025
2 1 6 24


5 947
29 353


6 97 9 5 5
4 99 7 32
1 74 2
87O
278 130
1478 429
3 6 8 95
2 7 4 6 6
24
2 6
32 215
96 626


6 29 6 0
S9 5 84 8
1 8 64
889
190 228
1218 432
3 8 O 28
2 6 375
30
26
24 845
89 304


10.5
10.1
12*1
19.2


2.74
1.02


11.0
12.9
11.6
18.8


1.81

.70


9.4
10.6
11*5
19.2
12.3
10.2
2.01

.73


12.1

24.2
12.0

1.17
.48


8.5


10.1
8.5
1.66


8.3
7.4
16.6
9.8
8.6

1.67
.42


9.1
12.9
7.4
19.1
13J.1
11.4

1.47
.54


18.7
11.5
10.4

1.47
.bo


3 1262 08852 2833 INTERSTATE COMMERCE COMMISSION ,
BUREAU OF STATISTICS


Statement No. M-215 (os-c)
APRIL 1942


YARD SERVICE PERFORMANCE OF CLASS I $TEAM RAILWAYS IN THE UNITED STATES
Compiled from 17p) reports of yard service' performance representing 161 railways 1/
(CLASS I SWITCHING AND TERIVINAL COMPANIES INCLUDED)

FOR THE MCONTH OF APRIL, 1942 AND 1941


Ulnlki o% F't &,


IL



U.S. D)EPOSITORY



















~C~C~-~-~ --


. .


SOUTHERN DISTRICT


--- I .. I L


I~ I I I I I I I I


I I : I I 1 1------~-1~1----------1 1


FOR FIVE MONTHS ENDEl WITH MAY, 1942 AND 1941

I~~ I -..


I I /I I ) I I I I I


I I I


1----------1----~-1 1 ~I I I I


I I


NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. yard switching hours of electric and gas-electric rail motorcars reoep y the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: May 1 62 ...... 5,116 hour 5 months 1 42 ...,.... 7~u hours
May 1941 ...... 5,116 hour 5 months 1 41 .....,i 2 39~ hours U S GOVERNMENT PRINTING OFFICE 1943--0-475224


1

uHIw. OF FL Lla.


US DEP


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


ITEM No.


~9142


2 91C


1 9Y1


19142


91 1


91 2


19142


AGGREGATES
1. Yard switching locomotive-hours--Freight :
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-03. Electric locomotive units. .............
1-04. Gasoline and gas-electric lcomotives. .....
1-05. Diesellocomotives. ...............
1-06. Total. . .
2. Yard switching locomotive-hours--Passenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives.. ........
2-05. Diesellocomotives.. ..... ......
2-06. Total. . . .
AVERAGES
3. Hour's per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomotives. ......
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, unse~riceable, and stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-Freight service. ...............
5. Yard switching and train switching locomotive-mhiles per 100 passenger-train
car-miles (with locomotives)-Passenger service. ........


3 365 718
5 25 01 9
28 431
3 5 68
630 312
4 553 04 8
177 353
30 187
31 958
26
71686
311 210


3 071 124
4 29 O 4 3
29 572
34 5 4
429 930
3 963 123
171 271
27 eso
30 419
27
59 757
289 154


2 032 882
3 5 9 7
26 714
2 6 9 7
266 35 5
2 332825

112 321
518
31 929
30 43
174 911


1 863 892
4 4 84
27 372
2 54 5
191 975
3 090 268
104 569
514
30 388
26 751
162 282


150 059


1 488
151 547

5 552


21
5 573


127 679



127 679

5 102


26
5 128


461 19'3
6 4 69

73 336
540 998
21 517
830

8 250
30 597


409 411
4 3 34

35 749
449 494
22 157
719
55

29 232


721 584
51 4 95 3
1 717
87 1
289 153
1 528 278
38 163
28 839
29
26
33 072
100 129


670 148
4 2 2 25
2 200
9 O9
202 206
1 295 652
39 443
26 447
31
27
26 624
92 578


1-01
1--02
1-03
1 05
1-06
2-01
2-02
2-03
2-0
2 05
2-06


.8


18.4

2.31


10.9
12.7
11.
18.
13.3
11.8

1.75
.70


9.9
10.9
11.5
19.0
12.8
10.6
1.82

.75


11.1
10.1




2.4)


12.3


24.j r
12.3
1.13
.47


11.0



11.0

1.04

.51


9.9
10.7

11.6 .
10.7

1.45
.42


8.6
5.6
17.o
10.1
8.9

1.53


1.0
8.0
18.8

11.3


*54


8.1
11.o
6,5
19.5
12.2
9.9
1.46

*58


AGGREGATES
1. Yard switching locomotive-hours-Freight :
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1-03. Electric locomotive umits. .............
1-04. Gasoline and gas-electric locomotives. .....
1-05. Diesel locomotives. ...............
1-06. Total. . . .
2. Yard switching locom~otive-h~ours-Passenger :
2-o2 1i-bburn ng steae lcm tes.
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives.. ........
2-05. Diesellocomotives.. ...... .......
2-06. Total. . . .
AVERAGES
3. Hours erf yard locomotive-day:
30.Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline gas-electric, and diesel locomotives. ......
3-05. Service le locomotives. ..............
3-06. All locomotives (serviceable, un~selrviceab~le, and stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ...............
5. Yard switching~ and train switching loeomotive-miles per 100 passenger-train
car-miles (with locomotives)-Passenger service. ........


16 556 744
2 519 671
144 447
17 638
3 006 960
22 245 454

876 895
156 660
129
340 722
1 524 318


14 661 328
1 985 6443
140 644
18 148
2 000 OSS
18 805 795

844 546
151 385
129
274 245
1 414 807


10 103 937
19 596
135 440
13 487
1 290 137
11 562 597

553 O 1
156 a27

14653 388


8 924 654
20 368
129 417
13 803
914 26 6
to oo8 50 8

516 483
151 334
120 213
790 111


698 590


3 656
702 24 6
27 329


98
27 427


585 318



585 318
24 113


111
24 224


2 195 64 0
30 308

336 852
2 562 800

104 368


41 04 5
151 534


1 980 515
24 232
1 605
164 250
2 170 sos

109 43



r 147 362 7


3 558 57 7
2 469 767
9 00 7
4 14 5
1 376 315
? 417 811

19 0 4
133
157 62 9
491 569


3 170 841
1 941 043
4 345
921 516
6 047 367
194 920
133 141
151
124 170
452 511


1-01
1-02
1-03
1-04
1-05
1-06
2-01
2-02
2-03
2-0
2-06


12.1
9.$
12.2
18)6
1Y4.
12.6
2.150
1.0)


10.9
12.7



1.7


9.
10*
11.4



1.95
.74


10.9
9*3
12.o
19.0
13.
11.
2.63
1.04


11.8

24.9
11.8
1.20


10.3


12.0

1.17
.47


9.6
10.5

17.9
11.4
10.3
1.52
.42


g.5
7.4

10.0
g.8
1.62


9.2
12.
7.6

11.
1.47

.56


7.9
10.5
15.
12.5



.59


1111111111111111111 ll1U11111INTERSTATE COMMERCE COMMISSION
3 126 0885 2981BUREAU OF STATISTICS


Statement No. MI-215 (os-c)
MAY 1942


YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways

(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF MAY, 1942 AND 1941











YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 155 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF JUNE, 1942 AND 1941

SOUTHERN DISTRICT
UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGIONITMo

1942 1911 1942 1941 1942 1941 1942 1941 1942 1941(
AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotives. .. .. 3 264 340 3 107 096 1 951 0291 1 894 024 146 900 1315 772 445 671 399 4421 720 740 677 858 1-01
1-02. Oil-burning steam locomotives. ..... &11 4 41 4 31 7 10 3 57 34 2 97 5 4 72 3 1 98 5OS 3 9 6 4 24 21 5 1-02
1.-03. Electric locomotive units. ....... 28 170 28 872 26 494 26 726 1 676 2 146( 1-03
1-04. Gasoline and gas-electrie locomotives. 551 3 730 2 679 2881 872 849 1-04
1-05. Diesellocomotives. ................ 629 647 435 940 263 066 193 r50 1 440 74 691 36 368 290 450 205 722 1-05
1-06. Total. .................... 4 437 149 4 007 348 2 246 841 2 121 778 148 340 135 772 525 834 439 008 1 516 134 1 310 790 1-06
2. Yard switching locom~otive-h~ours--P~asenger :
2-01. Coal-burning steam locomotives. .. .. .. 171 762 167 795 10'8 5621 100 8471 5 451 5 161 20 990 21 318 316 759 40 469 2-01
2-02. Oil-burning steam locomotives. ......... 2 9 4 6 2 7 1 62 & 4 58 9 77 O 4 65 28 4 45 2 6 2 O8 2-02
2-03. Electric locomotive units. ......... 31 471 29 675 31 444 29 651 7 24 2-03
2-04. Gasoline and gas-electric locomotives. ...85 3 9 -1 1 51 1 1 25 2 4 2-04
2-05. Diesellocomotives. ................ 70 824 57 563 30 517* 25 436 16 271 7 584 5 881 32 707 26 219 2-05
2-06. Total. 03 548 282 234 170 768 156 438 5 467 5 188 29 544 27 664 97 9631 92 944 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .. .. .. .., 1.9 10.3 11.8 11.6 12.1C 11.8 9.9 g*7 9.3 8.5 3-01
3-02. Oil-burning steam locomotives. ...........12.9 11.2 8.5 10.0 9*5 4.2 1 .o 11.4 3-02
3-03. Electric locomotive units. .............12.1 11.8 12.4 12.1 -31 6.6 3-03
3-04. Gasoline, gas-electric, and diesel loeomotives ... 18.a 19.1 18.6 19.1 2C. 1.7 17.0 19.2 19.8 3-04
3-05. Service le locomotives. 51 .1 14.1 14.3 13.f 13.4 11.6 10.2 1. 12.5 3-05
3-06. All loeomotives (servieable, unservieabled andsored). .1 91.0 2 12.1 12.l 11.8 10.7 9.1 11.6 10,j 3-06
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. .77 1.86 2.34 2*50 1.17 1.os 1*53 1.5 1.43 1 47 4
5. Yard switching and train switch ng locomotive-mhiles per 100 paissenger-train *
car-miles ( ith locomotives) Passenger service. .. .. .69 .72 1.00 1.01 .45 *54 .4C2 I 51 .52 .54 5

FOR SIX MONTHS ENDED WITH JUNE, 1942 AND 1941

AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotives. .. 19 821 080 17 768 424 12 054 962 10 818 678 84 5 490 721 0901 2 641 311 2 379 9571 4 279 317 3 848 699 1-01
1-02. Oil-burning steam locomotives. 0 31 11 2 2 4 17 3 53 2 3 16 9 a 4 6 65 3 5 7 8 O 27 4 3 02 97 2 16 3 2 3 65 5 8 1-02
1-08. Electric locomotive umits. .. ......... 172 617 169 516 161 934 156 143 1 605 10 663 11 768 1-03
1-04. Gasoline and gas-electric locomotives. .1 ........1183 21 878 1616b6 16 684 5 017 5 194 1-04
1-05. Diesellocomotives.. ............ 636 607 2 435 972 1553 203 1 108 11 5 096 411 543 200 618 1666 765 1127 238 1-05
1-06. Total. 6 688 599 2 2 813 143 13 809 434 12 124 286 850 586 721 090 3 088 634 2 609 610 8 933 94 5 7 358 157 1-06
2. Yard switching locomotive-hours--Passenger:
2-1. Coal-burningsteam locomotives.. .. .' .. .. 1 051 757 1 012 741 648 05 3 617 328 32 7801 29 2741 125 151 130 750 231775 235 389 2-01
2-02. Oil-burning steam locomotives. ...:....... 17 6 27 17 0 66 4 06 5 2 67 2 7 O 98 8 6 4 3 16 7 10 9 15 9 3 49 2-02
2-08. Electric locomotive units. ....... 188 131 181 060 187 971 180 885. 160 175 2-03
2-04. Gasoline and gas-electrie locomotives.. ......... 154 1681 -1 151 -I -I 15 4 153 2-04
2-05. Diesellocomotives. ............... 411 546 331 808 172 467 145 649 114 138 48 68 9 315 6321 190 53 6 150 36 9 2-05
2-06.. Total. .................... 1 827 860 1696 441 1 024 556 946 549 32 894 29 412 180 878 175 025 589 532 545 455 2-06
AVERAGES
3. Hours per yard locomotive-day:
8-01. Coal-burning steam locomotives. ...........10*9 9.8 12.0 11.0 11.8 10.6 9.6 8.6 9.2 8.0 3-01
3-02. Oil-burnmng steam locomotives. ...........12.7 10*5 9*3 9*4 -lo 6.9 12.8 10.6 3-02
8-08. Electric locomotive units. ..............12.0 11.5 12.2 11.9 4.4 7*5 6.o 3-os
I(M4. Gasolineb gas-electrie, and diesel locomotives.' ..1.7 8 18.6 19.0 28.8 1.2 16*5 19.o 19*3 S-04
3-05. Services le locomotives. .J~ ......1 .5 12.6 14. 13.8131 12.2 11.4 10.0 13 .1 12.1 3-05
3-06. All locomotives (serviceable, unee~rieable, and stored). ...11. 105 2* 1* 1* 10.6 to*3 d*9 11.re s-o
4. Yard switching and tramn switching locomotive-miles per 100 loaded freight 9*7
car-miles--Freight service. .41.93 2.47 2.60 1.20 1.15 1*5 1.6o 1.4c7 45
5. Yard switching and train switching locomotive-m~iles per 100 passenger-train 1.5
car-miles (with locomotives)-Passenger service. .. .. ..71 .74 .0 10 .48 .48 .421 .44 *55 .58 5

NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: June 194i2 ****** 5,o52 hours 6 months 1942 ***..., 30,549 hours
Juneo 1941 ...... 4,989 hours 6 mPonthr 1941 ***..., f1,952 hour US5 GOVERNMENT PRINTING OFFICE 1 942--0-475224


~@I aRL 36


Subject to revision


UNIVERSITY OF FLORIDA

3 1262 08852 282s NT R T T O ME C O M SIN
BUREAU OF TRANSPORT ECONOMICS AND STATISTICS


Statement No. M-215 (os-c)
JUNE 1942


















SOUTHERN DISTRICT
UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGION I ITEM No.
1942 1941 1942 1941 1942 1941 1942 1941 1942 1941
AGGREGATES
1. Yar~d switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives.. 332 585 3 265 829 1 977 156 1 961 472 146 942 138 8731 451 0701 417 3001 757 417 748 184 1-01
1-02. Oil-burning steam locomotives. .... ...... 5 4 1 86 6 4 60 6 1 3 28 4 3 8 O1 5 7 4 3 4 O 5 52 8 4 4 53 O 6O 1-02
1-03. Electric locomotive units. ..... 87 8 2 9 327 28 15 3 2 6 8 81 1 7 25 2 4 46 1-03
1-04. Gasoline and gas-electric locomotives. 3 50 6 3 6 81 2 6102 2 8 9 91 1 .I .I 90 4 7 8 1-04
1-05. Diesellocomotlves.. ............. 660 046 466 744 276 676 so3 78s an 79 928 356 99 sossa assess 8 1-05
1-06. Total. .................. 4 567 881 4 225 848 2 287 2~711 2198 835 147 763 138 875 536 732 456 799 3 596 11.5 1 431 335 1-06
2. Yard switching locom~otive-hour~s-Passenger :
2-01. Coal-burning steam locomotives. ........ .. 180 966 175 999 115 3231 106 2241 5 853 5 229 21 686 21 816 38 104 42 730 2-01
2--02. Oil-burning steam locomotives. .. ....... 3 0 6 48 2 8 5 90 -38 8 -.7 38 4 93 2 9 910 2 7 7 09 2-02
2-03. Electric locomotive units. 2 454 31 149 32 434 31 118 .30 31 2-03
2-04-. Gasoline and gas-electric locomotives. .. ......2 4 5 7 -1 361 -1 .I 2 4 2 1 2-04
2-05. Diesel locomotives. ............... 7 5 551 5 9 343 3 2 7 5 9 27 3 3 2 2 11 27 8 2 30 5 9 a7 5 4 5 41 2 6 5 7 2-05
2-06. Total. ..... .. .. .. .. .. 3 19 643 295 138 180 5061 165 098 5 874 5 256 30 654 28 236 102 609 96 548 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-bur~ning steam locomotives. ...........10.8 10.5 11.6 11.6 11.8 11.6 9.6 8.8 9*5 9*1 3-01
3-02. Oil-burning steam locomotives. .....1.4 11.6; 7.6 8.4 9,5 4.7 13.5 11,8 3-02
3-08. Electric locomotive units. ...........12.3 11.8 12.5 12.1 716.7 3-03
3-04. Gasoline, gas-electrie, and diesel locomotives.' ..1 71.8 18.6 19.0 1)6-1.5 16.1 18.9 19,2 3G_0
3-05. Serviceable loco motives.-06 .l .oooie .sriebe .nevcal n .: ...1.131 13.8 14.2 lT)11.0 11.3 10.2 13.5 12.9 3-06-5
3-6 lllcmoie sevcabe nerieblad trd. 1. 12 12.2 12.1 11911.6 1039.11.80. -6
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ......... ...1.75 1*91 a*30 2.59 1.20 1.14 1.52 1.63 1*41 1*50 4
5. Yard switching. and train switching locomotive-miles per 100 passenger-trarin
car-miles (with locomotives)-Passenger service. .........69 .72 .98 1.01 .46 *51 *42 *Bo *53 *54 5


FOR SEVEN MONTHS ENDED- WITH JULY, 1942 AND 1941


AGGREGATES
1. Yard switching locomotive-hours--Freight:
1-01. Coal-burning steam locomotivTes.. 231155 665 21034 2531 14 032 1181 2 780 150 992 43 2 859 96 3 3092 381 2797 257 5036 73 4 596 883 1-01
1-02. Oil-burning steam locomotives. ........... 3 572 978 2 877 614 26 453 28 466 41 514 30 830 3 505 Oil 2 818 318 1-02
1-03. Electric locomotive units. ........ 202 495 198 843 190 087 183 024 1 605 13 408 14 214 1-03
1-04. Gasoline and gas-electric locomotives. 24 689 25 559 18 768 19 583 5 921 5 976 1-04
1-05. Diesel locomotives. .. .. 4 296 653. 8 902 716. 1 829 27 9 1 311 898 5 917 491 471 236 717 1 969 986 1 354 101 1-05
1-06. Total. 1 250 480 27 038 985 16 096 70)5 14 323 121 998 34 9 859 963 3 625 366 3 066 409 10 530 060 8 78 9 4921 1-06
2. Yard switching locom~otive-hours-P~assenger :
2-01. Coal-burning steam locomnotives............ 1 232723 1188B740 777 376 723 552 38 633 34 503 146 837 152 566 269 877 278 119 2-01
2-02. Oil-burning steam locomotives. ........... 206 920 199 254 2 06j5 3 0601 -1 7 836 9 136 197 019 187 058 2-02
2-03. Electric locomotive units. ....... ..... 220 585 212 209 220 395 212 0031 -I -I 190 206 2-03
2-04. Gasoline and gas-electric locomotives.. 17 8 225 51 17 8 174 2-04
2-05. Diesel locomotives. .. ... ...... 487 097 391 151 20 5 226 172 981 155 165` 56 8591 41 559 224 877 176 446 2-05
2-06. Total. .................. 2 147 503 1 991 579 1 205 062 1 111 647 358 768 34 668 211 5321 203 261 692 141. 642 003( 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .. .. .. .., 10.9 9.9 11,9 11.1 11.9 10.7 9.6 8.6 9.3 8.2 3-01
3-02. Oil-burning steam locomotives. ......... 12.8J 10.7 9.0 9.3 10.6 6.7 12.9 10.g 3-02
3-03. Electric locomotive units. .............12,0 11.5 12.3J 11*9 .8 7.4 6.2 3-03
304. Gasoine gabs-lectric, and diesel locomotives.` .s ..1871.9 18. 19.0 2.5 1.a 16.4 19.o 19*3 3-04
3-05. Serviceable locomotives. ..... ........1. 2 421. x1.1. oo1. 22 ao
3-06. All locmnotives (serviceable, tinservieaible, and stored)....1. 1.51 61 90 110.11 8. 1 .e 9a.9 3-06
4. Yard switchimr and train switching locomotive-miles per 100 loaded freight
car-miles- Freight service. ...1.83 1.93 2.42.60 1.20 1.15 1.52 1.61 1.46 1*51 4
5. Yard switching. and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Passenger service. .. .. .71 .73 1.02B 1,03 .4a .48 .42 r45 *55 *57 5

NOTE.-Switching locomotive-miles are based on 6 miles e locomotive-hour. Yard switching hours of electric gndas-electric rai motorcars eord b the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above fgures,as follows: July 12 ...... 5, 233 houe 6monthe 2~Y **.... .6 hour
July 191 ****518 or months 1gi ****** 3719 hour U.9. GOVERNMENT PRINTING OFFICE 1942--0-475224


Subject to revision


UNIVERSITY OF FLORIDA

1111111111111111111111111111111111I INTERSTATE C OM M.E R CE COMMISSION
3 1262 08852 2973 BUREAU OF TRANSPORT ECjONOMICS AND STATISTICS


Statement No. M-215 (as-o)
JULY 1942


YARD SERVICE PERFORMANCE OF CLASS I STEAM RALWNAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF JULY, 1942 AND 1941


















SOUTHERN DISTRICT
UNITED STATES EASTE N DISTRICT WESTERN DISTRICT
ITEM POCAHONTAS REGION SOUTHERN REGION ( ITEM No.
19t2 1941 1942 1941 1942 1941 1942 1941 191C2 1941
AGGREGATES
1. Yard switching locomotive-hour iFreight:
1-01. Coal-burning steam locomotives. .. .. .. 3 393 572 3 296 102 1 999 008 1 966 481 151 277 144 132 451 590 422 036 791 677 763 453 1-01
1-02. Oil-burning steam locomotives. ........... 547 897 465 656 3 353 4 050 6 033 3 397 538 511 458 209 1-02
1.-08. Electric locomotive units. ...... .. 29 33 30 aa4 27 480 27 585 *- 1 910 2 699 1-03
1-04. Gasoline and gas-electric locomotives. 241 3 720 2 489 2 872 -* 812 848 1-04
1-05. Dieselloeomotives. ................ 685 889 497 339 285 282 212 210 821 84 704 37 141 315 082 247 988 1-05
1-06. Total. .................... 4 659 929 4 293 041 2 317 5k2 2 213 138 152 098 144 132 542 327 462 574 1 647 9921 1 473 197 1-06
2. Yard switching locomotive-hours-Passenger:
2-01. Coal-burning steam locomotives. .. .. 183 2761 176 276 116 2"/8 107 005 5 832 5 122 21 6861 21 958 59 480 42 191 2-01
2-02. Oil-burning steam locomotives. ......30 6 4 8 28 5 19 -5 18 -*8 95 449 2 9 7 53 2 7 5 52 2-02
2-03. Electric locomotive units. .2 ........ ...379O 3O438 32 761 3O424 9 14 2-03
2-04. Gasoline and gas-electric locomotives. .........44 O 1 4*- 4 2 6 2-04
2-05. Diesel locomotives. .............. .7 5 8 5 8 60 0 95 3 2 9 5 2 7 57 1 5 3 8 4 52 5 7 45 3 4 4 26 2 7 O 61 2-05
2-06. Total. 22 576 295 368 182 004 165 218 5 847 5 1541 31 0313 28 1521 103 692 96 844 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ... ......11.0 10.6 11.g 11.6 12.0 11.8 9.6 8.9 10.0 9.3 3-01
3-02. Oil-burning steam locomotives. .. ... .1,g1, 9* 9.2 10.2 5.0 13.8 12.o 3-02
3-03. Electric locomotive units. .............12.1C 11.7 12 1.
8-04. Gasoline, gas-electric, and diesel locomotives. ......1. 901 18.9 13.5 88 61 3-0
3-05. Services le locomotives. 3513.2 3*14 1 13.4 1l .1t 11. 10.4 13& -o5
3-06. All locomotives serviceablel, unservieable, an~d stored).... 12.1 11312. ~ 212 L 2.0 1 .8 10.P 9.2 12.3 3-06
4. Yard switching and train switching loeomotive-miles per 100 loaded freight
car-miles-Freight service. .1.72 1.85 2.2( 2.le9 1.18 1.09 1.50 1.59 1.0 .47 4
5. Yard switching and train switching locomotive-miles per 100 p'assenger-tramn
car-miles (with locomotives) Passenger service. .. ... .- .67 .72 ,9 .99 .4 52 .lo *51 *51 *5h 5

FOR EIGHT MONTHS ENDED LTITH AUGUST, 1942 AND 1941

AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives.. ...26 547 237 24 30 355 16 031 146 14 74663 1114 370 9 1 004 095 3 543 971 3 219 293 5 828 4115 360 336 1-01
1-02. Oil-burning steam locomotives. ........... 4 120 875 3 343 270 29 8 6 32 516 47 547 34 227 4 043 522 3 276 527 1-02
1-08. Electric locomotive units. ............. 231 825 229 067 217 5 )7 210 549 1 605 14 318 16 913 1-03
1-04. Gasoline and gas-electric locomotives. 27 9 30 2 9 27 9 21 1 7 23 4 5 5-. *6 7 33 6 8 2 4 1-04
1-05. Diesellocomotives. .......... .... 4 982 54 2 3 400 055 2! 114 5 1 1 524 108 6 738 57 6 17 5 273 858 2 285 068 1 602 089 1-05
1-06. Total. ................ 35 910 4091 31 332 Oad1 18 414 2 71 16 536 859 1 150 447 1 004 095 4 167 6931 3 528 9835 12 178 0531 10 263 689 1-06
2. Yard switching locomotive-hours-Passenger:
2-01. Coal-burning steam locomotives. .... ..... 1 415 999 1 365 016 893 6$4 830 557 44 465 39 625 168 523 174 524 309 357 '30 310 2-01
2-02. Oil-burnmngsteam locomotives. .. .. ..... 237 568 227 773 20$d5 3 578 731 9 585 226 772 214 610 2-02
2-08. Electric locomotive units. ... ... ... 253 375 242 647 2531l6 242?427 219 SO 2-03
2-04. Gasoline and gas-electric locomotives.. 182 265 65 182 80 2-04
2-05. Diesellocomotives. ........ .... 562 955 451 846 238 1 1 200 238 150 197 65 311 47 304 259 303 203 507 2-05

AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .....1.9 10.0 11. 11.1 11.s 10.8 9.6 8.7 9.ti 8.f 3-01
3M)2. Oil-burning steam locomotives. ...........12.9 10.8 8. 9,3 --10.1 6.4 3. 10.9 3-02
3-08. Electric locomotive units. ... .........12.1 11.5 12. 11.9 -i -3*37*5 6.4 303
3-04. Gasoline, gas-electric, and diesel locomotives. ... 18.6 18.8 18. 18.9 14.2 1.1 163 189 9.2 3-04
3-05. Serviceable locomotives........ 13.5 12.8 14. 13913.1 12.L 11.3 0. 3]12.3 3-05
3-06. All locomotives (serviceable, unserviceab~le, and stored). ...11.9 10.7 12. 11.6 11.9 10.8 10.3 9.0 116 10.0 3-06
4. Yard switching and tramn switching locomotive-miles per 100 loaded freight
ear-miles-FPreight service.... .......... 1.J1 1.92 2.48 2.59 1.19 1.14 1.52 1.60 1.115 1,51 4
5i. Yard switching and train switching locomotive-mhiles per 100 passenger-train
car-miles (with locomotives)-P~assenger service. 71 .73 1.01 1*o3 *4 49 .1C2 .45 .54 *57 5

NOTE.-Switching locomotive-miles are based on 6 miles per loomotive-hour. Yard switching hours of electric and gaoselectric rail motora eptd by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Linea; and Reading
Company not included in above figures, as follows: August 1 42 .. 5,153 hours d r ontha 1942 *,.. ** 935 hour
August 1 41 ....5,142 hour 8 months 1941 ...... 4e 281 hour US 5 GOVERNMENT PRINTING OFFICE 1943--0-475224


5 etL 3 ti :f k

Subject to revision


y


UNIVERSITY OF FLORIDA

311111111 12621111 08852 2932ll~ln(II INT'ERSTATE COM ~RCE COMMISSION State
BUREAU OF TRANSPORT CPOAS AND STATISTICS

YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITD STATES
Compiled from 153 reports of yard service) performance representing 161 railways
(CLASS I SWITCHING AND TER INAL COMPANIES INCLUDED)

FOR THE MONTH OF A JUST, 1942 AND 1941


!ment No. M-215 (osi-c)
AUGUST 1942


















_ __


I I


1----~-1-----1-------I--=~--I ---~-1~1------1---~-I 1 I


I I I 1 1-- -- --- -- -I-


FOR NINE MONTHS ENDED WPTH SEPTEMBER8,1942 AND 1941


AGGREGATES
1. Yard switching locomotive-hours-Freight :
1-01. Coal-burning steam locomotives. .. .. 29 894 7181 27 554 037 17 981 987 16 657 8521 1 289 928 1 141 125 3 990 9571 3 636 579 6 631 90 9 6 118 481 1-01
1-02. Oil-burning steamn locomotives. ... .. 4 6 62 2 66 3 8 O9 2 7 3 2 91 4 3 6 3 8 9 -I 5 2 6 8 3 7 5 64 4 5 76 9 84 3 7 35 07 4 1-02
1-03. Electric locomotive units. ......... 2 61 5 51 2 58 2 42 2 44 8 83 2 36 8 25 -* 1 6O5 1 6 6 68 1 9 8 12 1-03
1-04. Gasoline and gas-electrie locomotives. ....3O 8 67 3 2 54 O 2 3 43 5 2 4 9 O 8 -I -I 7 4 32 7 6 32 1-04
1-0i. Diesellocomotives............ 5 674 519 906 590 2 402 283 17399 065 8845 658 438 312 083 2 604 959 1854 601 1-05
1-06. Total. .... 40 523 9841 35 560 46 20 685502 18 695 8801 1898 773 1 141 125 4 701 7571 3 987 831 13 837 952. 11735 600~ 1-06
2. Yard switching lKocomotive-hour~s-Passnenger:
2-01. Coal-burning steam locomotives. .. .. 1 5 98 16 4 1 5353 341 1 009 932 932 8871 50 315 44 497 189 9661 195 too1 347 9511 360 8481 2-01
2-02. Oil-burning steam locomotives.. ....... 2 69 6 35 2 55 1 0 2 O 6 5 4 O 5 41 -1 9 57 81 10 O5 2 2 57 9 9 2 24 9 04 2-02
2-03. Electric locomotive units. .. .. ... .. 285 8841 272 551 285 640 272 3011 -I -I 24 4 250 2-03
2-04. Gasoline andgas-electriclocomotives.. .. .. 182 28 21 -1 65( -1 -I -I 182 217 2-04
2-05. Diesellocomotives. .. .. .. .. .. 638 2801 510 274 269 334 226 0061 165 215 74 00 8 53 119 294 77 3 230 9341 2-05
2-06. Total. .. .. .. .. .. .. .. .. 2 792 145( 2 571 458 1 566 971 1 435 3131 50 480 44 712 273 552 258 280 901 142 833 153 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .. .. 11.0 10.1 -~ 1.9 11.2 11.9 10.9 9.6 8.7 9.5 8.5 3-01
3-02. Oil-burning steam locomotives. 3111.0 9.2 9.3 9.9 6.2 13211.1 3-02
3-03. Electric locomotive units. .. ..........12.2 11.7 12.4C 12.1 ---597767 30
3-041. Gasoline, gas-electric, and diesel locomotives. ..1861.8 8.4 18i.8 16.5 too 161.9 19.2 3-04
3-05. Serviceable locomotives. ..............1. 281. 391. 251. 021. 24 30
3-06. All locomotives (serviceable, unservieabjle,' an'd stored).. 11. 10.8 12.5~ 11.7 11.9 10.9 10.g 9o.0 1. 10 .2 3-06
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. .80 1.91 P.40o 2.58 1.19 1.14 1.52 1.61 1.44 ~ 1.50 4
5. Yard switching and train switching locomotive-miles p~er 100 p~assenger-train
car-miles (with locomotives)-Passenger service. .. .. .70 .73 1.00 1.02 .47 .49 .Ir1 **6 .54 .57 5

NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motorcarateported by the Chicago, Rock Island & Pacific Ry.; HIinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: september 1942 .. .. 4, 6 hour 9 months 1942. .. 45, 618 hour
September 19421 ........4,993 hours 9 months 1941.......47,27.4 hour U.5. GOVERNMENT PRINTING OFFICE: (192--0-475224


5 c. sets. 4' St 49 t

Subject to revision


SOUTHERN DISTRICT


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


SOUTHERN REGION


1942


1941


1942


1941


1941


1942


1942


1941


AGGREGATES
1. Yard switching locomotive-hours--Freight :
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1-03. Electric locomotive units. .............
1-04. Gasoline and gas-electrie locomotives. .....
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locomotive-hours-Passenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning steam locomotives. ....... ..
2-03. Electric locomotive units. .............
2-041. Gasoline and gas-electric locomotives. .........
2-05. Diesel locomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomotives. ......
3-05. Serviceable locomotives. ..............
3-)6. All locomotives (serviceable, unservieable, and stored)i. ..
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-Freight service. ...............
5. Yard switching. and train switching locomotive-miles p~er 100 passeng~er-train
car-miles (with locomotives)-Passenger service. ........


3 347 544
5 41 39 1
29 726
2 937
691 310
4 612 908
182 165
3 2 O 6 7
32509
7 5 3 2 5
322 066


3 223 682
4 65 7 57
29 175
3 261
506 535
4 228 4did

168 326
27 2 37
29 904
1 7
5 9 2 8
284 512


1 950
3
27
2
287
2 271
116
32

S1
179


1 911
3
26
2
215
2 159
102
29
2 5
158


146 219


1 440
147 659
5 850


1 5
5 865


137 030



1317 030
4 872


1 8
4 890


446 986
4 8 21

82 25 7
534 064
21 443



30 987


417 286
59

38 225
458 848
20 585


5 8 15
26 867


803 498
5 33 4 6 2
2 350
699
319 891
1 659 900
38 594
3 1 22 0
25
3 5 4 7 0
105 309


758 145
4 58 5,4 7
2 899
808
252 512
1 472 911
40 538
2 6 9 4
30
1 7
2 7 4 87
94 306


1-01
1-02
1-03
1--04
1-05
1-06
2-01
2-02
2-03
2-04
2-05
2-06


11.2

12.7



1.72
.66


10.7
12.1






,73


11.9
8.6
12.9
18.6


8.28

*95


11.6
9.1
12.2
18.9
14.1
12 1

2.52
1.oo


12.0


24.3
1),4
12.0


11.6



12. :;

1.14

.52


9.8
8.6
18.6
11.5
10.6

1.51
.40


9.2
5.1
16.3
10.7
9.5
1.64

.51


10.6
14.4
9.9
19.6
14.4



.49


8.1


11.4

.56


3-01
3-02
3-03
3-04
3-05
3-06
4
5


UNIVERSITY OF FLORIDA

HIIIIIIIIIIIII I III 1111111111111I IN TERS TATE COM Idi ERCE COMMISSION
3 1262 08852 2791 BUREAU OF TRANSPORTL liOONOMICS AND STATISTICS


Statement No. MI-215 (os-c)
SEPTEMBER 1942


YARD SERVICE PERFORMANCE OF CLASS I' STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)

FOR THE MONTH OF SEPTEMBER,1942 AND 1941


UNIV. Oif FL Llq


't

P


JI'DMNo.



















SI SOUTHERN DISTRICT


UNIV. OF~ F~L (JE

'^.


1


I I I I I I I I---------I-------


- -1~ 11 :- 1 I I I I


I I I a I I I I I I


NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric rail motoncars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Penasylvania Systems; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: October 1942... ..5,010 hours.....10 months.....194C2 ......50,628 hours U. 5. GOVERNMENT PRINTING OFFICE: 1942--0-475224
October 1941.....,317 hours.....10 months.....1941 ......52,591 hours


I 1 i6e s6. ,, 3 /
Subject to revision


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


POCAHONTAS REGION

1942 1941


SOUTHERN REGION


ITEM No.


ITEM


1941


1942


1941


19C2


1941


19C2


1941


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-03. Electric locomotive units. .............
1-04. Gasoline and gas-electric locomotives. .........
1-05. Diesellocomotives. ...............
1-06. Total. . . .
2. Yard switching locomotive-hours--Passenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burning stearin locomotives. ...........
2-03. Electric locomotive units......... ....
2-04. Gasoline and gas-electric locomotives. .........
2-05. Diesel locomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotivre-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomotives. ......
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, unselrviceabjle, and stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-Fr~eight service. ...............
5. Yard switching and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Passenger service. ........


157 780


1 488
159 26 8

6 113



6 12


2 075
3
27
2
306
2 415
118
933

S2
184


2 051
4
27
2
231
2 317
104
31

2 7
163


449 337
3 461

44 712
497 510

20 191


7 7 O6
28 318


866 416
568 583
2027
738
344 914
1 782 678

40 139
3 4 O 66
7

37 09 3
111 305


801 057
505 453
2 745
945
268 736
1 578 936

41 401
28 40 4
31
2 7
2 8 3 8 2
98 245


3 578 309
577 157
29 415
3 260
740 140
4 928 281

186 175
3 4 95 5
33 759
7 8 835
333 724


3 453 193
513 041
30 300
3171
545 319
4 545 024

170 860
2 9 4 1
31 054
2 7
6 3 6 4 O
294 922


150 970



150 970

5 090


2 3
5 115


478 906
5 OO6

86 976
570 888

21 624


9 4 8 7
32 000


1-01
1-02
1-03
1-04
1-05
1-06
2-01
2-02
2-03
2-04)
2-05
2-06


11.1
12.7

19.2
13:9.7

1.85
.75


11.6
14.6
12.4

14.1
12.7

1.71
.66


9.6
5.o
17.1
11.2
9.9
1.60

.So


12.1
.~6
12.6
14.2
12.7
2.28

.98


12.0

12.3
18.8
14.4
12.5
2.48

1.0)


12.5

24.1




.41


12.2


- U
0


10.1
8.6

11.8



.41


11.1
14.s
8.2
20.0
14.8


i.yo


9.9
12.9
7.5
19.9


1.47
.59


FOR TEN MONTHS ENDED WITil OCTOBER, l192 AND 1941


AGGREGATES
1. Yard switching locomotive-hours--Freight :
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1-03. Electric locomotive units. .............
1-04. Gasoline and gas-electrielioeomotives. .........
1-05. Diesellocomotives.. ..... .. .....
1-06. Total. . . .
2. Yard switching locom~otive-h~our lPas'senger :
2-01. Coal-burning steam locomotives............
2-02. Oil-burning steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electrie locomotives.. ........
2-05. Diesellocomotives. ...............
2-06. Total. . . .
AVERAGES

3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-03. Electric locomotive units. .............
3-04. Gasoline, gas-electric, and diesel locomo~tives. ......
3-05. Serviceable locomotives. ..............
3-06. All locomotives (serviceable, unserviceable, and stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service.
5. Yard switching and train switching locomotive-miles per 100 passengler tr sin
car-miles (with locomotives)-Passenger service. ........


1 292 095



1 292 095





49 825


20 057
3 6
272
25
2709
23 100

1128
2
319

301
1 751


33 473 090
5 2 39 4 23
290 966
34 127
6 4153526
45 452 932

1784 339
304 590
'319 643
182
717 115
3 125 869



11.0
ly.)




1.79
.70


31 OO? 230
4 2 2 0 68
288 542
35 711
4 451 909
40 105 460

1704 201
a84 351
303 605
309
573 914
2 866 380


18 709
4 0
264
27
1971
21013

1037
4
303

253
1 598


1 447 708


11 00 0
1 458 708

56 428


-172
56 60 0


4 469 863
57 37 4

745 408
5 272 64 5
211 590
10 467

83 495
305 552


4 085 916
4 1 0 25
1 605
356 795
4 485 341

2153900
10 473

60 825
286 598


7 498 325
5 14 5 5 67
18 695
8 17 0
2 949 873
15 620 630

388 090
292 O58
251
182
331 866
1 012 447


6 919 538
4 24 0 5 27
22 557
8 577
2.123 337
13 314 536

402 249
269 308
281
244
259 316
931 39 8


10.2
11.1
11.7




.75


9.1
124

12.5

239
1.00


11.3
9.3
12.0



2.57
1.02


12.0

18.4
13.i
12.o

1.19


11.0


ie.6
11.0

1.14

.49


9.7
9.7


lo.4

1.52


8.8
6.3
5*3



1.61

.C6


11.2
6.8



1.50

*57


9.7
7.8
1 .1


UNIVERSITY OF FLORID

IIIHII111111111111111111111L INTERSTATE COMMERCE E COMMISSION
3 262 08852 2817 BUREAU OF TRANSPORT ECONOMICS AND ~STATISTICS


Statement No. M-215 (os-c)

OCTO)BER 1942


YARD SERVICE PERFORMANCE OF CLASS I STEAM ALWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 1L61 railways
(CLASS I SWITCHING AND TERMIINAL COMPANIES INCLUDED)

FOR THE MONTH OF OCTOBER, 1942 AND 1941











uNwV omF ul.

OCMET DEPT*


w~t,9. Lll"clr~rora~ I


SSOUTHERN REGION


III


I I I I I I I I_


1 .-- ~ 1---- -~- ~ I


FOR ELEVEN MONTHS ENDED WITH NOVEMBER. 1942 AND, 1941


AGGREGATES
1. Yard switching loeomotive-hours--Freight:
1-01. Coal-burning steam locomotives. 6 830 975 34 239 740 22 011 650 0 640 486 1 598 610 1 433 995 4 928 856 4 5.13 114 8 291 859 7 6512 145 1-01
1-02. Oil-burning steam locomotives. ........... 5 80 4 90 1 4 7 9 50 7 3 9 8 2 9 4 4 10 8 6 3 0 3 7 4 5 17 9 5 70 8 03 5 4 70 4 22 0 1-02
1-03. Electric locomotive units. ... ..... 318 284 315 737 298 045 289 8315 1 605 20 239 24 297 1-08
1-04. Gasoline and gas-electric locomotives. 7 15 O 38 19 7 2 8 37 7 88 7 95 -* 8 77 39 4 O 1-04
1-05. Diesel locomotives. ..... .... 7 131 OTO 4 992 493 3 008 645 2 201 518 12 440 828 770 405 677 3 281 215 2 38 5 297 1-05
1-06. Total. 50 122 380 44 379 673 85 386 546 23 204 742 1 611 0501 1 433 9951 5 820 663j 4 965 5751 17 304 121 14 77,5 3611 1-06
2. Yard switching locomotive-hourt-Passenger:
2-1. Coal-burning steam locomotives....... .... 1 966 623 1 870 892 1 242 461 1 140 260 GS 205 54 484 233 531 834 896 429 426 441 252 2-01
2-02. Oil-burnmngsteam locomotives. ..... 39 208 312 820 2 065 4 908 -* 11 546 10 967 325 597 296 945 2-02
2-03. Electric locomotive units. 55 527 334 437 352 275 334 128 58 309 2-08
2-04. Gasoline and gas-electric locomotives.. 182 330 65 182 26 2-04
2-05. Diesellocomotives. ............. 794 869 636 388 333 494 28 0 491 176 262 93 801 68 558 367 998 287 083 2-05
2-06. Total. 453409 3154867 1 930 29 1759 85 62 381 54 7461 3372781 3144151 1 234551 1025 85 4 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........11.0 10.2 11.9 11.3 12.0 11.1 9.7 8.8 9.7 8.7 3-01
3-02. Oil-burning steam locomotives. ...... .. 13.4C 11.2 9 .0 9.2 9.7 6.2 13. 5 11.3 3-02
3-03. Electric locomotive units. .............12.2 11.7 12.4 12.1 -- 4.8 .7 6,71 3-03
3-041. Gasoline, gas-electrie, and diesel locomotives.' ..1.8 18.6 18.6 18.6 18.9 1.0 16.1 19119 3-04

3-06. All locomotives (serviceable, unservieable, and stored). 12.0 10.9 12.5 11.8 12.0 11.1 10,4 9.2 12.o 10.4 8-06
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles--Freight service. ...............1.79 1.90 2.39 2.56 1.20 1.14 1.52 1.61 1.41.50 4
5. Yard switching and train switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Passenger service. .........69 .74 1.00' 1.02 .46 .49 .41 .47 .5) .51 5

NOTE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and ga-electric rail motorcars reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Reading Seashore Lines; and Reading
Company not included in above figures, as follows: Novemsber 1942.....4 453 hours.....11 ronthe 142,.....95 081 hours.
November 1941.....4 836 hours.....11l months 1.....51 1)27 hours U. S. GOVERNMENT PRINTING OFFICE: (1943-0-475122


Subject to revision


FOR THE MONTH OF NOVEMBER, 1942 AND 1941


SOUTHERN DISTRICT


UNITED STATES


EASTERN DISTRICT


WESTERN DISTRICT


ITEM


POCAHONTAS REGION


1942


1941


1941


1941


1942


19141


1942


1941


AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives. ...........
1-02. Oil-burning steam locomotives. ...........
1.-03. Electric locomotive units. .............
1-04. Gasoline and gas-electric locomotives. .....
1-05. Diesel locomotives. ...............
1-06. Total. . .
2. Yard switching locom'otive-hours-P~assenger :
2-01. Coal-burning steam locomotives. ...........
2-02. Oil-burming steam locomotives. ...........
2-03. Electric locomotive units. .............
2-04. Gasoline and gas-electric locomotives.. ........
2-05. Diesellocomotives. ...............
2-06. Total. . . .
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ...........
3-02. Oil-burning steam locomotives. ...........
3-08. Electric locomotive units. .............
3- 4. Gea blnegas- electric, and diesel locomotives. .
3-06. All locomotives (serviceable, un~servieab~le, and stored). ...
4. Yard switching and train switching locomotive-miles per 100 loaded freight
car-miles-Freight service. ...............
5. Yard switching and tramn switching locomotive-miles per100 p~assenger-tramn
car-miles (with locomotives)-Passenger service. ........


3 357 895
5 65 4 7 8
27 318
715 744
4 669 458
182 284
3 4 61 8
3 2 88 4
77 754
327 540


3 232 510
4 71 4 39
27195
2 4 8 6
540 583
4 274 813
166 691
2 8 4 6 9
30 832
21
62 474
288 487


1 954 456
3 3 4 7
25 774
2 4 SO
299 60
2 285 59
114 230
33 883
31 912
179 025


1 930 805
25 455
229 741
2 191 254
103 195
30 804
86 956
161 893


150 902


1 440
152 342
5 777


4
5 781


459 003
5 6 6 3

83 362
548 028
20 941
i 07 9

9 706
31 726


427 198
4 15 4

48 882
480 234
19 596



27 817


793 534
5 56 4 6 8
1544
6 O3
331 542
1 683 491
41 336
3 3 5 39
1
36 158
111 008


141 900



141 900
4 897


24
4 921


732 607
4 6 6 93
1740
8 25
261 960
1 460 825
39 003
a 7 6 37
as
21
27 767
94 456


1-01
1-02
1-03
1-04
1--05
1-06
2-01
2-02
2-08
2-04
2-05
2-06


11.2
1lr.7
12.2



1.81

,65


10.7
12.0
11.6
19 o
1 5
1.90
*76


11.8
1 2:



2.41
*98


11.7
1 2
ia.6
1.1
12.2
2.54
1.ob


12.3

24.1


1.25
.41


1.17
.Bo


39.9

18.7
11.
10.
1*55
*38


9. s
1.6
*Bo


10.6
14r.8



13.1 g

.49


9.4
12.2


11.3
1, 2
.Go


3-01
3-03
3-04
3-05
3-06
4
5


3 1262 08852 2809ir INTERSTATE COMMERCE COMMISSION
BUREAU OF TRANSPORT ECONO bCS AND) STATISTICS


Statement No. MI-215 (os-c)

NOVEMBER 1942


YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES
Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)


TErMNo.











Compiled from 153 reports of yard service performance representing 161 railways
(CLASS I SWITCHING AND TERMINAL COMPANIES INCLUDED)
FOR THE MONTH OF DECEMBER, 1942 AND 1941

SOUTHERN DISTRICT
ITEM UNITED STATES EASTERN DISTRICT WESTERN DISTRICT
POCAHONTAS REGION SOUTHERN REGION I ITEM No.
1942 1941 1942 1941 1942 1941 1942 1941 1942! 1941
AGGREGATES
1. Yard switching locomotive-hours-Freight:
1-01. Coal-burning steam locomotives.. 490 453 3279 747 2064360 1 983405 148318 134 28 476854 438 92 800 921 723186 1-01
1-02. Oil-burming steam locomotives. ........... 5 80 9 63 4 89 8 9 8 3 15 4 10 6- 6 6 66 4 6 7 0 5 7 1 48 2 8 22 1
1-03. Electric locomotive units. 2 8 4 O3 2 9 9 51 2 6 8 9 1 27 9 1 8 *1 51 2 48112 2 1-02
1-04. Gasoline and gas-electric locomotives. ..... .3 2 O3 3 4 9 3 2 60 9 2 5 9 759 2 O 1-03
1-05. Diesellocomotives. ................ 744 739 576 889 313 492 245 355 1 488 87 427 56 739 342 394 274 79 1-05
2. Yar TteT loooiehrs-aene: ......... 4 847 761 4 379 978 2 410 507 2 263 381 149 806 134 289 570 947 500 336 1 716 501 1 481 9721 1-06
2-01. Coal-burning steam locomotives. ........... 2 25 6 6 O 2OO 1 2 1 44 39 O 1 26 7 3 5 6 2 6 8 5 4 7 3 2 3 4 8 1 22 7 6 5 1 5 21 4 2-0
2-02. Oil-burning steam locomotives. ... ..... 3 9 58 O ; 3 2355 4 9 O 4211 57 85 4 7 ~01
2-03. Electric locomotive units. 6 808 35 312 36 80 35 282 2 9 749 3 7 2-02
2-04. Gasoline and gas-electric locomotives...........8a 3O 20
2- Ilcootvs.. .. .. .. .. 8 64 6974 3 89 29 101 52 10 958 8 723 41 837 31 826 2 05
.-6 .... ... .... 389 7401 337 5621 216 095 191 608 6 268 5 525 36 530 31 9891 130 8171 108 440( 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. .ll .0. .r. .2. .. .0. .~ 1. 1. 1
3-02. Oil-burning steam locomotives. 4712.2 8 171. 1098 059o ao
3-08. Electric locomotive units. ....... ....1.1.61 59*3 -*12*9 7.9 14.8 12 3 3-02
33-4 Gasoli e gseect i, and diesel locomotive3s. ... 19.2 19.1 138f 2.0 18. 17.3 1 3 03
3-06. All locomotives (senriceable, uz se -viceable, and stored). .~ .. .1.a 12*8 12.2 1 10.8 1. U.o 2 3-05
4. Yard switchn an drain switching loeomotive-miles per 100 loaded freight 1.1. 101. 301. 80
5. ar-smie thei and tr tchi oooieelspe 0 sne ri 1.94 1 2.00 2.64 2.71 1.32 1,26 1.60 1.74 1,56 1*56 4
car-miles (ndth locomotives) Passenger service. .. .. .70 .74 1.07 1.10 .JS .45 .41 .4 53 .55 5

FOR TWELVE MONTHS ENDED WITH DECEMBER, 1942 AND 1941

AGGREGATES
1. Yard switehn loeomotive-hours-Freight:

1-l. Col-unigsea o o otives. 6.. 14 3 1 438 37 51 4 7 24 06 O1 22 62 8 1 746 928 1 568 284 5 405 720 4 952 041 6 O 2 80 8 375 10

1-05. Diesellocom Ilves. ................ 7 874 OOO 5 569 486 3 322 137 2 446 978 13 928 914 388 468 416 3 623 547 2 660 092 1-05
2.Yr1 0.k otal.loooiehu Pangr 54 968 342 48 759 756 27 797 053 25 468 228 1 760 856 1 568 284 6 389 811 5 465 911 19 020 6221 16 357 5333 1-06

2-01. CoaT-burninif sta !!oie.2122 2010 8 5 1as9 68 473 59 957 256 O 2 256 973 380 94 487 090 2- 2
2-04. Gasoline and gas-electrie locomotives.. ... 90 357 65 *8 29 2-03
2-05 Desellocomotives. ................ 882 553 706 132 368 383 309 592 176 31 104 159 77 275 409 885 318 g 2 45
..08 ... .... .... 384 3149 3492 42 2 146390 1 951 460 68 649 60 271 373 838 46 404 1254 27 2 113 429 4 2-06
AVERAGES
3. Hours per yard locomotive-day:
3-01. Coal-burning steam locomotives. ....... 11.1 10.3 11,9 11.3 12.0 11.2 9.7 8.8 9.8 8.1 3-01
3-02. Oil-burning steam locomotives. 3d1. .8 09631. 1
3-03. Electric locomotive units. .. .... .....12. 11.d 12 j 12.2 -756.
3-041. Gasoline gas-electric, and diesel loeomotives.' ..1.8 18.1.5 18.7 19.) 1.1 16.2 19.2 19 3-43
3-05. Service le locomotives. ........... 13.6 13,0 11.1 14013.2 12.6 11.1C 10.3 13.7 12. 30
3-06. All locomotives (serviceable, unservieab~le, and stored). ...12.1 11.0 18.5 11.8 12.o 11.2 10.5 9.2 12.t.5 8-05
4. Yard switching and train switching locomotive-miles per 100 loaded freight 5 30
car-miles--Freight service. .81 1.91 2.41 2.58 1.21 1.15 1*52 1.62 1.45 1,1 4
5. Yard switching and tramn switching locomotive-miles per 100 passenger-train
car-miles (with locomotives)-Passenger service* .69 .74 1.01 1.03 .45 *49 .41 .46 .53 *57 5

NUPE.-Switching locomotive-miles are based on 6 miles per locomotive-hour. Yard switching hours of electric and gas-electric railetos reported by the Chicago, Rock Island & Pacific Ry.; Illinois Central R. R.; Pennsylvania System; Pennsylvania-Iteading Seashore Lines; and Readin
Company not included mn above figures, as follows:Deceaber 1942 ...4,61) houre.....12 mother 1 ?2...5 houcrs ngS OENETPITNGOFC:1~-0~52
Deceaber 1941*****5,209 hours.....12 months 1 ...25hus.USGVRMN PITN FIE 930452


_5C 14fe, Js': gb~L


Subject to revision


ul~m~1111,~ 11ivINTERSTATE COM hi RCE COMMISSION Statement No. M-215 (os-c)
BUREAU OF TRANSPORT ECONOMICS AND STATISTICS
DECEMBER 1942
YARD SERVICE PERFORMANCE OF CLASS I STEAM RAILWAYS IN THE UNITED STATES