<%BANNER%>
HIDE
 Front Cover
 Title Page
 Table of Contents
 Summary and introduction
 Climatic data analysis
 Available energy and crop...
 Water availability and crop...
 Climatic classification for agricultural...
 Extension of data
 Tabular presentation
 Acknowledgement
 Stations and classification
 Appendix I: Crop physiological...
 Appendix II: References














xml version 1.0 standalone yes
Volume_Errors
Errors
PageID P4
ErrorID 1002
ErrorText images need optimizing


World water for agriculture
CITATION THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/AA00004339/00001
 Material Information
Title: World water for agriculture climate, precipitation probabilities and adequacies for rainfed agriculture
Physical Description: xix, 177 p. : ; 23 cm.
Language: English
Creator: Hargreaves, George H
United States -- Agency for International Development
Publisher: Utah State University
Place of Publication: Logan
Publication Date: 1977
 Subjects
Subjects / Keywords: Water-supply, Agricultural -- Tables   ( lcsh )
Precipitation (Meteorology) -- Measurement -- Tables   ( lcsh )
Genre: government publication (state, provincial, terriorial, dependent)   ( marcgt )
bibliography   ( marcgt )
non-fiction   ( marcgt )
 Notes
Bibliography: Includes bibliographical references (p. 177).
Statement of Responsibility: by George H. Hargreaves.
General Note: "Prepared under support of United States Agency for International Development, contract no. AID/ta-c-1103."
General Note: "January 1977."
 Record Information
Source Institution: University of Florida
Rights Management: All rights reserved by the source institution and holding location.
Resource Identifier: oclc - 08302088
ocm08302088
System ID: AA00004339:00001

Table of Contents
    Front Cover
        Front Cover
    Title Page
        Page i
    Table of Contents
        Page ii
        Page iii
        Page iv
        Page v
        Page vi
        Page vii
        Page viii
        Page ix
        Page x
        Page xi
        Page xii
        Page xiii
        Page xiv
        Page xv
        Page xvi
        Page xvii
        Page xviii
        Page xix
        Page xx
    Summary and introduction
        Page 1
    Climatic data analysis
        Page 2
        Page 3
    Available energy and crop production
        Page 4
    Water availability and crop production
        Page 5
        Page 6
        Page 7
    Climatic classification for agricultural production
        Page 8
        Page 9
    Extension of data
        Page 10
    Tabular presentation
        Page 11
        Page 12
    Acknowledgement
        Page 13
    Stations and classification
        Page 14
        Page 15
        Page 16
        Page 17
        Page 18
        Page 19
        Page 20
        Page 21
        Page 22
        Page 23
        Page 24
        Page 25
        Page 26
        Page 27
        Page 28
        Page 29
        Page 30
        Page 31
        Page 32
        Page 33
        Page 34
        Page 35
        Page 36
        Page 37
        Page 38
        Page 39
        Page 40
        Page 41
        Page 42
        Page 43
        Page 44
        Page 45
        Page 46
        Page 47
        Page 48
        Page 49
        Page 50
        Page 51
        Page 52
        Page 53
        Page 54
        Page 55
        Page 56
        Page 57
        Page 58
        Page 59
        Page 60
        Page 61
        Page 62
        Page 63
        Page 64
        Page 65
        Page 66
        Page 67
        Page 68
        Page 69
        Page 70
        Page 71
        Page 72
        Page 73
        Page 74
        Page 75
        Page 76
        Page 77
        Page 78
        Page 79
        Page 80
        Page 81
        Page 82
        Page 83
        Page 84
        Page 85
        Page 86
        Page 87
        Page 88
        Page 89
        Page 90
        Page 91
        Page 92
        Page 93
        Page 94
        Page 95
        Page 96
        Page 97
        Page 98
        Page 99
        Page 100
        Page 101
        Page 102
        Page 103
        Page 104
        Page 105
        Page 106
        Page 107
        Page 108
        Page 109
        Page 110
        Page 111
        Page 112
        Page 113
        Page 114
        Page 115
        Page 116
        Page 117
        Page 118
        Page 119
        Page 120
        Page 121
        Page 122
        Page 123
        Page 124
        Page 125
        Page 126
        Page 127
        Page 128
        Page 129
        Page 130
        Page 131
        Page 132
        Page 133
        Page 134
        Page 135
        Page 136
        Page 137
        Page 138
        Page 139
        Page 140
        Page 141
        Page 142
        Page 143
        Page 144
        Page 145
        Page 146
        Page 147
        Page 148
        Page 149
        Page 150
        Page 151
        Page 152
        Page 153
        Page 154
        Page 155
        Page 156
        Page 157
        Page 158
        Page 159
        Page 160
        Page 161
        Page 162
        Page 163
        Page 164
        Page 165
        Page 166
        Page 167
        Page 168
        Page 169
        Page 170
        Page 171
        Page 172
        Page 173
        Page 174
    Appendix I: Crop physiological response characteristics
        Page 175
        Page 176
    Appendix II: References
        Page 177
Full Text

WORLD WATER FOR AGRICULTURE
:CUmate, Pedpktatton Pmobobltle and Adequades for Ralind Agdkulure)
4. /


f .:


January 4977
Agency for Intern.tionfl Deveopment











WORLD WATER FOR AGRICULTURE

(Climate, Precipitation Probabilities and
Adequacies for Rainfed Agriculture)


by
George H. Hargreaves












Prepared under support of

United States Agency for International Development
Contract No. AID/ta-c-1103






















UTAH STATE UNIVERSITY
January 1977








CONTENTS AND CLASSIFICATION


Page


Summary .
Introduction .
Climatic Data Analysis .
Available Energy and Crop Production .
Water Availability and Crop Production
Climatic Classification for Agricultural Production
Extension of Data .
Tabular Presentation .
Acknowledgments .


. 1
S 1
S2
S4
S5
S8
S 10
11
S13


Stations and Classification


Albania
Shkoder
Tirana
Vlore

Algeria
Alger/Dar-El-Beida
Bechar
Biskra
Laghouat
Oran/Es Senia
Tebessa


Angola
Luanda


Temperate, moderately wet
Temperate, moderately wet
Subtropical, moderately wet


Subtropical, wet-dry
Subtropical, very arid
Subtropical, very arid
Temperate, very arid
Subtropical, ;emi-arid
Temaperate, arid


Tropical, arid .


Argentina
Azul
Bariloche
Buenos Aires
Ceres
Comodoro Rivadavia
Cordoba
Corrientes
Formosa
Gualeguaychu
La Quiaca
La Rioja
Mendoza
Parana
Pilar
Presidencia Roque
Saenz Pena


Temperate, wet-dry
Temperate, wet-dry
Temperate, wet-dry
Temperate, wet-dry
Temperate, very arid
Subtropical, arid
Subtropical, wet-dry
Subtropical, wet-dry
Subtropical, wet-dry
Temperate, arid
Subtropical, arid
Temperate, arid
Subtropical, arid
Subtropical, arid

Subtropical, semi-arid


S 14
S 14
S 14


S 14
S 15
S 15
S 13
S 15
16


S 16


20









Salta
San Antonio Oeste
San Luis
Santiago del Estero
Trelew

Australia
Swan Island

Austria
Graz-Thalerhof
Insbruck-Univ.
Klagenfurt
St. Polten
Salzburg
Sonnblick
Wien-Hohe Wart e

Bahamas
Massan Int. Airport

Bahrain
Al Muharraq

Bangladesh
Bogra
C'.it tagong
Jessore
Narayanganj


Belgium
Uccle


Subtropical, semi-arid
Temperate, very arid
Subtropical, very arid
Subtropical, arid
Temperate, very arid


Tropical, wet-dry


Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Polar
Temperate .


Tropical, wet-dry


Tropical, arid .


Tropical,
Tropi al,
Tropical,
Tropical,
Tropic-i,


wet-dry
wi t-dry
wet-dry
wet-dry
we -11


Temperate .


25


Botzwana
Maun Subtropical, arid 25


Brazil
Alegrete
Alto Tapajos
Aracaju
Barra do Corda
Belem
Belo Horizonte
Bos Vista
Caetite
Caravelao
Coari
Corceicao do Araguai.


Subtropical, somewhat wet
Tropical, very wet
Tropical, wet-dry .
Tropical, wet-dry
Tropical, moderately wet .
Tropical, somewhat wet
Tropical, moderately wet
Tropical, arid .
Tropical, wet-dry
Tropical, moderately wet .
Tropical, somewhat wet


21


S 25
S 26
S 26
S 26
S 26
2*
27
S 27
S 27
S 28
S 28









Corumba
Cruzeiro du Sul
Cuiaba
Curitiba
Formosa
Manaus
Natal
Olinda
Porto Alegre
Porto Nacional
Porto Velho
Quixeramobim
Remanso
Rio de Janeiro
Salvador
Santa Cruz
Santarem
Santa Vitoria do Palmar
Sao Paulo
Turiacu
Uapes

Bulgaria
Karnobat
Lom
Sofia
Vratza

Burundi
Bujumbura

Cambodia
Pochentong


Tropical, wet-dry
Tropical, very wet
Tropical, wet-dry
Subtropical
Tropical, somewhat wet
Tropical, moderately wet .
Tropical, somewhat wet
Tropical, somewhat wet
Subtropical, somewhat wet
Tropical, somewhat wet
Tropical, moderately wet .
Tropical, semi-arid .
Tropical, very arid .
Tropical, wet-dry
Tropical, somewhat wet
Tropical, somewhat wet
Tropical, moderately wet .
Subtropical, somewhat wet
Subtropical, wet-dry
Tropical, moderately wet
Tropical, very wet


Temperate, semi-arid
Temperate, semi-arid
Temperate, semi-arid
Temperate .


Tropical, wet-dry


Tropical, wet-dry


Canada
Chatham
Edmonton
Port Harrison
Prince George
Regina
Sable Island
Sidney
Winnipeg

(Ceylon) Sri Lanka
Colombo
Hambantota
Mannar
Trincomalee


Subtemperate
Subtemperate,
Polar
Subtemperate
Subtemperate,
Subtemperate,
Subtemperate,
Subtemperate,


semi-arid


arid
somewhat wet
somewhat wet
semi-arid .


. 36
. 36
. 37


Tropical, moderately wet 37
Tropical, semi-arid 37
Tropical, semi-arid 37
Tropical, semi-arid 38


28
28
29
29
29
29
30
30
S 30
S 30
S 31
S 31
31
31
32
32
32
32
S 33
S 33


34


35







Chad


Abeche
Am-Timan
Ati
Bousso
Faya-Largeau
Fort-Archambault
Fort-Lamy
Mao
Moundou
Mongo
Pala

Taiwan (China)
Hengchun
Hwalien
Penghu
Taipei

Congo, Republic of
Djambala
Dolisie
Gamboma
Impfondo
Ouesso
Pointe-Noire


Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,


arid .
semi-arid .
semi-arid .
semi-arid .
very arid .
somewhat wet
semi-arid .
arid .
somewhat wet
semi-arid .
semi-arid .


Tropical, moderately wet
Tropical, somewhat wet
Subtropical, semi-arid
Subtropical, somewhat wet


Tropical,
Tropical,
Tropical,
Tropical
Tropical,
Tropical,


moderately wet
somewhat wet
somewhat wet

somewhat wet
wet-dry


S38
S38
S38
S39
39
S 39
S39
S40
S40
S 40
S 40


S 41
S 41
S 41
S 41


S 42
S 42
S 42
S 42
43
43


Cyprus
Nicosia


Czechoslovakia
Brno/Turany
Cheb
Ostrava
Poprad
Praha/Ruzyne
Sliac

(Dahomey) Benin
Bohicon
Kandi
Natitingou
Save
Tchaourou

Denmark
Alborg
Dueodde
Kobenhavn
Thorshavn


Subtropical, semi-arid


Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate .
Subtemperate


Tropical, semi-arid .
Tropical, semi-arid .
Tropical, somewhat wet
Tropical, wet-dry
Tropical, somewhat wet


Subtemperate
Subtemperate
Subtemperate
Boreal


S 45
S 45
S 45
S 46
46







Dominican Republic
Cindad Trujillo
(Sto. Domingo)
Puerto Plata

Ecuador
Guayaquil
Quito

Egypt
Alexandria
Baharia
Cairo
Dakhla
Helwan
Hurghada
Kharga
Manquabad/Asyut
Port Said
Siwa


El Salvador
San Salvador

Finland
Helsinki
Jokioinen
Kajaani
Luonetjarvi
Turku
Vaasa


France
Ajaccio/Campo del Oro
Bordeaux/Merignac
Bourges
Brest/Guivapas
Cayenne/Rochambeau
Fr. Guayana
Cherbourg
Dijon
Djibouti/Serpent
Afars/Issas
Dzaoudzi/Pamanzi
Comoro Isl.
Fort-de-france,
Martinique
Limoges
Lyon/Bron


Tropical, wet-dry
Tropical, somewhat wet


Tropical, semi-arid .
Subtropical, somewhat wet


Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid


Tropical, moderately wet .


Subtemperate
Boreal
Boreal
Boreal
Subtemperate
Boreal


Temperate
Temperate
Temperate
Temperate

Tropical,
Temperate
Temperate


very wet

. .


Tropical, very arid .

Tropical, semi-arid .


Tropical,
Temperate
Temperate


wet-dry

. .


47
47


48
48


51


S 53
S 54
S 54

54

54









Marseille/Marignane
Moroni, Comoro Isls.
Nancy
Nantes
Nice
Nimes


Temperate .
Tropical .
Subtemperate .
Temperate .
Temperate .


Noumea, New Caledonia Tropical, wet-dry
Paris/LeBourget Temperate .
Perpignan Temperate .
Pointe-A-Pitre/
Raizet Guad. Tropical, wet-dry
Saint-Denis Tropical, semi-arid .
Strasbourg Subtemperate
Tahiti-FAAA Fr.
Polynesia Tropical, wet-dry
Toulouse/Blagnac Temperate .
Trappes Temperate .


Germany
Berlin/Tempelhof
Brocken
Emden
Erfurt/Bindersleben
Essen/Mulheim
Fichtelberg
Friedrichshafen
Geisenheim
Gorlitz
Greifswald/Wieck
Hamburg/Fuhlsbuttel
Hannover
Kassel
Leipzig/Mockau
Lindenberg
Magdeburg
Munchen/Riem
Neustrelitz
Nurnberg/Kraftshof
Potsdam
Schleswig
Stuttgart/Cannstadt
Wahnsdorf
Warnemunde
Wernigerode


Subtemperate
Boreal
Subtemperate
Subtemperate
Temperate .
Boreal
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate
Subtemperate


S 59
. 59
S 60
S 60
S 60
S 60
S 61
S 61
S 61
S 61
S 62
S 62
S 62
S 62
S 63
S 63
. 63
. 63
S 64
S 64
S 64
S 64
. 65
. 65
* 65


Ghana
Accra
Kumasi
Takoradi
Tamale


Tropical, arid .
Tropical, wet-dry .
Tropical, semi-arid .
Tropical, wet-dry


S 58
S 59
. 59








Greece
Athinai/Obs.
Patrai
Thessaloniki

Guatemala
Guatemala Obs.

Guayana
Georgetown

Honduras
Tegucigalpa

Hong Kong
Hong Kong


Hungary
Budapest
Debrecen
Magyarovar
Miskolc
Pecs
Szeged

Iceland
Akureyri
Holar I. Honrafirdi
Reykjavik


India
Agra
Ahmadabad
Akola
Allahabad
Bangalore
Begampet
Belgaum
Bikaner
Bombay
Calcutta
Cherrapunji
Cuttack
Daltonganj
Darbhanga
Darjeeling
Dhubri
Dumka
Dwarka


Subtropical, arid
Subtropical
Temperate, semi-arid


S 66
67
. 67


Subtropical, wet-dry


Tropical, moderately wet .


Tropical, semi-arid .


Subtropical, somewhat wet


Temperate,
Temperate,
Temperate,
Temperate,
Temperate,
Temperate,


Boreal
Boreal
Boreal


semi-arid
semi-arid
semi-arid
semi-arid
semi-arid
semi-arid


Subtropical, arid 70
Tropical, arid 71
Tropical, semi-arid 71
Subtropical, semi-arid 71
Tropical, wet-dry 71
Tropical, semi-arid 72
Tropical, somewhat wet 72
Subtropical, arid 72
Tropical, wet-dry 72
Tropical, wet-dry 73
Subtropical, very wet 73
Tropical, somewhat wet 73
Subtropical, semi-arid 73
Subtropical, semi-arid 74
Temperate, moderately wet 74
Tropical, moderately wet 74
Tropical, somewhat wet 74
Tropical, arid 75


viii









Fort Cochin
Gauhati
Indore
Jagdalpur
Jodhpur
Kota
Ludhiana
Madras
Mangalore
Masulipatam
Minicoy
Mohanbari
Mukteswar/Kumaon
Nagpur
New Delhi/Safdarjung
Pamban
Poona
Sagar
Silchar
Trivandrum
Veraval
Vishakhapatnam


Indonesia
Djakarta


Iraq
Baghdad
Basrah
Diwaniya
Habbaniya
Khanaqin
Kirkuk
Kut-El-Hai
Mosul
Nasiriya
Rutbah

Ireland
Valentia Obs.

Israel
Eilat
Jerusalem
Lod Airport


Italy
Alghero
Ancona


Tropical, moderately wet
Subtropical, somewhat wet
Subtropical, semi-arid
Tropical, somewhat wet
Subtropical, very arid
Subtropical, arid .
Subtropical, arid
Tropical, semi-arid .
Tropical, moderately wet .
Tropical, semi-arid .
Tropical, somewhat wet
Subtropical, moderately wet
Temperate, semi-arid
Tropical, semi-arid .
Subtropical, semi-arid
Tropical, semi-arid .
Tropical, semi-arid .
Tropical, semi-arid .
Tropical, moderately wet .
Tropical, somewhat wet
Tropical, arid .
Tropical, semi-arid .


Tropical, somewhat wet


Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, very arid
Subtropical, semi-arid
Subtropical, semi-arid
Subtropical, very arid
Temperate, semi-arid
Subtropical, very arid
Temperate, very arid


Temperate, very wet .


Subtropical, very wet
Subtropical, semi-arid
Subtropical, semi-arid


Subtropical, wet-dry
Temperate, wet-dry


80


83
84
84








Brindisi
Cagliari-Elmas
Catania
Maria di Ginosa
Messina
Milano-Linate
Napoli-Capodichino
Pescara
Pisa
Roma-Fiumicino
Trapani-Birgi
Trieste
Udine Campoformido
Verona-Villafranca


Ivory Coast
Abidjan-Aero
Odienne
Tabou

Japan
Abashiri
Akita
Asahikawa
Fukuoka
Hachijojima
Hiroshima
Ishigakijima
Izuhara
Kagoshima
Kanazawa
Kochi
Maebashi
Matsumoto
Miyako
Miyazaki
Nagasaki
Nagoya
Nemuro
Niigata
Oita
Osaka
Sapporo
Sendai
Shionomisaki
Tokyo
Urakawa
Wajima


Subtropical, semi-arid
Subtropical, semi-arid
Subtropical, wet-dry
Subtropical, semi-arid
Subtropical, moderately we
Temperate .
Temperate, moderately wet
Temperate, moderately wet
Temperate, somewhat wet
Temperate .
Subtropical, wet-dry
Temperate, moderately wet
Temperate, moderately wet
Temperate .


Tropical, semi-arid .
Tropical, moderately wet.
Tropical, semi-arid .


Subtemperate .
Temperate .
Subtemperate .
Temperate, somewhat wet
Subtropical, very wet
Temperate .
Subtropical, somewhat wet
Temperate, somewhat wet
Temperate, moderately wet
Temperate, very wet
Temperate, very wet .
Temperate .
Temperate ..
Temperate, somewhat wet
Temperate, somewhat wet .
Temperate .
Temperate .
Subtemperate, somewhat wet
Temperate, moderately wet
Temperate .
Temperate .
Temperate, moderately wet
Temperate, somewhat wet
Temperate, very wet .
Temperate, somewhat wet.
Subtemperate, somewhat wet
Temperate, moderately wet


S 88
S 88
S 89


S 89
S 89
S 89
S 90
S 90
S 90
S 90
S 91
S 91
S 91
S 91
S 92
S 92
S 92
S 92
S 93
S 93
S 93
S 93
S 94
S 94
S 94
S 94
S 95
S 95
S 95
S 95








Jordan
Amman Airport


Temperate, arid


Kashmir
Leh
Srinagar


Kenya
Garissa
Lodwar
Mombasa
Nairobi/Dagoretti
Wajir

Korea
Inchon
Kangnung
Mokpo
Pusan

Lebanon
Rayack


Louxembourg
Louxembourg

Malagasy Republic
Analalava
Antalaha
Diego-Suarez
Fort-Dauphin
Maintirano
Majunga
Mananjary
Tamatave
Tananarive
Tulear


Malawi
Lilongwe


Bamako
Bougouni
Gao
Kayes
Koutiala
Menaka
Mopti


Subtemperate, very arid
Temperate, semi-arid


Tropical, very arid .
Tropical, very arid .
Tropical, semi-arid .
Subtropical, semi-arid
Tropical, very arid .


Temperate .
Temperate
Temperate .
Temperate .


Temperate, semi-arid


Temperate .


Tropical, somewhat wet
Tropical
Tropical, semi-arid .
Tropical, wet-dry
Tropical, somewhat wet
Tropical, moderately wet
Tropical, moderately wet
Tropical, very wet .
Subtropical, wet-dry
Tropical, very arid .


Subtropical, semi-arid


Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,


semi-arid
wet-dry.
arid .
semi-arid
semi-arid
arid .
semi-arid


S 96
S 96


S 99









Nioro Du Sahel
San
Sikasso
Tombouctou


Mauritius
Agalega
Plaisance
Rodrigues
St. Brandon


Tropical,
Tropical,
Tropical,
Tropical,


Tropical,
Tropical,
Tropical,
Tropical,


semi-arid .
semi-arid .
moderately wet
arid .


very wet
very wet
very wet
moderately wet


S 104
S 104
S 104
S 104


S 105
S 105
S 105
S 105


Mexico
Apaculco
Guanajuato
Mazatlan
Merida
Morelia
Salina Cruz
Tacubaya
Tampico
Veracruz
Zacatecas

Morocco
Agadir
Casablanca
Marrakech
Meknes
Ouarzazate

Mozambique
Beira
Inhambane
Lourenco Marques
Quelimane

Netherlands
De Bilt
Dr. Plesman Airport
Curacao

New Zealand
Christchurch
Grisborne
Hokitika South
Invercargil
New Plymouth
Wellington


Tropical, wet-dry
Subtropical, semi-arid
Tropical, semi-arid .
Tropical, semi-arid
Subtropical, semi-arid
Tropical, arid .
Subtropical, semi-arid
Tropical, semi-arid
Tropical, wet-dry
Subtropical, very arid


Subtropical, very arid
Subtropical, semi-arid
Subtropical, very-arid
Subtropical, wet-dry
Subtropical, very arid


Tropical, wet-dry
Tropical, semi-arid .
Tropical, semi-arid .
Tropical, wet-dry .


Temperate .

Tropical, arid .


Temperate, wet-dry
Temperate, moderately wet
Temperate, very wet .
Temperate, moderately wet
Subtropical, moderately wet
Temperate, moderately wet


108
S 108
S 109
S 109
S 109


S 111
S 111
S 111
112
S 112
112








Niger
Bilma
Birna N'Konni
Maradi
Tillabery
Zinder


Nigeria
Ilorin
Jos
Kano
Maiduguri
Minna
Yola


Tropical,
Tropical,
Tropical,
Tropical,
Tropical,


Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,


Norway
Bergen/Frederiksberg
Oslo/Blindern
Trondheim/Vol

Pakistan
Dalbandin
Dera Ismail Khan
Fort Sandeman
Hyderabad
Jacobabad
Kalat
Karachi/Manora
Lahore
Multan
Murree
Panjgur
Preshawar
Quetta


Paraguay
Asuncion

Philippines
Aparri
Basco
Cebu
Dagupan
Iloilo
Legaspi
Surigao
Tacloban
Zamboanga


very arid
semi-arid
semi-arid
arid .
arid


S 112
S 113
S 113
S113
S113


wet-dry .
moderately wet
semi-arid .
semi-arid .
wet-dry
wet-dry


S 114
S 114
S 114
114
115
115


Subtemperate, very wet
Subtemperate
Boreal


Subtropical, very arid 116
Subtropical, very arid 116
Temperate, very arid 116
Tropical, very arid 117
Subtropical, very arid 117
Temperate, very arid 117
Tropical, very arid 117
Subtropical, very arid 118
Subtropical, very arid 118
Temperate, moderately wet 118
Subtropical, very arid 118
Subtropical, arid 119
Temperate, arid 119


Tropical, wet-dry


Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,
Tropical,


moderately wet
moderately wet
wet-dry
moderately wet
moderately wet
moderately wet
very wet .
somewhat wet
wet-dry


S 119
S 120
S 120
S 120
S 120
121
S 121
S 121
121


xiii








Portugal
Beja
Baraganca
Coimbra
Faro
Funchal
Horta
Lisboa
Macau, Macao
Penhas Douradas
Ponta Delgada
Porto

Puerto Rico
San Juan

Rhodesia
Bulawayo
Chipinga
Salisbury

Romania
Bistrita
Bucuresti/Filaret
lasi
Sibiu
Sulina
Timisoara

Senegal
Dakar/Yoff
Linguere
Saint-Louis
Tambacounda
Ziguinchor

Sierra Leone
Bonthe
D- ru

South Africa
Alexander Bay
Beaufort West
Bloemfontein
D. F. Malan
Durban/Louis Botha
East London
George
Jan Smuts


Subtropical, semi-arid
Temperate, wet-dry
Subtropical, somewhat wet
Subtropical, semi-arid
Subtropical, semi-arid
Subtropical, moderately wet
Subtropical, wet-dry
Subtropical, somewhat wet
Subtemperate, moderately wet
Subtropical, moderately wet
Temperate, moderately wet


Tropical, wet-dry .


Subtropicpi, arid .
Subtropical, wet-dry
Subtropical, wet-dry


Subtemperate .
Temperate, arid
Temperate, arid
Subtemperat. .
Temperate, arid
Temperate, semi-arid


Tropical, arid .
Tropical, semi-arid .
Tropical, arid .
Tropical, semi-arid .
Tropical, moderately wet


Tropical, very wet
Tropical, very wet


Subtropical,
Subtropical,
Subtropical,
Subtropical,
Subtropical,
Subtropical,
Subtropical,
Subtropical,


very arid
very arid
very arid
semi-arid
wet-dry
sem,.-arid
semi-arid
wet-dry


125
1 26
S 126
S 126
S 126
S 127


S 127
S 127
S 127
S 128
S 128


129
129
129
129
130
130
130
130









Kimberley
Pietersburg
Port Elizabeth
Pretoria
Upington
Keetmanshoop S.W. Afr.
Windhoek

Spain
Alicante
Almeria
Badajoz
Barcelona
La Coruna
Madrid
Mahon
Palma de Mallorca
Sevilla
Santa Cruz de
Tenerife, Can.
Valladolid
Zaragoza

Sudan
Abu Hamed
Atbara
El Fasher
El Obeid
En-Nahud
Geneina
Juba
Karima
Kassala
Khartoum
Kosti
Malakal
Port Sudan
Wadi Halfa
Wad Medani
Wau

Sweden
Goteborg
Haparanda
Harnosand
Jonkoping
Karlstad
Ostersund/Froson
Stensele


Subtropical,
Subtropical,
Subtropical,
Subtropical,
Subtropical,
Subtropical,
Subtropical,


very arid
very arid
semi-arid
wet-dry
very arid
very arid
very arid


Subtropical, very ar
Subtropical, very ar
Temperate, semi-arid
Subtropical, semi-at
Subtropical, moderate
Temperate, arid
Subtropical, wet-dry
Subtropical, semi-ar
Subtropical, semi-ar

Tropical, very arid
Temperate, semi-arid
Temperate, arid


Tropical, vtry arid
Tropica very arid
Tropical, arid .
Tropical, arid .
Tropial, arid .
Tropical, semi-arid
Tropical, wet-dry
Tropical, very arid
Tropical, arid .
Tropical, very arid
Tropical, arid .
Tropical, semi-arid
Tropical, very arid
Subtropical, very ar
Tropical, arid .
Tropical, wet-dry


Subtemperate
Boreal
Subtemperate
Subtemperate
Subtemperate .
Boreal
Boreal


S 132
S 133
133
S 133
S 133
S 134
S 134
S 134
S 134


S 135
135
S135


S 135
S 136
S 136
S 136
S 136
S 137
S137
S137
S 137
S 138
S 138
S 138
S. 138
id 139
. 1s9
S 139


. 139
S140
S 140
140
S140
141
S141









Subtemperate
Subtemperate


. .141
S141


Switzerland
Geneve
Lugano
Santis
Zurich


Temperate .
Temperate .
Polar
Subtemperate


S142
S142
S142
. 142


Tanzania
Dar Es Salaam
Songea
Tabora

Thailand
Bangkok
Chiangmai
Nakhon Sawan
Phitsanulok
Udon Thani


Togo


Tropical,
Tropical,
Tropical,


Tropical,
Tropical,
Tropical,
Tropical,
Tropical,


Tropical,
Tropical,
Tropical,
Tropical,


Atakpame
Mango
Sokode
Tabligbo


semi-arid
wet-dry
wet-dry


somewhat \
somewhat i
somewhat i
somewhat N
wet-dry


wet dry
somewhat wet
somewhat wet
semi-arid .


143
143
143


S 143
S 144
S144
S 144
S144


S 145
S145
S 145
S 145


Trinidad
Piarco Airport

Tunisia
Gabes
Tunis Carthage

Turkey
Adana
Afyon
Ankara/Central
Antalya
Bursa
Diyarbakir
Edirne
Erzincan
Erzurum
Isparta
Istanbul/Goztepe
Izmir
Kastamonu


Tropical, somewhat wet


Subtropical, very arid .146
Subtropical, semi-arid 146


Subtropical, semi-arid 146
Temperate, wet-dry 147
Temperate, wet-dry 147
Subtropical, somewhat wet 147
Temperate, moderately wet 147
Temperate 148
Temperate 148
Temperate 148
Subtemperate 148
Temperate 149
Temperate, moderately wet 149
Subtropical, somewhat wet 149
Temperate 149


Stockholm
Visby









Konya
Malatya
Mugla
Rize
Samsun
Sivas


Uganda
Entebbe
Gulu


United Kingdom
Aberdeen/Dyce
Aldergrove
Diego Garcia Oil Islands
Eskdalemuir
Gorleston
Kew
Lauthala Bay
Lerwick
Mahe (Seychelles)
Manchester Airport
Plymouth/Mount Batten
Stornoway
Waddington

Upper Volta
Bobo Dioulasso
Ouagadougou

Uruguay
Montevideo/Prado
Punta del Este
Salto

United States
Abilene, Tex.
Albuquerque, N. Mex.
Anchorage, Alaska
Ashville, N.C.
Atlanta, GA
Bismark, N.D.
Blue Hill, Mass.
Boise, Ida.
Boston, Mass.
Brownsville, Tex.
Buffalo, N.Y.
Burlington, V.T.
Canton Island
Caribou, Maine


Temperate .
Temperate
Temperate, moderately wet
Temperate, very wet .
Temperate, moderately wet
Temperate .


Tropical, somewhat wet
Tropical, wet-dry


Subtemperate
Subtemperate
Tropical, very wet
Subtemperate, very wet
Temperate, moderately wet
Temperate, moderately wet
Tropical, moderately wet .
Subtemperate, very wet
Tropical, somewhat wet
Temperate, moderately wet
Temperate, moderately wet
Subtemperate, very wet
Temperate, moderately wet


Tropical, somewhat wet
Tropical, semi-arid .


Subtropical, wet-dry
Subtropical, wet-dry
Subtropical, semi-arid


151
151


S 152
S 152
S 152
S 152
S 153
S 153
S 153
S 153
S 154
154
S 154
S 154
S 155


S 155
155


S 155
S 156
S 156


Temperate, very arid 156
Temperate, very arid 156
Boreal .. 157
Temperate, wet-dry 157
Temperate, moderately wet 157
Subtemperate 157
Temperate 158
Temperate, arid 158
Temperate, wet-dry 158
Subtropical, very arid 158
Temperate 159
Subtemperate 159
Tropical, very arid 159
Subtemperate 159


xvii









Charleston, S.C.
Chicago, Ill.
Columbia, MO
Columbus, Ohio
Denver, Colorado
Des Moines, Iowa
Duluth, Minn.
El Paso, Texas
Ely, Nev.
Grand Junction, Colo.
Great Falls, Mont.
Guam, Mariana Is.
Hatteras, N.C.
Hilo/Gen. Lyman, Haw.
Honolulu, Haw.
Jacksonville, Fla.
Johnson Isl.
Juneau, Ala.
Koror Palan Isl.
Lihue, Kauai, Haw.
Las Vegas, Nev.
Little Rock, Ark.
Miami, Fla.
Nantucket, Mass.
Nashville, Tenn.
Medford, Ore.
New Orleans, La
New York/LaGuardia
Nome, Alaska
North Platte, Neb.
Oklahoma City, Okla.
Olympia, Wash.
Ponape, Caroline Isl.
Phoenix, Ariz.
Portland, Ore.
Rapid City, S.D.
Sacramento, Calif.
Saint Louis, MO.
St. Paul Isl., Alas.
Salt Lake City, Ut.
San Antonio, Tex.
San Diego, Calif.
San Francisco, Calif.
Sault Ste Marie, Mich.
Sheridan, Wyo.
Shreveport, La.
Spokane, Wash.
Tatoosh Island, Wash.
Truk, Caroline Is.


Subtropical 160
Temperate 160
Temperate 160
Temperate 160
Temperate, arid 161
Temperate 161
Subtemperate 161
Temperate, very arid 161
Subtemperate, very arid 162
Temperate, very arid 162
Subtemperate, very arid 162
Tropical, moderately wet 162
Temperate, somewhat wet 163
Tropical, very wet 163
Tropical, very arid 163
Subtropical 163
Tropical, very arid 164
Boreal 164
Tropical, very wet 164
Tropical, wet-dry 164
Temperate, very arid 165
Temperate, wet-dry 165
Tropical, wet-dry 165
Temperate 165
Temperate, moderately wet 166
Temperate, somewhat wet 166
Subtropical 166
Temperate 166
Polar 167
Temperate, very arid 167
Temperate, semi-arid 167
Temperate, very wet 167
Tropical, very wet 168
Subtropical, very arid 168
Temperate, moderately wet 168
Temperate, arid 168
Subtropical, semi-arid 169
Temperate, wet-dry 169
Polar 169
Temperate, arid 169
Subtropical, very arid 170
Subtropical, very arid 170
Subtropical, semi-arid 170
Subtemperate 170
Subtemperate, semi-arid 171
Subtropical, somewhat wet 171
Subtemperate 171
Temperate 171
Tropical, very wet 172


xviii









Yap, Caroline Is.
Washington, D.C.
Wichita, Kans.
Winnemucca, Nev.

Yemen (Aden)
Aden/Khurmaksar

Yugoslavia
Beograd
Zagreb-Gric

Zambia
Broken Hill
Kasama
Livingstone
Mongu


Tropical, moderately wet
Temperate .
Temperate .
Subtemperate, very arid


Tropical, very arid .


Temperate .
Temperate .


Tropical,
Tropical,
Tropical,
Tropical,


wet-dry .
moderately wet
semi-arid .
wet-dry .


S 174
174
S 174
S 174


Appendix I.--Crop Physiological Response Characteristics

Appendix II.--References .











SUMMARY

The 30 year climatic records (1931-1960) published by the
World Meterological Organization are used to develop and tabulate
precipitation probabilities, temperature, humidity, sunshine per-
centage, potential evapotranspiration, potential evapotranspiration
deficits at the 75 percent probability of precipitation occurrence
and a moisture availability or precipitation dependability index.
The relationships between available energy and adequacy of soil
water from precipitation and other sources for crop production are
briefly described. A classification of climate for agricultural
purposes is proposed. The classification is related to agri-
cultural production and relative needs for irrigation and drainage.
Agricultural technology transfer can be facilitated by using the
proposed climatic classification and by reference to the details
presented in the tables. Suggestions are made for additional
future country-wide or local area studies using climatic data from
other sources. Basic data relationships are presented that would
be useful in these studies.


INTRODUCTION

World food production depends to an important degree upon the
availability of water for crop production. Crop production is
principally a function of soil water availability, soil fertility
and (within an optimum range) available energy. Either deficits or
excesses of any of these factors result in reduced yields.
The World Meterological Organization, WMO, (3) has published a
summary of available worldwide climatic data for the 30 year period
1931-1960. This data summary provides a convenient basis for
evaluating water deficits and excesses and for determining avail-
able energy for a large number of locations.
Uses of climatic data analyses are numerous and include the
estimation of irrigation requirements, defining needs for drainage,









agricultural technology transfer, and other considerations that

relate climate to agricultural production. Although the primary
uses of the data presented here are agricultural, the information
presented has many potential uses such as planning of industrial
developments, transportation facilities and various other types of
construction.
An explanation of the analysis procedure is included. A
knowledge of this procedure can be used to extend the usefulness
of the information presented and to make the studies using data
from other sources.


CLIMATIC DATA ANALYSIS

Precipitation probabilities or frequency determinations can be
determined by different methods. The accuracy of the analysis
depends more on the length of record than on the method used. The
World Meterological Organization, WMO, (5) ranked the monthly
values of total precipitation for the 30-year period 1931-1960 and
published several kinds of probabilities. Probabilities of occurr-
ence in percent were determined from the published values by using
the equations:

F = m/n+l (1)
and
P = 100 100F (2)


in which m = the order number assigned to the data, ranked in
ascending order, m = 1, 2, . n, (m = 1 being the lowest record-
ed monthly rainfall); n = total number of data points, F = fre-
quency number; and P = percentage probability of occurrence. The
precipitation data published by WMO include the mean and the 97,
79, 60, 40, 21, and 3 percent probabilities of occurrence.
Mean monthly values of temperature, relative humidity and
duration of sunshine were also taken from the WMO report and were
used in the subsequent evapotranspiration analyses.








Crop water requirements are determined by climatic factors and
crop characteristics, including rate and stage of growth, and by
the climate. Crop water requirements can be accurately estimated
from published climatic data. The most important weather elements
influencing potential water use are ambient air temperature and
solar radiation. The best relationships between these elements and
crop water requirements exist when mean temperature is expressed in
degrees Fahrenheit, TMF, and incident solar radiation, RSM, is
expressed in equivalent mm of water evaporation.
When not measured directly, RSM can be calculated from tabular
values of extraterrestrial radiation, RMM, in equivalent mm of
water evaporation per month and from the percentage of possible
sunshine, S, occurring at a given location. The conversion equa-
tion from RMM to RSM allowing for the differences in sunshine
percentage can be written

RSM = 0.075 RMM x S /2. (3)

Percentage of possible sunshine, S, is determined from the actual
duration of sunshine in hours, SH, from day length, DL, and from
the number of days in the month, DM. The equation is

S = 100 SH/DL x DM (4)

When sunshine hours are not available, S can be roughly estimated
from mean monthly relative humidity, HM, using the equation
1/2
S = KS (100 HM) (5)

Values of the adjustment coefficient, KS, vary somewhat with cli-
mate and the manner and times of collecting the relative humidity
data. A computer program has been developed to calculate values of
KS for all stations having published values of SH and HM. For
locations where either SH or HM data were not available, a KS value
was assigned based on those values calculated in comparable areas
having similar climatic conditions.








Potential evapotranspiration, ETP, in mm can be estimated
directly using data for each location, from mean temperature in
degrees Fahrenheit, TMF, and incident solar radiation, RSM. Values
of ETP in mm per month are given by the equation

ETP = 0.0075 RSM x TMF (6)


Dependable precipitation, PD, is defined here as the 75 percent
probability of precipitation occurrence or that amount of precipi-
tation that can be anticipated to be equaled or exceeded during
three fourths of the years.
The moisture availability index, MAI, is a moisture adequacy
index at the 75 percent probability level of precipitation occur-
rence. It is defined as dependable precipitation divided by
potential evapotranspiration. The equation is


MAI = PD/ETP (7)


A MAI value of 1.00 means that dependable precipitation equals
potential evapotranspiration.
Additional details on methodology, definitions, uses and
equations are presented by Hargreaves (2) in a special water re-
quirements manual.


AVAILABLE ENERGY AND CROP PRODUCTION
Within the range of normal growing conditions, potential crop
production increases with increasing availability of ambient
energy. Radiation, for example, is more effective in stimulating
photosynthesis and crop growth at warmer air temperatures. How-
ever, crops are damaged by air and leaf temperatures that are too
high or too low. Various crops have different ranges of optimal
growing temperatures. Most crops are, however, retarded in growth
in some degree if mean monthly temperatures fall below 100C or
500F. For this reason the growing season as used herein includes

only those months having mean monthly temperatures of 100C or
above.








Within a range of climatic conditions including optimal con-
ditions and extending somewhat beyond optimal, potential crop
growth, yield of grain, and dry matter production tend to be
linearly related to available energy, i.e. to temperature in de-
grees Fahrenheit times incident solar radiation. Various crops
have differing optimum mean monthly temperature ranges for growth
and production. Spinach, for example, grows best in the range of
10 to 160C. Corn is a higher temperature crop and has an optimum
growing range of 30 to 35C. Additional information on crop suit-
ability for temperature ranges and radiation is presented in
Appendix I, Crop Physiological Response Characteristics.
Although optimum plant growth ranges are usually given only
for temperature as a determinant variable, temperatures and inci-
dent solar radiation frequently both increase at the same time.
However, the correlation between temperature and radiation is not
very reliable. Since various experiments have demonstrated yields
to be a function of potential evapotranspiration, it is proposed
here that potential yields, within a range of favorable conditions
be directly related to ETP computed from temperature in degrees
Fahrenheit times incident solar radiation.


WATER AVAILABILITY AND CROP PRODUCTION
Crops have critical periods during which soil water stress
produces much greater reduction in yields than is the case for
other growth periods. The critical periods are usually during the
flowering and fruit setting stages or the flowering and seed
development periods.
Very little data are available showing the relationship
between yield and moisture adequacy at seasonal water availability
levels below one-third the potential crop water requirements. For
most crops, one-third adequacy is close to a level below which
production is no longer economical. For the range from zero









adequacy to one-third adequacy, the moisture availability yield
function has not been well defined.
Yield relationships to water availability can be examined if Y
is used to express a ratio of actual yield to maximum yield at full
moisture adequacy under the prevailing fertility, climatic and
cultural conditions and X is the ratio of actual moisture available
during the crop season to the potential amount for which the yield
is a maximum. Y can then be expressed as a function of X. This
procedure permits yields in differing units to be analyzed on the
same graph.
If moisture stress is not concentrated in a critical crop
development period and moisture adequacy is maintained above about
one-third (X > 0.33) in any period then many crops demonstrate
similar production functions. Based on data from several crops
grown in various countries the following equation can be written:

Y = 0.8X + 1.3X2 1.X3 (8)


The incremental change in relative yield with change in rela-
tive water availability is given by the first derivative. The
equation can be written

dY/dX = 0.8 + 2.6X 3.3X2 (9)


For the range X = 0.086 to X = 0.701, the value of dY/dX is 1.0 or
greater with a maximum of 1.31 at X = 0.394. Above about 70 per-
cent adequacy of water, dY/dX is less than 1.00 declining to zero
as expected at full water adequacy. The greatest response of yield
to water occurs at X = 0.394. (Due to some approximation in the
equations, dY/dX is 0.1 for X = 1.0.)
Equation 8 is useful for comparing potential yield at one
location with yields possible at another location with a different
climate. It also provides a means for rapidly estimating possible
increases in yield that might result from increased availability of
an adequate water supply from irrigation development.








In the range where X is greater than 0.33 but less than 0.80
the production or yield function can be closely approximated by a
straight line equation. Within these limits, the relationship can
be approximated by the equation

Y = 1.15X (10)


This simple relationship makes rapid field evaluation of rainfed or
irrigated development potential easier.
Soils vary in their capacity to store and carry over readily
available moisture in the crop root zone. The amount of moisture
available to the crop from soil moisture storage depends upon the
crop rooting characteristics under prevailing conditions and the
capacity of the soil to store and make water available within that
depth.
For some soil and crop combinations moisture should be re-
placed in the root zone at short time intervals (5 days or less).
For other conditions replacement of soil moisture at two to three
week intervals is adequate.
Monthly probabilities of precipitation occurrence do not
always define the adequacy of distribution within the month. In
order to determine the precipitation requirements for shorter time
periods, daily rainfall data from several locations were used to
calculate 5, 10, and 15 day as well as monthly precipitation prob-
abilities. For a monthly potential evapotranspiration of 150 mm
the following estimated mean precipitation requirements were indi-
cated as providing a 75 percent probability of meeting the
potential evapotranspiration requirements.
Mean rainfall required in the
Time period during which soil time period to meet requirements
moisture storage is adequate at a 75 percent probability of
for plant requirements occurrence
one month 190 mm
15 days 120 mm
10 days 80 mm
5 days 50 mm








The daily data analyzed were from areas having fairly normal
rainfall distributions. For arid climates with more skew in the
distribution, mean precipitation for these time periods would need
to be correspondingly greater in order to meet the water require-
ments of crops and plants.
Although the limitations described above are of significant
importance, the moisture availability index, MAI, correlates rea-
sonably well with potential production under conditions of rainfed
agriculture. In most cases, correlations between MAI and average
production over a period of years are quite good.


CLIMATIC CLASSIFICATION OF AREAS FOR AGRICULTURAL PRODUCTION
Current climatic classifications are not fully adequate for
agricultural technology transfer. Most classifications are based
primarily on temperature and precipitation. Crop production tech-
nology transfer, to be successful, should also consider radiation,
sunshine hours and relative humidity.
The climate classification used in this study for technology
transfer of agricultural practices for crops is general and will at
times require a more refined breakdown for specific crops than that
proposed here. The following climatic types are proposed.



Climatic Type Criteria
Polar All months below 10 degrees Celsius
Boreal 1 to 3 months above 10 degrees Celsius
Subtemperate 4 to 5 months above 10 degrees Celsius
Temperate 6 to 9 months above 10 degrees Celsius
Subtropical 10 to 12 months above 10 degrees Celsius
Tropical All months of 17 degrees Celsius or above

In addition to the six temperature based climatic types given
above, seven additional classifications are suggested, relating to
adequacy or excess of precipitation for agricultural production.
These classifications are as follows:

8










Criteria
All months with MAI
in the range of
0.00 to 0.33

One or two months
with MAI of 0.34
or above
Three or four
months with MAI of
0.34 or above


Five or more
consecutive months
with MAI of 0.34
or above

One or two months
with MAI above
1.33

Three to five
months with MAI
above 1.33
Six or more months
with MAI above
1.33


'iap
Symbol
IL


Productivity
Classification
Not suited for rain-
fed agriculture


Climate
Classification
Very arid



Arid



Semi-arid




'Jet-dry




Somewhat wet



Moderately wet



Very wet


All climates are easily typed using the above criteria.
However, not all can be adequately described by the seven classi-

fications related to potential 'productivity given above. The
principal reason for assigning the types and classifications is to

facilitate identification of similar growing conditions so as to
make planning and technology transfer easier. It would be diffi-

cult to develop enough categories to precisely define all con-
ditions. It is therefore proposed that the types and classi-

fications presented above be used only as a rough guide or as an
outline for further study and that the detailed climatic and index

data for each station be used in the process of technology transfer

and for purposes of development planning.


o Limited suitability
for rainfed
agriculture

O Production possible
for crops requiring a
3 to 4 month growing
season
X Production possible
for crops requiring
a good supply of water
during 5 or more months
* Natural or artificial
drainage required for
good production

* Good drainage required
for normal agricultural
production
A Very good drainage
required for normal
agricultural production










EXTENSION OF DATA

For some important countries climatic data are not available

in the WMO publication. In some cases the data are available but
are not complete enough to permit the use of the computer program
developed for this study. Special studies can be made in the
future for these areas using data from other sources.
Various additional published and unpublished sources of cli-
matic data are available for extending the coverage published
herein. Precipitation probability analyses require fairly long
periods of record and use of monthly data from the individual
years. This analysis process can be made easier by use of the
tables in this paper. For climatically similar areas, the 75
percent probability of precipitation occurrence, PD, is related to
mean monthly rainfall. PD can be graphed as a function of mean
monthly precipitation, PM, or can be estimated by regression
analyses. The relationship is normally linear and has the form


PD = A + B x PM (11)


For most climates A will vary from -10 mm to -20 mm and B from
0.70 to 0.80. For precipitation distribution patterns with except-
ional skew, the slope of the line of equation 11 (the B value) can
be expected to be significantly flatter. Values of PD of less than
about 25 to 30 percent of the estimated value of ETP should not be
used in the graphical or regression analyses for the purpose of
determining the appropriate values of A and B.
Wernstedt (4) gives long term mean monthly precipitation data
and mean temperatures for world wide coverage. With use of long
term monthly precipitation means, equations (Eq. 11) derived from
the 30 year records can be expected to provide the 75 percent
probability of occurrence with as good or better accuracy than
probabilities calculated directly from significantly shorter re-
cords.







World wide potential evapotranspiration can be estimated from
the temperature data provided by Wernstedt (4) and from radiation
provided by Loff, Duffie, and Smith (3) or from radiation estimated
from relative humidity by using equations 3 and 5. The KS values
for use in equation 5 can be calculated from data in the above
tables by selecting similar climates. Equation 5 produces satis-
factory results for most interior or continental types of climate.
In coastal areas, values of KS can be quite variable.
Temperature measurements are not available at all locations
where precipitation records are available. Data are, however, gen-
erally adequate to provide a reasonably good indication of the
change in temperature with elevation for each latitude. These
relationships then can be used to estimate missing temperature
data.
By using climatic data from various in-country sources com-
bined with the above referenced climatic atlases, it is possible to
make a fairly complete evaluation of climatic conditions in most
countries. Such analyses are of particular value in estimating
excesses and deficits of water for agricultural production.
One example of possible use of the MAI is related to pre-
diction of drainage needs. For climates with one or two or more
months with MAI above 1.33, surface drainage has generally been
found to produce large benefits on slopes up to 2 percent and
irregular slopes up to 3 percent. Subsurface drainage may be
required if MAI is above 1.1 for a period of some months.
Once complete, country wide or area wide studies will have
numerous uses in planning agricultural programs for irrigation, for
drainage, and for most aspects of agricultural technology transfer.


TABULAR PRESENTATION
For those locations where appropriate data are presented by
the WMO publication, (5) tables were prepared presenting the
following information:









Heading
PM
PMI
P79
P60
PMX
TMC
HM
HMC
S
SC
PD


ETP
ETDF
MAI


Description
Mean monthly precipitation in mm
Minimum monthly recorded precipitation (30 years)
The 79 percent probability of precipitation occurrence
The 60 percent probability of precipitation occurrence
Maximum monthly recorded precipitation
Mean monthly temperature in degrees Celsius
Mean monthly percent relative humidity
Percent relative humidity calculated from sunshine (Eq
Percentage of possible sunshine
Percentage of sunshine calculated from HM (Eq. 5)
Dependable precipitation the 75 percent probability
precipitation occurrence
Potential evapotranspiration (Eq. 6)
Potential evapotranspiration deficit (ETP PD)
Moisture availability index (PD/ETP) (Eq. 7)


. 5)


of


For each location the station name, elevation in meters,
latitude, longitude and the annual average KS value are printed at
the top of the table.
The relationships presented have been tested using world wide

data. Equation 3 was evaluated at 68 world wide locations having 5
or more years of measured radiation data. Equation 6 appears to
provide a better fit of world wide lysimeter data than other
commonly used evapotranspiration formulas including the 18 methods
evaluated by the Technical Committee on Irrigation Water Require-
ments of the Irrigation and Drainage Division, American Society of
Civil Engineers (1).
Potential evapotranspiration computed by Equation 6 does not

account for the norm of reduction in evapotranspiration due to
plant maturity, to winter kill or frost damage or for the lower
potential ET that occurs at extremely high temperatures. For the








lower range of monthly temperatures, below 10C, there is also a
reduction in accuracy. An arbitrary lower limit of 3C for use of
Equation 6 was selected and ETP was arbitrarily assigned a value of
zero for mean temperatures below 30C. This, however, is somewhat
misleading since significant evaporation and some transpiration can
take place even though mean monthly temperatures are below 0C.
For this reason total annual potential evapotranspiration is not
shown for those locations having mean monthly temperatures below
30C.


ACKNOWLEDGMENTS
The work presented herein was financed in part by the Agency
for International Development through its contract AID/ta-c-1103
with Utah State University. The data processing and computer pro-
gramming were performed by Pi-Chien Chi and Karl Hancock, Research
Assistants. The views presented herein are those of the author and
do not necessarily represent those of the Agency for International
Development or of Utah State University.











EL- 3 LAT: 40 23 N LONG= 19 29 E KS= 9.4


JAN FE9 MAR APR MAY JUN JUL AUG SEP OCT NOV OEC ANN

PM 148. 102. 73. 60. 49. 29. 9. 25. 65. 133. 167. 170. 1023.
PMI 13. 13. 0. 16. 2. 0. 0. 0. 0. 25. 32. 14. 660.
P79 83. 32. 39. 30. 13. 5. 0. 0. 22. 77. 96. 88. 808.
P60 117. 81. 67. 48. 33. 12. 3. 10. 46. 110. 142. 120. 922.
PMX 302. 261. 239. 139. 144. 115. 36. 112. 204. 369. 296. 496. 1792.
TMC 9.2 10.2 11.3 14.9 18.7 22.4 24.7 24.6 22.0 18.4 14.6 11.0 16.9

HM 68. 68. 67. 69. 70. 63. 62. 63. 67. 70. 71. 67. 67.
SC 53. 53. 54. 52. 51. 57. 58. 57. 54. 51. 51. 54. 54.
PD 90. 42. 44. 34. 22. 6. 1. 2. 27. 84. 105. 95. 832.
ETP 38. 47. 76. 1U2. 135. 161. 173. 154. 111. 76. 47. 37. 1158.
ETOF -52. 5. 32. 68. 113. 154. 173. 152. 84. -8. -53. -58. 605.
MAI 2.38 .89 .58 .33 .16 .04 .00 .01 .24 1.10 2.24 2.56 .72


ALGER/DAR-EL-BEIDA ALGERIA EL: 25 LAT= 36 43 N LONG= 3 15 E KS=13.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 116. 76. 57. 65. 36. 14. 2. 4. 27. 84. 93. 117. 691.
PMI 6. 3. 11. 6. 0. 0. 0. 0. 0. 7. 13. 30.
P79 47. 29. 19. 20. 11. 3. 0. 0. 4. 31. 35. 53.
P6O 90. 62. 46. 41. 20. 5. 0. 0. 9. 39. 69. 83.
PMX 245. 192. 1 39. 193. 104. 78. 21. 76. 73. 350. 284. 281.
TMC 10.3 10.8 13.U 15.2 18.0 21.8 24.4 25.1 23.1 18.3 14.9 11.7 17.3

HM 82. 80. 77. 77. 75. 74. 73. 71. 75. 80. 80. 81. 77.
SC 58. 61. 66. 66. 68. 70. 71. 74. 68. 61. 61. 60. 65.
PD 56. 36. 25. 24. 13. 3. 0. 0. 5. 33. 42. 53.
ETP 48. 57. 93. 118. 153. 17C. 191. 181. 135. 92. 60. 47. 1349.
ETDF -8. 21. 68. 94. 141. 171. 191. 181. 130. 59. 18. -12. 1052.
MAI 1.18 .63 .27 .21 .08 .02 .00 .00 .04 .36 .71 1.27


SHKODER ALBANIA EL= 43 LAT- 42 6 N LONG= 19 32 E KS: 9.4

JAN FEB MAR APR MAY JUN JUL AUC SEP OCT NOV DEC ANN

PM 216. 173. 149. 101. 114. 58. 30. 44. 12i. 262. 241. 227. 1741.
PMI 42. 4. 0. 13. 6. 1. 0. 0. 0. 21. GLi. 15. 1140.
P73 115. 96. 82. 51. 41. 18. 5. 6. 35. 144. 121. 127. 1430.
P60 183. 125. 107. 90. 80. 26. 13. 24. 108. 214. 19'. 193. 1724.
PMX 527. 414. 511. 379. '08. 154. 105. 150. 344. 541. 537. 421. 2719.
TMC 5.3 7.1 10.1 14.7 19.1 23.2 26.4 26.0 22.2 16.5 11.6 7.4 15.8

HM 73. 73. 64. 64. 65. 59. 54. 54. 61. 66. 73. 73. 55.
4;C 1. 49. 56. 56. 56. 60. 64. 64. 59. 55. 4'. 49. 55.
PD 129. 102. 87. 59. 49. 20. 7. 10. 50. 159. 138. 141. 1492.
ETP 29. 39. 71. 104. 141. 168 189. 1E7. 114. 71. 3". 28. 1161.
ETOF -100. -64. -16. 44. 92. 149. 182. 157. 64. -87. -99. -112. 209.
MAI '1.48 2.67 1.23 .57 .35 .12 .04 .06 .44 2.23 3.52 4.95 1.29


TIRANA ALBANIA EL- 89 LAT= 41 20 N LONG= 19 47 E KS= 9.4

JAN FEB 4AR APR MAY JUN JUL AUG SEP OCT NOV OEC ANN

PM 132. 120. 100. 87. 99. 60. 29. 31. 73. 157. 152. 142. 1189.
PHI 18. 2. 4. 15. 5. O. 0. 0. V. 23. 8. 3. 824.
P79 76. 49. 49. 47. 42. 11. 5. 12. 26. 95. 78. 70. 941.
P60 116. 77. 75. 65. 64. 33. 15. 21. ,2. 119. 127. 99. 11i2.
PMX 786. 369. 306. 195. 279. 186. 90. 197. 235. 487. 319. 333. 1770.
TMC (.3 9.3 10.6 14.1 18.4 22.4 25.C 24.9 21.8 17.4 12.9 9.2 16.0

HM 70. 70. 68. bS. 69. 62. 58. 58. 64. 70. 74. 70. 67.
SC 51. 51. 53. 54. 52. 58. 61. El. 56. 51. 48. 51. 54.
PO 84. 55. 54. 51. 47. 16. 7. 14. 31. 100. 68. 76. 992.
ETP 33. 42. 71. 101. 135. 152. 179. 160. 112. 72. 42. 33. 1142.
EiD' -51. -13. 17. 50. 83. 146. 172. 16 80. -23. -46. -44. 518.
MAI 2.53 1.30 .77 .50 .35 .10 .04 .{0R .2S 1.38 2.10 2.34 .37


VLORE ALBANIA












EL- 306 LAT= 31 38 N LONG: 2 15 W KSIO.Z


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC ANN

PM 7. 9. 13. 8. 3. 2. 0. 4. 7. 14. 13. 10. 30.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P60 0. 1. 1. 2. 1. 0. 0. 0. 3. 6. 3. 5.
PMX 40. 65. 116. 52. 16. 14. 4. 35. 33. 53. 65. 54.
TMC 9.2 11.9 16.0 19.9 24.4 29.9 34.0 33.0 28.2 21.4 14.9 9.9 21.1

HM 54. 44. 37. 33. 29. 23. 17. 21. 29. 40. 49. 56. 36.
SC 69. 76. 81. 83. 86. 90. 93. 91. 86. 79. 73. 68. 81.
PD 0. 0. 0. 0. 0. 0. 0. 0. 1. 1. 1. 1.
ETP 59. 75. 121. 158. 205. 238. 269. 243. 180. 123. 76. 56. 1803.
ETOF 59. 75. 121. 158. 204. 238. 263. 243. 180. 122. 75. 55. 1793.
MAI .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .02


BISKRA ALGERIA EL= 81 LAT= 34 48 N LONG= 5 44 E KS=10.7

JAN FEB MAR APR 'AY JUN JUL AUG SEP OCT NOV DEC ANN

PM 13. 11. 19. 15. 9. 4. 1. 6. 17. 13. 13. 16. 143.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 1. 1. 0. 0. 0. 0. U. 0. 3. 0. 0.
P60 5. 3. 3. 4. 3. 0. 0. 0. 2. 6. 5. 7.
PMX 79. 92. 82. 50. 59. 43. 10. 46. 124. 66. 90. 54.
TMC 11.0 13.0 16.2 20.6 25.2 30.8 33.7 33.1 28.9 22.2 16.3 12.2 21.9

HM 60. 52. 4G. 42. 40. 33. 30. 33. 41. 53. 59. 63. 46.
SC 68. 74. 79. 81. 83. 88. 90. 88. 82. 73. 69. 65. 78.
PD 1. 1. 1. 1. 1. 0. 0. D. 0. 4. 1. 1.
ETP 56. 71. 115. 156. 205. 241. 263. 237. 173. 114. 70. 53. 1757.
ETDF 55. 70, 114. 155. 204. 241. 263. 237. 173. 110. 69. 52. 1745.
MAI .02 .02 .01 .01 .00 .00 .00 .00 .00 .03 .01 .03


LAGHOUAT ALGERIA EL- 767 LAT= 33 46 N LONG 2 56 E KS=10.3

JAN FEB MAR APR -AY JUN JUL AuG SEP OCT NOV DEC ANN

PM 12. 11. 15. 16. 14. 11. 5. q. 24. 22. 12. 19. 169.
PHI 0. O. o. 0. 0. 0. 0. 0. 0. j. o. 0.
P79 0. 0. O. 0. 2. 2. 0. 0. 3. 5. 3. 1.
P6G 4. 2. 6. G. 8. 6. 0. 4. 6. 9. 4. 6.
PMX 76. 58. 89. 84. 65. 34. 26. 22. 77. 113. 51. 94.
TMC 7.5 9.3 12.7 16.3 20.8 26.5 30.1 29.2 24.4 18.0 12.1 8.1 17.9

HM 65. 57. 53- 48. 44. 38. 34. 34. 46. 57. b3. 67. 50.
SC 64. 71. 75. 79. 52. b6. 89. 89. 80. 71. 66. 63. 76.
PD 1. 0. 1. 1. 3. '. P. 1. 4. 6. 3. Z.
ETP 50. 63. 102. 137. 182. 217. 243, 220. 156. 102. 62. 47. 1979.
ETDF 43. 63. 101. 135. 178. 214. 243. 219. 152. 96. 59. 45. 1554.
MAI .02 .01 .01 .01 .02 .01 .00 .00 .02 .06 .05 .04


ORAN/ES SENIA ALGERIA EL7 99 LAT 35 38 N LONG= 0 37 W KS=13.7

JAN FEB MAR APR "A4 JUN JUL AUG SEP OCT NOV DEC ANN

PM 70. 54. 35. 33. 19. 7. 1. 3. 16. 43. 46. 67. 394.
PMI 0. 0. 2. 1. 0. 0. 0. 0. 0. 0. 0. 2.
P79 30. 16. 8. 10. 6. O. 0. 0. 1. 10. 19. 27.
P6O 50. 32. 17. 16. 10. 1. 0. 0. 5. 23. 31. 49.
PMX 153. 175. 124. 11U. 81. 32. 8. 21. 67. 158. 125. 199.
TMC 10.2 11.0 13.2 15.4 18.3 21.8 24.5 25.1 22.3 18.4 14.2 11.1 17.2

HM 32. 80. 78. 76. 72. 72. 74. 72. 75. 73. 81. 82. 77.
SC 58. ii. 64. G7. 72. 72. 70. 72. 63. :'. 60. 58. 56.
PO 34. 11. 10. 11- 7. 0. 0. r. 2. '3. 22. 32.
ETP 49. 1s. 3. 121. 153. 178. 190. 1 80. 136. 9. SO. 47. 1E.
ETOF 15. 40. 84. 110. 153. 177. 190. 180. 134. 92, 38. 16. 1218.
,'AI .69 .33 .11 .01 .04 .O( .0o .00 .01 ,13 .36 .67


15


BECHAR ALGERTA












EL= 816 LAT= 35 26 N LONG: 8 8 E KS=11.0


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 26. 23. 31. 46. 38. 24. 5. 18. 33. 38. 34. 32. 348.
PMI 0. 2. 0. 0. 3. 0. 0. 0. 0. 0. 1. 2.
P79 9. 8. 11. 16. 10. 7. 0. 0. 9. 13. 9. 13.
P6U 15. 15. 21. 34. 21. 17. 1. 9. 17. 27. 20. 27.
PMX 82. 108. 88. 99. 137. 53. 22. 121. 91. 108. 121. 71.
TMC 6.1 7.5 10.5 13.7 17.7 23.1 26.4 Z5.9 22.0 16.3 11.1 7.2 15.6

HM 73. 66. 61. 61. 57. 51. 48. 50. 60. 68. 71. 73. 62.
SC 57. 64. 69. 69. 72. 77. 79. 78. 70. 62. 59. 57. 68.
PD 10. 9. 13. 20. 12. 9. 0. 2. 11. 16. 11. 16.
ETP 42. 53. 88. 116. 156. 189. 211. 190. 134. 88. 54. 41. 1364.
ETOF 32. 44. 75. 97. 144. 180. 211. 188. 124. 72. 43. 25. 1234.
MAI .25 .18 .1 .17 .08 .05 .00 .01 .08 .18 .21 .39


LUANDA ANGOLA EL= 70 LAT= 8 51 S LONG= 13 14 E KS=12.4

JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 26. 35. 97. 124. 19. 0. 0. 1. 2. 6. 34. 23. 367.
PMI 0. 0. 0. 15. 0. 0. 0. 0. o. 0. 0. 0. 62.
P79 1. 3. 3. 58. 0. 0. 0. 0. 1. 2. 5. 3. 189.
P60 4. 12. 55. 88. 5. 0. 0. 0. 1. 4. 20. 8. 276.
PMX 163. 152. 299. 404. 100. 5. 1. 5. 8. 25. 159. 135. 713.
TMC 25.9 26.6 26.9 26.4 25.0 22.2 20.2 20.3 21.8 24.0 25.2 25.6 24.2

HM 80. 79. 80. 84. 83. 82. 83. 85. 84. 82. 81. 81. 82.
S 56. 61. 57. 55. 63. 63. 47. 40. 41. 44. 52. 54. 53.
PD 2. 5. 19. 64. 1. 0. 0. 0. 1. 2. 8. 4. 207.
ETP 168. 160. 167. 145. 141. 120. 104. 105. 117. 141. 154. 163. 1685.
ETOF 166. 156. 148. 81. 140. 120. 104. 105. 116. 139. 146. 159. 1579.
MAI .01 .03 .11 .44 .01 .00 .00 .00 .01 .02 .05 .02 .12


AZUL ARGENTINA EL= 132 LAT' 36 45 S LONG= 59 50 W KS=12.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 68. 77. 118. 65. 76. 49. 49. 41. 60. 83. 86. 80. 852.
PMI 7. 13. 34. 13. 0. 0. 7. 1. 2. 2. 2. 10.
P79 27. 37. 70. 30. 20. 13. 21. 9. 21. 37. 44. 33.
P60 58. 65. 104. 40. 58. 20. 31. 18. 49. 53. 59. 74.
PMX 150. 186. 282. 187. 335. 274. 161. 133. 152. 451. 197. 151.
TMC 21.6 20.6 17.6 13.3 10.1 7.5 7.1 8.0 10.3 13.3 16.7 19.7 13.8

HMC 70. 71. 78. 78. 86. 90. 87. 84. 83. 77. 76. 77. 80.
S 69. 68. 59. 59. 47. 40. 45. 50. 52. 61. 61. 61. 56.
PD 34. 43. 77. 32. 28. 14. 23. 11. 27. 40. 47. 42.
ETP 185. 145. 113. 72. 44. 30. 34. 50. 72. 114. 143. 169. 1172.
ETDF 151. 102. 36. 40. 16. 15. 11. 39. 45. 74. 96. 128. 754.
MAI .18 .30 .68 .45 .64 .49 .67 .22 .37 .35 .33 .25


BARILOCHF ARGFNTINA EL= 836 LAT= 41 6 5 LONG: 71 10 W KS= 7.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 33. 27. 47. 65. 160. 165. 161. 121. 67. 41. 34. 33. 954.
PMI 0. 1. 2. 6. 28. 4. 34. 30. 15. 0. 0. 1.
P79 9. 9. 11. 29. 93. 61. 111. 56. 22. 11. 10. 2.
P60 21. 12. 18. 43. 117. 132. 15U. 82. 59. 24. 16. 14.
PMX 113. 138. 170. 247, 451. 367. 271. 316. 201. 156. 156. 130.
TMC 14.4 14.0 11.6 8.5 5.7 3.6 2.8 3.2 5.0 7.7 10.6 12.9 8.3

HMC 8. 18. 29. 48. 74. 78. 73. 65. 57. 40. 23. 19. 44.
S 75. 71. 66. 56. 39. 37. 41. 46. 51. 60. 68. 70. 57.
PD 12. 10. 12. 32. 98. 76. 119. 61. 30. 14. 11. 5.
ETP 156. 119. 94. 54. 29. 20. 0. 34. 54. 90. 123. 149.
ETDF 144. 110. 81. 22. -69. -56. -119. -27. 24. 76. 112. 144. 442.
MAI .07 .08 .13 .59 3.38 3.80 1.79 .55 .15 .09 .03


TEBESSA ALGEPIA











EL= 25 LAT= 34 35 S LONG= 5B 29 W KS=12.6


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 104. 82. 122. 90. 79. 68. 61. 68. 80. 100. 90. 83. 1027.
PMI 13. 1. 15. 11. 3. 1. 4. 1. 3. 4. 18. 6.
P79 39. 43. 59. 34. 31. 25. 19. 22. 33. 49. 40. 44.
P60 70. 58. 96. 64. 55. 39. 30. 42. 58. 73. 59. 60.
PMX 348. 249. 274. 405. 219. 174. 212. 189. 260. 291. 284. 274.
TMC 23.7 23.0 20.7 16.6 13.7 11.1 10.6 11.5 13.6 16.5 19.5 22.1 16.9

HMC 71. 71. 76. 77. 81. 87. 85. 81. 81. 78. 73. 74. 78.
S 67. 68. 61. 61. 55. 45. 48. 54. 55. 59. 65. 64. 58.
PD 46. 46. 67. 40. 36. 28. 21. 26. 38. 54. 44. 47.
ETP 193. 155. 128. 85. 57. 39. 44. 62. 86. 126. 160. 185. 1322.
ETDF 147. 109. 62. 44. 21. 11. 23. 36. 48. 72. 116. 138. 828.
MAI .24 .30 .52 .48 .63 .71 .48 .42 .44 .43 .27 .26


CERES ARGENTINA EL= 88 LAT: 29 53 S LONG= 61 57 W KS=1n.5

JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 113. 101. 124. 58. 37. 27. 22. 20. 36. 84. 103. 110. 835.
PMI 34. 25. 32. 3. 1. 0. 0. 0. 0. 24. 16. 17.
P79 74. 65. 59. 24. 8. 3. 0. 2. 5. 40. 53. 56.
P60 102. 84. 90. 44. 20. 13. 4. 6. 19. 52. 81. 105.
PMX 303. 256. 304. 156. 132. 94. 108. 57. 147. 305. 277. 228.
TMC 25.8 24.8 22.3 18.1 15.6 12.9 12.1 13.6 16.0 19.1 22.0 24.6 18.9

HM 60. 65. 71. 73. 75. 77. 71. 64. 62. 64. 61. 60. 67.
S 63. 67. 60. 61. 56. 45. 59. 60. 57. 62. 68. 64. 60.
PD 80. 69. 66. 28. 11. 5. 1. 3. 8. 43. 59. 66.
ETP 196. 164. 139. 96. 70. 49. 59. 78. 101. 143. 175. 195. 1464.
ETDF 116. 95. 73. 68. 59. 44. 58. 75. 93. 101. 116. 128. 1027.
MAI .41 .42 .47 .29 .15 .10 .01 .04 .08 .30 .34 .34
----------------------------------------------------------- --------------- -- --

COMODORO RIVADAVIA ARGENTINA EL= 61 LAT- 45 47 5 LONG- 67 30 W KS= 7.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 16. 11. 21. 22. 35. 20. 21. 18. 15. 10. 16. 13. 218.
PMI 0. 0. 1. 0. 0. 0. 1. 0. 0. 0. 0. 0.
P79 4. 1. 2. 4. 7. 0. 4. 3. 2. 1. 3. 4.
P60 9. 5. 9. 9. 17. 0. 7. 5. 6. 5. 7. 5.
PMX 78. 29. 141. 77. 138. 0. 87. 95. 56. 56. 79. 62.
TMC 18.6 18.2 16.0 12.7 9.4 7.0 6.9 7.6 9.6 12.8 15.4 17.3 12.6

HM 44. 46. 48. 53. 58. 62. 59. 56. 52. 46. 45. 44. 51.
S 56. 56. 46. 46. 39. 40. 41. 44. 43. 50. 54. 51. 47.
PD 5. 2. 3. 5. 9. 0. 5. 3. 3. 2. 4. 4.
ETP 152. 117. 85. 50. 27. 19. 22. 35. 55. 95. 127. 146. 929.
ETDF 147. 115. 81. 45. 18. 19. 18. 31. 52. 93. 123. 142. 884.
MAI .03 .02 .04 .10 .33 .00 .21 .10 .05 .02 .03 .03
- -- -- ------------------------------------------------------------ -- --- -- -- -----

CORDOBA ARGENTINA EL= 474 LAT- 31 14 S LONGr 64 13 W KS=10.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 95. 84. 93. 47. 24. 11. 9. 13. 27. 73. 93. 115. 684.
PMI 29. 15. 25. 3. 0. 0. 0. 0. 0. 2. 17. 6.
P79 48. 44. 58. 16. 4. 1. 0. 0. 3. 26. 47. 45.
P60 81. 69. 86. 24. 14. 4. 0. 3. 16. 54. 79. 77.
PMX 224. 253. 176. 124. 107. 46. 76. 111. 120. 232. 172. 271.
TMC 24.4 23.2 20.7 16.8 13.9 11.1 10.7 12.5 15.1 17.9 20.8 23.0 17.5

HMC 61. 61. 69. 67. 73. 76. 67. 64. 69. 67. 62. 64. 67.
5 65. 65. 58. 61. 54. 51. 60. 63. 58. 60. 65. 63. 60.
PD 55. 49. 64. 18. 6. 2. 0. 1. 6. 32. 54. 52.
ETP 193. 155. 130. 91. 63. 47. 55. 75. 98. 135. 166. 186. 1392.
ETDF 138. 106. 66. 73. 57. 45. 55. 74. 92. 104. 112. 135. 1055.
MAI .29 .32 .49 .20 .10 .03 .00 .01 .06 .24 .32 .28
----------------------------------------------------------------------------


BUENOS AIRES ARGENTINA











EL- 62 LAT- 27 27 S LONG= 58 46 N KS=10.5


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 149. 127. 151. 135. 86. 60. 47. 42. 74. 139. 139. 119. 1268.
PMI 7. 39. 2. 20. 13. 5. 0. 0. 10. 18. 9. 7.
P79 53. 58. 89. 61. 40. 17. 8. 9. 37. 65. 42. 43.
P60 92. 82. 125. 103. 61. 42. 24. 20. 56. 86. 91. 82.
PMX 430. 248. 402. 252. 319. 160. 170. 152. 179. 350. 419. 290.
TMC 27.6 26.7 24.9 20.9 18.6 16.4 15.7 17.4 19.2 21.5 24.C 26.5 21.6

HMC 59. 6O. 64. 66. 68. 79. 70. 64. 72. 68. 58. 57. 65.
5 67. 66. 63. 61. 60. 48. 57. 63. 55. 60. 68. 69. 62.
PD 61. 63. 97. 70. 44. 22. 11. 11. 41. 69. 52. 51.
ETP 210. 172. 155. 109. 84. 60. 70. 94. 112. 151. 184. 211. 1612.
ETDF 148. 109. 58. 39. 39. 38. 59. 83. 71. 82. 132. 160. 1013.
MAI .29 .37 .62 .64 .53 .37 .16 .12 .37 .46 .28 .24


FORMOSA ARGENTINA EL= 60 LAT= 26 11 S LONG= 58 13 W KS=10.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 124. 136. 157. 137. 117. 77. 48. 48. 82. 143. 138. 119. 1326.
PMI 34. 44. 16. 18. 26. 2. 0. 0. 2. 6. 20. 23.
P79 60. 73. 66. 65. 67. 23. 14. 11. 40. 76. 45. 58.
P60 99. 121. 118. 113. 101. 47. 35. 25. 66. 117. 106. 88.
PMX 287. 271. 470. 380. 285. 228. 143. 139. 197. 382. 352. 339.
TMC 27.6 26.9 24.9 21.4 18.8 17.4 16.8 16.5 19.9 22.2 24.4 26.8 22.1

HMC 63. 65. 72. 70. 74. 80. 70. 71. 76. 75. 56. 57. 69.
S 64. 63. 56. 57. 54. 47. 58. 57. 51. 53. 69. 69. 58.
PD 68. 87. 77. 75. 74. 28. 18. 14. 45. 85. 58. 64.
ETP 204. 168. 147. 109. 82. 64. 75. 89. 111. 146. 187. 211. 1593.
ETDF 136. 81. 70. 34. 8. 36. 57. 75. 66. 61. 130. 147. 899.
MAI .33 .52 .52 .69 .90 .U4 .24 .16 .41 .58 .31 .30


GUALEGUAYCHU ARGENTINA EL= 26 LAT- 33 1 S LONG= 58 21 W KS=12.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 112. 72. 144. 98. 67. 71. 53. 70. 75. 95. 89. 70. 1016.
PMI 6. 0. 22. 2. 3. 0. 0. 1. 0. 6. 10. 5.
P79 53. 30. 72. 36. 22. 19. 12. 21. 31. 49. 44. 24.
P60 81. 49. 105. 64. 51. 36. 39. 33. 55. 70. 55. 39.
PMX 284. 201. 416. 324. 221. 234. 160. 190. 218. 220. 233. 299.
TMC 25.0 24.0 21.2 17.1 13.8 11.4 10.8 12.0 14.4 17.0 20.4 23.0 17.5

HMC 78. 75. 83. 79. 80. 93. 86. 85. 88. 85. 76. 80. 82.
S 60. 62. 52. 58. 56. 33. 47. 50. 43. 49. 62. 57. 52.
PD 59. 34. 79. 42. 28. 23. 18. 24. 36. 53. 46. 27.
ETP 187. 1E4. 122. 86. 61. 36. 46. 63. 80. 118. 160. 178. 1292.
EODF 128. 120. 43. 45. 33. 13. 25. 39. 44. 65. 114. 151. 823.
MAI .31 .22 .65 .48 .46 .63 .38 .37 .45 .45 .29 .15


LA QUIACA ARGENTINA EL=3459 LATA 22 6 5 LONG= 65 36 W KS=11.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 89. 77. 43. 5. 1. 2. 1. 0. 2. 9. 31. 63. 323.
PMI 27. 20. 3. 0. 0. 0. 0. 0. 0. 0. 1. 17.
P79 61. 44. 20. 0. 0. 0. 0. 0. 0. 0. 17. 38.
P60 76. 68. 31. 1. O. 0. 0. 0. 0. 5. 23. 54.
PMX 229. 157. 94. 20. 13. 28. 11. 6. 16. 28. 94. 129.
TMC 12.4 12.4 12.2 10.3 6.6 3.9 4.0 6.4 9.2 11.1 12.3 12.6 9.4

HM 64. 66. 60. 47. 37. 33. 35. 35. 41. 47. 53. 60. 48.
5 63. 65. 75. 82. 88. 8 87 87. 85. 79. 78. 76. 69. 78.
PD 64. 49. 22. 0. 0. 0. 0. 0. 0. 1. 18. 41.
ETP 131. 114. 121. 98. 76. 58. 63. 81. 102. 128. 137. 139. 1247.
ETDF 67. 65. 99. 97. 76. 58. 63. 81. 102. 127. 118. 98. 1051.
MAI .49 .43 .18 .00 .00 .00 .00 .00 .00 .01 .13 .30


CORRIENTES ARGENTINA











EL= 430 LAT= 29 23 S LONGI 66 49 W KS=10.5


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 60. 56. 57. 16. 6. 3. 3. 3. 6. 24. 31. 51. 316.
PMI 6. 1. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 23. 21. 31. 1. 0. 0. 0. 0. 0. 0. 6. 21.
P60 35. 33. 43. 3. 2. 0. 0. 0. 1. 8. 21. 27.
PMX 189. 179. 147. 126. 32. 15. 32. 21. 56. 98. 90. 164.
TMC 27.4 25.9 23.4 19.0 15.1 11.8 11.3 14.1 17.7 21.0 24.4 26.6 19.8

HMC 60. 64. 67. 64. 66. 68. 58. 54. 57. 61. 58. 59. 61.
S 66. 63. 60. 63. 61. 59. 68. 71. 69. 66. 68. 67. 65.
PD 26. 24. 34. 1. 0. 0. 0. 0. 0. 2. 9. 22.
ETP 208. 164. 144. 101. 73. 55. 63. 87. 117. 155. 186. 210. 1562.
ETOF 182. 140. 110. 100. 73. 55. 63. 87. 117. 154. 177. 187. 1444.
MAI .12 .14 .23 .01 .01 .00 .00 .00 .00 .01 .05 .11


MENDOZA ARGENTINA EL= 827 LAT= 32 53 5 LONG= 68 51 W KS=10.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 28. 21. 21. 10. 11. 8. 7. 10. 14. 23. 20. 23. 196.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 6. 8. 2. 0. 2. 0. 1. 1. 2. 5. 7. 4.
P60 12. 13. 9. 4. 4. 1. 2. 4. 5. 12. 12. 6.
PMX 84. 125. 94. 41. 65. 57. 58. 52. 48. 107. 95. 134.
TMC 23.7 22.5 19.6 14.8 10.9 7.7 7.4 9.7 13.0 16.6 20.0 22.6 15.7

HMC 53. 53. 63. 60. 65. 69. 65. 62. 61. 60. 53. 54. 60.
S 72. 72. 64. 67. 62. 58. 62. 64. 65. 66. 72. 71. 66.
PD 7. 9. 3. 1. 2. 0. 1. 2. 3. 6. 8. 4.
ETP 199. 159. 130. 87. 58. 42. 47. 66. 94. 135. 171. 197. 1385.
ETDF 191. 150. 126. 86. 56. 41. 46. 65. 92. 129. 163. 193. 1337.
MAI .04 .06 .03 .01 .04 .01 .03 .02 .03 -05 .05 .02


PARANA ARGENTINA EL= 62 LA 31 47 S LONG= 60 29 W KS=11.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 136. 101. 154. 94. 52. 46. 31. 37. 55. 101. 108. 101. 1015.
PMI 20. 5. 13. 14. 2. 0. 0. 0. 3. 2. 26. 5.
P79 49. 37. 66. 37. 17. 5. 4. 6. 18. 36. 48. 43.
P60 109. 70. 114. 51. 32. 26. 13. 18. 38. 76. 79. 68.
PMX 289. 320. 317. 228. 163. 125. 115. 135. 164. 231. 308. 364.
TMC 25.2 23.6 21.6 17.4 14.8 12.4 11.8 12.8 15.0 17.7 20.9 23.3 18.0

HMC 69. 63. 70. 70. 74. 84. 77. 71. 75. 70. 64. 70. 71.
5 63. 70. 63. 62. 58. 46. 55. 61. 57. 62. 68. 62. 61.
PD 62. 44. 7r. 40. 20. 9. 6. 9. 22. 44. 55. 48.
ETP 194. 161. 137. 93. 66. 45. 54. 73. 96. 136. 171. 187. 1414.
ETDF 132. 117. 61. 53. 46. 36. 48. 65. 73. 92. 116. 139. 979.
MAI .32 .27 .51 .43 .30 .21 .11 .12 .23 .33 .32 .26
--------------------------------- ------ ------------------- -- ------------ -- -- -----

PILAR ARGENTINA EL= 338 LArT 31 40 S LONG= 63 53 W KS=11.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 164. 81. 89. 43. 25. 11. 11. 14. 31. 83. 101. 107. 700.
PMI 37. 13. 30. 1. 0. 0. 0. 0. 0. 1. 25. 1.
P79 53. 43. 64. 14. 7. 2. 0. 0. 5. 35. 60. 58.
P60 88. 65. 73. 25. 11. 4. 2. 2. 19. 57. 96. 77.
PMX 192. 250. 238. 109. 89. 42. 70. 84. 137. 305. 174. 351.
TMC 23.7 22.6 20.2 16.2 13.3 10.5 9.8 11.4 14.0 17.0 20.1 22.6 16.8

HMC 64. 66. 71. 69. 72. 76. 70. 67. 70. 70. 64. 65. 69.
5 68. 67. 62. 64. 60. 56. 63. 65. 63. 62. 69. 67. 64.
PD 60. 48. 66. 16. 8. 2. 0. 0. 8. 40. 68. 62.
ETP 194. 154. 131. 91. 65. 47. 54. 73. 97. 134. 167. 191. 1397.
ETOF 133. 107. 65. 74. 57. 45. 53. 72. 89. 94. 100. 129. 1019.
MAI .31 .31 .50 .18 .12 .05 .01 .01 .08 .30 .40 .32
------------------------- ---------- ---- ---------- -- ----------- --- -- -- --


LA RIOJA ARGENTINA










PPESIDENCIA ROGUE SAENZ PENA A EL7 92 LAT- 26 49 5 LONG= 60 27 W KS=10.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 136. 125. 133. 97. 49. 35. 23. 23. 44. 101. 113. 111. 987.
PMI 21. 21. 37. 18. 1. 0. 0. 0. 1. 14. 19. 34.
P79 46. 65. 72. 56. 17. 10. 1. 0. 14. 46. 49. 55.
P60 91. 93. 106. E9. 29. 21. 7. 5. 21. 69. 80. 79.
PMX 342. 293. 280. 205. 179. 113. 81. 104. 255. 243. 258. 346.
TMC 27.1 26.1 23.7 19.9 17.7 15.6 15.1 17.0 19.2 22.0 24.1 26.4 21.2

HMC 62. 64. 65. 68. 71. 81. 69. 61. 70. 66. 59. 58. 66.
S 65. 63. 62. 59. 56. 46. 58. 65. 57. 61. 67. 68. 61.
PD 55. 71. 79. 59. 20. 12. 2. 1. 15. 51. 56. 60.
ETP 203. 165. 150. 105. 81. 58. 71. 96. 114. 156. 183. 208. 1590.
ETOF 147. 94. 70. 46. 61. 46. 68. 95. 99. 105. 128. 148. 1108.
MAI .27 .43 .53 .56 .24 .21 .03 .01 .14 .33 .30 .29


SALTA ARGENTINA EL=1182 LATr 24 51 S LONG= 65 29 W KS=11.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 176. 149. 94. 25. 6. 3. 2. 4. 5. 25. 60. 122. 671.
PHI 82. 62. 16. 2. 0. 0. 0. 0. 0. 1. 6. 44.
P79 112. 101. 38. 6. 1. 0. 0. 0. 1. 11. 30. 74.
P60 176. 136. 77. 17. 3. 1. 0. 0. 2. 18. 43. 118.
PMX 256. 272. 197. 80. 33. 19. 17. 35. 21. 78. 182. 251.
TMC 21.4 20.5 19.2 16.1 13.6 11.1 10.6 12.8 15.8 18.5 20.2 21.5 16.8

HMC 82. 86. 89. 87. 82. 83. 74. 68. 77. 81. 82. 82. 81.
S 47. 42. 37. 40. 47. 45. 57. 63. 53. 48. 47. 47. 48.
PD 125. 108. 46. 8. 1. 0. 0. 0. 1. 12. 33. 83.
ETP 150. 117. 103. 80. 68. 53. 63. 85. 102. 126. 138. 152. 1237.
ETDF 25. 8. 57. 71. 66. 53. 63. 85. 101. 113. 106. 69. 818.
MAI .84 .93 .45 .10 .02 .00 .00 .00 .01 .10 .24 .55


SAN ANTONIO OESTE ARGENTINA EL= 7 LAT 40 44 S LONG= 64 57 W KS=10.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 14. 17. 27. 17. 33. 19. 26. 17. 21. 20. 17. 15. 224.
PHI 0. 0. 0. 0. 1. 0. 0. 0. 0. 1. 0. 0.
P79 2. 1. 3. 2. 10. 3. 4. 3. 5. 7. 3. 1.
P60 5. 5. 10. 4. 19. 7. 6. A. 13. 10. 8. 5.
PMX 56. 102. 97. 72. 124. 99. 149. 104. 95. 79. 50. 85.
TMC 22.5 21.8 19.U 15.0 11.1 8.2 8.0 9.1 11.5 15.3 18.8 21.0 15.1

HMC 44. 45. 55. 63. 76. 78. 75. 69. 71. 59. 49. 52. 61.
S 76. 75. 68. 62. 50. 47. 50. 56. 55. 65. 72. 70. 62.
PD 3. 2. 4. 2. 12. 4. 4. 4. 7. 8. 4. 2.
ETP 198. 154. 120. 71. 41. 28. 32. 49. 73. 122. 164. 189. 1242.
ETDF 195. 152. 116. 69. 29. 24. 28. 45. 66. 115. 159. 187. 1186.
MAI .01 .01 .04 .03 .29 .14 .14 .08 .09 .06 .02 .01


SAN LUIS ARGENTINA EL= 713 LAT 33 16 S LONG= 66 21 W KS=11.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 90. 74. 60. 33. 14. 13. 10. 6. 17. 53. 67. 105. 548.
PMI 14. 5. 3. 6. 0. 0. 0. 0. 0. 5. 11. 7.
P79 49. 30. 26. 12. 0. 1. 0. 0. 1. 20. 31. 50.
P60 73. 48. 54. 22. 4. 3. 1. 2. 9. 32. 47. 80.
PMX 175. 235. 171. 76. 115. 59. 144. 23. 49. 141. 195. 279.
TMC 24.0 23.0 20.2 15.8 12.5 9.1 8.8 10.7 14.0 17.1 20.5 23.2 16.6

HM 55. 55. 61. 62. 66. 69. 62. 58. 51. 55. 52. 50. 58.
SC 78. 78. 72. 72. 68. 65. 72. 75. 81. 78. 80. 82. 75.
PD 54. 34. 32. 14. 1. 1. 0. 0. 3. 23. 34. 56.
ETP 209. 167. 140. 92. 64. 46. 52. 73. 108., 149. 183. 215. 1498.
ETDF 155. 134. 108. 78. 63. 44. 52. 73. 106. 126. 149. 159. 1245.
MAI .26 .20 .23 .15 .01 .03 .00 .01 .02 .15 .19 .26











SANTIAGO DEL ESTERO ARGENTINA EL= 199 LAT= 27 46 S LONG= 64 18 W KS=ln.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 90. 93. 91. 27. 14. 10. 3. 3. 8. 39. 60. 79. 517.
PMI 24- 16. 19. 1. 0. 0. 0. 0. 0. 2. 8. 18.
P79 53. 42. 46. 9. 3. 3. 0. 0. 0. 8. 24. 41.
P60 70. 62. 72. 21. 6. 6. 0. 0. 2. 22. 43. 50.
PMX 209. 308. 252. 90. 58. 43. 17. 21. 42. 219. 173. 178.
TMC 27.3 25.8 23.5 19.5 16.4 13.6 12.9 1 5.2 18.6 21.9 24.4 26.7 20.5

HMC 69. 73. 78. 79. 79. 86. 73. 68. 71. 70. 70. 67. 74.
S 60. 56. 50. 51. 49. 41. 56. 61. 58. 59. 59. 62. 55.
PD 57. 46. 51. 12. 4. 4. 0. 0. 0. 11. 28. 43.
ETP 197. 154. 133. 95. 71. 50. 63. 86. 112. 152. 173. 200. 1486.
ETDF 140. 108. 82. 83. 67. 47. 63. 86. 112. 141. 145. 158. 1231.
MAI .29 .30 .39 .12 .05 .07 .00 .00 .00 .07 .16 .21


TRELEW ARGENTINA EL: 39 LAT= 43 14 S LONG= 65 18 W KS=10.1

JAN FEB MAR APR MAY JUN JUL AUG 'SEP OCT NOV DEC ANN

PM 8. 14. 18. 14. 22. 11. 17. 14. 13. 12. 16. 18. 177.
PMI 0. 1. 0. 0. 2. 0. 0. 0. 1. 0. 0. 0.
P79 0. 2. 4. 2. 8. 6. 3. 2. 2. 3. 1. 3.
P60 3. 5. 9. 6. 15. 8. 6. 7. 4. 5. 6. 7.
PMX 38. 96. 106. 51. 69. 25. 71. 67. 62. 55. 107. 97.
TMC 20.6 20.0 17.3 13.3 9.6 6.1 6.1 7.6 10.2 14.0 17.3 19.4 13.4

HM 40. 44. 49. 55. 62. 68. 64. 57. 53. 45. 41. 41. 52.
S 70. 70. 65. 61. 51. 50. 53. 56. 57. 65. 68. 66. 61.
PD 1. 3. 5. 3. 9. 6. 4. 3. 2. 3. 2. 4.
ETP 181. 140. 108. 63. 36. 23. 27. 43. 68. 115. 151. 175. 1130.
ETDF 180. 137. 103. 60. 26. 17. 24. 40. 65. 112. 149. 171. 1085.
MAI .00 .02 .05 .05 .27 .28 .13 .07 .04 .03 .01 .02


SWAN ISLAND AUSTRALIA EL= 11 LAT= 17 24 N LONG= 83 56 W KS=12.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 87. 29. 16. 21. 84. 164. 107. 93. 132. 246. 188. 143. 1311.
PMI 26. 4. 2. 2. 8. 24. 25. 16. 22. 72. 27. 33. 883.
P79 50. 12. 6. 6. 23. 65. 53. 40. 61. 138. 82. 70. 1129.
P60 70. 20. 11. 12. 46. 113. 81'. 64. 94. 197. 137. 108. 1269.
PMX 183. 75. 44. 72. 277. 420. 240. 226. 325. 540. 493. 346. 1794.
TMC 25.7 25.8 26.7 27.5 28.1 27.9 28.1 28.4 28.3 27.6 26.7 25.9 27.2

HM 75. 75. 74. 75. 77. 82. 80. 79. 80. 79. 77. 75. 77.
SC 64. 64. 66. 64. 62. 55. 58. 59. 58. 59. 62. 64. 61.
PD 54. 14. 7. 7. 28. 75. 59. 45. 68. 150. 94. 78. 1158.
ETP 130. 131. 167. 175. 185. 168. 179. 180. 163. 151. 130. 126. 1884.
ETDF 76. 117. 160. 168. 157. 93. 120. 135. 95. 1. 37. 48. 1205.
MAI .42 .10 .04 .04 .15 .45 .33 .25 .42 .99 .72 .62 .61
--------------------------------------------------------- --------

GRAZ-THALERHOF AUSTRIA EL= 342 LAT: 46 59 N LONG: 15 27 E KS= 9.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 31. 35. 34. 52. 93. 126. 114. 91. 80. 79. 57. 48. 840.
PMI 4. 0. 5. 4. 20. 37. 42. 27. 10. 18. 14. 4. 636.
P79 12. 7. 12. 24. 46. 72. 74. 55. 25. 30. 23. 18. 676.
P60 21. 26. 26. 43. 75. 109. 93. 65. 62. 64. 44. 33. 804.
PMX 88. 105. 114. 119. 198. 242. 222. 199. 220. 161. 125. 119. 1250.
TMC -3.8 -1.5 3.4 9.0 13.7 17.1 19.0 18.0 14.3 8.6 3.3 -1.3 8.3

HM 84. 79. 74. 70. 72. 72. 72. 76. 79. 82. 86. 87. 78.
S 28. 38. 42. 44. 46. 50. 55. 55. 51. 40. 26. 23. 42.
PD 14. 11. 15. 28. 52. 80. 78. 57. 33. 37. 27. 21. 703.
ETP 0. 0. 42. 72. 107. 130. 144. 122. 79. 41. 16. 0.
ETOF -14. -11. 27. 44. 55. 50. 66. 65. 46. 4. -11. -21. 299.
MAI .36 .39 .49 .62 .54 .47 .42 .91 1.68 .89











EL= 582 LAT= 47 16 N LONG: 11 24 E KS= 7.6


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 57. 52. 43. 55. 77. 114. 140. 113. 84. 71. 57. 48. 911.
PMI 15. 8. 12. 13. 25. 49. 87. 40. 23. 0. 6. 4. 693.
P79 33. 15. 23. 32. 44. 93. 108. 65. 38. 32. 24. 22. 789.
P60 46. 32. 32. 44. 60. 96. 123. 94. 74. 52. 36. 37. 893.
PMX 205. 156. 82. 132. 144. 188. 235. 212. 148. 168. 173. 118. 1273.
TMC -2.8 -.5 4.8 9.3 13.8 16.7 18.1 17.4 14.6 9.0 3.4 -1.1 8.6

HM 78. 73. 65. 63. 63. 67. 71. 73. 74. 75. 79. 79. 72.
S 27. 38. 44. 41. 41. 40. 44. 46. 48. 44. 31. 26. 39.
PD 36. 19. 25. 35. 47. 94. 111. 71. 46. 36. 27. 25. 811.
ETP 0. D. 45. 70. 102. 115. 126. 109. 77. 43. 18. 0.
ETDF -36. -19. 21. 36. 54. 22. 15. 38. 31. 7. -9. -25. 135.
MAI .55 .49 .47 .81 .88 .65 .59 .84 1.4"


KLAGENFURT AUSTRIA EL= 452 LAT= 46 39 N LONG= 14 21 E KS= 9.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 39. 42. 39. 69. 88. 124. 122. 102. 87. 87. 73. 54. 926.
PMI 9. 0. 2. 6. 23. 39. 47. 9. 15. 8. 21. 0. 662.
P79 19. 12. 9. 36. 45. 73. 76. 48. 40. 33. 31. 23. 782.
P60 28. 24. 19. 50. 68. 105. 90. 93. 66. 65. 60. 40. 871.
PMX 102. 114. 153. 148. 158. 216. 294. 185. 239. 290. 188. 132. 1300.
TMC -5.3 -2.6 3.1 8.7 13.3 17.0 18.6 17.7 14.1 8.1 2.3 -2.5 7.7

HM 87. 80. 72. 71. 74. 74. 76. 81. 83. 87. 90.. 92. 81.
S 27. 41. 46. 47. 46. 49. 54. 56. 49. 36. 20. 16. 41.
PD 21. 15. 11. 39. 50. 80. 79. 57. 45. 40. 37. 27. 801.
ETP 0. 0. 43. 74. 106. 129. 142. 122. 77. 38. 0. 0.
ETDF -21. -15. 32. 35. 56. 49. 63. 64. 32. -2. -37.. -27. 230.
MAI .26 .53 .47 .62 .56 .47 .59 1.04


ST. POLTEN AUSTRIA EL= 282 LAT: 48 12 N LONG: 15 38 E KS- 8.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 32. 37. 40. 49. 89. 102. 108. 92. 58. 53. 45. 36. 741.
PMI 3. 8. 6. 6. 14. 13. 46. 37. 8. 1. 6. 2. 545.
P79 20. 17. 15. 2U. 40. 52. 63. 58. 22. 18. 19. 16. 595.
P60 24. 35. 22. 35. 69. 85. 81. 74. 43. 44. 30. 25. 708.
PMX 81. 87. 143. 129. 97. 228. 237. 249. 208. 136. 92. 89. 1040.
TMC -2.2 -.7 3.7 9.0 13.7 17.0 18.8 18.0 14.5 8.8 3.9 .0 8.7

HM 83. 81. 74. 69. 71. 72. 73. 74. 77. 81. 84. 86. 77.
SC 33. 35. 41. 45. 44. 43. 42. 41. 39. 35. 32. 30. 38.
PD 21. 21. 17. 23. 46. 59. 67. 61. 26. 23. 21. 18. 619.
ETP 0. 0. 41. 72. 104. 120. 125. 105. 68. 37. 18. 0.
ETDF -21. -21. 24. 48. 58. 61. 58. 43. 41. 13. -4. -18. 284.
MAI .42 .32 .44 .49 .53 .59 .39 .63 1.20


SALZBURG AUSTRIA EL= 435 LATr 47 48 N LONG- 13 0 E KS= 8.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 73. 70. 70. 89. 127. 167. 191. 163. 111. 82. 70. 65. 1278.
PMI 26. 16. 23. 16. 29. 45. 74. 43. 19. 7. 16. 12. 925.
P79 46. 27. 44. 53. 86. 112. 141. 104. 74. 40. 40. 34. 1132.
P60 56. 46. 54. 81. 105. 139. 107. 133. 82. 55. 56. 52. 1246.
PMX 134. 166. 167. 164. 301. 370. 403. 285. 221. 199. 195. 126. 1819.
TMC -2.5 -1.1 3.7 8.3 13.2 16.0 17.8 1 7.1 14.0 8.4 3.3 -.9 8.1

HM 81. 79. 75. 73. 73. 74. 75. 77. 79. 82. 84. 84. 78.
5 28. 35. 3 39 39. 41. 44. 46. 50. 49. 41. 26. 25. 39.
PD 48. 31. 46. 59. 90. 118. 134. 110. 76. 43. 43. 38. 1155.
ETP 0. 0. 40. 65. 100. 118. 127. 113. 75. 40. 16. 0.
ETDF -48. -31. -6. 7. 10. 0. -7. 3. -1. -3. -28. -38. -142.
MAI 1.14 .90 .90 1.00 1.05 .98 1.01 1.08 2.76


INNSBRUCK-UNIV. AUSTRIA











EL=3107 LAT= 47 3 N LONG= 12 57 E KS= 9.5


JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 115. 108. 112. 153. 136. 142. 154. 134. 104. 118. 108. 111. 1495.
PMI 31. 18. 21. 20. 24. 45. 79. 54. 18. 18. 30. 28. 889.
P79 62. 44. 67. 91. 73. 65. 120. 100. 66. 56. 53. 53. 1150.
P60 94. 79. 85. 123. 110. 93. 142. 122. 90. 89. 97. 103. 1412.
PMX 296. 368. 222. 290. 324. 290. 219. 203. 206. 260. 265. 219. 2076.
TMC -13.2 -13.0 -11.2 -8.2 -3.8 -.6 1.6 1.4 -.5 -4.3 -8.3 -11.4 -6.0

HM 78. 76. 80. 87. 90. 92. 91. 91. 86. 81. 79. 79. 84.
S 40. 42. 41. 35. 32. 32. 35. 38. 44. 45. 41. 42. 39.
PD 69. 51. 71. 98. 81. 71. 125. 105. 71. 63. 62. 63. 1205.
ETP 0. 0. 0. 0. 0 0. 0. 0. 0. 0. 0.
ETDF -69. -51. -71. -98. -81. -71. -125. -105. -71. -63. -62. -63. -929.
MAI


WIEN-HOHE WARTE AUSTRIA EL= 212 LAT= 48 15 N LONG: 16 22 E KS= 8.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 40. 43. 45. 45. 70. 67. 83. 72. 41. 56. 53. 45. 660.
PMI 19. 5. 6. 2. 11. 12. 14. 22. 5. 1. 7. 6. 404.
P79 25. 16. 24. 20. 28. 30. 50. 40. 14. 13. 26. 17. 567.
P60 34. 31. 33. 28. 45. 47. 64. 49. 23. 41. 39. 33. 620.
PMX 93. 110. 108. 113. 180. 155. 204. 242. 140. 165. 127. 120. 988.
TMC -1.4 .4 4.7 10.3 14.8 18.1 19.9 19.3 15.6 9.8 4.8 1.0 9.8

HM 77. 73. 68. 62. 65. 66. 66. 68. 72. 78. 81. 81. 71.
5 21. 30. 38. 46. 51. 53. 56. 57. 54. 39. 20. 18. 40.
PD 27. 19. 26. 22. 32. 34. 53. 42. 16. 19. 29. 20. 578.
ETP 0. 0. 41. 76. 116. 137. 148. 128. 82. 41. 15. 0.
ETDF -27. -19. 16. 54. 85. 103. 95. 86. 67. 22. -14. -20. 446.
MAI .63 .29 .27 .25 .36 .33 .19 .47 1.96


MASSAU INT. AIRPOPT BAHAMAS EL= 10 LAT- 25 3 N LONG: 77 28 W KS=12.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 36. 43. 45. 78. 117. 159. 150. 135. 165. 164. 85. 39. 1216.
PMI 0. 0. 0. 4. 15. 11. 8. 3. 17. 27. 1. 3.
P79 6. 8. 7. 22. 49. 80. 8G. 74. 86. 106. 34. 13.
P60 13. 18. 18. 28. 79. 118. 146. 108. 109. 132. 53. 25.
PMX 296. 183. 193. 289. 323. 351. 368. 237. 383. 520. 252. 154.
TMC 20.3 20.9 22.2 23.6 25.2 26.7 27.4 27.7 27.1 25.5 23.5 21.6 24.3

HM 71. 80. 74. 77. 78. 79. 82. 79. 82. 80. 80. 79. 79.
SC 69. 58. 66. 62. 61. 59. 55. 59. 55. 58. 58. 59. 60.
PD 7. 10. 9. 23. 55. 88. 93. 81. 91. 111. 38. 16.
ETP 100. '17. 140. 154. 174. 176. 177. 177. 148. 129. 100. 91. 1664.
ETDF 93. 87. 331. 131. 119. 88. 78. 96. 57. 18. 62. 75. 1035.
MAI .07 .10 .07 .15 .32 .50 .56 .46 .61 .86 .38 .17


AL MUHARRAQ BAHRAIN EL= 2 LAT= 26 16 N LONG: 50 37 E KS=11.5

JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 16. 15. 11. 6. 1. 0. 0. 0. 0. 0. 9. 18. 76.
PMI 0. 0. . 0. 0. 0. 0 0 0. 0. 0. 0. 1.
P79 1. 0. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 36.
P60 3. 7. 5. 0. 0. 0. 0. 0. 0. 0. 0. 6. 62.
PMX 136. 85. 44. 65. 12. 0. 0. 0. 0. 0. 147. 63. 169.
TMC 17.4 18.3 21.2 25.6 29.6 32.0 33.8 34.3 32.5 29.0 24.5 19.2 26.4

HM 75. 73. 67. 62. 61. 59. 61. 65. 66. 68. 71. 77. 67.
SC 57. 60. 66. 71. 72. 74. 72. 68. 67. 65. 62. 55. 66.
PD 1. 1. 2. 0. 0. 0. 0. 0. 0. 0. 0. 1. 41.
ETP 81. 90. 135. 172. 210. 222. 233. 219. 183. 146. 104. 80. 1876.
ETDF 80. 89. 133. 172. 210. 222. 233. 219. 183. 146. 104. 78. 1870.
MAI .02 .02 .01 .00 .00 .00 .00 .00 .00 .00 .00 .02 .02


SONNBLICK AUSTRIA











EL: 20 LATr 24 51 N LONG: 89 23 E KS=13.5


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 14. 17. 27. 63. 195. 322. 317. 351. 275. 180. 13. 2. 1776.
PMI 0. 0. D. 0. 0. 0. 0. 0. 0. 0. 0. 0. 1124.
P79 0. 1. 0. 4. 118. 165. 218. 202. 174. 75. 0. 0. 1329.
P60 2. 7. 11. 30. 166. 240. 282. 297. 220. 107. 0. 0. 1657.
PMX 113. 76. 117. 305. 411. 619. 554. 722. 699. 634. 292. 39. 2594.
TMC 18.3 20.4 25.2 28.9 28.9 28.8 28.8 28.8 28.8 27.1 23.0 19.5 25.5

HM 73. 63. 58. 57. 76. 86. 83. 87. 87. PS. 79. 76. 76.
SC 70. 82. 87. 89. 66. 51. 56. 49. 49. 52. 62. 66. 65.
PD 0. 2. 2. 9. 128. 181. 231. 222. 184. 82. 0. 0. 1398.
ETP 95. 115. 175. 2Z9. 198. 171. 184. 165. 145. 128. 103. 91. 1780.
ETDF 95. 113. 172. 199. 70. -10. -48. -57. -39. 47. 103. 91. 738.
MAI .00 .02 .01 .05 .65 1.06 1.26 1.35 1.27 .64 .00 .00 .79


CHITTAGONG BANGLADESH EL= 14 LAT- 22 21 N LONG= 91 50 E KS=12.5

JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 10. 23. 58. 116. 285. 507. 642. 572. 344. 228. 56. 17. 2858.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. D. 0. 0. 1851.
P79 0. 0. 9. 38. 131. 371. 368. 361. 210. 120. 0. 0. 2356.
P60 0. 4. 25. 71. 231. 420. 550. 485. 278. 165. 7. 0. 2704.
PMX 69. 117. 376. 355. 635. 950. 1527. 780. 759. 579. 321. 146. 4277.
TMC 19.9 23.6 25.6 27.7 28.3 27.8 27.5 27.6 27.8 27.3 24.1 20.7 25.7

HM 79. 77. 79. 82. 85. 89. 89. 91. 89. 89. 85. 83. 85.
SC 57. 60. 57. 53. 48. 41. 41. 38. 41. 41. 48. 52. 48.
PD 0. 1. 12. 45. 152. 381. 406. 387. 224. 129. 1. 0. 2429.
ETP 95. 111. 146. 158. 167. 150. 153. 141. 133. 119. 99. 89. 1560.
ETDF 95. 110. 134. 113. 15. -232. -253. -246. -91. -11. 97. 89. -180.
MAI .00 .01 .08 .28 .91 2.55 2.66 2.75 1.69 1.09 .01 .00 1.56
--------------------------------------------------------------------- -------

JESSORE BANGLADESH EL= 7 LAT= 23 10 N LONG= 89 13 1: KS=12.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 14. 23. 35. 88. 182. 275. 313. 307. 197. 136. 22. 16. 1603.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 937.
P79 0. 0. 0. 28. 89. 169. 238. 179. 141. 60. 0. 0. 1257.
P60 1. 7. 17. 43. 140. 248. 281. 258. 162. 90. 1. 0. 1395.
PHX 127. 133. 166. 320. 699. 674. 538. 615. 510. 509. 124. 18. 2275.
TMC 18.2 20.7 25.9 29.6 29.9 29.3 28.5 28.6 28.7 27.2 22.7 18.9 25.7

HM 77. 70. 67. 69. 79. 87. 89. 91. 91. 87. 81. 81. 81.
SC 61. 70. 74. 71. 59. 46. 42. 38. 38. 46. 56. 56. 55.
PD 0. 1. 4. 31. 100. 185. 247. 196. 145. 66. 0. 0. 1286.
ETP 93. 110. 165. 191. 190. 164. 159. 146. 130. 124. 101. 86. 1658.
ETDF 92. 109. 162. 160. 91. -21. -88. -50. -15. 57. 101. 86. 683.
MAI .00 .01 .02 .16 .52 1.13 1.56 1.34 1.12 .54 .00 .00 .78
---------------------------------------------------------------- -

NARAYANGANJ BANGLADESH EL= .8 LAT- 23 37 N LONG= 90 30 E KS=13.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 14. 27. 46. 161. 245. 346. 348. 364. 242. 171. 29. 19. 2012.
PHI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 1438.
P79 0. 0. 7. 63. 152. 216. 258. 250. 170. 60. 0. 0. 1740.
P60 0. 14. 30. 103. 206. 270. 292. 323. 200. 113. 1. 0. 1855.
PMX 95. 73. 149. 325. 544. 866. 672. 727. 451. 605. 177. 24. 2630.
TMC 19.8 22.2 26.C 28.7 29.1 29.0 28.7 28.8 29.2 28.2 24.5 70.9 26.3

HM 75. 68. 67. 78. 82. 85. 86. 85. 85. 83. 79. 77. 79.
SC 65. 74. 75. 61. 55. 50. 49. 50. 50. 54. 60. 62. 59.
PD 0. 3. 12. 71. 163. 227. 265. 265. 176. 71. 0. 0. 1764.
ETP 99. 116. 169. 173. 182. 170. 171. 168. 150. 136. 108. 95. 1736.
ETDF 99. 113. 157. 102. 18. -57. -94. -98. -26. 64. 108. 95. 481.
MAI .00 .03 .07 .41 .90 1.33 1.55 1.58 1.17 .52 .00 .00 1.02


BOGRA BANGLADESH












EL= 21 LAT: 24 19 N LONG= 91 44 E KS=13.0


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 13. 34. 84. 225. 437. 518. 340. 340. 380. 192. 43. 3. 2503.
PHI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 1911.
P79 0. 1. 19. 133. 324. 367. 236. 239. 186. 79. 0. 0. 2286.
P60 1. 11. 55. 193. 410. 444. 295. 295. 272. 151. 3. 0. 2426.
PMX 76. 142. 249. 514. 663. 823. 530. 605. 411. 424. 205. 22. 3269.
TMC 17.2 19.5 24.3 27.3 27.7 28.2 28.5 28.3 28.2 26.4 22.2 18.4 24.7

HM 90. 81. 76. 78. 84. 89. 90. 90. 91. 91. 93. 92. 87.
SC 41. 57. 64. 61. 52. 43. 41. 41. 39. 39. 34. 37. 46.
PD 0. 3. 27. 146. 342. 383. 248. 251. 204. 94. 1. 0. 2315.
ETP 72. 94. 147. 167. 171. 155. 157. 150. 129. 110. 76. 67. 1494.
ETDF 71. 91. 120. 22. -171. -229. -92. -101. -75. 16. 76. 67. -20F.
MAI .00 .03 .18 .87 2.00 2.47 1.59 1.67 1.59 .86 .01 .00 1.55


UCCLE BELGIUM EL: 104 LA T= 50 48 N LONG= 4 21 E KS: 8.7

JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV OEC ANN

PM 73. 59. 52. 54. 57. 57. 79. 75. 68. 72. 71. 68. 785.
PMI 23. 6. 10. i5. 10. 20. 9. 13. 5. 6. 19. 10. 521.
P79 44. 29. 27. 28. 38. 36. 50. 55. 39. 28. 37. 43. 695.
P60 63. 42. 38. 45. 43. 43. 67. 59. 57. 51. 48. 62. 745.
PMX 141. 148. 105. 127. 128. 118. 203. 133. 138. 234. 16G. 140. 963.
TMC 2.2 2.6 6.0 9.2 13.6 16.0 17.5 17.3 14.7 10.3 6.2 3.3 9.9

HM 88. 86. 80. 78. 77. 78. 80. 82. 84. 88. 90. 90. 83.
S 20. 26. 37. 40. 43. 44. 40. 43. 41. 33. 21. 17. 34.
PD 48. 32. 29. 32. 39. 37. 54. 56. 43. 33. 39. 47. 705.
ETP 0. 0. 40. 66. 102. 117. 117. 102. 67. 35. 14. 8.
ETOF -48. -32. 11. 34. 63. 79. 64. 46. 24. 2. -26. -39. 179.
MAI .72 .48 .38 .32 .46 .55 .64 .94 2.87 5.89


MAUN BOTZWANA EL' 900 LATr 19 59 S LONG: 23 25 E KS: 8.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 110. 104. 83. 25. 5. 1. 0. 0. 1. 16. 46. 80. 471.
PMI 18. 8. 0. 0. 0. 0. 0. 0. 0. 0. 1. 16. 284.
P79 66. 46. 18. 1. 0. 0. 0. 0. 0. 3. 16. 47. 373.
P60 86. 72. 48. 11. 0. 0. 0. 0. 0. 5. 36. 64. 423.
PMX 381. 339. 270. 91. 34. 10. 1. 0. 12. 61. 116. 233. 776.
TMC 24.1 23.7 23.4 22.2 18.5 15.5 15.7 18.8 23.2 26.8 25.7 24.8 21.9

HM 71. 73. 67. 57. 50. 46. 40. 33. 30. 36. 54. 66. 52.
SC 47. 46. 51. 58. 62. 65. 68. 72. 74. 70. 60. 51. 60.
PD 70. 51. 24. 3. 0. 0. 0. 0. 0. 3. 20. 51. 383.
ETP 158. 133. 140. 121. 99. 82. 91. 119. 154. 191. 177. 169. 1632.
ETDF 88. 81. 115. 118. 99. 82. 91. 110. 154. 188. 156. 118. 1409.
MAI .44 .39 .17 .03 .00 .00 .00 .00 .00 .02 .11 .30 .23


ALEGRETE BRAZIL EL= 103 LATr 29 47 S LONG= 55 47 W KS=12.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 145. 109. 121. 165. 149. 129. 109. 108. 128. 191. 133. 123. 1610.
PMI 18. 11. 24. 6. 30. 28. 11. 34. 39. 57. 19. 13.
P79 82. 60. 73. 72. 71. 74. 53. 58. 73. 100. 53. 39.
P60 136. 114. 128. 127. 127. 139. 92. 79. 102. 166. 99. 97.
PMX 390. 206. 249. 539. 372. 275. 281. 323. 408. 421. 348. 337.
TMC 24.6 24.2 22.1 18.3 15.3 13.0 12.6 14.6 15.9 18.4 20.9 23.3 18.6

HM 68. 70. 74. 78. 81. 83. 80. 76. 75. 75. 68. 66. 74.
S 67. 69. 65. 63. 58. 48. 57. 60. 56. 58. 68. 69. 62.
PD 93. 71. 85. 84. 83. 88. 61. 62. 79. 114. 63. 51.
ETP 195. 164. 144. 99. 71. 51. 59. 81. 99. 136. 170. 197. 1465.
ETDF 102. 93. 59. 15. -12. -37. -2. 18. 20. 22. 107. 146. 532.
MAI .48 .44 .59 .84 1.17 1.73 1.03 .77 .80 .84 .37 .26


SRIMANGAL BANGLADESH












EL= 125 LAT= 7 21 S LONG= 57 31 W KS=13.4


JAN FEB MAR AFR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 408. 375. 435. 285. 128. 26. 11. 33. 138. 238. 215. 329. 2721.
PMI 280. 137. 247. 122. 17. 0. 0. 0. 56. 82. 18C. 203.
P79 341. 304. 318. 235. 70. 11. 0. 4. 101. 165. 243. 271.
P60 371. 371. 385. 261. 104. 19. 0. 11. 127. 205. 281. 304.
PMX 612. 581. 626. 452. 297. 67. 51. 145. 308. 399. 566. 513.
TMC 25.1 25.2 25.3 25.5 25.5 24.9 24.4 25.5 25.8 25.6 25.5 25.3 25.3

HM 92. 92. 92. 92. 89. 86. 83. 81. 87. 90. 91. 92. 89.
S 26. 28. 28. 36. 52. 68. 73. 71. 48. 42. 34. 28. 45.
PD 347. 318. 332. 240. 77. 13. 0. 5. 106. 173. 251. 278.
ETP 111. 105. 114. 117. 132. 136. 148. 162. 142. 142. 125. 116. 1550.
ETDF -236. -213. -218. -124. 55. 124. 148. 157. 35. -32. -126. -162. -592.
MAI 3.12 3.02 2.92 2.06 .59 .09 .00 .03 .75 1.22 2.01 2.40


ARACAJU BRAZIL EL: 6 LAT= 10 55 5 LONG= 37 3 W KS=12.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 43. 46. 107. 162. 263. 177. 161. 104. 54. 50. 49. 38. 1254.
PMI 4. 7. 3. 43. 46. 62. 89. 47. 11. 7. 0. 2.
P79 8. 14. 45. 80. 147. 98. 128. 68. 28. 15. 7. 9.
P60 24. 28. 64. 13. 220. 147. 147. 91. 43. 22. 11. 21.
PMX 187. 168. 279. 326. 705. 348. 241. 258. 175. 235. 198. 200.
TMC 26.5 26.8 26.9 25.7 25.3 24.5 23.7 23.7 24.5 25.3 25.8 26.2 25.4

HM 77. 77. 78. 79. 81. 80. 80. 77. 77. 77. 78. 78. 78.
S 65. 65. G0. 61. 53. 55. 51. 56. 60. 64. 66. 68. 60.
PD 11. 17. 49. 91. 162. 108. 132. 73. 31. 16. 8. 12.
ETP 187. 168. 171. 149. 127. 114. 115. 133. 151. 175. 178. 190. 1857.
ETDF 175. 151. 122. 57. -35. 5. -17. 60. 120. 159. 170. 179. 1146.
MAI .06 .10 .29 .61 1.28 .95 1.15 .55 .21 .09 .04 .06


BARRA DO CORDA BrAZIL EL= 82 LAT= 5 30 5 LONG= 45 1 W KS=15.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 185. 175. 228. 156. 53. 14. 5. 7. 16. 42. 75. 118. 1074.
PMI 35. 51. 44. 44. 3. 0. O. 0. 0. 0. 0. 37.
P79 120. 111. 143. 93. 20. 0. 0. 0. 2. A. 34. 76.
P60 155. 139. 194. 138. 31. 4. 0. 0. 7. 28. 57. 107.
PMX 336. 335. 553. 321. 293. 64. 56. 49. 53. 159. 235. 241.
TMC 25.7 25.6 25. 25.6 25.2 24.6 24.3 25.5 27.7 27.9 27.3 26.4 25.9

HM 84. 85. 87. 86. 34. 78. 72. 66. 64. 67. 72. 78. 77.
S 47. 45. 46. 54. 65. 76. 82. 80. 67. 57. 53. 51. 60.
PD 135. 117. 154. 102. 22. 1. 0. 0. 3. 12. 39. 83.
ETP 149. 133. 146. 145. 1"9. 147. 160. 175. 176. 174. 160. 157. 1871.
ETDF 14. 16. -8. 42. 127. 146. 160. 175. 173. 162. 121.. 74. 1203.
MAI .91 .88 1.05 .71 .15 .01 .00 .00 .02 .07 .24 .53
------------------------------- --- -- -------- ----------------------------- -- -- ---

EELEIM PRAZIL ELt 24 LAT= 1 28 5 LONG= '*8 2' W KS 14.6

JAN FEB MAR APR RAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 318. "07. ':36. 382. 265. 165. 161. 116. 116. 105. 94.. 197. 2162.
PMI 191. 221. 246. 190. 142. 85. 67. 16. 46. 31. 23. 62.
P'79 235, 314. 347. 326. 180. 121. 118. 57, 94. 75. 46. 139.
P60 256. 395. 393. 367. 221. 134. 146. 10 108. 91. 62. 185.
PMX 464. 604. 696 581 545. 289. 295. 220. 222. 1"6. 240. 349.
TMC 25.6 25.5 75.4 75.7 26.0 26.0 25.9 26.0 26.0 26.2 26.5 2653 25.9

HM e9. 91. 91. 30. 87. A4. 83. 83. 84. 83. 82. 85. 86.
S 42. 33. 27. 36. 53. 67. 73. 72. 65. 56. 59. 57. 54.
FD 239. 331. 357. 335. 19". 124. 124. 67. 97. 7S. 49. 149.
ETP 136. 111. 112. 122. 144. 150. 164. 174. L66. 178. 160. 159. 1773.
ErOF -104. -2. -270. -244 -213. -45. 26. 40. 107. 71. :CO- 111. 10. -360.
MA; 1.77 2.37 3. S9 2.75 1.J1 .82 .76 .38 .58 .44 .3] .94


ALTO TAPAJOS BRAZIL











EL= 785 LAT= 19 51 S LONG: 43 57 W KS=10.7


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 268. 194. 165. 77. 22. 10. 7. 9. 38. 113. 215. 354. 1472.
PMI 35. 47. 23. 0. 0. 0. 0. 0. 0. 36. 96. 180.
P79 127. 101. 82. 22. 1. 0. 0. 0. 9. 58. 124. 215.
P60 222. 151. 142. 43. 5. 2. 0. 0. 24. 110. 204. 301.
PMX 573. 384. 298. 181. 103. 59. 71. 78. 109. 200. 373. 611.
TMC 22.7 22.9 22.3 21.1 19.1 18.0 17.7 19.0 20.8 21.5 21.8 21.6 20.7

HH 76. 74. 76. 74. 73. 72. 67. 61. 63. 69. 74. 80. 72.
S 47. 49. 55. 63. 70. 77. 76. 75. 56. 47. 44. 35. 58.
PD 147. 111. 95. 26. 2. 0. O. 0. 12. 69. 141. 233.
ETP 153. 135. 141. 123. 108. 96. 102. 122. 126. 137. 138. 128. 1507.
ETDF 6. 23. 47. 96. 106. 96. 102. 122. 114. 68. -3. -105. 671.
MAI .96 .83 .67 .22 .02 .00 .00 .00 .10 .50 1.02 1.82


BOA VISTA BRAZIL EL= 74 LAT= 2 49 N LONG= 60 40 W KS=12.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 75. 75. 80. 151. 304. 365. 346. 226. 110. 74. 66. 69. 1941.
PMI 0. 0. 0. 3. 57. 9. 3. 34. 23.. 0. 0.
P79 10. 3. 11. 68. 220. 257. 211. 153. 67. 30. 22. 8.
P60 24. 21. 40. 139. 279. 374. 340. 185. 99. 67. 48. 17.
PMX 390. 341. 321. 364. 485. 566. 650. 507. 258. 221. 161. 330.
TMC 27.8 27.9 28.2 27.9 26.7 25.9 25.7 26.2 27.8 28.4 28.5 28.0 27.4

HM 71. 70. 69. 71. 76. 77. 77. 78. 73. 72. 71. 73. 73.
SC 65. 66. 67. 65. 59. 58. 58. 56. 62. 63. 65. 62. 62.
PD 13. 7. 17. 83. 232. 282. 238. 160. 74. 38. 27. 10.
ETP 169. 161. 186. 174. 160. 146. 152. 158. 172. 180. 169. 165. 1991.
ETDF 156. 154. 169. 91. -73. -136. -86. -1. 98. 142. 141. 155. 811.
MAI .08 .04 .09 .48 1.45 1.93 1.57 1.01 .43 .21 .16 .06


CAETITE BRAZTL EL= 878 LATr 14 4 5 LONG: 42 29 W KS=11.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 86. 93. 127. 70. 19. 11. 12. 10. 13. 59. 185. 161. 846.
PHI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 3. 17.
P79 32. 23. 20. 16. 2. 3. 2. 0. 0. 9. 103. 84.
P60 81. 61. 66. 49. 5. 6. 7. 2. 3. 36. 126. 132.
PMX 335. 308. 327. 225. 100. 40. 43. 48. 61. 241. 522. 528.
TMC 22.0 22.3 22.4 21.6 20.4 19.2 18.7 19.5 21.6 22.8 22.2 22.1 21.2

HM 77. 76. 77. 77. 76. 73. 71. 66. 62. 64. 74. 78. 73.
SC 57. 59. 57. 57. 58. 12. 64. 69. 73. 71. 61. 56. 62.
PD 42. 31. 30. 23. 3. 4. 3. 0. 1. 15. 108. 94.
ETP 160. 144. 148. 126. 112. 100. 107. 128. 153. 175. 159. 159. 1671.
ETDF 117. 113. 119. 103. 109. 97. 104. 128. 152. 160. 52. 65. 1318.
MAI .26 .22 .20 .13 .02 .04 .03 .00 .00 .08 .6S .59


CARAVELAS BRAZIL EL= 4 LAT= 17 38 5 LONG= 39 15 W KS=11.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 125. 97. 183. 218. 141. 113. 119. 81. 98. 144. 239. 173. 1731.
PHI 17. 14. 49. 68. 60. 48. 57. 17. 8. 33. 44. 21.
P79 33. 31. 98. 122. 98. 85. 75. 51. 28. 66. 127. 90.
P60 62. 72. 132. 179. 119. 103. 96. 67. 66. 108. 230. 128.
PMX 372. 313. 391. 571. 254. 213. 222. 182. 429. 47.. 438. 391.
TMC 25.5 25.7 25.4 24.5 22.9 21.7 20.8 21.2 22.2 23.5 24.2 25.0 23.6

HM 81. 81. 83. 84. 84. 85. 84. 82. 81. 81. 83. 82. 83.
SC 50. 50. 47. 46. 46. 44. 46. 48. 50. 50. 47. 48. 48.
PD 41. 40. 105. 134. 102. 89. 79. 54. 36. 75. 149. 98.
ETP 166. 145. 143. 117. 100. 85. 90. 107. 125. 148. 150. 163. 1539.
ETDF 124. 106. 38. -17. -3. -4. 11. 53. 89. 74. 1. 65. 536.
MAI .25 .27 .73 1.15 1.03 1.05 .88 .51 .29 .50 .99 .60


BELO HORIZONTE BRAZIL












EL- 48 LAT 1 4 5 5 LONG= 63 8 W KS=12.0


JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 316. 274. 281. 288. 226. 134. 88. 75. 99. 158. 188. 222. 2349.
PMI 128. 128. 128. 125. 68. 30. 21. 5. 32. 60. 64. 94.
P79 251. 203. 216. 224. 172. 73. 47. 33. 61. 98. 132. 160.
P60 280. 243. 271. 258. 196. 128. 82. 74. 89. 143. 173. 222.
PMX 606. 469. 460. 524. 422. 336. 270. 168. 183. 302. 363. 437.
TMC 25.2 25.2 25.4 25.2 25.3 25.3 25.4 26.0 26.0 25.9 25.9 25.6 25.5

HM 89. 89. 90. 90. 90. 89. 87. 86. 87. 87. 87. 88. 88.
SC 40. 40. 38. 38. 38. 40. 43. 45. 43. 43. 43. 42. 41.
PD 257. 211. 228. 231. 177. 85. 54. 42. 67. 107. 141. 173.
ETP 134. 123. 132. 121. 116. 110. 121. 1 34. 136. 144. 138. 137. 1549.
ETDF -123. -89. -95. -110. -61. 26. 67. 93. 69. 37. -2. -36. -224.
MAI 1.92 1.72 1.72 1.91 1.52 .77 .45 .31 .49 .74 1.02 1.26


CONCEICAO DO ARACUAIA BRAZIL EL= 157 LAT= 8 16 S LONG= 49 17 W KS=12.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 252. 225. 256. 193. 52. 10. 5. 6. 46. 133. 215. 246. 1839.
PMI 111. 65. 95. 88. 0. 0. 0. 0. 0. 29. 119. 59.
P79 183. 172. 165. 133. 9. 0. 0. 0. 11. 75. 171. 150.
P60 229. 222. 234. 166. 30. 0. 0. 0. 23. 98. 199. 205.
PMX 381. 331. 410. 372. 138. 99. 51. 52. 139. 315. 359. 500.
TMC 24.9 24.8 24.9 25.4 25.6 24.9 24.5 25.5 26.4 25.7 25.3 25.0 25.2

HM 86. 87. 87. 85. 80. 75. 71. 66. 73. 80. 84. 85. 80.
SC 48. 46. 48. 49. 57. 63. 68. 74. 66. 57. 51. 49. 56.
PD 193. 182. 179. 140. 13. 0. 0. 0. 14. 80. 177. 162.
ETP 151. 133. 143. 135. 137. 130. 141. 164. 168. 166. 152. 153. 1774.
ETDF -42. -49. -36. -5. 123. 130. 141. 164. 154. 87. -24. -8. 634.
MAI 1.28 1.37 1.25 1.04 .10 .00 .00 .00 .08 .48 1.16 1.05 .-,
--- ---------------------------- ---------- --- -- - ------- --- -- -- ---

CORUMBA BRAZIL EL= 145 LAT= 19 0 S LONG= 57 39 W KS=11.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 170. 158. 119. 71. 62. 35. 29. 20. 52. 83. 118. 145. 1062.
PMI 46. 33. 32. 13. 0. 2. 0. 0. 0. 20. 29. 46.
P79 114. 79. 70. 27. 11. 5. 1. 0. 18. 44. 65. 87.
PG0 157. 108. 105. 45. 26. 19. 8. 3. 30. 68. 97. 112.
PMX 326. 383. 252. 196. 231. 176. 150. 112. 164. 204. 271. 332.
TMC 27.1 26.9 26.4 24.7 23.1 21.6 21.4 23.4 25.4 26.2 27.0 27.4 25.0

HM 79. 80. 80. 78. 77. 76. 70. 62. 63. 67. 71. 74. 73.
S 53. 53. 57. 63. 63. 59. 67. 68. 59. 59. 59. 58. 60.
PD 123. 85. 77. 31. 14. 8. 2. 1. 21. 49. 72. 92.
ETP 178. 155. 161. 136. 115. 95. 108. 132. 146. 172. 181. 190. 1769.
ETDF 55. 70. 84. 105. 101. 87. 105. 132. 125. 123. 109. 98. 1194.
MAI .69 .55 .48 .23 .12 .08 .02 .00 .14 .28 .40 .49


CRUZEIRO DO 9UL BRAZIL EL= 170 LAT- 7 39 S LONG= 72 40 W KS=11.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 246. 244. 269. 241. 138. 105. 47. 85. 147. 251. 216. 241. 2230.
PMI 89. 69. 136. 93. 33. 20. 0. 14. 56. 104. 107. 78.
P79 161. 189. 202. 190. 97. 61. 23. 38. 102. 194. 153. 186.
P6U 220. 233. 246. 231. 120. 97. 39. 69. 142. 228. 205. 247.
PMX 479. 400. 451. 437. 358. 244. 128. 218. 256. 412. 356. 342.
TMC 24.4 24.6 24.4 24.2 24.1 23.4 22.9 23.8 24.5 24.6 27.7 24.6 24.2

HM 89. 90. 90. 90. 89. 89. 86. 84. 85. 88. 89. 89. 88.
SC 37. 35. 35. 35. 37. 37. 42. 44. 43. 38. 37. 37. 38.
PD 173. 198. 211. 199. 102. 69. 26. 45. 110. 201. 164. 199.
ETP 130. 116. 124. 111. 107. 96. 107. 123. 130. 133. 137. 131. 1444.
ETDF -43. -83. -87. -88. 5. 28. 80. 78. 19. -68. -27. -68. -253.
MAI 1.33 1.71 1.71 1.79 .95 .71 .25 .36 .85 1.51 1.20 1.52


COARI BRAZIL











EL= 165 LATI 15 36 S LONG= 56 6 W KS=10.6


JAN FEB MAR AP9 MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 216. 198. 232. 115. 52. 14. 6. 12. 39. 130. 165. 194. 1373.
PHI 70. 95. 48. 23. 0. 0. 0. 0. 1. 36. 81. 34.
P79 160. 131. 146. 58. 8. 0. 0. 0. 7. 75. 113. 134.
P60 176. 169. 203. 92. 24. 1. 0. 0. 19. 105. 141. 173.
PMX 385. 399. 433. 237. 160. 64. 72. 59. 168. 278. 318. 358.
TMC 26.5 26.5 26.2 25.5 24.3 23.2 22.8 25.0 26.9 27.2 26.8 26.6 25.6

HM 81. 82. 82. 81. 77. 72. 65. 56. 58. 69. 76. 79. 73.
S 42. 43. 47. 57. 66. 71. 75. 70. 56. 51. 49. 43. 56.
PD 163. 139. 158. 65. 11. 0. 0. 0. 10. 81. 119. 142.
ETP 154. 137. 146. 137. 129. 116. 127. 146. 151. 164. 162. 157. 1726.
ETDF -9. -2. -12. 72. 118. 116. 127. 146. 141. 83. 43. 15. 837.
MAI 1.06 1.01 1.08 .48 .09 .00 .00 .00 .06 .49 .74 .91


CURITIBA BRAZIL EL= 908 LAT= 25 31 S LONG- 49 10 W KS-10.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 191. 163. 124. 78. 85. 89. 81. 83. 119. 130. 105. 147. 1395.
PMI 53. 52. 26. 23. 15. 3. 13. 15. 32. 41. 21. 51.
P79 152. 105. 79. 45. 34. 40. 30. 28. 711. 88. 57. 115.
P60 186. 144. 112. 62. 60. 69. 40. 63. 90. 102. 78. 135.
PMX 372. 354. 233. 172. 297. 227. 348. 238. 300. 318. 223. 259.
TMC 20.1 20.0 19.3 16.8 14.5 13.4 12.6 14.0 14.8 16.1 17.4 18.9 16.5

HM 82. 84. 84. 84. 83. 83. 80. 78. 80. 82. 80. 81. 82.
S 43. 43. 46. 48. 52. 52. 57. 54. 40. 38. 43. 44. 47.
PD 159. 113. 86. 49. 39. 46. 32. 35. 74. 91. 61. 119.
ETP 138. 117. 116. 88. 72. 60. 66. 81. 85. 104. 121. 138. 1187.
ETOF -22. 4. 30. 39. 33. 14. 34. 46. 11. 13. 60. 19. 282.
MAI 1.16 .97 .74 .55 .55 .77 .48 .44 .88 .87 .51 .86


FORMOSA BRAZIL EL= 906 LAT= 15 32 5 LONG= 47 20 W KS=11.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 252. 204. 227. 93. 17. 3. 5. 3. 30. 127. 255. 343. 1559.
PHI 78. 55. 67. 8. 0. 0. 0. 0. 0. 3. 75. 145.
P79 114. 125. 102. 40. 0. 0. 0. 0. 2. 66. 190. 247.
P60 209. 171. 204. 71. 4. 0. 0. 0. 12. 114. 220. 296.
PMX 568. 364. 437. 276. 78. 21. 89. 66. 162. 240. 437. 726.
TMC 22.0 22.1 22.0 21.5 20.1 19.0 18.9 20.7 22.8 22.8 21.9 21.6 21.3

HM 80. 81. 82. 77. 71. 66. 59. 50. 52. 66. 79. 84. 71.
S 45. 45. 50. 63. 77. 84. 86. 85. 66. 52. 37. 36. 61.
PD 134. 135. 123. 47. 1. 0. 0. 0. 4. 76. 196. 257.
ETP 143. 126. 136. 130. 125. 113. 122. 144. 148. 150. 125. 128. 1592.
ETDF 9. -8. 13. 84. 124. 113. 122. 144. 144. 74. -71. -130. 619.
MAI .93 1.07 .9 0 .36 .01 .00 .00 .00 .03 .51 1.57 2.02
- ------------------------------------------------------------------------

MANAUS BRAZIL EL=' 83 LAT= 3 8 S LONG= 60 1 W KS=12.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 276. 277. 301. 287. 193. 99. 61. 41. 62. 112. 165. 228. 2102.
PHI 150. 157. 109. 139. 64. 22. 6. 2. 14. 10. 48. 108.
P79 207. 215. 228. 194. 95. 64. 35. 22. 31. 71. 116. 177.
P60 234. 246. 259. 262. 151. 82. 46. 34. 48. 92. 147. 197.
PHX 410. 422. 578. 455. 501. 249. 156. 100. 178. 230. 275. 376.
TMC 25.9 25.8 25.8 25.9 26.4 26.6 26.9 27.5 27.9 27.7 27.3 26.7 26.7

HM 88. 88. 88. 88. 86. 83. 80. 77. 78. 79. 82. 85. 83.
S 32. 33. 30. 33. 46. 59. 67. 69. 63. 55. 49. 41. 48.
PD 213. 222. 235. 208. 107. 68. 37. 25. 35. 75. 123. 181.
ETP 120. 113. 118. 115. 132. 140. 158. 174. 172. 169. 150. 138. 1701.
ETOF -92. -108. -116. -93. 26. 72. 121. 150. 137. 94. 28. -43. 174.
MAI 1.77 1.96 1.98 1.81 .81 .49 .24 .14 .20 .45 .81 1.31


CUIABA BRAZIL











EL= 49 LAT= 5 55 S LONG: 35 15 W KS=14.1


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PH 43. 86. 189. 255. 263. 284. 208. 124. 46. 15. 14. 20. 1547.
PHI 3. 2. 24. 65. 85. 75. 18. 30. 7. 0. 0. 0.
P79 9. 11. 72. 121. 149. 193. 131. 55. 19. 5. 3. 5.
P60 21. 47. 139. 167. 224. 257. 186. 96. 27. 10. 6. 8.
PMX 218. 319. 455. 624. 570. 603. 383. 257. 134. 84. 66. 80.
TMC 27.2 27.3 27.3 26.7 26.0 24.9 24.4 24.5 25.5 26.3 26.7 27.0 26.2

HM 76. 76. 77. 80. 81. 82. 80. 78. 76. 74. 74. 74. 77.
S 72. 68. 62. 58. 58. 56. 60. 67. 73. 79. 79. 77. 67.
PD 12. 19. 86. 131. 165. 206. 143. 64. 21. 6. 4. 6.
ETP 192. 171. 177. 153. 143. 126. 136. 156. 174. 198. 193. 197. 2016.
ETDF 180. 152. 90. 22. -21. -81. -6. 93. 153. 192. 190. 192. 1156.
MAI .06 .11 .49 .86 1.15 1.64 1.05 .41 .12 .03 .02 .03


OLINDA BRAZIL EL 10 LAT= 8 9 5 LONG= 34 55 W KS=13.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PH 41. 90. 197. 241. 335. 318. 224. 147. 62. 37. 25. 40. 1767.
PHI 4. 5. 17. 56. 140. 145. 107. 46. 5. 2. 2. 5.
P79 12. 18. 71. 115. 195. 195. 146. 88. 30. 16. 10. 8.
P60 24. 42. 136. 216. 278. 265. 183. 115. 44. 20. 16. 24.
PMX 163. 525. 666. 596. 763. 609. 457. 288. 148. 298. 93. 123.
TMC 27.0 27.1 26.9 26.5 25.6 24.6 24.1 24.1 25.0 25.9 26.4 26.7 25.8

HM 76. 77. 79. 81. 82. 83. 82. 80. 78. 76. 76. 76. 79.
SC 66. 65. 62. 59. 57. 56. 57. 60. 63. 66. 66. 66. 62.
PD 15. 23. 85. 136. 212. 210. 154. 94. 33. 17. 11. 11.
ETP 187. 167. 174. 151. 137. 121. 128. 144. 159. 180. 178. 185. 1913.
ETOF 172. 144. 90. 15. -75. -89. -26. 50. 126. 164. 167. 174. 12.
MAI .08 .14 .49 .90 1.55 1.73 1.20 .65 .21 .09 .06 .06


PORTO ALEGRE BRAZIL EL= 3 LAT7 30 0 S LONG= 51 11 W KS=11.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 119. 104. 89. 10. 115. 140. 128. 114. 124. 115. 75. 88. 1314.
PHI 15. 37. 21. 19. 30. 42. 11. 19. 34. 25. 5. 0.
P79 42. 59. 55. 43. 48. 81. 69. 66. 76. 54. 33. h1.
P60 75. 82. 71. 67. 77. 109. 100. 95. 103. 92. 46. 75.
PMX 275. 198. 187. 387. 406. 404. 280. 253. 253. 317. 216. 185.
TMC 24.8 24.5 23.3 19.7 17.1 14.9 14.3 15.3 16.8 19.1 21.3 23.4 19.5

HM 70. 74. 75. 78. 81. 83. 81. 78. 77. 75. 70. 68. 76.
S 61. 58. 60. 57. 53. 47. 52. 53. 42. 53. 61. 65. 55.
PD 49. 64. 58. 48. 54. 87. 76. 72. 82. 62. 36. 40.
ETP 188. 152. 142. 97. 71. 53. 60. 77. 89. 132. 162. 192. 1416.
ETOF 140. 88. 84. 49. 17. -34. -16. 5. 7. 70. 127. 151. 688.
MAI .26 .42 .41 .49 .76 1.64 1.27 .93 .92 .47 .22 -21
---------------------------------------------------------------------------

PORTO NACTONAL BRAZIL EL= 238 LAT= 10 42 S LONG= 48 25 W KS=11.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 274. 229. 273. 150. 37. 1. 2. 3. 35. 142. 233. 284. 1663.
PMI 89. 92. 107. 48. 0. 0. 0. 0. 0. 53. 118. 98.
P79 143. 167. 197. 97. 1. 0. 0. 0. 6. 86. 134. 185.
P60 257. 203. 245. 129. 23. 0. 0. 0. 18. 110. 195. 245.
PMX 511. 494. 573. 287. 130. 13. 31. 39. 154. 373. 537. 517.
TMC 25.2 25.2 25.3 25.9 25.7 24.7 24.6 26.2 27.7 26.9 25.8 25.3 25.7

HM 84. 85. 85. 81. 75. 68. 62. 53. 57. 73. 81. 84. 74.
S 42. 40. 40. 57. 78. 85. 89. 87. 63. 52. 42. 38. 59.
PD 167. 175. 207. 104. 6. 0. 0. 0. 9. 91. 147. 198.
ETP 146. 126. 135. 144. 155. 144. 156. 177. 168. 164. 142. 139. 1795.
ETDF -21. -48. -72. 41. 149. 144. 156. 177. 159. 73. -5. -59. 693.
MAI 1.15 1.38 1.54 .72 .04 .00 .00 .00 .05 .56 1.04 1.42
-------------------------------------------------------------------------


NATAL BRAZIL












EL= 105 LAT7 8 46 S LONG: 63 55 W KS-11.2


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 337. 305. 337. 225. 108. 32. 11. 26. 99. 207. 241. 317. 2245.
PHI 184. 142. 209. 69. 26. 0. 0. 0. 18. 82. 75. 167.
P79 235. 223. 288. 168. 47. 11. 0. 3. 57. 143. 152. 258.
P60 299. 289. 324. 200. 87. 23. 2. 20. 81. 194. 229. 301.
PMX 522. 512. 475. 395. 239. 132. 87. 75. 246. 389. 425. 615.
TMC 25.0 25.1 25.2 25.2 25.2 25.0 24.8 26.2 26.4 26.0 25.7 25.4 25.4

HM 88. 88. 88. 87. 85. 80. 74. 68. 75. 82. 84. 86. 82.
SC 39. 39. 39. 40. 43. 50. 57. 63. 56. 48. 45. 42. 47.
PD 248. 241. 296. 175. 55. 14. 0. 7. 62. 154. 168. 267.
ETP 137. 124. 133. 121. 117. 115. 129. 154. 154. 153. 145. 143. 1626.
ETOF -111. -117. -163. -54. 62. 101. 129. 147. 92. -0. -23. -124. -61.
MAI 1.81 1.95 2.23 1.44 .47 .12 .00 .04 .40 1.OU 1.16 1.86


GUIXERAMOBIM BRAZIL EL= 198 LAT= 5 12 S LONG= 39 18 W KS=10.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 43. 88. 171. 160. 101. 40. 21. 9. 4. 2. 6. 16. 661.
PMI 0. 9. 30. 36. 9. 1. 1. 0. 0. 0. 0. 0.
P79 6. 26. 73. 109. 47. 11. 4. 0. 0. 0. 0. 1.
P60 18. 62. 135. 130. 71. 16. 8. 4. 0. 1. 1. 4.
PMX 152. 271. 481. 305. 287. 137. 92. 45. 28. 38. 60. 77.
TMC 29.0 28.4 27.E 27.1 26.7 26.5 26.9 27.7 28.3 28.6 28.7 29.1 27.9

HM 56. 63. 70. 73. 72. 66. 56. 51. 51. 51. 52. 53. 59.
S 61. 58. 54. 58. 63. 66. 73. 81. 79. 78. 71. 67. 68.
PD 9. 34. 86. 113. 52. 12. 5. 1. 0. 0. 0. 2.
ETP 183. 161. 166. 155. 153. 144. 161. 186. 194. 207. 191. 192. 2094.
ETOF 175. 127. 80. 42. 101. 132. 156. 185. 194. 207. 191. 190. 1781.
MAI .05 .21 .52 .73 .34 .08 .03 .00 .00 .00 .00 .01


REMANSO BRAZIL EL= 411 LAT= 9 41 S LONG= 42 4 W KS=11.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 92. 65. 108. 35. 10. 2. 1. 0. 4. 10. 78. 93. 498.
PMI 0. O. 6. O. 0. 0. 0. 0. 0. 0. 0. 0.
P79 12. 23. 39. 3. 0. 0. 0. 0. 0. 0. 28. 45.
P60 54. 35. 96. 9. 0. 0. 0. 0. 0. 0. 47. 75.
PMX 449. 214. 468. 158. 174. 12. 33. 0. 84. 73. 267. 204.
TMC 27.4 27.5 27.1 27.3 26.0 26.0 25.6 25.9 27.2 28.3 28.0 27.5 27.0

HM 50. 52. 51. 50. 51. 50. 51. 48. 46. 45. 47. 48. 49.
SC 82. 80. 81. 82. 81. 82. 81. 84. 85. 86. 84. 84. 83.
PD 21. 26. 51. 4. 0. 0. 0. 0. 0. 0. 32. 51.
ETP 212. 189. 200. 180. 162. 143. 155. 174. 193. 218. 211. 215. 7258.
ETDF 191. 163. 149. 176. 162. 143. 155. 174. 193. 218. 179. 163. 2073.
MAI .10 .14 .25 .02 .00 .00 .00 .00 .00 .00 .15 .24


RIO DE JANEIRO BRAZIL EL= 27 LAT= 22 54 5 LONG: 43 10 W KS=10.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 137. 137. 143. 116. 73. 43. 43. 43. 53. 74. 97. 127. 1086.
PMI 28. 26. 9. 20. 25. 3. 4. 2. 3. 17. 40. 41.
P79 72. 52. 69. 67. 39. 18. 17. 14. 30. 42. 62. 83.
P60 110. 95. 97. 107. 56. 35. 37. 28. 43. 65. 74. 105.
PMX 318. 314. 286. 241. 165. 128. 91. 140. 173. 172. 167. 248.
TMC 25.9 26.1 25.5 23.9 22.3 21.3 20.8 21.1 21.5 22.3 23.1 24.4 23.2

HM 78. 78. 79. 79. 79. 78. 76. 75. 78. 78. 79. 79. 78.
S 52. 54. 56. 55. 57. 59. 60. 59. 43. 40. 43. 42. 52.
PD 80. 61. 75. 75. 43. 22. 21. 17. 33. 47. 65. 88.
ETP 176. 154. 152. 119. 100. 87. 93. 109. .110. 129. 142. 153. 1523.
ETDF 96. 93. 77. 43. 57. 65. 72. 92. 77. 82. 78. 66. 897.
MAI .46 .40 .49 .63 .43 .25 .23 .16 .30 .36 .45 .57


PORTO VELHO BRAZIL











ELr 6 LAT= 12 54 S LONG= 38 20 W KS=12.4


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 77. P5. 153. 291. 293. 107. 207. 97. 83. 91. 135. 104. 1723.
PMI 3. 5. 27. 33. 88. 78. 100. 58. 14. 7. 27. 10.
P79 37. 23. 65. 158. 188. 106. 150. 83. 40. 42. 67. 35.
P60 55. 46. 139. 235. 236. 166. 173. 94. 69. 53. 103. 64.
PMX 212. 231. 386. 723. 794. 428. 475. 221. 244. 275. 576. 342.
TMC 26.2 26.6 26.6 26.0 24.9 24.1 23.3 23.3 23.9 24.8 25.2 25.7 25.0

HM 80. 79. 80. 82. 83. 82. 82. 80. 80. 81. 83. 82. 81.
SC 55. 57. 55. 53. 51. 53. 53. 55. 55. 54. 51. 53. 54.
PD 41. 28. 81. 174. 198. 119. 155. 85. 46. 44. 75. 41.
ETP 173. 157. 163. 136. 120. 107. 112. 128. 142. 160. 157. 167. 1723.
ETDF 133. 129. 82. -38. -78. -11. -43. 43. 96. 116. 82. 126. 637.
MAI .24 .18 .50 1.28 1.65 1.10 1.38 .66 .32 .28 .48 .25


SANTA CRUZ BRAZIL EL= 416 LAT- 15 43 S LONG: 52 45 W KS=10.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 286. 251. 214. 95. 32. 12. 4. 5. 53. 130. 212. 273. 1567.
PMI 98. 150. 82. 20. 0. 0. 0. 0. 0. 14. 51. 152.
P79 163. 182. 138. 39. 6. 0. 0. 0. 11. 70. 133. 220.
P60 249. 270. 165. 49. 14. 0. 0. 0. 27. 108. 185. 266.
PMX 796. 427. 460. 213. 101. 87. 87. 45. 167. 304. 506. 429.
TMC 24.2 24.3 24.3 23.7 21.8 20.0 19.6 21.7 24.3 25.2 24.5 24.2 23.2

HM 84. 85. 85. 82. 78. 75. 70. 61. 62. 72. 80. 84. 76.
SC 42. 41. 41. 45. 50. 53. 58. 66. 65. 56. 47. 42. 51.
PD 181. 200. 144. 41. 8. 0. U. 0. 14. 78. 144. 230.
ETP 147. 127. 131. 116. 105. 92. 102. 130. 153. 165. 150. 148. 1566.
ETDF -34. -73. -13. 75. 97. 92. 102. 130. 139. 87. 7. -82. 526.
MAI 1.23 1.58 1.10 .35 .07 .00 .00 .00 .09 .47 .96 1.56


SANTAREM BRAZIL EL= 72 LAT= 2 25 S LONG= 54 43 3 KS=10.9

JAN FES MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 179. 275. 258. 262. 293. 174. 112. 50. 39. 46. 85. 123. 1896.
PHI 37. 111. 170. 180. 120. 74. 29. 8. 2. 0. 0. 2.
P79 122. 189. 296. 286. 239. 104. 73. 27. 10. 9. 18. 38.
P60 162. 337. 335. 340. 288. 151. 102. 41. 23. 20. 66. 71.
PMX 398. 489. 527. 533. 406. 372. 252. 140. 126. 173. 202. 374.
TMC 25.8 25.5 25.5 25.6 25.6 25.4 25.6 26.2 26.7 27.0 26.9 26.5 26.0

HM 85. 87. 88. 88. 89. 88. 86. 83. 80. 78. 79. 80. 84.
S 38. 31. 29. 33. 40. 50. 58. 66. 62. 62. 54. 50. 48.
PD 130. 220. 304. 297. 249. 114. 79. 30. 13. 11. 28. 45.
ETP 131. 109. 116. 115. 122. 126. 144. 166. 166. 176. 156. 151. 1677.
ETDF 0. -111. -188. -183. -127. 12. 65. 136. 154. 164. 128. 106. 156.
MAI 1.00 2.02 2.63 2.59 2.04 .90 .55 .18 .08 .06 .18 .30


SANTA VITORIA DO PALMAR ERAZ. EL= 6 LAT= 33 31 S LONG= 53 22 W KS=12.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 92. 91. 128. 124. 106. 119. 97. 109. 119. 101. 70. 80. 1236.
PHI 4. 7. 20. 8. 8. 13. 0. 13. 2. 11. 10. 3.
P79 47. 38. 74. 47. 35. 78. 32. 52. 39. 57. 34. 45.
P60 76. 69. 100. 71. 78. 98. 75. 82. 84. 88. 52. 53.
PMX 298. 244. 425. 396. 403. 291. 279. 274. 311. 316. 158. 269.
TMC 22.2 21.8 20.6 17.1 14.3 12.0 11.3 11.9 13.3 15.7 17.9 20.5 16.6

HM 74. 77. 80. 82. 84. 86. 85. 83. 83. 80. 77. 74. 80.
S 62. 63. 58. 59. 52. 46. 47. 51. 49. 53. 60. 62. 55.
PD 53. 45. 79. 52. 44. 82. 41. 58. 48. 64. 38. 47.
ETP 178. 146. 126. 86. 59. 43. 46. 63. 82. 118. 147. 175. 1270.
ETDF 125. 101. 47. 34. 15. -40. 5. 5. 34. 55. 110. 128. 619.
MAI .30 .31 .63 .60 .75 1.93 .88 .92 .59 .54 .26 .27


SALVADOR BRAZIL











EL= 801 LAT= 23 37 S LONG= 46 39 W KS= 9.9


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PH 248. 289. 152. 62. 48. 41. 36. 29. 48. 113. 134. 186. 1386.
PHI 90. 78. 71. 10. 1. 0. 0. 0. 3. 15. 12. 54.
P79 125. 126. 111. 28. 10. 17. 4. 7. 19. 69. 70. 108.
P60 210. 170. 145. 43. 35. 33. 12. 22. 40. 87. 102. 127.
PMX 411. 423. 312. 206. 146. 129. 100. 213. 216. 212. 224. 330.
TMC 22.1 21.4 21.3 19.5 17.3 15.8 15.0 16.5 17.3 18.7 19.5 21.1 18.8

HM 81. 82. 84. 82. 82. 79. 78. 74. 75. 80. 80. 79. 80.
S 38. 40. 41. 52. 50. 57. 56. 57. 40. 31. 37. 42. 45.
PD 143. 135. 118. 31. 15. 20. 6. 10. 23. 73. 77. 112.
ETP 136. 117. 116. 102. 81. 71. 74. 93. 93. 103. 120. 142. 1248.
ETDF -7. -19. -2. 71. 65. 51. 69. 83. 70. 30. 43. 30. 484.
MAI 1.05 1.16 1.02 .31 .19 .29 .08 .11 .25 .71 .64 .79


TURIACU BRAZIL EL= 8 LAT= 1 41 S LONG= 45 22 W KS=11.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 141. 260. 446. 425. 328. 221. 181. 69. 17. 10. 20. 59. 2177.
PHI 9. 3. 125. 67. 88. 108. 18. 14. 2. 1. 0. 1.
P79 63. 137. 295. 302. 211. 161. 130. 43. 4. 3. 3. 8.
P60 94. 238. 408. 383. 290. 197. 152. 53. 9. 7. 9. 22.
PMX 321. 523. 1014. 674. 631. 442. 293. 147. 79. 31. 96. 248.
TMC 27.0 26.5 26.1 26.1 26.3 26.2 26.1 26.6 27.0 27.3 27.5 26.6 26.7

HM 80. 84. 86. 87. 86. 84. 83. 79. 76. 75. 75. 76. 81.
5 53. 40. 34. 35. 44. 57. 64. 72. 72. 70. 67. 64. 56.
PD 70. 158. 319. 319. 228. 169. 135. 45. 5. 4 4. 11.
ETP 157. 125. 127. 119. 131. 139. 155. 176. 181. 199. 176. 170. 1846.
ETDF 88. -33. -191. -200. -96. -30. 20. 131. 176. 185. 172. 159. 380.
MAI .44 1.26 2.50 2.67 1.73 1.22 .87 .26 .03 .02 .02 .06


UAPES BRAZIL EL= 86 LAT= 0 8 5 LONGz 67 5 W KS=13.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 275. 250. 285. 267. 317. 250. 246. 195. 148. 173. 202. 309. 2917.
PMI 1U7. 95. 80. 150. 146. 117. 66. 88. 73. 72. 59. 189.
P79 187. 169. 180. 213. 243. 185. 152. 154. 103. 120. 136. 223.
P6U 240. 217. 234. 251. 291. 230. 215. 183. 127. 146. 203. 268.
PMX 640. 443. 546. 437. 480. 474. 413. 298. 312. 373. 308. 568.
TMC 25.4 25.5 25.6 25.3 25.0 24.5 24.3 24.8 25.4 25.6 25.9 25.5 25.2

HM 89. 87. 87. 89. 90. 91. 90. 8P. 86. 86. 87. 88. 88.
5 44. 46. 44. 40. 41. 41. 44. 50. 55. 51. 50. 47. 4G.
PD 198. 179. 191. 221. 257. 194. 165. 160. 108. 12E. 150. 232.
ETP 136. 130. 142. 127. 125. 115. 125. 142. 153. 153. 144. 139. 131.
ETDF -62. -49. -49. -94. -132. -79. -40. -18. 45. 28. -6. -93. -551.
MAI 1.46 1.38 1.34 1.74 2.06 1.69, 1.32 1.13 .71 .82 1.04 1.67


KARNOBAT BULGARIA EL= 195 LAT: 42 39 N LONG: 26 59 E KS: 9.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 36. 30. 28. 47. 66. 71. 43. 33. 33. 44. 56. 53. 540.
PHI 6. 2. 1. 8. 15. 8. 6. 3. 0. 1. 5. 0.
P79 18. 10. 15. 27. 44. 24. 15. R. 5. 16. 24. 16.
P60 33. 24. 24. 33. 61. 61. 27. 17. 19. 33. 49. 41.
PMX 106. 98. 186. 113. 137. 120. 186. 121. 129. 111. 199. 133.
TMC .2 1.9 4.9 10.4 15.4 19.4 22.3 21.9 17.8 12.7 7.2 2.7 11.4

HM 84. 80. 76. 72. 73. 70. 63. 63. 69. 76. 83. 85. 74.
SC 39. 44. 48. 52. 51. 54. 60. 60. 55. 49. 40. 38. 49.
PD 21. 13. 17. 28. 48. 32. 13. 10. 8. 20. 29. 21.
ETP 0. 0. 52. 85. 121. 144. 165. 145. 97. 59. 30. 0.
ETDF -21. -13. 36. 57. 73. 112. 148. 136. 89. 39. 0. -21. 634.
MAI .32 .33 .39 .22 .11 .07 .08 .34 .99


SAO PAULO BRAZIL












EL: 33 LAT= 43 49 N LONG= 23 14 E KS= 9.5


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 40. 32. 34. 50. 69. 71. 40. 36. 35. 50. 54. 45. 555.
PMI 5. 1. 2. 5. 4. 7. 2. 3. 0. 4. 7. 2.
P79 24. 7. 9. 25. 34. 33. 11. 6. 10. 14. 26. 18.
P60 39. 21. 23. 41. 41. 45. 24. 11. 14. 23. 43. 36.
PMX 118. 124. 86. 139. 134. 324. 85. 126. 110. 145. 124. 117.
TMC -2.0 .5 5.E 12.6 17.8 21.5 23.8 23.0 18.5 12.0 5.8 .9 11.7

HM 86. 81. 73. 66. 68. 66. 63. 63. 68. 78. 85. 87. 74.
SC 36. 41. 49. 55. 54. 55. 58. 58. 54. 45. 37. 34. 48.
PD 27. 10. 12. 28. 35. 36. 14. 9. 11. 16. 30. 22.
ETP 0. 0. 54. 94. 133. 155. 169. 146. 96. 53. 25. 0.
ETDF -27. -10. 42. 66. 98. 119. 155. 134. 86. 37. -4. -22. 677.
MAI .22 .30 .27 .23 .08 .06 .11 .30 1.16


SOFIA BULGARIA EL: 588 LAT= 42 49 N LONC= 23 23 E KS= 9.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 42. 31. 37. 55. 71. 90. 59. 43. 42. 55. 52. 44. 622.
PHI 3. 1. 2. 14. 27. 23. 6. 6. 4. 1. 9. 3.
P79 21. 1. 13. 31. 47. 43. 35. 12. 14. 17. 31. 17.
P60 30. 17. 22. 41. 63. 61. 42. 22. 28. 39. 33. 34.
PMX 91. 58. 78. 98. 172. 217. 145. 92. 153. 121. 73. 95.
TMC -1.7 .6 4.6 10.6 15.4 19.0 21.3 20.7 16.7 11.1 5.5 .6 10.4

HM 84. 78. 72. 66. 68. 67. 62. 61. 68. 75. 83. 85. 72.
SC 38. 45. 50. 55. 54. 55. 59. 59. 54. 47. 39. 37. 49.
PD 23. 11. 15. 33. 50. 47. 36. 14. 17. 22. 33. 21.
ETP 0. 0. 53. 89. 124. 143. 159. 140. 93. 55. 27. O.
ETDF -23. -11. 38. 56. 74. 97. 123. 126. 76. 33. -6. -21. 561.
MAI .28 .37 .41 .33 .23 .10 .18 .40 1.21


VRATZA BULGARIA EL= 348 LATn 43 12 N LONG= 23 32 E KS= 9.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 49. 39. 49. 71. 114. 106. 79. 57. 57. 71. 61. 54. 807.
PMI 18. 2. 0. 7. 25. 32. 14. 9. 4. 1. 25. 9.
P79 29. 19. 19. 35. 65. 51. 30. 21. 11. 37. 43. 19.
P60 40. 31. 35. 51. 85. 67. 57. 35. 20. 51. 54. 46.
PMX 140. 86. 116. 171. 226. 265. 213. 172. 201. 192. 132. 130.
TMC -1.8 .4 5.0 11.5 16.3 19.9 22.3 22.0 17.8 11.5 5.6 1.0 11.0

HM 82. 78. 73. 66. 69. 67. 61. 59. 65. 75. 84. 83. 72.
SC 40. 45. 49. 55. 53. 55. 59. 61. 56. 47. 38. 39. 50.
PD 31. 22. 22. 38. 69. 54. 36. 24. 13. 40. 45. 25.
ETP 0. 0. 53. 91. 127. 147. 165. 147. 97. 55. 26. 0.
ETDF -31. -22. 31. 53. 57. 93. 129. 123. 85. 15. -19. -25. 489.
MAI .42 .42 .55 .37 .22 .16 .13 .72 1.72


BUJUMBURA BURUNDI EL= 783 LAT: 3 19 S LONG= 29 19 E KS=10.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 90. 110. 120. 125. 54. 11. 7. 10. 37. 62. 97. 115. 838.
PMI 23. 48. 40. 53. 12. 0. 0. 0. 3. 18. 42. 40. 617.
P79 59. 68. 79. 85. 24. 0. 0. 0. 14. 38. 58. 74. 693.
P60 69. 90. 102. 109. 45. 2. 0. 2. 26. 50. 83. 108. 830.
PMX 161. 223. 225. 226. 123. 104. 74. 89. 106. 134. 169. 194. 1106.
TMC 23.1 22.9 22.2 22.8 23.2 23.0 22.1 23.0 24.2 24.6 23.5 23.5 23.2

HM 79. 77. 80. 82. 72. 67. 65. 63. 66. 68. 75. 75. 72.
SC 49. 51. 48. 45. 57. 61. 63. 65. 62. 61. 53. 53. 56.
PD 61. 73. 84. 90. 28. 0. 0. 0. 17. 41. 63. 81. 722.
ETP 140. 131. 137. 125. 136. 131. 136. 151. 157. 165. 144. 147. 1701.
ETDF 79. 59. 53. 35. 108. 130. 136. 151. 140. 124. 81. 66. 1163.
MAI .44 .55 .61 .72 .21 .00 .00 .00 .11 .25 .44 .55 .42


LOM BULGARIA











EL= 10 LAT= 11 33 N LONG=104 51 E KS=12.8


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 9. 8. 28. 73. 146. 129. 129. 147. 231. 250. 134. 36. 1320.
PMI 0. 0. 0. 13. 19. 38. 47. 44. 128. 63. 4. 0. 935.
P79 0. 0. 2. 26. 90. 76. 98. 98. 164. 157. 66. 5. 1087.
PEO 0. 0. 12. 52. 127. 97, 120. 128. 190. 222. 105. 10. 1265.
PMX 57. 65. 94. 177. 395. 347. 227. 321. 406. 429. 284. 105. 1792.
TMC 26.1 27.5 28.9 29.4 28.8 28.1 27.6 27.7 27.3 27.2 26.7 25.4 27.6

HM 71. 69. 69. 73. 80. 80. 81. 82. 84. 82. 78. 74. 77.
S 81. 79. 72. 67. 59. 51. 46. 46. 43. 55. 67. 77. 62.
PD 0. 0. 4. 31. 98. 80. 103. 104. 169. 171. 74. 6. 1124.
ETP 162. 162. 190. 187. 178. 197. 152. 155. 140. 153. 149. 151. 1935.
ETDF 162. 162. 186. 156. 80. 76. 50. 50. -30. -17. 74. 145. 1094.
MAI .00 .00 .02 .17 .55 .51 .67 .67 1.21 1.11 .50 .04 .58


CHATHAM N.B. CANACA EL= 34 LAT= 47 1 N LONG: 65 27 W KS- 9.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 87. 80. 76. 73. 75. 95. 74. 74. 93. 89. 104. 77. 997.
PMI 14. 16. 25. 15. 22. 30. 19. 10. 15. 23. 24. 20. 723.
P79 51. 42. 51. 53. 51. 68. 51. 42. 48. 47. 68. 44. 809.
P60 61. 61. 64. 60. 60. 84. 67. 73. 64. 68. 80. 64. 933.
PMX 286. 178. 207. 167. 149. 172. 158. 193. 257. 227. 220. 130. 1243.
TMC -9.6 -8.8 -3.7 3.2 9.7 15.2 19.3 18.2 13.6 7.4 .8 -7.1 4.8

HM 82. 78. 78. 72. 71. 72. 72. 74. 76. 77. 81. 79. 76.
S 39. 41. 39. 45. 46. 45. 55. 55. 51. 46. 32. 37. 44.
PD 53. 46. 54. 54. 53. 71. 54. 49. 51. 51. 71. 48. 835.
ETP 0. 0. 0. 56. 93. 116. 145. 122. 77. 42. 0. 0.
ETDF -53. -46. -54. 2. 40. 45. 91. 74. 26. -10. -71. -48. -4.
MAI .97 .57 .62 .37 .40 .67 1.24


EDMONTON ALTA. CANADA EL= 676 LAT= 53 34 N LONG=113 31 W KS= 9.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 24. 20. 21. 28. 47. 80. 85. 65. 34. 23. 22. 25. 474.
PMI 0. 0. 5. 1. 7. 11. 33. 1. 3. 4. 6. 4. 327.
P79 13. 9. 8. 10. 19. 37. 62. 36. 15. 6. 12. 12. 404.
P60 18. 14. 11. 18. 40. 61. 71. 49. 24. 13. 17. 19. 466.
PMX 64. 58. 70. 88. 134. 172. 211. 141. 105. 49. 79. 72. 648.
TMC -14.1 -11.6 -5. 5 4.2 11.2 14.3 17.3 15.6 10.8 5.1 -4.2 -10.4 2.7

HM 77. 75. 75. 61. 56. 64. 67. 71. 69. 69. 73. 77. 69.
S 35. 45. 46. 54. 53. 50. 63. 60. 50. 49. 40. 34. 48.
PD 14. 10. 9. 12. 23. 42. 64. 39. 17. 7. 13. 13. 417.
ETP J. 0. 0. 60. 103. 118. 144. 112. 61. 31. 0. 0.
ETOF -14. -10. -9. 48. 80. 76. 80. 73. 44. 23. -13. -13. 366.
MAI .19 .23 .36 .44 .35 .28 .24


PORT HARRISON QUE. CANADA EL= 20 LAT= 58 27 N LONG= 78 8 W KS= 7.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 14. 9. 16. 17. 23. 30. 51. 54. 62. 49. 47. 23. 395.
PHI 2. 0. 0. 2. 4. 10. 10. 15. 24. 16. 12. 2. 226.
P79 4. 4. 3. 8. 13. 13. 32. 31. 42. 27. 20. 11. 332.
P60 7. 5. 8. 13. 19. 19. 47. 48. 56. 37. 29. 17. 356.
PMX 60. 51. 99. 37. 43. 48. 106. 113. 95. 109. 154. 53. 579.
TMC -25.0 -25.3 -19.8 -10.8 -2.2 4.4 8.9 8.6 5.0 -.3 -8.1 -18.3 -6.9

HM 73. 74. 79. 83. 88. 82. 83. 87. 88. 87. 86. 77. 82.
S 28. 44. 44. 38. 27. 35. 37. 33. 20. 16. 12. 14. 29.
PD 5. 4. 4. 9. 14. 14. 35. 35. 45. 29. 22. 12. 337.
ETP 0. 0. 0. 0. 0. 67. 82. 63. 28. 0. 0. 0.
ETDF -5. -4. -4. -9. -14. 53. 47. 28. -17. -29. -22. -12. 11.
MAI .21 .43 .55 1.62


POCHENTONG CAMBOCIA












PRINCE GEORGE B.C. CANADA EL= 676 LAT= 53 53 N LONGr122 41 W KS= 8.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 56. 44. 36. 28. 43. 62. 64. 65. 56. 59. 57. 56. 626.
PHI 20. 13. 13. 6. 6. 9. 1. 14. 14. 27. 26. 11. 503.
P79 40. 28. 21. 17. 21. 39. 39. 33. 33. 50. 33. 32. 544.
P60 50. 38. 27. 22. 42. 53. 55. 49. 48. 54. 49. 49. 614.
PMX 103. 88. 81. 75. 106. 105. 129. 147. 156. 93. 115. 127. 770.
TMC -10.4 -7.4 -1.8 4.5 9.9 13.2 15.2 14.0 10.2 4.9 -2.2 -7.1 3.6

HM 85. 79. 73. 65. 58. 69. 71. 75. 76. 77. 84. 85. 75.
S 22. 33. 36. 44. 51. 48. 53. 54. 45. 32. 23. 18. 38.
PD 42. 30. 22. 18. 25. 42. 42. 36. 36. 51. 36. 36. 559.
ETP 0. 0. 0. 55. 96. 111. 124. 101. 56. 24. 0. 0.
ETDF -42. -30. -22. 37. 71. 69. 82. 64. 20. -27. -36. -36. 150.
MAI .33 .26 .38 .34 .36 .64 2.09


REGINA SASK. CANADA EL= 574 LAT= 50 26 N LONG=104 40 W KS=10.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 19. 17. 21. 21. 40. 83. 55. 49. 34. 18. 20. 17. 394.
PMI 2. 1. 4. 1. 1. 20. 14. 16. 3. 0. 3. 1. 216.
P79 7. 9. 11. 6. 15. 45. 30. 22. 10. 6. 7. 9. 314.
P60 17. 13. 14. 17. 25. 72. 46. 34. 21. 11. 13. 15. 365.
PMX 37. 48. 51. 55. 110. 147. 137. 119. 138. 49. 57. 44. 622.
TMC -16.9 -14.8 -8.1 3.4 11.2 15.3 19.3 17.8 11.9 5.1 -5.4 -12.3 2.2

HM 86. 82. 83. 68. 61. 66. 67. 65. 67. 72. 84. 87. 74.
S 38. 43. 42. 53. 56. 51. 68. 65. 53. 53. 37. 35. 50.
PD 9. 10. 12. 8. 17. 51. 33. 25. 12. 7. 8. 10. 325.
ETP 0. 0. 0. 60. 108. 124. 161. 128. 70. 36. 0. 0.
ETDF -9. -10. -12. 51. 91. 73. 128. 104. 57. 29. -8. -10. 484.
MAI .14 .16 .41 .21 .19 .18 .20


SABLE ISLAND CANADA EL= 4 LAT= 43 56 N LONG= 60 21 W KS= 9.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 125. 114. 106. 94. 87. 81. 74. 101. 97. 110. 126. 133. 1248.
PMI 26. 50. 20. 44. 9. 22. 16. 11. 22. 9. 23. 41. 549.
P79 96. 85. 58. 60. 61. 41. 38. 54. 52. 58. 92. 87. 1089.
P60 118. 99. 99. 89. 73. 64. 66. 76. 89. 94. 102. 122. 1232.
PMX 209. 178. 197. 192. 159. 168. 163. 219. 182. 248. 293. 318. 1632.
TMC -.2 -1.1 .4 3.4 6.8 10.9 15.7 17.8 16.1 11.6 7.3 2.4 7.6

HM 84. 81. 83. 86. 91. 93. 94. 92. 87. 84. 85. 83. 87.
SC 40. 43. 41. 37. 30. 26. 24. 28. 36. 40. 38. 41. 40.
PD 101. 88. 67. 66. 64. 46. 44. 59. 60. 66. 94. 94. 1119.
ETP 0. 0. 0. 53. 68. 77. 87. 88. 73. 49. 27. 0.
ETDF -101. -89. -67. -13. 4. 31. 43. 30. 13. -16. -67. -94. -324.
MAI 1.24 .94 .60 .50 .66 .82 1.33 3.42


SYDNEY N.S. CANADA EL= 60 LAT= 46 10 N LONG= 60 3 W KS= 9.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 130. 119. 112. 98. 94. 89. 71. 103. 104. 115. 143. 128. 1306.
PMI 38. 66. 39. 24. 23. 28. 9. 25. 34. 38. 35. 54. 1022.
P79 82. 84. 80. 64. 58. 51. 47. 69. 48. 65. 81. 99. 1206.
P60 106. 108. 98. 90. 77. 75. 64. 84. 89. 91. 130. 113. 1318.
PMX 248. 221. 186. 169. 167. 277. 133. 202. 313. 284. 228. 227. 1584.
TMC -4.3 -5.4 -2.3 2.8 8.2 13.3 18.3 18.3 14.4 9.1 4.2 -1.6 6.2

HM 87. 84. 85. 81. 80. 82. 81. 83. 83. 84. 86. 85. 83.
S 26. 35. 33. 40. 44. 45. 55. 51. 47. 43. 26. 26. 39.
PD 87. 89. 84. 69. 62. 56. 51. 77. 57. 70. 91. 102. 1230.
ETP 0. 0. 0. 0. 86. 109. 141. 119. 77. 44. 18. 0.
ETDF -87. -89. -84. -69. 24. 53. 91. 47. 20. -27. -73. -102. -295.
MAI .72 .51 .36 .60 .74 1.60 5.07











WINNIPEG MON. CANADA EL: 240 LAT= 49 E4 N LONG= 97 14 W KS= 9.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 26. 21. 27. 30. 50. 81. 69. 70. 55. 37. 29. 22. 517.
PMI 6. 4. 2. 2. 9. 25. 17. 13. 1. 8. 2. 3. 356.
P79 15. 15. 13. 10. 23. 53. 41. 34. 23. 14. 16. 8. 410.
P60 19. 17. 18. 25. 36. 63. 48. 54. 39. 24. 21. 17. 499.
PMX 52. 44. 72. 70. 134. 171. 197. 140. 150. 144. 90. 52. 718.
TMC -17.7 -15.5 -7." 3.3 13.3 16.5 20.Z 18.9 12.8 6.2 -4.P -12.9 2.5

HM 77. 78. 78. 69. 61. 66. 69. 69. 71. 73. 82. 82. 73.
S 39. 49. 47. 51. 52. 52. 64. 61. 49. 47. 31. 33. 48.
PD 16. 15. 14. 13. 26. 55. 42. 38. 26. 16. 17. 10. 429.
ETP 0. 0. 0. 59. 111. 129. 159. 129. 70. 36. 0. 0.
ETDF -16. -15. -14. 45. 86. 74. 117. 91. 43. 20. -17. -10. 404.
MAI .22 .23 .43 .27 .30 .38 .44


COLOMBO(CEYLON) SRI LANKA EL= 6 LAT= 6 54 N LONG= 79 52 E KS=11.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 88. 96. 118. 26G. 353. 212. 140. 124. 153. 354. 324. 175. 2397.
PMI 0. 1. 4. 73. 20. 43. 7. 3. 18. 123. 72. 30.
P79 26. 39. 54. 133. 224. 149. 59. 35. 56. 230. 205. 66.
P60 59. 70. 96. 199. 306. 183. 85. 87. 111. 308. 307. 119.
PMX 310. 269. 247. 657. 359. 463. 529. 406. 402. 781. 590. 547.
TMC 26.2 26.4 27.2 27.7 28.0 27.4 27.1 27.2 27.2 26.6 26.2 26.1 26.9

HM 75. 76. 78. 81. 82. 82. 81. 80. 80. 83. 82. 78. 80.
SC 59. 58. 56. 52. 50. 50. 52. 53. 53. 49. 50. 56. 53.
PD 33. 46. 63. 147. 241. 156. 64. 46. 68. 246. 226. 77.
ETP 149. 142. 164. 157. 157. 147. 155. 161. 157. 148. 135. 141. 1812.
ETDF 116. 96. 101. 10. -84. -9. 90. 115. 89. -99. -91. 64. 399.
MAI .22 .32 .38 .94 1.53 1.06 .42 .29 .43 1.67 1.68 .55


HAMBANTOTA (CEYLON) SRI LANXA EL= 20 LAT- 6 7 N LONG= 81 8 E KS=11.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 101. 58. 66. 109. 121. 55. 43. 42. 45. 126. 187. 121. 1074.
PMI 0. 0. 2. 19. 0. 11. 1. 0. 2. 24. 26. 19.
P79 22. 17. 17. 52. 47. 21. 9. 12. 14. 52. 92. 38.
P60 47. 27. 50. 74. 71. 35. 20. 28. 23. 83. 171. 81.
PMX 376. 273. 193. 303. 512. 216. 224. 152. 128. 326. 367. 480.
TMC 26.1 26.3 27.1 27.8 28.0 27.6 27.7 27.6 27.4 27.1 26.6 26.1 27.1

HM 78. 78. 79. 81. 81. 79. 76. 76. 79. 80. 82. 80. 79.
SC 56. 56. 55. 52. 52. 55. 58. 58. 55. 53. 50. 53. 54.
PD 27. 19. 24. 57. 52. 24. 11. 15. 16. 59. 109. 47.
ETP 145. 139. 162. 157. 159. 153. 165. 169. 159. 157. 138. 139. 1342.
ETDF 118. 120. 138. 100. 107. 129. 154. 154. 144. 98. 29. 92. 1383.
MAI .19 .14 .15 .36 .33 .16' .07 .09 .10 .37 .79 .34


MANNER (CEYLON) SRI LANKA EL= 3 LA7I 8 59 N LONG- 79 55 E KS=11.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 87. 34. 44. 77. 44. 5. 7. 16. 23. 168. 242. 202. 949.
PMI 3. 0. 0. 2. 0. 0. 0. 0. 0. 25. 42. 49.
P79 27. 6. 2. 25. 3. 0. 0. 0. 0. 77. 141. 73.
P60 48. 13. 10. 53. 23. 0. 0. 1. 2. 123. 193. 118.
PMX 304. 246. 176. 376. 164. 57. 68. 149. 145. 495. 480. 620.
TMC 26.0 26.7 27.9 29.0 29.5 29.1 28.4 28.3 28.4 27.8 26.7 26.0 27.8

HM 78. 74. 74. 76. 77. 76. 77. 77. 76. 79. 81. 80. 77.
SC 54. 59. 59. 56. 55. 56. 55. 55. 56. 53. 50. 51. 55.
PD 31. 7. 4. 31. 7. 0. 0. 0. 0. 87. 152. 82.
ETP 137. 140. 170. 169. 172. 165. 167. 170. 165. 155. 133. 131. 1873.
ETDF 106. 133. 166. 139. 165. 165. 167. 169. 165. 68. -19. 48. 1471.
MAI .23 .05 .02 .18 .04 .00 .00 .00 .00 .56 1.14 .63











TRINCOMALEE (CEYLON) SRI LANKA EL= 7 LAT= 8 35 N LONG= 81 15 E KS11.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 211. 95. 48. 77. 68. 18. 54. 103. 89. 235. 355.. 374. 1727.
PMI 15. 3. 0. 0. 0. 0. 1. 1. 3. 58. 81,. 74.
P79 1U4. 20. 3. 27. 23. 0. 8. 26. 39. 141. 207. 175.
P60 169. 52. 20. 61. 51. 1. 33. 70. 68. 206. 269.. 242.
PMX 525. 392. 282. 223. 234. 105. 183. 2 55. 211. 490. 954. 820.
TMC 25.6 26.2 27.3 28.7 29.8 29.9 29.7 29.4 79.3 27.8 26.3 25.7 28.0

HM 80. 77. 77. 75. 69. 63. 62. 64. 64. 74. 82. 82. 72.
SC 53. 57. 57. 59. 66. 72. 73. 71. 71. 61. 50. 50. 62.
PD 118. 27. 7. 34. 29. 0. 13. 35. 45. 155. 220. 189.
ETP 136. 137. 165. 172. 190. 189. 198. 197. 190. 167. 133. 129. 2004.
ETDF 18. 111. 159. 139. 161. 189. 184. 162. 145. 12. -87. -60. 1132.
MAI .87 .19 .04 .20 .15 .OU .07 .18 .24 .93 1.66 1.46


ABECHE CHAD EL= 549 LAT- 13 51 N LONG: 20 51 E KS= 9.8

JAN FrB MAR APR PAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 0. 1. 24. 26. 141. 232. 67. 14. 0. 0. 505.
PMI 0. 0. 0. 0. 0. 4. 28. 48. 0. 0. 0. 0.
P79 0. 0. 0. 0. 5. 8. 85. 188. 22. 0. 0. 0.
P60 0. 0. 0. 0. 8. 16. 105. 213. 39. 1. 0. 0.
PMX 0. 0. 2. 1. 74. 69. 273. 454. 171. 65. 0. 0.
TMC 25.4 27.8 31.1 32.6 32.8 31.7 28.E 26.2 27.3 29.3 28.2 26.0 28.9

HM 23. 19. 18. 21. 32. 43. 62. 76. 66. 33. 26. 25. 37.
S 90. 90. 80. 80. 78. 67. 61. 52. 72. 86. 90. 91. 78.
PD 0. 0. 0. 0. 6. 10. 89. 193. 26. 0. 0. 0.
ETP 162. 169. 208. 219. 227. 198. 182. 160. 180. 196. 172. 160. 2231.
ETOF 162. 169. 2U8. 219. 221. 188. 92. -34. 155. 196. 172. 160. 1908.
MAI .00 .00 .00 .00 .02 .05 .49 1.21 .14 .00 .o0 .00


AM-TIMAN CHAD EL '136 LAT= 11 2 N LONG= 20 IT E KS= 9.9

JAN FEB MAR AP? MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 4. 8. 19. 80. 123. 182. 311. 154. 38. 0. 0. 918.
PMI 0. 0. 0. 0. 13. 75. 117. 136. 90. 2. 0. 0.
P79 0. 0. 0. 7. 36. 83. 140. 237. 104. 19. 0. 0.
P60 0. 0. 0. 12. 60. 109. 172. 302. 135. 26. 0. 0.
PMX 0. 41. 60. 79. 141. 207. 285. 494. 249. 92. 0. 0.
TMC 24.8 25.0 29.3 30.5 30.0 28.3 25.8 25.3 26.1 26.4 25.5 25.1 26.8

HM 33. 27. 30. 40. 48. 61. 79. 85. 83. 74. 56. 42. 55.
SC 81. 85. 83. 77. 71. 62. 45. 38. 41. 50. 66. 75. 65.
PD 0. 0. 0. 8. 41. 88. 147. 251. 111. 20. 0. 0.
ETP 158. 158. 206. 204. 201. 172. 145. 133. 133. 145. 144. 150. 1949.
ETDF 158. 158. 206. 196. 160. 84. -2. -118. 22. 124. 144. 150. 1283.
MAI .00 .00 .00 .04 .20 .51 1.01 1.49 .83 .14 .00 .00
------------------------------- ------------ -- ------------------------- -- --- ---

ATI CHAD EL- 334 LAT= 13 13 N LONG: 18 19 E KS=10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 0. 1. 23. 25. 121. 206. 73. 6. 0. 0. 457.
PMI 0. 0. 0. 0. 0. 1. 68. 85. 22. 0. 0. 0.
P79 0. 0. 0. 0. 0. 4. 88. 139. 48. 0. 0. 0.
P60 0. 0. 0. 0. 14. 16. 97. 177. 80. 1. 0. 0.
PMX 0. 0. 2. 6. 67. 79. 193. 328. 111. 25. 3. 0.
TMC 24.1 26.0 30.6 33.3 33.8 32.7 29.3 27.6 27.3 29.3 28.3 26.1 29.0

HM 24. 24. 21. 23. 32. 45. 65. 77. 67. 42. 27. 28. 40.
SC 87. 87. 89. 88. 82. 74. 59. 48. 57. 76. 85. 85. 77.
PD 0. 0. 0. 0. 3. 7. 90. 147. 55. 0. 0. 0.
ETP 156. 161. 217. 232. 237. 211. 182. 158. 161. 186. 170. 157. 2227.
ETDF 156. 161. 217. 232. 234. 205. 92. 11. 106. 186. 170. 157. 1926.
MAI .00 .00 .00 .00 .01 .03 .49 .93 .34 .00 .00 .00
-- ------------------------------------ --------------------- -- ------------ -- -- ---











EL: 336 LAT: 10 29 N LONG: 16 43 E KS=ln.l


JAN FEB "AR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM D. 0. 3. 21. 64. 105. 280. 326. 189. 47. 6. 0. 1040.
PMI O. 0. 0. 0. 21. 29. 150. 223. 46. 10. 0. 0.
P79 0. 0. 0. 8. 30. 69. 181. 258. 84. 20. U. 0.
P60 0. 0. 0. 12. 41. 91. 233. 304. 163. 29. 0. 0.
PMX 0. 0. 22. 85. 122. 181. 416. 434. 299. 108. 54. 0.
TMC 25.2 27.3 30.9 32.6 31.7 28.7 26.7 26.4 26.5 27.9 27.2 25.8 28.0

HM 31. 24. 30. 44. 50. 62. 77. 84. 81. 75. 56. 41. 55.
S 86. 85. 73. 67. 68. 59. 51. 45. 54. 69. 83. 83. 69.
PD 0. 0. 0. 9. 32. 74. 192. 268. 101. 22. 0. 0.
ETP 166. 168. 201. 199. 203. 169. 156. 148. 154. 176. 170. 162. 2073.
ETDF 166. 168. 201. 191. 171. 95. -36. -120. 54. 154. 170. 162. 1376.
MAI .00 .00 .00 .04 .16 .44 1.23 1.81 .65 .12 .00 .00


FAYA-LARGEAU CHAD EL= 234 LAT: 18 0 N LONG: 19 10 E KS=10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 0. 0. 0. 2. 1. 11. 2. 0. 0. 0. 16.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 0. D. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P60 0. 0. 0. 0. 0. 0. D. 5. 0. 0. 0. 0.
PMX O. 0. 0. 0. 2. 48. 8. 31. 23. 2. 1. 0.
TMC 20.4 22.7 27.U 30.6 33.8 34.2 33.6 32.7 32.6 30.5 25.5 21.3 28.7

HM 28. 25. 22. 19. 23. 24. 32. 39. 29. 24. 26. 29. 27.
SC 85. 87. 88. 90. 88. 87. 82. 78. 84. 87. 86. 84. 86.
PD 0. 0. 0. 0. 0. 0. 0. 1. 0. 0. 0. 0.
ETP 129. 139. 194. 222. 249. 243. 241. 227. 215. 195. 148. 127. 2329.
ETOF 129. 139. 194. 222. 249. 243. 241. 226. 215. 195. 148. 127. 2328.
MAI .00 .00 .00 .n0 .0 .00 .00 .00 .00 .00 .00 .00
- --------------------------------- ----- ------- -------- - ------------ ------- -- ---

FORT-ACHAMBAULT CHAD EL= 365 LAT= 9 8 N LONG: 18 23 E KS= 9.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 1. 8. 39. 105. 143. 226. 311. 225. 80. 3. 0. 1140.
PMI 0. 0. 0. 0. 16. 88. 104. 234. 79. 9. 0. 0.
P79 0. 0. 0. 5. 61. 104. 164. 253. 165. 28. 0. D.
P60 0. 0. 0. 23. 75. 120. 194. 312. 202. 60. 0. 0.
PMX 0. 11. 66. 90. 205. 261. 473. 423. 515. 239. 14. 1.
TMC 26.2 28.4 31.1 31.2 29.6 27.4 26.1 25.5 26.1 27.3 27.4 26.1 27.7

HM 36. 34. 41. 51. 63. 74. 81. 84. 83. 77. 63. 47. 61.
S 77. 79. 65. 61. 61. 52. 42. 41. 50. 62. 78. 78. 62.
PD 0. O. 0. 9. 64. 107. 170. 265. 173. 35. 0. 0.
ETP 164. 169. 191. 184. 182. 152. 139. 138. 147. 166. 168. 161. 1961.
ETOF 164. 169. 191. 175. 119. 45. -31. -28. -26. 131. 168. 161. 1118.
MAI .00 .00 .00 .05 .35 .70 1.23 1.93 1.17 .21 .00 .00
----------------------------- --------------- --------------------- ----

FORT-LAMY CHAD EL= 295 LAT 12 8 N LONG= 15 2 E KSZ10.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 0. 5. 36. 66. 156. 257. 104. 23. 1. 0. 646.
PMI 0. 0. O. 0. 2. 3. 49. 115. 17. 0. 0. 0.
P79 0. 0. 0. 0. 9. 38. 101. 168. 49. 2. 0. 0.
P60 0. 0. 0. 0. 23. 53. 124. 210. 99. 5. 0. 0.
PMX 0. 1. 0. 53. 141. 137. 281. 582. 206. 95. 16. 0.
TMC 23.5 25.9 30.1 32.7 32.3 30.5 27.5 26.2 27.1 28.6 27.1 24.1 27.9

HM 32. 24. 23. 26. 40. 55. 71. 81. 76. 58. 36. 33. 46.
SC 83. 88. 89. 87. 78. 68. 54. 44. 49. 65. 81. 83. 72.
PD 0. 0. 0. 0. 12. 41. 106. 177. 59. 3. 0. 0.
ETP 153. 163. 216. 228. 222. 191. 166. 146. 149. 172. 163. 150. 2119.
ETDF 153. 163. 216. 228. 210. 150. 60. -31. 90. 169. 163. 150. 1721.
MAI .00 .00 .00 .00 .05 .22 .64 1.21 s40 .02 .00 .00
----------------------------------------------------------- ------------- ---- --


BOUSSO CHAD












EL: 356 LAT- 14 7 N LONG: 15 19 E KS=10.0


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 0. 0. 10. 13. 1U7. 148. 46. A. 0. 0. 335.
PMI 0. O. 0. 0. 0. 0. 0. 23. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 1. 60. 91. 1. 0. 0. 0.
P60 0. 0. 0. 0. 0. 8. 81. 131. 25. 0. 0. 0.
PMX 0. 2. 0. 1. 47. 53. 261. 297. 144. 34. 0. 0.
TMC. 22.8 25.3 29.9 32.9 33.5 32.6 29.5 27.7 29.5 30.3 28.5 26.1 28.9

HM 25. 17. 22. 24. 30. 43. 64. 72. 59. 31. 21. 25. 36.
SC 87. 91. 88. 87. 84. 75. 60. 53. 64. 83. 89. 87. 79.
PD 0. 0. 0. 0. 0. 2. 64. 99. 5. 0. 0. 0.
ETP 148. 160. 212. 229. 238. 214. 185. 166. 178. 197. 171. 156. 2255.
ETDF 148. 160. 212. 229. 238. 212. 120. 67. 172. 197. 171. 156. 2083.
HAI .00 .00 .00 .00 .00 .01 .35 .B0 .03 .00 .00 .00


MOUNDOU CHAD EL= 422 LAT= 8 37 N LONG: 16 4 E KS=10.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. O. 2. 40. 118. 171. 244. 303. 250. 96. 4. 0. 1228.
PHI 0. 0. 0. 0. 19. 85. 101. 134. 93. 16. 0. 0.
P79 0. 0. 0. 9. 63. 130. 154. 210. 175. 49. 0. 0.
P60 0. 0. 1. 20. 91. 152. 230. 262. 205. 64. 0. 0.
PMX 0. 9. 57. 119. 295. 293. 612. 490. 441. 328. 35. 2.
TMC 24.9 27.4 30.U 30.9 29.2 27.4 26.1 25.4 25.4 26.7 26.8 25.0 27.1

HM 42. 36. 39. 52. 64. 74. 80. 83. 83. 76. 61. 50. 62.
5 80. 79. 68. 58. 62. 53. 47. 42. 49. 62. 82. 84. 64.
PD 0. 0. 0. 11. 69. 135. 170. 221. 181. 52. D. 0.
ETP 164. 166. 191. 179. 182. 153. 146. 137. 144. 164. 171. 164. 1960.
ETDF 164. 166. 191. 168. 113. 18. -24. -84. -38. 112. 171. 164. 1121.
MAI .00 .00 .00 .06 .38 .88 1.16 1.61 1.26 .32 .00 .00


MONGO CHAD EL= 428 LAT- 12 11 N LONG= 18 41 C KS=10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 2. 12. 57. 64. 207. 325. 155. 35. 1. 0. 856.
PHI 0. 0. 0. 0. 16. 33. 135. 164. 76. 7. 0. 0.
P79 0. D. 0. 1. 21. 36. 141. 207. 40. 20. 0. 0.
P60 0. 0. 0. 5. 37. 62. 175. 279. 132. 31. 0. 0.
PMX 0. 0. 9. 33. 134. 106. 317. 545. 233. 64. 4. 0.
TMC 26.7 28.5 32.2 33.7 32.6 30.5 28.0 25.9 26.9 28.8 28.9 27.7 29.1

HM 18. 14. 24. 28. 36. 50. 68. 78. 72. 47. 26. 22. 40.
SC 91. 93. 87. 85. 80. 71. 57. 47. 53. 73. 86. 88. 76.
PD 0. 0. 0. 2. 24. 41. 148. 222. 59. 22. 0. 0.
ETP 172. 179. 224. 230. 226. 195. 171. 149. 154. 182. 175. 169. 2226.
ETDF 172. 178. 224. 228. 202. 154. 23. -73. 94. 159. 175. 169. 1706.
MAI .00 .00 .00 .01 .11 .21 .85 1.49 .39 .12 .00 .00


PALA CHAD EL= 455 LAT: 9 22 N LONG: 14 55 E KS= 9.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 10. 32. 94. 156. 230. 224. 210. 84. 4. 0. 1043.
PHI 0. 0. 0. 0. 17. 93. 149. 138. 134. 10. 0. 0.
P79 0. 0. 0. 6. 52. 105. 174. 150. 179. 24. 0. 0.
P60 0. 0. 4. 24. 74. 144. 209. 203. 214. 90. 0. 0.
PMX 0. 1. 46. 70. 223. 242. 313. 345. 277. 124. 15. 0.
TMC 25.5 27.3 30.9 31.3 30.1 27.1 25.5 25.1 25.2 27.0 27.9 25.4 27.4

HM 25. 21. 25. 45. 55. 71. 76. 81. 82. 68. 42. 29. 52.
S 89. 86. 77. 66. 69. 57. 50. 41. 56. 68. 84. 89. 69.
PD 0. 0. 1. 10. 57. 113. 181. 161. 186. 38. 0. 0.
ETP 173. 172. 207. 193. 196. 158. 150. 137. 152. 172. 176. 173. 2059.
ETDF 173. 172. 207. 183. 140. 45. -32. -25. -34. 134. 176. 173. 1312.
MAI .00 .00 .00 .05 .29 .71 1.21 1.18 1.22 .22 .00D .00


MAO CHAD











EL= 24 LAT= 22 0 N LONG-120 45 E KS- 9.5


JAN FEB MAR APR -AY JUN JUL AUG SEP OCT NOV DEC ANN

PM 17. 26. 21. 53. 151. 466. 584. 537 357. 137. 87. 25. 2462.
PMI 4. 0. 1. 3. 13. 57. 74. 34. 94. 7. 1. 1.
P79 7. 7. 6. 7. 50. 265. 310. 251. 217. 37. 9. 7.
P6l 9. 12. 14. 16. 96. 397. 401. 412. 267. 66. 22. 13.
PMX 74. 197. 119. 374. 558. 1798. 1926. 1516. 1000. 429. 363. 116.
TMC 20.6 21.2 22." 25.0 27.1 27.7 27.8 27.6 27.1 25.7 23.9 21.6 24.8

HM 72. 73. 74. 75. 77. 83. 83. 83. 80. 73. 72. 72. 76.
SC 50. 49. 48. 47. 46. 39. 39. 39. 42. 49. 50. 50. 46.
PD 7. 9. 8. 9. 60. 293. 329. 285. 227. 43. 12. 8.
ETP 92. 95. 126. 141. 157. 145. 149. 144. 133. 125. 101. 90. 1498.
ETDF 84. 87. 118. 132. 97. -143. -180. -141. -95. 82. 89. 82. 209.
MAI .08 .08 .06 .06 .38 2.02 2.20 1.98 1.71 .34 .12 .09


HWALIEN TAIWAN (CHINA) EL= 19 LATz 23 58 N LONG=121 37 E KSZ 9.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 59. 84. 112. 136. 180. 210. 203. 244. 362. 255. 174. 89. 2078.
PMI 20. 12. 26. 15. 33. 45. 11. 20. 85. 27. 21. 18.
P79 33. 48. 65. 51. 133. 120. 46. 74. 170. 62. 54. 43.
P60 45. 64. 87. 79. 158. 158. 101. 185. 232. 129. 100. 62.
PMX 147. 236. 323. 2E4. 346. 549. 835. 619. 1210. 1145. 910. 349.
TMC 17.4 17.8 19.5 21.9 24.6 26.3 27.6 27.4 26.4 23.9 21.6 19.0 22.8

HM 79. 81. 82. 83. 85. 86. 81. 82. 82. 80. 80. 79. 82.
SC 44. 41. 40. 39. 37. 36. 41. 40. 40. 42. 42. 44. 41.
PD 36. 51. 70. 57. 138. 128. 58. 97. 183. 76. 64. 47.
ETP 75. 77. 103. 118. 134. 135. 154. 145. 126. 103. 84. 75. 1333.
ETDF 39. 26. 34. 61. -5. 7. 96. 48. -57. 32. 20. 28. 329.
MAI .47 .67 .68 .48 1.04 .95 .37 .67 1.46 .70 .76 .63


PENGHU TAIWAN (CHINA) EL= 11 LATZ 23 32 N LONG=119 33 E KS= 9.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 23. 44. 65. 76. 98. 189. 195. 178. 128. 47. 19. 28. 1090.
PMI 0. 0. 1. 0. 0. 4. 3. 2. 1. 0. 0. 0.
P79 4. 11. 19. 26. 37. 116. 46. 69. 13. 0. 1. 7.
P60 11. 32. 42. 42. 74. 144. 135. 115. 50. 5. 7. 13.
PMX 94. 142. 205. 259. 277. 457. 728. 509. 909. 384. 66. 136.
TMC 16.4 16.3 19.0 22.5 25.7 27.5 28.4 28.2 27.6 25.0 22.1 18.5 23.1

HM 83. 84. 84. 85. 85. 88. 85. 85. 83. 78. 79. 81. 83.
SC 39. 38. 38. 37. 37. 33. 37. 37. 39. 45. 44. 41. 39.
PD 5. 15. 24. 29. 45. 122. 65. 79. 21. 1. 2. 8.
ETP 70. 71. 99. 116. 137. 133. 148. 141. 128. 115. 87. 73. 1317.
ETDF 64. 56. 75. 87. 92. 11. 83. 63. 107. 114. 85. 64. 900.
MAI .08 .22 .24 .25 .33 .92, .44 .56 .16 .01 .03 .11


TAIPEI TAIWAN (CHINA) EL= 9 LAT= 25 2 N LONG=121 31 E KS: 9.5

JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 91. 147. 164. 182. 205. 322. 269. 266. 189. 117. 71. 77. 2100.
PMI 12. 24. 10. 24. 33. 87. 60. 9. 28. 14. 11. 7.
P79 45. 67. 92. 86. 87. 211. 163. 144. 113. 48. 32. 36.
P60 69. 111. 139. 134. 176. 258. 209. 188. 163. 76. 53. 68.
PMX 280. 317. 350. 596. 533. 712. 519. 647. 395. 421. 193. 153.
TMC 15.2 15.4 17.5 20.9 24.5 26.8 28.4 28.3 26.9 23.3 20.5 17.2 22.1

HM 84. 85. 83. 82. 81. 81. 77. 76. 77. 80. 81. 84. 81.
SC 38. 37. 39. 40. 41. 41. 46. 47. 46. 42. 41. 38. 41.
PD 50. 76. 102. 96. 106. 221. 173. 153. 123. 54. 36. 43.
ETP 64. 66. 95. 116. 142. 148. 165. 159. 134. 105. 79. 64. 1337.
ETDF 14. -10. -7. 20. 36. -73. -8. 6. 11. 51. 42. 22. 104.
MAI .78 1.15 1.07 .83 .75 1.49 1.05 .96 .92 .51 .46 .66


HENGCHUN TAIWAN (CHINA)











EL= 790 LAT- 2 32 S LONG= 14 46 E KS= 8.3


JAN FEB MAR APR HAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 174. 191. 242. 244. 183. 24. 10. 38. 139. 150- 246- 248. 1889.
PMI 76. 89. 63. 129. 66. 0. 0. 0. 49. 143. 166. 130. 1570.
P79 130. 146. 135. 167. 102. 2. 0. 4. 71. 204. 192. 160. 1810.
P60 155. 171. 240. 201. 164. 7. 3. 15. 100. 224. 220. 218. 1954.
PMX 308. 276. 348. 435. 411. 90. 38. 217. 287. 522. 406. 456. 2794.
TMC 23.3 23.2 23.6 23.8 25.3 22.2 21.2 22.0 22.6 24.7 22.8 22.8 23.0

HM 82. 80. 80. 80. 82. 79. 78. 75. 79. 80. 83. 83. 80.
SC 35. 37. 37. 37. 35. 38. 39. 41. 38. 37. 34. 34. 37.
PD 135. 151. 157. 174. 115. 3. 1. P. 77. 208. 198. 172. 1840.
ETP 119. 112. 125. 116. 114. 102. 105. 118. 118. 129. 113. 114. 1386.
ETOF -17. -39. -32. -58. -1. 99. 105. 112. 41. -79. -85. -58. -12-
MAI 1.14 1.35 1.26 1.49 1.01 .03 .01 .05 .65 1.61 1.76 1.50 1.33


DOLISIE CONGO. REP. OF EL= 330 LAT= 4 11 S LONG= 12 40 E KS= 8.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 124. 167. 205. 203. 93. 0. 0. 0. 7. 71. 214. 168. 1252.
PHI 40. 39. 105. 89. 0. 0. 0. 0. 0. 0. 62. 67. 801-
P79 64. 109. 145. 143. 27. 0. 0. 0. 0. 25. 136. 213. 1064.
P60 102. 166. 165. 183. 69. 0. 0. 0. 1. 47. 211. 250- 1132.
PMX 243. 270. '77. 382. 223. 5. 2. 1. 36. 189. 327. 266. 1834.
TMC 25.4 25.8 26.U 25.9 24.9 22.6 21.1 21.7 23.3 25.0 25.2 25.2 24.3

HM 80. 79. 79. 80. 81. 78. 78. 76. 76. 77. 80. 81. 79.
SC 38. 38. 38. 38. 37. 39. 39. 41. 41. 40. 38. 37. 39-
PD 72. 121. 149. 151. 36. 0. 0. 0. 0. 30. 152. 221. 1078.
ETP 131. 123. 135. 122. 113. 102. 104. 115. 124. 136. 127. 128. 1461.
ETOF 59. 2. -14. -29. 77. 102. 104. 115. 124. 107. -25. -93. 530.
MAI .55 .99 1.1U 1.24 .32 .00 .00 .00 .00 .22 1.20 1.73 .74


GAMBOMA CONGO, REP. OF EL= 376 LA 1 54 5 LONG 15 51 E KS= 9.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 141. 168. 171. 152. 152. 41. 21. 57. 160. 260. 205. 175. 1703.
PMI 60. 89. 109. 66. 56. 0. 0. 7. 74. 160. 82- 62. 1242.
P79 96. 121. 131. 110. 98. 12. 0. 25. 107. 204. 139. 104. 1433.
P60 129. 149. 144. 126. 151. 24. 7. 29. 131. 224. 182. 160. 1625.
PMX 251. 3UO. 276. 296. 282. 127. 88. 152. 274. 535. 358. 394. 2199.
TMC 25.5 25.6 25.9 25.9 25.6 25.1 24.8 25.5 25.1 24.7 24.9 25.0 25.3

HM 82. 80. 80. 81. 82. 79. 75. 73. 79. 83. 83. 83. 80.
SC 41. 43. 43. 42. 41. 44. 48. 50. 44. 40. 40. 40. 43.
PD 103. 127. 134. 113. 109. 15. 1. 26. 112. 208. 148. 116. 1473.
ETP 134. 127. 142. 131. 124. 119. 129. 142. 135. 133. 127. 129. 1573.
ETDF 31. 0. 8. 17. 15. 104. 128. 116. 23. -75. -21. 13. 361.
MAI .77 1.00 .94 .87 .88 .12 .01 .18 .83 1.57 1.17 .90 .94


IMPFONDO CONGO. PEP. OF EL= 326 LAT= 1 37 N LONG= 18 4 E KS=11.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 73. 78. 159. 171. 188. 151. 132. 169. 169. 220. 176. 107. 1793.
PMI 16. 22. 24. 80. 68. 64. 26. 37. 105. 120. 73. 17. 1371.
P79 24. 42. 103. 128. 110. 100. 91. 108. 128. 166. 94. 56. 1638.
P60 44. 61. 128. 164. 161. 124. 119. 163. 155. 191. 153. 99. 1725.
PFX 193. 173. 290. 259. 321. 279. 304. 260. 261. 462. 307. 198. 2181-
TMC 25.4 25.9 26.0 26.1 25.9 25.2 24.6 24.7 24.7 24.9 24.9 25.3 25.3

HM 84. 81. 81 . 83. 84. 86. 86. 86. 85. 86. 86. 85. 84.
S 52. 51. 45. 43. 47. 40. 39. 38. 37. 41. 45. 50. 44.
PD 28. 46. 108. 136. 121. 105. 97. 120. 134. 171. 106. 65. 1656.
ETP 145. 136. 146. 135. 138. 118. 120. 125. 123. 134. 131. 140. 1592.
ETDF 117. 90. 37. -0. 18. 13. 23. 6. -11. -37. 24. 75. 355.
MAI .19 .34 .74 1.00 .87 .89 .81 .96 1.09 1.28 .81 .46 1.04
------------------ ------ -- ------- ------------------- -- -- --


DJAMBALA CONGO. REP. OF











EL= 351 LAT= 1 37 N LONG= 16 4 E KS= 9.6


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 56. 79. 150. 127. 152. 117. 79. 155. 220. 226. 152. 83. 1596.
PMI 1. 16. 49. 21. 88. 40. 4. 57. 131. 81. 82. 6. 1289.
P79 19. 52. 96. 86. 114. 74. 40. 96. 156. 172. 106. 51. 1485.
P60 36. 60. 123. 105. 139. 106. 62. 129. 209. 207. 136. 82. 1523.
PMX 154. 237. 254. 238. 290. 246. 228. 340. 330. 366. 330. 140. 1987.
TMC 25.6 26.0 26.2 26.5 26.1 25.2 24.7 24.8 24.8 25.0 25.0 25.2 25.4

HM 81. 79. 79. 80. 81. 83. 82. 81. 83. 83. 83. 82. 81.
5 45. 47. 42. 46. 51. 42. 37. 36. 34. 37. 42. 43. 42.
PO 23. 54. 102. 90. 119. 81. 45. 103. 167. 179. 112. 58. 1493.
ETP 135. 131. 141. 141. 145. 121. 117. 122. 118. 128. 127. 130. 1558.
ETDF 113. 78. 40. 51. 25. 41. 72. 19. -49. -51. 15. 73. 426.
MAI .17 .41 .72 .64 .82 .67 .38 .84 1.41 1.40 .88 .44 .96


POINTE-NOIRE CONGO REP. OF EL= 17 LAT= 4 49 5 LONG= 11 54 E KS= 8.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 152. 210. 227. 179. 89. 1. 0. 2. 13. 71. 167. 143. 1254.
PHI 16. 3. 28. 39. 0. 0. 0. 0. 1. 15. 20. 6. 299.
P79 68. 88. 123. 77. 10. 0. 0. 0. 4. 24. 65. 68. 1036.
P60 90. 156. 184. 145. 39. 0. 0. 1. 10. 36. 125. 108. 1123.
PMX 472. 430. 576. 377. 382. 8. 2. 8. 35. 349. 424. 385. 1940.
TMC 26.2 26.6 27.0 26.8 25.6 22.7 21.2 21.5 23.4 25.2 25.7 25.9 24.8

HM 84. 83. 83. 84. 85. 83. 82. 82. 83. 83. 85. 85. 83.
S 41. 45. 42. 44. 36. 36. 30. 30. 18. 26. 33. 38. 35.
PD 73. 102. 136. 91. 16. 0. 0. 0. 5. 27. 78. 76. 1054.
ETP 140. 136. 145. 135. 113. 97. 90. 97. 83. 111. 122. 133. 1401.
ETDF 67. 34. 9. 44. 97. 97. 90. 97. 78. 85. 44. 56. 797.
MAI .52 .75 .94 .68 .14 .00 .00 .00 .06 .24 .64 .58 .75


NICOSIA CYPRUS EL:' 217 LAT- 35 9 N LOG:= 33 17 E KS=12.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 74. 43. 37. 17. 21. 9. 1. 2. 7. 21. 32. 75. 339.
PHI 19. 7. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 193.
P79 49. 19. 13. 6. 2. 0. 0. 0. 0. 1. 6. 27. 248.
P50 54. 36. 22. 10. 12. 0. 0. 0. 0. 7. 15. 51. 315.
PMX 188. 94. 137. 47. 76. 82. 18. 24. 40. 138. 91. 279. 503.
TMC 10.6 11.1 12.5 16.7 21.1 25.5 28.1 28.5 25.4 21.2 16.0 12.0 19.1

HM 77. 72. 69. 60. 52. 50. 47. 50. 53. 57. 67. 76. 61.
S 55. 66. 64. 71. 80. 87. 91. 92. 89. 81. 70. 56. 75.
PD 50. 23. 15. 7. 4. 0. 0. 0. 0. 2. 8. 32. 262.
ETP 50. 63. 92. 130. 181. 214. 235. 219. 166. 116. 69. 49. 1584.
ETOF -0. 40. 77. 123. 177. 214. 235. 219. 16E. 114. 61. 17. 1443.
MAI 1.01 .36 .16 .05 .02 .00 .00 .00 .00 .02 .11 .66 .17


BRNO/TURANY CZECHOSLOVAKIA EL' 238 LAT= 49 9 N LONG= 16 42 E KS= 8.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 26. 24. 21. 33. 55. 81. 73. 67. 37. 41. 39. 30. 527.
PHI 8. 2. 3. 4. 9. 13. 1. 22. 0. 0. 8. 4. 334.
P79 19. 11. 10. 21. 28. 53. 49. 32. 17. 17. 16. 17. 467.
P60 24. 21. 13. 28. 51. 69. 61. 53. 32. 37. 25. 26. 511.
PMX 77. 54. 58. 64. 115. 150. 190. 190. 123. 105. 130. 74. 694.
TMC -2.7 -1.0 3.7 8.7 14.2 17.8 19.3 18.5 14.8 9.1 4.0 -.2 8.8

HM 83. 81. 72. 65. 65. 66. 66. 68. 70. 77. 82. 85. 73.
S 21. 28. 40. 46. 51. 53. 54. 56. 52. 39. 20. 16. 40.
PD 20. 13. 11. 22. 33. 56. 52. 36. 20. 21. 18. 19. 476.
ETP 0. 0. 40. 71. 114. 135. 143. 123. 78. 38. 13. 0.
ETDF -20. -13. 29. 49. 82. 79. 91. 86. 58. 17. -5. -19. 434.
MAI .27 .32 .29 .42 .36 .30 .26 .56 1.35


OUESSO CONGO. REP. OF











EL- 474 LAT= 50 5 N LONG: 12 24 E KS= 8.4


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 38. 36. 32. 39. 53. 67. 84. 64. 46. 45. 37. 37. 578.
PMI 10. 3. 7. 15. 14. 19. 18. 14. 2. 1. 3. 6. 390.
P79 25. 19. 15. 28. 30. 41. 37. 45. 20. 23. 17. 20. 468.
P60 36. 28. 24. 34. 48. 51. 59. 58. 37. 40. 26. 26. 561.
PMX 74. 105. 95. 71. 105. 144. 176. 128. 104. 103. 83.. 142. 777.
TMC -3.0 -1.9 2.2 6.6 11.7 15.1 16.7 15.8 12.4 7.4 2.5 -1.3 7.0

HM 87. 85. 80. E7. 73. 73. 74. 76. 80. 84. 91. 90. 81.
S 15. 24. 37. 42. 46. 46. 44. 46. 44. 31. 17. 12. 34.
PD 27. 21. 17. 29. 34. 43. 42. 48. 24. 27. 19. 21. 488.
ETP 0. 0. 0. 61. 99. 117. 120. 102. 65. 31. 0. 0.
ETDF -27. -21. -17. 32. 65. 74. 79. 54. 42. 4. -19. -21. 244.
MAI .48 .34 .37 .35 .47 .36 .87


OSTRAVA CZECHOSL CVAKIA EL= 257 LAT= 49 47 N LONG= 18 16 E KS= 8.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 30. 29. 35. 39. 79. 91. 99. 92. 59. 51. 39. 32. 675.
PMI 15. 7. 7. 8. 16. 16. 17. 34. 2. 0. 13. 5. 523.
P79 20. 14. 20. 24. 40. 70. 66. 55. 25. 17. 22. 14. 608.
P60 26. 24. 27. 33. 59. 82. 88. 86. 39. 37. 33. 26. 651.
PMX 67. 73. 98. 71. 157. 161. 204. 166. 173. 107. 82. 66. 975.
TMC -2.9 -1.4 2.9 8.0 13.1 16.4 18.2 17.4 13.9 8.2 3.8 .0 8.1

HM 85. 80. 77. 71. 72. 72. 74. 78. 79. 82. 85. 89. 79.
S 21. 24. 34. 42. 46. 47. 49. 52. 47. 36. 21. 18. 37.
PD 21. 16. 21. 26. 44. 73. 71. 62. 28. 21. 24. 17. 617.
ETP 0. 0. 0. 66. 105. 123. 132. 115. 71. 35. 13. 0.
E7DF -21. -16. -21. 40. 61. 50. 62. 53. 43. 13. -11. -17. 235.
MAI .40 .42 .59 .53 .54 .39 .61 1.87


POPRAD CZECHOSLOVAKIA EL= 707 LAT= 49 4 N LONG: 20 15 E KS= 9.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 28. 25. 34. 34. 68. 85. 90. 78. 43. 42. 48. 33. 608.
PMI 4. 5. 7. 8. 18. 31. 32. 20. 3. 4. 7. 2. 403.
P79 13. 11. 16. 19. 33. 51. 49. 48. 23. 26. 17. 16. 482.
PEO 22. 22. 23. 31. 52. 66. 75. 67. 31. 36. 41. 28. 548.
PMX 75. 57. 108. 72. 203. 158. 205. 200. 108. 89. 186. 186. 893.
TMC -5.8 -3.9 .0 5.6 10.9 14.2 16.0 15.1 11.6 6.3 1.3 -2.7 5.7

HM 87. 83. 76. 70. 70. 72. 70. 72. 73. 78. 86. 88. 77.
S 36. 41. 47. 47. 50. 48. 53. 55. 56. 48. 32. 32. 45.
PD 15. 13. 17. 22. 37. 54. 54. 52. 25. 28. 22. 19. 496.
ETP 0. 0. 0. 63. 100. 116. 129. 110. 73. 38. 0. 0.
ETDF -15. -13. -17. 41. 63. 62. 74. 58. 48. 10. -22. -19. 271.
MAI .34 .37 .47 .42 .47 .34 .74
-- ----------------------------------------------------------------------

PRAHA/RUZYNE CZECHOSLOVAKIA EL= 374 LAT= 50 6 N LONG= 14 17 E KS= 8.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 23. 24. 23. 32. 61. 67. 82. 66. -36. 42. 26. 26. 508.
PHI 11. 3. 6. 12. 2. 22. 7. 13. 0. 1. 4. 3. 304.
P79 15. 11. 10. 20. 35. 44. 49. 48. 17. 18. 14. 13. 422.
P60 19. 18. 16. 24. 51. 52. 62. 58. 30. 31. 19. 21. 531.
PMX 47. 64. 59. 116. 118. 142. 209. 167. 89. 127. 47. 75. 739.
TMC -2.6 -1.6 2.7 7.8 12.9 16.2 17.9 17.4 13.9 8.2 3.1 -.8 7.9

HM 86. 83. 77. 70. 69. 70. 72. 71. 75. 81. 87. 89. 77.
S 22. 30. 40. 44. 50. 51. 50. 53. 49. 37. 19. 17. 38.
PD 16. 12. 11. 21. 38. 46. 52. 50. 20. 21. 15. 15. 445.
ETP 0. 0. D. 66. 107. 127. 132. 115. 72. 35. 12. 0.
ETDF -16. -12. -11. 45. 69. 81. 80. 65. 52. 14. -3. -15. 349.
MAI .32 .36 .36 .39 .44 .27 .59 1.29


CHEB CZECHOSLOVAKIA












EL= 318 LAT-- 48 38 N LONG= 19 9 E KS: 9.2


JAN FEB MAR APr MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 45. 46. 45. 40. 77. 86. 83. 66. 48. 57. 69. 55. 717.
PMI 7. 1. 1. 6. 15. 25. 25. 3. 1. 7. 13. 12. 520.
P79 24. 17. 18. 18. 38. 45. 39. 34. 19. 23. 35. 29. 5E1.
P6U 33. 35. 34. 31. 59. 77. 63. 49. 35. 40. 55. 40. 665.
PMX 130. 105. 131. 86. 217. 161. 193. 153. 134. 133. 139. 125. 1005.
TMC -2.7 -2.2 2.5 8.5 13.6 17.0 18. 17.8 13.7 8.1 3.4 -1.2 7.9

HM 88. 86. 75. 67. 70. 72. 70. 70. 74. 80. 87. 90. 77.
5 25. 32. 42. 47. 51. 52. 57. 58. 52. 39. 21. 17. 41.
PD 26. 21. 21. 21. 42. 52. 44. 37. 22. 27. 39. 31. 599.
ETP 0. 0. 0. 72. 111. 132. 146. 123. 76. 37. 14. 0.
ETDF -26. -21. -21. 51. 69. 80. 102. 86. 54. 11. -26. -31. 327.
MAI .29 .38 .39 .30 .30 .29 .71 2.83


BOHICON (DAHOMEY) BENIN EL= 167 LAT= 7 10 N LONG- 2 4 E KS=10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 11. 25. 98. 134. 147. 148. 116. 68. 140. 149. 40. 14. 1090.
PMI 0. 0. 13. 63. 54. 34. 0. 2. 45. 46. 1. 0. 723.
P79 1. 4. 33. 88. 87. 73. 41. 11. 80. 94. 18. 0. 834.
P60 3. 14. 81. 111. 136. 130. 85. 44. 130. 116. 30. 7. 970.
PMX 64. 99. 209. 252. 254. 249. 250. 186. 279. 280. 102. 65. 1671.
TMC 28.2 29.3 29.3 28.5 27.6 26.5 25.3 25.0 26.1 26.6 27.9 27.1 27.3

HM 68. 69. 73. 73. 80. 83. 83. 82. 82. 83. 78. 72. 77.
SC 57. 56. 52. 52. 45. 41. 41. 42. 42. 41. 47. 53. 47.
PD 1. 6. 43. 93. 97. 85. 50. 18. 90. 99. 21. 1. 8E3.
ETP 151. 147. 166. 160. 147. 131. 132. 137. 136. 135. 135. 140. 1718.
ETDF 150. 141. 123. 67. 50. 46. 82. 119. 46. 37. 115. 138. 1113.
MAI .01 .04 .26 .58 .66 .65 .38 .13 .66 .73 .15 .01 .50


KANDI IOAHOMEY) BENIN EL= 292 LAT= 11 9 N LONG: 2 56 E KSP10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 1. 8. 29. 92. 150. 191. 282. 219. 52. 2. 0. 1026.
PMI 0. O. 0. 0. 21. 61. 66. 120. 118. 0. 0. 0. 735.
P79 0. 0. U. G. 48. 119. 146. 209. 149. 14. 0. 0. 842.
P60 0. 0. 2. 21. 67. 135. 166. 259. 184. 28. 0. 0. 064.
PMX 1. 12. 56. 74. 278. 229. 399. 447. 382. 210. 32. 1. 1472.
TMC 25.0 27.6 30.8 31.8 30.1 27.7 26.1 25.4 26.1 27.6 26.9 24.9 27.5

HM 34. 31. 40. 51. 65. 75. 81. 85. 85. 76. 55. 42. 60.
SC 81. 83. 77. 70. 59. 50. 44. 39. 39. 49. 67. 76. 61.
PD 0. 0. 0. 9. 52. 122. 150. 219. 156. 17. 0. 0. 868.
ETP 159. 167. 0U6. 2L1. 183. 153. 143. 134. 129. 146. 150. 150. 1921.
ETDF 159. 167. 206. 191. 131. 31. -7. -86. -27. 129. 150. 150. 1194.
MAI .00 .00 .00 .05 .28 .80' 1.05 1.64 1.21 .12 .00 .00 .45


NATITINGOU (DAHOMEY) BENIN EL- 461 LAT- 10 19 N LONG= 1 23 E KS= 9.7

JAN FEB MAR AFP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 3. 8. 26. 75. 126. 162. 221. 254. 311. 118. 33. 5. 1340.
PMI 0. 0. 0. 7. 3. 77. 43. 119. 172. 4. 0. 0. 1018.
P79 0. 0. 8. 41. 31. 119. 146. 207. 231. 61. 1. 0. 1155.
P60 0. O. 21. 54. 44. 148. 195. 231. 276. 90. 19. 0. 1269.
PMX 35. 75. 89. 231. 309. 300. 420. 366. 497. 252. 128. 62. 1898.
TMC 27.0 28.3 29.7 29.3 27.8 26.0 24.7 24.2 24.9 26.1 26.4 26.4 26.7

HM 29. 34. 49. 63. 73. 80. 83. 85. 85. 78. 59. 37. 63.
SC 82. 79. 69. 59. 50. 43. 40. 38. 38. 45. 62. 77. 57.
PD 0. 0. 11. 44. 34. 124. 156. 212. 240. 67. 5. 0. 1179.
ETP 169. 166. 191. 174. 160. 136. 132. 128. 124. 137. 144. 158. 1820.
ETDF 169. 166. 180. 131. 126. 12. -25. -84. -116. 70. 139. 158. 927.
MAI .00 .00 .0E .25 .21 .91 1.19 1.66 1.94 .49 .03 .00 .65


SLIAC CZECHO'OVAKIA












ELZ 200 LAT= 7 59 N LONG 2 21; E KS=10.0


JAN FrB MAR APR MAY JUN JUL AUG SEP orT NOV DEC ANN

PM 7. 19. 79. 108. 145. 141. 139. 111. 174. 133. 33. 8. 1097.
PMI 0. 0. 2. 2. 32. 64. 4. 21. 71. 37. 0. 0. 529.
P79 0. 3. 25. 25. 101. 105. 48. 37. 116. 91. 8. 0. 880.
P60 2. 9. 67. 67. 114. 131. 116. 64. 162. 107. 14.. 0. 1063.
PMX 37. 91. 203. 203. 252. 216. 356. 290. 317. 263. 112. 82. 1540.
TMC 28.0 29.2 .9.2 28.5 27.4 26.4 25.2 24.7 25.6 26.4 27.9 27.7 27.2

HM 59. 59. 68. 74. 78. 81. 84. 83. 84. 82. 74. 64. 74.
SC 64. 64. 57. 51. 47. 44. 40. 41. 40. 42. 51. 60. 50.
PD 0. 4. 34. 34. 104. 110. 62. 43. 12E. 94. 9. 0. 918.
ETP 159. 157. 172. 159. 151. 135. 131. 134. 131. 136. 139. 149. 1752.
ETDF 158. 152. 138. 125. 47. 25. 69. 91. 5. 41. 130. 149. 1131.
MAI .00 .03 .2U .21 .69 .82 .48 .32 .96 .70 .07 .00 .52


TCHAOUROU (DAHOMEY) BENIN EL= 327 LAT= 8 52 N LONG- 2 36 E KS=10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 7. 15. 58. 104. 141. 161. 165. 1E2. 214. 161. 16. 7. 1211.
PMI 0. 0. 0. 20. 40. 80. 8. 47. 95. 49. 0. 0.
P79 0. 0. 26. 47. 99. 98. 80. 76. 168. 99. 1. 0.
P60 0. 3. 45. 80. 126. 141. 113. 109. 200. 148. 9. 0.
PMX 49. 70. 180. 203. 279. 282. 387. 413. 391. 354. 66. 62.
TMC 26.8 28.3 29.2 28.5 27.3 25.9 24.9 24.1 25.1 25.9 26.7 26.0 26.6

HM 50. 53. 64. 72. 77. 81. 85. 86. 86. 83. 75. 59. 73.
SC 71. 69. 60. 53. 48. 44. 39. 37. 37. 41. 50. 64. 51.
PD 0. 1. 30. 54. 1U5. 107. 87. 83. 175. 109. 3. 0.
ETP 160. 157. 177. 162. 153. 135. 129. 126. 125. 131. 133. 146. 1734.
ETDF 160. 157. 147. 108. 48. 27. 42. 43. -50. 22. 130. 146. 981.
MAI .00 .00 .17 .33 .68 .80 .67 .66 1.40 .83 .02 .00


ALBORG DENMARK EL= 3 LAT- 57 6 N LONG: 3 52 E KS= 8.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PK 45. 31. 26. 31. 33. 42. 70. 72. 69. 58. 55. 44. 576.
PMI 11. 2. 2. 2. 6. 9. 14. 11. 7. 6. 8. 2.
P79 26. 15. 12. 17. 14. 23. 38. 30. 39. 36. 33. 30.
P60 41. 23. 20. 23. 25. 30. 62. 62. 56. 44. 43. 35.
PMX 87. 63. 61. 79. 65. 134. 159. 158. 145. 132. 119. 105.
TMC -.5 -.8 1.6 5.8 10.6 14.1 16.4 16.0 12.8 8.E 4.6 1.7 7.6

HM 90. 39. 85. 78. 71. 74. 78. 80. 84. 87. 91. 92. 83.
SC 25. 27. 31. 38. 43. 41. 38. 36. 32. 29. 24. 23. 32.
PD 29. 17. 14. 18. 16. 24. 43. 37. 43. 38. 35. 31.
ETP 0. 0. 0. 51. 89. 105. 107. 85. 49. 23. 9. 0.
ETDF -29. -17. -14. 33. 73. 81. 64. 48. 6. -14. -27. -31. 174.
MAI .36 .18 .23 .40 .43 .88 1.61 4.12


DUEODDE DENMARK EL= 6 LAT: 55 0 N LONG- 15 5 E KS= 8.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 48. 33. 29. 31. 32. 42. 57. 58. 61. 60. 54. 48. 553.
PMI 24. 4. 9. 11. 4. 4. 19. 16. 8. 2. 11. 12.
P79 30. 16. 15. 15. 14. 20. 34. 33. 35. 26. 25. 22.
P60 37. 28. 20. 22. 26. 29. 41. 49. 51. 44. 43. 38.
PMX 83. 83. 80. E4. 72. 112. 145. 133. 151. 120. 169. 114.
TMC .3 -.2 1.3 5.0 9.4 14.0 17.0 17.1 14.0 9.6 5.5 7.7 8.0

HM 87. 87. 86. 81. 80. 80. 81. 83. 83. 84. 86. 88. 84.
SC 29. 29. 30. 35. 36. 36. 35. 33. 33. 32. 30. 28. 32.
PD 31. 19. 16. 16. 17. 22. 35. 36. 38. 30. 29. 25.
ETP O. 0. 0. 49. 79. 99. 106. 86. 54. 28. 12. 8.
ETDF -31. -19. -16. 33. 62. 77. 71. 50. 15. -2. -17. -17. 206.
MAI .34 .21 .22 .33 .42 .71 1.06 2.43 3.01


SAVE (DAHOMEYI BENIN












EL= 5 LAT= 55 38 N LONG= 12 40 E KS= 8.0


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 49. 39. 32. 38. 42. 47. 71. 66. 62. 59. 48. 49. 602.
PMI 13. 4. 10. 14. 13. 8. 30. 10. 7. 2. 15. 6.
P79 24. 17. 16. 22. 27. 27. 43. 35. 28. 34. 32. 26.
P60 41. 28. 23. 30. 32. 38. 54. 53. 51. 44. 40. 40.
PMX 102. 146. 82. 116. 104. 133. 164. 144. 138. 140. 90. 115.
TMC .1 -.1 1.9 6.6 11.8 15.6 17.8 17.3 13.9 9.3 5.4 2.5 8.5

HM 87. 85. 83. 70. 68. 68. 71. 74. 78. 83. 87. 88. 78.
5 16. 21. 33. 39. 50. 48. 46. 45. 42. 28. 14. 9. 33.
PD 28. 19. 17. 24. 28. 29. 45. 39. 33. 36. 34. 29.
ETP 0. 0. 0. 55. 101. 120. 125. 100. 60. 25. 8. 0.
ETDF -28. -19. -17. 31. 73. 90. 80. 61. 27. -11. -26. -29. 232.
MAI .43 .28 .24 .36 .39 .55 1.43 4.37


THORSHAVN DENMARK EL= 24 LAT= 62 3 N LONG= 6 45 W KS= 5.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 149. 136. 114. 106. 67. 74. 79. 96. 132. 157. 156. 167. 1433.
PHI 36. 35. 21. 45. 15. 26. 22. 15. 60. 40. 45. 72.
P79 89. 93. 71. 71. 37. 55. 51. 72. 86. 98. 121. 129.
P60 126. 124. 95. 96. 49. 60. 72. 87. 118. 141. 139. 149.
PMX 251. 223. 285. 239. 161. 151. 152. 157. 223. 325. 272. 284.
THC 3.9 3.7 4.6 5.4 7.3 9.2 11.0 11.1 10.0 7.9 6.1 5.0 7.1

HM 83. 82. 82. 82. 83. 84. 86. 87. 86. 83. 84. 83. 84.
S 8. 17. 22. 26. 26. 24. 19. 21. 22. 20. 12. 5. 18.
PD 97. 100. 76. 76. 40. 56. 55. 75. 93. 107. 125. 133.
ETP 2. 7. 21. 39. 59. 68. 64. 53. 32. 14. 4. 1. 363.
ETDF -95. -92. -56. -37. 19. 12. 8. -23. -61. -93. -121. -132. -670.
MAI 3.71 1.96 .67 .82 .87 1.43 2.90 7.48


CIUDAD TRUJILLO DOMINICAN REP EL= 14 LAT= 18 28 N LONG= 69 53 W KS=12.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 47. 45. 45. 65. 190. 175. 158. 147. 168. 165. 113. 67. 1386.
PMI 9. 5. 0. 4. 16. 31. 73. 45. 71. 53. 0. 6. 867.
P79 17. 12. 6. 17. 85. 76. 88. 103. 100. 96. 53. 41. 1120.
P60 33. 21. 15. 44. 138. 123. 116. 131. 143. 132. 80. 59. 1318.
PMX 193. 145. 199. 281. 745. 511. 428. 359. 316. 343. 288. 134. 2025.
TMC 23.9 24.0 24.5 25.3 25.9 26.5 26.7 27.0 26.8 26.4 29.6 24.6 25.6

HM 81. 79. 78. 80. 84. 85. 85. 85. 86. 86. 85. 84. 83.
S 52. 56. 62. 55. 46. P7. 47. 54. 55. 56. 55. 52. 53.
PD 20. 14. 8. 23. 96. 86. 94. 10. 109. 104. 59. 45. 1162.
ETP 109. 115. 153. 153. 153. 152. 157. 167. 152. 141. 129. 107. 1688.
ETDF 89. 101. 145. 130. 56. 66. 63. 58. 43. 38. 71. 62. 522.
MAI .19 .12 .05 .15 .63 .57 .60 .65 .72 .73 .45 .42 .69


PUERTO PLATA )OMINICAN REP. EL= 16 LAT: 19 47 N LONG- 70 40 W KS=12.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 209. 162. 134. 160. 168. 82. 78. 88. 97. 158. 283. 307. 1924.
PMI 56. 17. 0. 0. 20. 2. 19. 9. 12. 40. 76. 80. 1287.
P79 10G. 57. 45. 33. 45. 36. 27. 37. 45. 72. 145. 154. 1520.
P60 148. 91. 63. 88. 127. 52. 46. 67. 65. 113. 211. 219. 1740.
PMX 418. 563. 479. 525. 347. 295. 287. 350. 297. 438. 615. 737. 2958.
TMC 22.4 22.3 23.2 24.0 24.9 26.1 26.5 26.7 26.6 26.0 24.7 22.2 24.7

HM 86. 83. 85. 84. 84. 82. 80. 81. 81. 82. 84. 85. 83.
SC 48. 53. 50. 52. 52. 55. 58. 56. 56. 55. 52. 50. 53.
PD 115. 64. 49. 45. 62. 39. 31. 43. 49. 81. 159. 168. 1566.
ETP 99. 105. 131. 144. 158. 163. 174. 169. 153. 137. 103. 96. 1637.
ETDF -16. 41. 82. 99. 95. 124. 143. 126. 104. 56. -50. -72. 733.
MAI 1.16 .61 .37 .31 .39 .24 .18 .26 .32 .59 1.46 1.74 .96


KOBENHAVN DENMARK













EL= 6 LAT= 2 12 S LONG- 79 53 W KS= 7.5


JAN FEB MAR AM MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 212. 289. 292. 207. 54. 11. '4. 0. 0. 1. 2. 28. 00L .
PMI 0. 51. 54. 5. 0. 0. 0. 0. 0. 0. 0. 0. 451.
P79 152. 187. 142. 82. 4. 0. 0. 0. 0. 0. 0. 0. 705.
P60 173. 226. 216. 119. 17. 0. 0. 0. 0. 0. 0. 3. 852.
PMX 507. 595. 586. 580. 363. 126. 92. 5. 3. 13. 9. 169. 2121.
TMC 25.5 26.0 26.4 26.3 25.6 24.4 23.5 23.2 23.8 24.0 24.6 25.4 24.9

HM 79. 79. 80. 78. 75. 78. 78. 76. 76. 76. 75. 73. 77.
S 27. 30. 38. 42. 46. 35. 35. 36. 40. 36. 33. 36. 36.
PD 156. 195. 158. 90. 7. 0. 0. 0. 0. 0. 0. 1. 736.
ETP 109. 108. 135. 132. 131. 103. 106. 113. 125. 125. 115. 125. 1428.
ETOF -47. -87. -22. 42. 124. 103. 106. 113. 125. 125. 115. 124. 821.
MA1 1.43 1.81 1.17 .68 .05 .00 .00 o00 .00 .00 .0O .01 .52
-------------------------------------------------------------------

GUITO ECUADOR EL=2812 LAT= 0 8 5 LONG= 78 29 W KS=10.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 119. 131. 154. 185. 130. 54. 20. 25. 81. 134. 96. 104. 1233.
PMI 14. 59. 48. 98. 46. 6. 2. 0. 11. 48. 8. 38. 889.
P79 60. 87. 112. 132. 91. 26. 6. 6. 41. 97. 47. 75. 1062.
P60 86. 120. 138. 175. 121. 44. 13. 20. 62. 116. 76.. 90. 1130.
PMX 285. 219. 278. 293. 228. 119. 65. 73. 194. 270. 229.. 172. 1668.
TMC 13.0 13.0 12.9 13.0 13.1 13.0 12.9 13.1 13.2 12.9 12.8 13.0 13.0

HM 80. 81. 82. 83. 81. 75. 68. 65. 70. 80. 79. 80. 77.
S 45. 41. 37. 33. 45. 52. 59. 60. 71. 45. 47. 47. 49.
PD 65. 94. 117. 141. 97. 30. 7. 9. 45. 101. 53. 78. 1076.
ETP 97. 87. 91. 89. 93. 94. 104. 111. 123. 101. 97. 98. 1184.
ETDF 31. -7. -26. -53. -4. 64. 97. 102. 78. -0. 44. 20. 345.
MAI .68 1.08 1.29 1.60 1.04 .32 .07 .08 .37 1.00 .55 .80 .91
- ------------------------------------------------------------------------

ALEXANDRIA ECYPT EL= 7 LAT= 31 12 N LONG- 29 57 E KS=11.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 41. 25. 11. 3. 2. 0. 0. 1. 1. 7. 30. 48. 163.
PMI 1. 3. 0. n. U. 0. 0. 0. D. 0. 0. 0. 33.
P79 10. 11. 2. 0. 0. 0. 0. 0. 0. 0. 6. 14. 134.
P60 27. 15. 6. 0. U. 0. 0. 0. 0. 2. 14. 26. 144.
PMX 101. 97. 52. 12. 12. 0. U. 16. 7. 27. 122. 160. 314.
TMC 14.7 15.2 16.0 19.1 20.0 24.5 26.2 27.1 26.2 24.2 20.9 16.6 21.1

HM 68. 66. 64. 68. 70. 74. 76. 74. 69. 68. 68. 68. 69.
S 69. 73. 76. 80. 79. 85. 86. 90. 89. 87. 78. 66. 30.
PD 14. 12. 3. U. 0. 0. 0. 0. 0. 0. 8. 17. 136.
ETP 72. 92. 121. 152. 175. 204. 218. 213. 176. 139. 94. 70. 1718.
ETDF 59. 70. 118. 152. 175. 204. 213. 213. 176. 139. 86. 54. 1665.
MAI .19 .14 .02 .00 .00 .00 .00 .00 .00 .00 .08 .24 .08


BAHARIA EGYPT EL= 130 LAT= 28 20 N LONG: 28 54 E KS=12.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM U. 1. 0. 1. 0. 0. 0. 0. 0. 0. 1. 1. 4.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P60 0. 0. 0. n. o. o. o. o. O. 0. o. n.
PMX 0. 14. 1. 16. 2. 6. 0. n. 0. 6. 14. 13. 21.
TMC 12.3 14.4 17.2 21.4 25.9 27.8 28.7 28.8 26.4 23.4 18.7 14.1 21.6

HM 57. 53. 50. 43. 41. 43. 44. 47. 53. 55. 57. 59. 50.
SC 79. 82. 85. 91. 92. 91. 90. 87. 82. 80. 79. 77. 85.
PD 0. 0. U. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
ETP 77. 90. 134. 174. 219. 226. 235. 220. 174. 138. 96. 76. 1860.
ETDF 77. 90. 134. 174. 219. 226. 235. 220. 174. 138. 96. 76. 1860.
MAI .00 .OU .on .00 .00 .00 .00 .00 .00 .00 .00 .00 .00


GUAYAQUIL ECUADOF










EL= 74 LA T 30 8 N LONG- 31 34 E KS=12.1


JAN FE3 MAR APT, MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 4. 4. 3. 1. 1. 0. 0. 0. 0. 1. 1. 7. 22.
PMI O. 0. O. n. 0. o. o. 0. o. O. 0. 0. 2.
P79 0. O. D. 0. o. 0. 0. 0. o. 0. 0. o. 9.
P60 2. 1. 0. 0. 0. 0. 0. 0. U. 0. 0. 0. 15.
PMX 18. 21. 15. 7. 17. 0. 0. 2. 0. 31. 13. 54. G3.
TMC 14.U 15.1 17.8 2 1.2 25.3 27.6 28.9 28.6 26.3 24.2 19.9 15.5 22.0

HM 59. 56. 54. 49. 46. 51. 55. 57. 62. 61. 63. 63. 56.
S 73. 75. 76. 76. 79. 85. 85. 86. 86. 95. 80. 70. 80.
PD O. 0. 0. 0. 0. 0. 0. 0. 0. 0. D. o. 10.
ETP 75. 85. 126. 158. 200. 219. 230. 216. 175. 141. 96. 72. 1792.
ETDF 74. 85. 126. 158. 200. 219. 230. 216. 175. 141. 96. 72. 1791.
MAI .01 .00 .0U .00 .00 .00 .00 .00 .00 .00 .00 .00 .01


DAKHLA EGYPT EL= 112 LAT= 25 29 N LONG- 29 0 E KS:11.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
PHI O. 0. O. n. 0. O. 0. 0. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P60 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
PMX 0. 10. 0. 0. 3. 0. 0. 0. 0. 1. 0. 1. 11.
TMC 12.9 15.0 18.E 23.5 28.6 30.4 30.9 30.9 28.2 24.7 19.8 15.0 23.2

HM 47. 42. 34. 29. 27. 28. 26. 33. 35. 40. 45. 51. 36.
SC 82. 85. 91. 94. 96. 95. 96. 92. 90. 87. 83. 78. 89.
PD 0. 0. 0. 0 0. 0. 0. 0. 0. 0. 0. 0. 0.
ETP 86. 99. 149. 189. 237. 243. 253. 237. 194. 155. 108. 86. 2036.
ETDF 86. 99. 149. 189. 237. 243. 253. 237. 194. 155. 108. 86. 2036.
MAI .0 .00 00 .00 .00 00 00 .00 .00 .00 .00 .00 .00


HELWAN EGYPT EL= 141 LAT= 29 52 N LONC= 31 20 E KSz11.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 3. 4. 3. 1. 3. 0. 0. 0. 0. 1. 4. 7. 26.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 2.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 9.
P60 0. 2. 0. 0. 0. 0. 0. 0. 0. 0. 0. 1. 15.
PMX 11. 24. 21. 12. 71. 0. 0. 0. 0. 23. 42. 49. 80.
TMC 13.7 15.0 17.6 21.2 25.4 27.0 28.4 28.4 26.3 24.4 20.n 15.4 21.9

HM 56. 53. 47. 44. 40. 43. 51. 55. 56. 54. 55. 59. 51.
S 75. 79. 78. 82. 81. 91. 90. 91. 90. 97. 82. 73. 83.
PD 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. I0.
ETP 75. 88. 128. 163. 203. 223. 235. 222. 179. 144. 98. 74. 1832.
ETDF 75. 87. 128. 163. 203. 223. 235. 222. 179. 144. 98. 74. 1831.
MAI .00 .00 .oU .00 .00 .00 .00 .00 .00 .00 .00 .00 .01
---- -- ----------------- --- - --- -- - ----------------- -- -

HURGHADA EGYPT EL= 3 LAT- 27 17 N LONGz 33 46 E KS=11.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 2. 2. 4.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P60 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
PMX 3. 1. 7. 0. 6. 0. 0. 0. 0. 1. 42. 26. 43.
TMC 15.4 15.8 20.9 21.5 25.5 27.9 28.4 28.9 26.6 24.5 20.8 17.2 22.8

HM 56. 54. 53. 54. 51. 51. 54. 53. 58. 58. 59. 59. 55.
SC 78. 79. 80. 79. 82. 82. 79. 80. 76. 76. 75. 75. 78.
PD 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
ETP 87. 95. 146. 164. 205. 215. 219. 211. 169. 140. 102. 85. 1838.
ETOF 87. 95. 146. 164. 205. 215. 219. 211. 169. 140. 102. 85. 1838.
HAI .OU .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00


CAIRO EGYPT










KHARGA EGYPT EL= 73 LAT: 25 26 N LONG: 30 34 E KS=11.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 0. O. 0. 0. 0. 0. 0. 0. 0. 0. O. o. 0.
PHI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P60 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
PMX 2. 5. 0. n. 6. 0. 0. 0. o. 1. 2. 8. 8.
TMC 14.1 15.8 19.7 24.4 79.4 31.0 31.2 31.2 29.0 26.3 20.8 16.1 24.1

HM 50. 45. 37. 31. 30. 31. 31. 33. 35. 41. 48. 52. 39.
SC 79. 83. 89. 93. 94. 93. 93. 92. 90. 86. 81. 78. 88.
PD 0. 0. 0. 0. 0. 0. a. 0. 0. 0. O. 0. 0.
ETP 88. 100. 152. 192. 239. 244. 251. 38. 198. 160. 110. 88. 20z0.
ETOF 88. 100. 152. 192. 239. 244. 251. 238. 198. 160. 110. 88. 2060.
MAI .00 .OU .00 .00 00U .00 .00 .00 .00 .00 .00 .00 .00


MANQUABAD/ASYUT EGYPT EL= 70 LAT: 27 11 N LONG= 31 E E KS=11.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 1. 1. 0. 0. 1. 0. 0. 0. 0. 0. 1. 1. 5.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
P60 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
PMX 13. 7. 0. 3. 15. 0. 0. 0. 0. 0. 25. 13. 25.
TMC 13.4 15.1 18.4 22.9 27.8 29.2 29.6 29.8 27.6 24.8 20.0 15.4 22.8

HM 55. 51. 42. 32. 29. 32. 37. 40. 44. 51. 54. 58. 44.
SC 77. 80. 88. 95. 97. 95. 91. 89. 86. 80. 78. 75. 86.
PD 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0.
ETP 81. 94. 143. 186. 235. 238. 241. 227. 185. 146. 102. 81. 1958.
ETOF 81. 94. 143. 186. 235. 238. 241. 227. 185. 146. 102. 81. 1958.
MAI .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00


PORT SAID EGYPT EL= 7 LAT= 31 17 N LONG= 32 14 E KS=14.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 12. 11. 7. 2. 4. 0. 0. 0. 0. 3. 9. 15. 63.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. .0. 13.
P79 4. 3. 0. 0. 0. 0. 0. 0. 0. 0. 1. 1. 38.
P6U 7. 6. 3. 0. 0. 0. 0. 0. 0. 0. 3. 7. 48.
PMX 36. 35. 33. 17. 31. 0. 0. 0. 2. 23. 60. 43. 110.
THC 14.8 15.6 17.2 19.2 22.7 25.5 27.4 28.0 26.8 24.6 21.2 1 6.6 21.6

HM 73. 71. 70. 72. 72. 73. 74. 72. 70. 69. 71. 73. 72.
5 71. 71. 70. 73. 75. 84. 83. 86. 85. 85. 77. 65. 77.
PD 5. 4. 1. 0. 0. 0. 0. 0. 0. 0. 1. 2.. 40.
ETP 73. 82. 118. 145. 183. 208. 221. 213. 174. 139. 94. 69. 1720.
ETDF 69. 78. 117. 145. 183. 208. 221. 213. 174. 139. 93. 67. 1707.
MAI .06 .04 .01 .00 .00 .00 .r0 .00 .00 .00 .02 .03 .02


SIWA EGYPT EL= -14 LAT= 29 12 N LONG= 25 29 E KS=12.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV 1EC ANN

PM 1. 3. 0. 1. 2. 0. 0. 0 0. 0. 0. 2. 9.
PMI 0. 0. 00. 0. 0. 0. 0. 0. 0. 0. 0.
P79 0. 0. 0. 0. 0. 0. 0. 0. 0, 0. 0. 0. 2.
P60 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 5.
PMX 12. 21. 3. 13. 39. 0. 0. 0. 0. ?9. 2. 22. 43.
THC 11.9 13.8 16.6 21.0 25.6 28.2 29.4 29.2 26.7 23.3 18.2 1.3.6 21.5

HM 62. 57. 52. 47. 46. 47. 49. 49. 54. 55. 57. 63. 53.
SC 74. 79. 83. 87. 88. 87. 86. 86. 81. 80. 79. 73. 82.
PD 0. 0. 0. U. 0. 0. 0. 0. 0. 0. 0. 0. 3.
ETP 72. 85. 129. 168. 213. 225. 234. 219. 173. 136. 92. 71. 11818.
ETDF 72. 85. 129. 168. 213. 225. 234. 219. 173. 136. 92. 71. 1818.
MAI .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00










SAN SALVADOR EL SALVADOR EL= 689 LAT= 13 43 N LONG= 89 12 W KS=12.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 5. 3. 8. D0. 190. 322. 304. 297. 325. 220. 35. 7. 1775.
PHI 0. 0. 0. 0. 69. 139. 117. 82. 211. 25. 0. 0. 1029.
P79 0. 0. 0. 9. 131. 213. 227. 241. 231. 124. 2. 0. 1540.
P60 0. 0. 0. 27. 161. 254. 289. 282. 261. 195. 18. 2. 1710.
PMX 41. 24. 67. 511. 324. 617. 493. 469. 611. 364. 124. 27. 2206.
TMC 22.1 22.4 23.5 24.2 23.7 23.1 23.0 22.5 22.5 22.4 22.0 22.0 22.8

HM 65. 63. 64. 68. 76. 81. 79. 80. 83. 80. 71. 68. 73.
S 77. 80. 80. 71. 67. 54. 72. 73. 53. 57. 70. 74. 69.
PD 0. 0. 0. 13. 137. 222. 240. 250. 237. 139. 5. 0. 1576.
ETP 186. 169. 180. 150. 131. 105. 129. 143. 133. 155. 171. 182. 1833.
ETOF 186. 169. 180. 137. -6. -117. -111. -107. -105. 16. 165. 182. 589.
MAI .00 .0 .OU .09 1.05 2.11 1.87 1.75 1.79 .90 .03 .00 .86


HELSINKI FINLAND EL= 58 LAT= 60 19 N LONG= 24 58 E KS= 9.5

JAN FEB MAR APR NAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 49. 34. 32. 41. 38. 47. 68. 71. 70. 72. 61. 58. 641.
PMI 7. 8. 7. 7. 9. 7. 11. 4. 4. 9. 15. 10. 363.
P79 26. 17. 19. 25. 25. 32. 42. 34. 29. 27. 35. 29. 530.
P60 40. 29. 27. 36. 31. 38. 56. 53. 56. 53. 50. 43. 615.
PMX 97. 103. 71. 98. 114. 110. 129. 161. 151. 176. 135. 137. 909.
TMC -6.8 -7.4 -4.1 2.2 9.0 14.3 17.1 15.6 10.4 4.8 .6 -3.2 4.4

HM 89. 88. 78. 75. 64. 64. 70. 77. 85. 89. 89. 91. 80.
S 20. 30. 43. 48. 52. 53. 54. 53. 40. 27. 16. 13. 37.
PD 29. 20. 21. 27. 26. 33. 45. 38. 35. 32. 38. 32. 548.
ETP 0. 0. 0. 0. 90. 121. 130. 98. 46. 16. 0. 0.
ETDF -29. -20. -21. -27. 64. 87. 85. 60. 12. -16. -38. -32. 126.
MAI .29 .28 .35 .39 .75 2.00


JOKIDINEN FINLAND EL= 103 LAT= 60 49 N LONG= 23 29 E KS= 8.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PH 35. 27. 25. 33. 39. 42. 66. 74. 61. 61. 51. 41. 555.
PMI 4. 6. 3. 6. 7. 7. 17. 6. 8. 10. 16. 14. 360.
P79 21. 13. 14. 19. 17. 22. 41. 54. 36. 29. 24. 25. 473.
P60 31. 20. 22. 25. 33. 33. 51. 64. 50. 53. 43. 35. 527.
PMX 76. 68. 55. 86. 76. 81. 150. 148. 116. 136. 98. 79. 833.
TMC -7.2 -7.8 -4.6 2.2 8.8 13.7 16.4 14.7 9.7 4.3 -.1 -3.5 3.9

HM 89. 86. 80. 73. 68. 67. 73. 80. 83. 89. 92. 92. 81.
S 19. 32. 45. 45. 44. 47. 44. 44. 37. 21. 14. 13. 34.
PD 23. 14. 16. 20. 20. 24. 43. 56. 39. 34. 28. 27. 484.
ETP 0. 0. 0. 0. 83. 111. 115. 87. 43. 14. 0. 0.
ETDF -23. -14. -16. -20. 62. 87. 72. 31. 4. -20. -28. -27. 107.
MAI .25 .22 .37 .64 .91 2.51


KAJAANI FINLAND EL= 136 LAT= 64 17 N LONG= 27 41 E KS= 7.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 31. 22. 23. 33. 36. 66. 71. 70. 61. 51. 40. 32. 536.
PNI 4. 3. 3. 7. 9. 17. 15. 11. 16. 6. 12. 15. 290.
P79 23. 14. 12. 16. 13. 37. 38. 39. 33. 17. 23. 21. 461.
P60 29. 18. 19. 31. 31. 57. 54. 57. 47. 44. 34. 31. 524.
PNX 62. 73. 92. 79. 103. 133. 155. 147. 147. 117. 72. 73. 772.
THC -10.6 -10.5 -6.7 .3 6.9 12.9 16.1 14.0 8.3 2.1 -2.6 -7.0 1.9

HM 87. 84. 77. 71. 68. 67. 70. 78. 82. 88. 89. 88. 79.
S 11. 25. 43. 41. 46. 43. 47. 43. 30. 19. 10. 5. 30.
PD 24. 15. 13. 19. 17. 41. 41. 43. 36. 23. 25. 23. 474.
ETP 0. 0. 0. 0. 77. 104. 117. 81. 33. 0. 0. 0.
ETOF -24. -15. -13. -19. 60. 62. 75. 38. -3. -23. -25. -23. 90.
MAI .22 .40 .35 .53 1.10











LUONETJARVI FINLAND EL= 145 LAT= 62 24 N LONG= 25 40 E KS= 8.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 40. 27. 26. 35. 41. 54. 81. 85. 71. 63. 53. 43. 619.
PHI 9. 6. 6. 10. 6. 13. 13. 6. 12. 2. 7. 12. 345.
P79 29. 18. 15. 23. 20. 30. 40. 35. 34. 27. 31. 24. 504.
P60 36. 23. 22. 29. 31. 42. 65. 75. 48. 51. 40. 33. 586.
PMX 67. 54. 52. 67. 82. 149. 229. 175. 153. 155. 103. 78. 854.
TMC -9.4 -9.2 -5.4 1.4 8.1 13.4 16.3 14.1 8.8 3.0 -1.5 -5.8 2.8

HH 92. 89. 80. 73. 68. 69. 75. 81. 86. 90. 93. 93. 82.
S 12. 27. 43. 41. 45. 44. 46. 48. 32. 19. 12.. 8. 31.
PD 30. 19. 16. 24. 22. 33. 45. 43. 37. 32. 33. 26. 521.
ETP 0. 0. 0. 0. 80. 107. 117. 87. 37. 11. 0. 0.
ETOF -30. -19. -16. -24. 58. 74. 71. 44. -0. -21. -33. -26. 77.
MAI .28 .30 .39 .50 1.01 2.91


TURKU FINLAND EL= 54 LAT= 60 31 N LONG= 22 16 E KS= 9.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 44. 28. 24. 35. 31. 46. 64. 78. 65. 64. 58. 51. 588.
PMI 4. 3. 6. 8. 2. 7. 10. 14. 4. 11. 10. 17. 326.
P79 23. 12. 11. 16. 16. 23. 34. 38. 32. 23. 25. 28. 436.
P60 34. 18. 18. 23. 21. 32. 58. 62. 53. 48. 50. 36. 508.
PMX 87. 66. 46. 72. 77. 92. 186. 155. 166. 145. 137. 101. 804.
TMC -6.0 -6.6 -3. 2.2 8.7 13.9 17.1 15.7 10.6 5.2 .9 -2.7 4.6

HM 89. 85. 78. 74. 68. 67. 71. 79. 81. 86. 90. 91. 80.
S 21. 33. 48. 47. 49. 51. 49. 50. 41. 25. 17. 15. 37.
PD 25. 13. 12. 17. 17. 25. 39. 43. 36. 28. 30. 30. 451.
ETP 0. 0. 0. 0. 87. 116. 124. 95. 47. 16. 0. 0.
ETDF -25. -13. -12. -17. 70. 91. 85. 52. 11. -12. -30. -30. 168.
MAI .20 .21 .31 .45 .77 1.79


VAASA FINLAND EL= 8 LAT= 63 3 N LONG= 21 46 E KS=10.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 32. 21. 18. 30. 31. 47. 62. 63. 65. 58. 49. 37. 513.
PMI 1. 3. 3. 8. 0. 8. 11. 8. 20. 9. 11. 12. 343.
P79 17. 10. 10. 15. 18. 26. 31. 31. 37. 29. 25. 24. 448.
P6o 26. 14. 14. 23. 21. 42. 54. 51. 50. 42. 37. 28. 473.
PMX 68. 46. 36. 73. 83. 86. 134. 141. 234. 93. 90. 90. 609.
TMC -7.3 -7.5 -4.7 1.3 7.5 12.8 16.2 14.6 9.6 3.8 -.5 -3.7 3.5

HM 91. 89. 84. 79. 71. 70. 76. 82. 86. 89. 91. 92. 83.
S 14. 28. 38. 44. 56. 53. 53. 49. 40. 24. 25. 9. 36.
PD 19. 11. 11. 17. 19. 29. 36. 35. 40. 32. 28. 25. 453.
ETP 0. 0. 0. 0. 87. 114. 125. 89. 42. 12. 0. 0.
ETDF -19. -11. -11. -17. 69. 85. 89. 54. 2. -19. -28. -25. 169.
MAI .21 .26 .29 .40 .95 2.58


AJACCIO/CAMPO DEL ORO FRANCE EL= 5 LAT= 41 55 N LONG= 8 48 E KS:14.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 76. 65. 53. 48. 50. 21. 10. 16. 50. 88. 97. 98. 672.
PHI 0. 7. 0. 2. 2. 0. 0. 0. 0. 24. 3. 24. 316.
P79 31. 20. 11. 27. 19. 0. 0. 1. 17. 36. 50. 46. 552.
P60 66. 43. 42. 43. 34. 8. 0. 6. 43. 63. 76. 70. 638.
PMX 188. 172. 160. 149. 161. 100. 163. 63. 151. 237. 237. 206. 985.
TMC 7.7 8.7 10.5 12.6 15.9 19.8 22.0 22.2 20.3 16.3 11.8 8.7 14.7

HM 82. 81. 80. 79. 80. 77. 74. 75. 77. 78. 82. 83. 79.
S 46. 48. 56. 61. 67. 75. 84. 81. 74. 61. 48. 42. 62.
PD 38. 25. 18. 30. 22. 2. 0. 2. 22. 42. 55. 51. 570.
ETP 31. 41. 72. 101. 141. 172. 194. 172. 122. 75. 40. 28. 1189.
ETDF -7. 16. 54. 71. 119. 171. 194. 169. 100. 34. -16. -23. 881.
MAI 1.22 .61 .24 .30 .16 .01 .00 .01 .18 .55 1.40 1.82 .48











EL: 51 LAI- 44 50 N LONG= 0 42 W KS=10.5


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 90. 75. 63. 48. 61. 65. 56. 70. 84. 83. 96. 109. 900.
PMI 18. 3. 11. 1. 10. 18. 4. 2. 24. 20. 10. 12. 494.
P79 42. 23. 29. 25. 40. 30. 28. 36. 42. 33. 52. 54. 757.
P60 76. 44. 43. 38. 60. 50. 48. 58. 66. 60. 82. 89. 838.
PMX 183. 169. 182. 109. 127. 148. 145. 193. 207. 226. 211. 254. 1289.
TMC 5.2 5.9 9.3 11.7 14.7 18.0 19.6 19.5 17.1 12.7 8.4 5.7 12.3

HH 91. 84. 78. 72. 73. 73. 72. 74. 80. 85. 92. 92. 80.
S 29. 36. 48. 51. 49. 55. 54. 55. 51. 45. 30. 24. 44.
PD 49. 27. 32. 28. 44. 34. 32. 41. 47. 39. 58. 61. 774.
ETP 19. 28. 60. 87. 116. 139. 146. 130. 89. 53. 24. 16. 908.
ETDF -30. 1. 28. 59. 72. 105. 114. 89. 42. 14. -34. -45. 416.
MAI 2.54 .97 .53 .32 .38 .25 .22 .31 .53 .73 2.39 3.83 .85


BOURGES FRANCE EL= 162 LAT= 47 4 N LONG= 2 23 E KS= 8.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PH 58. 50. 44. 46. 68. 60. 52. 63. 57. 58. 61. 58. 675.
PHI 11. 0. 3. 1. 20. 17. 3. 3. 7. 11. 14. 10. 476.
P79 30. 23. 23. 23. 43. 38. 29. 30. 32. 24. 34. 35. 583.
P60 45. 50. 35. 34. 66. 50. 39. 45. 44. 38. 50. 50. 628.
PMX 123. 110. 90. 100. 125. 128. 121. 150. 166. 187. 150. 130. 963.
THC 3.0 3.9 7.6 10.6 14.2 17.6 19.4 19.0 16.2 11.3 6.8 3.8 11.1

HH 88. 85. 75. 69. 71. 71. 68. 69. 76. 82. 88. 89. 78.
S 25. 32. 42. 46. 44. 46. 50. 47. 47. 42. 24. 21. 39.
PD 33. 29. 26. 25. 48. 41. 31. 33. 35. 27. 37. 38. 592.
ETP 14. 23. 50. 77. 106. 126. 138. 117. 80. 46. 18. 12. 808.
ETOF -19. -6. 25. 52. 59. 86. 107. 83. 45. 19. -19. -26. 406.
MAI 2.30 1.27 .51 .33 .45 .32 .22 .28 .43 .59 2.04 3.18 .73


BREST/GUIVAPAS FRANCE EL= 103 LAT= 48 27 N LONG= 4 2 5 W KS=11.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 133. 96. 83. 69. 68. 56. 62. 80. 87. 104. 138. 150. 1126.
PHI 25. 5. 10. 5. 10. 10. 20. 0. 10. 20. 16. 21. 711.
P79 75. 46. 40. 38. 34. 30. 38. 25. 57. 61. 66. 100. 1010.
P60 120. 68. 66. 56. 60. 50. 50. 55. 80. 91. 100. 141. 1098.
PHX 250. 244. 209. 200. 150. 119. 130. 170. 180. 228. 263. 309. 1606.
TMC 6.1 5.8 7.8 9.2 11.6 14.4 15.6 16.0 14.7 12.0 9.0 7.0 10.8

HM 90. 87. 85. 82. 83. 85. 85. 85. 88. 88. 89. 89. 86.
S 26. 32. 44. 48. 48. 48. 46. 48. 46. 38. 27. 24. 40.
PD 84. 51. 45. 42. 39. 34. 41. 31. 62. 67. 73. 109. 1028.
ETP 16. 24. 50. 75. 102. 116. 119. 106. 74. 43. 20. 14. 759.
ETOF -69. -27. 5. 33. 62. 82. 79. 75. 12. -24. -53. -95. 80.
MAI 5.35 2.14 .91 .56 .39 .29 .34 .29 .83 1.57 3.65 7.95 1.36
- -----------------------------------------------------------------------

CAYENNE/ROCHAMBEAU FR. GUIANA EL= 9 LAT= 4 50 N LONG= 52 22 U KS=11.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 431. 423. 432. 480. 590. 457. 274. 144. 32. 42. 122. 317. 3744.
PMI 13. 29. 27. 97. 305. 234. 76. 19. 1. 2. 11. 63. 2519.
P79 228. 173. 194. 199. 402. 325. 176. 56. 8. 8. 25. 208. 3033.
P60 377. 303. 266. 344. 535. 398. 226. 109. 17. 20. 74. 249. 3300.
PMX 1056. 1114. 1385. 1252. 888. 906. 747. 539. 125. 125. 423. 629. 5308.
TMC 25.1 25.2 25.5 25.7 25.3 25.2 25.1 25.6 26.1 26.3 26.0 25.4 25.5

HM 88. 87. 86. 87. 90. 89. 88. 86. 83. 82. 84. 88. 86.
S 39. 34. 37. 36. 36. 46. 55. 62. 72. 72. 66. 53. 51.
PD 259. 200. 209. 229. 430. 340. 186. 67. 10. 11. 35. 217. 3089.
ETP 121. 107. 129. 123. 123. 131. 149. 166. 178. 180. 158. 139. 1704.
ETOF -138. -93. -80. -106. -307. -209. -38. 98. 168. 170. 122. -78. -490.
MAI 2.15 1.87 1.62 1.86 3.49 2.59 1.25 .41 .06 .06 .22 1.56 1.81


BORDEAUX/MERIGNAC FRANCE










EL= 12 LAT= 49 39 N LONG= 1 38 W KS= 8.9


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 109. 75. 62. 49. 41. 39. 55. 71. 79. 99. 133. 119. 931.
PNI 24. 1. 1. 3. 3. 11. 3. 1. 6. 17. 16. 23. 641.
P79 49. 25. 27. 18. 19. 23. 26. 36. 47. 56. 50. 68. 804.
P60 95. 56. 52. 32. 36. 33. 47. 54. 71. 76. 79. 105. 877.
PMX 191. 224. 166. 104. 91. 77. 126. 194. 224. 225. 340. 219. 1343.
TMC 6.5 6.3 7.7 9.6 12.1 14.8 16.4 16.8 15.8 12.9 9.7 7.5 11.3

HM 84. 82. 80. 80. 79. 79. 81. 83. 82. 82. 83. 83. 81.
SC 36. 38. 40. 40 1. 1 41. 39. 37. 38. 38. 37. 37. 42.
PD 59. 32. 32. 21. 23. 25. 30. 40. 52. 60. 56. 76. 819.
ETP 17. 25. 46. 68. 95. 109. 112. 94. 68. 42. 22. 16. 714.
ETOF -41. -7. 14. 47. 72. 84. 81. 54. 16. -18. -34. -60. 208.
MAI 3.38 1.27 .69 .31 .24 .23 .27 .42 .77 1.43 2.52 4.84 1.15


DIJON FRANCE EL= 227 LAT= 47 16 N LONG 5 5 E KS= 9.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 64. 42. 42. 46. 64. 81. 58. 77. 72. 60. 76. 57. 739.
PHI 13. 0. 3. 2. 20. 13. 2. 22. 17. 11. 12. 10. 468.
P79 34. 16. 15. 25. 37. 53. 20. 40. 49. 26. 40. 31. 631.
P60 58. 31. 32. 36. 54. 66. 46. 60. 58. 48. 51. 42. 717.
PMX 126. 101. 102. 106. 126. 214. 141. 143. 150. 161. 192. 170. 977.
TMC 1.3 2.6 6.9 10.4 14.3 17.7 19.6 19.0 15.9 10.5 5.7 2.1 10.5

HM 89. 84. 73. 67. 68. 69. 66. 70. 77. 83. 88. 90. 77.
5 25. 33. 51. 53. 54. 54. 57. 56. 56. 45. 26. 17. 44.
PD 39. 19. 19. 27. 41. 56. 25. 44. 51. 31. 42. 33. 649.
ETP 0. 0. 54. 83. 119. 137. 149. 127. 86. 46. 18. 0.
ETDF -39. -19. 35. 55. 78. 81. 123. 82. 35. 15. -24. -33. 390.
MAI .34 .33 .34 .41 .17 .35 .59 .67 2.34


DJIBOUTI/SERENT AFARS/ISSAS F EL= 7 LAT= 11 36 N LONG= 43 9 E KS=13.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 13. 7. 24. 11. 6. 0. 7. 8. 3. 13. 30. 13. 133.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 25.
P79 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 2. 54.
P60 3. 2. 1. 0. 0. 0. 0. 1. 0. 0. 2. 4. 105.
PMX 89. 55. 173. 7U. 43. 2. 78. 51. 23. 79. 225. 69. 300.
TMC 25.1 25.4 26.8 28.5 30.6 33.3 34.2 33.3 32.2 29.6 27.4 25.9 29.4

HM 78. 79. 81. 79. 76. 63. 55. 59. 71. 73. 74. 76. 72.
S 68. 74. 68. 76. 80. 66. 59. 68. 75. 82. 87. 79. 74.
PD 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 2. 65.
ETP 145. 149. 177. 195. 216. 199. 199. 212. 206. 197. 172. 155. 2221.
ETOF 144. 149. 176. 195. 216. 199. 199. 212. 206. 197. 171. 152. 2216.
MAI .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .02 .03
------------- ---------- ------------ -------------- -- -- ---

D2AOUDZI/PAMANZI COMOPO ISL. F EL= 7 LAT- 12 48 S LONG= 45 17 E KS=13.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 264. 254. 163. 94. 13. 12. 13. 10. 29. 50. 93. 177. 1170.
PHI 80. 26. 55. 0. 0. 0. 0. 0. 0. 3. 9. 49. 785.
P79 166. 122. 112. 35. 3. 2. 2. 2. 6. 17. 26. 76. 850.
P60 231. 202. 172. 57. 14. 5. 5. 5. 13. 31. 45. 104. 100i.
PMX 597. 448. 454. 233. 81. 64. 59. 39. 68. 163. 242. 479. 1799.
TMC 27.3 26.9 27.1 27.0 !6.3 25.3 24.2 23.8 24.3 25.2 26.2 27.1 25.9

HM 84. 86. 85. 84. 81. 79. 81. 83. 83. 83. 83. 82. 83.
SC 53. 49. 51. 53. 58. 60. 58. 54. 54. 54. 54. 56. 55.
PD 180. 139. 125. 40. 5. 3. 3. 3. 7. 20. 30. 82. 884.
ETP 174. 148. 158. 140. 132. 119. 120. 129. 142. 162. 166. 178. 1766.
ETOF -6. 9. 33. 100. 126. 116. 118. 126. 135. 142. 136. 96. 1131.
MAI 1.04 .94 .79 .28 .04 .02 .02 .02 .05 .12 .18 .46 .50


CHERBOURG FRANCE










FORT-DE-FRANCE MARTINIQUF FR. EL= 146 LAT= 14 37 N LONG= 61 4 W KS=11.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PH 96. 68. 58. 82. 126. 160. 214. 227. 232. 221. 230. 126. 1840.
PHI 36. 4. 3. 26. 23. 56. 100. 67. 88. 108. 88. 32. 1267.
P79 62. 44. 27. 47. 61. 104. 157. 134. 153. 142. 148. 88. 1511.
P60 78. 53. 46. 59. 96. 132. 188. 193. 183. 188. 177. 98. 1713.
PMX 175. 150. 132. 190. 436. 327. 380. 362. 457. 369. 474. 245. 2667.
THC 23.5 23.5 24.01 24.7 25.4 25.7 25.6 26.0 25.9 25.6 25.2 24.2 24.9

HM 78. 78. 76. 78. 80. 82. 83. 83. 83. 84. 83. 81. 81.
5 74. 73. 74. 88. 63. 58. 60. 68. 62. 63. 67. 69. 67.
PD 65. 46. 31. 50. 68. 110. 164. 146. 159. 152. 154. 90. 1553.
ETP 138. 136. 169. 168. 172. 161. 170. 181. 162. 153. 137. 132. 1880.
ETDF 73. 90. 138. 119. 104. 51. 6. 35. 2. 1. -17. 42. 644.
MAI .47 .34 .18 .29 .40 .68 .96 .81 .99 .99 1.13 .68 .83


LIMOGES FRANCE EL= 284 LAT= 45 49 N LONG= 1 17 E KS= 9.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 89. 76. 66. 65. 80. 67. 71. 72. 84. 80. 88. 94. 932.
PHI 16. 1. 6. 1. 15. 21. 3. 10. 23. 21. 6. 21. 686.
P79 46. 28. 28. 23. 45. 42. 29. 39. 49. 39. 45. 47. 803.
P60 66. 67. 48. 43. 61. 53. 50. 70. 76. 54. 74. 72. 873.
PMX 198. 163. 188. 157. 188. 165. 168. 134. 173. 239. 189. 188. 1318.
TMC 3.1 3.9 7.4 9.9 13.3 16.8 18.4 17.8 15.3 10.7 6.7 3.8 10.6

HM 87. 83. 74. 69. 72. 72. 71. 73. 79. 83. 86. 87. 78.
5 26. 33. 45. 47. 47. 51. 51. 52. 50. 43. 28. 24. 42.
PD 50. 36. 32. 27. 48. 44. 33. 46. 55. 42. 51. 52. 818.
ETP 16. 24. 53. 78. 108. 130. 137. 119. 82. 47. 21. 14. 829.
ETOF -34. -12. 21. 50. 59. 86. 104. 74. 27. 5. -30. -38. 311.
MAI 3.13 1.49 .60 .35 .45 .34 .24 .38 .67 .90 2.41 3.74 .99


LYON/BRON FRANCE EL' 201 LAT= 45 43 N LONG= 4 57 E KS= 9.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PH 52. 46. 53. 56. 69. 85. 56. 89. 93. 77. 80. 57. 813.
PHI 10. 1. 1. 1. 17. 29. 12. 7. 10. 22. 15. 15. 581.
P79 33. 12. 23. 23. 40. 40. 22. 45. 44. 48. 46. 34. 666.
P60 42. 33. 41. 38. 59. 65. 34. 74. 82. 61. 60. 51. 783.
PMX 153. 118. 168. 144. 142. 159. 136. 225. 211. 247. 183. 129. 1232.
TMC 2.1 3.3 7.7 10.9 14.9 18.5 20.7 20.1 16.9 11.4 6.7 3.1 11.4

HM 87. 82. 74. 69. 69. 68. 64. 67. 76. 83. 86. 87. 76.
S 23. 35. 49. 51. 52. 56. 61. 59. 54. 40. 23. 18. 43.
PD 35. 16. 27. 26. 44. 45. 25. 51. 52. 51. 49. 38. 691.
ETP 0. 24. 56. 84. 120. 143. 159. 135. 89. 47. 19. 12.
ETDF -35. 8. 29. 57. 76. 97. 134. 84. 37. -4. -30. -26. 429.
MAI .68 .48 .31 .37 .32 .15 .38 .58 1.08 2.53 3.20
-- -- -- -- ------------------------

MARSEILLE/MARIGNANE FRANCE EL=' 8 LAT= 43 27 N LONG= 5 13 E KS=11.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 43. 32. 43. R 46. 24. 11. 34. 60. 76. 69. 66. 546.
PHI 3. 2. 0. O. 2. 0. 0. 0. 1. 12. 1. 2. 355.
P79 10. 8. 12. 5. 17. 4. 0. 8. 12. 32. 25. 28. 420.
P60 25. 19. 32. 33. 26. 15. 1. 25. 41. 54. 40. 51. 492.
PMX 175. 92. 108. 150. 181. 88. 68. 100. 319. 171. 217. 172. 884.
TMC 5.5 6.6 10.0 13.0 16.8 20.8 23.3 22.8 19.9 15.0 10.2 6.9 14.2

HM 78. 73. 71. 67. 68. 65. 61. 64. 71. 76. 79. 79. 71.
S 48. 56. 58. 64. 65. 71. 80. 76. 69. 58. 52. 45. 62.
PD 13. 10. 16. 11. 19. 6. 0. 12. 18. 37. 28. 33. 435.
ETP 27. 38. 70. 103. 142. 172. 196. 168. 114. 68. 36. 25. 1160.
ETDF 14. 28. 54. 93. 123. 166. 196. 156. 96. 31. 8. -8. 957.
HAI .48 .27 .23 .11 .13 .04 .00 .07 .16 .54 .77 1.31 .38
-------------------------- ---------------------










MORONI COMORO ISLANDS FRANCE EL= 17 LAT= 11 42 S LCNG- 43 14 E KS=13.2

JAN FF9 MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 357. 291. 284. 309. 211. 217. 271. 141. 131. 89. 105. 233. 2639.
PMI 179. 78. 76. 64. 12. 20. 20. 13. 5. In. 9. 46. 1599.
P79 214. 189. 175. 131. 43. 47. 69. 54. 47. 53. 33. 129. 1948.
P60 271. 251. 227. 204. 101. 130. 97. 110. 72. 72. 66. 164. 2354.
PMX 798. 829. 598. 1216. 1065. 798. 1114. 329. 919. 278. 266. 855. 4393.
TMC 26.2 26.2 26.3 25.9 25.0 23.7 22.8 22.7 23.1 24.2 25.5 26.2 24.8

HM 82. 82. 82. 82. 78. 76. 76. 78. 80. 81. 79. 79. 80.
SC 56. 56. 56. 56. 62. 65. 65. 62. 59. 58. 60. 60. 60.
PD 226. 202. 186. 146. 55. 64. 74. 66. 52. 57. 40. 136. 2033.
ETP 173. 154. 163. 142. 134. 12n. 125. 135. 144. 162. 171. 180. 1804.
ETDF -53. -48. -23. -5. 79. 56. 51. 70. 92. 105. 131. 44. 499.
MAI 1.31 1.31 1.14 1.(13 .41 .54 .5" .49 .36 .35 .23 .76 1.13


NANCY FRANCE EL= 217 LAT: 48 41 N LONG: 6 13 E KS= 9.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 67. 55. 41. 49. 54. 77. 60. 67. 65. 55. 61. 61. 712.
PMI 15. 4. 8. 8. 12. 15. 6. 12. 14. 9. 13. 5. 495.
P79 35. 25. 18. 24. 25. 44. 27. 44. 37. 28. 35. 33. 577.
P60 53. 39. 24. 41. 47. 63. 49. 55. 55. 40. 44. 49. E78.
PMX 157. 135. 128. 97. 110. 176. 132. 131. 133. 162. 169. 171. 962.
TMC .8 1.6 5.5 9.2 13.3 16.5 18.3 17.7 14.7 9.4 5.2 1.8 9.5

HM 91. 87. 79. 73. 74. 76. 75. 76. 82. 87. 91. 91. 82.
5 20. 30. 44. 41. 47. 46. 49. 49. 45. 36. 20. 17. 37.
PD 39. 28. 19. 28. 30. 48. 31. 46. 41. 31. 37. 36. 598.
ETP 0. 0. 45. 68. 106. 123. 133. 113. 73. 38. 14. 0.
ETOF -39. -28. 26. 41. 76. 75. 102. 66. 32. 7. -22. -36. 299.
MAI .42 .40 .29 .39 .24 .41 .56 .81 2.55


NANTES FRANCE EL= 27 LAT= 47 10 N LONG= 1 37 W KS=10.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 81. 66. 57. 45. 58. 44. 48. 63. 73. 75. 83. 89. 782.
PMI 10. 1. 1. 3. 22. 15. 3. 0. 12. 20. 13. 24. 546.
P79 40. 22. 27. 28. 30. 24. 15. 25. 39. 41. 39. 45. 627.
P60 70. 40. 45. 35. 43. 29. 27. 50. 60. 55. 67. 79. 755.
PMX 190. 186. 128. 107. 140. 140. 120. 190. 187. 220. 185. 180. 1076.
TMC 5.0 5.3 8.4 10.8 13.9 17.2 18.8 18.6 16.4 12.2 8.2 5.5 11.7

HM 92. 88. 82. 77. 78. 75. 74. 76. 82. 88. 91. 92. 83.
5 28. 33. 43. 48. 47. 49. 50. 51. 46. 40. 28. 22. 40.
PD 46. 26. 31. 29. 33. 25. 18. 30. 43. 44. 45. 52. 654.
ETP 17. 25. 53. 80. 110. 129. )36. 119. 80. 46. 21. 13. 827.
ETDF -30. -1. 22. 50. 77. 104. 118. 89. 36. 2. -24. -39. 405.
MAI 2.78 1.05 .59 .37 .30 .19 .13 .25 .55 .95 2.15 3.90 .79


NICE FRANCE EL= 10 LAT= 43 39 N LONG= 7 12 E KS-12.9

JAN FEB MAR AR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 68. 61. 73. 73. 68. 35. 20. 27. 77. 124. 129. 107. 862.
PHI 0. 0. 0. 0. 3. 1. 0. 0. 2. 10. 7. 5. 503.
P79 23. 17. 23. 28. 27. 7. 1. 3. 20. 55. 58. 37. 695.
P60 41. 41. 42. 44. 50. 15. 3. 10. 41. 96. 100. 69. 774.
PMX 202. 208. 195. 199. 157. 150. 160. 95. 211. 279. 317. 270. 121.
TMC 7.5 8.5 10. 13.3 16.7 20.1 22.7 22.5 20.3 16.0 11.5 8.2 14.8

HM 73. 72. 75. 77. 78. 77. 75. 76. 76. 76. 76. 75. 75.
S 52. 57. 55. 61. 62. 68. 78. 76. 70. 60. 52. 49. 62.
PD 27. 22. 27. 31. 32. 9. 1. 4. 24. 64. 67. 44. 712.
ETP 30. 42. 70. 102. 139. 165. 191. 166. 116. 71. 38. 27. 1156.
ETDF 4. 20. 43. 71. 107. 157. 189. 161. 91. 7. -29. -16. 804.
MAI .88 .53 .39 .31 .23 .05 .01 .03 .21 .90 1.75 1.60 .62












EL= 60 LAT= 43 52 N LONG: 4 24 E KS=10.6


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 49. 36. 69. 61. 68. 38. 21. 42. 109. 90. 82. 78. 743.
PHI 1. 0. 0. 0. 7. 1. 0. 1. 10. 8. 4. 15. 438.
P79 10. 8. 31. 20. 30. 13. 4. 10. 36. 47. 48. 36. 583.
P60 22. 17. 49. 35. 50. 22. 11. 22. 72. 63. 57. 55. 666.
PMX 199. 132. 214. 276. 184. 142. 92. 122. 304. 258. 241. 186. 1072.
TMC 5.7 6.8 10.1 13.0 16.6 20.8 23.6 22.9 19.7 14.6 9.8 6.5 14.2

HM 72. 67. 66. 63. 64. 60. 55. 59. 67. 72. 75. 75. 66.
5 51. 58. 55. 62. 62. 70. 78. 73. 65. 55. 49. 46. 60.
PD 13. 10. 35. 23. 34. 15. 5. 13. 44. 50. 50. 40. 600.
ETP 28. 39. 68. 101. 138. 171. 195. 164. 110. 64. 34. 24. 1136.
ETDF 15. 29. 33. 78. 104. 156. 190. 151. 66. 14. -16. -16. 804.
MAI .45 .25 .51 .23 .25 .09 .03 .08 .40 .78 1.45 1.66 .53


NOUMEA NEW CALEDONIA IS. FRAN. EL=' 75 LAT= 22 16 S LONG=166 27 E KS:12.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 117. 94. 175. 124. 93. 89. 84. 70. 53. 52. 47. 85. 1083.
PMI 4. 15. 38. 20. 24. 16. 11. 12. 5. 4. 1. 0. 577.
P79 23. 44. 67. 53. 46. 51. 49. 35. 14. 10. 15. 19. 817.
P60 97. 61. 130. 81. 61. 73. 62. 56. 29. 34. 20. 43. 966.
PMX 352. 262. 577. 430. 339. 177. 210. 129. 164. 204. 329. 274. 1792.
TMC 25.6 26.0 25.0 23.4 22.0 20.5 19.4 19.9 20.6 22.1 24.0 25.3 22.8

HM 76. 78. 80. 80. 78. 78. 77. 73. 74. 72. 72. 73. 76.
S 58. 65. 54. 59. 54. 52. 56. 59. 57. 70. 65. 65. 59.
PD 39. 48. 80. 59. 49. 56. 52. 39. 17. 15. 16. 24. 848.
ETP 182. 167. 148. 122. 98. 81. 88. 107. 124. 168. 178. 194. 1658.
ETDF 144. 120. 68. 64. 49. 25. 36. 68. 107. 153. 162. 170. 1165.
MAI .21 .28 .54 .48 .50 .69 .59 .37 .14 .09 .09 .12 .51


PARIS/LE BOURGET FRANCE EL= 53 LAT= 48 58 N LONG= 2 27 E KS= 8.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 54. 43. 32. 38. 52. 50; 55. 62. 51. 49. 50. 49. 585.
PMI 12. 0. 0. 2. 3. 12. 7. 10. 4. 15. 11. 10. 286.
P79 26. 13. 18. 14. 25. 29. 24. 29. 29. 22. 23. 32. 496.
P60 48. 32. 23. 30. 37. 38. 44. 51. 41. 38. 45. 40. 534.
PMX 115. 110. 76. 78. 122. 117. 142. 180. 103. 117. 120. 91. 822.
TMC 3.1 3.8 7.2 10.3 14.0 17.1 19.0 18.5 15.9 11.1 6.8 4.1 10.9

HM 89. 84. 75. 69. 69. 69. 70. 72. 78. 84. 89. 89. 78.
5 19. 27. 40. 45. 47. 48. 47. 46. 43. 36. 20. 16. 36.
PD 31. 17. 19. 17. 28. 31. 28. 34. 32. 25. 28. 34. 504.
ETP 11. 19. 46. 74. 109. 127. 132. 111. 73. 40. 15. 9. 768.
ETDF -19. 2. 27. 57. 81. 96. 104. 78. 42. 14. -12. -24. 445.
MAI 2.73 .88 .41 .23 .25 .24 .21 .30 .43 .64 1.82 3.60 .66
-------------------------- -- --------------------

PERPIGNAN FRANCE EL- 48 LAT- 42 44 N LONG= 2 52 E KS=10.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 39. 52. 66. 39. 52. 38. 24. 31. 82. 74. 55. 87. 639.
PHI 1. 0. 3. 0. 1. 0. 3. 0. 3. 1. 1. 7. 325.
P79 7. 5. 20. 9. 16. 12. 7. 14. 24. 18. 5. 16. 455.
P60 19. 18. 29. 15. 35. 20. 12. 27. 37. 43. 22. 27. 514.
PMX 143. 333. 195. 176. 122. 150. 139. 75. 434. 382. 246. 445. 1341.
TMC 7.5 8.4 11.3 13.9 17.1 21.1 23.8 23.3 20.5 15.9 11.5 8.6 15.2

HM 71. 67. 68. 64. 65. 63. 59. 63. 69. 72. 73. 72. 67.
5 57. 59. 60. 65. 59. 63. 70. 67. 61. 55. 55. 51. 60.
PD 10. 8. 22. 10. 20. 14. 8. 17. 27. 23. 9. 18. 467.
ETP 33. 44. 75. 108. 137. 163. 186. 160. 111. 69. 41. 29. 1154.
ETDF 24. 36. 54. 98. 117. 149. 177. 143. 84. 45. 32. 11. 969.
MAI .29 .18 .29 .10 .15 .08 .04 .10 .24 .34 .21 .62 .41


NIMES FRANCE













POINTE-A-PITRE/RAIZET GUAD. FR EL= 8 LAT= 16 16 N LONG: 61 31 W KS=11.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 91. 66. 66. 86. 135. 148. 179. 244. 196. 229. 231. 143. 1814.
PMI 19. 19. 12. 16. 28. 37. 87. 61. 94. 81. 58. 34. 1268.
P79 44. 31. 30. 43. 60. 96. 118. 140. 120. 134. 118. 80. 1572.
PSO 61. 55. 48. 67. 101. 118. 152. 184. 155. 186. 182. 116. 1702.
PMX 230. 169. 162. 273. 332. 426. 303. 610. 518. 516. 554. 312. 2412.
TMC 23.4 23.5 24.0 26.0 26.0 26.8 26.7 26.8 26.7 26.1 25.3 24.3 25.5

HM 81. 78. 77. 78. 79. 78. 80. 80. 81. 82. 82. 81. 80.
S 65. 68. 70. 64. 58. 59. 58. 60. 58. 61. 62. 64. 62.
PD 48. 36. 34. 48. 69. 101. 125. 149. 127. 145. 131. 88. 1599.
ETP 125. 129. 162. 169. 170. 168. 172. 174. 158. 150. 129. 124. 1831.
ETDF 78. 93. 128. 121. 102. 68. 47. 25. 30. 5. -3. 36. 731.
MAI .38 .28 .21 .28 .40 .60 .73 .86 .81 .96 1.U2 .71 .87


SAINT-DENIS FRANCE EL= 12 LAT= 20 53 S LONG= 55 31 E KS=11.4

JAN FEB MAR A R MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 252. 217. 292. 162. 71. 80. 72. 47. 44. 50. 99. 140. 1526.
PMI 60. 23. 55. 3. 0. 6. 2. 1. 1. 2. 0. 50.
P79 78. 97. 141. 29. 22. 12. 12. 8. 8. 10. 7. 82.
P60 150. 143. 215. 81. 36. 21. 26. 21. 22. 23. 35. 125.
PMX 713. 386. 1069. 406. 204. 171. 137. 100. 117. 101. 165. 273.
TMC 26.0 26.3 25.8 24.5 22.9 21.6 20.7 20.6 21.3 22.2 23.6 25.2 23.4

HM 76. 76. 77. 73. 70. 69. 69. 68. 69. 70. 72. 75. 72.
S 55. 59. 53. 68. 75. 68. 68. 60. 59. 58. 54. 54. 61.
PD 93. 107. 157. 40. 25. 14. 15. 11. 11. 13. 13. 91.
ETP 180. 161. 151. 137. 121. 98. 103. 112. 130. 154. 160. 176. 1682.
ETDF 86. 55. -6. 97. 96. 84. 88. 102. 119. 142. 147. 85. 1093.
MAI .52 .66 1.04 .29 .21 .14 .15 .10 .08 .08 .08 .52


STRASBOURG FRANCE EL= 154 LAT= 48 33 N LONG= 7 38 E KS= 8.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 39. 33. 30. 39. G0. 77. 77. 80. 58. 42. 41. 31. 607.
PMI 14. 1. 4. 14. 9. 19. 8. 15. 12. 10. 4. '5. 358.
P79 22. 17. 13. 21. 33. 50. 39. 47. 30. 17. 22. 18. 500.
P60 30. 22. 22. 29. 51. 59. 66. 69. 48. 30. 28. 25. 600.
PMX 99. 103. 87. 89. 115. 154. 167. 145. 139. 150. 140. 75. 831.
TMC .4 1.5 5.E 9.8 14.0 17.2 19.0 18.3 15.1 9.5 4.9 1.3 9.7

HM 88. 86. 76. 71. 73. 74. 74. 77. 81. 86. 89. 90. 80.
5 19. 28. 44. 43. 46. 46. 43. 50. 45. 34. 18. 15. 36.
PD 24. 18. 15. 23. 37. 52. 45. 52. 34. 20. 23. 19. 521.
ETP 0. 0. 46. 71. 108. 125. 134. 115. 74. 37. 14. n.
ETDF -24. -18. 31. 49. 71. 73. 89. 64. 40. 17. -10. -19. 363.
MAI .33 .32 .34 .42 .33 .45 .46 .54 1.70


TAHITI-FAAA FRENCH POLYNFSIA EL= 2 LAT: 17 33 S LONG=149 37 W KS=12.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 423. 240. 122. 92. 144. 60. 70. 47. 103. 81. 166. 252. 1800.
PMI 117. 36. 10. 3. 0. 12. 0. 6. 10. 12. 19. 55. 1020.
P79 239. 115. 78. 31. 39. 24. 12. 18. 18. 31. 57. 127. 1502.
P60 302. 179. 114. 41. 74. 37. 45. 33. 58. 57. 118. 182. 1654.
PMX 1365. 572. 234. 329. 502. 176. 253. 111. 297. 316. 497. 728. 2791.
TMC 26.0 26.2 26.5 26.3 75.5 24.6 24.1 23.9 24.3 24.8 25.6 26.0 25.3

HM 79. 78. 78. 78. 78. 77. 76. 76. 77. 77. 77. 78. 77.
SC 57. 53. 58. 58. 58. 59. 61. 61. 59. 59. 59. 58. 59.
PD 252. 128. 86. 33. 46. 27. 19. 21. 26. 36. 70. 139. 1534.
ETP 179. 159. 163. 138. 120. 106. 113. 129. 144. 168. 174. 183. 1777.
ETDF -73. 31. 78. 105. 74. 79. 94. 109. 118. 131. 105. 44. 894.
MAI 1.41 .81 .52 .24 .38 .25 .17 .16 .18 .22 .40 .76 .86












EL= 152 LAT= 43 37 N LONG= 1 22 E KS-=10;.


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 49. 46. 53. 50. 75. 61. 44. 54. 64. 45. 51. 67. 659.
PMI 10. 2. 4. 1. 30. 4. 6. 5. 10. 8. 10. 8. 400.
P79 20. 12. 20. 31. 35. 27. 18. 22. 28. 27. 31. 25. 508.
P60 36. 39. 40. 40. 50. 42. 26. 49. 47. 38. 40. 50. 636.
PMX 149. 120. 120. 120. 160. 228. 140. 140. 240. 76. 130. 180. 870.
TMC 4.5 5.4 9.0 11.4 14.8 18.6 20.8 20.7 18.0 13.0 8.3 5.3 12.5

HM 88. 83. 76. 74. 73. 71. 67. 70. 76. 83. 89. 89. 78.
S 30. 39. 51. 52. 49. 52. 56. 57. 54. 47. 33. 24. 45.
PD Z3. 18. 24. 33. 38. 30. 20. 28. 32. 29. 33. 30. 535.
ETP 20. 30. 63. 88. 117. 139. 153. 137. 96. 57. 27. 17. 943.
ETOF -3. 13. 39. 55. 78. 109. 134. 110. 64. 27. -6. -13. 605.
MAI 1.15 .58 .39 .38 .33 .22 .13 .20 .33 .52 1.23 1.79 .57


TRAPPES FRANCE EL= 168 LAT- 48 46 N LONG= 2 1 E KS= 8.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 57. 45. 37. 44. 55. 50. 52. 63. 58. 54. 56. 52. 623.
PMI 14. 0. 0. 4. 5. 10. 6. 10. 2. 16. 19. 12. 387.
P79 29. 19. 16. 18. 24. 29. 21. 31. 32. 27. 30. 30. 499.
P60 52. 35. 29. 35. 44. 42. 35. 55. 46. 43. 47. 39. 572.
PMX 124. 100. 80. 89. 124. 100. 128. 178. 148. 150. 118. 118. 900.
TMC 2.6 3.0 6.5 9.5 13.0 15.8 17.8 17.4 14.8 10.5 6.2 3.5 10.0

HM 92. 89. 78. 73. 75. 75. 76. 76. 83. 88. 92. 92. 82.
S 19. 25. 39. 43. 45. 48. 46. 45. 42. 35. 21. 15. 35.
PD 34. 22. 19. 22. 28. 32. 24. 36. 35. 30. 34. 32. 514.
ETP 0. 18. 44. 71. 103. 122. 127. 107. 70. 38. 15. 9.
ETOF -34. -5. 26. 49. 75. 91. 103. 71. 35. 8. -18. -23. 377.
MAI 1.25 .42 .31 .27 .26 .19 .34 .50 .79 2.19 3.60


BERLIN/TEMPELHOF CERMANY EL= 50 LAT- 52 28 N LONG= 13 26 E KS- 8.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 41. 37. 30. 39. 44. 60. 67. 65. 45. 45. 44. 39. 556.
PMI 12. 5. 8. 7. 19. 12. 19. 15. 3. 1. 5. 1. 394.
P79 25. 20. 13. 22. 30. 36. 44. 34. 21. 18. 27. 20. 494.
P60 30. 26. 20. 33. 33. 47. 52. 53. 37. 36. 31. 28. 516.
PMX 95. 100. 71. 98. 84. 192. 140. 156. 139. 110. 122. 88. 754.
TMC -.5 .2 3.9 9.0 14.3 17.7 19.4 18.8 15.0 9.6 4.7 1.2 9.5

HM 83. 82. 70. 66. 61. 61. 65. 67. 71. 78. 85. 83. 73.
SC 33. 34. 44. 47. 50. 50. 47. 46. 43. 38. 31. 33. 41.
PD 26. 21. 14. 24. 31. 38. 46. 38. 24. 22. 28. 22. 199.
ETP 0. 0. 38. 69. 111. 131. 133. 109. 67. 34. 14. 0.
ETDF -26. -21. 24. 45. 81. 93. 88. 71. 43. 12. -14. -22. 373.
MAI .38 .35 .27 .29 .34 .35 .36 .64 1.99


BROKEN GERMANY EL=1152 LAT= 51 48 N LONG: 10 37 E KS= 7.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 158. 126. 94. 105. 96. 115. 143. 117. 105. 122. 115. 126. 1422.
PMI 40. 12. 19. 25. 40. 39. 37. 50. 7. 12. 29. 21.
P79 84. 71. 46. 65. 53. 77. 87. 76. 61. 59. 63. 75.
P60 134. 101. 72. 90. 83. 88. 116. 91. 82. 98. 87. 113.
PMX 424. 350. 197. 231. 196. 307. 348. 209. 199. 278. 282. 274.
TMC -4.6 -4.7 -2.0 1.2 5.7 9.1 10.8 10.7 7.9 3.6 -.3 -3.0 2.9

HM 89. 90. 85. 80. 83. 83. 87. 87. 89. 91. 91. 90. 87.
SC 26. 25. 30. 35. 32. 32. 28. 28. 26. 23. 23. 25. 28.
PD 94. 77. 51. 70. 59. 79. 93. 79. 65. 67. 68. 83.
ETP 0. 0. 0. 0. 65. 79. 79. 66. 41. 21. 0. 0.
ETDF -94. -77. -51. -70. 6. -0. -15. -13. -24. -46. -68. -83. -537.
MAI .91 1.00 1.19 1.19 1.60 3.16


TOULOUSE/BLAGNAC FRANCE













EL: 1 LAT= 53 22 N LONG= 7 13 E KS: 9.8


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV OEC ANN

PM 57. 46. 39. 43. 51. 53. 92. 88. 68. 68. 69. 57. 737.
PMT 15. 9. 11. 6. 15. 18. 16. 12. 4. 11. 23. 9. 480.
P79 36. 18. 20. 23. 26. 37. 58. 58. 38. 30. 37. 34. 601.
P60 43. 38. 27. 40. 40. 61. 76. 78. 62. 54. 50. 56. 697.
PMX 113. 143. 82. 94. 116. 93. 243. 185. 152. 145. 187. 91. 988.
TMC .9 1.3 3.8 7.6 11.8 15.1 16.8 16,6 13.9 9.6 5.6 2.7 8.8

HM 93. 93. 86. 81. 78. 77. 81. 83. 84. 89. 91. 92. 86.
S 20. 25. 32. 47. 48. 43. 40. 41. 43. 31. 22. 15. 34.
PO 37. 22. 21. 27. 29. 42. 62. 62. 43. 35. 40. 39. 621.
ETP U. 0. 32. 65. 101. 113. 114. 96. 63. 30. 11. 0.
ETOF -37. -22. 11. 38. 72. 71. 52. 33. 20. -5. -28. -39. 165.
MAI .67 .41 .29 .37 .54 .65 .68 1.17 3.48


ERFURT/BTNDERSLEBEN GERMANY ELz 316 LAT= 50 59 N LONG= 10 58 E KS- 7.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 33. 31. 28. 34. 58. 67. 71. 55. 46. 45. 34. 30. 532.
PMI 7. 5. 3. 7. 15. 25. 12. 15. 0. 1. 3. 6.
P79 21. 16. 10. 17. 38. 31. 27. 43. 20. 25. 17. 16.
P60 25. 21. 17. 30. 47. 51. 46. 52. 33. 38. 29. 22-
PMX 62. 89. 102. 80. 102. 146. 213. 100. 154. 117. 74. 83.
TMC -1.6 -.8 2.8 7.5 12.1 15.5 17.3 16.5 13.1 8.0 3.8 -.1 7.8

HM 86. 85. 81. 75. 74. 73. 74. 75. 78. 82. 85. 88. 80.
SC 29. 30. 34. 39. 40. 41. 40. 39. 37. 33. 30. 27. 35.
PD 22. 17. 11. 20. 40. 35. 31. 45. 23. 28. 20. 17.
ETP 0. 0. 0. 61. 93. 111. 116. 95. 60. 32. 15. 0. 647.
ETDF -22. -17. -11. 41. 53. 76. 85. 50. 37. 4. -5. -17. 273.
MAI 2.30 1.16 *.32 .43 .32 .27 .47 .38 .88 1.34 2.05


ESSEN/MULHEIM GERMANY EL= 129 LAT 51 25 N LONG 6 57 E KS= 7.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 73. 63. 47. 61. 63. 75. 86. 90. 66. E7. 72. 66. 829.
PMI 25. 18. 13. 7. 20. 25. 28. 19. 6. 6. 9. 6. 576.
P79 41. 30. 26. 35. 40. 53. 45. 44. 35. 28. 37. 49. 698.
P60 60. 44. 41. 48. 53. 65. 51. 59. 55. 48. 49. 55. 805.
PMX 162. 220. 113. 164. 128. 126. 174. 235. 186. 181. 195. 120. 1032.
TMC 1.5 1.9 5.3 8.9 13.1 16.0 17.5 17.3 14.6 10.0 5.8 2.8 9.6

HM 90. 87. 77. 72. 72. 71. 74. 76. 80. 83. 89. 89. 80.
5 16. 23. 33. 43. 45. 42. 36. 38. 40. 30. 20. 14. 32.
PD 45. 33. 29. 38. 43. 56. 46. 47. 39. 32. 40. 50. 720.
ETP 0. 0. 37. 67. 102. 114. 111. 97. 65. 32. 13. 0.
ETOF -45. -33. 8. 29. 59. 59. 65. 49. 26. -0. -27. -50. 140.
MAI .79 .57 .42 .49 .42 .49 .60 1.00 3.09


FICHTELBERG GERMANY EL=1215 LAT- 50 26 N LONG- 12 57 E KS= 8.4

JAN FrB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 94. 92. 79. 81. 94. 101. 141. 102. 87. 89. 74. 77. 1109.
PMI 30. 21. 12. 27. 27. 40. 32. 13. 2. 1. 22. 13.
P79 67. 38. 43. 39. 56. 53. 74. 62. 51. 41. 38. 49.
P60 84. 68. 69. 66. 81. 85. 113. 87. 65. 67. 57. 63.
PMX 198. 269. 212. 194. 169. 269. 407. 191. 217. 221. 170. 234.
TMC -5.7 -5.4 -2.5 1.5 6.5 9.8 11.5 11.3 8.3 3.5 -.9 -3.8 2.8

HM 90. 90. 87. 85. 82. 82. 85. 85. 82. 90. 92. 91. 87.
SC 27. 27. 30. 33. 36. 36. 33. 33. 36. 27. 24. 25. 30.
PD 71. 44. 48. 45. 61. 60. 82. 67. 54. 46. 42. 52.
ETP 0. 0. 0. 0. 71. 86. 87. 74. 50. 24. 0. 0.
ETDF -71. -44. -48. -45. 10. 26. 5. 7. -4. -23. -42. -52. -281.
MAI .86 .70 .95 .91 1.08 1.96


EMDEN GERMANY











EL= 407 LAT= 47 39 N LONG= 9 29 E KS= 9.4


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 63. 56. 53. 60. 95. 112. 137. 113. 93. 66. 59. 54. 961.
PMI 10. 3. 11. 10. 24. 42. 23. 25. 13. 0. 9. 13. 611.
P79 41. 28. 30. 39. 60. 88. 87. 73. 52. 22. 23. 27. 884.
P6D 54. 44. 40. 50. 71. 107. 125. 108. 59. 50. 37. 37. 939.
PMX 139. 146. 119. 114. 224. 181. 241. 202. 233. 173. 175. 125. 1252.
TMC -1.0 .2 4.1 8.6 13.2 16.7 18.5 17.7 14.3 8.9 4.2 .5 8.8

HM 91. 86. 79. 74. 73. 74. 74. 78. 84. 86. 90. 89. 81.
5 19. 25. 44. 46. 50. 46. 50. 52. 48. 33. 21. 15. 37.
PD 44. 31. 32. 41. 62. 92. 95. 80. 53. 28. 26. 29. 896.
ETP 0. 0. 44. 72. 110. 123. 136. 117. 75. 36. 15. 0.
ETOF -44. -31. 12. 31. 48. 31. 41. 36. 22. 8. -11. -29. 113.
MAI .73 .57 .57 .75 .70 .69 .71 .77 1.74


GEISENHEIM GERMANY EL= 108 LAT= 49 59 N LONG= 7 58 E KS= 7.7

JAN FEB M.R APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 43. 35. 30. 37. 54. 56. 54. 60. 44. 39. 42. 42. 536.
PMI 2. 2. 3. 6. 2. 7. 2. 5. 1. 5. 5. 4. 340.
P79 23. 16. 14. 20. 33. 37. 29. 34. 25. 20. 22. 26. 435.
P60 35. 29. 17. 28. 46. 51. 41. 44. 35. 30. 28. 31. 521.
PMX 86. 76. 77. 152. 118. 92. 190. 156. 86. 125. 105. 82. 753.
TMC .7 1.7 5.3 9.9 14.2 17.2 18.8 18.1 14.8 9.7 5.4 1.9 9.8

HH 88. 84. 72. 65. 65. 67. 69. 71. 78. 82. 85. 87. 76.
S 18. 26. 40. 47. 50. 44. 45. 45. 44. 31. 15. 11. 35.
PD 26. 19. 15. 22. 36. 40. 32. 36. 27. 22. 23. 27. 453.
ETP 0. 0. 42. 74. 112. 122. 129. 108. 70. 34. 12. 0.
ETDF -26. -19. 28. 53. 76. 82. 97. 72. 43. 11. -11. -27. 380.
MAI .34 .29 .32 .33 .24 .34 .38 .66 1.97


GORLITZ GERMANY EL= 238 LAT= 51 1U N LONG= 14 57 E KS= 8.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 47. 42. 44. 48. 65. 71. 98. 76. 52. 54. 46. 45. 688.
PMI 17. 9. 9. 8. 22. 28. 19. 11. 6. 2. 10. 7.
P79 27. 27. 21. 27. 41. 44. 57. 54. 25. 19. 21- 17.
P60 38. 33. 36. 35. 53. 60. 75. 67. 38. 36. 32. 29.
PMX 135. 175. 102. 117. 146. 129. 236. 266. 147. 178. 157. 129.
TMC -2.0 -1.6 2.3 7.5 12.5 16.1 17.7 17.2 13.6 8.4 3.9 .0 8.0

HM 83. 82. 77. 72. 71. 71. 75. 75. 77. 81. 85. 86. 78.
SC 33. 34. 39. 43. 44. 44. 40. 40. 39. 35. 31. 30. 38.
PD 29. 28. 24. 29. 44. 47. 61. 57. 28. 23. 23. 20.
ETP 0. 0. 0. 64. 99. 117. 118. 99. 62. 33. 15. 0.
E1DF -29. -28. -24. 35. 55. 70. 57. 42. 35. 10. -9. -20. 194.
MAI .45 .44 .40 .52 .57 .44 .69 1.58


GREIFSMALD/WIECK rERMANY EL= 3 LAT= 54 6 N LONG= 13 27 E KS=10.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 40. 33. 30. 39. 45. 55. 69. 55. 59. 51. 36. 41. 553.
PMI 18. 8. 8. 17. 5. 12. 23. 16. 3. 4. 5. 5.
P79 29. 20. 14. 24. 27. 41. 41. 33. 44. 20. 27. 25.
P60 37. 30. 22. 31. 39. 50. 58. 54. 57. 48. 33. 35.
PMX 77. 78. 79. 80. 121. 153. 148. 134. 111. 112. 101. 108.
TMC -1.0 -.6 2.4 7.1 12.3 16.1 18.1 17.7 14.4 9.2 4.5 1.0 8.3

HM 87. 87. 84. 80. 77. 77. 80. 82. 82. 85. 89. 89. 83.
SC 36. 36. 40. 45. 48. 48. 45. 43. 43. 39. 33. 33. 41.
PD 31. 22. 16. 25. 30. 43. 45. 37. 47. 26. 28. 27.
ETP 0. 0. 0. 62. 102. 123. 125. 101. 63. 32. 13. 0.
ETDF -31. -22. -16. 36. 72. 80. 80. 63. 17. 6. -15. -27. 244.
MAI .41 .29 .35 .36 .37 .74 .81 2.20


FRIEDRICHSHAFEN GERMANY












HAMBURG/FUHLSBUTTEL GERMANY EL= 14 LAT= 53 39 N LONG- 10 0 E KS= 9.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 57. 48. 39. 52. 53. 64. 84. 83. 63. 59. 59. 59. 720.
PMI 19. 6. 7. 10. 23. 18. 41. 12. 3. 2. 15. 12. 396.
P79 38. 20. 22. 25. 31. 31. 48. 44. 37. 27. 31. 35. 638.
P60 47. 31. 29. 37. 51. 56. 63. 70. 58. 48. 46. 45. 707.
PMX 101. 109. 104. 115. 86. 142. 246. 236. 145. 127. 160. 131. 908.
TMC .0 .4 3.3 7.6 12.2 15.6 17.3 16.8 13.6 ?.1 4.9 1.8 8.6

HM 93. 91. 83. 81. 72. 71. 77. 79. 83. 88. 93. 93. 84.
5 21. 24. 37. 45. 47. 44. 44. 41. 46. 32. 18. 12. 34.
PD 40. 22. 23. 28. 35. 36. 51. 49. 41. 31. 34. 37. 652.
ETP 0. 0. 33. 64. 101. 116. 120. 96. 65. 29. 10. 0.
ETOF -40. -22. 10. 36. 66. 79. 69. 46. 23. -2. -24. -37. 203.
MAI .71 .43 .35 .31 .43 .52 .64 1.08 3.49


HANNOVER GERMANY EL= 55 LAT- 52 29 N LONG: 9 42 E KS= 8.7

JAN FER MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 50. 48. 39. 47. 53. 66. 83. 72. 52. 57. 55. 50. 672.
PMI 21. 5. 11. 10. 17. 11. 31. 22. 0. 1. 21. 13. 339.
P79 29. 22. 21. 30. 30. 30. 47. 42. 25. 24. 32. 30. 615.
P60 40. 34. 26. 37. 49. 59. 61. 52. 43. 45. 42. 36. 652.
PMX 1US. 143. 105. 101. 114. 169. 189. 168. 130. 124. 136. 109. 839.
TMC .2 .6 3.6 8.2 12.9 16.1 17.6 17.2 13.9 9.1 5.1 1.9 8.9

HM 93. 90. 80. 75. 71. 71. 74. 76. 80. 80. 90. 92- 81.
S 19. 26. 34. 45. 47. 43. 41. 42. 44. 33. 20. 15. 34.
PD 31. 25. 22. 31. 34. 36. 50. 44. 29. 28. 34. 31. 623.
ETP 0. 0. 33. 66. 104. 116. 119. 100. 66. 31. 12. 0.
ETOF -31. -25. 11. 34. 70. 80. 69. 56. 37. 3. -23. -31. 250.
MAI .66 .48 .33 .31 .42 .44 .44 .92 2.95


KASSEL GERMANY EL= 163 LAT= 51 19 N LONG= 9 29 E KS= 7.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 46. 43. 32. 47. 58. 66. 72. 66. 52. 53. 49.. 46. 630.
PMI 19. 5. 10. 13. 17. 23. 21. 8. 2. 3. 2. '6. 336.
P79 30. 24. 17. 29. 35. 43. 26. 37. 32. 26. 24.. 26. 541.
P60 37. 34. 25. 40. 50. 53. 63. 48. 39. 41. 36. 37. 588.
PMX 103. 130. 72. 79. 126. 179. 197. 191. 149. 137. 119.. 121. 834.
TMC .0 .8 4., 8.8 13.2 16.4 17.8 17.3 14.0 9.1 4.8 1.3 9.0

HM 90. 86. 75. 70. 68. 68. 72. 73. 78. 83. 87. 90. 78.
S 19, 27. 38. 46. 47. 44. 41. 41. 40. 32. 20. 12. 34.
PD 31. 26. 19. 31. 38. 45. 34. 39. 33. 29. 27. 28. 551.
ETP 0. 0. 38. 69. 104. 118. 119. 99. 64. 32. 12. 0.
ETDF -31. -26. 20. 38. 66. 73. 86. 60. 31. 3. -14. -28. 276.
MAI .49 .45 .37 .38 .28 .40 .52 .91 2.20


LEIPZIG/MOCKAJ GERMANY EL= 137 LATe 51 24 N LONG= 12 24 E KS= 7.9

JAN FE MAR AR P MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 37. 36. 34. 38. 47. 67. 73. 59. 38. 46. 39. 45. 559.
PMI 15. 11. 5. 9. 14. 15. 15. 20. 6. 2. 11. 8.
P79 22. 17. 18. 18. 28. 46. 40. 34. 20. 23. 17. 21.
P60 27. 26. 22. 30. 43. 62. 62. 50. 28. 42. 33. 26.
PMX 76. 1in. 81. 87. 125. 15R. 175. 135. 145. 126. 88. 84.
TMC -.8 -.3 3.4 8.3 13.0 16.3 18.1 17.6 14.3 9.1 4.5 .9 8.7

HM 87. 85. 80. 74. 73. 72. 73. 74. 77. 81. 85. 89. 79.
SC 28. 31. 35. 40. 41. 42. 41. 40. 38. 34. 31. 26. 36.
PD 23. 19. 19. 21. 31. 49. 45. 37. 22. 27. 20. 22.
ETP 0. 0. 35. 63. 97. 115. 120. 100. 63. 33. 15. 0.
ETDF -23. -19. 16. 43. 66. 66. 75. 62. 41. 6. -6. -22. 706.
MAI .54 .32 .32 .43 .37 .37 .35 .82 1.38











EL= 105 LAT: 52 13 N LONG= 14 7 E KS= 8.0


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 41. 39. 34. 38. 45. 54. 77. 69. 41. 42. 43. 40. 563.
PMI 15. 10. 4. 9. 15. 15. 24. 19. 2. 0. 9. 4.
P79 23. 22. 16. 25. 26. 31. 47. 49. 24. 14. 25. 24.
P60 33. 29. 23. 31. 35. 53. 62. 54. 31. 37. 32. 29.
PMX 101. 96. 83. 86. 144. 100. 202. 171. 102. 98. 110. 98.
TMC -1.5 -.8 .3 8.1 13.4 16.8 18.5 17.9 14.2 8.9 3.9 .4 8.6

HM 86. 84. 77. 71. 67. 63. 71. 73. 76. 82. 89. 89. 78.
SC 30. 32. 33. 43. 46. 45. 43. 42. 39. 34. ?7. 27. 37.
PD 29. 23. 17. 26. 28. 36. 50. 50. 25. 19. 26. 25.
ETP 0. 0. 0. 64. 104. 122. 124. 101. 63. 32. 13. 0. 683.
ETDF -29. -23. -17. 3P. 76. 86. 74. 51. 37. 13. -14. -25. 267.
MAI .41 .27 .29 .40 .49 .41 .60 2.09


MAGDEBURC GERMANY EL= 85 LAT= 52 6 N LONG= 11 35 E KS= 8.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 35. 33. 28. 34. 49. 61. 64. 57. 38. 43. 40. 33. 515.
PMI 12. 4. 5. 4. 6. 15. 12. 12. 0. 4. 14. 4.
P79 32. 16. 14. 21. 28. 34. 39. 33. 22. 20. 19. 17.
P60 32. 22. 20. 26. 36. 44. 53. 49. 28. 32. 33. 25.
PMX 70. 110. 86. 102. 112. 150. 240. 136. 93. 94. 92. 89.
TMC -.7 .1 3.6 8.4 13.3 16.5 18.1 17.4 14.0 8.8 4.4 1.1 8.7

HM 85. 83. 77. 71. 68. 68. 72. 72. 76. 81. 86. 87. 77.
SC 33. 35. 40. 45. 48. 48. 44. 44. 41. 37. 31. 30. 40.
PD 32. 17. 15. 22. 30. 36. 42. 36. 23. 23. 22. 19.
ETP 0. 0. 37. 67. 105. 123. 125. 103. 64. 33. 14. 0.
ETDF -32. -17. 21. 45. 76. 87. 83. 67. 41. 10. -8. -19. 355.
MAI .42 .33 .28 .29 .34 .35 .36 .69 1.54


MUNCHEN/RTEM GERMANY EL= 528 LAT= 48 8 N LONG= 11 42 E KS= 8.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 59. 55. 51. 62. 107. 125. 140. 104. 87. 67. 57. 50. 964.
PMI 13. 11. 9. 10. 31. 36. 28. 32. 4. 0. 13. 17. 640.
P79 33. 28. 32. 37. 63. 98. 90. 75. 55. 29. 29. 32. 883.
P60 49. 42. 39. 56. 77. 113. 125. 96. 64. 50. 40. 42. 934.
PMX 101. 144. 101. 117. 375. 198. 301. 176. 221. 153. 174. 118. 1276.
TMC -2.2 -1.0 3.3 7.9 12.5 15.9 17.7 16.9 13.7 8.2 3.1 -.7 7.9

HM 90. 87. 77. 71. 72. 72. 72. 74. 78. 84. 89. 89. 80.
S 21. 26. 39. 43. 47. 42. 47. 48. 48. 40. 20. 16. 36.
PD 36. 31. 33. 41. 66. 101. 97. 79. 57. 33. 31. 34. 894.
ETP 0. 0. 39. 67. 104. 115. 128. 110. 73. 38. 13. 0.
ETDF -36. -31. 6. 26. 38. 14. 31. 30. 16. 5. -18. -34. 47.
MAI .85 .61 .64 .88 .76 .72 .78 .87 2.32


NFUSTRELITZ GERMANY EL= 70 LAT= 53 21 N LONG= 13 5 E KS= 9.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 37. 34. 29. 44. 56. 66. 70. 65. 53. 52. 38. 37. 581.
PMI 16. 7. 8. 12. 17. 13. 16. 13. 3. 2. 7. 5.
P79 27. 20. 16. 25. 31. 31. 44. 49. 30. 16. 22. 22.
P60 34. 30. 20. 38. 42. 54. 52. 63. 46. 39. 33. 33.
PMX 75. 85. 72. 88. 87. 158. 148. 120. 99. 110. 97. 89.
TMC -1.3 -.8 2.5 7.3 12.3 15.7 17.3 16.6 13.2 8.1 3.9 6.6 8.0

HM 87. 85. 79. 73. 70. 72. 75. 76. 80. 85. 89. 89. 80.
SC 34. 36. 43. 48. 51. 49. 46. 46. 4-. 36. 31. 31. 41.
PD 28. 22. 17. 28. 33. 36. 46. 52. 33. 21. 24. 24.
ETP 0. 0. 0. 65. 105. 122. 124. 101. 61. 30. 13. 10.
ETDF -28. -22. -17. 37. 72. 87. 79. 49. 28. 9. -12. -14. 267.
MAI .43 .32 .29 .37 .51 .55 .69 1.92 2.41


LINDENBERG GERMANY











EL= 318 LAT- 49 30 N LONG= 11 5 E KS= 9.6


JAN FE MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 43. 39. 35. 40. 55. 71. 30. 75. 46. 46. 41. 42. 623.
PMI 17. 3. 3. 10. 8. 20. 8. 2. 2. 0. 7. 7. 401.
P7S 26. 18. 19. 21. 35. 45. 51. 39. 23. 23. 18. 24. 509.
P60 35. 34. 29. 34. 47. 64. 68. 60. 36. 33. 29. 35. 597.
PMX 85. 80. 105. 119. 115. 139. 230. 153. 102. 129. 118. 141. 925.
TMC -1.4 -.4 3.7 8.2 13.0 16.6 18.2 17.4 13.7 8.3 3.8 .1 8.4

HM 92. 87. 77. 71. 70. 68. 67. 71. 77. 82. 88. 91. 78.
S 21. 29. 43. 47. 49. 46. 47. 49. 47. 38. 20. 16. 38.
PD 28. 21. 21. 24. 38. 49. 55. 43. 26. 25. 20. 26. 527.
ETP 0. 0. 40. 70. 108. 122. 130. 111. 71. 36. 13. 0.
ETDF -28. -21. 19. 46. 70. 73. 75. E7. 45. 11. -7. -26. 325.
MAI .52 .34 .35 .40 .42 .39 .36 .69 1.56


POTSDAM GERMANY EL= 93 LAT= 52 23 N LONG: 13 4 I KS= 8.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 44. 39. 32. 42. 47. 66. 71. 71. 45. 47. 46. 40. 590.
PMI 14. 7. 6. 11. 16. 15. 26. 17. 4. 4. 9. 9.
P79 27. 19. 16. 21. 29. 37. 42. 40. 22. 19. 27. 23.
P60 35. 28. 23. 33. 38. 50. 53. 60. 33. 42. 34. 32.
PMX 96. 99. 78. 106. 97. 158. 147. 152. 112. 138. 116. 86.
TMC -1.1 -.3 3.3 8.3 13.4 16.8 18.4 17.7 14.2 8.9 4.2 .7 8.7

HM 87. 84. 76. 70. 67. 69. 72. 73. 77. 83. 89. 89. 78.
SC 29. 32. 39. 44. 46. 45. 42. 42. 38. 33. 27. 27. 37.
PD 29. 21. 17. 24. 31. 40. 44. 44. 24. 24. 28. 25.
ETP 0. 0. 35. 65. 104. 121. 123. 101. 62. 31. 13. 0.
ETDF -29. -21. 18. 42. 73. 81. 78. 56. 37. 7. -16. -25. 303.
MAI .49 .36 .30 .33 .36 .44 .39 .77 2.24


SCHLESWIC GERMANY EL=' 48 LAT= 54 32 N LONG= 9 33 E KS=1O.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 74. 60. 46. 58. 61. 63. 95. 104. 87. 89. 73. 70. 880.
PMI 24. 3. 10. 13. 7. 13. 26. 12. 6. 6. 23. 13. 593.
P79 46. 36. 27. 38. 32. 33. 56. 51. 43. 46. 42. 47. 756.
P60 64. 45. 38. 52. 51. 58. 84. 84. 76. 76. 56. 61. 855.
PMX 129. 129. 104. 114. 122. 128. 264. 228. 174. 222. 182. 157. 1228.
TMC .1 .2 2.5 6.7 11.3 14.8 16.7 16.2 13.3 8.9 5.0 2.1 8.2

HM 93. 93. 86. 80. 74. 75. 79. 83. 85. 89. 91. 93. 85.
S 21. 25. 36. 46. 51. 49. 47. 41. 47. 32. 19. 15. 36.
PD 50. 38. 29. t. 36. 38. 62. 58. 50. 52. 45. 50. 777.
ETP 0. 0. 0. 61. 101. 118. 122. 94. 63. 28. 10. 0.
ETDF -50. -38. -29. 2. 65. 80. 60. 36. 13. -24. -35. -50. 48.
MAI .67 .36 .32 .51 .62 .79 1.86 4.73


STUTTGART/CANNSTADT GERMANY EL= 315 LAT= 48 50 N LONG: 9 12 E KS= 8.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 48. 42. 38. 51. 74. 94. 79. 79. 62. 48. 48. 40. 703.
PMI 16. 3. 4. 10. 19. 24. 17. 11. 3. 0. 5. 9. 466.
P79 28. 21. 20. 30. 45. 68. 46. 47. 36. 22. 26. 23. 577.
P60 38. 32. 29. 42. 65. 74. 63. 67. 48. 35. 32. 28. 668.
PMX 92. 131. 88. 115. 171. 182. 201. 177. 159. 142. 124. 110. 1008.
TMC .2 1.1 5.3 9.6 13.6 16.9 18.6 18.0 14.7 9.6 4.8 1.2 9.5

HM 84. 83. 72. 66., 69. 70. 69. 70. 74. 81. 84. 83. 75.
S 26. 33. 42. 45. 48. 43. 49. 50. 48. 42. 25. 24. 39.
PD 30. 23. 22. 33. 49. 69. 50. 51. 39. 25. 27. 24. 596.
ETP 0. 0. 44. 73. 109. 119. 134. 114. 75. 41. 16. 0.
ETDF -30. -23. 22. 40. 60. 50. 84. 63. 36. 16. -12. -24. 282.
MAI .50 .45 .45 .58 .37 .45 .51 .61 1.75


NURNBERG/KRAFTSHOF GERMANY











EL= 232 LAT- 51 7 N LONrG 13 41 E KS= 8.0


JAN FEB MAR AFR PAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 38. 36. 37. 46. 63. 68. 109. 72. 48. 52. 42. 37. 649.
PMI 16. 6. 5. 14. 16. 10. 20. 21. 1. n. 7. 6.
P79 25. 19. 21. 27. 34. 35. G6. 39. 24. 18. 21. 19.
P60 30. 28. 26. 34. 48. 61. 85. 52. 39. 43. 27. 28.
PMX 87. 134. 97. 97. 204. 137. 274. 223. 122. 149. 126. 94.
TMC -1.2 -.7 3.2 8.2 13.0 16.5 18.1 17.8 14.4 9.1 4.3 .4 8.6

HM 82. 81. 76. 70. 69. 68. 71. 71. 74. 79. 84. 85. 76.
SC 34. 35. 39. 44. 45. 45. 43. 43. 41. 37. 32. 31. 39.
PD 26. 21. 22. 28. 37. 40. 65. 42. 27. 23. 22. 21.
ETP U. 0. 36. 66. 102. 121. 123. 104. 66. 34. 15. 0.
ETDF -26. -21. 14. 39. 65. 80. 58. 62. 38. 11. -7. -21. 292.
MAI .61 .43 .36 .34 .53 .40 .41 .67 1.46


WARNEMUNDF GERMANY EL- 1U LA T= 54 11 N LONG- 12 5 E KS-ln.1

JAN FEB MtR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 44. 32. 33. 40. 49. 54. 78. 64. 60. 52. 46. 43. 595.
PMI 12. 5. 6. 15. 10. 5. 15. IF. 6. 2. 18. 7.
P79 26. 14. 14. 22. 30. 35. 45. 38. 41. 25. 27. 18.
P6U 35. 29. 24. 32. 43. 47. 61. 59. 52. 47. 35. 31.
PMX 78. 75. 85. 77. 102. 116. 150. 189. 122. 100. 113. 103.
TMC -.1 .1 2.7 6.7 11.5 15.4 17.6 17.4 14.3 9.6 5.1 1.8 8.5

HM 87. 87. 83. 80. 76. 76. 82. 83. 83. 84. 88. 89. 83.
SC 36. 36. 42. 45. 49. 49. 43. 42. 42. 40. 35. 33. 41.
PD 28. 17. 16. 24. 33. 38. 48. 42. 43. 30. 29. 21.
ETP 0. 0. 0. 61. 100. 121. 120. 98. 62. 33. 13. 0.
ETDF -28. -17. -16. 37. 67. 84. 72. 56. 19. 3. -15. -21. 240.
MAI .40 .33 .31 .40 .43 .70 .90 2.14


WERNIGERODE GERMANY EL= 240 LAT= 51 51 N LONG- 10 46 E KS: 7.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 49. 41. 36. 46. 60. 69. 73. 60. 43. 51. 50. 49. 627.
PHI 11. 7. 7. 13. 11. 15. 11. 7. 0. 6. 8. 6.
P79 29. 24. 16. 31. 35. 39. 34. 35. 24. 25. 24. 25.
P60 37. 30. 26. 40. 52. 59. 53. 52. 37. 44. 41. 34.
PMX 102. 147. 96. 98. 112. 163. 245. 131. 112. 132. 112. 122.
TMC -.4 .1 3.3 7.7 12.3 15.5 17.2 16.8 13.9 9.0 4.7 1.5 8.5

HM 81. 80. 76. 71. 68. 67. 69. 69. 72. 77. 81. 82. 74.
SC 34. 35. 38. 42. 44. 45. 43. 43. 41. 37. 34. 33. 39.
PD 31. 25. 18. 33. 39. 43. 38. 39. 27. 29. 28. 27.
ETP 0. 0. 35. 63. 98. 116. 120. 101. 64. 34. 15. 0.
ETDF -31. -25. 17. 30. 60. 73. 82. 62. 37. 5. -12. -27. 272.
MAI .51 .52 .39 .37 .32 .38 .42 .86 1.81


ACCRA GHANA EL= 65 LAT 5 36 N LONG= 0 10 W KS=12.5

JAN FEB 'AR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 16. 37. 73. 82. 145. 193. 49. 16. 40. 80. 38. 18. 787.
PMI 0. 0. 0. 14. 7. 2. 1. 0. 2. 9. 6. 0.
P79 0. 5. 39. 48. 83. 88. 4. 2. 11. 29. 16. 3.
P60 6. 22. 60. 71. 135. 142. 17. 7. 23. 61. 23. 8.
PMX 95. 140. 165. 203. 308. 478. 197. 62. 224. 201. 139. 71.
TMC 27.3 27.7 27.8 27.7 27.0 25.7 24.6 24.3 25.3 26.1 27.1 27.3 26.5

HM 79. 77. 77. 80. 82. 85. 85. 83. 82. 83. 80. 79. 81.
5 57. 63. 61. 60. 56. 40. 39. 39. 47. 58. 70. 64. 55.
PD 1. 9. 43. 53. 94. 99. 7. 3. 14. 36. 17. 4.
ETP 152. 154. 175. 16-. 161. 124. 125. 129. 140. 160. 165. 158. 1812.
ETDF 151. 145. 131. 115. 67. 25. 118. 126. 127. 125. 147. 154. 1432.
MAI .01 .06 .25 .31 .58 .80 .05 .02 .10 .22 .11 .03


WAHNSDOPF GERMANY











EL= 293 LAT= 6 43 N LONG= 1 36 W KS= 9.7


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 26. 65. 136. 139. 191. 223. 113. 74. 170. 201. 95. 32. 1465.
PMI 0. 7. 52. 26. 103. 104. 1. 14. 63. 94. 31. 0.
P79 4. 31. 105. 109. 143. 153. 34. 29. 101. 149. 46. 4.
P60 9. 40. 120. 127. 160. 184. 77. 43. 161. 188. 75. 21.
PMX 103. 189. 245. 265. 413. 396. 249. 200. 315. 383. 220. 127.
TMC 25.2 26.7 26.9 26.7 26.4 25.4 24.2 23.6 24.8 25.4 25.9 25.4 25.5

HM 74. 71. 75. 77. 79. 82. 83. 84. 82. 80. 78. 78. 79.
S 50. 55. 56. 57. 53. 39. 26. 19. 28. 43. 57. 53. 45.
PD 5. 33. 108. 113. 147. 160. 43. 32. 114. 157. 52. 8.
ETP 133. 139. 164. 160. 155. 123. 102. 88. 108. 135. 143. 136. 1584.
ETDF 128. 106. 55. 47. 8. -37. 59. 56. -6. -23. 91. 128. 614.
MAI .04 .24 .66 .70 .95 1.30 .42 .36 1.05 1.17 .36 .06
-------------------------------------------------------------------------

TAKORADI GHANA EL= 9 LAT= 4 53 N LONG= 1 46 W KS=13.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 31. 38. 80. 102. 250. 288. 87. 35. 48. 131. 77. 38. 1205.
PMI 0. 0. 4. 0. 31. 79. 0. 2. 4. 12. 14. 5.
P79 0. 15. 32. 34. 165. 135. 14. 6. 16. 57. 40. 10.
P60 7. 23. 61. 60. 204. 226. 58. 16. 31. 110. 55. 28.
PMX 205. 77. 195. 279. 500. 729. 310. 181. 242. 315. 182. 112.
TMC 26.1 26.7 27.2 27.1 26.3 25.5 24.4 23.8 24.7 23.3 21.7 23.9 25.1

HM 85. 85. 83. 83. 87. 87. 87. 87. 87. 86. 86. 85. 86.
S 56. 62. 62. 59. 50. 33. 42. 34. 35. 52. 69. 62. 51.
PD 1. 17. 38. 39. 173. 154. 23. 8. 19. 68. 43. 14.
ETP 148. 150. 174. 165. 148. 111. 128. 118. 120. 142. 144. 145. 1693.
ETDF 147. 133. 136. 125. -25. -43. 104. 110. 101. 74. 101. 131. 1095.
MAI .01 .11 .22 .24 1.17 1.39 .18 .07 .16 .48 .30 .10


TAMALE GHANA EL= 188 LAT= 9 25 N LONG= 0 52; W KS=10.O

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 2. 9. 51. 88. 121. 132. 128. 189. 217. 98. 13. 5. 1053.
PMI 0. 0. 0. 13. 49. 36. 28. 57. 77. 22. 0. *0.
P79 0. 0. 10. 49. 86. 94. 91. 117. 173. 49. 0. 0.
P60 0. 0. 30. 61. 112. 111. 126. 173. 210. 90. 1. 0.
PMX 30. 69. 151. 201. 302. 252. 343. 334. 322. 201. 102. 45.
TMC 28.0 29.7 30.E 30.1 28.4 26.8 25.9 25.3 25.8 26.8 28.4 27.7 27.8

HM 33. 35. 49. 60. 69. 74. 79. 79. 81. 78. 60. 41. 61.
S 74. 73. 68. 66. 64. 56. 42. 36. 44. 70. 83. 76. 63.
PD 0. 0. 14. 52. 91. 98. 38. 129. 181. 58. 0. 0.
ETP 167. 166. 193. 188. 182. 156. 133. 127. 137. 173. 177. 164. 1970.
ETDF 167. 166. 179. 135. 91. 59. 40. -1. -43. 116. 176. 164. 1249.
MAI .OU .00 .07 .28 .50 .62 .71 1.01 1.32 .33 .00 .00
- --------------------------------- ---------------------- ----------------------

ATHINAI/OSERVATOPY GREECE EL= 107 LAT= 37 58 N LONG= 23 43 E KS=10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 62. 36. 38. 23. 23. 14. 6. 7. 15. 51. 56. 71. 402.
PMI 9. 1. 2. 0. 0. 0. 0. 0. 0. 1. 8. 5.
P79 33. 11. 14. 9. 1. 1. 0. 0. 1. 11. 22. 30.
P60 46. 22. 25. 17. 7. 3. 0. 0. 5. 32. 47. 51.
PMX 140. 104. 117. 62. 100. 73. 40. 69. 144. 251. 137. 166.
TMC 9.3 9.9 11.3 15.3 20.0 24.6 27.6 27.4 23.5 19.0 14.7 11.0 17.8

HM 74. 70. 67. 63. 59. 53. 47. 47. 56. 67. 73. 75. 63.
SC 51. 55. 57. 61. 64. 69. 73. 73. 66. 57. 52. 50. 61.
PD 36. 13. 16. 11. 2. 1. 0. 0. 2. 15. 27. 34.
ETP 41. 51. 80. 113. 157. 186. 208. 188. 132. 87. 52. 40. 1336.
ETDF 5. 38. 64. 103. 154. 184. 208. 188. 130. 71. 25. 5. 1177.
MAI .87 .26 .20 .09 .01 .01 .00 .00 .01 .18 .52 .87


KUMASI GHANA











EL: 3 LAT= 38 15 N LONG: 21 44 E KS= 9.9


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 123. 87. 72. 50. 27. 13. 1. 6. 27. 82. 113. 148. 749.
PHI 32. 4. 11. 3. 2. 0. 0. 0. 0. 5. 59. 35.
P79 75. 32. 24. 18. 9. 1. 0. 0. 6. 48. 89. 79.
P60 103. 62. 41. 41. 19. 7. 0. 0. 19. 62. 93. 116.
PMX 256. 261. 223. 106. 131. 73. 6. 88. 89. 185. 252. 377.
TMC 9.7 10.4 11.9 15.6 19.6 23.8 26.3 26.4 23.1 18.7 14.4 10.9 17.6

HM 74. 71. 69. 68. 67. 64. 61. 62. 67. 71. 74. 74. 68.
SC 50. 53. 55. 56. 57. 59. 62. 61. 57. 53. 50. 50. 55.
PD 81. 38. 28. 23. 11. 2. 0. 0. 9. 51. 90. 87.
ETP 41. 51. 80. 110. 146. 170. 186. 168. 121. 82. 51. 39. 1244.
ETOF -40. 12. 52. 87. 135. 167. 186. 168. 112. 31. -39. -47. 825.
MAI 1.97 .76 .35 .21 .08 .01 .00 .OU .07 .62 1.77 2.21


THESSALONIKI GREECE EL= 7 LAT= 40 31 N LONG= 22 58 E KS= 9.8

JAN FEB MAR PR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 44. 34. 35. 36. 40. 33. 20. 14. 28. 55. 56. 54. 449.
PHI 10. 0. 4. 0. 2. 8. 0. 0. 0. 4. 18. 8.
P79 17. 9. 9. 15. 14. 16. 3. 1. 5. 23. 28. 20.
P60 30. 19. 31. 25. 33. 22. 10. 4. 15. 44. 39. 34.
PMX 95. 97. 80. 111. 102. 88. 79. 43. 127. 146. 142. 167.
TMC 5.5 7.1 9.6 14.5 19.6 24.7 27.3 26.8 22.5 17.1 12.0 7.5 16.1

HM 78. 71. 69. 67. 66. 56. 51. 52. 60. 69. 76. 78. 66.
SC 46. 53. 55. 56. 57. 65. 69. 68. 62. 55. 48. 46. 57.
PD 20. 11. 14. 17. 18. 17. 4. 2. 7. 27. 30. 23.
ETP 30. 42. 70. 104. 146. 182. 201. 177. 121. 75. 42. 30. 1220.
ETDF 11. 31. 57. 87. 128. 164. 196. 176. 114. 48. 12. 7. 1029.
MAI .65 .27 .19 .16 .12 .09 .02 .01 .06 .36 .72 .77


GUATEMALA OBS. GUATEMALA EL=1502 LAT= 14 35 N LONG= 90 32 W KS=12.9

JAN FER MAR APR MAY JUN JUL AUG SE.P OCT NOV DEC ANN

PM 3. 2. 7. 19. 141. 265. 211. 187. 257. 159. 23. 7. 1281.
PMI 0. 0. 0. 0. 11. 137. 104. 74. 128. 22. 0. 0. 760.
P79 0. 0. 0. 3. 61. 170. 137. 115. 164. 90. 3. 0. 1106.
P60 1. 0. 1. 7. 123. 230. 170. 157. 224. 145. 11. 1. 1225.
PMX 12. 21. 53. 100. 361. 466. 479. 383. 480. 367. 94. 56. 1831.
TMC 16.3 17.0 18.4 19.5 19.6 18.7 18.5 18.7 18.3 17.7 16.7 16.3 18.0

HM 70. 68. 69. 70. 76. 83. 81. 79. 83. 82. 76. 73. 76.
SC 71. 73. 72. 71. 63. 53. 56. 59. 53. 55. 63. 67. 63.
PD 0. 0. 0. 4. 74. 183. 144. 124. 177. 102. 5. 0. 1131.
ETP 111. 114. 143. 150. 149. 129. 136. 140. 122. 116. 106. 105. 1521.
ETOF 111. 114. 143. 146. 75. -54. -8. 16. -54. 15. 101. 105. 710.
MAI .00 .00 .00 .03 .50 1.42 1.06 .88 1.44 .87 .04 .00 .74


GEORGETOWN GUYANA EL= 1 LAT= 6 49 N LONG: 58 11 W KS=13.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 251. 122. 113. 178. 296. 346. 281. 185. 88. 98. 147. 313. 2418.
PMI 44. 17. 4. 26. 84. 191. 89. 17. 7. 10. 3. 58.
P79 115. 41. 33. 65. 199. 269. 211. 90. 43. 63. 38. 152.
P60 163. 70. 55. 136. 283. 329. 257. 133. 53. 86. 115. 215.
PMX 831. 383. 349. 541. 589. 541. 539. 654. 345. 234. 523. 102.
TMC 26.3 26.4 26.8 27.1 27.0 26.7 26.2 27.7 27.7 27.7 27.4 26.7 27.0

HMC 85. 82. 82. 84. 87. 89. 82. 77. 76. 79. 80. 86. 82.
5 52. 56. 56. 54. 48. 44. 56. 65. 66. 62. 60. 50. 56.
PD 125. 47. 38. 80. 217. 282. 221. 99. 45. 68. 54. 165.
ETP 140. 139. 164. 157. 149. 136. 157. 180. 177. 170. 152. 136. 1857.
ETDF 15. 92. 126. 77. -67. -146. -63. 80. 132. 102. 98. -29. 417.
MAI .90 .34 .23 .51 1.45 2.07 1.40 .55 .26 .40 .36 1.22


rtTRAI GREECE











EL=1007 LA T 14 4 N LONG= 87 13 W KS=12.9


JAN FEB MAR APR MAY JUN JUL AUG SEP CCT NOV DEC ANN

PM 14. 5. 11. 29. 156. 166. 92. 111. 176. 141. 40. 15. 954.
PMI O. 0. 0. 0. 44. 3. 31. 35. 40. 37. 0. 0.
P79 2. 0. 0. 4. 73. 93. 44. 46. 125. 72. 13. 3.
P6U 5. 4. 2. 9. 128. 145. 67. 63. 161. 99. 25. 5.
PMX 64. 27. 50. 142. 309. 355. 300. 294. 337. 409. 153. 53.
TMC 19.2 20.3 21.3 23.2 23.7 23.1 22.6 22.8 22.9 21.9 20.8 19.7 21.8

HM 74. 68. 63. 63. 70. 79. 79. 76. 80. 81. 79. 77. 74.
SC 66. 73. 78. 79. 71. 55. 61. 63. 58. 56. 59. 62. 65.
PD 3. 1. 0. 5. 85. 104. 49. 50. 133. 78. 16. 3.
ETP 117. 126. 165. 174. 175. 152. 157. 161. 145. 133. 116. 112. 1734.
ETDF 115. 125. 164. 170. 91. 48. 119. 112. 12. 55. 100. 109. 1210.
MAI .02 .01 .00 .03 .48 .68 .31 .31 .92 .58 .13 .03


HONG KONG HONG KONG EL- 33 LAT: 22 19 N LONG:114 10 E: KSZ10.4

JAN FEB MAR AFP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 30. 60. 70. 133. 332. 479. 286. 415. 364. 33. 46. 17. 2265.
PMI 1. 0. 9. 42. 79. 219. 146. 175. 70. 1. 0. 1. 1367.
P79 9. 12. 40. 59. 137. 269. 154. 307. 152. 10. 1. 5. 1841.
PE6 20. 30. 51. 92. 233. 410. 174. 388. 252. 25. 21. 8. 2294.
PMX 77. 210. 133. 294. 894. 914. 619. 604. 844. 83. 138. 78. 2950.
TMC 15.4 15.8 18.2 21.8 25.6 27.5 28.4 27.9 27.3 24.7 21.2 17.4 22.6

HM 73. 80. 85. 85. 85. 85. 83. 85. 81. 72. 71. 70. 80.
S 44. 36. 25. 33. 40. 39. 57. 51. 53. 65. 62. 54. 47.
PD 11. 16. 42. 66. 157. 299. 153. 324. 173. 13. 5. 6. 1936.
ETP 73. 69. 80. 107. 141. 144. 183. 1E5. 149. 140. 104. 83. 1433.
ETDF 62. 54. 38. 41. -16. -155. 25. -1!9. -24. 127. 98. 77. 169.
MAI .15 .23 .53 .61 1.11 2.07 .86 1.97 1.16 .09 .05 .07 1.35


BUDAPEST HUNGRY EL= 130 LAT= 47 31 N LONG= 19 2 E KS- 9.8

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 42. 44. 39. 45. 72. 76. 54. 51. 34. 56. 69. 48. 630.
PMI 9. 1. 5. 3. 7. 19. 8. 4. 0. 3. 8. 5. 440.
P79 19. 13. 12. 21. 33. 42. 25. 19. 12. 23. 30. 22. 548.
P60 26. 32. 21. 35. 54. 59. 46. 29. 24. 40. 43. 36. 567.
PMX 98. 131. 155. 96. 152. 144. 124. 263. 85. 127. 161. 116. 989.
TMC -1.1 1.0 5.8 11.8 16.8 20.2 22.2 21.4 17.4 11.3 5.8 1.5 11.2

HM 81. 76. 67. 60. 62. 62. 60. 62. 65. 74. 81. 83. 69.
S 21. 30. 39. 49. 54. 58. 65. 65. 58. 44. 22. 17. 44.
PD 20. 17. 14. 24. 37. 46. 29. 21. 15. 27. 33. 25. 552.
ETP 0. 0. 45. 83. 128. 153. 171. 145. 91. 46. 17. 0.
ETDF -20. -17. 31. 59. 91. 107. 141. 124. 77. 20. -16. -25. 571.
MAI .31 .29 .29 .30 .17 .15 .16 .57 1.98


DEBRECEN HUNGRY EL= 128 LAT= 47 33 N LONG= 21 37 E KS= 9.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 35. 36. 30. 36. 61. 80. 59. 64. 41. 49. 53. 40. 584.
PHI 6. 0. 1. 6. 7. 26. 7. 17. 3. 3. 14. 3. 361.
P79 21. 14. 13. 17. 31. 48. 35. 33. 22. 14. 27. 16. 498.
P60 26. 18. 21. 30. 46. 63. 45. 49. 32. 30. 38. 31. 531.
PMX 76. 91. 70. s 130. 139. 166. 161. 145. 129. 109. 112. 782.
TMC -2.7 -.6 4.5 11.0 16.5 19.8 21.8 20.8 16.4 10.2 4.9 .5 10.3

HM 85. 82. 74. 67. 67. 69. 67. 70. 73. 78. 85. 86. 75.
5 22. 30. 42. 49. 56. 59. 65. 64. 58. 46. 25. 18. 44.
PD 22. 15. 15. 20. 34. 51. 37. 6U. 24. 17. 29. 19. 505.
ETP 0. 0. 44. 81. 129. 152. 169. 142. 89. 45. 17. 0.
ETDF -22. -15. 29. 62. 94. 101. 132. 105. 65. 28. -12. -19. 547.
MAI .34 .24 .27 .34 .22 .26 .27 .36 1.74


TEGUCICALPA HONDURAS











EL= 121 LAT= 47 53 N LONr= 17 16 E KS: 9.8


JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 33. 36. 40. 38. 63. 67. 80. F8. 35. 56. 53. 46. 615.
PMI 13. 3. 9. 2. 8. 8. 17. 20. 1. 2. 7. 10. 327.
P79 21. 13. 16. 18. 24. 36. 49. 30. 6. 32. 25. 24. 518.
P60 28. 28. 27. 25. 45. 49. 65. 46. 26. 49. 34. 36. 535.
PMX 75. 80. 142. 95. 160. 152. 201. 1El. 95. 157. 188. 108. 852.
TMC -1.8 .0 4.7 10.6 15.6 18.9 2U.8 19.9 16.1 10.2 5.1 .8 10.1

HM 86. 82. 76. 70. 71. 70. 70. 71. 74. 79. 84. 87. 77.
SC 37. 42. 48. 54. 53. 54. 54. 53. 50. 45. 39. 35. 47.
PD 22. 16. 18. 19. 28. 39. 52. 33. 10. 36. 27. 27. 532.
ETP 0. 0. 47. 8'. 122. 141. 149. 125. 81. 44. 21. 0.
ETDF -22. -16. 28. 64. 93. 103. 97. 92. 71. 9. -6. -27. 486.
MAI .30 .23 .23 .27 .35 .27 .13 .!U 1.28


MISKOLC HUNGRY EL= 120 LAT: 48 8 N LONG- 20 48 E KS= 9.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 31. 31. 28. 39. 70. 84. 66. 66. 40. 49. 56. 40. 600.
PMI 4. 0. 0. 6. 15. 27. 13. 14. 1. 0. 10. 5. 369.
P79 10. 7. 3. 20. 40. 45. 20. 28. 20. 16. 23. 18. 483.
P60 21. 18. 16. 29. 69. 57. 49. 46. 26. 27. 40. 29. 541.
PMX 73. 86. 86. 93. 118. 213. 140. 158. 123. 143. 158. 121. 848.
TMC -3.3 -.9 4.1 10.3 16.0 19.1 21.1 20.2 15.9 9.5 4.1 -.3 9.7

HM 87. 84. 75. 67. 68. 71. 69. 70. 74. 80. 87. 89. 77.
5 22. 28. 39. 46. 54. 55. 62. C0. 54. 40. 22. 15. 41.
PD 12. 9. 6. 22. 46. 48. 26. 32. 21. 18. 27. 20. 495.
ETP 0. 0. 41. 76. 125. 143. 161. 134. 83. 41. 15. 0.
ETDF -12. -9. 35. 54. 78. 95. 135. 102. 62. 22. -12. -20. 531.
MAI .14 .29 .37 .33 .16 .24 .26 .45 1.80


PECS HUNGRY EL= 124 LAT= 46 3 N LONG: 18 14 E KS= 8.9

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 41. 46. 41. 58. 66. 69. 64. 55. 47. 64. 71. 45. 667.
PMI 14. 4. 6. 1. 17. 10. 6. 6. 1. 5. 8. 6. 461.
P79 24. 14. 15. 29. 38. 35. 34. 37. 18. 26. 34. 22. 534.
P60 31. 37. 29. 54. 59. 58. 47. 47. 33. 40. 47. 36. 605.
PMX 90. 104. 95. 145. 136. 135. 161. 148. 135. 186. 197. 117. 950.
TMC -.7 1.3 6.1 11.9 16.9 20.4 22.6 21.9 17.9 11.8 6.2 1.8 11.5

HM 83. 78. 70. 64. 66. 64. 62. 63. 67. 75. 81. 83. 71.
S 24. 34. 39. 47. 54. 59. 66. 67. 57. 45. 25. 20. 45.
PD 25. 19. 18. 34. 42. 40. 37. 39. 21. 29. 37. 25. 549.
ETP 0. 0. 47. 83. 129. 155. 174. 151. 94. 50. 19. 0.
ETDF -25. -19. 29. 49. 86. 115. 138. 112. 73. 21. -17. -25. 536.
MAI .38 .41 .33 .26 .21 .26 .22 .58 1.91
-----------------------------------------------

SZEGED HUNGRY EL= 97 LAT= 46 15 N LONG= 20 9 E KS= 9.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 34. 38. 35. 41. 63. 63. 51. 47. 42. 46. 59. 39. 558.
PMI 16. 2. 3. 12. 9. 21. 2. 6. 4. 3. 14. 13. 387.
P79 20. 18. 12. 22. 24. 31. 19. 19. 11. 17. 25. 19. 444.
P6G 30. 31. 20. 34. 44. 54. 34. 34. 29. 26. 46. 32. 483.
PMX 57. 103. 104. 135. 196. 111. 141. 131. 127. 138. 142. 86. 867.
TMC -1.4 .7 5.8 11.9 17.3 20.8 23.0 22.2 18.2 12.0 6.1 1.5 11.5

HM 87. 83. 74. 66. 65. 64. 61. 63. 66. 75. 85. 88. 73.
S 23. 33. 41. 50. 57. 61. 68. 69. 69. 49. 28. 21. 47.
PD 22. 21. 14. 25. 28. 36. 22. 22. 15. 19. 29. 22. 452.
ETP 0. 0. 47. 85. 134. 159. 179. 154. 104. 52. 20. 0.
ETOF -22. -21. 33. 61. 105. 123. 157. 132. 90. 33. -9. -22. 660.
MAI .29 .29 .21 .23 .12 .14 .14 .36 1.47


MAGYAROVAQ HUNGRY











EL= 5 LA T 65 41 N LONG= 18 5 W KS= 6.7


JAN FEB MAR AR MAY JUN JUL AUC SEP OCT NOV DEC ANN

PM 45. 42. 42. 32. 15. 22. 35. 39. 46. 57. 45. 54. 474.
PMI 6. 5. 3. 5. 0. 3. 12. 5. 0. 1. 3. 19. 258.
P79 28. 20. 19. 17. 8. 10. 19. 16. 26. 18. 19. 37. 396.
P6U 36. 35. 29. 22. 11. 14. 22. 29. 32. 48. 37. 46. 437.
PMX 127. 73. 143. An. 45. 61. 83. 130. 166. 131. 97. 115. 659.
TMC -1.5 -1.6 -.3 1.7 6.3 9.3 10.9 In.3 7.8 3.6 1.' -.5 3.9

HMC 100. 95. 89. 88. 80. 84. 87. 89. 91. 93. 99. 100. 91.
5 5. 15. 22. 24. 30. 27. 24. 22. 20. 18. 8. 0. 18.
PD 30. 23. 21. 18. 9. 11. 19. 19. 27. 24. 23. 39. 405.
ETP 0. 0. 0. n. 60. 72. 70. 50. 25. 9. 0. 0.
ETDF -30. -23. -21. -13. 51. 61. 51. 32. -2. -16. -23. -39. 24.
MAI .14 .15 .27 .37 1.09 2.76


HOLAR I HORNAFIRDI ICFLAND EL= 17 LAT- 64 18 N LONG 15 12 W KS= 6.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 191. 115. 132. 108. 90. 83. 93. 116. 162. 170. 187. 185. 1632.
PMI 9. 11. 2. 4. 6. 11. 7. 6. 27. 60. 35. 56.
P79 74. 53. 75. 53. 34. 35. 41. 54. 88. 101. 117. 119.
P60 115. 79. 105. 74. 65. 50. 58. 97. 131. 135. 164. 173.
PMX 520. 253. 357. 3L18. 208. 199. 287. 242. 376. 382. 366. 343.
TMC .3 .0 1.5 3.0 6.5 9.3 10.9 10.4 8.2 4.9 2.7 1.2 4.9

HMC 90. 77. 75. 80. 76. 87. 86. 82. 81. 83. 84. 94. 83.
5 21. 32. 33. 30. 33. 24. 25. 28. 29. 27. 27. 16. 27.
PD 83. 58. 81. 57. 41. 38. 45. 63. 97. 108. 127. 130.
ETP 0. 0. 0. 36. 63. 68. 72. 58. 32. 13. 0. 0.
ETDF -83. -58. -81. -21. 23. 29. 27. -5. -65. -95. -127. -130. -587.
MAI 1.60 .64 .57 .62 1.09 3.01 8.45


REYKJAVIK ICELAND EL= 16 LAT- 64 8 N LONG= 21 56 W KS= 6.7

JAN FEB MAR APR "AY JUN JUL AUG SEP OCT NOV DEC ANN

PM 90. 65. 65. 53. 42. 41. 48. 66. 72. 97. 85. 81. 805.
PMI 2. 17. 7. 7. 0. 16. 13. 4. 13. 33. 13. 27. 560.
P79 43. 31. 26. 31. 21. 28. 28. 33. 36. 54. 44. 54. 653.
P60 68. 43. 51. 47. 32. 34. 43. 51. 60. 87. 59. 69. 667.
PMX 189. 174. 150. 11n. 96. 91. 92. 165. 157. 1R1. 212. 171. 1080.
TMC -.4 -.1 1.5 3.1 6.9 9.5 11.2 10.8 8.6 4.9 2.6 .9 5.0

HM 86. 85. 81. 81. 76. 77. 80. 81. 83. 84. 84. 84. 82.
5 13. 25. 30. 31. 33. 31. 30. 32. 28. 25. 18. 7. 25.
PD 48. 34. 31. 34. 23. 29. 31. 37. 41. 61. 47. 57. 664.
ETP 0. 0. 0. 37. 65. 78. 80. 63. 32. 12. 0. 0.
ETDF -48. -34. -31. 3. 42. 49. 48. 26. -9. -49. -47. -57. -107.
MAI .93 .36 .37 .39 .59 1.27 4.97


AGRA INDIA EL= 169 LAT= 27 10 N LONG= 79 2 E KS= 9.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 16. 9. 11. 5. 10. 60. 210. 263. 154. 23. 2. 4. 767.
PMI 0. 0. O. 0. U. 0. 62. 23. 3. 0. 0. 0. 374.
P79 0. 0. 0. 0. 0. 8. 106. 163. 40. 0. 0. 0. 529.
P60 7. 0. 1. 0. 2. 22. 161. 217. 79. 0. 0. 0. 682.
PMX 72. 57. 72. 38. 58. 356. 388. 618. 609. 162. 23. 24. 1202.
TMC 14.8 18.0 23.8 29.7 34.5 35.0 30.9 29.3 28.9 26.2 20.6 16.1 25.7

HM 61. 48. 36. 26. 27. 41. 71. 79. 69. 52. 45. 55. 51.
SC 57. 66. 73. 78. 78. 70. 49. 42. 51. 63. 67. 61. 63.
PD 1. 0. 0. n. 0. 11. 113. 174. 48. 0. 0. 0. 561.
ETP 73. 92. 150. 198. 243. 231. 182. 154. 146. 133. 96. 75. 1774.
ETDF 72. 92. 150. 198. 243. 220. 64. -20. 98. 133. 96. 75. 1420.
MAI .02 .00 .00 .00 .00 .05 .65 1.13 .33 .00 .00 .00 .32


AKUREYRI ICELAND











EL= 55 LAT7 23 4 N LONG= 72 38 E KS=10.2


JAN FEB MAR APR- MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 4. 0. 1. 2. 5. 81. 316. 213. 163. 13. 5. 1. 804.
PHI 0. 0. 0. 0. U. 0. 37. 2. 0. 0. 0. 0. 307.
P79 0. 0. U. 0. 0. 18. 135. 87. 24. 0. 0. 0. 515.
P60 0. U. 0. 0. 0. 64. 209. 151. 67. 0. 0. 0. 716.
PMX 57. 4. 12. 26. 45. 291. 949. 589. 637. 94. 53. 14. 1453.
TMC 20.3 22.8 27.1 31.3 33.5 32.7 29.4 29.3 28.7 28.4 24.5 21.1 27.3

HM 45. 36. 33. 33. 46. 59. 78. 79. 71. 51. 41. 43. 51.
S 90. 91. 78. 81. 83. 64. 36. 32. 55. 83. 92. 91. 73.
PD 0. 0. U. 0. 0. 28. 151. 100. 33. 0. 1. 0. 557.
ETP 119. 133. 176. 211. 245. 208. 149. 132. 156. 171. 135. 117. 1952.
ETDF 119. 133. 176. 211. 245. 180. -1. 32. 123. 171. 135. 117. 1641.
MAI .00 .OU .Ou .00 .00 .13 1.01 .76 .21 .00 .00 .00 .29


AKOLA INDIA EL= 282 LAT= 20 42 N LONG= 77 2 E KS= 9.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 9. 8. 7. 7. 11. 146. 261. 170. 178. 46. 28. 6. 877.
PHI 0. 0. 0. 0. 0. 28. 98. 19. 22. 0. 0. 0. 430.
P79 0. 0. 0. 0. 0. 71. 164. 112. 87. 1. 0. 0. 700.
PGO 0. 0. 0. 0. 0. 107. 225. 127. 125. 12. 0. 0. 82U.
PMX 64. 85. 51. 72. 71. 362. 477. 505. 810. 205. 342. 46. 1365.
TMC 22.U 24.0 28.3 32.5 35.3 31.8 27.7 27.1 27.3 26.7 23.1 21.1 27.2

HM 45. 33. 27. 24. 29. 53. 74. 75. 72. 54. 45. 45. 48.
SC 70. 77. 80. 82. 79. 64. 48. 47. 50. 64. 70. 70. 67.
PD 0. 0. 0. 0. 0. 79. 177. 115. 95. 3. 0. 0. 725.
ETP 115. 130. 187. 219. 246. 202. 164. 156. 145. 148. 119. 108. 1941.
ETDF 115. 130. 187. 219. 246. 124. -13. 41. 50. 145. 119. 108. 1472.
MAI .00 .OU .00 .00 .39 1.08 .74 .65 .02 .00 .00 .37
------------------------------------------------------------ ------------- ----- -----

ALLAHABAD INDIA EL= 98 LAT- 25 27 N LONG= 81 44 E KS=10.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 20. 22. 14. 5. 8. 100. 283. 333. 195. 40. 6. 6. 1032.
PHI 0. 0. 0. 0. 0. 0. 129. 109. 40. 0. 0. 0. 607.
P79 1. 4. 0. 0. 0. 36. 180. 249. 99. 1. 0. 0. 822.
P60 13. 11. 1. 0. 1. 71. 237. 293. 123. 14. 0. 0. 918.
PMX 75. 99. 81. 44. 47. 257. 476. 915. 405. 181. 92. 63. 1676.
TMC 16.4 19.1 25.1 30.7 34.7 34.3 30.1 29.1 29.0 26.5 21.1 17.1 26.1

HM 67. 51. 35. 24. 27. 47. 76. 81. 77. 61. 55. 63. 55.
S 75. 83. 74. 78. 72. 54. 38. 38. 57. 76. 86. 85. 68.
PD 4. 5. 0. 0. 0. 43. 192. 258. 104. 4. 0. 0. 842.
ETP 92. 110. 160. 203. 234. 199. 157. 147. 157. 152. 115. 95. 1820.
ETDF 88. 105. 160. 203. 234. 156. -35. -112. 53. 148. 115. 95. 1210.
MAI .04 .05 .00 .00 .00 .22 1.23 1.76 .66 .02 .00 .00 .46
------------------------------------------------------------------------

BANGALORE INDIA EL= 921 LAT= 12 58 N LONG= 77 35 E KS= 9.1

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 3. 10. 6. 46. 117. 80. 117. 147. 143. 185. 54. 16. 924.
PHI 0. 0. 0. 2. 20. 5. 28. 33. 8. 29. 0. 0. 588.
P79 0. 0. 0. 8. 59. 56. 65. 70. 86. 89. 6. 0. 798.
P60 0. 0. 0. 21. 91. 71. 97. 101. 109. 151. 34. 5. 868.
PMX 19. 90. 72. 162. 287. 171. 350. 344. 267. 522. 179. 86. 1283.
TMC 20.9 23.1 25.7 27.3 26.9 24.3 23.2 23.3 23.3 23.3 21.7 20.5 23.6

HM 59. 47. 43. 51. 61. 73. 78. 77. 75. 74. 69. 65. 64.
5 73. 78. 76. 69. 62. 39. 25. 34. 41. 49. 55. 64. 55.
PO 0. 0. 0. 11. 66. 59. 72. 77. 91. 102. 12. 1. 813.
ETP 132. 142. 180. 181. 177. 126. 102. 119. 124. 130. 117. 119. 1648.
ETDF 132. 142. 180. 170. 111. 67. 30. 43. 33. 28. 105. 118. 1159.
MAI .00 .00 .00 .06 .37 .47 .70 .64 .73 .79 .10 .01 .49
- - - - - - - - - - - - - -- - - - -


AHNADABAD INDIA











EL- 545 LAT= 17 27 N LONG= 78 28 E KS=10.3


JAN FFB MAR APR HAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 2. 10. 13. 23. 30. 107. 165. 147. 163. 71. 25. 5. 761.
PMI 0. 0. 0. 0. 0. 30. 41. 26. 61. 2. 0. 0. 481.
P79 0. 0. 0. 4. 5. 54. 115. 77. 87. 24. 0. 0. 628.
P60 0. 3. 1. 12. 14. 78. 144. 119. 107. 53. 1. 0. 726.
PMX 26. 96. 114. 163. 116. 324. 313. 334. 362. 269. 229. 69. 1158.
TMC 21.6 24.0 27.2 30.3 32.3 28.9 26.U 25.7 25.5 25.0 22.3 20.7 25.8

HM 57. 47. 41. 42. 41. 62. 75. 76. 77. 67. 59. 57. 58.
SC 68. 75. 79. 78. 79. 63. 51. 50. 49. 59. 66. 68. 66.
PD 0. 0. 0. 6. 7. 59. 121. 86. 91. 30. 0. 0. 649.
ETP 120. 135. 185. 206. 229. 185. 161. 156. 141. 142. 121. 113. 1893.
ETDF 12U. 135. 185. 200. 222. 126. 40. 70. 50. 112. 120. 113. 1493.
MAI .00 .00 .00 .03 .03 .32 .75 .55 .65 .21 .00 .00 .34


BELGAUM INDIA EL= 753 LAT= 15 51 N LONG- 74 32 E KS=10.0

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 1. 2. 12. 57. 87. 211. 505. 284. 120. 168. 38. 7. 1492.
PMI 0. 0. 0. 1. 5. 52. 173. 87. 39. 21. 0. 0. 896.
P79 0. 0. 0. 19. 25. 109. 333. 165. 67. 78. 3. 0. 1193.
P60 0. 0. 0. 40. 45. 184. 478. 226. 85. 101. 13. 0. 1303.
PMX 17. 50. 46. 165. 293. 503. 809. 680. 281. 516. 142. 65. 2278.
TMC 22.1 23.7 26.5 27.7 27.3 24.1 22.5 22.5 23.0 24.3 23.3 21.5 24.0

HM 50. 45. 47. 59. 69. 79. 91. 89. 85. 73. 60. 53. 67.
SC 71. 74. 73. 64. 56. 46. 30. 33. 39. 52. 63. 69. 56.
PD 0. 0. 0. 23. 29. 125. 363. 178. 71. 83. 5. 0. 1221.
ETP 128. 136. 177. 176. 171. 139. 112. 116. 118. 133. 124. 120. 1649.
ETDF 128. 136. 177. 152. 142. 14. -252. -61. 47. 51. 119. 120. 772.
MAI .00 .00 .00 .13 .17 .90 3.25 1.53 .60 .62 .04 .00 .74


BIKANER INDIA EL= 224 LAT- 28 0 N LONG: 73 18 E KS= 9.7

JAN FEB MAR AFR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 6. 7. 6. 5. 7. 27. 87. 104. 45. 6. 3. 2. 305.
PMI 0. 0. D. 0. 0. 0. 0. 0. 0. 0. 0. 0. 91.
P79 0. 0. 0. 0. 0. 5. 24. 36. 0. 0. 0. 0. 191.
P60 0. 0. 0. 0. 0. 13. 43. 68. 7. 0. 0. 0. 219.
PMX 28. 53. 55. 35. 56. 89. 311. 3 37. 224. 82. 44. 17. 695.
TMC 13.6 17.2 23.5 29.6 34.6 35.6 33.1 31.3 30.7 27.1 20.2 15.1 26.0

HM 53. 41. 34. 23. 25. 38. 59. 64. 57. 41. 39. 48. 43.
SC 66. 75. 79. 85. 84. 76. 62. 58. 64. 75. 76. 70. 72.
PD 0. 0. 0. 0. 0. 7. 2R. 43. 1. 0. 0. 0. 197.
ETP 74. 94. 154. 2 16. 253. 245. 215. 190. 169. 146. 99. 76. 1921.
ETDF 74. 94. 154. 2U6. 253. 239. 187. 147. 167. 146. 99. 76. 1842.
AI .00 .0 .0o .00 .00 .03 .13 .23 .01 .00 .00 .00 .10


BOMBAY INDIA EL= 11 LAT= 18 54 N LONG- 72 49 E KS-12.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 2. 1. 0. 3. 16. 520. 709. 419. 297. 88. 21. 2. 2078.
PMI 0. 0. 0. 0. 0. 92. 206. 83. 43. 0. 0. 0. 909.
P79 0. 0. 0. 0. 0. 251. 517. 193. 115. 19. 0. 0. 1692.
P60 0. 0. 0. 0. 0. 465. 609. 344. 182. 38. 1. 0. 1877.
PMX 21. 14. 6. 64. 153. 1011. 1310. 1265. 1245. 385. 164. 24. 3482.
TMC 24.3 24.9 26.9 28.7 29.9 29.1 27.5 27.1 27.4 28.3 27.5 25.9 27.3

HM 68. 67. 68. 69. 70. 79. 85. 85. 83. 77. 70. 67. 74.
5 85. 86. 79. 78. 75. 41. 17. 22. 42. 70. 83. 85. 64.
PD 0. 0. 0. 0. 0. 296. 536. 225. 129. 23. U. 0. 1731.
ETP 140. 145. 182. 197. 212. 151. 96. 107. 135. 165. 150. 140. 1820.
ETDF 140. 145. 182. 197. 212. -145. -440. -118. 6. 142. 149. 140. 611.
MAI .00 .00 .00 .00 .00 1.96 5.53 2.10 .95 .14 .00 .00 .95
---- --------- -- ---------------------- ---- ------ -- -- -------------- -- -- ---


BEGAMPET INDIA











EL= 6 LAT= 22 32 N LONG: 88 20 E KS=10.7


JAN FEB MAR APR "AY JUN JUL AUG SEP OCT NOV DEC ANN

PM 13. 24. 27. 43. 121. 259. 301. 306. 290. 160. 35. 3. 1582.
PMI 0. 0. 0. 0. 11. 68. 132. 152. 56. 23. 0. 0. 909.
P79 0. 2. 3. 9. 56. 174. 195. 224. 183. 90. 0. 0. 133U.
P60 1. 12. 9. 26. 78. 221. 275. 254. 264. 102. 1. 0. 15E0.
PMX 66. 138. 157. 152. 369. 510. 585. 629. 521. 474. 239. 32. 2221.
TMC 20.2 23.0 27.9 30.1 31.1 30.4 29.1 29.1 29.2 27.9 24.0 20.6 26.8

HM 67. 59. 57. 63. 69. 78. 83. 84. 83. 79. 69. 68. 72.
5 77. 77. 72. 70. 63. 36. 29. 31. 40. 59. 76. 79. 59.
PD 0. 4. 4. 12. 61. 184. 212. 230. 200. 93. 0. 0. 1378.
ETP 111. 123. 172. 191. 203. 148. 132. 133. 134. 143. 123. 109. 1723.
ETDF 111. 119. 168. 180. 142. -36. -80. -97. -66. 50. 123. 109. 723.
MAI .00 .03 .02 .06 .30 1.24 1.60 1.73 1.49 .65 .00 .00 .80


CHERRAPUNJI INDIA EL=1313 LAT= 25 15 N LONG= 91 44 E KS=10.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 20. 41. 179. 605. 1705. 2875. 2855. 1827. 1231. 447. 47. 5.11437.
PMI 0. 0. 8. 87. 717. 1367. 930. 685. 281. 16. 0. 0. 8105.
P79 0. 7. 31. 312. 1111. 2102. 1701. 1202. 705. 110. 0. 0. 9639.
P60 4. 30. 86. 473. 1390. 2403. 2143. 1406. 1135. 257. 4. 0.10765.
PMX 104. 133. 760. 1472. 3278. 5689. 4553. 3482. 2500. 1435. 284. 41.15707.
TMC 11.7 13.3 16.7 18.6 19.2 20.0 20.3 20.5 20.5 19.1 15.9 12.9 17.4

HM 73. 67. 68. 80. 87. 94. 95. 93. 91. 84. 75. 75. 82.
SC 55. 61. 60. 47. 38. 26. 24. 28. 32. 42. 53. 53. 43.
PD 1. 12. 43. 346. 1170. 2165. 1794. 1245. 795. 141. 1. 0. 9875.
ETP 68. 79. 115. 118. 118. 99. 97. 102. 95. 94. 78. 66. 1129.
ETDF 67. 68. 72. -228.-1051.-2067.-1696.- 1143. -700. -47. 77. 66.-65G2.
MAI .01 .15 .37 2.93 9.87 21.95 18.42 12.21 8.34 1.50 .01 .00 8.74


CUTTACK INDIA EL= 27 LAT= 20 48 N LONG= 85 56 E KS=12.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 10. 27. 19. 26. 70. 207. 355. 365. 252. 168. 41. 5. 1545.
PMI 0. 0. 0. 0. 3. 67. 148. 159. 137. 5. 0. 0. 884.
P79 0. 0. 1. 0. 23. 118. 245. 244. 197. 55. 0. 0. 1283.
P60 0. 7. 4. 9. 42. 165. 264. 316. 217. 103. 2. 0. 1452.
PMX 34. 189. 100. 152. 230. 517. 681. 823. 455. 494. 233. 96. 2372.
TMC 22.3 24.9 29.0 31.8 32.9 31.1 28.6 28.6 28.9 27.9 24.5 21.9 27.7

HM 63. 59. 57. 61. 63. 71. 81. 83. 81. 76. 67. 65. 69.
SC 74. 78. 80. 76. 74. 66. 53. 50. 53. 60. 70. 72. 67.
PD 0. 1. 2. 2. 27. 128. 249. 259. 201. 65. 0. 0. 1322.
ETP 120. 134. 189. 208. 227. 201. 176. 167. 156. 147. 124. 112. 1962.
ETOF 120. 133. 187. 207. 200. 73. -73. -92. -45. 82. 123. 112. 1027.
MAI .00 .01 .01 .01 .12 .64' 1.41 1.55 1.29 .44 .00 .00 .67


DALTONGANJ INDIA EL: 221 LAT= 24 3 N LONG: 84 4 E K510.6

JAN FEB MAR APR "AY JUN JUL AUG SEP OCT NOV DEC ANN

PM 31. 28. 21. 9. 13. 140. 346. 358. 223. 57. 7. 4. 1237.
PMI 0. 0. U. 0. 0. 37. 76. 122. 78. 0. 0. 0. 708.
P79 5. 7. 1. 0. 0. 64. 256. 248. 147. 14. 0. 0. 1060.
P60 14. 17. 7. 2. 4. 95. 297. 312. 192. 37. 0. 0. 1140.
PMX 111. 99. 91. 40. 59. 362. 621. 638. 449. 220. 54. 54. 1857.
TMC 16.9 19.3 24.5 29.7 33.9 33.0 29.0 28.3 28.2 25.7 20.5 16.9 25.5

HM 65. 54. 41. 31. 29. 53. 77. 81. 78. 67. 62. 64. 58.
SC 63. 72. 81. 88. 89. 73. 51. 46. 50. 61. 65. 64. 67.
PD 7. 9. 2. 0. 1. 71. 265. 261. 156. 19. 0. 0. 1077.
ETP 88. 106. 167. 213. 256. 223. 176. 159. 145. 135. 101. 85. 1855.
ETDF 81. 97. 165. 212. 255. 153. -89. -103. -11. 117. 101. 85. 1063.
MAI .08 .09 .01 .00 .00 .32 1.50 1.65 1.08 .14 .00 .00 .58


CALCUTTA INDIA











DARBHANGA INDIA EL= 49 LAT= 26 10 N LONG= 85 54 E KS=10.6

JAN FEB MAR ArR MAY JUN JUL AUG SEP OCT NOV DFC ANN

PM 20. 14. 10. 20. 57. 190. 330. 291. 247. 70. 7. 2. 1258.
PMI 0. 0. 0. 0. 0. 72. 74. 108. 41. 0. 0. 0. 851.
P79 0. 1. 0. U. 17. 105. 166. 191. 103. 10. 0. o. 1046.
P6U 5. 8. 1. 1. 44. 137. 244. 234. 174. 29. 0. 0. 1183.
PMX 114. 59. 124. 92. 140. 480. 673. 609. 649. 327. 65. 17. 2522.
TMC 16.8 19.1 24.0 28.7 30.5 30.3 29.3 2 .3 29.0 26.8 21.9 18.0 25.3

HM 76. 63. 49. 47. 57. 73. 81. 82. 81. 75. 73. 77. 69.
SC 52. 64. 76. 77. 70. 55. 46. 45. 46. 53. 55. 51. 58.
PD 1. 2. 0. 0. 23. 112. 182. 206. 122. 14. 0. 0. 1075.
ETP 76. 96. 156. 193. 211. 185. 170. 160. 141. 126. 92. 74. 1680.
ETDF 75. 93. 155. 193. 188. 74. -12. -46. 19. 112. 92. 74. 1017.
MAI .01 .03 .00 .OU .11 .60 1.07 1.29 .87 .11 .00 .00 .64


DARJEELING IFOIA EL=2127 LAT= 27 3 N LONG= 88 16 E KS=10.5

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 22. 27. 53. 109. 187. 522. 713. 573. 419. 116. 14. 5. 2760.
PMI U. U. 0. 11. 67. 225. 208. 338. 177. 6. 0. 0. 2202.
P79 0. 8. 14. 62. 123. 333. 583. 471. 301. 18. 0. 0. 2432.
P60 6. 14. 41. 79. 159. 427. 693. 542. 368. 45. 2. 0. 2564.
PMX 240. 97. 156. 260. 421. 1402. 985. 924. 302. 561. 127. 31. 3792.
TMC 6.4 7.7 11.2 14.3 15.7 17.0 17.5 17.5 17.2 15.1 11.3 8.1 13.3

HM 80. 81. 75. 76. 88. 93. 95. 92. 91. 83. 79. 79. 84.
SC 47. 46. 52. 51. 36. 28. 23. 30. 31. 43. 48. 48. 40.
PD 1. 9. 20. 66. 131. 353. 606. 486. 315. 24. 0. 0. 2460.
ETP 49. 54. 88. 107. 105. 94. 90. 96. 85. 82. 61. 50. 963.
ETDF 48. 45. 68. 42. -26. -258. -516. -390. -230. 58. 61. 50.-1048.
MAI .03 .17 .22 .61 1.25 3.74 6.73 5.05 3.69 .29 .01 .00 2.56


DHUBRI INDIA EL= 35 LAT= 26 1 N LONG= 89 59 E KS=10.6

JAN FEB MAR APR MAy JUN JUL AUG SEP OCT NOV DEC ANN

PM 11. 19. 45. 154. 481. 644. 448. 305. 328. 145. 12. 1. 2593.
PMI 0. 0. O. 4. 216. 295. 129. 108. 58. 0. 0. 0. 1712.
P79 0. 2. 2. 76. 302. 41q. 233. 200. 191. 44. 0. 0. 2127.
P60 0. 10. 7. 101. 378. 525. 387. 248. 280. 107. 0. 0. 2448.
PMX 82. 70. 193. 4Z4. 869. 1078. 996. 649. 911. 411. 98. 12. 3669.
TMC 17.7 19.8 24.1 26.6 26.4 27.2 28.1 28.3 27.8 26.1 22.3 18.9 24.4

HM 76. 65. 60. 68. 81. 88. 87. 85. 87. 83. 79. 77. 78.
SC 52. 63. 67. 6U. 46. 37. 38. 41. 38. 44. 49. 51. 49.
PD 0. 4. 3. 81. 318. 440. 265. 210. 210. 57. 0. 0. 2194.
ETP 79. 97. 147. 163. 157. 141. 150. 150. 125. 113. 88. 76. 1464.
ETOF 79. 93. 144. 81. -161. -299. -115. -61. -85. 55. 88. 76. -105.
MAI .OU .04 .02 .50 2.03 3.12 1.76 1.41 1.68 .51 .00 .00 1.48


DUMKA INDIA EL= 149 LAT- 24 16 N LONG= 87 15 E KS=in.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 20. 27. 14. 29. 81. 207. 370. 349. 274. 125. 15. 3. 1514.
PMI O. U. O. 0. 0. 56. 158. 147. 92. 7. 0. 0. 983.
P79 0. 4. 0. 2. 34. 141. 268. 250. 155. 56. 0. 0. 1300.
P60 5. 11. 2. 7. 53. 179. 343. 303. 255. 80. 0. 0. 1477.
PMX 139. 146. 85. 172. 234. 435. 790. 620. 522. 697. 139. 16. 1941.
TMC 17.9 20.5 26.2 30.3 31.7 30.5 29.5 28.3 28.3 26.5 21.9 18.5 25.8

HM 59. 47. 41. 43. 57. 73. 83. 83. 81. 72. 61. 57. 63.
SC 69. 79. 82. 81. 70. 56. 44. 44. 47. 57. 67. 70. 64.
PO 1. 5. 0. 3. 38. 149. 284. 261. 176. 61. 0. 0. 1337.
ETP 95. 113. 174. 206. 217. 186. 162. 1 5. 141. 133. 106. 93. 1780.
ETDF 94. 108. 174. 203. 179. 37. -121. -106. -35. 72. 106. 93. 802.
MAI .01 .05 .00 .01 .18 .80 1.75 1.68 1.25 .46 .00 .00 .75











EL= 11 LAT= 22 22 N LONG: 69 5 E KS=12.5


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 2. 2. 1. O. U. 49. 220. 77. 42. 5. 19. 2. 419.
PPI 0. 0. 0. n. 0. 0. 6. 1. 0. O. 0. 0. 37.
P79 0. 0. 0. 0. 0. 1. 44. 12. 1. 0. 0. 0. 217.
P60 0. 0. 0. 0. 0. 13. 114. 18. 7. 0. 0. 0. 290.
PMX 23. 23. 11. 1. 8. 239. 913. 357. 265. 45. 379. 42. 1080.
TMC 20.5 22.1 24.9 27.2 29.1 30.1 28.5 27.7 27.5 27.3 25.7 22.3 26.1

HM 58. 65. 75. 78. 80. 79. 83. 94. 81. 76. 61. 55. 73.
SC 81. 74. 63. 59. 56. 57. 52. 50. 54. 61. 78. 84. 64.
PD 0. 0. 0. 0. 0. 4. 59. 13. 2. 0. 0. 0. 232.
ETP 115. 119. 150. 165. 182. 185. 174. 163. 151. 144. 130. 118. 1797.
ETDF 115. 119. 150. 165. 182. 182. 116. 150. 149. 144. 130. 118. 1720.
MAI .OU .oU .00 .00 .00 .02 .34 .08 .01 .00 .00 .00 .13


FORT COCHIN INDIA EL= 3 LATr 9 58 N LONG: 76 14 E KS=11.9

JAN FEB MAR APR MAY JUN JUL AUC SEP OCT NOV DEC ANN

PM 10. 34. 50. 145. 364. 756. 572. 386. 235. 333. 184. 37. 3106.
PHI 0. 0. 2. 49. 56. 290. 276. 121. 21. 117. 1. 0. 2115.
P79 0. 1. 9. 71. 116. 582. 380. 223. 95. 157. 86. 3. 2553.
P60 0. 9. 22. 118. 251. 672. 490. 317. 173. 264. 152. 11. 3043.
PMX 68. 129. 245. 314. U178. 1100. 1070. 1172. 530. 906. 441. 204. 5318.
TMC 26.9 27.5 28.5 28.7 28.3 26.5 25.9 26.1 26.3 26.7 27.0 26.9 27.1

HM 67. 71. 74. 75. 81. 87. 87. 87. 84. 82. 77. 69. 78.
SC 68. 64. 61. 59. 52. 43. 43. 43. 48. 50. 57. 66. 55.
PD 0. 3. 12. 81. 144. 601. 403. 243. 111. 179. 100. 5. 2656.
ETP 155. 148. 174. 173. 164. 137. 140. 143. 144. 147. 141. 149. 1814.
ETDF 155. 145. 162. 92. 19. -464. -263. -100. 33. -33. 41. 145. -67.
MAI .00 .02 .07 .47 .88 4.40 2.88 1.70 .77 1.22 .71 .03 1.46


GAUHATI INDIA EL= 54 LAT= 26 5 N LONG= 91 43 E KS=10.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 11. 18. 53. 171. 274. 292. 301. 263. 190. 90. 11. 5. 1679.
PHI 0. 0. 0. 12. 99. 117. 140. 90. 35. 0. 0. 0. 1048.
P79 0. 4. 11. 99. 182. 206. 206. 173. 125. 36. 0. 0. 1380.
P60 1. 9. 32. 131. 246. 245. 271. 211. 141. 67. 3. 0. 1619.
PMX 65. 71. 159. 400. 565. 589. 533. 595. 448. 292. 53. 26. 2082.
TMC 16.4 18.6 22.3 25.5 26.7 27.9 28.4 28.5 28.2 25.7 21.4 17.6 23.9

HM 79. 62. 55. 66. 74. 83. 82. 83. 83. 82. 82. 81. 76.
SC 49. 66. 72. 62. 55. '4. 45. 44. 44. 45. 45. 47. 52.
PD 0. 5. 15. 106. 195. 214. 220. 181. 128. 43. 1. 0. 1430.
ETP 73. 96. 145. 161. 172. 157. 165. 156. 135. 114. 83. 70. 1527.
ETDF 73. 91. 130. 56. -24. -57. -55. -25. 7. 71. 82. 70. 419.
MAI .00 .05 .11 .65 1.14 1.36 1.33 1.16 .95 .37 .01 .00 .94


INDORE INDIA EL= 567 LAT= 22 43 N LONG= 75 48 E KS=10.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 85. 1. 3. 3. 13. 145. 316. 267. 221. 48. 22. 3. 1127.
PMI 0. 0. 0. 0. 0. 16. 56. 70. 39. 0. 0. 0. 582.
P79 9. 0. 0. 0. 0. 53. 237. 113. 102. 2. 0. 0. 838.
P60 0. 0. 0. 1. 0. 106. 271. 203. 156. 13. 0. 0. 950.
PMX 40. 8. 35. 30. 98. 409. 690. 707. 767. 174. 217. 19. 1743.
TMC 17.9 19.9 24.5 29.1 32.3 30.1 26.1 25.1 25.1 24.1 20.5 18.3 24.4

HH 50. 35. 25. 25. 32. 60. 81. 83. 77. 53. 44. 47. 51.
SC 72. 82. 88. 88. 84. 65. 44. 42. 49. 70. 76. 74. 70.
PD . 0. 0. 0. 64. 244. 132. 113. 4. 0. 0. 862.
ETP 100. 117. 176. 211. 240. 197. 153. 141. 135. 142. 112. 99. 1823.
ETDF 100. 117. 176. 211. 740. 133. -91. 9. 22. 138. 112. 99. 1265.
AI .0 .00 .00 .00 .00 .33 1.59 .94 .84 .03 .00 .00 .47


DUARKA INDIA











EL= 553 LAT- 19 5 N LONG= 82 2 E KS=10.5


JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 5. 15. 17. 51. 65. 212. 396. 380. 246. 115. 24. 4. 1530.
PMI 0. 0. 0. 2. 4. 34. 14U. 203. 51. 12. 0. 0. 1072.
P79 0. 0. 0. 26. 23. 114. 278. 295. 140. 52. 0. 0. 1337.
P60 0. 1. 6. 38. 51. 154. 353. 338. 232. 88. 6. 0. 1494.
PMX 44. 146. 79. 126. 154. 498. 632. 6F4. 485. 312. 113. 40. 2230.
TMC 20.2 22.8 26.5 29.5 31.5 28.7 25.1 25.3 25.8 24.8 21.4 19.3 25.1

HM 57. 59. 40. 43. 47. 67. 84. 85. 83. 75. 67. 62. 64.
SC 69. 67. 81. 79. 76. 60. 42. 41. 43. 52. 60. 65. 61.
PD 0. 0. 1. 29. 29. 122. 294. 304. 159. 60. 1. 0. 1370.
ETP 113. 121. 182. 2U3. 222. 181. 143. 139. 132. 131. 109. 103. 1780.
ETDF 113. 121. 181. 174. 194. 59. -150. -165. -27. 71. 108. 103. 781.
MAI .00 .OU .01 .14 .13 .68 2.05 2.19 1.21 .45 .01 .00 .77


JODHPUR INDIA EL= 224 LAT= 26 18 N LONG= 73 1 E KS= 9.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 8. 5. 2. 2. 6. 31. 122. 146. 47. 7. 3. 1. 380.
PMI 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 135.
P79 0. 0. 0. 0. 0. 9. 40. 35. 1. 0. 0. 0. 269.
P60 0. 0. 0. 0. 1. 13. 63. 95. 13. 0. 0. 0. 342.
PMX 57. 48. 15. 20. 32. 154. 391. 544. 207. 88. 39. 23. 778.
TMC 17.1 19.9 25.2 30.3 34.4 34.3 31.3 29.2 29.4 27.7 22.7 18.7 26.7

HM 41. 30. 25. 23. 31. 45. 65. 71. 61. 37. 29. 37. 41.
5 84. 87. 76. 79. 79. 71. 50. 47. 69. 87. 92. 89. 76.
PD O. 0. 0. 0. 0. 10. 45. 48. 4. 0. 0. 0. 284.
ETP 98. 113. 161. 203. 244. 228. 184. 164. 173. 164. 121. 99. 1953.
ETDF 98. 113. 161. 203. 244. 218. 140. 116. 169. 164. 121. 99. 1847.
MAI .00 .00 .00 .00 .00 .04 .24 .29 .02 .00 .00 .00 .15


KOTA INDIA EL= 257 LAT= 25 11 N LONG= 75 51 E KS=10.3

JAN FER MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 9. 4. 5. 3. 7. 79. 311. 268. 135. 15. 6. 3. 845.
PMI 0. 0. 0. 0. 0. 4. 30. 46. 10. 0. 0. 0. 338.
P79 0. 0. 0. 0. 0. 30. 172. 153. 35. 0. 0. 0. 587.
P60 2. 0. 0. 0. 1. 56. 250. 190. 83. 1. 0. 0. 780.
PMX 40. 18. 31. 35. 38. 216. 714. 704. 444. 111. 44. 36. 1305.
TMC 17.9 20.8 26.7 31.8 36.2 34.9 30.0 28.6 28.9 27.7 22.9 19.0 27.1

HM 53. 37. 25. 19. 21. 41. 70. 75. 68. 45. 41. 49. 45.
SC 71. 82. 89. 93. 92. 79. 56. 51. 58. 76. 79. 74. 75.
PD O. 0. 0. U. 0. 35. 188. 161. 45. 0. 0. 0. 528.
ETP 94. 115. 18U. 227. 272. 243. 190. 161. 159. 156. 116. 94. 2016.
ETOF 94. 115. 180. 227. 272. 208. 2. 8. 114. 156. 116. 94. 1586.
MAI .OU .OU .00 .00 .00 .15 .99 .95 .28 .00 .00 .00 .31


LUDHIANA INDIA EL- 247 LAT: 30 56 N LONG- 75 52 E KS=10.3

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 35. 35. 29. 11. 9. 54. 191. 173. 136. 35. 3. 14. 725.
PMI 1. 0. 0. 0. U. 0. 72. 29. 0. 0. 0. 0. 353.
P79 11. 3. 6. 1. 0. 12. 123. 101. 13. 0. 0. 0. 541.
P60 20. 13. 11. 4. 3. 35. 164. 140. 34. 3. 0. 0. 669.
PMX 138. 146. 130. 81. 53. 146. 508. 368. 699. 588. 25. 64. 1402.
TMC 13.0 15.7 21.1 27.3 32.7 34.1 31.3 30.3 29.5 25.6 19.F 14.6 24.6

HM 71. 63. 55. 40. 31. 41. 67. 74. 67. 55. 56. 68. 57.
SC 55. 63. 69. 80. 86. 79. 59. 53. 59. 69. 68. 58. 67.
PD 13. 5. 7. 2. 1. 17. 132. 109. 17. 1. 0. 0. 568.
ETP 62. 73. 131. 187. 246. 244. 203. 175. 155. 129. 86. 62. 1758.
ETDF 49. 73. 124. 185. 246. 227. 71. 66. 137. 129. 86. 62. 1455.
MAI .21 .07 .05 .01 .00 .07 .65 .62 .11 .00 .00 .00 .32


JAGDALPUR INDIA












ELM 16 LFP 13 0 N LONG 80U 11 E KS=11.9


JAN FF- MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 24. 7. 15. 25. 52. 53. 83. 1. 12 118. 267. 308. 157. 1733.
PMI 0. n. O. n. 0. 9. 21. 22. 21. 70. 6. 1. 672.
P79 0. 0. 0. Il. U. 23. 44. 69. 62. 140. 138. 20. 911.
P60 3. U. 0. 9. 1. 37. 60. 105. 99. 203. 210. 58. 1043.
PMX 13E. 64. 263. 133. 389. 130. 266. 231. 279. 892. 808. 599. -135.
TMC 24.5 25.9 27.9 311.5 32.7 32.5 30.7 30.1 29.7 28.1 25.9 24.6 2 .6

HM 75. 73. 71. 71. 65. 59. 64. E8. 71. 79. 80. 77. 71.
5 77. 85. 82. 79. 72. 53. 40. 50. 54. 57. 57. 65. 64.
PD 1. 0. 0. 2. 0. 26. 47. 77. 70. 153. 153. 28. 940.
ETP 149. 159. 197. 2U7. 216. 179. 154. 170. 166. 157. 132. 133. 2016.
TCDF 148. 159. 197. 215. 216. 152. 1 16. 94. 96. 4. -21. 105. 1459.
MAT .00 .00 .0D .01 .00 .15 .31 .45 .42 .98 1.16 .21 .47


MANGALORE INDIA EL 22 LA T 12 52 N LONG- 74 51 E KS-11.9

JAN FEB MAP APT MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 5. 2. 9. U 233. 980. 1059. 577. 279. 206. 71. 18. 3473.
PMI O. 0. 0. 0. 0. 441. 417. 277. 38. 69. 0. 0. 2452.
P79 0. 0. 0. 5. 69. 779. 841. 381. 151. 109. 6. 0. 2991.
PGO 0. 0. 0. 13. 112. 847. 979. 470. 225. 144. 52. 1. "?97.
PMX 61. 24. 90. 123. 752. 1437. 178. 123F. 637. 4S6. 206. 158. 4703.
TMC 26.5 26.9 28.1 21.3 29.1 26.7 26.0 2E.1 26.1 26.8 27.1 26.9 27.1

HM 67. 71. 71. 71. 75. 87. 89. 89. 86. 82. 73. 65. 77.
SC 68. 64. 64. 64. 59. 43. 39. 34. 45. 50. 62. 70. 56.
PD 0. 0. 0. 7. 78. 793. 870. 400. 167. 116. 16. 0. 3054.
ETP 147. 141. 175. 182. 182. 140. 137. 139. 139. 144. 141. 147. 1812.
ETDF 147. 141. 175. 175. 103. -653. -733. -262. -29. 28. 125. 146. -634.
MAI .00 .00 .00 .04 .43 5.65 6.34 2.90 1.21 .90 .11 .00 1.69


MASULIPATAM INDIA ELL 3 LAT: 16 11 N LONG= 81 8 E KS=12.0

JAN FEB MAR APP MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 1. 11. 9. 18. 36. 106. 199. 152. 156. 264. 110. 15. 1077.
PMI 0. 0. 0. 0. 0. 9. 47. 20. 53. 39. 0. 0. 628.
P79 0. 0. 0. n. 4. 42. 106. 77. 104. 130. 6. 0. 876.
P60 0. 0. 0. 2. 14. 78. 179. 134. 125. 204. 28. 0. 998.
PMX 8. 111. 91. 101. 174. 490. 466. 317. 300. 621. 397. 256. 1701.
TMC 23.6 75.2 27.4 29.9 32.3 31.9 29.1 25.0 28.7 27.' 25.1 23.3 27.8

HM 75. 74. 73. 73. 69. 65. 75. 76. 79. 80. 75. 74. 74.
SC 60. 61. 62. 62. 67. 71. 60. 59. 55. 54. 60. 61. 61.
PD 0. 0. 0. 0. 6. 50. 121. 89. 108. 146. 11. 0. 902.
ETP 122. 127. 167. 182. 209. 207. 185. 181. 161. 147. 126. 118. 1933.
ETDF 122. 127. 167. 182. 203. 158. 64. 92. 53. 2. 115. 114. 1402.
MAI .00 .00 .00 .l00 .03 .24 .65 .49 .67 .99 .08 .00 .47


MINICOY INDIA EL= 2 LAT= 8 18 N LONG! 73 0 E KS=11.9

JAN FEB MAR APQ MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 35. 25. 16. 52. 2UU. 293. 212. 200. 144. 185. 141. 76. 1579.
PHI 0. 0. G. 1. 5. 105. 48. 35. 30. 20. 24. 0. 1050.
P79 8. 1. 0. 12. 81. 201. 122. 75. 56. 80. 68. 21. 1379.
P60 15. 6. 4. 33. 122. 289. 200. 170. 120. 161. 111. 50. 15 1.
PMX 148. 136. 90. 141]. 626. 544. 502. 451. 348. 452. 337. 282. 2248.
TMC 26.1 26.7 27.7 28.7 28.8 27.7 27.3 27.3 27.3 27.1 26.6 26.5 27.3

HM 77. 75. 74. 75. 77. 81. 81. 81. 79. 79. 78. 77. 78.
SC 57. 59. 61. 59. 57. 52. 52. 52. 55. 55. 56. 57. 56.
PD 9. 2. 1. 16. 90. 219. 138. 95. 69. 97. 77. 27. 1421.
ETP 143. 142. 172. 172. 172. 152. 157. 1FO. 159. 156. 141. 141. 1867.
ETDF 133. 140. 171. 156. 82. -67. 19. 65. 89. 59. 64. 114. 1026.
MAI .07 .01 .0or .10 .52 1.44 .88 .59 .44 .62 .55 .19 .76


MADRAS INPIA












EL 111 LAT- 27 23 N LCNG: 95 1 E KS=10.7


JAN FCE MAR APR -AY JUN JUL AUG SEP OCT NOV DEC ANN

PM 39. 61. 100. 2U4. 356. 507. 523. 41 352. 166. 27. 21. 2775.
PMI 0. 9. 4. 82. 146. 267. 297. 211. 131. 6. 0. 0. 2209.
P79 19. 30. 48. 127. 258. 421. 402. 280. 264. 97. 4. 7. 2448.
P60 31. 58. 69. 160. 288. 459. 452. 381. 320. 133. 11. 11. 2681.
PMX 1U1. 149. 232. 464. 707. 764. 877. 729. 667. 45U. 129. 62. 3300.
TMC 15.2 17.7 D0.G 23.3 25.3 27.3 27.8 28.1 27.6 24.8 20.2 16.5 22.8

HM 83. 76. 70. 72. 82. 74. 74. 72. 75. 86. 85. 88. 78.
SC 44. 52. 59. 57. 45. 55. 55. 57. 53. 40. 41. 37. 50.
PD 22. 36. 52. 134. 264. 429. 412. 301. 276. 105. 5. 8. 2497.
EIP 65. 81. 124. 145. 152. 173. 179. 174. 145. 1L2. 74. 58. 1473.
ETDF 43. 45. 71. 11. -113. -256. -233. -127. -131. -2. 68. 51. -572.
MAI .33 .44 .42 .92 1.74 2.48 2.30 1.73 1.30 1.02 .07 .13 1.70


MUKTESWAR/KUMAON TNDIA EL=2311 LATz 29 28 N LONG= 79 39 E KS= 9.2

JAN FED MAR AFR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 56. 56. 45. 34. 51. 143. 332. 285. 200. 79. 4. 23. 1308.
PMI 0. 0. 1. 0. 2. 18. 101. 114. 49. 0. 0. 0. 853.
P79 7. 11. 18. 5. 15. 67. 218. 196. 86. 1. 0. 0. 1106.
P60 42. 39. 35. 29. 32. 105. 282. 242. 154. 13. 0. 4. 1196.
PMX 247. 168. 130. 80. 167. 401. 748. 551. 491. 477. 32. 117. 2254.
TMC 5.8 7.1 11.1 15.5 18.7 19.1 17.6 17.3 16.5 14.1 11.2 7.9 13.5

HM 58. 53. 48. 40. 43. 65. 91. 93. 87. 65. 51. 47. 62.
SC 6U. 63. 66. 71. 69. 54. 28. 24. 33. 54. 64. 67. 55.
PD 14. 17. 22. 10. 19. 75. 231. 206. 100. 4. 0. 1. 1125.
ETP 51. 60. 96. 130. 158. 141. 99. 86. 84. 86. 66. 55. 1111.
ETDF 36. 43. 74. 120. 140. 66. -133. -119. -16. 82. 66. 54. 413.
MAI .28 .28 .22 .08 .12 .53 2.35 2.38 1.19 .04 .00 .02 1.01


NAGPUR INDIA EL= 310 LAT= 21 6 N LONG= 79 3 E KS= 9.4

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 14. 19. 22. 20. 13. 210. 407. 288. 173. 65. 17. 3. 1251.
PMI 0. 0. 0. 0. 0. 57. 163. 156. 62. 0. 0. 0. 618.
P79 0. 0. 0. 3. D. 126. 277. 187. 86. 9. 1. 0. 998.
PEO 0. 1. 5. 8. 2. 146. 375. 238. 150. 21. 0. 0. 1180.
PMX 104. 157. 104. 129. 101. 498. 592. 449. 375. 209. 162. 24. 1931.
TMC 20.7 23.8 27.7 31.8 35.6 32.5 27.6 27.1 27.3 25.9 22.0 20.4 26.9

HM 51. 37. 32. 30. 26. 53. 77. 79. 75. 63. 51. 53. 52.
S 85. 90. 79. 76. 75. 48. 25. 28. 44. 73. 86. 90. 66.
PD O. n. 1. 4. 0. 130. 298. 198. 99. 12. 0. 0. 1036.
ETP 122. 139. 182. 208. 241. 176. 117. 120. 136. 155. 128. 119. 1845.
ETDF 122. 139. 181. 204. 240. 46. -180. -79. 37. 1'3. 128. 119. 1103.
MAI .00 .00 .01 .02 .00 .74 2.54 1.64 .73 .07 .00 .00 .56
- ------------------------------------------------------------------------

NEW DELHI/SAFOARJUNG INDIA EL- 216 LAT= 28 3- N LONG: 77 12 E KS= 9.1

JAN FES MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 25. 22. 17. 7. 8. 65. 211. 173. 150. 31. 1. 5. 715.
PMI 0. 0. 0. 0. 0. 2. 4. 15. 0. 0. 0. 0. 322.
P79 3. 0. 1. 0. 1. 13. 114. 77. 42. 0. 0. 0. 517.
P60 13. 2. 8. 1. 4. 30. 162. 119. 108. 1. 0. 0. 632.
PMX 74. 128. 64. 57. 54. 415. 464. 551. 359. 238. 16. 68. 1533.
TMC 14.3 17.3 22.9 29.1 33.5 34.5 31.2 29.9 29.3 25.9 20.2 15.7 25.3

HM 62. 47. 39. 25. 25. 39. 67. 73. 65. 49. 44. 55. 49.
S 71. 80. 68. 69. 60. 46. 42. 46. 59. 82. 90. 80. 66.
PD 5. 0. 2. 0. 2. 17. 124. 86. 56. 0. 0. 0. 541.
ETP 78. 97. 140. 182. 209. 187. 170. 164. 158. 148. 106. 81. 1720.
ETDF 72. 97. 138. 182. 208. 171. 46. 78. 102. 148. 106. 81. 1427.
MAI .07 .00 .02 .00 .01 .09 .73 .52 .35 .00 .00 .00 .31
- ------------------------------------------------------ ------------------


MOHANBAPI INDIA












EL; 11 LAT- 9 16 N LONG= 79 18 E KS=11-.9


JAN FER MAR AFR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 66. 19. 24. 69. 24. 5. 9. 12. 16. 175. 308. 196. 922.
PMI 0. 0. 0. 2. 0. 0. 0. 0. 0. 20. 33. 20. 459.
P79 8. 0. 0. 17. 0. 0. 0. 0. 0. 94. 176. 79. 704.
P60 34. 5. 1. 36. 12. 0. 0. 0. 5. 159. 297. 120. 834.
PMX 268. 91. 143. 216. 141. 70. 68. 89. 63. 338. 586. 840. 1568.
TMC 26.0 26.6 27.3 29.5 30.1 29.5 29.0 28.9 28.8 28.1 27.0 26.0 28.1

HM 81. 77. 75. 77. 77. 78. 79. 79. 80. 81. 83. 83. 79.
SC 52. 57. 59. 57. 57. 56. 55. 55. 53. 52. 49. 49. 54.
PD 13. 1. 0. 21. 3. 0. U. 0. 1. 108. 201. 88. 731.
ETP 134. 138. 171. 172. 178. 166. 169. 171. 162. 155. 132. 127. 1873.
ETDF 120. 137. 170. 151. 176. 166. 169. 171. 161. 47. -70. 40. 1437.
MAI .10 .01 .00 .12 .01 .00 .00 .00 .01 .7U 1.53 .69 .39


POONA INDIA EL: 559 LAT= 18 32 N LONG: 73 51 E KS: 9.7

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 2. 0. 3. 18. 35. 103. 187. 106. 127. 92. 37. 5. 715.
PMI 0. 0. 0. 0. 0. 1. 37. 25. 17. 4. 0. 0. 455.
P79 0. 0. 0. 0. 0. 50. 101. 66. 45. 24. 0. 0. 563.
P60 0. 0. 0. 3. 11. 88. 160. 85. 98. 64. 4. 0. 655.
PMX 35. 5. 38. E6. 182. 187. 397. 277. 310. 257. 209. 71. 1183.
TMC 21.3 23.1 26.5 29.3 29.9 27.5 24.9 24.6 25.0 25.5 22.9 21.1 25.1

HM 55. 44. 37. 39. 49. 68. 81. 81. 77. 67. 58. 56. 53.
S 86. 89. 83. 79. 77. 48. 22. 28. 45. 68. 79. 84. 66.
PD 0. 0. 0. 1. 2. 58. 113. 70. 56. 32. 1. D. 582.
ETP 132. 141. 186. 202. 215. 157. 102. 113. 133. 152. 132. 125. 1789.
ETDF 132. 141. 186. 201. 213. 99. -11. 43. 76. 120. 131. 125. 1455.
MAI .00 .00 .00 .00 .01 .37 1.11 .62 .42 .21 .01 .00 .33


SAGAR INDIA EL= 551 LAT: 23 51 N LONG: 78 45 E KS=10.2

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 30. 13. 10. 4. 8. 145. 463. 418. 228. 44. 24. 7. 1394.
PMI 0. 0. 0. o. 0. 1. 175. 195. 48. 0. 0. 0. 763.
P79 0. 0. 0. 0. 0. 73. 288. 262. 111. 4. 0. 0. 1155.
P60 12. 1. 1. 1. 1. 111. 364. 341. 145. 12. 0. 0. 1284.
PMX 181. 57. 99. 28. 64. 333. 915. 984. 623. 229. 167. 49. 2192.
TMC 18.1 20.7 25.5 30.3 33.9 31.3 26.3 25.3 25.6 24.9 21.7 19.1 25.2

HM 51. 36. 26. 21. 24. 52. 87. 87. 79. 53. 39. 43. 50.
SC 71. 82. 88. 91. 89. 71. 37. 37. 47. 70. 80. 77. 70.
PD 3. 0. 0. 0. 0. 81. 304. 279. 118. 6. 0. 0. 1182.
ETP 98. 117. 178. 219. 255. 212. 141. 132. 133. 143. 116. 100. 1844.
ETDF 96. 117. 178. 218. 255. 132. -163. -146. 15. 137. 116. 100. 1053.
MAI .03 .00 .00 .00 .00 .38 2.1E 2.11 .89 .04 .00 .00 .64


SILCHAR INDIA EL- 29 LAT: 24 49 N LONG= 92 48 E KS:10.6

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC ANN

PM 15. 46. 131. 3 3. 493. 594. 547. 488. 378. 207. 44. 7. 3263.
PMI 0. 0. 2.. 217. 301. 386. 86. 163. 59. 0. 0. 2138.
P79 0. 9. 37. 178. 347. 493. 414. 306. 234. 109. 1. 0. 2951.
P60 2. 18. 75. 252. 421. 537. 488. 453. 323. 160. 8. 0. 3111.
PMX 88. 120. 369. 679. 966. 1024. 929. 956. 698. 458. 375. 62. 4423.
TMC 18.6 20.3 24.0 26.1 27.0 27.9 28.5 28.5 28.3 26.9 23.4 19.9 24.9

HM 73. 65. 63. 69. 79. 84. 85. 84. 84. 82. 77. 75. 77.
SC 55. 63. 64. 59. 49. 42. 41. 42. 42. 45. 51. 53. 51.
PD 0. 11. 45. 194. 363. 502. 430. 337. 253. 120. 2. 0. 2985.
ETP 85. 100. 146. 160. 163. 153. 157. 153. 134. 118. 95. 83. 1546.
ETOF 85. 89. 101. -34. -200. -349. -273. -184. -119. -1. 92. 83. -709.
MAI .00 .11 .31 1.21 2.23 3.28 2.74 2.20 1.89 1.01 .03 .00 1.93


PAMBAN INDIA