Selective demolition : a report for the maintenance assay of Floyd Hall
ALL VOLUMES CITATION THUMBNAILS PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/AA00001374/00020
Finding Guide: Historic Preservation Documents
 Material Information
Title: Selective demolition : a report for the maintenance assay of Floyd Hall
Physical Description: Archival
Language: English
Creator: Department of Architecure, University of Florida
Publisher: Department of Architecure, University of Florida
Place of Publication: Gainesville, Fla.
Publication Date: 1985
 Record Information
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution.
Resource Identifier:
System ID: AA00001374:00020

Full Text










SELECTIVE DEMOLITION

A Report for the Maintenance Assay of Floyd Hall
ARC 5810 Documentation

Spring 1985

Professors Reeves, Shepard, Tate



Bys Sheila M. Rowley
































if











SELECTIVE DEMOLITION


Selective demolition is a step in the building process which includes

historical research and documentation, building survey, and structural ana-

lysis. Under the heading of building survey are visual examination and manu-

al testing, or selective demolition. Visual examination provides clues to

potential problem areas and gives an idea of the general building condition.

Selective demolition is the follow-up of the visual examination to allow clo-

ser inspection, As part of the architectural field services, selective demo-

lition is usually done under separate contract. It is an extra service per-

formed by the architect with the aid of an engineer where necessary.

In general there are two categories of information which selective demoli-

tion may supply. First, it may be used to verify the location of structure

which is shown on the original drawings but is not exposed. Inspection will

confirm whether the "as-built" condition agrees with the original design, or

whether alterations were made. Second, it may be used to determine the condi-

tion of critical structural members, especially where deterioration is suspect-

ed. A reasonable number of members over a range of areas should be examined in

order that they be representative of the whole structure.

The selective demolition process will involve the removal of finish materi-

als, i.e., wall plaster, flooring tiles, and suspended ceilings. It should be

planned for locations where the investigation of the structure is most indica-

tive of likely conditions and least disruptive. Where possible the new openings

should be made in places that could be easily repaired. Unfinished areas, i.e.,

utility closets, maintenance spaces, basements, attics, and crawl spaces, and

areas which have damaged or deteriorated material should not be overlooked as

sources for information about the building materials.









SELECTIVE DEMOLITION


I. VERIFICATION OF STRUCTURE

A. Foundations
1. corners of building
2. columns and piers
3. exterior walls (footings)
4. chimney

* B. Exterior Walls
1. joist connections
2. arches over windows

C. Floors
1. spacing of joists
2. concrete floors

D. Columns
1. locations in walls (all three floors)
2. continuous structure (from floor-to-floor)

* E. Roof
1. dormer connections
2. exterior wall connections

F. Chimney and Vent Flues
I1 location and dimensions
2. continuous chase in walls


II. ANALYSIS OF CONDITION

A. Masonry
i. structural distress
2. surface deterioration
3. missing material

B. Wood
i1 shrinkage, deflection, and warping
2. insect infestation and rot
3. tests (partially destructive to building fabric)


* Demolition to occur only where the area is not accessible through existing
openings, such as closets on the third floor, crawl spaces, or the attic.


Reference materials

Laurence E. Reiner, How to Recycle Buildings (New Yorks McGraw-Hill, Inc.,
1979), PP. 51-7.

"Rehabilitation Guideline for Structural Assessment," Draft (Washington, DCs
National Institute for Building Standards, 1982), pp. 4-11.








DEMOLITION


The demolition process would take place after the new program and design

had been completed. Demolition could occur in two phases under separate con-

tracts. The first phase would involve the removal of loose debris and unusa-

ble or surplus materials, leaving a structural shell. The second phase would

involve the removal of parts of the structure as required due to poor condi-

tion or by design.


Io REMOVAL OF MATERIALS

A. Electrical System
1. wiring
2. outlets
* 3. fixtures

B. Mechanical System
1. pipes and ducts
2. machinery
* 3. fixtures

C. Partition Walls

D. Finish Materials (where original material is obscured or deteriorated)
1. floors
2. ceilings
3o walls

* E. Furnishings
1. finished woodwork/cabinets
2. doors and windows
3. hardware


II. REMOVAL OF STRUCTURE

A. Deteriorated Members and Fabric

B. Extraneous Structure
1. unsympathetic alterations
2. temporary or patch construction


* Salvage where possible. Items to be cleaned, repaired, refinished, and re-
used in accordance with new design.


Reference materials
Levitt Bernstein Associates, Supervisor's Guide to Rehabilitation and Con-
version (London. The Architectural Press, Ltd., 1978), pp. 13-16.




University of Florida Home Page
© 2004 - 2011 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated May 24, 2011 - - mvs


TRACE ROUTE

Total Execution Time: 28 Milliseconds

MILLISECOND   CLASS.METHODMESSAGE
0sobekcm_page_globals.constructor
0sobekcm_page_globals.constructorApplication State validated or built
0sobekcm_database.verify_item_lookup_object
0sobekcm_page_globals.constructorNavigation Object created from URI query string
0sobekcm_database.verify_item_lookup_object
0sobekcm_page_globals.display_itemRetrieving item or group information
0sobekcm_page_globals.get_entire_collection_hierarchyRetrieving hierarchy information
0sobekcm_assistant.get_entire_collection_hierarchy
0cached_data_manager.retrieve_item_aggregation
0cached_data_manager.retrieve_item_aggregationFound item aggregation on local cache
0item_aggregation_builder.get_item_aggregationFound 'all' item aggregation in cache
0system.web.ui.page.page_load (ufdc.page_load)
0sobekcm_page_globals.constructor.on_page_load
0html_echo_mainwriter.add_style_referencesAdding style references to HTML
0html_echo_mainwriter.add_text_to_pageReading the text from the file and echoing back to the output stream
28html_echo_mainwriter.add_text_to_pageFinished reading and writing the file